Accurate screening method for offshore wind power foundation monitoring points and safety performance evaluation method

By accurately screening monitoring measurement points and setting screening conditions, personalized monitoring is carried out for different pile foundations, which solves the problems of monitoring redundancy and deficiencies in the existing technology, achieves precise monitoring and safety performance assessment of offshore wind power foundations, and improves This ensures the validity of monitoring data and the accuracy of safety assessments on an entire site basis.

CN118757331APending Publication Date: 2024-10-11CCCC SHANGHAI THIRD HARBOR SCI RES INST CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410846675.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing offshore wind power foundation monitoring measuring point layout plan has problems of redundant and insufficient monitoring. It fails to effectively consider the load difference between the stations and the complexity of the geological conditions, which affects the accuracy of the safety assessment.

Method used

By obtaining wind farm foundation design information, setting first-level, second-level and third-level filtering conditions, accurately screening the locations of monitoring measuring points, increasing or reducing the number of measuring points, conducting personalized monitoring for different pile foundations, collecting and evaluating monitoring data, and realizing Precise monitoring and safety performance assessment of sensitive aircraft positions and the entire site.

Benefits of technology

It improves the effectiveness and accuracy of monitoring data, ensures accurate monitoring of sensitive camera positions, and then realizes the safety assessment of the entire field foundation, optimizing the allocation of monitoring resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757331A_ABST
    Figure CN118757331A_ABST
Patent Text Reader

Abstract

The invention discloses an accurate screening method for offshore wind power foundation monitoring points. The method comprises the following steps: S1, acquiring foundation design information of a whole wind field; s2, primary screening conditions are set, and the most unfavorable foundation pile foundation meeting the primary screening conditions and the first round of conventional foundation pile foundations are selected out; s3, for the selected most unfavorable foundation pile foundation meeting the first-stage screening condition, corresponding monitoring points are added according to the first-stage screening condition and the structural influence; s4, secondary screening conditions are set for the first round of conventional foundation pile foundations, and favorable foundation pile foundations meeting the secondary screening conditions and second round of conventional foundation pile foundations are selected out; and S5, for the selected favorable foundation pile foundation meeting the second-stage screening condition, the monitoring points are reduced according to the second-stage screening condition and the response and influence of the pile foundation. The invention further discloses an offshore wind power foundation safety performance evaluation method. According to the invention, the effectiveness of the monitoring data is improved, and the precise monitoring of the sensitive machine position is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method for accurately screening monitoring points for offshore wind power foundations and a method for evaluating safety performance. Background Art

[0002] The wind turbine foundation is at risk of damage due to complex and changeable load conditions during wind turbine operation, which will seriously affect the safety and applicability of the foundation. In order to effectively ensure the safety of the foundation and the upper wind turbine unit, structural health monitoring is usually carried out on the foundation according to design and use requirements. The monitoring content includes safety, applicability and durability. Among them, safety and applicability monitoring mainly includes strain monitoring, displacement and deformation monitoring, and vibration monitoring. The monitoring data can directly reflect the real-time stress and deformation state of the foundation, which is indispensable and crucial in the work of foundation safety and foundation life assessment.

[0003] The principles for arranging measuring points for traditional pile foundation monitoring are as follows: 1. A steel plate stress gauge is arranged on the inner wall of each pile body at a position 3-5 times the pile diameter below the mud surface of the wind turbine foundation to monitor the stress of the pile body; a steel plate stress gauge is arranged on the inner surface below the top flange of the steel pipe pile foundation (above the inner platform of the foundation top) to monitor the stress conditions at the key nodes of the foundation top; 2. A set of mutually perpendicular inclinometers are arranged at the top of the wind turbine foundation along the main wind direction to monitor the inclination of the foundation; 3. A set of mutually perpendicular accelerometers are arranged at the top of the wind turbine foundation along the main wind direction to monitor the vibration of the foundation.

[0004] The current measurement point arrangement scheme has the following shortcomings:

[0005] 1. Different positions use the same measurement point layout. For units with adjacent positions, the monitoring data is not very different, and there may be monitoring redundancy;

[0006] 2. The monitoring plan does not take into account the differences in loads on units at different positions in the wind farm. In actual situations, due to the influence of wind direction and the fleet, some units in the same wind farm may have excessive loads, resulting in excessive stress on the foundation. There are differences in foundation loads, and there may be insufficient monitoring for foundations with excessive loads, affecting safety assessments.

