300MW gas-steam combined cycle unit system for test verification

By designing a 300MW gas-steam combined cycle unit system, including a gas turbine prototype, a waste heat boiler and a bypass chimney, the problem of the lack of heavy-duty gas turbine test verification system in China was solved, and comprehensive test verification of heavy-duty gas turbines and system savings were achieved. land and cost.

CN118757245APending Publication Date: 2024-10-11SHANDONG ELECTRIC POWER ENG CONSULTING INST CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410723560.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

There is a lack of test verification system in China that can meet the development and improvement stages of heavy-duty gas turbines, and existing test verification devices cannot achieve comprehensive test verification of heavy-duty gas turbines.

Method used

A 300MW gas-steam combined cycle unit system is designed for experimental verification, including a gas turbine prototype, a waste heat boiler and a bypass chimney. The bypass chimney is equipped with a three-way baffle to control the exhaust gas of the gas turbine prototype through the waste heat boiler to meet the simple requirements cycle and combined cycle testing requirements, and optimize equipment layout to save space and costs by rationally arranging the gas turbine room and steam turbine room.

Benefits of technology

It achieves comprehensive test verification of heavy-duty gas turbines, meets the needs of test verification measurement, monitoring, detection, disassembly and lifting, saves space and costs, and provides a test platform for the first domestic 300MW F-class heavy-duty gas turbine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757245A_ABST
    Figure CN118757245A_ABST
Patent Text Reader

Abstract

The invention provides a test verification-oriented 300MW gas-steam combined cycle unit system, which comprises a bypass chimney, a gas turbine prototype, a waste heat boiler and a steam turbine generator unit, the gas turbine prototype is arranged in a gas turbine room, the steam turbine generator unit is arranged in a steam turbine room, and the central axis of the gas turbine prototype is parallel to the central axis of the steam turbine generator unit; the bypass chimney is arranged between the gas turbine prototype and the waste heat boiler, the bypass chimney is provided with a three-way baffle plate, and the three-way baffle plate is used for controlling smoke exhausted by the gas turbine prototype to pass through the waste heat boiler or not to pass through the waste heat boiler so as to realize a combined cycle test or a simple cycle test of the combined cycle unit; the span, the height, the length and the like of the system (namely the main power house) fully consider the requirements of test verification measurement, monitoring, detection, disassembly, assembly, hoisting and the like; by arranging the bypass chimney between the gas turbine prototype and the waste heat boiler, the test and verification requirements of simple cycle and combined cycle operation of the gas turbine prototype are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to gas turbine test verification, and in particular to a 300MW gas-steam combined cycle unit system oriented to test verification. Background Art

[0002] The statements in this section merely provide background art related to the present invention and do not necessarily constitute prior art.

[0003] The development of heavy-duty gas turbine products requires long-term operation tests in test power plants to verify the overall design technology and assess the performance and reliability of the unit, and to improve the design and manufacturing process based on the test and assessment results to finally finalize the product. Subsequent tests are also required to improve product maturity and continuously upgrade the product.

[0004] The test power station is a key link in the development of heavy-duty gas turbines. At present, various foreign heavy-duty gas turbine manufacturers have successively built test power stations, and their new products have been technically verified, product improved, and performance evaluated and improved in the test power stations. At present, although China has the ability to test and verify the design of some components, the current test and verification devices are all basic design verification devices. There is a lack of a test and verification system that can meet the needs of independent development of heavy-duty gas turbines, and it is not possible to build a test and verification system for the development and improvement stages of heavy-duty gas turbines. Summary of the invention

[0005] In order to address the deficiencies in the prior art, the present invention provides a 300MW gas-steam combined cycle unit system for test verification. The span, height and length of the system (i.e., the main plant) fully take into account the needs of test verification measurement, monitoring, detection, disassembly and lifting. By arranging a bypass chimney between the gas turbine prototype and the waste heat boiler, the test and verification requirements of the simple cycle and combined cycle operation of the gas turbine prototype are met.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A 300MW gas-steam combined cycle unit system for test verification, comprising: a bypass chimney, a gas turbine prototype, a waste heat boiler and a steam turbine generator set, wherein the gas turbine prototype is arranged in a gas turbine room, the steam turbine generator set is arranged in a steam turbine room, and the central axis of the gas turbine prototype is parallel to the central axis of the steam turbine generator set;

[0008] The bypass chimney is arranged between the gas turbine prototype and the waste heat boiler. The bypass chimney is provided with a three-way baffle, which is used to control the exhaust of the gas turbine prototype to pass through the waste heat boiler or not, so as to realize the combined cycle test or simple cycle test of the combined cycle unit.

