Shock insulation pile foundation structure and construction method thereof
By designing a multi-layered seismic isolation pile foundation, including a constraint layer, an isolation layer and an isolation layer, combined with a composite concrete core and steel bar pin connection, the problem of insufficient deformation of the existing seismic isolation pile foundation under strong vibration is solved. Better seismic performance and dynamic response are achieved.
Patent Information
- Application Number
- CN202411129504.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-11
AI Technical Summary
Under the action of large seismic waves or strong vibrations, the existing isolation pile foundation has limited deformation movement, making it difficult to isolate/isolate, which may lead to structural failure and affect the overall seismic performance of the building.
A seismic isolation pile foundation structure is designed, including a seismic isolation cap and a seismic isolation pile foundation arranged below the seismic isolation cap. The pile foundation is composed of multi-segment pile foundation units. Each pile foundation unit includes a constraint layer, an isolation layer, The isolation layer and composite concrete core are connected through steel pin assemblies and are made of materials such as synthetic oil-based composites and high-density polyethylene materials to form a sealed cavity to absorb and disperse vibration energy.
It significantly improves the structural stability and isolation performance of the isolation pile foundation, can effectively absorb and disperse formation vibration energy, weaken vibration transmission, and improve the safety and stability of the superstructure.
Smart Images

Figure CN118756743A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering, and in particular to a seismic isolation pile foundation structure and a construction method thereof. Background Art
[0002] In recent years, with the continuous expansion of urban scale, urban rail transit has achieved unprecedented development as an efficient and convenient public transportation mode. However, this development has also brought a series of challenges, especially in the context of increasingly intensive urban land resources. The network density of rail transit has continued to increase, and the distance between the line and adjacent buildings has gradually decreased, which has aggravated the environmental vibration and noise problems generated by rail infrastructure, especially subway tunnels in operation. On the one hand, the operation of trains in subway tunnels will generate vibrations in the strata, which will propagate to surrounding buildings and have a significant impact on the response, durability and safety of the building structure. On the other hand, the micro-vibrations generated by the stratum vibration energy caused by the train can easily affect the performance of precision instruments and precision processing equipment, and have an adverse effect on the use of sensitive equipment. At the same time, in order to minimize the impact of earthquakes on buildings, some seismic isolation structures are usually set in the building foundation to block or weaken the transmission of vibrations to the main part of the building.
[0003] Traditional seismic isolation pile foundations mainly play a bearing role, and their vibration isolation effect is poor. They can only absorb and reduce the transmission of vibration (vibration) to a certain extent. Under the action of large earthquake waves or strong vibrations, the amplitude of their deformation movement is limited, making it difficult to isolate / isolate vibrations, which may cause structural failure and thus affect the overall seismic performance of the building. Summary of the invention
[0004] The present invention provides a seismic isolation pile foundation structure and a construction method thereof, which are used to solve the technical problem that under the action of large earthquake waves or strong vibrations, the existing seismic isolation pile foundation has a limited deformation movement amplitude, is difficult to isolate / vibrate, may cause structural failure, and further affect the overall seismic performance of the building.
[0005] A first aspect of the present invention provides a seismic isolation pile foundation structure, comprising: a seismic isolation cap and a seismic isolation pile foundation arranged below the seismic isolation cap;
[0006] The seismic isolation pile foundation is composed of multiple pile foundation units; each pile foundation unit includes a constraint layer, a seismic isolation layer, an isolation layer and a composite concrete core;
[0007] The constraint layer is sleeved on the outer periphery of the composite concrete core, and the isolation layer is filled between the constraint layer and the composite concrete core;
[0008] The isolation layer is laid between the inner wall of the seismic isolation layer and the outer wall of the composite concrete core;
[0009] Seismic isolation bearings are arranged between the pile foundation units, and the seismic isolation bearings are connected to the composite concrete core through a steel bar pin assembly.
[0010] Specifically, the seismic isolation cap is formed by stacking multiple layers of concrete layers and multiple layers of seismic isolation materials, and the concrete layers and the seismic isolation material layers are bonded to each other.
