A kind of plastering equipment and using method of building construction

By introducing adjustment components, auxiliary plastering components and protective components into the construction plastering equipment, the problems of mortar overflow, poor efficiency of corner plastering and equipment damage are solved, and efficient plastering and convenient equipment management are achieved.

CN118756923BActive Publication Date: 2024-11-22HENAN HONGJIAN CONSTR DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411245043.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-22
Estimated Expiration
2044-09-06

AI Technical Summary

Technical Problem

The existing construction plastering equipment in the plastering process is poor in the plastering process, the efficiency and effect of corner plastering are poor, manual observation increases labor intensity, infrared sensor distance measurement error leads to equipment damage, screw lifting mechanism limits the plastering range and equipment storage and transportation .

Method used

A construction plastering equipment including adjustment components, auxiliary plastering components and protective components was designed. The lifting height of the equipment is automatically controlled through sliding seats, lifting frames and spring structures, and the angle and position of the plastering plate are adjusted using electric push rods and motors. , the auxiliary plastering board smooths overflow mortar, the spring provides cushioning protection, and the lifting assembly is convenient for equipment storage and storage.

Benefits of technology

It improves the quality and efficiency of plastering, reduces the labor intensity of construction workers, avoids damage from contact with the building, and facilitates the storage, storage and transportation of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756923B_ABST
    Figure CN118756923B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction plastering equipment and a method of using it, and relates to the technical field of construction engineering equipment. The present invention includes a movable base and a sliding seat slidably connected to the inside thereof, an adjustment component is provided at the front end of the outer wall of the rotating ring, and auxiliary plastering components are provided at the upper and lower edges of the outer sides of the rear end faces of the first plastering plate and the second plastering plate. The present invention can smooth the overflowed mortar through the adjustment component and the auxiliary plastering component, and adjust the angles of the first plastering plate and the second plastering plate according to the angle between the adjacent wall surfaces. At the same time, the protective component can be used to buffer and protect the equipment, components, etc., and reduce the labor intensity of the construction personnel, without having to concentrate for a long time to pay attention to whether the equipment lifting touches the top, and the lifting component and the lifting seat can be adjusted according to the height of the building wall through the lifting component and the hoisting component, and it is convenient for subsequent construction personnel to store, store and transport the plastering equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction engineering equipment, and in particular relates to a construction plastering equipment and a use method thereof. Background Art

[0002] A construction project refers to an engineering entity formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. Among them, "buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities. After the construction of the building frame is completed, the building walls will generally be preliminarily plastered and painted to protect the base and increase the beauty.

[0003] In the construction process of existing buildings, it is generally necessary to use construction plastering equipment to plaster the wall surface. For example, the existing authorization document CN112482698B-A wall plastering construction equipment discloses a construction equipment for wall plastering. Although the existing plastering equipment can realize the plastering of the building wall surface, the mortar will overflow from the surrounding of the flat plate under pressure during the plastering process, and the efficiency and effect of the plastering operation at the corners are poor; of course, the existing public documents involve the use of manual observation or infrared sensors to control the lifting height of the plastering equipment, wherein manual observation requires concentration and increases the labor intensity, and when using infrared sensors, due to the rough surface of the top of the building, there is a ranging error, which may cause the equipment, components, etc. to be in hard contact with the building and cause damage; finally, in the existing public documents, the lifting and lowering of the plastering equipment is realized by a screw lifting mechanism, and the length of the screw in this way will limit the plastering range, and it is not convenient for subsequent storage, storage and equipment transportation, etc.; therefore, it is necessary to improve the existing technology to solve the above technical problems. Summary of the invention

[0004] The purpose of the present invention is to provide a plastering device for building construction and a method for using the same. By utilizing an adjusting component and an auxiliary plastering component, overflowed mortar can be smoothed to improve the quality and efficiency of plastering, and the angles of a first plastering plate and a second plastering plate can be adjusted according to the angle between adjacent wall surfaces. The device has a wide range of practical applications. At the same time, the protective component can play a buffering and protective role for equipment, components, etc. under the elastic properties of a first spring and a second spring, and automatically control the lifting height of a lifting frame and a lifting seat to prevent the lifting frame and the lifting seat from continuously rising and contacting with the top of a building, causing pressure damage to the equipment, components, etc. At the same time, the labor intensity of construction personnel can be reduced, and there is no need to concentrate for a long time on whether the equipment lifting touches the top. The lifting component and the hoisting component can adjust the height of the lifting frame and the lifting seat according to the height of the building wall. The device has a wide range of applications and is convenient for subsequent construction personnel to store, store and transport the plastering equipment.

[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:

[0006] The present invention provides a plastering device for building construction, comprising a movable base and a sliding seat slidably connected therein, a storage rack being fixedly connected to one side of the upper surface of the sliding seat, a lifting frame being slidably connected to the upper inner part of the storage rack, a lifting seat being sleeved on the outer side of the outer wall of the storage rack and the lifting frame, the outer side of the outer wall of the lifting seat being rotatably connected to the inner wall of a rotating ring through a bearing, an adjusting component being arranged at the front end of the outer wall of the rotating ring, the adjusting component comprising a connecting seat and a first electric push rod symmetrically arranged at the edges of both sides of the rear end face thereof, the telescopic end of the first electric push rod passing through the rear end face of the connecting seat and being connected to the rear end face of the extension frame, a second motor being installed on the inner rear end face of the extension frame, the output shaft of the second motor being connected to the first screw through a coupling, the other end of the first screw passing through the bearing on the inner wall of the extension frame and the rear end face of the first movable seat in sequence The threaded hole at the top is rotatably connected to the bearing on the rear end face of the baffle, and the first plastering plate and the second plastering plate are respectively arranged on both sides directly in front of the first movable seat, and the rear ends of the adjacent end faces of the first plastering plate and the second plastering plate are movably connected by hinges, and the hinges at the rear end faces of the first plastering plate and the second plastering plate are fixedly connected to the center position of the front end face of the baffle through limiting fixings, and auxiliary plastering assemblies are arranged at the upper and lower edges of the outer sides of the rear end faces of the first plastering plate and the second plastering plate. The auxiliary plastering assembly includes a fixed frame fixedly connected to a partition on the inner side of the inner wall and a third motor installed on the inner side thereof, the output shaft of the third motor passes through the bearing on the end face of one side of the partition and is connected to the second screw through a coupling, and the other end of the second screw passes through the threaded hole on the end face of one side of the second movable seat and is connected to the bearing on the inner wall of the fixed frame.