[0009] As an optional implementation of the present invention, the exhaust diffusion section, bypass chimney and waste heat boiler of the gas turbine prototype are arranged in sequence along the axial direction of the gas turbine exhaust.

[0010] As an optional implementation of the present invention, the gas turbine room includes a main span and an auxiliary span, the main span is used to arrange the gas turbine prototype, the auxiliary span is used to arrange the generator and the air intake system of the gas prototype, and a crane is installed on both the main span and the auxiliary span.

[0011] As an optional implementation of the present invention, the main span of the engine room can enable the crane lifting range to cover the entire engine prototype, the casing and the air intake duct. The height of the engine room is determined according to the size of the air intake duct, the maximum lifting height of the engine prototype for disassembly, assembly and maintenance, and the crane height.

[0012] The auxiliary span of the engine room is determined according to the space dimension requirements of the windward side of the engine prototype, the length dimension of the generator and the disassembly and assembly dimension. The auxiliary span height is determined according to the required height of the air intake system support, the lifting height of the generator disassembly and assembly and the maximum value of the crane dimension.

[0013] As an optional implementation of the present invention, the distance between the on-site measurement cabinet and the cover of the gas turbine prototype is less than or equal to 5 meters.

[0014] As an optional implementation of the present invention, the lifting range of the crane on the top of the main span of the engine room covers the entire length of the engine room, and the lifting capacity of the crane on the top of the main span is selected according to the maximum lifting mass of the engine prototype.

[0015] As an optional implementation method of the present invention, the auxiliary span top crane in the gas turbine room takes into account the disassembly and assembly of the generator and auxiliary equipment, the walking area of ​​the auxiliary span top crane does not need to cover the central control room and the distribution room, and the lifting capacity of the auxiliary span top crane is selected according to the maximum lifting mass of the generator.

[0016] As an optional implementation of the present invention, a closed cooling water pump and a heat exchanger are arranged in the steam turbine room to supply cooling water to the gas turbine prototype test system and related auxiliary machines when the gas turbine prototype is subjected to a simple cycle test or a combined cycle operation test.

[0017] As an optional implementation method of the present invention, the steam turbine room is centered on the steam turbine generator set and auxiliary equipment, and the auxiliary comprehensive room, excitation room and maintenance area are arranged around the center. The waste heat boiler auxiliary equipment and related inverter room and distribution room are arranged on one side of the steam turbine room close to the waste heat boiler.

[0018] As an optional implementation of the present invention, in the steam engine room, the steam turbine is arranged at a low position, and the axial exhaust is connected to the condenser. The steam turbine generator set is located at the other end of the steam turbine, and a condensate pump and a pipeline drain expansion tank are arranged on the left side of the steam turbine, a vacuum pump is arranged on the left side of the condenser, a steam seal cooler, a high-pressure feed water pump, a medium-pressure feed water pump and a low-pressure economizer recirculation pump are arranged on the left side of the generator, and a lubricating oil module, a control oil module, a closed-loop cooling water pump and a closed-loop cooling water heat exchanger are arranged on the right side of the steam turbine generator set.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. The present invention innovatively develops a 300MW gas-steam combined cycle unit system for test verification. The span, height and length of the system (i.e., the main plant) fully consider the needs of test verification measurement, monitoring, detection, disassembly and lifting.

[0021] 2. The present invention meets the testing and verification requirements of the simple cycle and combined cycle operation of the gas turbine prototype by arranging a bypass chimney between the gas turbine prototype and the waste heat boiler.

