Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

207 results about "Construction worker" patented technology

Control method of intelligent tension system and intelligent tension system

The invention provides a control method of an intelligent tension system and the intelligent tension system. The method is characterized by including the steps that a loading speed control unit is built and used for detecting pressure of an oil inlet, and the pressure, monitored in real time, of the oil inlet is compared with preset pretightening force of each stage; a prestressing tendon extending amount control unit is built and used for detecting the displacement value of a prestressed steel bar in real time in the tensioning process and the displacement value of the prestressed steel bar in set holdup time after the prestressed steel bar reaches set tension force of each stage; tensioning values of different jacks are compared after first-stage tension; control signals of different stage conditions in the tensioning process are converted into electromagnetic motions and frequency converter rotation speed control requirements; according to signals fed back by a pressure sensor and a displacement sensor in the tensioning process, the related control commands undergo fuzzy conditioning. The control method and the system have the advantages of improving data measuring precision and construction efficiency, reducing labor intensity of construction workers, reducing cost, improving labor efficiency, eliminating safety hidden risks of the construction workers, and enabling the whole tensioning process to be finished at a time.
Owner:LIUZHOU QIAN BRIDGE ENG MATERIALS

Method and system for monitoring construction intrusion of railway station yard

InactiveCN107248250ARealize location monitoringEasy to calculate working hoursBurglar alarm electric actuationYardReader writer
The invention belongs to the technical field of RTLS real-time monitoring, and provides a method and system for monitoring construction intrusion of a railway station yard. The method comprises the following steps of (1), acquiring location information of each electronic tag through an electronic reader-writer, and sending the location information to a management server; (2), calculating the distance Si between each electronic tag and a dangerous area through the management server; (3), judging whether or not Si is smaller than a preset safe distance S0, and if yes, conducting the step (4); otherwise, conducting the step (5); (4), raising the alarm through an warner, wherein a camera which falls into a preset range of the corresponding electronic tag turns to the corresponding electronic tag, and sends information of the alarm to an intelligent terminal which the corresponding electronic tag is bound to, and then returning to the step (3); (5), judging whether or not the alarm is started through the warner, if yes, canceling the alarm, and returning to the step (1); if not, returning to the step (1). According to the method and system for monitoring construction intrusion of a railway station yard, position monitoring of on-site construction workers, transportation vehicles, machinery and equipment and travelling tracks of a railway line can be achieved, the alarm is raised when intrusion behavior exists, and the safety distance between each entity and the dangerous area is guaranteed, so that the occurrence of collision accidents is reduced.
Owner:李易东

Power cable pay-off device

PendingCN108023305AConvenient laying-out constructionReduce labor intensityApparatus for laying cablesPower cableEngineering
The invention discloses a power cable pay-off device, comprising a frame, a first support rack, a second support rack, a third support rack, a cable drum, a tensioning wheel set, a wire passing shaftand a walking wheel; the first support rack, the second support rack and the third support rack are orderly fixed on the frame; the cable drum is connected onto the first support rack in a rotating manner through a rotating shaft, the tensioning wheel set is connected onto the second support rack in a rotating manner, the wire passing shaft is connected to the third support rack in a rotating manner, and the walking wheel is arranged below the frame; the third support rack includes a supporting plate fixed on the frame, two side plates fixed on the supporting board, a central shaft fixedly connected between the two side plates, sensor probes arranged inside the side plates, and a counter disposed on the frame and connected with the sensor probes. The power cable pay-off device is characterized by simple structure, convenient operation and reliable operation; the power cable pay-off device can be widely applied in power cable laying operation, cable pay-off construction can be greatly facilitated, construction efficiency can be effectively improved, and labor intensity of construction workers can be lowered.
Owner:STATE GRID CORP OF CHINA +1

High-temperature reactor control rod system overhaul device and technology based on ergonomics

The invention belongs to the technical field of high-temperature gas-cooled reactor control rod system overhaul, and particularly relates to a high-temperature reactor control rod system overhaul device and technology based on ergonomics. The device comprises an atmosphere isolation main cabin, a transition cabin, an overhaul platform and an aisle, wherein the atmosphere isolation main cabin and the transition cabin are controlled to be communicated or isolated by a door II which can be automatically opened and closed; the upper end of the atmosphere isolation main cabin is fixed on the transition cabin, and the lower end is tightly held and sealed with a shielding seal barrel of a control rod drive mechanism through a seal ring; the transition cabin is supported and fixed on an upper sealhead of a pressure vessel by support legs; the overhaul platform is fixed on the supporting legs, and the aisle provides access for construction workers from the 28m platform to the transition cabin.In the overhaul process, the device and the technology not only ensure that atmosphere in the pressure vessel does not leak out, but also ensure that the construction workers do not directly enter orleave the helium environment.
Owner:HUANENG SHANDONG SHIDAO BAY NUCLEAR POWER CO LTD +2