[0011] Specifically, it also includes: an external connecting steel sleeve for protecting the seismic isolation support;
[0012] The seismic isolation support is composed of an upper connecting plate and a lower connecting plate;
[0013] A rubber block layer is provided between the upper connecting plate and the lower connecting plate;
[0014] A rubber gasket is arranged around the top of the upper connecting plate;
[0015] The outer connecting steel sleeve is sleeved around the upper connecting plate and the rubber block layer through the rubber gasket, and is fitted on the top of the lower connecting plate, so that the outer connecting steel sleeve, the rubber gasket, the upper connecting plate, the rubber block layer and the lower connecting plate form a sealed cavity.
[0016] Specifically, the steel bar pin assembly includes a plurality of upper steel bar pins and lower steel bar pins;
[0017] The upper connecting plate and the rubber block layer are provided with first reserved holes; the upper steel bar pins are provided corresponding to the first reserved holes;
[0018] The outer connecting steel sleeve and the lower connecting plate are provided with second reserved holes; the lower steel bar pins are arranged corresponding to the second reserved holes.
[0019] Specifically, the upper steel bar pin is partially embedded in the composite concrete core located above the seismic isolation support, and the other part of the upper steel bar pin is arranged in the first reserved hole of the upper connecting plate and the rubber block layer;
[0020] The lower reinforcement pin part passes through the second reserved hole of the outer connection steel sleeve and the lower connection plate, and the other part of the lower reinforcement pin is embedded in the composite concrete core below the seismic isolation bearing.
[0021] Specifically, a first gap and a second gap are left between the outer connecting steel sleeve and the upper connecting plate and the composite concrete core located above the outer connecting steel sleeve, so as to limit the deformation range of the seismic isolation bearing in the horizontal direction and the vertical direction respectively.
[0022] Specifically, an isolation layer is laid on the outer wall of the composite concrete core close to the seismic isolation support.
[0023] Specifically, the constraining layer is made of glass fiber reinforced plastic with built-in fiber reinforced composite material;
[0024] The isolation layer is made of high-density polyethylene.
[0025] Specifically, the seismic isolation layer and the seismic isolation material layer are made of synthetic oil-based composite materials.
[0026] A second aspect of the present invention provides a construction method for a seismic isolation pile foundation structure, comprising:
[0027] According to the construction environment data, determine the arrangement and depth of the pile positions, and dig the pile holes until they reach the rock layer;
[0028] Placing the composite concrete core in the pile hole, and sequentially sleeve an isolation layer, a seismic isolation layer, and a constraint layer on the periphery of the composite concrete core to form a pile foundation unit; connecting the outer connecting steel sleeve and the lower connecting plate of the seismic isolation support by means of lower steel bar pins embedded in the composite concrete core;
[0029] Placing the next composite concrete core in the pile hole, and connecting the upper connection plate of the seismic isolation support through the upper steel bar pins embedded in the next composite concrete core; sequentially sleeve the isolation layer, seismic isolation layer and constraint layer on the periphery of the next composite concrete core to form a pile foundation unit; until all pile foundation units are placed, a seismic isolation pile foundation is formed;
[0030] The seismic isolation cap is installed on top of the seismic isolation pile foundation and quick-drying concrete is poured in to set quickly.
[0031] It can be seen from the above technical solutions that the present invention has the following advantages:
[0032] The present invention provides a seismic isolation pile foundation structure and a construction method thereof, wherein the seismic isolation pile foundation structure comprises: a seismic isolation pedestal and a seismic isolation pile foundation arranged below the seismic isolation pedestal; the seismic isolation pile foundation is composed of a plurality of pile foundation units; each pile foundation unit comprises a constraint layer, a seismic isolation layer, an isolation layer and a composite concrete core; the constraint layer is sleeved on the periphery of the composite concrete core, and the seismic isolation layer is filled between the constraint layer and the composite concrete core; an isolation layer is laid between the inner wall of the seismic isolation layer and the outer wall of the composite concrete core; a seismic isolation bearing is arranged between each pile foundation unit, and the seismic isolation bearing is connected to the composite concrete core through a steel bar pin assembly.
