Large-span underground cavern top arch layer excavation method and installation structure

By adopting the method of butt excavation from both ends and the excavation of the middle guide tunnel in the construction of large-span underground caverns, combined with longitudinal segmentation and anchor support, the problem of long construction period is solved, and construction efficiency and safety are improved. Structural stability is ensured.

CN118757176APending Publication Date: 2024-10-11中国水利水电第七工程局有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410920962.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The traditional long-span underground cavern excavation method has a long construction period, which affects construction efficiency and acceptance.

Method used

Adopt the method of butt-joint excavation from both ends to the middle, climb and excavate the central guide tunnel on the inner wall of the construction channel, and excavate along the axial direction of the central guide tunnel. Combined with the technology of longitudinal block, two-side expansion and zoning support, through Anchor support ensures structural stability and safety, while the installation structure is designed to assist in the placement and support of anchors.

Benefits of technology

The construction period is shortened, the construction efficiency is improved, the stability and safety of the large-span underground cavern are ensured, and the construction problems are solved through reasonable construction sequence and support measures, and the construction safety and efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757176A_ABST
    Figure CN118757176A_ABST
Patent Text Reader

Abstract

The invention provides a large-span underground cavern top arch layer excavation method and a mounting structure, and relates to the technical field of cavern excavation, the large-span underground cavern top arch layer excavation method comprises the following steps: extension excavation of a construction channel is carried out until the construction channel is communicated with an extension route of a construction cavern; excavating and supporting a middle pilot tunnel; expanding excavation and supporting for the first time; second-time expanding excavation and supporting are conducted on the side wall of the first expanding excavation; excavation and supporting are conducted at the top lifting position of the construction channel pressure occupying position; secondary excavation is conducted on the bottom of the construction cavern, so that the bottom height of the construction cavern is flush with the lowest height of the construction channel, and the final shape of the construction cavern is formed; and the construction cavern with the excavated middle is excavated towards the two ends along the central axis so as to be in butt joint with the route excavated from the two ends of the construction cavern to the middle of the construction cavern. Compared with the prior art, the method has the advantages that the construction period is shortened, and construction is safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cavern excavation, and in particular to a method and an installation structure for excavating a large-span underground cavern top arch layer. Background Art

[0002] Large-span underground caverns usually refer to structures built underground that can cover a large area of ​​space. These structures may be used for various purposes, such as underground garages, underground shopping malls, underground warehouses, underground transportation passages or underground facilities. The excavation method generally used for large-span underground caverns is to excavate from both ends to the middle. After the two ends of the mountain have been excavated towards the middle and have worked a certain distance, it is necessary to open up the connecting section. This is an important node in the cavern project, and precise measurements and calculations are usually performed to ensure that the caverns at both ends can be accurately connected.

[0003] With respect to the above-mentioned prior art, the applicant believes that the traditional construction period of excavating the cavern from both ends to the middle is long, which is not conducive to construction acceptance. Summary of the invention

[0004] In order to solve the problem of long construction period of cavern excavation, the present application provides a method and installation structure for excavating the top arch layer of a large-span underground cavern.

[0005] In the first aspect, the present application provides a method for excavating a large-span underground cavern top arch layer, which adopts the following technical solution: A method for excavating a large-span underground cavern top arch layer comprises the following steps: On the pre-excavation route planned for the construction cavern, excavation is carried out from both ends to the middle; Excavating a construction channel at the side of the middle of the planned pre-excavation route of the construction cavern, so that the construction channel is connected with the extension route of the construction cavern, and the lowest part of the excavated construction channel is flush with the bottom wall of the planned construction cavern; On the inner wall of the construction channel, first climb and excavate to the bottom wall of the planned pre-excavation route of the middle guide tunnel, the bottom wall of the middle guide tunnel is higher than the bottom wall of the preset route of the construction cavern, and a top of the occupied area will be formed between the construction channel and the middle guide tunnel during the excavation process; Excavating the middle guide hole along the preset route of the construction cavern, during the excavation process, the bottom of the middle guide hole is level with the lowest position of the top arch layer of the construction cavern, and the top wall of the excavated middle guide hole is consistent with the curvature of the top arch layer of the construction cavern, and the width of the excavated middle guide hole is smaller than the width of the construction cavern; The tunnel walls on both sides of the middle guide tunnel are expanded and supported for the first time, the top wall of the middle guide tunnel after the first expansion is consistent with the curvature of the top arch layer of the construction cavern, and the width of the middle guide tunnel after the first expansion is smaller than the width of the construction cavern; Excavation is performed simultaneously at the bottom of the middle guide tunnel and the first expansion excavation, and the bottom height after excavation is higher than the bottom height of the final formed construction cavern, so that the height of the middle guide tunnel meets the height requirement during support construction; Conducting a second excavation on the side wall of the first excavation to fully form the top arch layer profile of the construction cavern; Excavation and support are carried out at the top position of the construction channel; Performing secondary excavation on the bottom of the construction cavern so that the bottom height of the construction cavern is equal to the lowest height of the construction passage, thereby forming the final shape of the construction cavern; The construction cavern dug in the middle is dug toward both ends along the central axis to connect with the route dug from both ends of the construction cavern toward the middle.