[0007] The present invention is further configured such that universal wheels are installed at the four corners of the bottom of the mobile base, and a sliding mechanism is arranged inside the mobile base, wherein the sliding mechanism drives the sliding seat to move in a horizontal direction, a pulley is installed above one side of the top of the lifting frame, and auxiliary wheels are movably connected on both sides of the top center through hole of the lifting frame.

[0008] The present invention is further configured such that guide wheels are movably installed at both front and rear ends of both sides of the internal central through hole of the lifting seat, a lifting ring is fixedly connected to the center position of the upper surface of the lifting seat, a first motor is installed on one side of the upper surface of the lifting seat, a gear disk is installed on the output shaft of the first motor, a gear ring is arranged on the inner side of the top of the rotating ring, wherein the gear on the outer wall of the gear disk is meshed with the gear on the inner wall of the gear ring, and a spraying mechanism is arranged at the rear end of the outer wall of the rotating ring.

[0009] The present invention is further configured such that a guide rod is fixedly connected to the bottom of the front end face of the extension frame, the other end of the guide rod passes through the through hole at the bottom of the rear end face of the first movable seat and is connected to the bottom of the rear end face of the baffle, one side of the rear end face of the first plastering plate and the second plastering plate are movably connected to one end of the support rod through a hinge, and the other end of the support rod is movably connected to the center position of the outer walls on both sides of the first movable seat through a hinge.

[0010] The present invention is further configured such that a second electric push rod is installed at the center position of the rear end surface of the second movable seat, a connecting plate is installed at the telescopic end of the second electric push rod, and the other end of the connecting plate is fixedly connected to an auxiliary plastering plate.

[0011] The beneficial effects of the present invention are as follows: the third motor drives the auxiliary plastering board to move up and down to smooth out the mortar overflowing on both sides, and the second electric push rod is used to adjust the front and rear positions of the auxiliary plastering board to facilitate the storage of the auxiliary plastering board, so as to facilitate plastering of the top and bottom corners of the wall, avoid affecting the plastering of the surrounding walls, and improve the quality and efficiency of plastering; then the second motor drives to adjust the angle between the first plastering board and the second plastering board, so that the first plastering board and the second plastering board can be adjusted accordingly according to the angle between adjacent walls, so as to be suitable for plastering operations at adjacent wall corners of various angles, with a wide range of practical applications, good plastering quality and high efficiency.

[0012] The present invention is further configured such that a protective component is provided on the top of the lifting frame, and the protective component includes a first fixing frame fixedly connected to a support plate at the middle end of the inner wall, a top plate is provided directly above the first fixing frame, a second fixing frame is fixedly connected to one side of the bottom of the top plate, a first touch plate is provided at the inner top end of the first fixing frame, a first connecting rod is fixedly connected at the four corners of the upper surface of the first touch plate, the top end of the first connecting rod passes through a through hole on the surface of the first fixing frame and is connected to the inner wall of the top plate, a first spring is sleeved on the outer side of the outer wall of the first connecting rod, and the first spring is located between the top of the first fixing frame and the bottom of the top plate.

[0013] The present invention is further configured as follows: a base plate is provided directly below the second fixed frame, and second connecting rods are fixedly connected to the front and rear ends of both sides of the upper surface of the base plate, the top end of the second connecting rod passes through the through hole at the bottom of the second fixed frame and is connected to the second touch plate, and a second spring is sleeved on the outer side of the outer wall of the second connecting rod, wherein the second spring is located between the bottom of the second fixed frame and the top of the base plate, and electric control buttons are provided at the center position of the upper surface of the support plate and the outer side of the bottom of the top plate.

[0014] Another beneficial effect of the present invention is that the elastic properties of the first spring and the second spring can provide buffering protection for equipment, components, etc., wherein the first touch panel and the second touch panel will automatically stop the driving device in the lifting assembly when in contact with the corresponding electric control button, and can automatically control the lifting height of the lifting frame and the lifting seat to avoid the lifting frame and the lifting seat from continuously rising and contacting with the top of the building, causing damage to the equipment, components, etc. due to pressure, and at the same time can reduce the labor intensity of construction workers, without having to concentrate for a long time on whether the equipment lifting touches the top.

[0015] The present invention is further configured such that a lifting assembly is provided inside the storage rack, and the lifting assembly includes a fourth motor and a first sprocket installed on its output shaft, the outer wall of the first sprocket is transmission-connected to the outer wall of the second sprocket at the front and rear ends through a chain, a third screw is provided at the center position of the inner wall of the second sprocket, the bottom end of the third screw passes through the center position of the upper surface of the second sprocket and is connected to the bearing at the bottom end of the storage rack, and the outer wall of the third screw is meshedly connected with the internal thread on the inner wall of the thread groove at the bottom of the lifting rack.

[0016] The present invention is further configured such that a lifting assembly is provided on one side of the upper surface of the sliding seat, the lifting assembly includes a rope winding roller driven by a fifth motor and a connecting rope sleeved on the outside of its outer wall, the other end of the connecting rope passes around the pulley and passes through the auxiliary wheels on both sides to be connected with a hook, wherein the hook is hung inside the lifting ring.

[0017] Another beneficial effect of the present invention is that the fourth motor drives the lifting frame to move up and down inside the storage frame to adjust the height, and the fifth motor drives the rope winding roller to rotate and reel in or release the connecting rope on the outer wall of the rope winding roller, thereby driving the lifting seat to achieve the function of lifting up and down, and then can make corresponding adjustments according to the height of the building wall. It has a wide range of applications. After the plastering equipment is used, the lifting seat is first lowered to the bottom, and then the lifting frame is stored in the storage frame. The height of the entire plastering equipment can be changed, so that subsequent construction personnel can store, store and transport the plastering equipment, which is convenient to use.