[0022] 3. The gas engine room, steam engine room, exhaust diffuser section, bypass chimney, waste heat boiler and natural gas front module of the present invention are arranged as a whole. Font, saving floor space and cost.

[0023] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0025] Figure 1 The overall schematic diagram of the 300MW gas-steam combined cycle unit system for test verification provided by the present invention;

[0026] Figure 2 A schematic diagram of the overall layout of the main plant provided by the present invention;

[0027] Figure 3 A profile elevation view of the combustion engine prototype provided by the present invention;

[0028] Figure 4 The span and height of the engine room provided by the present invention;

[0029] Figure 5 A schematic diagram of the test system layout provided by the present invention;

[0030] Figure 6 A schematic diagram of the arrangement of the detection system provided by the present invention;

[0031] Figure 7 A schematic diagram of the driving range provided by the present invention;

[0032] Figure 8 A schematic diagram of the layout of auxiliary equipment in the engine room provided by the present invention;

[0033] Fig. 9 A schematic diagram of the overall layout of the turbine room provided by the present invention;

[0034] Fig.10 A schematic diagram of the layout of auxiliary equipment in the turbine room provided by the present invention;

[0035] in,

[0036] 1. Gas turbine room, 2. Steam turbine room, 3. Exhaust diffusion section, 4. Bypass chimney, 5. Waste heat boiler, 6. Natural gas pre-module;

[0037] 10. Gas turbine prototype, 11. Electronic equipment room, 12. Power distribution room, 13. SFC and excitation room, 14. Central control room, 15. Gas turbine test and maintenance area, 16. Generator maintenance area; 17. Cooling system; 18. Control valve station; 19. Field measurement cabinet layout area;

[0038] 101, gas turbine prototype; 102, generator; 1011, air intake volute; 1012, gas module; 1013, gas turbine housing fire protection module; 1014, lubricating oil module; 1015, control oil module; 1016, water washing module; 1017, test cabinet; 1021, generator sealing oil module; 1022, electrical excitation transformer;

[0039] 20. Steam turbine generator; 21. Auxiliary integrated room; 22. HRSG inverter room and power distribution room; 23. Excitation room; 24. Maintenance area; 25. HRSG auxiliary machine; 26. Central control room;

[0040] 201. Steam turbine; 202. Generator; 203. Condenser; 2011. Lubricating oil module; 2012. Control oil module; 2013. Steam seal cooler module; 2014. Condensate pump; 2015. Pipeline drain expansion tank; 2016. Vacuum pump; 2017. Closed-loop cooling water pump; 2018. Closed-loop cooling water heat exchanger; 2501. HRSG high-pressure feed water pump; 2502. HRSG medium-pressure feed water pump; 2503. HRSG low-pressure economizer recirculation pump. DETAILED DESCRIPTION

[0041] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0042] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0043] In this implementation, a 300MW gas-steam combined cycle unit system for experimental verification is proposed. Figure 1 As shown, it includes the whole machine test prototype, process system and professional supporting system;

[0044] Among them, the whole machine test prototype includes: gas turbine prototype, control system, lubricating oil system, natural gas module and other auxiliary gases; the process system includes: whole machine test system, disassembly and assembly system and detection system; professional supporting systems include: thermal system, power system, electrical system, water supply and drainage system, chemical system, ventilation and air conditioning system, thermal automation system, information and safety protection system, communication system and flue gas denitrification system.

[0045] The main plant of the test power station provided by this implementation method accommodates the whole machine test prototype, process system and most of the professional supporting systems of the whole machine test unit. It is the first domestic 300MW F-class heavy-duty gas turbine gas-steam combined cycle unit whole machine test platform. Specifically, the span, height, length, etc. of the main plant of this implementation method fully consider the needs of test verification measurement, monitoring, detection, disassembly and assembly, lifting, etc.; the gas turbine prototype is equipped with a bypass chimney to meet the simple cycle and combined cycle operation test and verification of the prototype.