[0006] Preferably, a construction channel is excavated at the side of the middle of the planned pre-excavation route of the construction cavern so that the construction channel is connected with the extension route of the construction cavern, and the lowest part of the excavated construction channel is flush with the bottom wall of the planned construction cavern, including: Excavating a transverse portion of the construction passage in the horizontal direction, wherein the bottom of the transverse portion is flush with the bottom of the construction cavern, the top of the transverse portion is flush with the top of the side line of the construction cavern, and the transverse portion extends horizontally from the outside of the mountain to the side line of the construction cavern; After the transverse portion is excavated, an oblique portion is excavated obliquely upward along the end surface of the transverse portion until it extends to the sideline of the first expansion excavation of the construction cavern.

[0007] Preferably, the slope of the oblique portion is 10% to 12%.

[0008] Preferably, when the first excavation is carried out on both sides of the middle guide tunnel, the first excavation on both sides is staggered excavation, and the staggered distance during the staggered excavation is at least 30m.

[0009] Preferably, before excavating and supporting the top position of the construction channel, the bottom of the construction channel is first raised so that the excavation and support equipment can reach the top position of the construction channel.

[0010] Preferably, the support for the first expansion and excavation, the support for the second expansion and excavation, and the support for the top of the construction channel are all anchor rod supports.

[0011] In the second aspect, the present application provides a large-span underground cavern top arch installation structure, which adopts the following technical solution: A large-span underground cavern top arch installation structure, used in the large-span underground cavern top arch excavation method, comprises a traction part, a displacement part and a steering part; wherein: The traction part is installed in the construction cave and is used to connect with the distal end of the anchor rod. When the proximal end of the anchor rod is restricted from axial movement, the traction part can drive the anchor rod to gradually rotate from an axial placement state to a radial placement state. The displacement part is arranged on the bottom wall of the construction cavern along the axial direction of the construction cavern, the steering part is arranged on the displacement part, and the displacement part can drive the steering part to move in the axial direction of the construction cavern to just below the anchor hole; The steering portion is used to be connected to the proximal end of the anchor rod to drive the proximal end of the anchor rod to move axially in the construction cavern. Under the traction of the traction portion, the steering portion can synchronously drive the proximal end of the anchor rod to rotate.

[0012] Preferably, it further comprises a driving unit, and the driving unit is installed in the construction cave; wherein, The driving part is used to drive the end of the traction part away from the anchor rod to contract so as to achieve traction of the anchor rod, and the driving part is used to drive the displacement part to operate at the same time; When the displacement part drives the steering part to move to the position directly below the anchor hole, the displacement part is disconnected from the driving part, and the anchor rod is in an inclined state between the axial placement state and the radial placement state.

[0013] Preferably, the driving part comprises a first driving sub-part and a second driving sub-part, and the first driving sub-part drives the second driving sub-part to operate synchronously; wherein, The first driving sub-unit is connected to the displacement unit to drive the displacement unit to operate; The second driving sub-unit is connected to the traction unit to drive one end of the traction unit to contract; When the displacement portion drives the steering portion to move to directly below the anchor hole, the first driving sub-portion is disconnected from the displacement portion, and the first driving sub-portion remains connected to the first driving sub-portion.

[0014] Preferably, the traction part comprises a rotating member and a traction rope, the rotating member is mounted on the top wall of the construction cavern, one end of the traction rope is connected to the distal end of the anchor rod, and the other end is wound around the rotating member and then around the second driving sub-part; and / or, The displacement part includes a base frame, a screw and a moving member, the base frame is arranged on the bottom wall of the construction cave, the screw is installed on the base frame along the axial direction of the construction cave, the screw is coaxially connected with the first driving sub-part, the steering part is installed on the moving member, and the moving member is threadedly matched with the screw to enable the moving member to move along the screw; and / or, The steering part includes a connector, a rotating base and a limit member, the rotating base is installed on the movable part, the connector is rotatably installed on the rotating base, the connector is used to be connected to the proximal end of the anchor rod, and the limit member is installed on the rotating base. When the connector drives the proximal end of the anchor rod to rotate synchronously to a radial placement state, the limit member is used to limit the connector from continuing to rotate.