[0033] In the present invention, each pile foundation unit is sequentially provided with a composite concrete core, an isolation layer, a seismic isolation layer and a constraint layer from the inside to the outside. The constraint layer can improve the compressive strength of the composite concrete core, and the seismic isolation layer can effectively absorb the vibration / vibration energy of the stratum, and significantly reduce the transmission of vibration energy from the pile foundation structure to the upper building body. The mutual deformation between each pile foundation unit gives the seismic isolation bearing sufficient tensile and shear stiffness, and has an excellent deformation buffering effect. The pile foundation unit and the seismic isolation bearing improve the structural stability and seismic isolation performance of the seismic isolation pile foundation and show better dynamic response, thereby improving the safety and stability of the upper building structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0035] Figure 1 A schematic diagram of the overall structure of a seismic isolation pile foundation structure provided in this application;
[0036] Figure 2 A top view of the pile foundation unit provided for this application;
[0037] Figure 3 A schematic diagram of the structure of the seismic isolation bearing provided for this application;
[0038] Figure 4 A flowchart of the steps of a construction method of a seismic isolation pile foundation structure provided in this application;
[0039] Among them, the figures are marked as: constraint layer 1, seismic isolation layer 2, isolation layer 3, composite concrete core 4, seismic isolation base 5, concrete layer 6, seismic isolation material layer 7, pile foundation unit 8, seismic isolation bearing 9, steel bar pin 10, upper connecting plate 11, high-strength bolt 12, lower connecting plate 13, rubber gasket 14, external connecting steel sleeve 15, rubber gasket 16, first gap 17 and second gap 18. DETAILED DESCRIPTION
[0040] The embodiment of the present invention provides a seismic isolation pile foundation structure and a construction method thereof, which are used to solve the technical problem that the existing seismic isolation pile foundation has a limited amplitude of deformation movement under the action of large seismic waves or strong vibrations, is difficult to isolate / vibrate, may cause structural failure, and further affect the overall seismic performance of the building.
[0041] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0043] Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] See also Figure 1 In a first aspect, the present application provides an embodiment of a seismic isolation pile foundation structure, comprising: a seismic isolation cap 5 and a seismic isolation pile foundation arranged below the seismic isolation cap 5;
[0045] The seismic isolation pile foundation is composed of a plurality of pile foundation units 8; each pile foundation unit 8 includes a constraint layer 1, a seismic isolation layer 2, an isolation layer 3 and a composite concrete core 4; the constraint layer 1 is sleeved on the periphery of the composite concrete core 4, and the seismic isolation layer 2 is filled between the constraint layer 1 and the composite concrete core 4; the isolation layer 3 is laid between the inner wall of the seismic isolation layer 2 and the outer wall of the composite concrete core 4;
[0046] Seismic isolation supports 9 are provided between the pile foundation units 8 , and the seismic isolation supports 9 are connected to the composite concrete core 4 via a steel bar pin assembly.
[0047] It should be noted that the purpose of setting up the seismic isolation pedestal 5 and the seismic isolation pile foundation is to reduce the vibration (vibration) caused by earthquakes or rail infrastructure, and to improve the stability and seismic isolation performance of the seismic isolation pile foundation structure and show better dynamic response under the action of larger seismic waves or strong vibrations, thereby achieving effective seismic isolation and improving the safety and stability of the upper building structure.
[0048] The seismic isolation pile foundation is composed of multiple pile foundation units 8, and seismic isolation bearings 9 are installed between each pile foundation unit 8. The mutual deformation between each pile foundation unit 8 gives the seismic isolation bearing 9 sufficient tensile and shear stiffness as well as anti-corrosion and anti-rust capabilities. The seismic isolation bearing 9 has an excellent deformation buffering effect, effectively absorbing or dispersing vibrations transmitted from the pile foundation to the upper building body.