[0007] 3. Wind farms are located in vast areas with complex geological conditions. There is a possibility that the geological conditions in the same area may vary greatly. For foundations with poor geological conditions, monitoring should be strengthened from a safety perspective. Summary of the invention

[0008] The purpose of the present invention is to overcome the existing defects and provide an accurate screening method for monitoring points of offshore wind power foundations and a safety performance evaluation method, so as to improve the validity of monitoring data and realize accurate monitoring of sensitive machine positions.

[0009] The technical solution to achieve the above purpose is:

[0010] A method for accurately screening monitoring points for offshore wind power foundations according to one embodiment of the present invention comprises:

[0011] Step S1, obtaining the basic design information of the entire wind farm;

[0012] Step S2, setting the first-level screening conditions, selecting the most unfavorable foundation piles and the first round of conventional foundation piles that meet the first-level screening conditions;

[0013] Step S3, selecting the most unfavorable foundation pile that meets the first-level screening conditions, and adding corresponding monitoring points according to the first-level screening conditions and structural influences;

[0014] Step S4, setting secondary screening conditions for the first round of conventional foundation piles, selecting favorable foundation piles and second round conventional foundation piles that meet the secondary screening conditions;

[0015] Step S5, selecting favorable foundation piles that meet the secondary screening conditions, and reducing monitoring points according to the second-level screening conditions and the response and impact of the pile foundation;

[0016] Step S6: three-level screening conditions may be set for the second round of conventional foundation piles as needed, and the monitoring points may be further reduced according to the third-level screening conditions and the response and impact of the pile foundations.

[0017] Preferably, in step S1, the wind farm foundation design information includes but is not limited to pile foundation size, geological conditions and design load.

[0018] Preferably, in step S2, the primary screening conditions include: pile foundations with the largest loads under various working conditions and pile foundations at locations with poor geological conditions.

[0019] Preferably, in step S3, relevant measurement points of adverse responses are added, including structural stress measurement points, deformation measurement points and foundation tilt measurement points.

[0020] Preferably, in step S4, the secondary screening conditions include: foundation piles with smaller loads, foundation piles with better geological conditions, and foundation piles with nearby strengthened monitoring.

[0021] Preferably, in step S5, the third-level screening condition is routine monitoring.

[0022] The second invention provides a method for evaluating the safety performance of an offshore wind power foundation based on a precise screening method for monitoring points of an offshore wind power foundation, comprising:

[0023] Step T1, collecting monitoring data of the pile foundation of the added measuring point;

[0024] Step T2, evaluating the safety performance of the pile foundation at the added measuring point through monitoring data;

[0025] Step T3, generalize the safety assessment results to the foundation piles that meet the requirements of adding measurement points;

[0026] Step T4, collecting monitoring data of conventional monitoring foundation piles;

[0027] Step T5, conducting safety performance assessment on conventional monitoring foundation piles through monitoring data;

[0028] Step T6, generalize the safety assessment results to the foundation piles that comply with routine monitoring;

[0029] Step T7, collecting monitoring data of the pile foundation of the reduced measuring point;

[0030] Step T8, evaluating the safety performance of the pile foundation with reduced measuring points through monitoring data;

[0031] Step T9, generalizing the safety assessment results to the pile foundation that meets the requirements of reducing the number of measuring points;

[0032] Step T10, further evaluating the safety performance of the entire foundation pile.

[0033] Preferably, in step T2, step T4 and step T7, the collected monitoring data include environmental conditions, inclination, uneven settlement, vibration, stress and deformation of the foundation pile foundation. The load of the foundation pile foundation is calculated based on the monitoring data, and the obtained load result is compared with the design load to conduct a safety performance assessment.

[0034] Preferably, in step T2, step S4 and step T7, if the load result is less than or equal to the design load, the safety performance is high, and if the load result is greater than the design load, the safety performance is low.

