Active supporting method for two sides of mining roadway of extremely soft coal seam

Through the joint support method of anchor cables + W-shaped steel belts, anchoring to solid layers solves the problem of passive support for mining tunnels in extremely soft coal seams, improves the stability and bearing capacity of the tunnels, reduces the risk of accidents, and achieves safety and security. Economic support effect.

CN118757192APending Publication Date: 2024-10-11BOXIA MINING TECH LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411111811.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing support methods for mining roadways in extremely soft coal seams include passive support methods, which cannot effectively control the deformation of the surrounding rock of the roadway and have poor stability, and the cost is high. Especially at the two sides of the mining roadway, there is a risk of a surge in the bottom heave and shrinkage of the roadway. .

Method used

The joint support method of anchor cables + W-shaped steel belts is adopted. The anchor cables are anchored to a solid layer and combined with the installation of W-shaped steel belts to achieve active support for both sides of the mining tunnel and improve the stability and bearing capacity of the surrounding rock of the tunnel. .

Benefits of technology

It effectively reduces the occurrence of accidents such as roof collapse and floor heaving in the tunnel, improves the overall stability of the tunnel, reduces support costs, makes the construction simple and efficient, and is suitable for active support of mining tunnels in extremely soft coal seams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757192A_ABST
    Figure CN118757192A_ABST
Patent Text Reader

Abstract

The invention discloses a method for actively supporting two sides of a mining roadway of an extremely soft coal seam, which comprises an upper row of anchor cables, a lower row of anchor cables and a W-shaped steel belt, and the upper row of anchor cables and the lower row of anchor cables are respectively fixed in a firm top layer and a firm bottom layer. By adopting an anchor cable and W-shaped steel belt combined supporting mode, before the integrity of the roadway is seriously damaged, the two sides of the mining roadway in the extremely soft coal seam are actively supported, the anchor cables are anchored to a firm layer, the self bearing capacity of the sides of the mining roadway is improved, the overall stability of roadway surrounding rock is improved, and the safety of the mining roadway is improved. Accidents such as roof fall and floor heave of a mining roadway in an extremely soft coal seam are reduced, safe production of a mine is achieved, the installation structure of the anchor cables and the W-shaped steel belts is simple, cost can be saved, potential safety hazards caused by local deformation are not prone to occurring, the installation mode of the active supporting structure is provided, construction is simple and efficient, and the active supporting structure has the advantages of being good in economic benefit and the like. The method is suitable for active supporting of mining roadways in extremely soft coal seams and convenient to popularize.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine tunnel support, and in particular to a method for actively supporting both sides of an extremely soft coal seam mining tunnel. Background Art

[0002] Extremely soft coal seams are common geological structures in my country's coal mining process. The tunnels in them have the characteristics of large deformation, poor stability, poor surrounding rock properties, and easy collapse. In particular, the mining tunnels will be affected by the mining of the working face, and the surrounding rock control becomes more difficult. It is more likely to have tunnel floor heave and tunnel wall shrinkage surge. So far, many experts and scholars have proposed many support methods for mining tunnels in extremely soft coal seams, such as scaffolding, grouting reinforcement, etc.

[0003] The Chinese utility model patent with announcement number CN206608188U discloses a U-shaped steel support structure for controlling extremely soft coal seam tunnels, and provides a support method for extremely soft coal seam tunnels. It mainly applies locking leg anchor rods and pressure relief drill holes on the basis of traditional U-shaped steel support, which solves the problem that single anchor rod or U-shaped steel support has great limitations; however, during the construction process, the issue of whether the anchor rod is anchored to a solid layer is not considered.

[0004] The Chinese invention patent with announcement number CN111119935B discloses a multi-layer grouting reinforcement method for soft and broken surrounding rock of tunnels, and provides a grouting reinforcement technology for soft coal seam tunnels. It uses existing grouting materials and equipment for multi-layer grouting, effectively solving the problem of poor bearing capacity of surrounding rock in soft coal seams. However, there are the following shortcomings: (1) The U-shaped steel shed is a passive support method, which ignores the fact that the U-shaped steel shed may not be able to effectively control the deformation of the tunnel surrounding rock in one support, and there are problems such as passive support causing serious damage to the integrity of the surrounding rock and high support costs. (2) The cost of using grouting reinforcement is relatively high.