Casing pipe dislocation horizontal well correction and repair method and dedicated integration tools of casing pipe dislocation horizontal well correction and repair

The invention discloses dedicated integration tools of casing pipe dislocation horizontal well correction and repair. The structure comprises a bottom expansion work room, an expansion combination sealing device, a propelling hydraulic cylinder device and a top anchoring device from top to down in sequence, and the bottom expansion work room, the expansion combination sealing device, the propelling hydraulic cylinder device and the top anchoring device are connected. A dislocated casing pipe in a horizontal section of a horizontal well can be corrected and repaired, the shortcoming that an existing dislocated casing pipe in a horizontal section of a horizontal well can not be corrected and repaired effectively is overcome, some abandoned wells and dried-up wells are revived, oil well yield is improved, service life of oil wells is prolonged, and input-output ratio of development cost is improved. The casing pipe dislocation horizontal well correction and repair method and dedicated integration tools of the casing pipe dislocation horizontal well correction and repair is characterized in that two processes of correction and casing pipe repair are combined. The casing pipe dislocation horizontal well correction and repair method and dedicated integration tools of the casing pipe dislocation horizontal well correction and repair omits a process of fixing bottom dislocation casing pipes, avoids secondary pollution of an oil layer, has simple construction process, reduces requirements for construction workers, and is beneficial to popularizing.
Owner:CHINA PETROLEUM & CHEM CORP +1

Steel bar part welding and positioning device for building construction

The invention relates to a steel bar part welding and positioning device for building construction so as to solve the problems that in the welding process of steel bar electroslag pressure welding, a device is frequently disassembled, different-diameter steel bars are not coaxial after being installed and clamped, and the quality problem after steel bar welding is caused by operation of building workers during pressurizing and upsetting. The steel bar part welding and positioning device comprises a fixing rod with the axis vertically arranged, a first arc-shaped frame and a second arc-shaped frame are connected to the fixing rod, a first centering and clamping mechanism, a welding distance adjusting mechanism and a control system are arranged on the first arc-shaped frame, a second centering and clamping mechanism is arranged on the second arc-shaped frame, and a conductive agent box opening and closing mechanism is arranged on the fixing rod. By adjusting the welding distance adjusting mechanism, the problem that the welding distances of steel bars with different diameters are different is solved, a motor rotating speed switch is adjusted, the pressurizing and upsetting time of the steel bars with different diameters is adjusted, and in the pressurizing and upsetting process, the steel bar welding quality problem caused by the operation problem of workers is effectively avoided.
Owner:华新建工集团有限公司 +1

Method for draining accumulated floor water during super high-rise building construction, and apparatus thereof

The invention discloses a method for draining accumulated floor water during super high-rise building construction, and an apparatus thereof. The method comprises the following steps: building a water pool at the mouth of a construction water feeding pipe of each of floors, arranging a water draining standpipe connected with a water pool on a lower layer floor at the bottom of the water pool, and draining water leaked by the feeding pipes to a bottom waterway through the water drainage ditch layer by layer; setting a group of floor drain at the edges of floor slabs of each of the floor in an interval manner, connecting the floor drain with a water draining flat pipe below the floor slab, and connecting the water draining flat pipe with the water draining standpipe; and draining accumulated water in the construction process or rainwater to the bottom water drainage ditch through the floor drain layer by layer. Accumulated water generated by the floor during the super high-rise building construction or generated due to rain fall can be timely and orderly discharged from a construction site through the method and the apparatus without overturning the accumulated water out of the floor by directly utilizing a trolley through manpower drainage. The method and the apparatus have no influences on below construction workers, passing pedestrians and passing vehicles, are in favor of the onsite civilized construction, and can reduce the drainage cost.
Owner:CCFED THE FIRST CONSTR & ENG

Steel strip reinforced polyethylene helically-corrugated drain pipe foundation structure and construction method thereof

