Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2152 results about "Construction worker" patented technology

Intelligent design method for support scheme of rock burst section in TBM tunnel

An intelligent design method for a support scheme of a rock burst section in a TBM tunnel, relating to the field of tunnel engineering. The intelligent design method for the support scheme of the rock burst section in the TBM tunnel comprises: determining a surrounding rock class on the basis of TBM mainframe operation data, surrounding rock feedback evaluation, and a tunnel engineering geological survey report, and using a rock burst intensity assessment method to predict a rock burst grade; and on the basis of the surrounding rock class and the rock burst grade, using a computer deep learning technology to determine an initial surrounding rock support method. The method effectively avoids the impact of subjective factors, actively utilizes TBM mainframe operation data and surrounding rock feedback evaluation, utilizes big data processing and an artificial intelligence technology to propose an intelligently designed support scheme for a rock burst section in a TBM tunnel, and can provide an efficient support scheme for field construction workers for a rock burst section in a tunnel.
Owner:NORTHEASTERN UNIV CHINA

Construction site unsafe behavior detection method and system based on image recognition

The invention discloses a construction site unsafe behavior detection method and system based on image recognition, and relates to the technical field of intelligent visual safety monitoring, and the method comprises the steps: collecting a construction image containing a constructor, carrying out the rectangular frame labeling of unsafe behaviors in the construction image, and generating a structured labeling data set; inputting the structured annotation data set into a YOLOv5 target detection model, performing training through Mosaic data enhancement and an adaptive anchor box generation algorithm, and outputting the trained YOLOv5 target detection model; based on the trained YOLOv5 target detection model, performing 128-dimensional feature vector extraction and track association matching on a detected target through a DeepSORT multi-target tracking algorithm, and outputting a track data table; and the recognition stability and behavior analysis depth of the system in a complex environment are enhanced, so that automation and intelligentization of safety management of a construction site are effectively supported.
Owner:NANJING TECH UNIV +1

Lightweight target detection method and system based on improved YOLOv8

The embodiment of the invention provides a lightweight target detection method and system based on improved YOLOv8, and the method comprises the steps: collecting a normal data set of construction personnel operation, constructing an interference data set based on the normal data set, marking and classifying the data set, and dividing the data set into a training set, a verification set and a test set; the method comprises the following steps: establishing an SVM-YOLO lightweight target detection model, and designing a network architecture of the SVM-YOLO; using a training set to set training parameters, using an Inner-MPDIOU loss function to train the constructed target detection model, and evaluating a target detection result through an evaluation index; and testing the effect of the trained target detection model by using the test set. The small target detection precision can be improved.
Owner:BEIJING UNIV OF CIVIL ENG & ARCHITECTURE

Pumped storage power station safety construction monitoring method based on image recognition

The invention discloses a pumped storage power station safety construction monitoring method based on image recognition, and relates to the technical field of pumped storage power station safety construction monitoring, and the method comprises the steps: carrying out the intelligent monitoring of a construction site through a high-definition camera, an unmanned plane, and a multispectral imaging device, and optimizing the target capturing capability through an environment adaptive adjustment strategy. And in combination with a deep learning and behavior analysis model, identifying construction personnel, equipment and environment states, detecting behaviors such as no safety helmet wearing, illegal retention, equipment abnormity and the like, and performing real-time tracking and updating. Based on a risk level calculation model, a multi-level alarm mechanism is constructed, acousto-optic early warning, remote alarm and task scheduling are triggered, and construction safety is optimized in combination with cloud collaborative management. And self-supervised learning and cross-scene transfer learning are adopted, so that the recognition precision and the system adaptability in a complex environment are improved. According to the method, better effects are achieved in the aspects of real-time performance and accuracy.
Owner:GUANGDONG SENXU GENERAL EQUIP TECH CO LTD

High-altitude falling risk dynamic evaluation technology and mapping method and system for building workers based on digital twinning