[0018] The present invention also provides a method for using the construction plastering equipment, which specifically comprises the following steps:

[0019] S1: First, the construction worker pushes the mobile base to the position on the wall where plastering is required, and then uses the sliding mechanism to drive and adjust the position of the sliding seat;

[0020] S2: According to S1, the fourth motor is controlled to operate through the external controller, and the lifting frame is driven to move up and down inside the storage rack through the fourth motor, and the height of the lifting frame is increased, and then the fifth motor is started, and the operation of the fifth motor drives the lifting seat to move up and down along the storage rack and the outer wall of the lifting frame, and at the same time, the spraying mechanism is used to spray mortar on the wall during the lifting process;

[0021] S3: During the lifting process of the lifting frame and the lifting seat, the elastic properties of the first spring and the second spring above are used to prevent the equipment from being damaged by hard contact with the top of the building. At the same time, the first touch plate or the second touch plate contacts the corresponding electric control button respectively to realize the automatic shutdown of the fourth motor or the fifth motor, which is safe.

[0022] S4: After the mortar spraying is completed, the first motor drives the rotating ring to rotate and adjust the positions of the spraying mechanism and the adjusting assembly, and then the first plastering board and the second plastering board are used to smooth the mortar, wherein the third motor drives the auxiliary plastering board to move up and down to smooth the mortar overflowing from both sides during the plastering process of the first plastering board and the second plastering board;

[0023] S5: When plastering the corner of the wall, the angle between the first plastering board and the second plastering board is adjusted to match the corner of the wall through the second motor drive, so as to realize the plastering operation on the corner of the wall. After the plastering is completed, the height of the lifting seat and the lifting frame are lowered in turn to facilitate the construction workers to transport and store. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0025] Figure 1 It is a structural schematic diagram of a plastering equipment for building construction;

[0026] Figure 2 It is a cross-sectional view of a plastering equipment for building construction;

[0027] Figure 3 This is a structural diagram of the storage rack and lifting rack;

[0028] Figure 4 This is a disassembled diagram of the storage rack, lifting rack, and lifting assembly;

[0029] Figure 5 This is the disassembly diagram of the lifting seat and the rotating ring;

[0030] Figure 6 A structural diagram of the adjustment component;

[0031] Figure 7 A structural diagram of the first movable seat, the first plastering plate, the second plastering plate and related components;

[0032] Figure 8 Structural drawings of auxiliary plastering components;

[0033] Fig. 9 Schematic diagram of disassembly of protective components Figure 1 ;

[0034] Fig.10 Schematic diagram of disassembly of protective components Figure 2 ;

[0035] Fig.11 This is a structural diagram of the lifting component.

[0036] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0037] 100-mobile base, 101-universal wheel, 102-sliding mechanism, 103-sliding seat, 104-storage rack, 105-lifting frame, 105a-pulley, 105b-auxiliary wheel, 106-lifting seat, 106a-guide wheel, 106b-hanging ring, 106c-first motor, 106d-toothed disc, 107-rotating ring, 107a-toothed ring, 108-spraying mechanism, 200-adjusting component, 201-connecting seat, 202-first electric push rod, 203-extension frame, 203a-guide rod, 204-second motor, 204a-first screw, 205-baffle, 206-first mobile seat, 206a-support rod, 207-first plastering board, 208-second plastering board, 300-auxiliary plastering component, 301-fixed frame, 301a-partition , 302-the third motor, 302a-the second screw, 303-the second moving seat, 304-the second electric push rod, 305-the auxiliary plastering plate, 305a-the connecting plate, 400-the protective assembly, 401-the first fixed frame, 401a-the support plate, 402-the top plate, 402a-the second fixed frame, 403-the first connecting rod, 403a-the first spring, 403b-the first touch plate, 404-the bottom plate, 405-the second connecting rod, 405a-the second spring, 405b-the second touch plate, 406-the electric control button, 500-the lifting assembly, 501-the fourth motor, 501a-the first sprocket, 502-the third screw, 502a-the second sprocket, 600-the lifting assembly, 601-the fifth motor, 602-the rope roller, 602a-the connecting rope, 602b-the hook. DETAILED DESCRIPTION

[0038] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Example 1

[0039] See also Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 , Figure 7 and Figure 8, which is the first embodiment of the present invention, provides a construction plastering equipment, which can adjust the angles of the first plastering board 207 and the second plastering board 208 by rotating the first screw 204a to be suitable for plastering operations at the corners of adjacent walls at various angles, and at the same time, the auxiliary plastering board 305 can be used to smooth the mortar overflowing on both sides.

[0040] Specifically, the mobile base 100 and the sliding base 103 slidably connected therein, the sliding base 103 can move inside the mobile base 100, a storage rack 104 is fixedly connected to one side of the upper surface of the sliding base 103, a lifting rack 105 is slidably connected to the upper part of the storage rack 104, the lifting rack 105 can move up and down inside the storage rack 104, a lifting seat 106 is sleeved on the outer side of the outer wall of the storage rack 104 and the lifting rack 105, the lifting seat 106 can be lifted up and down outside the storage rack 104 and the lifting rack 105, the outer side of the outer wall of the lifting seat 106 is rotatably connected to the inner wall of the rotating ring 107 through a bearing, the rotating ring 107 can rotate outside the lifting seat 106 to adjust the angle, and an adjustment component 200 is provided at the front end of the outer wall of the rotating ring 107;