[0015] The present invention has the following advantages and beneficial effects: (1) The present invention enters the cave from the side at the middle of the construction cave, and after entering the construction cave, excavation is carried out toward both ends of the construction cave, which is carried out simultaneously with the inward excavation of both ends of the construction cave, greatly shortening the construction period and improving the construction efficiency; (2) The present invention ensures the stability and safety of large-span underground caverns by reasonable excavation stratification and zoning; by setting a reasonable construction sequence and adopting the process of "vertical block division, two-side expansion, zoned excavation, and layer-by-layer support", the construction problem of side entry is effectively solved; (3) First, connect the proximal end of the anchor rod to the steering part, and then lay the anchor rod flat in the construction cavern, so that the anchor rod remains parallel to the axial direction of the construction cavern, start the driving part, and let the driving part drive the traction part to contract, so that the distal end of the anchor rod is lifted up, and the proximal end of the anchor rod connected to the steering part will synchronously move along the axial direction of the construction cavern along the displacement part, so that the anchor rod gradually rotates from the axial placement state to the radial placement state, and when the proximal end of the anchor rod reaches the bottom of the anchor hole, the displacement part will automatically stop, so that the proximal end of the anchor rod stays at the position under the anchor hole, but at this time the distal end of the anchor rod will continue to be pulled by the traction part until the anchor rod is in the radial placement state, and the anchor rod will remain in the current state. At this time, the construction personnel can directly insert the anchor rod vertically into the anchor hole to make the support safer and more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the steps of an embodiment of the present application; Figure 2 This is a schematic diagram of the structure used to illustrate climbing from the construction channel to the middle guide tunnel in an embodiment of the present application; Figure 3 This is a schematic diagram of the installation structure of the embodiment of the present application. Figure 1 ; Figure 4This is a schematic diagram of the installation structure of the embodiment of the present application. Figure 2 ; Figure 5 is a partial cross-sectional view for showing a steering portion of an embodiment of the present application; Figure 6 is a partial schematic diagram for illustrating a driving unit in an embodiment of the present application; Figure 7 It is a partial schematic diagram for showing the shaft connection part of an embodiment of the present application; Figure 8 yes Figure 7 A magnified view of part A in FIG. Fig. 9 It is a partial schematic diagram for showing the pulling part of an embodiment of the present application; Fig.10 This is a schematic diagram of an embodiment of the present application for showing a state where the anchor rod is gradually straightened; Fig.11 yes Fig.10 A magnified view of part B in FIG. Fig.12 It is a schematic diagram of an embodiment of the present application for showing the state where the stop plate and the movable plate are in contact with each other.

[0018] The markings in the figure are: 100, construction cavern; 110, middle guide hole; 200, construction passage; 210, transverse part; 220, oblique part; 300, traction part; 310, rotating part; 320, traction rope; 400, displacement part; 410, base frame; 411, stop plate; 412, limit groove; 420, screw; 421, second docking part; 430, moving part; 431, moving plate; 432, threaded sleeve; 500, steering part; 510, connector; 520, rotating base; 530, limit part ;600, driving part;610, first driving sub-part;611, motor;6110, first bevel gear;612, first docking part;620, second driving sub-part;621, second bevel gear;622, second connecting rod;623, winding part;700, connecting shaft part;710, first connecting shaft hole;720, second connecting shaft hole;800, plate body;900, pulling part;910, pulling rope;920, storage part;921, storage box;922, first guide cylinder;923, second guide cylinder. DETAILED DESCRIPTION

[0019] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0020] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0021] In the related art, the excavation method generally used for large-span underground caverns is to excavate from both ends toward the middle. After the two ends of the mountain have excavated toward the middle for a certain distance, it is necessary to open up the connecting section until the passages excavated from both ends to the middle are completely connected to form a large-span underground cavern.

[0022] If the length of a large-span underground cavern is greater than or equal to 1 kilometer, this excavation method is not suitable, because when the tunnel or cavern to be excavated becomes longer, construction can only be carried out from both ends to the middle, which prolongs the construction period and is not conducive to construction acceptance.

[0023] In view of this, the embodiment of the present application provides a method for excavating the top arch layer of a large-span underground cavern, which is suitable for the construction of a large-span underground cavern with a long length and can effectively shorten the construction period. Figure 1 , 2 , the excavation method comprises the following steps: S1, according to the construction drawings, determine the excavation position of the construction cavern 100, perform preliminary excavation at both ends of the determined excavation route of the construction cavern 100, and simultaneously perform docking excavation toward the middle when excavating at both ends, so as to improve construction efficiency. Exemplarily, the construction cavern 100 includes a top arch layer, a side line and a bottom, the top arch layer is arc-shaped, and the side line stands upright between the bottom and the top arch layer.

[0024] S2. According to the construction drawings, the position of the middle part of the construction cavern 100 is determined on the outer wall side of the mountain, and then a construction passage 200 is radially excavated from the outer wall side of the mountain toward the middle part of the cavern, so that the construction passage 200 is connected with the extension route of the construction cavern 100, and the lowest part of the excavated construction passage 200 is flush with the bottom wall of the planned construction cavern 100. In this way, when the subsequent construction cavern 100 is fully formed, the lowest part of the construction passage 200 can be used as a reference to improve the forming efficiency of the construction cavern 100.