[0049] Specifically, the constraint layer 1 constrains the composite concrete core 4. When the load on the upper building body is transferred to the seismic isolation layer 2, the composite concrete core 4 is in a three-way compression state, thereby improving the compressive strength of the composite concrete core 4. In addition, the three-way compression specifically includes the bearing capacity and the reaction force of the seismic isolation pedestal 5 in the vertical direction, and the circumferential constraint force in the horizontal direction. The seismic isolation layer 2 can effectively absorb the vibration / vibration energy of the stratum, significantly reducing the transmission of vibration energy from the pile foundation structure to the upper building body. The isolation layer 3 is to prevent the outer wall of the composite concrete core 4 from bonding with the interior of the seismic isolation layer 2.
[0050] It can be understood that the composite concrete core 4, the seismic isolation bearings 9, the seismic isolation caps 5 and the constraining layer 1 are all prefabricated in the factory, assembled and then painted.
[0051] In a specific embodiment, in order to improve the seismic bearing capacity of the upper building, the seismic isolation base 5 is composed of multiple layers of concrete layers 6 and multiple layers of seismic isolation material layers 7, and the concrete layers 6 and the seismic isolation material layers 7 are bonded to each other.
[0052] It can be understood that the concrete layer 6 provides strength and rigidity for the seismic isolation pedestal 5 structure, and the seismic isolation material layer 7 can absorb and dissipate part of the vibration energy. By stacking multiple layers of concrete layers 6 and multiple layers of seismic isolation material layers 7 to form a seismic isolation pedestal 5, the vibration characteristics of the structure are effectively improved, the stability of the seismic isolation pedestal 5 is improved, and the seismic isolation effect of the seismic isolation pile foundation structure is thereby improved.
[0053] In a specific embodiment, it also includes: an external connecting steel sleeve 15 for protecting the seismic isolation support 9;
[0054] The seismic isolation support 9 is composed of an upper connecting plate 11 and a lower connecting plate 13; a rubber block layer is provided between the upper connecting plate 11 and the lower connecting plate 13; a rubber gasket 1614 is provided around the top of the upper connecting plate 11;
[0055] The outer connecting steel sleeve 15 is sleeved around the upper connecting plate 11 and the rubber block layer through the rubber gasket 1614, and is fitted on the top of the lower connecting plate 13, so that the outer connecting steel sleeve 15, the rubber gasket 1614, the upper connecting plate 11, the rubber block layer and the lower connecting plate 13 form a sealed cavity.
[0056] When an earthquake occurs or strong vibrations are caused in the rail infrastructure, the vibration energy is transmitted along the soil to the seismic isolation pile foundation, causing the seismic isolation pile foundation to move in different directions. When transmitted to the seismic isolation pile foundation, the seismic isolation bearing 9 deforms through the rubber block layer, absorbing most of the vibration mechanical energy, thereby reducing the impact of the vibration intensity on the seismic isolation pile foundation, further improving the shock-absorbing effect of the seismic isolation pile foundation.
[0057] At the same time, considering that the composite concrete core 4 is prone to axial tensile deformation during construction and under earthquake action, thereby causing greater damage to the seismic isolation bearing 9, the external connecting steel sleeve 15 can prevent the seismic isolation bearing 9 from further vertical deformation.
[0058] In addition, the formed sealed cavity can prevent liquid from flowing into the interior of the seismic isolation support 9, thereby protecting and preventing corrosion of the interior of the seismic isolation support 9. During the design, the thickness of the external connection steel sleeve 15 is close to the thickness of the upper / lower connection plate 13, and the upper / lower connection plate 13 and the external connection steel sleeve 15 can be rounded to reduce the risk of construction workers being injured during construction, and to reduce stress concentration on the upper / lower connection plate 13 and the external connection steel sleeve 15.
[0059] In a specific embodiment, the steel bar pin assembly includes a plurality of upper steel bar pins 10 and lower steel bar pins 10; the upper connecting plate 11 and the rubber block layer are provided with a first reserved hole; the upper steel bar pins 10 are provided corresponding to the first reserved hole; the outer connecting steel sleeve 15 and the lower connecting plate 13 are provided with a second reserved hole; the lower steel bar pins 10 are provided corresponding to the second reserved hole.