[0041] The adjustment component 200 includes a connecting seat 201 and a first electric push rod 202 symmetrically installed at the edges of both sides of the rear end face thereof. The telescopic end of the first electric push rod 202 penetrates the rear end face of the connecting seat 201 and is connected to the rear end face of the extension frame 203. The first electric push rod 202 can be used to push the extension frame 203 to move and adjust the positions of the extension frame 203 and the outer adjustment component 200. A second motor 204 is installed on the inner rear end face of the extension frame 203. The output shaft of the second motor 204 is connected to the first screw 204a through a coupling. The other end of the first screw 204a sequentially penetrates the bearing on the inner wall of the extension frame 203 and the threaded hole above the rear end face of the first movable seat 206 and is rotatably connected to the bearing on the rear end face of the baffle 205. A first plastering plate 207 and a second plastering plate 208 are respectively arranged on both sides directly in front of the first movable seat 206. , the rear ends of the adjacent end faces of the first plastering plate 207 and the second plastering plate 208 are movably connected by hinges, and the hinged joints of the rear ends of the first plastering plate 207 and the second plastering plate 208 are fixedly connected to the center position of the front end face of the baffle 205 through limiting fixings, wherein the limiting fixings can limit the hinged joints of the rear ends of the first plastering plate 207 and the second plastering plate 208 to achieve the angle adjustment of the first plastering plate 207 and the second plastering plate 208, and the operation of the second motor 204 can drive the first screw 204a to rotate, and the external thread on the outer wall of the first screw 204a is meshed with the internal thread in the wall of the threaded hole above the end face of one side of the first movable seat 206, so when the first screw 204a rotates, the first movable seat 206 can be driven to move under the action of the thread, wherein the middle parts of the first plastering plate 207 and the second plastering plate 208 can be rotated to adjust the angle;

[0042] Auxiliary plastering components 300 are arranged at the upper and lower edges of the outer sides of the rear end faces of the first plastering plate 207 and the second plastering plate 208. The auxiliary plastering components 300 include a fixed frame 301 fixedly connected to a partition 301a on the inner side of the inner wall and a third motor 302 installed on the inner side thereof. The output shaft of the third motor 302 passes through the bearing on one end face of the partition 301a and is connected to the second screw 302a through a coupling. The other end of the second screw 302a passes through a threaded hole on one end face of the second movable seat 303 and is connected to the bearing on the inner wall of the fixed frame 301. The operation of the third motor 302 can drive the second screw 3 02a rotates, wherein the external thread on the outer wall of the second screw rod 302a is meshedly connected with the internal thread in the wall of the threaded hole on the end face of the second movable seat 303, so when the second screw rod 302a rotates, the second movable seat 303 can be driven to move and adjust its position. The third motor 302 can adopt a suitable micro motor, which is mainly used for adjusting the height of the auxiliary plastering plate 305. Its model can use TEC4260-2480, GMP42-775-2450-100-MR, GMP42-TEC4260-2450-100-MR-brushless, etc. The specific use can be adjusted and selected according to actual use needs;

[0043] A guide rod 203a is fixedly connected to the bottom of the front end face of the extension frame 203, and the other end of the guide rod 203a passes through the through hole at the bottom of the rear end face of the first movable seat 206 and is connected to the bottom of the rear end face of the baffle 205. The guide rod 203a can play a role of limiting and guiding when the first movable seat 206 moves. One side of the rear end face of the first plastering plate 207 and the second plastering plate 208 are movably connected to one end of the support rod 206a through a hinge, and the other end of the support rod 206a is movably connected to the center position of the outer wall of both sides of the first movable seat 206 through a hinge. Two support rods 206a are provided, and the two ends of the support rod 206a are respectively connected to the first plastering plate 207 and the second plastering plate 208 through hinges. 08 and the outer walls of both sides of the first movable seat 206 are movably connected, so when the first movable seat 206 moves, the angle between the first plastering plate 207 and the second plastering plate 208 can be adjusted under the action of the hinge and the support rod 206a to adapt to different wall angles. A second electric push rod 304 is installed at the center position of the rear end face of the second movable seat 303, and a connecting plate 305a is installed at the telescopic end of the second electric push rod 304. The other end of the connecting plate 305a is fixedly connected with an auxiliary plastering plate 305. The front and rear positions of the connecting plate 305a and the auxiliary plastering plate 305 can be adjusted by the second electric push rod 304, and then the upper and lower positions of the auxiliary plastering plate 305 can be adjusted by the second movable seat 303.

[0044] When the above arrangement is in use, the first electric push rod 202 is started, and the telescopic end of the first electric push rod 202 extends to push the extension frame 203 toward the wall, and the first plastering board 207, the second plastering board 208 and the auxiliary plastering board 305 are pressed against the mortar on the wall. Then, the lifting seat 106 is driven up and down by the lifting assembly 600, so that the first plastering board 207, the second plastering board 208 and the auxiliary plastering board 305 move up and down, and the mortar on the wall can be smoothed. At the same time, during the smoothing process of the first plastering board 207 and the second plastering board 208, the two will squeeze the mortar in contact and cause the mortar to overflow to both sides. At this time, since the auxiliary plastering boards 305 are respectively placed on the first plastering board 2 07 and the upper and lower outer sides of the second plastering plate 208. During the process of smoothing the mortar with the first plastering plate 207 and the second plastering plate 208, the mortar overflowing on both sides can be smoothed by the auxiliary plastering plate 305. The third motor 302 is started, and the output shaft of the third motor 302 rotates to drive the second screw rod 302a to rotate under the action of the coupling, and the external thread on the outer wall of the second screw rod 302a is meshed with the internal thread in the threaded hole wall on the end face of one side of the second movable seat 303. Therefore, when the second screw 302a rotates, the second movable seat 303 can be driven to move up and down, and then the auxiliary plastering plate 305 can be driven to move up and down under the action of the second electric push rod 304 and the connecting plate 305a. , so as to achieve the purpose of adjusting the lifting of the auxiliary plastering plate 305 separately. At the same time, the front and rear positions of the auxiliary plastering plate 305 can be adjusted under the action of the second electric push rod 304, so as to facilitate the storage of the auxiliary plastering plate 305, so as to facilitate the plastering of the top and bottom corners of the wall, avoid affecting the plastering of the surrounding walls, and improve the plastering quality and efficiency. When plastering the two wall corners, the second motor 204 is started, and the output shaft of the second motor 204 rotates to drive the first screw rod 204a to rotate under the action of the coupling, and the external thread on the outer wall of the first screw rod 204a is meshed with the internal thread in the wall of the threaded hole on the outer wall of the first movable seat 206, so the rotation of the first screw rod 204a and the movement of the guide rod 203a are The position of the first movable seat 206 can be adjusted under the auxiliary action, wherein the outer walls on both sides of the first movable seat 206 are movably connected with the corresponding first plastering board 207 and the second plastering board 208 through hinges and support rods 206a, and the first plastering board 207 and the second plastering board 208 are movably connected, so when the first movable seat 206 moves, the angle between the first plastering board 207 and the second plastering board 208 will be adjusted under the action of the hinges and the support rods 206a, so that the first plastering board 207 and the second plastering board 208 can make corresponding adjustments according to the angle between adjacent walls, so as to be suitable for plastering operations at the corners of adjacent walls at various angles, with a wide practical range, good plastering quality and high efficiency.