[0025] In some embodiments, the transverse portion 210 of the construction channel 200 is excavated in the horizontal direction, the bottom of the transverse portion 210 is flush with the bottom of the construction cavern 100, the top of the transverse portion 210 is flush with the top of the side line of the construction cavern 100, and the transverse portion 210 extends horizontally from the outside of the mountain to the side line of the construction cavern 100; illustratively, after the transverse portion 210 is excavated, the oblique portion 220 is excavated upward along the end face of the transverse portion 210 until it extends to the side line of the first expansion of the construction cavern 100. The purpose of the oblique opening of the oblique portion 220 is to allow the oblique portion 220 to pass through the preset route of the middle guide tunnel, so that the middle guide tunnel can be excavated directly in the oblique portion 220, thereby improving construction efficiency.

[0026] In some embodiments, the transverse portion 210 is connected to the oblique portion 220, the transverse portion 210 is the initial excavation section, and the oblique portion 220 extends obliquely upward from the end of the transverse portion 210 to the other side edge of the construction cavern 100 away from the construction passage 200. Exemplarily, the construction passage 200 is extended and excavated perpendicular to the axial direction of the construction cavern 100, and the area marked as ① in the figure is the area where the construction passage 200 is extended and excavated.

[0027] In some embodiments, the slope of the inclined portion 220 is 10% to 12%, and the corresponding inclination angle is 6° to 7°, so that the inclined portion 220 can obliquely pass through the construction cavern 100. Subsequently, axial excavation of the construction cavern 100 can be carried out in the inclined portion 220 of the construction channel 200, and the inclined portion 220 is made more stable, and construction personnel can also enter and exit the construction channel 200 normally.

[0028] S3, on the inner wall of the construction channel 200, first climb up and excavate to the bottom wall of the planned pre-excavation route of the middle guide tunnel 110. The bottom wall of the middle guide tunnel 110 is higher than the bottom wall of the preset route of the construction cavern 100. During the excavation process, a top of the occupied area will be formed between the construction channel 200 and the middle guide tunnel 110 (see attached). Figure 2 The position marked as T in the figure). Exemplarily, the reason for the formation of the top of the occupied area is that after the excavation equipment is driven into the construction channel 200, the excavation height of the excavation equipment in the construction channel 200 cannot reach the target top height of the middle guide hole 110 under certain construction conditions. Therefore, after reaching the highest excavation height of the excavation equipment, the middle guide hole 110 will be partially excavated directly on one side, and then axial excavation will be performed in part of the middle guide hole 110 to completely excavate the height of the middle guide hole 110. At this time, the top of the occupied area will be formed between the middle guide hole 110 and the oblique part 220. Moreover, the top of the occupied area can also prevent the collapse between the middle guide hole 110 and the oblique part 220, thereby improving construction safety; S4, axial excavation of the middle guide tunnel 110 is carried out along the central axis of the construction cavern 100. During the excavation process, the bottom of the middle guide tunnel 110 is aligned with the lowest position of the top arch layer of the construction cavern 100, and the top wall of the excavated middle guide tunnel 110 has the same curvature as the top arch layer of the construction cavern 100. The area marked as ② in the figure is the area for excavation and support of the middle guide tunnel 110.

[0029] S5, the first expansion and support of the two side walls of the middle guide tunnel 110 is performed. The top wall after the first expansion is consistent with the curvature of the top arch layer of the construction cavern 100, and the support adopts anchor support. Exemplarily, the oblique part 220 of the construction channel 200 continues to be excavated along its own axis and end face until the excavation stops after the edge position of the first expansion, so that the excavation of the middle guide tunnel 110 can be carried out in the oblique part 220. The area marked as ③ in the figure is the area of ​​the first expansion and support.

[0030] In some embodiments, the excavation direction of the middle guide tunnel 110 is along the central axis of the construction cavern 100. After the cross-section of the construction channel 200 is vertically climbed from the bottom wall height of the construction channel 200 to the bottom wall height of the middle guide tunnel 110, the excavation of the middle guide tunnel 110 of the construction cavern 100 continues.

[0031] In some embodiments, when the first excavation is carried out on both sides of the middle guide tunnel 110, the first excavation on both sides is staggered excavation, and the staggered distance during the staggered excavation is at least 30m. The purpose of the staggered excavation is to ensure the structural stability of the construction cavern 100 to a certain extent.

[0032] S6, excavation is carried out at the bottom of the middle guide hole 110 and the first expansion at the same time, the excavation depth is 2m~3m, the bottom height after excavation is higher than the bottom height of the final construction cavern 100, so that the height of the middle guide hole (110) meets the height requirement during support construction, and such excavation can ensure that the height of the top arch after the first expansion can meet the construction height of the anchor rod during subsequent support, that is, the height of the top arch after the first expansion is greater than or equal to the height of the anchor rod. Exemplarily, the area marked as ④ in the figure is the area of ​​the middle guide hole 110 and the bottom excavation after the first expansion, and is also the area of ​​the first excavation at the bottom of the construction cavern 100.

[0033] S7, a second excavation is carried out on the side wall of the first excavation to form the top arch layer outline of the construction cavern 100. After the second excavation, support is carried out simultaneously, and anchor support is adopted. The area marked as ⑤ in the figure is the area of ​​the second excavation and support.