[0005] Therefore, it is necessary to research and develop an active support method for both sides of the mining tunnel in extremely soft coal seams. Summary of the invention

[0006] The technical problem to be solved by the present invention is to address the deficiencies of the above-mentioned prior art and to provide a method for active support of the two sides of a mining tunnel in an extremely soft coal seam. By adopting a combined support method of anchor cables + W-shaped steel belts, active support is provided for the two sides of a mining tunnel in an extremely soft coal seam before the integrity of the tunnel is seriously damaged. The anchor cables are anchored to solid strata, thereby improving the self-bearing capacity of the sides of the mining tunnel and increasing the overall stability of the tunnel surrounding rock, thereby solving the above-mentioned technical problems.

[0007] The technical solution adopted by the present invention is:

[0008] An active support method for both sides of an extremely soft coal seam mining roadway comprises an upper row of anchor cables, a lower row of anchor cables and a W-shaped steel belt, wherein the upper row of anchor cables and the lower row of anchor cables are respectively fixed in a solid top layer and a solid bottom layer, and the W-shaped steel belt is installed at both sides of the extremely soft coal seam mining roadway, and an active support method of upper and lower double rows of anchor cables + steel belt is adopted to actively support both sides of the target mining roadway, and the operation steps are as follows:

[0009] S1. Determine the positions of the solid top layer and the solid bottom layer: the solid top layer and the solid bottom layer correspond to the positions of the top solid rock layer and the bottom solid rock layer adjacent to the target mining roadway, respectively, and the space between the solid top layer and the top wall of the target mining roadway is set as the direct top layer, and the space between the solid bottom layer and the bottom wall of the target mining roadway is set as the direct bottom layer;

[0010] S2. Determine the starting coordinate point o of the anchor cable installation hole to be drilled in the target mining roadway: including an upper starting point and a lower starting point, the upper starting point and the lower starting point are symmetrically distributed about the center axis of the target mining roadway, set the distance between the upper starting point and the lower starting point, and calculate the distance from the upper starting point to the top wall of the target mining roadway and the distance from the lower starting point to the bottom wall of the target mining roadway;

[0011] S3. Determine the inclination and inclination angle of the borehole: Since the shear resistance of the anchor cable is relatively weak, if the inclination angle of the anchor cable to the upper and lower roof and floor plates is too large, shear force is likely to be generated. Therefore, the anchor cable installation holes corresponding to the upper row of anchor cables are drilled at an elevation angle of 45°, and the anchor cable installation holes corresponding to the lower row of anchor cables are drilled at a depression angle of 45°. The two anchor cable installation holes corresponding to the upper and lower rows of anchor cables are inclined to the inner side of the target mining tunnel and are distributed vertically. The drilling inclination deviation of the anchor cable installation holes should not be greater than 5%;

[0012] S4. Determine the drilling depth of the anchor cable installation hole: extend the ray from the starting coordinate point o along the inclination angle of the anchor cable installation hole until it terminates with the side wall of the solid top layer or solid bottom layer away from the target mining tunnel. The distance between the starting coordinate point o and the termination point is the drilling depth of the anchor cable installation hole;

[0013] S5. Use an anchor drill to drill with casing: according to the determined drilling starting coordinate point o, drilling inclination and inclination angle, and drilling depth, drive the outer casing into the rock mass. After a section of casing is driven in, it is tightened by the thread on the casing, and each section of casing is driven in continuously;

[0014] S6. Determine the length of the upper row anchor cable and the lower row anchor cable: when cutting the upper row anchor cable and the lower row anchor cable, reserve installation sections based on the lengths of the upper row anchor cable installation holes and the lower row anchor cable installation holes respectively;

[0015] S7. Install the upper and lower row anchor cables: install two rolls of resin anchor agent for each anchor cable, use the front end of the anchor cable to send the resin anchor agent into the bottom of the anchor cable installation hole of the anchor cable to be installed, and then use the drilling rig with the stirrer to push and stir the resin anchor agent until the front end of the anchor cable enters the bottom of the anchor cable installation hole, so that the installation section extends out of the anchor cable installation hole. After the anchor cable enters the bottom of the hole, start the drilling rig to slowly and evenly pull out the casing. When pulling out the casing, be careful not to pull out the anchor cable. If it is pulled out, pull the casing back and forth slowly;

[0016] S8. Install W-shaped steel belt: After the anchor cables are anchored, the upper and lower anchor cables pass through the corresponding steel belt holes on the W-shaped steel belt through the installation section, and the W-shaped steel belt is supported close to the side wall of the W-shaped steel belt for joint support. It should be noted that the upward and downward section moduli of the W-shaped steel belt are quite different, so during installation, an anchor drill is used to tighten upward. The steel belt section modulus is very small and is easy to fit closely with the roof surrounding rock. However, when the roof is pressed, the downward bending section modulus of the steel belt is very large, which can make the loose surrounding rock form a whole;

[0017] S9. Install the lock and apply pre-tightening force: Put the anchor cable lock into the tail of the installation section of the upper and lower anchor cables, then use the tensioning jack to put it on the upper and lower anchor cables, and turn on the pump for tensioning and pre-tightening.