[0035] The beneficial effects of the present invention are as follows: the present invention can increase or decrease the number of monitoring positions and measuring points by setting primary screening conditions, secondary screening conditions and tertiary screening conditions to screen the monitoring positions and measuring points, so that the detection data is more comprehensive, the effectiveness of the monitoring data is improved, and precise monitoring of sensitive positions is achieved, thereby realizing the safety assessment of the entire field foundation based on the safety performance assessment of the monitoring foundation pile foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a flow chart of the method for accurately screening monitoring points for offshore wind power foundations of the present invention;

[0037] Figure 2 It is a flow chart of the offshore wind power foundation safety performance assessment method of the present invention. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0039] The present invention will be further described below in conjunction with the accompanying drawings.

[0040] like Figure 1 As shown in the figure, the accurate screening method of offshore wind power foundation monitoring points includes:

[0041] Step S1, obtaining the basic design information of the entire wind farm.

[0042] In the embodiment, the wind farm foundation design information includes but is not limited to pile foundation size, geological conditions and design load.

[0043] Step S2, setting the first-level screening conditions, selecting the most unfavorable foundation piles and the first-round conventional foundation piles that meet the first-level screening conditions.

[0044] In the embodiment, the first-level screening conditions include: pile foundations with the largest loads under various working conditions and pile foundations at locations with poor geological conditions.

[0045] Step S3, for selecting the most unfavorable foundation piles that meet the first-level screening conditions, corresponding monitoring points are added according to the first-level screening conditions and structural influences.

[0046] In the embodiment, relevant measurement points of adverse responses are added, including structural stress measurement points, deformation measurement points and foundation tilt measurement points.

[0047] Step S4, setting secondary screening conditions for the first round of conventional foundation piles, selecting favorable foundation piles and second round conventional foundation piles that meet the secondary screening conditions.

[0048] In the embodiment, the secondary screening conditions include: foundation piles with smaller loads, foundation piles with better geological conditions, and foundation piles with nearby strengthened monitoring.

[0049] Step S5, selecting favorable foundation piles that meet the secondary screening conditions, and reducing monitoring points according to the second-level screening conditions and the response and impact of the pile foundation.

[0050] In the embodiment, the third-level screening condition is routine monitoring.

[0051] Step S6: three-level screening conditions may be set for the second round of conventional foundation piles as needed, and the monitoring points may be further reduced according to the third-level screening conditions and the response and impact of the pile foundations.

[0052] After optimizing the measurement points for the entire field infrastructure according to the above process, the infrastructure is deployed on site for testing, data is collected according to the monitoring plan, and a safety assessment of the entire field infrastructure is conducted based on the optimized and precise monitoring data.

[0053] like Figure 2 As shown in the figure, the offshore wind power foundation safety performance assessment method includes:

[0054] Step T1, collecting monitoring data of the pile foundation of the added measuring point.

[0055] Step T2, evaluating the safety performance of the pile foundation at the added measuring point through monitoring data.

[0056] Step T3: Based on the envelope, the safety assessment results are extended to the foundation piles that meet the requirements of adding measurement points.

[0057] Step T4, collecting monitoring data of conventional monitoring foundation piles.

[0058] Step T5, conduct safety performance assessment on conventional monitoring foundation piles through monitoring data.

[0059] Step T6, based on the envelope, generalize the safety assessment results to the foundation piles that comply with routine monitoring.

[0060] Step T7, collecting monitoring data of the pile foundation of the reduced measuring point.

[0061] Step T8, evaluating the safety performance of the pile foundation with reduced measuring points through monitoring data.

[0062] Step T9, based on the envelope, generalize the safety assessment results to the pile foundation that meets the requirements of reducing the number of measuring points.

[0063] Step T10, further evaluating the safety performance of the entire foundation pile.

[0064] In the embodiment, the collected monitoring data include environmental conditions, inclination, uneven settlement, vibration, stress and deformation of the foundation pile foundation. The load of the foundation pile foundation is calculated based on the monitoring data, and the obtained load result is compared with the design load to conduct a safety performance assessment.

[0065] In the embodiment, if the load result is less than or equal to the design load, the safety performance is high, and if the load result is greater than the design load, the safety performance is low. For example, the wind speed in the environmental conditions affects the load result, that is, the greater the wind speed change, the greater the turbulence, and the greater the load change.