The invention discloses a digital twinning-based high-altitude falling risk state assessment technology for building workers and a mapping method and system. The method comprises the following steps: extracting aqueduct building engineering site space element information and personnel positions by an IFC model, and respectively inputting the information and the positions into an indoor navigation model and a three-dimensional digital model; historical risk data of an aqueduct construction engineering site are collected to analyze a risk assessment index and a preset risk threshold value; constructing a digital twinborn model according to the risk assessment index, the risk threshold value, the indoor navigation model and the three-dimensional digital model; real-time construction site environment data, worker behavior data and equipment state data are collected to update and simulate the digital twin model in real time; evaluating the risk range of the high-altitude falling risk by combining the updated and simulated results with a risk evaluation algorithm; and performing mapping association on the digital twinborn model through the construction site environment data, the worker behavior data and the risk range, performing visual interface presentation on the mapping association part, and designing a risk early warning trigger threshold.
Owner:CHINA RAILWAY FIRST GROUP FIFTH ENGINEERING CO LTD +2

Hospital basement ventilation illuminating lamp and energy-saving management and control system

The invention discloses a hospital basement ventilation lighting lamp and an energy-saving management and control system.The hospital basement ventilation lighting lamp comprises a lighting unit, a ventilation unit and an energy supply unit, the lighting unit comprises a light-transmitting plate and an LED lamp set, the ventilation unit comprises a motor and a fan, and the energy supply unit comprises a storage battery pack and a standby power supply. The ventilation lighting lamp and energy-saving management and control system for the hospital basement comprises a lighting module, a grouping module, a sensor module and a control module, the grouping module divides the basement into a plurality of control areas, the sensor module comprises an infrared temperature sensor, and the control module comprises a controller and an actuator. The problems that when constructors conduct construction, light of the whole construction area is turned on, but single-time construction only aims at a small area, so that energy waste of an unconstructed area is caused, meanwhile, the health of the constructors is easily affected due to the fact that the quality of air in a basement is low, and heating is easily caused due to the fact that illumination time is too long are solved.
Owner:CHINA MCC17 GRP CO LTD

Automatic tiling device for building construction

The automatic tiling device for building construction comprises a base plate and a feeding device arranged at the top of a first bottom plate, and a paving device is arranged at the top of a second bottom plate; according to the brick tiling device, horizontally-placed bricks are rotated by a certain angle through the rotating mechanism to be in a vertical state and attached to the wall face, so that existing suction cup tiling is replaced, the bricks of various materials and sizes can be firmly adsorbed, the bricks are not prone to falling off in the conveying process, and the brick tiling device is convenient to use and high in practicability. According to the automatic tiling device, the tiling efficiency is improved, the surfaces of the attached bricks are intermittently beaten in a reciprocating mode to a certain degree through the vibration mechanism, then the surfaces of the attached bricks are evenly vibrated, the beating strength and position of each time can be guaranteed, and the tiling efficiency is improved. The tightness of full contact between the bricks and the concrete and the smoothness of attachment between the bricks are improved.
Owner:KUNSHAN DESILAN ZHONGKAI MASCH CO LTD

Building engineering data information intelligent management platform

The invention provides a building engineering data information intelligent management platform which comprises an intelligent sensing module, an edge calculation module, a data management module, an AI decision module, a business application module and a safety standard module. Through the intelligent sensing module, the edge calculation module, the data management module, the AI decision module, the service application module and the safety standard module, the position of a constructor and the equipment state can be tracked in real time, personnel are prevented from entering a dangerous area by mistake and the mechanical overload risk is prevented, operation safety is guaranteed, AI quality inspection and fault diagnosis are locally processed, cloud dependence is reduced, and the working efficiency is improved. According to the method, the system and the device, real-time early warning of potential safety hazards can still be ensured when the network is interrupted, BIM, IoT and service data can be integrated in a standardized manner, information islands are eliminated, and cross-stage quality tracing and responsibility definition are realized.
Owner:HUAQING COLLEGE OF XIAN UNIV OF ARCHITECTURE & TECH

Construction personnel vital sign monitoring bracelet and monitoring method thereof

The invention discloses a constructor vital sign monitoring bracelet and a monitoring method thereof, and particularly relates to the technical field of health monitoring, the constructor vital sign monitoring bracelet comprises a vital sign sensing module, an environment monitoring module, a local data processing module, a cloud analysis module, a local early warning module and a cloud early warning module; the vital sign sensing module monitors vital sign data in real time, and the environment monitoring module monitors environment information; the local data processing module performs preliminary health analysis and determines data uploading or early warning according to a result; the cloud analysis module carries out health risk assessment through a decision tree algorithm in combination with environmental factors, and the cloud early warning module determines whether to carry out positioning early warning or not according to an analysis result; the local early warning module executes a corresponding early warning strategy; according to the method, a consideration mechanism of environmental factors is introduced, and the environmental data and the vital sign data are combined, so that the health risk of the construction personnel can be evaluated more comprehensively, the risk evaluation model is dynamically adjusted, and the accuracy of health risk early warning is improved.
Owner:NINGBO INTELLIGENT MFG TECH RES INST CO LTD +1