[0045] For details, please refer to Figure 1 , Figure 3 and Figure 5Universal wheels 101 are installed at the four corners of the bottom of the mobile base 100, and a sliding mechanism 102 is arranged inside the mobile base 100. The sliding mechanism 102 is the same as the sliding components and principles in the existing authorization document CN112482698B-A wall plastering construction equipment. This is the prior art, so it will not be described in detail here. Among them, the sliding mechanism 102 drives the sliding seat 103 to move in the horizontal direction, and a pulley 105a is installed on the top side of the lifting frame 105. Auxiliary wheels 105b are movably connected on both sides of the top center through hole of the lifting frame 105. Guide wheels 106a are movably installed on both sides of the front and rear ends of the inner center through hole of the lifting seat 106. The guide wheels 106a can assist the lifting seat 106 in the lifting and lowering movement outside the storage rack 104 and the lifting frame 105 to improve its stability. A lifting ring 106b is fixedly connected to the center position of the upper surface of the lifting seat 106. One side of the upper surface of the lifting seat 106 A first motor 106c is installed, and a toothed disc 106d is installed on the output shaft of the first motor 106c. A toothed ring 107a is arranged on the inner side of the top of the rotating ring 107, wherein the gear on the outer wall of the toothed disc 106d is meshedly connected with the gear on the inner wall of the toothed ring 107a, and a spraying mechanism 108 is arranged on the rear end of the outer wall of the rotating ring 107. The operation of the first motor 106c can drive the toothed disc 106d to rotate, wherein the gear on the outer wall of the toothed disc 106d is meshedly connected with the gear on the inner wall of the outer toothed ring 107a, so when the toothed disc 106d rotates, the toothed ring 107a can be driven to rotate, and the rotating ring 107 is driven to rotate on the outer side of the outer wall of the lifting seat 106 through the toothed ring 107a, and the positions of the adjusting component 200 and the spraying mechanism 108 are adjusted. The spraying mechanism 108 is the same as the spraying components and principles of the existing authorization document CN112482698B-a wall plastering construction equipment. This is a prior art, so it will not be described in detail here.

[0046] When the above arrangement is in use, the construction personnel first move the mobile base 100 to a suitable position under the action of the universal wheel 101, and then adjust the height position of the lifting seat 106 outside the storage rack 104 and the lifting frame 105, and then use the spraying mechanism 108 to spray mortar on the building wall. After the mortar spraying is completed, the first motor 106c is started, and the output shaft of the first motor 106c rotates to drive the gear plate 106d, wherein the gear on the outer wall of the gear plate 106d is meshed with the gear on the inner wall of the outer gear ring 107a, so when the gear plate 106d rotates, it will drive the outer gear ring 107a to rotate, and under the action of the gear ring 107a, its bottom rotating ring 107 rotates outside the outer wall of the lifting seat 106, so that the position of the spraying mechanism 108 and the adjustment component 200 symmetrically arranged front and back can be adjusted. Example 2

[0047] See also Figure 3 , Fig. 9 and Fig.10On the basis of the specific embodiment 1, this embodiment can play a role of buffer protection when the equipment and components are in contact with each other under the elastic performance of the first spring 403a and the second spring 405a, and when the first touch plate 403b and the second touch plate 405b are in contact with the corresponding electric control button 406, the lifting height of the lifting frame 105 and the lifting seat 106 can be automatically controlled to avoid the lifting frame 105 and the lifting seat 106 from continuously rising and rigidly contacting with the top of the building, causing damage to the equipment and components, etc., and at the same time, it can reduce the labor intensity of construction personnel, and there is no need to concentrate for a long time to pay attention to whether the equipment lifting touches the top.

[0048] Specifically, a protective component 400 is provided on the top of the lifting frame 105, and the protective component 400 includes a first fixing frame 401 fixedly connected to a support plate 401a at the middle end of the inner wall, the first fixing frame 401 is fixed to the top of the lifting frame 105, and a top plate 402 is provided directly above the first fixing frame 401. During the lifting process of the lifting frame 105, the top plate 402 above it will first contact the top of the building to avoid contact between the equipment and the top of the building, and a second fixing frame 402a is fixedly connected to one side of the bottom of the top plate 402, and a first touch plate 403b is provided at the inner top of the first fixing frame 401, and the four corners of the upper surface of the first touch plate 403b are fixedly connected to the first connecting The connecting rod 403, the top end of the first connecting rod 403 passes through the through hole on the surface of the first fixing frame 401 and is connected to the inner wall of the top plate 402, the outer side of the outer wall of the first connecting rod 403 is sleeved with a first spring 403a, and the first spring 403a is located between the top of the first fixing frame 401 and the bottom of the top plate 402, when the top plate 402 and the first fixing frame 401 move relative to each other, the first connecting rod 403 will push the first touch plate 403b and squeeze the first spring 403a, wherein the first connecting rod 403 connects the first touch plate 403b and the top plate 402, plays a role of connecting transmission, and can play a role of buffering under the elastic performance of the first spring 403a;

[0049] A bottom plate 404 is provided directly below the second fixing frame 402a, and second connecting rods 405 are fixedly connected to both ends of the upper surface of the bottom plate 404, and the top end of the second connecting rod 405 passes through the through hole at the bottom of the second fixing frame 402a and is connected to the second touch plate 405b, and a second spring 405a is sleeved on the outer side of the outer wall of the second connecting rod 405, wherein the second spring 405a is located between the bottom of the second fixing frame 402a and the top of the bottom plate 404, and electric control buttons 406 are provided at the center of the upper surface of the support plate 401a and the outer side of the bottom of the top plate 402, equipment, components, etc. When in contact with the bottom of the bottom plate 404, the bottom plate 404 is pushed upward, and the second touch plate 405b is pushed upward through the second connecting rod 405, and the second spring 405a is squeezed, wherein the second connecting rod 405 connects the second touch plate 405b and the bottom plate 404, plays a role of connecting transmission, and can play a buffering role under the elastic performance of the second spring 405a. The electric control button 406 is provided with two groups, and is respectively arranged corresponding to the first touch plate 403b and the second touch plate 405b. When the two are in contact, the fourth motor 501 and the fifth motor 601 can be stopped respectively;