[0060] In a specific embodiment, a portion of the upper steel bar pin 10 is embedded in the composite concrete core 4 located above the seismic isolation bearing 9, and another portion of the upper steel bar pin 10 is arranged in the first reserved hole of the upper connecting plate 11 and the rubber block layer; a portion of the lower steel bar pin 10 passes through the second reserved hole of the external connecting steel sleeve 15 and the lower connecting plate 13, and another portion of the lower steel bar pin 10 is embedded in the composite concrete core 4 located below the seismic isolation bearing 9.
[0061] It can be understood that the upper / lower steel bar pins 10 can facilitate the structural installation of the construction and installation, and at the same time realize the stable connection between the composite concrete core 4 of each pile foundation unit 8 and the seismic isolation support 9, thereby improving the connection strength and overall stability of the seismic isolation support 9. In addition, during installation, the outer connecting steel sleeve 15 and the lower connecting plate 13 can be fixedly connected by the high-strength bolts 12 in conjunction with the lower steel bar pins 10.
[0062] See also Figure 1 and Figure 3 In a specific embodiment, a first gap 17 and a second gap 18 are left between the outer connecting steel sleeve 15 and the upper connecting plate 11 and the composite concrete core 4 located above it, which are used to limit the deformation range of the seismic isolation bearing 9 in the horizontal direction and the vertical direction respectively.
[0063] In the present invention, the first gap 17 is specifically the maximum displacement of the seismic isolation bearing 9 in the horizontal direction. Specifically, when the vibration energy is transmitted to the seismic isolation pile foundation, the seismic isolation bearing 9 achieves the shock absorption effect through the horizontal deformation of the rubber. When its horizontal deformation exceeds the maximum displacement, the external connection steel sleeve 15 contacts the seismic isolation bearing 9, and the external connection steel sleeve 15 will prevent the seismic isolation bearing 9 from further deformation in the horizontal direction. The external connection steel sleeve 15 protects the seismic isolation bearing 9 from damage; at this time, the composite concrete core 4 is in full contact with the external connection steel sleeve 15, further dissipating the vibration energy, and preventing the seismic isolation bearing 9 from being damaged due to excessive shear deformation.
[0064] Please note that Figure 3 The rubber gasket 16 is disposed in a second gap 18 between the outer connecting steel sleeve 15 and the upper connecting plate 11 , and the outer connecting steel sleeve 15 and the upper connecting plate 11 are connected via the rubber gasket 16 .
[0065] In the present invention, the second gap 18 is specifically the maximum displacement of the seismic isolation bearing 9 when it is stretched in the vertical direction. Specifically, when the vibration energy is transmitted to the seismic isolation pile foundation, the seismic isolation bearing 9 achieves the shock absorption effect through the vertical deformation of the rubber. At the same time, when the vertical deformation exceeds the maximum displacement, the rubber gasket deforms to further absorb and dissipate part of the vibration energy. The external connecting steel sleeve 15 will prevent the seismic isolation bearing 9 from further deforming vertically, and the external connecting steel sleeve 15 protects the seismic isolation bearing 9 from damage; at this time, the composite concrete core 4 is in full contact with the external connecting steel sleeve 15, further dissipating the vibration energy, and preventing the seismic isolation bearing 9 from being damaged due to excessive axial tensile deformation.
[0066] Therefore, compared with the traditional seismic isolation bearing 9, the seismic isolation bearing 9 provided by the present invention has stronger tensile stiffness, shear stiffness and tensile and shear bearing capacity, which can avoid the formation of a negative pressure state inside the rubber when the rubber of the seismic isolation bearing 9 is subjected to tension or the internal rubber fibers being torn to form a negative pressure state when the laminated rubber is subjected to shear, thereby avoiding damage to the seismic isolation bearing 9.
[0067] In a specific embodiment, in order to prevent the outer wall of the composite concrete core 4 from being bonded to the seismic isolation support 9 , an isolation layer 3 is laid on the outer wall of the composite concrete core 4 close to the seismic isolation support 9 .