[0034] S8, before excavating and supporting the top of the construction channel 200, the bottom of the construction channel 200 is first raised so that the excavation and support equipment can reach the top of the construction channel 200, and then excavation and support are carried out. Anchor support is also used here. For example, the area marked as ⑥ in the figure is the area for excavation and support of the top of the construction channel 200.

[0035] S9, performing secondary excavation on the bottom of the construction cavern 100 so that the bottom height of the construction cavern 100 is equal to the lowest height of the construction passage 200, forming the final shape of the construction cavern 100. The area marked as ⑦ in the figure is the secondary excavation area of ​​the bottom of the construction cavern 100; S10, the construction cavern 100 excavated in the middle is excavated toward both ends along the central axis to connect the route excavated from both ends of the construction cavern 100 toward the middle.

[0036] In the related art, during each expansion and support, anchor support is generally adopted, that is, an anchor hole extending vertically upward is drilled in advance at the top arch of the expansion, and then a longer top arch mortar anchor is directly inserted into the anchor hole. Due to the heavy weight of the anchor, it is difficult for construction workers to lift the anchor to a vertical state, and when the construction workers manually adjust the length direction of the anchor, if the operation is not careful, the anchor is likely to slip and be hit by the collapsed anchor, which is prone to safety accidents.

[0037] In view of this, the embodiment of the present application provides a large-span underground cavern top arch layer installation structure, which can assist in lifting the anchor rod and improve the safety factor during support. Figure 3 , 4 The installation structure includes a traction part 300, a displacement part 400 and a steering part 500; wherein the traction part 300 is installed in the construction cave 100 and is used to connect with the distal end of the anchor rod. When the proximal end of the anchor rod is restricted from axial movement, the traction part 300 can drive the anchor rod to gradually rotate from an axial placement state to a radial placement state. Exemplarily, the proximal end of the anchor rod refers to the end close to the traction part 300, and the distal end of the anchor rod refers to the end away from the traction part 300.

[0038] In some embodiments, the traction part 300 includes a rotating member 310 and a traction rope 320. The rotating member 310 is installed on the top wall of the construction cavern 100. One end of the traction rope 320 is connected to the distal end of the anchor rod, and the other end passes around the rotating member 310 and then extends to the bottom wall of the construction cavern 100. Exemplarily, the rotating member 310 is a pulley, which is installed on the top wall of the construction cavern 100 through pre-buried anchor bars. One end of the traction rope 320 is connected to the distal end of the anchor rod, and the other end passes around the upper part of the pulley and then extends obliquely downward to the bottom wall side of the construction cavern 100. Exemplarily, the other end of the traction rope 320 can be pulled manually or by a pulling device.

[0039] In some embodiments, the displacement part 400 is arranged on the bottom wall of the construction cavern 100 along the axial direction of the construction cavern 100, and the steering part 500 is arranged on the displacement part 400. The displacement part 400 can drive the steering part 500 to move in the axial direction of the construction cavern 100 to just below the anchor hole. Further, the displacement part 400 includes a base frame 410, a screw rod 420 and a moving part 430. The base frame 410 is arranged on the bottom wall of the construction cavern 100, and the screw rod 420 is installed on the base frame 410 along the axial direction of the construction cavern 100. The end of the screw rod 420 is driven by a driving device to achieve rotation. Figure 3 , 4 Exemplarily, the moving member 430 includes a moving plate 431 and a threaded sleeve 432, the threaded sleeve 432 is installed on the bottom wall of the moving plate 431, and the threaded sleeve 432 is threadedly sleeved on the screw 420, and limiting grooves 412 are opened on both sides of the moving plate 431 on the base frame 410, and the two sides of the moving plate 431 are respectively slidably inserted in the limiting grooves 412, so that the screw 420 can drive the moving plate 431 to achieve displacement along the length direction of the screw 420 when rotating.

[0040] In some embodiments, reference Figure 5 , 6, the steering part 500 is mounted on the top wall of the movable plate 431, and the steering part 500 is used to connect with the proximal end of the anchor rod to drive the proximal end of the anchor rod to move axially in the construction cavern 100. Under the traction of the traction rope 320, the steering part 500 can synchronously drive the proximal end of the anchor rod to rotate. Further, the steering part 500 includes a plug-in connector 510, a rotating base 520 and a stopper 530. The rotating base 520 is mounted on the movable plate 431, and the plug-in connector 510 is rotatably mounted on the rotating base 520. The plug-in connector 510 is used to connect with the proximal end of the anchor rod. Exemplarily, the plug-in connector 510 is a plug-in sleeve, one end of the plug-in sleeve is open and the interior is hollow, the end of the plug-in sleeve away from the opening is rotatably connected to the rotating base 520, and the rotating surface of the plug-in sleeve is a vertical surface, and the inner diameter of the plug-in sleeve is adapted to the outer diameter of the anchor rod, so that the proximal end of the anchor rod can be directly inserted into the plug-in sleeve. The limiter 530 is installed on the rotating base 520. When the connector 510 drives the proximal end of the anchor rod to rotate synchronously to the radial placement state, the limiter 530 is used to limit the connector 510 from continuing to rotate. For example, the limiter 530 is a limiter plate, which is vertically installed on the rotating base 520. When the plug-in sleeve rotates to the vertical direction, one side wall of the plug-in sleeve abuts against the limiter plate, so that the plug-in sleeve is restricted from continuing to rotate. When the plug-in sleeve is in the vertical direction, the anchor rod plugged in the plug-in sleeve is also in the radial placement state.