[0050] When the above arrangement is in use, during the process of driving the lifting frame 105 to lift inside the storage rack 104 through the lifting assembly 500, as the height of the lifting frame 105 continues to rise, the top plate 402 above it will contact the top of the building. Since the top of the top plate 402 is limited, the upward movement of the lifting frame 105 will cause the first fixing frame 401 and the top plate 402 to move relative to each other, and squeeze the first spring 403a, and push the first touch plate 403b to move under the action of the first connecting rod 403. When the first touch plate 403b contacts the electric control button 406 on the surface of the support plate 401a, the driving device in the lifting assembly 500 will be automatically stopped, and the lifting frame 105 can be automatically controlled. The lifting height is prevented from being pressed and damaged by the equipment and parts by the continuous lifting of the lifting frame 105 and the contact with the top of the building. The electric control button 406 is a switch for controlling the corresponding fourth motor 501 and fifth motor 601 to be turned off during the lifting process of the lifting frame 105 and the lifting seat 106. When the first touch plate 403b or the second touch plate 405b contacts the corresponding electric control button 406, the electric control button 406 transmits the contact information to the external controller through an electrical signal to realize the automatic shutdown of the fourth motor 501 and the fifth motor 601. After the plastering is completed, when the lifting frame 105 and the lifting seat 106 need to be lowered for recovery, it is necessary to manually disconnect the electric control button 406 through the external controller. After the control button 406 is connected with the electrical signal, the fourth motor 501 and the fifth motor 601 are controlled to reverse and drive the lifting frame 105 and the lifting seat 106 to descend and change the height for the next use. The lifting assembly 600 is used to drive the lifting seat 106 to rise outside the storage rack 104 and the lifting frame 105. As the lifting seat 106 continues to rise, the first motor 106c and other devices and components on its surface will contact the bottom plate 404 above it. Since the position of the top plate 402 is limited, the upward movement of the bottom plate 404 will cooperate with the second fixing frame 402a to squeeze the second spring 405a, and under the action of the second connecting rod 405, the second touch plate 405b can be pushed upward. , and at the same time, it will contact the electric control button 406 under the top plate 402. At this time, the driving equipment in the lifting assembly 600 will be automatically shut down, and the lifting height of the lifting seat 106 can be automatically controlled to prevent the lifting seat 106 from continuously rising and contacting the top of the building, causing pressure damage to the equipment and components. At the same time, the labor intensity of the construction personnel can be reduced, and there is no need to concentrate for a long time to pay attention to whether the equipment lifting touches the top. Among them, when the first motor 106c and other equipment and components on the surface of the lifting seat 106 complete the contact and extrusion of the upper bottom plate 404, the plastering surface of the first plastering board 207 and the second plastering board 208 or the auxiliary plastering board 305 is in contact with the top of the side wall, so as to achieve sufficient plastering of the side wall. Example 3

[0051] See also Figure 3 and Figure 4Based on the specific embodiment 1, this embodiment drives the lifting frame 105 to move up and down inside the storage rack 104 through the fourth motor 501, and adjusts the height of the lifting frame 105 to be suitable for use in buildings of various heights. At the same time, it is convenient for subsequent storage, storage and transportation, etc., and is easy to use.

[0052] Specifically, a lifting assembly 500 is provided inside the storage rack 104, and the lifting assembly 500 includes a fourth motor 501 and a first sprocket 501a installed on its output shaft, and the outer wall of the first sprocket 501a is connected to the outer wall of the second sprocket 502a at the front and rear ends through a chain. The operation of the fourth motor 501 can drive the first sprocket 501a to rotate, wherein the outer wall of the first sprocket 501a is connected to the outer wall of the second sprocket 502a on both sides through a chain, which plays a role of transmission, so the rotation of the first sprocket 501a can drive the second sprocket 502a to rotate, and the second chain A third screw 502 is provided at the center position of the inner wall of the wheel 502a, and the bottom end of the third screw 502 passes through the center position of the upper surface of the second sprocket 502a and is connected to the bearing at the bottom end of the storage rack 104, and the outer wall of the third screw 502 is meshed with the internal thread on the inner wall of the bottom thread groove of the lifting frame 105. The rotation of the second sprocket 502a can drive the third screw 502 to rotate, wherein the external thread on the outer wall of the third screw 502 is meshed with the internal thread on the inner wall of the bottom thread groove of the lifting frame 105, so that when the third screw 502 rotates, it can drive the lifting frame 105 to move up and down.

[0053] When the above arrangement is in use, after the equipment is moved to a suitable position and before plastering the wall, the fourth motor 501 is started, and the output shaft of the fourth motor 501 rotates to drive the first sprocket 501a to rotate, wherein the outer wall of the first sprocket 501a is transmission-connected to the second sprockets 502a on both sides through a chain, so when the first sprocket 501a rotates, it will drive the second sprockets 502a on both sides to rotate under the action of the chain, and make the corresponding third screw 502 rotate, and the external thread on the outer wall of the third screw 502 is meshed with the internal thread on the inner wall of the thread groove at the bottom of the lifting frame 105, so when the third screw 502 rotates, it can drive the lifting frame 105 to move up and down inside the storage rack 104 to adjust the height. Example 4

[0054] See also Figure 2 and Fig.11 In this embodiment, based on the specific embodiments 1 and 3, the fifth motor 601 drives the rope winding roller 602 to rotate to realize the release and winding operation of the connecting rope 602a, thereby realizing the up and down lifting of the lifting seat 106 to change the height of the plastering component.