[0068] In a specific embodiment, the constraining layer 1 is made of glass fiber reinforced plastic (FRP) with built-in fiber reinforced plastic; the isolation layer 3 is made of high-density polyethylene (HDPE).
[0069] It should be noted that the constraining layer 11 is built with reinforcing fibers during manufacturing, which not only maintains its inherent high compressive strength, but also significantly improves the overall tensile and impact resistance, thereby ensuring that the integrity of the structure can be maintained when an earthquake occurs. At the same time, the FRP itself has a strong compressive strength, and its FRP wall has a constraining effect on the composite concrete core 4, and the constrained composite concrete core 4 also improves the stability of the FRP wall, thereby greatly improving the overall compressive strength and self-bearing capacity of the pile foundation unit 8.
[0070] In a specific embodiment, the seismic isolation layer 2 and the seismic isolation material layer 7 are made of synthetic oil-based composite materials.
[0071] It should be noted that synthetic oil-based composite materials have high viscosity and good energy absorption performance, and can effectively absorb and disperse the vibration energy transmitted through the seismic isolation pile foundation.
[0072] In practical applications, when the vibration energy or seismic wave energy generated by a train running in a subway tunnel is transmitted along the soil to the seismic isolation pile foundation structure, especially when passing through the seismic isolation layer 2 inside it, the synthetic oil-based composite material absorbs energy and deforms, and then the absorbed energy can be dissipated in the form of kinetic energy, thereby achieving the effect of vibration isolation and shock reduction.
[0073] The present invention provides a seismic isolation pile foundation structure, which has the following beneficial effects:
[0074] 1. The seismic isolation layer can effectively block or weaken the vibration and vibration energy transmitted through the seismic isolation pile foundation.
[0075] 2. Through the seismic isolation material layer of the seismic isolation bearing and the seismic isolation cap, strong vibrations or seismic waves are effectively absorbed and dispersed from the seismic isolation pile foundation structure to the upper building structure.
[0076] 3. By setting a constraint layer on the periphery of the seismic isolation pile foundation, the overall compressive strength and bearing capacity of the seismic isolation pile foundation are significantly improved, thereby ensuring that the integrity of the structure can be maintained when an earthquake occurs or strong vibration occurs in the rail infrastructure.
[0077] 4. A first gap is left between the outer connection steel sleeve and the upper connection plate and the composite concrete core located above it. This gap is the maximum displacement of the seismic isolation bearing in the horizontal direction. When the vibration energy is transmitted to the seismic isolation pile foundation, the seismic isolation bearing achieves the shock absorption effect through the horizontal deformation of the rubber. When the horizontal deformation exceeds the maximum displacement, the composite concrete core is in full contact with the outer connection steel sleeve, and the outer connection steel sleeve will prevent the seismic isolation bearing from further deforming in the horizontal direction, thereby preventing the seismic isolation bearing from being damaged due to excessive shear deformation.
[0078] 5. A second gap is left between the outer connecting steel sleeve, the upper connecting plate and the composite concrete core located above it. This gap is the maximum displacement of the seismic isolation bearing when it is stretched in the vertical direction. When the vibration energy is transmitted to the seismic isolation pile foundation, the seismic isolation bearing achieves the shock absorption effect through the vertical deformation of the rubber. At the same time, when the vertical deformation exceeds the maximum displacement, the composite concrete core is in full contact with the outer connecting steel sleeve, and the outer connecting steel sleeve will prevent the seismic isolation bearing from further deforming vertically, thereby preventing the seismic isolation bearing from being damaged due to excessive axial tensile deformation.
[0079] 6. Since the vehicle may swing and bump to a certain extent during transportation and the isolation bearing may shake and swing during construction, which may cause great damage to the isolation bearing, the external connecting steel sleeve can prevent the isolation bearing from further deformation and prevent the isolation bearing from being damaged during transportation or construction.
[0080] 7. The external connecting steel sleeve, rubber gasket, upper connecting plate, rubber block layer and lower connecting plate form a sealed cavity, which can prevent liquid from flowing into the interior of the seismic isolation bearing, thereby protecting and preventing corrosion of the interior of the seismic isolation bearing.