[0018] Preferably, in S1, before the positions of the solid top layer and the solid bottom layer are determined, the distribution structure of the coal and rock layers in the target mining tunnel area is obtained by drilling, and a construction coal mine borehole columnar diagram is drawn based on the drilled sampled coal and rock layers. Based on the corresponding construction coal mine borehole columnar diagram, the distribution of different coal and rock layers above and below the target mining tunnel is observed, and the positions of the top solid rock layer and the bottom solid rock layer closest to the target mining tunnel are determined based on the lithology of each layer shown in the columnar diagram.

[0019] Preferably, in S2, the distance from the upper starting point to the top wall of the target mining tunnel and the distance from the lower starting point to the bottom wall of the target mining tunnel are equal, and the expression is as follows:

[0020]

[0021] Among them, h r Indicates the height value of the target mining tunnel, the measured value;

[0022] h0 represents the distance between the upper starting point and the lower starting point, which is a set value;

[0023] h1 represents the distance from the upper starting point to the top wall of the target mining tunnel or the distance from the lower starting point to the bottom wall of the target mining tunnel.

[0024] Preferably, in S4, the depth of the anchor cable installation hole is calculated by the following formula:

[0025]

[0026] Where:

[0027] h2=h1+h u (1-4)

[0028] h3=h1+h d (1-5)

[0029] Wherein, d1 represents the drilling depth of the upper row anchor cable installation holes;

[0030] d2 represents the drilling depth of the lower row anchor cable installation holes;

[0031] h u Represents the distance between the top of the solid top layer and the bottom of the immediate top layer, measured;

[0032] h d Represents the distance between the bottom of the solid subfloor and the top of the immediate subfloor, measured;

[0033] h2 represents the distance from the upper starting point to the top of the solid top layer;

[0034] h3 represents the distance from the lower starting point to the bottom of the solid underlying layer.

[0035] Preferably, in S6, the length range of the reserved installation sections on the upper row of anchor cables and the lower row of anchor cables is set to 0.2-0.3 m, and the expression is as follows:

[0036] d1+0.2≤d3≤d1+0.3(1-6)

[0037] d2+0.2≤d4≤d2+0.3(1-7)

[0038] Wherein, d3 represents the length of the upper row of anchor cables;

[0039] d4 represents the length of the lower row of anchor cables.

[0040] Preferably, in S7, the resin anchor is set to an anchor of model MSZ-23-60, and the anchor cable is stirred for 20-30 seconds after entering the bottom of the anchor cable installation hole.

[0041] Preferably, in S8, the W-shaped steel strip has a stamped rib plate, and the length of the W-shaped steel strip is L<h r , the distance between the ends of the W-shaped steel strip is L0

[0042] The outer diameters of the upper row anchor cables and the lower row anchor cables are smaller than the inner diameter d of the steel belt hole, and the outer diameter of the anchor cable lock is larger than the inner diameter d of the steel belt hole.

[0043] ​Preferably, in S9, the pre-tightening force N on the upper row of anchor cables and the lower row of anchor cables is ≥ 200 kN.

[0044] Preferably, h1≥0.5m, the distance between the lower row of drill holes and the bottom of the target mining tunnel is not less than 500mm, a construction position is reserved for the drilling rig, the horizontal positioning deviation of the drilling position is <0.02m, and the vertical positioning deviation is <0.05m.

[0045] Preferably, the number of the upper starting points and the lower starting points are set to multiple, and the multiple upper starting points are distributed one-to-one directly above the multiple lower starting points. In the target mining tunnel, the support structure composed of upper row anchor cables, lower row anchor cables and W-shaped steel belts is provided with multiple rows, and the multiple rows of support structures are respectively installed corresponding to the multiple groups of upper starting points and lower starting points.