[0055] Specifically, a lifting component 600 is provided on one side of the upper surface of the sliding seat 103, and the lifting component 600 includes a rope winding roller 602 driven by the fifth motor 601 and a connecting rope 602a sleeved on the outside of the outer wall thereof, the other end of the connecting rope 602a passes around the pulley 105a and passes through the auxiliary wheels 105b on both sides to be connected with the hook 602b, wherein the hook 602b is hung inside the lifting ring 106b, and the operation of the fifth motor 601 can drive the rope winding roller 602 to rotate, realize the release and winding of the connecting rope 602a, and then change the height position of the lifting seat 106, wherein the pulley 105a and the auxiliary wheel 105b both play an auxiliary guiding role for the connecting rope 602a.

[0056] When the above arrangement is in use, after the height adjustment of the lifting frame 105 is completed, the fifth motor 601 is started, and the operation of the fifth motor 601 can drive the rope winding roller 602 to rotate, and can reel in or release the connecting rope 602a on the outer wall of the rope winding roller 602, wherein the lifting seat 106 can be driven to achieve the function of lifting up and down under the action of the pulley 105a, the auxiliary wheel 105b, the hook 602b and the lifting ring 106b, and then can make corresponding adjustments according to the height of the building wall, and has a wide range of applications. After the plastering equipment is used, the lifting seat 106 is first lowered to the bottom, and then the lifting frame 105 is stored in the storage rack 104, which can change the height of the entire plastering equipment, so that subsequent construction personnel can store, store and transport the plastering equipment, etc., which is convenient to use. Example 5

[0057] The present invention also provides a method for using the construction plastering equipment, which specifically comprises the following steps:

[0058] S1: First, the construction worker pushes the mobile base 100 to the position of the wall surface where plastering is required, and then uses the sliding mechanism 102 to drive and adjust the position of the sliding seat 103;

[0059] S2: According to S1, the fourth motor 501 is controlled to operate by an external controller, and the fourth motor 501 drives the lifting frame 105 to move up and down inside the storage rack 104, and the height of the lifting frame 105 is increased, and then the fifth motor 601 is started, and the fifth motor 601 operates to drive the lifting seat 106 to move up and down along the outer wall of the storage rack 104 and the lifting frame 105, and the spraying mechanism 108 is used to spray mortar on the wall during the lifting process;

[0060] S3: During the lifting process of the lifting frame 105 and the lifting seat 106, the elastic properties of the first spring 403a and the second spring 405a above are used to prevent the equipment from being damaged by hard contact with the top of the building. At the same time, the first touch plate 403b or the second touch plate 405b is in contact with the corresponding electric control button 406, so that the fourth motor 501 or the fifth motor 601 is automatically stopped, which is safe.

[0061] S4: After the mortar spraying is completed, the first motor 106c drives the rotating ring 107 to rotate and adjust the positions of the spraying mechanism 108 and the adjusting assembly 200, and then the first plastering board 207 and the second plastering board 208 are used to smooth the mortar, wherein the third motor 302 drives the auxiliary plastering board 305 to move up and down to smooth the mortar overflowing from both sides during the plastering process of the first plastering board 207 and the second plastering board 208;

[0062] S5: When plastering the corner, the second motor 204 is used to drive the first plastering plate 207 and the second plastering plate 208 to adjust the angle to match the corner, so as to achieve the plastering operation on the corner. After the plastering is completed, the height of the lifting seat 106 and the lifting frame 105 are lowered in turn to facilitate the construction workers to transport and store them.

[0063] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments, any equivalent replacement of some of the technical features therein, and any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.