[0081] See also Figure 4 The second aspect of the present application provides a construction method for a seismic isolation pile foundation structure, the method comprising:
[0082] Step 401, according to the construction environment data, the arrangement and depth of the pile positions are determined, and the pile holes are excavated until the rock layer is reached.
[0083] It should be noted that before construction, it is necessary to carry out geological exploration at the construction site, make detailed construction plans according to geological conditions and construction requirements, determine the layout and depth of the pile positions, and ensure that the seismic isolation pile foundation structure has sufficient bearing capacity and stability; after the pile hole is successfully excavated, set up lifting equipment in the pile hole to erect the seismic isolation pile foundation structure.
[0084] Step 402, placing the composite concrete core in the pile hole, sequentially sleeve an isolation layer, a seismic isolation layer and a constraint layer on the periphery of the composite concrete core to form a pile foundation unit; connecting the outer connecting steel sleeve and the lower connecting plate of the seismic isolation bearing by means of lower steel bar pins embedded in the composite concrete core.
[0085] It should be noted that, in order to facilitate installation and transportation, the composite concrete core, isolation layer, constraint layer and seismic isolation cap can be prefabricated in the factory and transported to the construction site. Specifically, the isolation layer is sleeved on the outside of the composite concrete core, and the prefabricated constraint layer is sleeved at an appropriate position on the periphery thereof, and then a synthetic oil-based composite material (i.e., seismic isolation layer) with high viscosity and good energy absorption performance is poured in to construct a pile foundation unit that can effectively absorb and disperse vibration energy.
[0086] The outer connecting steel sleeve and the lower connecting plate of the seismic isolation bearing are connected by lower steel bar pins to enhance the connection strength between the seismic isolation bearing and the pile foundation unit.
[0087] Step 403, placing the next composite concrete core in the pile hole, and connecting the upper connecting plate of the seismic isolation bearing by embedding the upper steel bar pins of the next composite concrete core, and sequentially sleeve the isolation layer, seismic isolation layer and constraint layer on the periphery of the next composite concrete core to form a pile foundation unit; until all the pile foundation units are placed, a seismic isolation pile foundation is formed.
[0088] In the present invention, the composite concrete cores are placed one by one, and the upper / lower connecting plates of the seismic isolation bearings are connected by steel pins. The segmented construction method is convenient for construction management and quality control, and can also speed up the construction progress and shorten the construction period.
[0089] Step 404, installing the seismic isolation cap on top of the seismic isolation pile foundation and pouring quick-drying concrete into it for rapid solidification.
[0090] In this step, the seismic isolation pedestal is installed above the seismic isolation pile foundation, providing a stable supporting platform for the upper building structure. At the same time, the use of quick-drying concrete can quickly accelerate the stable connection and fixation of the seismic isolation pedestal, so that the seismic isolation pedestal and the seismic isolation pile foundation constitute a stable seismic isolation pile foundation structure, which exhibits better dynamic response under the action of larger seismic waves or strong vibrations. Each pile foundation unit can effectively absorb the vibration / vibration energy of the stratum and improve the seismic isolation effect of the pile foundation structure. At the same time, the mutual deformation between the pile foundation units gives the seismic isolation bearing sufficient tensile and shear stiffness capabilities. The seismic isolation pedestal can further absorb and dissipate part of the vibration energy, significantly reducing the transmission of vibration energy from the pile foundation structure to the upper building body, thereby improving the overall seismic resistance of the upper building structure.
[0091] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A seismic isolation pile foundation structure, characterized in that: include: A seismic isolation cap and a seismic isolation pile foundation arranged below the seismic isolation cap; The seismic isolation pile foundation is composed of multiple pile foundation units; each pile foundation unit includes a constraint layer, a seismic isolation layer, an isolation layer and a composite concrete core; The constraint layer is sleeved on the outer periphery of the composite concrete core, and the isolation layer is filled between the constraint layer and the composite concrete core; The isolation layer is laid between the inner wall of the seismic isolation layer and the outer wall of the composite concrete core; Seismic isolation bearings are arranged between the pile foundation units, and the seismic isolation bearings are connected to the composite concrete core through a steel bar pin assembly.