[0046] Compared with the prior art, the present invention adopts the above technical solution and has the following technical effects:

[0047] 1. By adopting the combined support method of anchor cable + W-shaped steel belt, the two sides of the mining roadway in the extremely soft coal seam are actively supported before the integrity of the roadway is seriously damaged, and the anchor cable is anchored to the solid layer, which improves the self-bearing capacity of the side of the mining roadway, increases the overall stability of the roadway surrounding rock, and reduces the occurrence of accidents such as roof collapse and bottom drum in the mining roadway in the extremely soft coal seam, so as to achieve safe production of the mine. The installation structure of the anchor cable and the W-shaped steel belt is simple, which can save costs and is not prone to safety hazards caused by local deformation. The installation method of the active support structure is also given, which has the advantages of simple and efficient construction, good economic benefits, etc. It is suitable for active support of mining roadways in extremely soft coal seams and is easy to promote. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0049] Figure 1 A cross-sectional view of the active support structure on both sides of the extremely soft coal seam mining tunnel provided by the present invention;

[0050] Figure 2 A top view of the W-shaped steel belt structure provided by the present invention;

[0051] Figure 3 A side view of the W-shaped steel belt structure provided by the present invention;

[0052] Figure 4 This is a rendering of the tunnel side support effect provided by the present invention.

[0053] In the figure:

[0054] Upper row anchor cable-1; Lower row anchor cable-2; W-shaped steel belt-3; Solid top layer-4; Solid bottom layer-5; Target mining tunnel-6; Upper starting point-7; Lower starting point-8; Direct top layer-9; Direct bottom layer-10; Steel belt hole-11;

[0055] L-strip length; W-strip width; L0-strip end distance; L1-strip hole spacing; d-strip hole diameter; T-strip thickness; H-strip height; B-strip support width. DETAILED DESCRIPTION

[0056] The present invention is further described in detail below in conjunction with the accompanying drawings and specific preferred embodiments.

[0057] In the description of the present invention, it should be understood that the terms "left side", "right side", "upper part", "lower part" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. "First", "second" and the like do not indicate the importance of the components, and therefore cannot be understood as limiting the present invention. The specific dimensions used in this embodiment are only for illustrating the technical solution, and do not limit the scope of protection of the present invention.

[0058] like Figure 1-4 As shown, a method for actively supporting both sides of a mining roadway in an extremely soft coal seam comprises an upper row of anchor cables 1, a lower row of anchor cables 2 and a W-shaped steel belt 3. The upper row of anchor cables 1 and the lower row of anchor cables 2 are fixed in a solid top layer 4 and a solid bottom layer 5 respectively. The W-shaped steel belt 3 is installed at both sides of the mining roadway in an extremely soft coal seam. An active support method of upper and lower double rows of anchor cables + steel belts is adopted to actively support both sides of a target mining roadway 6. The operation steps are as follows:

[0059] S1. Determine the positions of the solid top layer 4 and the solid bottom layer 5: the solid top layer 4 and the solid bottom layer 5 correspond to the top solid rock layer and the bottom solid rock layer adjacent to the target mining roadway 6, respectively, and the space between the solid top layer 4 and the top wall of the target mining roadway 6 is set as the direct top layer 9, and the space between the solid bottom layer 5 and the bottom wall of the target mining roadway 6 is set as the direct bottom layer 10;

[0060] Specifically, before the positions of the solid top layer 4 and the solid bottom layer 5 are determined, the distribution structure of the coal and rock layers in the target mining roadway 6 area is obtained by drilling, and a construction coal mine borehole columnar diagram is drawn based on the drilling sampled coal and rock layers. According to the corresponding construction coal mine borehole columnar diagram, the distribution of different coal and rock layers above and below the target mining roadway 6 is observed, and the positions of the top solid rock layer and the bottom solid rock layer closest to the target mining roadway 6 are determined according to the lithology of each layer shown in the columnar diagram;

[0061] S2, determine the starting coordinate point o of the anchor cable installation hole drilled in the target mining tunnel 6: including the upper starting point 7 and the lower starting point 8, the upper starting point 7 and the lower starting point 8 are symmetrically distributed about the center axis of the target mining tunnel 6, set the distance between the upper starting point 7 and the lower starting point 8, and calculate the distance from the upper starting point 7 to the top wall of the target mining tunnel 6 and the distance from the lower starting point 8 to the bottom wall of the target mining tunnel 6;

[0062] The distance from the upper starting point 7 to the top wall of the target mining tunnel 6 and the distance from the lower starting point 8 to the bottom wall of the target mining tunnel 6 are equal, and the expressions are as follows:

[0063]

[0064] Among them, h r Indicates the height value of the target mining tunnel 6, measured value;

[0065] h0 represents the distance between the upper starting point 7 and the lower starting point 8, which is a set value;

[0066] h1 represents the distance from the upper starting point 7 to the top wall of the target mining tunnel 6 or the distance from the lower starting point 8 to the bottom wall of the target mining tunnel 6;