Claims

1. A plastering device for building construction, comprising a mobile base (100) and a sliding base (103) slidably connected therein, a storage rack (104) being fixedly connected to one side of the upper surface of the sliding base (103), a lifting rack (105) being slidably connected to the upper part of the storage rack (104), universal wheels (101) being installed at the four corners of the bottom of the mobile base (100), and a sliding mechanism (102) being arranged inside the mobile base (100); wherein: The sliding mechanism (102) drives the sliding seat (103) to move in a horizontal direction. A pulley (105a) is installed on one side of the top of the lifting frame (105). Auxiliary wheels (105b) are movably connected to both sides of the central through hole at the top of the lifting frame (105). A lifting seat (106) is sleeved on the outer side of the outer wall of the storage rack (104) and the lifting frame (105). The outer side of the outer wall of the lifting seat (106) is rotatably connected to the inner wall of the rotating ring (107) through a bearing. Guide wheels (106a) are movably installed on both sides of the inner central through hole of the lifting seat (106). A lifting ring (106b) is fixedly connected to the center position of the upper surface of the lifting seat (106), a first motor (106c) is installed on one side of the upper surface of the lifting seat (106), a toothed disc (106d) is installed on the output shaft of the first motor (106c), and a toothed ring (107a) is arranged on the inner side of the top of the rotating ring (107); wherein the gear on the outer wall of the toothed disc (106d) is meshingly connected with the gear on the inner wall of the toothed ring (107a), and a spraying mechanism (108) is arranged at the rear end of the outer wall of the rotating ring (107), characterized in that: an adjustment component (200) is arranged at the front end of the outer wall of the rotating ring (107); The adjustment assembly (200) comprises a connection seat (201) and a first electric push rod (202) symmetrically mounted on both side edges of the rear end face thereof, wherein the telescopic end of the first electric push rod (202) penetrates the rear end face of the connection seat (201) and is connected to the rear end face of the extension frame (203); A second motor (204) is installed on the inner rear end surface of the extension frame (203); the output shaft of the second motor (204) is connected to the first screw rod (204a) via a coupling; the other end of the first screw rod (204a) sequentially passes through the bearing on the inner wall of the extension frame (203) and the threaded hole above the rear end surface of the first movable seat (206) and is rotatably connected to the bearing on the rear end surface of the baffle plate (205); A first plastering plate (207) and a second plastering plate (208) are respectively arranged on both sides in front of the first movable seat (206); the rear ends of the adjacent end faces of the first plastering plate (207) and the second plastering plate (208) are movably connected via hinges; the hinged joints of the rear end faces of the first plastering plate (207) and the second plastering plate (208) are fixedly connected to the center position of the front end face of the baffle (205) via a limiting fixing piece; the bottom of the front end face of the extension frame (203) is fixedly connected to a guide rod (203a); the other end of the guide rod (203a) passes through a through hole at the bottom of the rear end face of the first movable seat (206) and is connected to the bottom of the rear end face of the baffle (205); One side of the rear end surface of the first plastering plate (207) and the second plastering plate (208) is movably connected to one end of the support rod (206a) through a hinge, and the other end of the support rod (206a) is movably connected to the center position of the outer wall of both sides of the first movable seat (206) through a hinge, and auxiliary plastering components (300) are provided at the upper and lower edges of the outer sides of the rear end surfaces of the first plastering plate (207) and the second plastering plate (208); The auxiliary plastering assembly (300) comprises a fixed frame (301) having a partition (301a) fixedly connected to the inner side of the inner wall, and a third motor (302) mounted on the inner side of the fixed frame (301), the output shaft of the third motor (302) passing through a bearing on one end face of the partition (301a) and connected to a second screw rod (302a) via a coupling, the other end of the second screw rod (302a) passing through a threaded hole on one end face of a second movable seat (303) and connected to a bearing on the inner wall of the fixed frame (301), a second electric push rod (304) being mounted at the center of the rear end face of the second movable seat (303), a connecting plate (305a) being mounted on the telescopic end of the second electric push rod (304), the other end of the connecting plate (305a) being fixedly connected to an auxiliary plastering plate (305); A protection component (400) is arranged on the top of the lifting frame (105), and the protection component (400) comprises a first fixing frame (401) fixedly connected to a support plate (401a) at the middle end of the inner wall, a top plate (402) is arranged directly above the first fixing frame (401), and a second fixing frame (402a) is fixedly connected to one side of the bottom of the top plate (402); A first touch panel (403b) is provided at the inner top of the first fixing frame (401), and first connecting rods (403) are fixedly connected at four corners of the upper surface of the first touch panel (403b), and the top of the first connecting rod (403) passes through a through hole on the surface of the first fixing frame (401) and is connected to the inner wall of the top plate (402), and a first spring (403a) is sleeved on the outer side of the outer wall of the first connecting rod (403), and the first spring (403a) is located between the top of the first fixing frame (401) and the bottom of the top plate (402); A bottom plate (404) is arranged directly below the second fixing frame (402a), and second connecting rods (405) are fixedly connected to both front and rear ends of the upper surface of the bottom plate (404), and the top end of the second connecting rod (405) passes through a through hole at the bottom of the second fixing frame (402a) and is connected to the second touch plate (405b), and a second spring (405a) is sleeved on the outer side of the outer wall of the second connecting rod (405); The second spring (405a) is located between the bottom of the second fixing frame (402a) and the top of the bottom plate (404), and an electric control button (406) is provided at the center of the upper surface of the support plate (401a) and at the outer side of the bottom of the top plate (402).

2. A construction plastering equipment according to claim 1, characterized in that: A lifting assembly (500) is arranged inside the storage rack (104), the lifting assembly (500) comprising a fourth motor (501) and a first sprocket (501a) mounted on its output shaft, the outer wall of the first sprocket (501a) being transmission-connected to the outer walls of the second sprockets (502a) at the front and rear ends via a chain; A third screw rod (502) is provided at the center position of the inner wall of the second sprocket (502a), and the bottom end of the third screw rod (502) passes through the center position of the upper surface of the second sprocket (502a) and is connected to the bearing at the bottom end of the storage rack (104), and the outer wall of the third screw rod (502) is meshedly connected with the internal thread on the inner wall of the thread groove at the bottom of the lifting rack (105).

3. A construction plastering equipment according to claim 1, characterized in that: A lifting assembly (600) is provided on one side of the upper surface of the sliding seat (103), the lifting assembly (600) comprising a rope winding roller (602) driven by a fifth motor (601) and a connecting rope (602a) sleeved on the outside of the outer wall thereof, the other end of the connecting rope (602a) passing around the pulley (105a) and passing through the auxiliary wheels (105b) on both sides to be connected to the hook (602b); Wherein, the hook (602b) is hung inside the hanging ring (106b).

4. A method for using a construction plastering device as claimed in any one of claims 1 to 3, characterized in that: The specific method of use includes the following steps: S1: First, the construction worker pushes the movable base (100) to the position on the wall where plastering is required, and then uses the sliding mechanism (102) to drive and adjust the position of the sliding seat (103); S2: According to S1, the operation of the fourth motor (501) is controlled by an external controller, and the lifting frame (105) is driven by the fourth motor (501) to be lifted and lowered inside the storage frame (104), and the height of the lifting frame (105) is increased, and then the fifth motor (601) is started, and the operation of the fifth motor (601) drives the lifting seat (106) to be lifted and lowered along the outer wall of the storage frame (104) and the lifting frame (105), and at the same time, the spraying mechanism (108) is used to spray mortar on the wall during the lifting process; S3: During the lifting process of the lifting frame (105) and the lifting seat (106), the elastic properties of the first spring (403a) and the second spring (405a) above are used to avoid damage caused by hard contact between the equipment and the top of the building. At the same time, the first touch plate (403b) or the second touch plate (405b) respectively contacts the corresponding electric control button (406) to achieve automatic shutdown of the fourth motor (501) or the fifth motor (601), which has good safety. S4: After the mortar spraying is completed, the first motor (106c) drives the rotating ring (107) to rotate and adjust the positions of the spraying mechanism (108) and the adjustment component (200), and then the first plastering board (207) and the second plastering board (208) are used to smooth the mortar, wherein the third motor (302) drives the auxiliary plastering board (305) to move up and down to smooth the mortar overflowing from both sides of the first plastering board (207) and the second plastering board (208) during the plastering process; S5: When plastering the corner of the wall, the second motor (204) is used to drive and adjust the angle between the first plastering plate (207) and the second plastering plate (208) to match the corner of the wall, thereby achieving the plastering operation on the corner of the wall. After the plastering is completed, the heights of the lifting seat (106) and the lifting frame (105) are lowered in turn to facilitate the construction workers to transport and store them.