[0046] The layout principles are as follows: (1) The test unit adopts a split-axis layout; (2) The span, height, and site of the main plant building fully consider the needs of test verification measurement, monitoring, testing, disassembly, lifting, and product upgrading; (3) The gas turbine prototype is equipped with a bypass chimney to meet the simple cycle and combined cycle operation test and verification of the prototype; (4) The equipment is arranged reasonably, and if conditions permit, it is concentrated and combined as much as possible to ensure clear functional divisions, smooth processes, convenient production, safe operation, and easy testing and maintenance; (5) The layout is optimized to make the equipment layout compact, the process pipelines short, the high-pressure pipelines and cables shortened, the building volume small, the design and construction period short, the project quality high, and the project cost low.

[0047] This implementation method uses a gas turbine prototype. The optional shaft system arrangements include one-to-one split shaft and one-to-one single shaft. The one-to-one single shaft requires less investment and occupies less space. However, since the gas turbine is newly developed and the technology still needs to be verified, the technical risk of single-shaft operation is relatively large. Therefore, this implementation method chooses the one-to-one split shaft arrangement solution.

[0048] In this implementation, the bypass chimney is arranged between the gas turbine and the waste heat boiler. The bypass chimney is provided with a three-way baffle, and the baffle position can be switched so that the gas turbine exhaust passes through the waste heat boiler or not, thereby realizing the switching of the unit's combined cycle and simple cycle operating modes, and the simple cycle and combined cycle tests of the gas turbine prototype can be carried out respectively.

[0049] The center lines of the gas turbine prototype GTG and STG (i.e., steam turbine generator set) are parallel to each other, and the gas turbine room 1, steam turbine room 2, exhaust diffuser section 3, bypass chimney 4, waste heat boiler 5 and natural gas front module 6 are arranged as a whole. Font, saving space, such as Figure 2 shown.

[0050] The test verified that the GTG prototype was arranged in the engine room, the exhaust diffuser section 3, the bypass chimney 4, and the waste heat boiler 5 were arranged along the axial direction of the engine exhaust, a steel chimney was provided at the tail, and the steam turbine generator set STG was arranged in the turbine room 2, adjacent to the engine room 1.

[0051] Natural gas comes from the upper left of the main plant area, cooling water is connected from the right side of the steam turbine room, and electricity is sent out from the lower left of the gas turbine room and above the steam turbine room; a fixed platform is set up around the gas turbine prototype GTG, and the zero-meter level passage is usually convenient for personnel and equipment such as testing, inspection, installation, commissioning and operation to approach.

[0052] The 300MW F-class gas turbine prototype of this implementation adopts a low-position layout, with upper air intake and axial exhaust. The generator end is the cold end, connected to the air intake volute, and the exhaust end is connected to the exhaust diffuser. The air intake system is located directly above the prototype generator, and the air intake centerline is parallel to the gas turbine generator set, connected to the air intake volute below, and an air flow measurement device is installed in the air intake duct; the gas turbine is equipped with an external cover to prevent the possibility of combustible gas leaking into the engine room. The engine module is adjacent to the engine prototype cover, and the outline of the engine prototype is as follows: Figure 3 shown.

[0053] According to the structural characteristics of the gas turbine prototype, the size and height of the gas turbine prototype and the generator are different. The gas turbine room is divided into a main span and an auxiliary span. The main span is where the gas turbine is arranged, and the auxiliary span is where the generator and the gas prototype's air intake system are arranged. According to the hoisting requirements of the prototype, a crane is installed on both the main span and the auxiliary span, such as Figure 4 shown.

[0054] The selection of the main span of the engine room, that is, the span of the crane on the top of the engine room, needs to take into account the disassembly, lifting and product upgrade of the engine prototype. When testing and overhauling the prototype, the compressor, combustion chamber, and turbine cylinder need to be removed, and the cover also needs to be disassembled. When the prototype is disassembled and upgraded, the engine prototype needs to be lifted as a whole, and its cover and part of the air intake duct need to be disassembled. Therefore, when selecting the span of the engine room, it is considered that the crane lifting range covers the entire engine prototype, cover and air intake duct, so that the plant structure will not hinder the disassembly, lifting, cover and air duct of the prototype, nor will it hinder the movement of the crane. The height of the engine room is determined by the size of the air intake duct, the maximum lifting height of the engine prototype disassembly and overhaul, and the height of the crane.