[0067] h1≥0.5m, the distance between the lower row of drill holes and the bottom of the target mining tunnel 6 is not less than 500mm, and a construction position is reserved for the drilling rig;

[0068] S3. Determine the inclination and inclination angle of the borehole: Since the shear resistance of the anchor cable is relatively weak, if the inclination angle of the anchor cable to the upper and lower roof and floor plates is too large, shear force is likely to be generated. Therefore, the anchor cable installation holes corresponding to the upper row anchor cable 1 are drilled at an elevation angle of 45°, and the anchor cable installation holes corresponding to the lower row anchor cable 2 are drilled at a depression angle of 45°. The two anchor cable installation holes corresponding to the upper row anchor cable 1 and the lower row anchor cable 2 are inclined to the inner side of the target recovery tunnel 6 and are vertically distributed. The drilling inclination deviation of the anchor cable installation holes should not be greater than 5%;

[0069] S4, determine the drilling depth of the anchor cable installation hole: extend the ray from the starting coordinate point o along the inclination angle of the anchor cable installation hole until it ends at the side wall of the solid top layer 4 or the solid bottom layer 5 away from the target mining tunnel 6, and the distance between the starting coordinate point o and the end point is the drilling depth of the anchor cable installation hole;

[0070] The depth of the anchor cable installation hole is calculated by the following formula:

[0071]

[0072] Where:

[0073] h2=h1+h u (1-4)

[0074] h3=h1+h d (1-5)

[0075] Wherein, d1 represents the drilling depth of the mounting hole of the upper row anchor cable 1;

[0076] d2 represents the drilling depth of the mounting holes of the lower row anchor cable 2;

[0077] h u represents the distance between the top of the solid top layer 4 and the bottom of the direct top layer 9, measured value;

[0078] h d Represents the distance between the bottom of the solid bottom layer 5 and the top of the immediate bottom layer 10, measured value;

[0079] h2 represents the distance from the upper starting point 7 to the top of the solid top layer 4;

[0080] h3 represents the distance from the lower starting point 8 to the bottom of the solid bottom layer 5;

[0081] S5. Use anchor drilling rigs to cooperate with casing drilling: according to the determined drilling starting coordinate point o, drilling inclination and inclination angle, and drilling depth, the outer casing is driven into the rock mass. Since the extremely soft coal seam is prone to hole collapse, the anchor drilling rig uses the outer casing to be driven in first. After a section of casing is driven in, it is tightened by the sleeve thread on the casing, and each section of casing is driven in continuously to prevent the soft coal seam from collapsing and protect the broken surrounding rock or extremely soft coal seam;

[0082] The horizontal positioning deviation of the drilling position is less than 0.02m, and the vertical positioning deviation is less than 0.05m;

[0083] S6, determining the length of the upper row anchor cable 1 and the lower row anchor cable 2: when cutting the upper row anchor cable 1 and the lower row anchor cable 2, respectively, reserve installation sections based on the lengths of the installation holes of the upper row anchor cable 1 and the installation holes of the lower row anchor cable 2;

[0084] The reserved installation section length range of the upper row anchor cable 1 and the lower row anchor cable 2 is set to 0.2-0.3m, and the expression is as follows:

[0085] d1+0.2≤d3≤d1+0.3(1-6)

[0086] d2+0.2≤d4≤d2+0.3(1-7)

[0087] Wherein, d3 represents the length of the upper row anchor cable 1;

[0088] d4 represents the length of the lower row anchor cable 2;

[0089] S7. Install the upper row anchor cable 1 and the lower row anchor cable 2: Install two rolls of MSZ-23-60 resin anchor for each anchor cable. Use the front end of the anchor cable to send the resin anchor to the bottom of the hole. Then use the drilling rig with a stirrer to push and stir the resin anchor until the front end of the anchor cable enters the bottom of the borehole. The stirring time should be 20-30 seconds. After the anchor cable reaches the bottom of the hole, connect the drilling rig power head to the casing, start the motor and slowly and evenly pull out the casing. When pulling out the casing, be careful not to pull out the anchor cable. If it is pulled out, pull the casing back and forth slowly. The anchor drilling rig uses the MQT-130 / 2.8 drilling rig.