[0041] In some embodiments, in combination Figure 4 , 6 The large-span underground cavern top arch layer installation structure also includes a driving part 600, which includes a first driving sub-part 610 and a second driving sub-part 620. The first driving sub-part 610 drives the second driving sub-part 620 to operate synchronously. The first driving sub-part 610 is connected to the displacement part 400 to drive the displacement part 400 to operate. For example, the first driving sub-part 610 is detachably coaxially connected to the screw rod 420. The second driving sub-part 620 is connected to the traction part 300 to drive one end of the traction part 300 to contract. When the displacement part 400 drives the steering part 500 to move to the bottom of the anchor hole, the first driving sub-part 610 is disconnected from the displacement part 400, and the first driving sub-part 610 remains connected to the first driving sub-part 610, so that the proximal end of the anchor rod stops moving when it moves to the bottom of the anchor hole, while the distal end of the anchor rod can continue to rotate until the anchor rod is in a radial placement state, that is, the distal end of the anchor rod is close to and facing the anchor hole. At this time, the anchor rod is vertically and stably located directly below the anchor hole. The anchor rod can be installed by only pushing the anchor rod vertically upward. At this time, the construction personnel do not need to manually adjust the length direction of the anchor rod, which improves the safety factor when adjusting the anchor rod.

[0042] In some embodiments, reference Figure 7 , 8The first driving sub-unit 610 includes a motor 611 and a first docking portion 612, the first docking portion 612 is coaxially connected to the output shaft of the motor 611, and a second docking portion 421 is coaxially provided at the end of the screw 420, and the first docking portion 612 is directly opposite to the second docking portion 421. Exemplarily, the cross-sectional shapes of the first docking portion 612 and the second docking portion 421 can be triangular, quadrilateral, and polygonal. A coupling part 700 is coaxially sleeved between the first docking part 612 and the second docking part 421, and a first coupling hole 710 and a second coupling hole 720 are axially opened in the coupling part 700. The first coupling hole 710 is for the first docking part 612 to be inserted, and the second coupling hole 720 is for the second docking part 421 to be inserted. The first coupling hole 710 and the second coupling hole 720 are coaxially arranged and not connected. The shape of the coupling hole is adapted to the first docking part 612 and the second docking part 421, so that when the motor 611 rotates, the screw 420 can be driven to rotate synchronously. Exemplarily, the length of the first coupling hole 710 is greater than the length of the second coupling hole 720, so that the first docking part 612 can be inserted into and / or separated from the first coupling hole 710.

[0043] In some embodiments, reference Fig. 9 The second driving sub-unit 620 includes a second bevel gear 621, a second connecting rod 622 and a winding part 623. Exemplarily, a plate 800 is provided below the motor 611 and the winding part 623, the motor 611 is mounted on the plate 800, and the winding part 623 is rotatably provided on the plate 800. One end of the traction rope 320 is wound around the winding part 623, the second connecting rod 622 is coaxially provided at one end of the winding part 623, and the second bevel gear 621 is coaxially provided at one end of the second connecting rod 622 away from the winding part 623. A first bevel gear 6110 is coaxially provided on the output shaft of the motor 611, and the first bevel gear 6110 is meshed with the second bevel gear 621, so that when the motor 611 rotates, the winding part 623 can be driven to rotate synchronously.

[0044] In some embodiments, in combination Fig.10 , 11 A pulling part 900 is provided on the bottom frame 410, and the pulling part 900 includes a pulling rope 910 and a storage part 920. One end of the pulling rope 910 is connected to the moving plate 431, and the other end is connected to the connecting shaft part 700. The storage part 920 is used to store the loose rope segments of the pulling rope 910. Fig.12 A stop plate 411 is also provided at one end of the base frame 410 away from the motor 611. When the movable plate 431 moves to abut against the stop plate 411, the proximal end of the anchor rod is directly below the anchor hole, and the pulling rope 910 will be in a straightened state as a whole and pull the connecting shaft part 700 out of the first docking part 612.

[0045] In the above scheme, when the motor 611 rotates, it drives the screw rod 420 to rotate, so that the threaded sleeve 432 drives the moving plate 431 to move away from the motor 611, and the loose rope segment of the pulling rope 910 is gradually straightened. When the moving plate 431 moves to a position where it contacts the stop plate 411, the moving plate 431 cannot move further. At this time, the proximal end of the anchor rod is directly below the anchor hole, and the pulling rope 910 is completely in a straightened state, and pulls the coupling part 700 away from the first docking part 612, so that the first docking part 612 is disengaged from the first coupling hole 710, and the coupling part 700 is on the second docking part 421. Exemplarily, a rubber layer is provided inside the second coupling hole 720 , so that the friction between the second docking portion 421 and the second coupling hole 720 is greater, so that when the pull rope 910 pulls the coupling portion 700 away from the first docking portion 612 , the second docking portion 421 is not easy to fall off from the second coupling hole 720 .