Steel casing mounting device for pile foundation drilling

The invention relates to the technical field of pile foundation construction, and particularly discloses a pile foundation drilling steel casing mounting device which comprises a base and a position adjusting mechanism, the position adjusting mechanism comprises a coaxial correction assembly, a mounting hole is formed in the base, and the coaxial correction assembly comprises two clamping pieces which are symmetrically arranged up and down; the clamping piece comprises a clamping arm, a first retaining elastic piece, a rotating shaft, a first gear, a clamping plate and a second retaining elastic piece; when the first retaining elastic piece is in a natural state, the clamping arm is kept at the initial position, a clamping face used for clamping the peripheral face of the steel casing is arranged on the inner side of the clamping plate, and when the second retaining elastic piece is in a natural state, the clamping plate is located at the initial position. When the steel casing installation device for pile foundation drilling is used, the position of a steel casing can be automatically adjusted, the steel casing to be in butt joint and an embedded steel casing are coaxial, constructors do not need to continuously observe the position of the steel casing and conduct manual adjustment, and therefore the construction efficiency is improved.
Owner:POLY CHANGDA ENGINEERING CO LTD

Fabricated scaffold applied to high-rise building construction

The invention relates to the technical field of building construction scaffolds, and discloses an assembly type scaffold applied to high-rise building construction, which comprises a support frame, a slope plate, a diagonal bridging, a transverse horizontal rod, a vertical rod, a longitudinal horizontal rod, a straddle vertical rod and a base plate. When a person walks, components in the plane structure move to enable the plane structure to loosen the supporting contact of the clamping structure and enable the plane structure to rotate downwards to abut against the lower-layer channel plate, then the position of the hollow groove is exposed, and at the moment, the person walks downwards from the inclined plane structure of the upper-layer channel plate and walks to the lower-layer channel plate. The plane structure is rotationally supported at the position of the clamping structure on the upper layer on the lower layer, so that constructors can walk on the channel plate and cannot be blocked by the inclined plane structure.
Owner:SHISHI XIEHE CONSTR ENG CO LTD

Full-period safety supervision method for electric power engineering

The invention provides an electric power engineering full-period safety supervision method, and relates to the technical field of electric power engineering safety monitoring, and the method comprises the steps: collecting the electromagnetic field intensity and environment humidity data of a hot-line work region, obtaining three-dimensional space coordinates in real time through combining with a positioning tag on a safety helmet of a constructor, and dynamically calculating the three-dimensional boundary of a dangerous region; a comprehensive proximity index is constructed by analyzing the spatial relationship and the moving trend of the constructors and the dangerous boundary, the trend of the constructors approaching the dangerous area is judged in real time, and early warning is given out through the dynamically adjusted vibration frequency. In this way, the problems that in the prior art, dangerous area division is not accurate, monitoring of the movement trend of constructors is insufficient, and early warning response is single can be solved, and the safety monitoring capacity of the hot-line work environment is greatly improved.
Owner:BEIJING TIANRUIFENG ENG MANAGEMENT CO LTD

Hydraulic engineering construction safety analysis system and method based on multi-source data fusion

The invention relates to the technical field of safety management and control, in particular to a multi-source data fusion water conservancy project construction safety analysis system and method.The method comprises the steps that firstly, whether work starting can be conducted or not is judged according to an overall construction environment index, and construction progress data of the day are obtained and processed in the work starting state; the safety monitoring item vector and the safety monitoring equipment vector of the day are obtained, the safety monitoring equipment vector of the day comprises equipment keys and equipment values, the equipment keys represent equipment numbers, and the equipment values represent equipment safety values; then, a constructor positioning data set is obtained and processed, a constructor track point distribution map is obtained, clustering analysis is carried out, and a constructor gathering center is obtained; and obtaining and processing a safety monitoring item vector of the day, a constructor fatigue value and a water conservancy project monitoring value of the constructor gathering center to obtain an accumulated safety value in the region, and if the accumulated safety value is smaller than a preset safety threshold, sending out a safety early warning. Through the method provided by the invention, the monitoring efficiency of the construction safety of the water conservancy project is improved.
Owner:LIAOCHENG YELLOW RIVER ENG BUREAU