2. The seismic isolation pile foundation structure according to claim 1, characterized in that: The seismic isolation bearing platform is formed by stacking multiple layers of concrete layers and multiple layers of seismic isolation materials, and the concrete layers and the seismic isolation material layers are bonded to each other.
3. The seismic isolation pile foundation structure according to claim 1, characterized in that: Also includes: An external connecting steel sleeve for protecting the seismic isolation support; The seismic isolation support is composed of an upper connecting plate and a lower connecting plate; A rubber block layer is provided between the upper connecting plate and the lower connecting plate; A rubber gasket is arranged around the top of the upper connecting plate; The outer connecting steel sleeve is sleeved around the upper connecting plate and the rubber block layer through the rubber gasket, and is fitted on the top of the lower connecting plate, so that the outer connecting steel sleeve, the rubber gasket, the upper connecting plate, the rubber block layer and the lower connecting plate form a sealed cavity.
4. The seismic isolation pile foundation structure according to claim 3, characterized in that: The steel bar pin assembly includes a plurality of upper steel bar pins and a lower steel bar pin; The upper connecting plate and the rubber block layer are provided with first reserved holes; the upper steel bar pins are provided corresponding to the first reserved holes; The outer connecting steel sleeve and the lower connecting plate are provided with second reserved holes; the lower steel bar pins are arranged corresponding to the second reserved holes.
5. The seismic isolation pile foundation structure according to claim 4, characterized in that: The upper steel bar pin is partially embedded in the composite concrete core located above the seismic isolation support, and the other part of the upper steel bar pin is arranged in the first reserved hole of the upper connecting plate and the rubber block layer; The lower reinforcement pin part passes through the second reserved hole of the outer connection steel sleeve and the lower connection plate, and the other part of the lower reinforcement pin is embedded in the composite concrete core below the seismic isolation bearing.
6. The seismic isolation pile foundation structure according to claim 3, characterized in that: A first gap and a second gap are left between the outer connecting steel sleeve and the upper connecting plate and the composite concrete core located above the outer connecting steel sleeve, so as to limit the deformation range of the seismic isolation bearing in the horizontal direction and the vertical direction respectively.
7. The seismic isolation pile foundation structure according to claim 1, characterized in that: An isolation layer is laid on the outer wall of the composite concrete core body close to the seismic isolation support.
8. The seismic isolation pile foundation structure according to claim 1, characterized in that: The constraining layer is made of glass fiber reinforced plastic with built-in fiber reinforced composite material; The isolation layer is made of high-density polyethylene.
9. The seismic isolation pile foundation structure according to claim 2, characterized in that: The seismic isolation layer and the seismic isolation material layer are made of synthetic oil-based composite materials.
10. A construction method for a seismic isolation pile foundation structure, characterized in that: include: According to the construction environment data, determine the arrangement and depth of the pile positions, and dig the pile holes until they reach the rock layer; Placing the composite concrete core in the pile hole, and sequentially sleeve an isolation layer, a seismic isolation layer, and a constraint layer on the periphery of the composite concrete core to form a pile foundation unit; connecting the outer connecting steel sleeve and the lower connecting plate of the seismic isolation support by means of lower steel bar pins embedded in the composite concrete core; Placing the next composite concrete core in the pile hole, and connecting the upper connection plate of the seismic isolation support through the upper steel bar pins embedded in the next composite concrete core; sequentially sleeve the isolation layer, seismic isolation layer and constraint layer on the periphery of the next composite concrete core to form a pile foundation unit; until all pile foundation units are placed, a seismic isolation pile foundation is formed; The seismic isolation cap is installed on top of the seismic isolation pile foundation and quick-drying concrete is poured in to set quickly.
Citation Information
Patent Citations
Multi-dimensional damping control device for pile foundation
CN105735367A
Combined limiting device for rubber shock insulation support
CN116005814A
Building vibration-isolation braking support
CN201635179U
Isolation bearing structure of building
CN205259390U
Novel shock insulation pile foundation
CN210151767U