[0066] Application examples:

[0067] A certain wind farm has 50 10MW units, of which two have excessively large loads and five have poor geological conditions, requiring special attention. After applying the precise screening method for monitoring points for offshore wind power foundations in the present invention, additional measuring points can be arranged at seven positions, and the remaining 43 positions can be compared with factors such as geological conditions and loads of various working conditions. 50% (or other proportions) of the positions can be taken for decentralized monitoring, and 50% (or other proportions) of the monitoring positions can be reduced. The total number of monitoring positions is reduced from 50 to less than 30. In addition, for the seven enhanced monitoring positions, since their monitoring data is more comprehensive, the evaluation of the entire field position can be carried out based on these data according to the offshore wind power foundation safety performance evaluation method of the present invention, making the evaluation more accurate.

[0068] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A precise screening method for monitoring points of offshore wind power foundations, characterized in that: include: Step S1, obtaining the basic design information of the entire wind farm; Step S2, setting the first-level screening conditions, selecting the most unfavorable foundation piles and the first-round conventional foundation piles that meet the first-level screening conditions; Step S3, selecting the most unfavorable foundation pile that meets the first-level screening conditions, and adding corresponding monitoring points according to the first-level screening conditions and structural influences; Step S4, setting secondary screening conditions for the first round of conventional foundation piles, selecting favorable foundation piles and second round conventional foundation piles that meet the secondary screening conditions; Step S5, selecting favorable foundation piles that meet the secondary screening conditions, and reducing monitoring points according to the second-level screening conditions and the response and impact of the pile foundation; Step S6: three-level screening conditions may be set for the second round of conventional foundation piles as needed, and the monitoring points may be further reduced according to the third-level screening conditions and the response and impact of the pile foundations.

2. The method for accurately screening monitoring points for offshore wind power foundations according to claim 1 is characterized in that: In step S1, the wind farm foundation design information includes but is not limited to pile foundation size, geological conditions and design load.

3. The method for accurately screening monitoring points for offshore wind power foundations according to claim 1 is characterized in that: In step S2, the first-level screening conditions include: pile foundations with the largest loads under various working conditions and pile foundations at locations with poor geological conditions.

4. The method for accurately screening monitoring points for offshore wind power foundations according to claim 1 is characterized in that: In the step S3, relevant measurement points of adverse response are added, including structural stress measurement points, deformation measurement points and foundation tilt measurement points.

5. The method for accurately screening monitoring points for offshore wind power foundations according to claim 1 is characterized in that: In step S4, the secondary screening conditions include: foundation piles with smaller loads, foundation piles with better geological conditions, and foundation piles with nearby strengthened monitoring.

6. The method for accurately screening monitoring points for offshore wind power foundations according to claim 1 is characterized in that: In step S5, the third-level screening condition is conventional monitoring.

7. A method for evaluating the safety performance of an offshore wind power foundation based on the method for accurately screening monitoring points for offshore wind power foundations according to claim 1, characterized in that: include: Step T1, collecting monitoring data of the pile foundation of the added measuring point; Step T2, evaluating the safety performance of the pile foundation at the added measuring point through monitoring data; Step T3, generalize the safety assessment results to the foundation piles that meet the requirements of adding measurement points; Step T4, collecting monitoring data of conventional monitoring foundation piles; Step T5, conducting safety performance assessment on conventional monitoring foundation piles through monitoring data; Step T6, generalize the safety assessment results to the foundation piles that comply with routine monitoring; Step T7, collecting monitoring data of the pile foundation of the reduced measuring point; Step T8, evaluating the safety performance of the pile foundation with reduced measuring points through monitoring data; Step T9, generalizing the safety assessment results to the pile foundation that meets the requirements of reducing the number of measuring points; Step T10, further evaluating the safety performance of the entire foundation pile.

8. The offshore wind power foundation safety performance assessment method according to claim 7, characterized in that: In step T2, step T4 and step T7, the collected monitoring data include the environmental conditions, inclination, uneven settlement, vibration, stress and deformation of the foundation piles. The load of the foundation piles is calculated based on the monitoring data, and the obtained load result is compared with the design load to conduct a safety performance assessment.

9. The offshore wind power foundation safety performance assessment method according to claim 8, characterized in that: In step T2, step S4 and step T7, if the load result is less than or equal to the design load, the safety performance is high, and if the load result is greater than the design load, the safety performance is low.

Citation Information

Cited By

  • Offshore wind power plant remote monitoring management method and system

    CN120537675A

  • A method and system for remote monitoring and management of offshore wind farms

    CN120537675B

  • Transmission casing vibration measurement point rationality evaluation and optimization method

    CN121113507A