Construction operator safety risk assessment early warning method, device and equipment

The invention relates to the field of artificial intelligence, and discloses a construction worker safety risk assessment early warning method, device and equipment, and the method comprises the steps: obtaining the attribute data of a construction worker and the behavior data of a construction site, taking the data as input data, inputting the input data into a construction worker safety risk assessment model, the method comprises the following steps: inputting an input variable to obtain a multi-dimensional characteristic value of the input variable, carrying out clustering analysis on the multi-dimensional characteristic value to obtain a construction worker safety risk classification, and generating a construction worker safety risk early warning indication according to the construction worker safety risk classification. By comprehensively analyzing multiple dimensions of the constructors and inputting data into the safety risk assessment model, the system can mine data features of different dimensions and identify potential safety hazards of the constructors.
Owner:THREE GORGES HI TECH INFORMATION TECH CO LTD

Construction site personnel risk identification method and system based on image processing

The invention provides a construction site personnel risk identification method and system based on image processing, and relates to the technical field of risk identification, and the method comprises the steps: collecting the real-time, working condition and personnel image data of a construction site, dividing a region into a plurality of risk regions, and working condition data such as site materials, equipment operation and fire-fighting supplies are combined to calculate a risk assessment value according to a preset proportion, and a risk assessment area is determined through scoring. The personnel image data are preprocessed to obtain personnel behavior data, behavior prediction probability data are obtained through a behavior prediction model, a danger judgment value is calculated according to the behavior prediction probability data and a risk assessment area, early warning is triggered if the danger judgment value exceeds a threshold value, and an optimization feedback mechanism is further arranged to record an early warning event to optimize an early warning mechanism. According to the method, the risk judgment values of the behavior risk data and the behavior probability data in the plurality of risk assessment areas are calculated, and early warning is performed according to the risk judgment values, so that the timeliness and accuracy of risk early warning are enhanced, and the safety of building workers can be further guaranteed.
Owner:GUANGXI SAFETY ENG VOCATIONAL & TECH COLLEGE

Building decorative plate installation auxiliary device

The utility model relates to the technical field of auxiliary devices, and discloses a building decorative plate installation auxiliary device which comprises a base, the top end of the base is fixedly connected with a supporting frame, the inner walls of the front side and the rear side of the top end of the supporting frame are both fixedly connected with limiting rods, and the bottom ends of the limiting rods on the two sides are both fixedly connected to the top end of the base. A hydraulic cylinder is fixedly connected to the position, located on the lower side of the supporting frame, of the top end of the base, a sliding column is fixedly connected to the telescopic rod end of the hydraulic cylinder, a cavity is formed in the inner wall of the left end of the sliding column, a first motor is fixedly connected to the top end of the sliding column, and the first motor is connected with the rotating shaft through a gear set. The building decoration plate is clamped and fixed through the sliding plate and the clamping plate, the risk of damage to the building decoration plate is reduced, the installation cost is saved, the angle adjusting effect on the building decoration plate is achieved through the gear set, the safety risk of constructors is reduced, and convenient and fast installation is achieved.
Owner:HUAGANG ELECTRIC POWER GRP CO LTD

Complex geological condition tunnel blasting design method based on explosive density partition

PendingCN118999285ASolve complex working conditions such as staggeringImprove applicabilityBlastingExplosive AgentsMining engineering
The invention discloses a complex geological condition tunnel blasting design method based on explosive density partitioning, and belongs to the technical field of tunnel blasting. The method mainly comprises the steps that the rock mass distribution condition of a tunnel face is determined; carrying out conventional tunnel blasting design; the blasting unit consumption in different levels of surrounding rock areas of the tunnel is adjusted; the density of explosives filled in blast holes in the rock mass area with the low grade is adjusted; determining charge density subareas of all levels of rock mass areas of the tunnel face; and refining the charge density partition of the tunnel face. According to different levels of rock masses of the tunnel face, the explosive with the adjustable density is adopted, differential distribution of explosive energy is achieved, on the premise that tunnel blasting hole net parameters and operation habits of construction workers are not changed, accurate design of tunnel blasting under the complex geological conditions is achieved, it is ensured that the expected tunnel blasting excavation effect is achieved, and the tunnel blasting efficiency is improved. And the construction cost is saved. The method is suitable for different geology and different blast hole arrangement working conditions, is extremely high in applicability and can be widely popularized.
Owner:RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +2