[0055] The selection of the auxiliary span span shall be determined by considering the size of the prototype air intake system, the space size requirements of the windward surface, the length size of the generator, and the disassembly and assembly size. The height of the auxiliary span shall be determined based on the required height of the air intake system support, the lifting height of the generator disassembly and assembly, and the maximum value of the crane size.

[0056] The gas turbine prototype test system is responsible for the simple cycle and combined cycle assessment test of 300MW heavy-duty gas turbines, assessing the start-stop characteristics, variable operating conditions, and steady-state operating conditions under partial load and full load, and testing the performance of the three major components, the control system performance, and the whole machine performance, providing test data support for design optimization and finalization. The test content mainly includes: atmospheric environment parameters, whole machine test, compressor component test, combustion chamber component test, turbine component test, control system test, etc.

[0057] The test system is mainly composed of measuring points, field measurement cabinets, cooling system equipment, central control room equipment and connecting cables. The measuring points are set in the gas turbine prototype. When the electrical signal is transmitted to the field measurement cabinet, there is a certain attenuation. To ensure accurate measurement, the distance between the field measurement cabinet and the gas turbine cover is required to be no more than 5m. The gas module is adjacent to the left side of the gas turbine prototype, so the field test cabinet is arranged adjacent to the right side. The cooling system equipment is temporary equipment. To save plant space, the gas supply device can be arranged in an outdoor open space. Its control valve station is arranged close to the gas turbine for easy on-site operation. The layout of the test system control operation room requires convenient observation of the prototype, and there are many workstations, so the area requirement is large. Therefore, it is arranged in the wide lower right corner of the gas turbine room, separated from the gas turbine prototype with an inspection area. The test cabinet signal is transmitted to the central control room through the cable in the cable trough box. See the test system layout. Figure 5 The shaded area in the figure (where 17 is the cooling system, 18 is the control valve station, 19 is the field measurement cabinet layout area, and 26 is the central control room).

[0058] The inspection system includes four types: non-destructive inspection, material inspection, dimension inspection, and inspection and evaluation. The non-destructive inspection is carried out in the gas turbine room, and other inspections are carried out in other functional rooms in the test power station. Non-destructive inspection should be carried out when abnormalities occur in the gas turbine prototype (including components) during the test process, as well as during defect elimination and maintenance, so as to timely discover defects, analyze faults, and avoid larger defects or faults. The gas turbine prototype inspection is arranged to be carried out in the gas turbine test and maintenance area 15, see Figure 6 The shaded areas in the figure (where 10 is the gas turbine prototype, 11 is the electronic equipment room, 12 is the power distribution room, 13 is the SFC and excitation room, 14 is the central control room, 15 is the gas turbine test and maintenance area, and 16 is the generator maintenance area).

[0059] The main span of the gas turbine room is top-mounted, and it is necessary to consider the disassembly, lifting and product upgrade of the gas turbine prototype. It is also necessary to consider the disassembly of the compressor, combustion chamber, turbine cylinder, and the cover and air intake duct during prototype testing and maintenance, as well as the disassembly and assembly of some auxiliary machines. Figure 7 The number 15 (gas turbine test and maintenance area) is the area required for disassembling the gas turbine prototype. Therefore, the lifting range of the crane on the top of the main span of the gas turbine room covers the entire length of the gas turbine room. The lifting capacity of the crane is selected according to the maximum lifting mass of the gas turbine prototype. The auxiliary span crane considers the disassembly and assembly of the generator and auxiliary equipment. The walking area does not need to cover the central control room and the distribution room. The lifting capacity is selected according to the maximum lifting mass of the generator. The walking range of the main span and auxiliary span cranes is as follows: Figure 7 As shown (wherein 10 is the gas turbine prototype, 11 is the electronic equipment room, 12 is the power distribution room, 13 is the SFC and excitation room, 14 is the central control room, 15 is the gas turbine test and maintenance area, and 16 is the generator maintenance area).