[0046] In some embodiments, the storage member 920 includes a storage box 921, a first guide cylinder 922, and a second guide cylinder 923, wherein the storage box 921 is hollow inside and has an upper opening, and the loose rope segments of the pull rope 910 can be stored in the storage box 921 to prevent the loose rope segments of the pull rope 910 from being twisted on the screw 420 and affecting the normal rotation of the screw 420. Exemplarily, a first guide cylinder 922 is provided on each side of the upper opening of the storage box 921, and the first guide cylinder 922 can be passed through by the pull rope 910 to prevent the pull rope 910 from directly contacting the edge of the upper opening of the storage box 921 and causing wear. Exemplarily, the second guide cylinder 923 is an arc-shaped structure and is used for the pulling rope 910 to pass through. The side of the second guide cylinder 923 close to the connecting part 700 is close to the height of the connecting part 700, so that the pulling rope 910 can apply a greater axial pulling force to the connecting part 700 after being straightened, thereby making it easier to pull the connecting part 700 off the first docking part 612.

[0047] The implementation principle of the installation structure is as follows: first connect the proximal end of the anchor rod to the steering part 500, then lay the anchor rod flat in the construction cavern 100, keep the anchor rod in a state parallel to the axial direction of the construction cavern 100, start the driving part 600, let the driving part 600 drive the traction part 300 to contract, so that the distal end of the anchor rod is lifted up, and the proximal end of the anchor rod connected to the steering part 500 will synchronously move along the axial direction of the construction cavern 100 along the displacement part 400, thereby allowing the anchor rod to gradually rotate from an axial placement state to a radial placement state, and when the proximal end of the anchor rod reaches directly below the anchor hole, the displacement part 400 will automatically stop, so that the proximal end of the anchor rod stays in a position directly below the anchor hole, but at this time the distal end of the anchor rod will continue to be pulled by the traction part 300 until the anchor rod is in a radial placement state, and the anchor rod will remain in the current state. At this time, the construction personnel can directly insert the anchor rod vertically into the anchor hole to make support safer and more convenient.

[0048] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for excavating a large-span underground cavern top arch layer, characterized in that: The following steps are involved: On the pre-excavation route planned for the construction cavern (100), butt excavation is performed from both ends toward the middle; Excavating a construction passage (200) at the side of the middle of the planned pre-excavation route of the construction cavern (100), so that the construction passage (200) is connected with the extension route of the construction cavern (100), and the lowest part of the excavated construction passage (200) is flush with the bottom wall of the planned construction cavern (100); On the inner side wall of the construction channel (200), first climb and excavate to the bottom wall of the planned pre-excavated route of the middle guide tunnel (110), the bottom wall of the middle guide tunnel (110) is higher than the bottom wall of the preset route of the construction cavern (100), and during the excavation process, a top of the occupied area will be formed between the construction channel (200) and the middle guide tunnel (110); The middle guide hole (110) is excavated along a preset route of the construction cavern (100), and during the excavation process, the bottom of the middle guide hole (110) is aligned with the lowest position of the top arch layer of the construction cavern (100), and the top wall of the excavated middle guide hole (110) is consistent with the curvature of the top arch layer of the construction cavern (100), and the width of the excavated middle guide hole (110) is smaller than the width of the construction cavern (100); The tunnel walls on both sides of the middle guide tunnel (110) are expanded and supported for the first time, the top wall of the middle guide tunnel (110) after the first expansion is consistent with the curvature of the top arch layer of the construction cavern (100), and the width of the middle guide tunnel (110) after the first expansion is smaller than the width of the construction cavern (100); Excavating the bottom of the middle guide tunnel (110) and the first expansion excavation simultaneously, the bottom height after excavation being higher than the bottom height of the final formed construction cavern (100), so that the height of the middle guide tunnel (110) meets the height requirement during support construction; Performing a second excavation on the side wall of the first excavation to completely form the top arch layer profile of the construction cavern (100); Excavating and supporting the top of the construction channel (200); Performing secondary excavation on the bottom of the construction cavern (100) so that the bottom height of the construction cavern (100) is equal to the lowest height of the construction passage (200), thereby forming the final shape of the construction cavern (100); The construction cavern (100) excavated in the middle is excavated towards both ends along the central axis to connect with the route excavated from both ends of the construction cavern (100) towards the middle.