Dust collection device for dust treatment

The utility model relates to the technical field of dust collection devices, in particular to a dust collection device for dust treatment, which comprises a treatment box, a dust collection seat, a first dust collection port, a second dust collection port, a corrugated pipe, an exhaust pipe, a water tank and a spray head, the top of the treatment box is provided with the dust collection seat, one side of the dust collection seat is provided with the first dust collection port, and the other side of the dust collection seat is provided with the second dust collection port. A second dust collection opening is formed in one side, close to the first dust collection opening, of the dust collection seat; the dust removal device has the beneficial effects that dust can be degraded by spray through a spray head arranged in the treatment box, so that a filter screen body and a dust removal screen body arranged in the treatment box can filter the dust, and meanwhile, the dust is adsorbed, so that the dust is accumulated in the filter screen body and the dust removal screen body; and dust is prevented from being discharged from the exhaust pipe along with airflow, so that the dust suction device can quickly filter the dust when being used in a processing area, and constructors can be safer when working in a construction area.
Owner:HEBEI FENGBAOTAI TECH CO LTD

Safety protection device for large-span frame construction

The invention discloses a large-span frame construction safety protection device which comprises steel cables and safety ropes connected to the steel cables, the steel cables are hung through slings, and connecting nodes are arranged between the slings; the safety rope comprises a sliding assembly, a connecting rope and a hook part, the hook part and the sliding assembly are connected through the connecting rope, and the hook part is used for being matched with a constructor for hooking; the sliding assembly comprises a connecting base, two connecting rods arranged on the connecting base, pulleys rotationally connected to the connecting rods and a connecting hook arranged on the connecting base in an up-down sliding mode, the two connecting rods are located on the two sides of the steel cable correspondingly, grooves are formed in the positions, corresponding to the steel cable, of the pulleys, and the two pulleys are clamped on the steel cable through mutual cooperation of the grooves; sliding connection is formed with the steel rope; and the connecting hook is matched with the two connecting rods and tensions the two connecting rods. According to the scheme, a constructor can move conveniently during large-span frame construction, and meanwhile the safety protection effect on the constructor is kept.
Owner:CHINA CONSTR FIFTH ENG DIV CORP LTD +1

Supervision and management method for construction operation and pre-class education supervision system

The invention discloses a supervision and management method for construction operation and a pre-class education supervision system, and relates to the technical field of data processing. Firstly, learning videos corresponding to all construction workers in the supervision and management system are obtained through matching, and then progress data in learning hosts of all the construction workers are analyzed, so that the safety awareness of the construction workers can be evaluated; and then the safety data of each construction work subordinate sub-region and the behavior characteristic data of each construction worker are analyzed, so that the pre-class education learning effect of the construction worker in the actual work process can be analyzed, potential safety hazards can be identified, the working strategy can be adjusted in time, the accident risk is reduced, and the working efficiency is improved. And finally, comprehensively analyzing to obtain a learning effect evaluation value of the supervision and management method for the construction operation, and further adjusting the supervision and management method, so that the management process can be continuously optimized, and the safety awareness of construction personnel is further improved.
Owner:GUANGZHOU MINGJI INNOVATION TECH CO LTD

Multifunctional water retaining device for water conservancy construction

The invention discloses a multifunctional water retaining device for water conservancy construction, and relates to the technical field of water conservancy projects, the multifunctional water retaining device comprises a base and a first water retaining plate fixed at the top end of the base, a plurality of ground nails are arranged at the bottom end of the base, a self-adjusting assembly and a buffering assembly are arranged in the first water retaining plate, and the buffering assembly is located below the self-adjusting assembly; the self-adjusting assembly comprises an open groove formed in the first water baffle, and a second water baffle is installed in the open groove in a sliding mode. The situation that the height of a traditional water baffle is fixed and cannot be automatically adjusted according to the change of the water level, so that when the water level is higher than the water baffle, the water overflows from the top of the water baffle, and equipment and materials are damaged can be avoided, meanwhile, manual intervention can be reduced, the psychological pressure of constructors can be relieved, the working intensity is reduced, and in an emergency, the construction efficiency is improved. And workers can timely evacuate or take corresponding protection measures, so that the safety can be effectively improved.
Owner:ANHUI & HUAI RIVER WATER RESOURCES RES INST