[0090] S8, install the W-shaped steel belt 3: after the anchor cable is anchored, the upper row anchor cable 1 and the lower row anchor cable 2 are passed through the corresponding steel belt holes 11 on the W-shaped steel belt 3 through the installation section, and the W-shaped steel belt 3 is supported to be close to the side wall of the W-shaped steel belt 3 for joint support. It should be noted that the upward and downward section moduli of the W-shaped steel belt 3 are quite different, so during installation, an anchor drill is used to tighten upward. The section modulus of the steel belt is very small, and it is easy to fit closely with the top plate surrounding rock. However, when the top plate is pressed, the downward bending section modulus of the steel belt is very large, which can make the loose surrounding rock form a whole;

[0091] The W-shaped steel strip 3 has a stamped rib plate, and the length of the W-shaped steel strip 3 is L<h r , the distance between the ends of the W-shaped steel belt 3 is L0

[0092] The outer diameters of the upper row anchor cables 1 and the lower row anchor cables 2 are smaller than the inner diameter d of the steel belt hole 11, and the outer diameter of the anchor cable lock is larger than the inner diameter d of the steel belt hole 11;

[0093] S9. Install the lock and apply pre-tightening force: insert the anchor cable lock into the tail of the installation section of the upper row anchor cable 1 and the lower row anchor cable 2, then use the tensioning jack to put it on the upper row anchor cable 1 and the lower row anchor cable 2, turn on the pump for tensioning and pre-tightening, and the pre-tightening force N on the upper row anchor cable 1 and the lower row anchor cable 2 is ≥ 200kN.

[0094] ​When the method provided by the present invention is used to install the active support structure of the upper and lower double-row anchor cables + steel belts, the number of steel belt holes 11 on the W-shaped steel belt 3 can be set to one group or to multiple groups, and the number of steel belt holes 11 in each group is set to two, so that multiple groups of upper-row anchor cables 1 and lower-row anchor cables 2 can be installed, and they are installed in multiple groups of anchor cable installation holes set on the same longitudinal section, thereby improving the support strength of the W-shaped steel belt 3 and providing a greater preload force, thereby improving the stability of the target mining tunnel 6. In addition, the number of upper starting points 7 and lower starting points 8 are both set to multiple, and the multiple upper starting points 7 are distributed one-to-one directly above the multiple lower starting points 8. In the target mining tunnel 6, the support structure composed of the upper-row anchor cables 1, the lower-row anchor cables 2 and the W-shaped steel belt 3 is provided with multiple rows, and the multiple rows of support structures are installed corresponding to the multiple groups of upper starting points 7 and lower starting points 8, respectively, such as Figure 4 As shown, the target recovery tunnel 6 with different widths can be installed. At the same time, a protective frame can be installed on the inner wall of the target recovery tunnel 6 to further ensure the stability and safety of the target recovery tunnel 6 structure.

[0095] Embodiments of the present invention

[0096] In order to study the support problem of the two sides of the extremely soft coal seam transport drift in the 10706 working face of a certain mine, an active support method for the extremely soft coal seam mining tunnel provided by the present invention was adopted, and the two-side support of the transport drift of the 10706 working face was analyzed based on the engineering geological conditions of the 10706 working face.

[0097] According to the drilling column chart of a mine, the distribution of different coal and rock layers above the mining roadway of the 10706 working face can be observed, the position of the solid rock layer closest to the 10706 working face can be determined, and h can be measured. u 4.6m,h d 5.2m,h r is 2.4m; the anchor cable spacing is set to 1m and the spacing is 1m. According to the tunnel height, it can be calculated that h1 is 1.15m and h0 is 1m; h2 is 5.75m, then according to the drilling inclination angle of 45°, the upper row drilling depth d1 can be calculated to be 8.1m; h3 is 6.35m, then according to the drilling inclination angle of 45°, it can be known that the lower row drilling depth d2 is 9.0m.

[0098] The upper row anchor cable 1 and the lower row anchor cable 2 both use steel strands with a diameter of 17.8 mm and a strand number of 1*7. The upper row anchor cable 1 can be set to 8.4 m; the lower row anchor cable 2 can be set to 9.3 m.

[0099] A W-shaped steel belt 11 with a specification of 3mm thickness, 145mm width and 1500mm length is selected. The drilling distance between the W-shaped steel belts 11 should match the drilling spacing of 1000mm. Each W-shaped steel belt 11 is jointly supported with two corresponding anchor cables in the upper and lower rows. According to the number of anchor cables equipped with each W-shaped steel belt 11, after all the equipped anchor cables are anchored, the W-shaped steel belt 11 is successively inserted into the tail of the anchor cable and supported to a position close to the top plate. It should be noted that the upward and downward section moduli of the W-shaped steel belt 11 are quite different, so during installation, an anchor drill is used to tighten it upward. The section modulus of the steel belt is very small, and it is easy to fit closely with the surrounding rock of the top plate. However, when the top plate is pressed, the downward bending section modulus of the steel belt is very large, which can make the loose surrounding rock form a whole. Finally, install the anchor cable lock into the tail of the anchor cable, and then use the tensioning jack to put it on the anchor cable, turn on the pump for tensioning and pre-tightening, and the pre-tightening force of the anchor cable is 230kN.