The invention aims to provide a steel strip reinforced polyethylene helically-corrugated drain pipe foundation structure and a construction method thereof. According to the technical scheme, the foundation structure is composed of a groove, a water-proof geomembrane, laying layers, poured water, a vibrating needle and a drain pipe, wherein two drain ditches are formed in the bottom of the groove; the laying layers include the foundation laying layer and the stable laying layer; and the drain pipe is composed of filling strips, an outer adhesive layer, outer steel strips, an inner adhesive layer, inner steel strips and hot melting strips. Steel strip reinforced polyethylene helically-corrugated pipes are combined and welded in a hot extrusion mode through the hot melting strips at pipeline connecting ends, so that joints of the two pipes are tightly bonded, jointing seams of pipe openings have certain strength, and then the sealing performance of pipeline connection is reinforced; and during pipeline laying, water pouring and vibration are performed on a sand foundation layer in the groove for pipeline laying, gaps in the sand foundation layer are reduced, and then the sand foundation layer is more compact, so that the number of construction workers, machines and tools is reduced, the operation cost is reduced, and the efficiency is improved.
Owner:天津第一市政公路工程有限公司

Automatic turnover device and turnover method for unit curtain wall

The invention discloses an automatic turnover device and turnover method for a unit curtain wall, and belongs to the technical field of unit curtain walls. The automatic turnover device comprises a placing table, the bottom of the placing table is connected with four rollers through supporting columns, and the left side of the placing table extends to the exteriors of the rollers. According to the device and the method, by means of a push plate, a lifting plate and a telescopic sliding rail, the end of the curtain wall is lifted, and meanwhile, the curtain wall is pushed to the left side till the curtain wall is pushed to the vertical state, and manual operation is reduced in the whole process; by means of the left side of the containing table, the curtain wall can be moved to the outer side of a building, and workers do not need to be located on the edge of the building so that workers can be in a safe working environment, and the safety of building workers is guaranteed; and after the curtain wall is hoisted by hoisting equipment, a second sliding rail and a first sliding rail can be shrunk into a storage barrel again under the action of an air spring, and manual return operation is not needed, so that on one hand, manual operation is reduced, and on the other hand, follow-up turnover operation for the curtain wall is facilitated.
Owner:SHENZHEN WEIYE DECORATION GRP

Assembly type steel bar framework rapid forming lap joint structure

The invention discloses an assembly type steel bar framework rapid forming lap joint structure. The structure comprises a lap joint structure body, external lap joint plates, middle lap joint frames,steel bars, a rotary shaft and locking knobs. The external lap joint plates are arranged at the upper and lower ends of the lap joint structure body, the middle lap joint frames are distributed between the two external lap joint plates at equal intervals, and the steel bars are inserted in the external lap joint plates and the middle lap joint frames. First adjusting frames are inserted in first adjusting grooves, abutting grooves are formed in the upper end faces of the first adjusting frames, the locking knobs are in threaded connection with the upper end of a first supporting frame and theupper end of a second supporting frame, and the inner ends of the locking knobs are connected with the abutting grooves. The assembly type steel bar framework rapid forming lap joint structure can quickly fix the steel bars by designing a steel bar fixing structure according to the lap joint characteristic of a reinforcement cage framework, the binding size of the reinforcement cage framework canbe adjusted, and great convenience is brought to rapid binding of a reinforcement cage for building workers.
Owner:东至县尧春富农家庭农场

Electric heating control method and system based on power line carrier communication

The invention discloses an electric heating control method and system based on power line carrier communication. The method comprises the following steps that a temperature measuring device is paired with a controller, and after successful pairing, the temperature measuring device is installed in a heating space controlled by the corresponding controller for temperature measurement; the temperature measuring device collects heating space data in real time and transmits the collected real-time data to a tuner through a power line carrier module; the real-time data collected by the tuner are subjected to real-time data analysis, a control module is started / stopped according to the analysis result, and starting / stopping of the control module decides power supply to / cut off from the load. According to the method and the system, the load and temperature measurement are separated, the influence on temperature measurement caused by the heating reason of the temperature measuring device is reduced, the temperature measurement precision is improved, the installation difficulty is reduced, fool-type installation is realized, the technical requirements on construction workers are reduced, and the temperature measurement position is more flexible; in addition, due to strong current control, noise pollution caused by a common temperature controller relay is reduced at the electric box end, and meanwhile, the service life is prolonged.
Owner:张晓菊