Tunnel construction intelligent supervision system and method based on intelligent safety helmet

The invention relates to the technical field of tunnel construction intelligent supervision, in particular to a tunnel construction intelligent supervision system and method based on an intelligent safety helmet. The sensing unit is used for collecting data of positions and working environments of constructors; the communication unit is used for transmitting the collected data through a wireless communication protocol; the edge calculation unit performs edge calculation on the data transmitted by the communication unit for real-time analysis, analyzes positioning information through a centroid method, and introduces personnel density and material stacking weight to optimize calculation of centroid coordinates, so as to reduce the influence of signal change in positioning information calculation, the edge calculation unit comprises a trajectory prediction module, a contour construction module and a collision early warning module. According to the design, positioning information is analyzed through a centroid method, the positions of constructors can be tracked, and each worker can be rapidly positioned especially in a complex and changeable tunnel environment.
Owner:YUNNAN YUNZHONG INTELLIGENT ENGINEERING CO LTD

Hanging basket frame for construction

The utility model relates to the technical field of hanging basket frames, and discloses a construction hanging basket frame which comprises a bottom plate, stand columns are fixedly installed at the four corners of the top of the bottom plate, a fixing rod is fixedly installed between every two adjacent stand columns, and a plurality of protective fences are fixedly installed between the fixing rods and the bottom plate at equal intervals. A hydraulic cylinder is arranged in the middle of the bottom plate, the output end of the hydraulic cylinder is fixedly connected with a supporting plate, the supporting plate is arranged among the multiple stand columns in a sliding mode, and the protective fence penetrates through the supporting plate. The mounting groove is formed in the bottom plate, the hydraulic cylinder and the supporting plate are arranged in a matched mode, the hydraulic cylinder can drive the supporting plate to move up and down by starting the hydraulic cylinder, the distance between the supporting plate and the fixing rod can be adjusted, and therefore the protection effect on constructors of different heights is improved; the influence on the construction operation of constructors is avoided, and the practicability of the device is improved.
Owner:ANHUI SHENGHE CONSTR ENG CO LTD

Building wall removing device capable of ensuring integrity of old bricks

The application relates to the technical field of wall body dismantling, and discloses a building wall body dismantling device capable of guaranteeing the completeness of old bricks, which comprises a surrounding wall and a bearing box, further comprises a dismantling unit arranged on the bearing box, the dismantling unit comprises a flattening component and a cutting component arranged in the bearing box; the flattening component comprises shafts arranged on the inner walls of the bearing box, deflection frames arranged on the shafts, and a plurality of connecting rods arranged on the inner walls of the deflection frames; through the dismantling unit, a construction worker can divide a wall body into a plurality of wall body units when dismantling the wall body, and slowly lays down the single wall body units one by one, and through the cutting unit, the wall body units after being laid down are cut in the horizontal direction, the wall body units are divided into strips one by one, and then the strip-shaped wall bodies are cut into single bricks, so that the safety during the dismantling of the wall body is effectively improved, the completeness of the bricks is guaranteed, the construction cost is reduced, and the utilization rate of resources is improved.
Owner:ARCHITECTURAL DESIGN & RES INST OF TSINGHUA UNIV +1

Cast-in-situ bored pile construction operation platform

The utility model relates to a cast-in-situ bored pile construction operation platform. The cast-in-situ bored pile construction operation platform comprises a platform base and a turnover platform plate. Wherein the platform base comprises a platform top plate and a plurality of supporting legs, the supporting legs are fixedly arranged at the bottom of the platform top plate, and a center hole is formed in the middle of the platform top plate; the two overturning platform plates are hinged to the upper surface of the platform top plate, the two overturning platform plates are symmetrically arranged, and the two overturning platform plates are used for covering the upper portion of the center hole; and semi-circular grooves are correspondingly formed in the opposite sides of the two overturning platform plates correspondingly, and when the two overturning platform plates cover the center hole, the two semi-circular grooves are spliced to form a circular hole. According to the cast-in-situ bored pile construction operation platform, a working platform can be provided for constructors in the construction process, the safety of the constructors is ensured, inclination or displacement in the drilling or pouring process can be prevented, the drilling and pile forming quality is improved, and the construction efficiency is improved.
Owner:CHINA MCC 2 GRP CO LTD