2. The method for excavating the top arch layer of a large-span underground cavern according to claim 1, characterized in that: A construction channel (200) is excavated at the side of the middle of the pre-excavated route of the planned construction cavern (100), so that the construction channel (200) is connected with the extended route of the construction cavern (100), and the lowest part of the excavated construction channel (200) is flush with the bottom wall of the planned construction cavern (100), comprising: Excavating a transverse portion (210) of the construction passage (200) in a horizontal direction, wherein the bottom of the transverse portion (210) is flush with the bottom of the construction cave (100), the top of the transverse portion (210) is flush with the top of the side line of the construction cave (100), and the transverse portion (210) extends horizontally from the outside of the mountain to the side line of the construction cave (100); After the transverse portion (210) is excavated, an oblique portion (220) is excavated obliquely upward along the end surface of the transverse portion (210) until it extends to the edge line of the first expansion excavation of the construction cavern (100).

3. The method for excavating the top arch layer of a large-span underground cavern according to claim 2, characterized in that: The slope of the oblique portion (220) is 10% to 12%.

4. The method for excavating the top arch layer of a large-span underground cavern according to claim 1, characterized in that: When the first excavation is performed on both sides of the middle guide tunnel (110), the first excavation on both sides is staggered excavation, and the staggered distance during the staggered excavation is at least 30m.

5. The method for excavating the top arch layer of a large-span underground cavern according to claim 1, characterized in that: Before excavating and supporting the top of the construction channel (200), the bottom of the construction channel (200) is first raised to enable excavation and supporting equipment to reach the top of the construction channel (200).

6. The method for excavating the top arch layer of a large-span underground cavern according to any one of claims 1 to 5, characterized in that: The support for the first expansion and excavation, the support for the second expansion and excavation, and the support for the top of the construction passage (200) are all anchor rod supports.

7. A large-span underground cavern top arch installation structure, used in the large-span underground cavern top arch excavation method according to claim 6, characterized in that: It comprises a traction part (300), a displacement part (400) and a steering part (500); wherein, The traction part (300) is installed in the construction cave (100) and is used to connect with the distal end of the anchor rod. When the proximal end of the anchor rod is restricted from axial movement, the traction part (300) can drive the anchor rod to gradually rotate from an axial placement state to a radial placement state. The displacement portion (400) is arranged on the bottom wall of the construction cavern (100) along the axial direction of the construction cavern (100), and the steering portion (500) is arranged on the displacement portion (400). The displacement portion (400) can drive the steering portion (500) to move in the axial direction of the construction cavern (100) to just below the anchor hole; The steering portion (500) is used to be connected to the proximal end of the anchor rod to drive the proximal end of the anchor rod to move axially in the construction cave (100). Under the traction of the traction portion (300), the steering portion (500) can synchronously drive the proximal end of the anchor rod to rotate.

8. The large-span underground cavern top arch installation structure according to claim 7, characterized in that: It also includes a driving unit (600), and the driving unit (600) is installed in the construction cave (100); wherein, The driving part (600) is used to drive the end of the traction part (300) away from the anchor rod to retract so as to achieve traction of the anchor rod, and the driving part (600) is used to simultaneously drive the displacement part (400) to operate; When the displacement part (400) drives the steering part (500) to move to the position directly below the anchor hole, the displacement part (400) is disconnected from the driving part (600), and the anchor rod is in an inclined state between the axial placement state and the radial placement state.

9. A large-span underground cavern top arch installation structure according to claim 8, characterized in that: The driving part (600) comprises a first driving sub-part (610) and a second driving sub-part (620), wherein the first driving sub-part (610) drives the second driving sub-part (620) to operate synchronously; wherein, The first driving sub-unit (610) is connected to the displacement unit (400) to drive the displacement unit (400) to operate; The second driving sub-unit (620) is connected to the traction unit (300) to drive one end of the traction unit (300) to contract; When the displacement part (400) drives the steering part (500) to move to the position directly below the anchor hole, the first driving sub-part (610) is disconnected from the displacement part (400), and the first driving sub-part (610) remains connected to the first driving sub-part (610).

10. A large-span underground cavern top arch installation structure according to claim 9, characterized in that: The traction part (300) comprises a rotating part (310) and a traction rope (320), wherein the rotating part (310) is installed on the top wall of the construction cave (100), one end of the traction rope (320) is connected to the distal end of the anchor rod, and the other end of the traction rope (320) is wound around the rotating part (310) and then around the second driving sub-part (620); and / or, The displacement part (400) comprises a base frame (410), a screw rod (420) and a moving member (430), wherein the base frame (410) is arranged on the bottom wall of the construction cave (100), the screw rod (420) is installed on the base frame (410) along the axial direction of the construction cave (100), the screw rod (420) is coaxially connected to the first driving sub-part (610), the steering part (500) is installed on the moving member (430), and the moving member (430) and the screw rod (420) are threadedly matched to enable the moving member (430) to move along the screw rod (420); and / or, The steering part (500) includes a connector (510), a rotating base (520) and a limit member (530), wherein the rotating base (520) is installed on the movable part (430), the connector (510) is rotatably installed on the rotating base (520), the connector (510) is used to be connected to the proximal end of the anchor rod, and the limit member (530) is installed on the rotating base (520), and when the connector (510) drives the proximal end of the anchor rod to rotate synchronously to a radial placement state, the limit member (530) is used to limit the connector (510) from continuing to rotate.