[0100] During use, the structure can actively support the two sides of the mining tunnel in the extremely soft coal seam, which can save costs and prevent serious damage to the integrity of the surrounding rock of the mining tunnel in the extremely soft coal seam.

[0101] It will be understood by those skilled in the art that, unless otherwise defined, all terms used herein, including technical and scientific terms, have the same meaning as generally understood by those skilled in the art in the art to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0102] The above embodiments are only for explaining the technical idea of ​​the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution according to the technical idea proposed by the present invention shall fall within the protection scope of the present invention. The above embodiments of the present invention are described in detail, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.

Claims

1. An active support method for both sides of a mining roadway in an extremely soft coal seam, comprising an upper row of anchor cables (1), a lower row of anchor cables (2) and a W-shaped steel belt (3), wherein the upper row of anchor cables (1) and the lower row of anchor cables (2) are respectively fixed in a solid top layer (4) and a solid bottom layer (5), and the W-shaped steel belt (3) is installed at both sides of the mining roadway in an extremely soft coal seam, characterized in that: The steps for active support of both sides of the target mining tunnel (6) are as follows: S1. Determine the positions of the solid top layer (4) and the solid bottom layer (5): the solid top layer (4) and the solid bottom layer (5) correspond to the positions of the top solid rock layer and the bottom solid rock layer adjacent to the target mining roadway (6), respectively, and the space between the solid top layer (4) and the top wall of the target mining roadway (6) is set as the direct top layer (9), and the space between the solid bottom layer (5) and the bottom wall of the target mining roadway (6) is set as the direct bottom layer (10); S2, determining the starting coordinate point o of the anchor cable installation hole drilled in the target mining tunnel (6): including an upper starting point (7) and a lower starting point (8), the upper starting point (7) and the lower starting point (8) are symmetrically distributed about the center axis of the target mining tunnel (6), setting the distance between the upper starting point (7) and the lower starting point (8), and calculating the distance from the upper starting point (7) to the top wall of the target mining tunnel (6) and the distance from the lower starting point (8) to the bottom wall of the target mining tunnel (6); S3, determining the inclination and inclination angle of the borehole: the anchor cable installation holes corresponding to the upper row of anchor cables (1) are drilled at an elevation angle of 45°, and the anchor cable installation holes corresponding to the lower row of anchor cables (2) are drilled at a depression angle of 45°, and the two anchor cable installation holes corresponding to the upper row of anchor cables (1) and the lower row of anchor cables (2) are inclined to the inner side of the target mining tunnel (6) and are vertically distributed; S4. Determine the drilling depth of the anchor cable installation hole: extend a ray from the starting coordinate point o along the inclination angle of the anchor cable installation hole until it terminates at the side wall of the solid top layer (4) or the solid bottom layer (5) away from the target mining tunnel (6). The distance between the starting coordinate point o and the termination point is the drilling depth of the anchor cable installation hole; S5. Use an anchor drill to drill with casing: according to the determined drilling starting coordinate point o, drilling inclination and inclination angle, and drilling depth, drive the outer casing into the rock mass. After a section of casing is driven in, it is tightened by the thread on the casing, and each section of casing is driven in continuously; S6, determining the length of the upper row anchor cable (1) and the lower row anchor cable (2): when cutting the upper row anchor cable (1) and the lower row anchor cable (2), a mounting section is reserved based on the length of the mounting hole of the upper row anchor cable (1) and the mounting hole of the lower row anchor cable (2); S7, installing the upper row anchor cables (1) and the lower row anchor cables (2): two rolls of resin anchoring agent are installed on each anchor cable, and the front end of the anchor cable is used to deliver the resin anchoring agent to the bottom of the anchor cable installation hole of the anchor cable to be installed, and then the resin anchoring agent is pushed and stirred by using a drilling rig and a stirrer until the front end of the anchor cable enters the bottom of the anchor cable installation hole, so that the installation section extends out of the anchor cable installation hole. After the anchor cable enters the bottom of the hole, the drilling rig is started to slowly and evenly pull out the casing; S8, installing the W-shaped steel belt (3): after the anchor cables are anchored, the upper row of anchor cables (1) and the lower row of anchor cables (2) are passed through the corresponding steel belt holes (11) on the W-shaped steel belt (3) through the installation section, and the W-shaped steel belt (3) is supported to be close to the side wall of the W-shaped steel belt (3) for joint support; S9. Install the lock and apply pre-tightening force: insert the anchor cable lock into the tail of the installation section of the upper row anchor cable (1) and the lower row anchor cable (2), then use the tensioning jack to cover the upper row anchor cable (1) and the lower row anchor cable (2), and start the pump to tension and pre-tighten.

2. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 1 is characterized by: In S1, before the positions of the solid top layer (4) and the solid bottom layer (5) are determined, the distribution structure of the coal and rock layers in the target mining tunnel (6) area is obtained by drilling, and a construction coal mine borehole column chart is drawn based on the coal and rock layers sampled by drilling. Based on the corresponding construction coal mine borehole column chart, the distribution of different coal and rock layers above and below the target mining tunnel (6) is observed, and the positions of the top solid rock layer and the bottom solid rock layer closest to the target mining tunnel (6) are determined based on the lithology of each layer shown in the column chart.

3. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 2 is characterized by: In S2, the distance from the upper starting point (7) to the top wall of the target mining tunnel (6) and the distance from the lower starting point (8) to the bottom wall of the target mining tunnel (6) are equal, and the expression is as follows: Among them, h r represents the height value of the target mining tunnel (6), the measured value; h0 represents the distance between the upper starting point (7) and the lower starting point (8), which is a set value; h1 represents the distance from the upper starting point (7) to the top wall of the target mining tunnel (6) or the distance from the lower starting point (8) to the bottom wall of the target mining tunnel (6).

4. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 3 is characterized by: In S4, the depth of the anchor cable installation hole is calculated by the following formula: Where: h2=h1+h u (1-4) h3=h1+h d (1-5) Wherein, d1 represents the drilling depth of the installation hole of the upper row anchor cable (1); d2 represents the drilling depth of the installation holes of the lower row of anchor cables (2); h u represents the distance between the top of the solid top layer (4) and the bottom of the direct top layer (9), measured value; h d represents the distance between the bottom of the solid bottom layer (5) and the top of the immediate bottom layer (10), measured value; h2 represents the distance from the upper starting point (7) to the top of the solid top layer (4); h3 represents the distance from the lower starting point (8) to the bottom of the solid bottom layer (5).

5. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 4, characterized in that: In S6, the length range of the reserved installation section on the upper row anchor cable (1) and the lower row anchor cable (2) is set to 0.2-0.3m, and the expression is as follows: d1+0.2≤d3≤d1+0.3 (1-6) d2+0.2≤d4≤d2+0.3 (1-7) Wherein, d3 represents the length of the upper row of anchor cables (1); d4 represents the length of the lower row of anchor cables (2).

6. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 1, characterized in that: In S7, the resin anchoring agent is set to an anchoring agent of model MSZ-23-60, and the anchor cable is stirred for 20-30 seconds after entering the bottom of the anchor cable installation hole.

7. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 3 is characterized by: In S8, the W-shaped steel strip (3) has a stamped rib plate, and the length of the W-shaped steel strip (3) is L<h r , the distance between the ends of the W-shaped steel strip (3) L0<h1, the distance between the holes of the steel strip on the W-shaped steel strip (3) L1=h0, and the thickness of the steel strip of the W-shaped steel strip (3) T≥3mm; The outer diameters of the upper row anchor cables (1) and the lower row anchor cables (2) are smaller than the inner diameter d of the steel belt hole (11), and the outer diameter of the anchor cable lock is larger than the inner diameter d of the steel belt hole (11).

8. The method for active support of two sides of extremely soft coal seam mining tunnel according to claim 1, characterized in that: In S9, the pre-tightening force N on the upper row of anchor cables (1) and the lower row of anchor cables (2) is ≥ 200 kN.

9. The method for active support of both sides of extremely soft coal seam mining tunnel according to claim 3, characterized in that: h1≥0.5m, horizontal positioning deviation of drilling position is <0.02m, and vertical positioning deviation is <0.05m.

10. The method for active support of both sides of extremely soft coal seam mining tunnel according to claim 1, characterized in that: The number of the upper starting points (7) and the number of the lower starting points (8) are both set to be multiple, and the multiple upper starting points (7) are distributed one-to-one directly above the multiple lower starting points (8). In the target mining tunnel (6), a support structure composed of an upper row of anchor cables (1), a lower row of anchor cables (2) and a W-shaped steel belt (3) is arranged in multiple rows, and the multiple rows of support structures are respectively installed corresponding to the multiple groups of upper starting points (7) and lower starting points (8).