Elevator shaft horizontal protection device with turnover working face

The utility model relates to the technical field of protective devices, and discloses an elevator shaft horizontal protective device with a turnover working face, which comprises a support frame, an elevator shaft is arranged below the support frame, a protective net is fixedly connected on the support frame, and a connecting plate is fixedly connected below the support frame. The elevator shaft protection device has the advantages that the supporting frame is formed by welding round steel of 1.2 cm, the protection net is welded and fixed to the supporting frame through round steel of 0.8 cm, the device is placed on an elevator shaft, the threaded rod is driven to rotate by rotating the handle, the bearing seat and the pressing plate can be pushed to move, and the bearing seat and the pressing plate can be pushed to move. Under the cooperation of a plurality of fixing mechanisms below the supporting frame, the device can be fixed to the elevator shaft, building workers are prevented from slipping off from the elevator shaft, the device is high in practicability, the principle is simple and easy to understand, the device plays a role in protecting the horizontal hole of the elevator shaft, and the safety of the construction workers can be guaranteed.
Owner:SHANGHAI BAOYE GRP CORP

Intelligent safety step monitoring method and system for tunnel construction safety control

The invention relates to the technical field of tunnel safety monitoring, in particular to an intelligent safety step monitoring method and system for tunnel construction safety control, and the system comprises a sensor arrangement module, a data collection and transmission module, a safety step intelligent analysis and early warning module and a dynamic control module. According to the tunnel safety-oriented safety step pitch monitoring method and system, various high-precision sensors are arranged at key positions of the tunnel, and advanced data transmission and intelligent analysis technologies are utilized, so that key information such as the safety step pitch and the stress state of surrounding rock can be accurately obtained in real time. Once the safety step is close to or beyond a reasonable range, the system immediately triggers multi-channel early warning, so that constructors can know potential dangers in the first time and take countermeasures in time, serious safety accidents such as tunnel collapse are effectively avoided, and the life safety of the constructors is greatly guaranteed.
Owner:CHINA RAILWAY 19TH BUREAU GROUP SIXTH ENGINEERING CO LTD +2

Building safety education training system based on interactive experience

The invention discloses a building safety education training system based on interactive experience, relates to the technical field of construction site safety education, and aims to solve the problems that traditional building worker safety education lacks pertinence and is difficult to meet specific safety requirements of various types of work, and the teaching mode is relatively single. The system comprises a database, a personalized learning recommendation module, an interactive learning module and a learning progress and achievement tracking module. The database is used for pre-storing safety knowledge of various construction work types; the personalized learning recommendation module is used for screening and recommending learning content suitable for the worker from a pre-stored database covering safety knowledge of various construction work types according to the work type information and learning history of the construction worker, and the learning content comprises a document and a video course. The method has the advantages that precise education content conforming to the work type and the knowledge level of each worker is provided for the worker, and the safety awareness and the skill level of the building worker are improved.
Owner:CCCC FIRST PUBLIC BUREAU GRP CONSTR ENG CO LTD

Sand distributing and feeding device

The utility model provides a sand distributing and feeding device. The sand distributing and feeding device comprises a mounting frame, a transverse distributing mechanism and a longitudinal distributing mechanism, during sand discharging and feeding, sand falls into the vehicle hopper through the first corrugated pipe, the first discharging pipe, the second corrugated pipe and the second discharging pipe, the driving assembly is adjusted to drive the first discharging pipe to slide in a reciprocating mode, the first discharging pipe can drive the second corrugated pipe and the second discharging pipe to slide in a reciprocating mode, and the second discharging pipe slides in a reciprocating mode so that the sand can be distributed in the vehicle hopper in the horizontal transverse direction. Meanwhile, the first discharging pipe slides in a reciprocating mode to drive the second discharging pipe to swing in a reciprocating mode through the transmission assembly, the second discharging pipe swings in a reciprocating mode to distribute sand in the car hopper in the longitudinal direction, sand is prevented from being accumulated in the car hopper during sand discharging and feeding through sand distribution in the car hopper in the horizontal transverse direction and the longitudinal direction, and therefore follow-up shutdown smoothing operation is not needed, and the sand discharging and feeding efficiency is improved; and the labor intensity of constructors is reduced.
Owner:CHINA POWER CONSTRUCTION CHONGQING CONSTRUCTION DEVELOPMENT CO LTD