Material transportation cart used for building construction

The invention discloses a material transportation cart used for building construction. The material transportation cart comprises a supporting mechanism, a regulation mechanism, a storage mechanism and a drive mechanism. The regulation mechanism is installed on the supporting mechanism. The storage mechanism is installed on the regulation mechanism. The drive mechanism is installed on the storagemechanism. The supporting mechanism comprises a bottom plate. Rolling wheels are installed at the positions of the four corners of the bottom of the bottom plate correspondingly. A push plate is installed on the right side of the bottom plate. The regulation mechanism comprises a fixed plate and an electric push rod. According to the material transportation cart, through cooperation of the fixed plate, the electric push rod, a fixed shaft, a top plate, a concave shell, a connection plate, a cylinder, a scraper, a movable plate and a baffle, the material transportation cart used for building construction is obtained; when materials are transported to the destination, it is avoided that unloading needs to be manually conducted; during unloading, the situation that due to the fact that dead corners appear in a hopper, cleaning needs to be manually conducted is avoided; and the work efficiency of building workers is greatly improved, labor burdens on the workers are relieved, and great convenience is brought to users.
Owner:陕西锦瑞能源开发有限公司

A kind of construction ground cement initial laying equipment

The invention relates to cement preliminary pavement equipment, in particular to cement preliminary pavement equipment for a building ground. Thus, according to the technical aims to be achieved, thecement preliminary pavement equipment for the building ground saves manpower and can assist in leveling cement. According to the technical embodiment, the cement preliminary pavement equipment for thebuilding ground comprises a round barrel, a cover plate, wheels, a sliding block, an arc plate, a convex block, mounting racks, a first connecting rod, a dragging device, fixed pulleys, a pull wire,a spring and the like; a discharge opening is formed in the top of the round barrel; the cover plate is arranged on the discharge opening; a discharging opening is formed in the bottom of the round barrel; an arc sliding groove is formed in the right side of the lower portion of the round barrel; the sliding block is arranged in the arc sliding groove in a sliding manner; and the bottom of the sliding block is connected with the arc plate. According to the cement preliminary pavement equipment, cement is firstly stored in the round barrel, then the discharging opening is opened, the cement inthe round barrel is leaked out through the discharging opening, the leaked cement can be leveled through a roller, and therefore building workers can be assisted in leveling the cement, and the time of the building worker can be saved.
Owner:金华美诺机电有限公司

Channel surface image acquisition device and tunnel boring machine

The embodiment of the invention provides a channel surface image acquisition device and a tunnel boring machine. The channel surface image acquisition device comprises: a shell provided with an opening; a photographing unit which comprises a plurality of cameras, wherein the cameras shoot the detection area on the surface of the channel through the opening, and the photographing unit is configured in a manner that the photographing areas of the cameras are mutually spliced to form a continuous photographing area; a lighting unit which is used for irradiating the detection area to provide a lighting light source for the camera, wherein the lighting area, on the detection area, of the light source of the lighting unit can cover the continuous shooting area; a bearing bracket which is connected to the shell and is used for mounting the cameras and the lighting unit; and an information collector which is arranged on the shell and is used for collecting position information of the cameras relative to the detection area. According to the channel surface image acquisition device provided by the embodiment of the invention, at least part of the sub-images are spliced to obtain a complete working face image, the life safety of construction workers is guaranteed, and the construction efficiency is improved.
Owner:BEIJING UNIV OF TECH +1

Construction site operation surface people counting method, system and device, storage medium and device

The invention belongs to the technical field of video monitoring, and discloses a construction site working surface people counting method, system and device, and a storage medium, and the method comprises the steps: collecting and transmitting a construction site working surface image; performing worker detection on the acquired working surface image; marking the positions of the workers on the construction site working surface images, and outputting marked images and the number of the workers; and outputting and displaying the marked images and the number of the workers. According to the invention, a manager can directly obtain the situation on the current working surface from the display; the position and the number of the workers can be visually seen, a manager can judge whether the workers are on duty normally or not conveniently and quickly, the trouble that the manager counts the number of the construction workers by himself / herself is avoided, and convenience is brought to smooth proceeding of a project. According to the method, the number of false yang is reduced, other objects are prevented from being mistakenly judged as workers, and the accuracy of the model is improved.
Owner:西安咏圣达电子科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products