[0060] The natural gas comes from the left side of the gas turbine prototype, so the gas module and the fire protection module are both arranged on the left side of the gas turbine prototype. The natural gas front module has the possibility of natural gas leakage, and is arranged outdoors on the left side of the gas turbine prototype, parallel to the waste heat boiler. The lubricating oil system is on the right side of the gas turbine prototype. A test cabinet is also arranged on the right side, so the lubricating oil module is arranged close to the generator. The generator sealing oil system is also arranged on the right side of the generator, with a smooth process, which is convenient for testing and maintenance. The gas turbine water washing device is arranged on the left side of the gas turbine generator, and the stator cooling water device is arranged at the bottom. The electrical excitation transformer is arranged close to the excitation room. The control oil module needs to operate the gas turbine prototype and the gas module, so it is arranged on the left side of the gas module. In order to facilitate the detection and debugging of auxiliary equipment, the operating space is arranged around the auxiliary equipment according to the equipment requirements. The layout of auxiliary equipment in the gas turbine room can be seen. Figure 8(Among them, 101 is the gas turbine prototype; 102 is the generator, 1011 is the air intake volute, 1012 is the gas module, 1013 is the gas turbine cover fire protection module, 1014 is the lubricating oil module, 1015 is the control oil module, 1016 is the water washing module, 1017 is the test cabinet, 1021 is the generator sealing oil module, and 1022 is the electrical excitation transformer).

[0061] The equipment and systems in the turbine room are mainly used to test and verify the simple cycle and combined cycle operation of the prototype. The closed cooling water pump and heat exchanger in the turbine room supply cooling water to the prototype test system and related auxiliary machines when the simple cycle and combined cycle of the gas turbine prototype are running. The turbine room is centered on the STG and auxiliary machines, and the auxiliary comprehensive room, excitation room and maintenance area are arranged around the center. The waste heat boiler auxiliary machine and related inverter room and power distribution room are arranged on the side of the waste heat boiler in the turbine room, see Fig. 9 (Among them, 20 is the gas turbine prototype, 21 is the auxiliary integrated room, 22 is the HRSG inverter room and distribution room, 23 is the excitation room, 24 is the maintenance area, and 25 is the HRSG auxiliary machine).

[0062] The auxiliary comprehensive room of the steam turbine room is equipped with a dosing sampling room, a battery room, an electronic equipment room, a power distribution room, a relay room, a UPS room, a fire cylinder room and an air conditioning room. The steam turbine is arranged at a low position, and the axial exhaust is connected to the condenser. The steam turbine generator is located at the other end of the steam turbine. The condensate pump and the pipeline drain expansion tank are arranged on the left side of the steam turbine. The vacuum pump is arranged on the left side of the condenser. The steam seal cooler, HRSG high-pressure feed water pump, medium-pressure feed water pump, and low-pressure economizer recirculation pump are arranged on the left side of the generator. The lubricating oil module, control oil module, closed-loop cooling water pump and closed-loop cooling water heat exchanger are arranged on the right side of the steam turbine generator set. The steam-water system, oil system, and cooling water system of the steam turbine room are clearly divided, and the process is smooth.

[0063] A fixed platform is set up on the left and upper side of STG, and a bridge crane is set up to cover the lower left vacuum pump and upper right maintenance area to meet the maintenance requirements of STG, lubricating oil module, control oil module, closed-loop cooling water pump, condensate pump, and vacuum pump. The areas that cannot be covered by the bridge crane, such as HRSG high-pressure feed water pump, medium-pressure feed water pump, and low-pressure economizer recirculation pump, are equipped with separate maintenance hoisting equipment. The main and auxiliary equipment layout in the steam engine room is shown in Fig.10 (Among them, 201 is the steam turbine, 202 is the generator, 203 is the condenser, 2011 is the lubricating oil module, 2012 is the control oil module, 2013 is the steam seal cooler module, 2014 is the condensate pump, 2015 is the pipeline drain expansion tank, 2016 is the vacuum pump, 2017 is the closed-loop cooling water pump, 2018 is the closed-loop cooling water heat exchanger, 2501 is the HRSG high-pressure feed water pump, 2502 is the HRSG medium-pressure feed water pump, and 2503 is the HRSG low-pressure economizer recirculation pump).

[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A 300MW gas-steam combined cycle unit system for test verification, characterized in that: It includes: bypass chimney, gas turbine prototype, waste heat boiler and steam turbine generator set. The gas turbine prototype is arranged in the gas turbine room, and the steam turbine generator set is arranged in the steam turbine room. The central axis of the gas turbine prototype is parallel to the central axis of the steam turbine generator set. The bypass chimney is arranged between the gas turbine prototype and the waste heat boiler. The bypass chimney is provided with a three-way baffle, which is used to control the exhaust of the gas turbine prototype to pass through the waste heat boiler or not, so as to realize the combined cycle test or simple cycle test of the combined cycle unit.

2. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The exhaust diffusion section, bypass chimney and waste heat boiler of the gas turbine prototype are arranged in sequence along the axial direction of the gas turbine exhaust.

3. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The engine room includes a main span and an auxiliary span. The main span is used to arrange the engine prototype, and the auxiliary span is used to arrange the generator and the air intake system of the gas prototype. A crane is installed on each of the main span and the auxiliary span.

4. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The main span of the engine room can make the crane lifting range cover the entire engine prototype, housing and air intake duct. The height of the engine room is determined according to the size of the air intake duct, the maximum lifting height of the engine prototype for disassembly, assembly and maintenance, and the crane height. The auxiliary span of the engine room is determined according to the space dimension requirements of the windward side of the engine prototype, the length dimension of the generator and the disassembly and assembly dimension. The auxiliary span height is determined according to the required height of the air intake system support, the lifting height of the generator disassembly and assembly and the maximum value of the crane dimension.

5. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The distance between the cabinet and the anode cover of the gas turbine measured on site is less than or equal to 5 meters.

6. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The lifting range of the crane on the top of the main span of the engine room covers the entire length of the engine room, and the lifting capacity of the crane on the top of the main span is selected according to the maximum lifting mass of the engine prototype.

7. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: The auxiliary span top crane in the gas engine room takes into account the disassembly and assembly of the generator and auxiliary equipment. The walking area of ​​the auxiliary span top crane does not need to cover the central control room and the distribution room. The lifting capacity of the auxiliary span top crane is selected according to the maximum lifting mass of the generator.

8. The 300MW gas-steam combined cycle unit system for test verification according to claim 1, characterized in that: A closed cooling water pump and heat exchanger are arranged in the turbine room to supply cooling water to the turbine prototype test system and related auxiliary machines when the turbine prototype is undergoing a simple cycle test or a combined cycle operation test.

9. The 300MW gas-steam combined cycle unit system for test verification as claimed in claim 8, characterized in that: The turbine room is centered around the steam turbine generator set and auxiliary equipment, with the auxiliary comprehensive room, excitation room and maintenance area arranged around the center. The waste heat boiler auxiliary equipment and related inverter room and distribution room are arranged on one side of the turbine room close to the waste heat boiler.

10. The 300MW gas-steam combined cycle unit system for test verification according to claim 8, characterized in that: In the steam engine room, the steam turbine is arranged at a low position, with axial exhaust connected to the condenser. The steam turbine generator set is located at the other end of the steam turbine. The condensate pump and pipeline drain expansion tank are arranged on the left side of the steam turbine, the vacuum pump is arranged on the left side of the condenser, the steam seal cooler, high-pressure feed water pump, medium-pressure feed water pump and low-pressure economizer recirculation pump are arranged on the left side of the generator, and the lubricating oil module, control oil module, closed-loop cooling water pump and closed-loop cooling water heat exchanger are arranged on the right side of the steam turbine generator set.