Control method, device and equipment of composite material production system and storage medium

By introducing automated identification information transmission into the composite material production system, automatic transfer and hot pressing operations of cut materials are realized, which solves the problems of low production efficiency and high cost caused by manual operations, and improves the feasibility of manufacturing vehicle parts.

CN118760067APending Publication Date: 2024-10-11ZHEJIANG ZEEKR INTELLIGENT TECH CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410777161.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The composite material production process relies on manual operations, resulting in low production efficiency and high cost, which limits its popularity in the manufacturing of vehicle parts.

Method used

A control method for the composite material production system is designed. Through the automatic identification information transmission between the cutting machine, the target receiving tool and the hot pressing equipment, the automatic transfer and hot pressing operation of the cut material are realized, and manual participation is reduced.

Benefits of technology

It improves the production efficiency of composite materials, reduces costs, realizes automated production processes, and improves the feasibility of manufacturing vehicle parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760067A_ABST
    Figure CN118760067A_ABST
Patent Text Reader

Abstract

The invention relates to a control method, device and equipment for a composite material production system and a storage medium, and the method comprises the steps: when a cutting machine cuts a cut material placed in a target material receiving tool, the target material receiving tool can be controlled to move to a target interlayer station according to first identification information used for indicating the target material receiving tool; the layer laying operation can be conveniently executed; and then when a product after layering is obtained after layering operation, hot pressing equipment in the composite material production system is controlled to perform hot pressing operation on the product after layering according to second identification information used for indicating the product after layering, and a final composite material is obtained. According to the scheme provided by the invention, manual participation is not needed, the transfer of the cut material in the target material receiving tool can be executed, and the hot pressing operation of the hot pressing equipment on the laminated product can be controlled, so that the production efficiency of the composite material is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the technical field of composite material production, and in particular, to a control method, device, equipment and storage medium for a composite material production system. Background Art

[0002] Composite materials represented by carbon fiber can be used in the manufacturing of many vehicle parts due to their excellent strength and lightweight contribution. Although the use of composite materials in some vehicle parts can improve the performance of the vehicle, the high manufacturing cost of composite materials has not yet been popularized.

[0003] At present, one of the reasons why the manufacturing cost of composite materials is high is that some of the production processes of composite materials rely too much on manual operations, resulting in low production efficiency and thus high costs. Summary of the invention

[0004] The present application aims to at least solve the technical problems existing in the prior art. To this end, the present application proposes a control method, device, equipment and storage medium for a composite material production system, which can improve production efficiency.

[0005] To achieve the above-mentioned purpose, a first aspect of an embodiment of the present application provides a control method for a composite material production system, characterized in that the method comprises:

[0006] When a cutting machine in the composite material production system cuts a cut material and the cut material is placed in a target material receiving tool, first identification information is obtained; wherein the target material receiving tool is at least one material receiving tool among a plurality of material receiving tools in the composite material production system, and the first identification information is used to indicate the target material receiving tool;

[0007] Based on the first identification information, control the target material receiving tool to move to a target inter-ply station; wherein the target inter-ply station is a station associated with the target material receiving tool among a plurality of inter-ply stations in the composite material production system;

[0008] When the target inter-layer laying station performs a layer laying process on the cut material to obtain a layered product, obtaining second identification information generated by the target inter-layer laying station, wherein the second identification information is used to indicate the layered product;

[0009] Based on the second identification information, a hot pressing device in the composite material production system is controlled to perform a hot pressing operation on the layered product to obtain a composite material.

[0010] In some embodiments, the cut material includes a plurality of materials to be laid up;

[0011] When the cutting machine in the composite material production system cuts the cut material and the cut material is placed in a target material receiving tool, before obtaining the first identification information, the method further includes:

[0012] When the cutting machine cuts the plurality of materials to be laid, obtaining material information of the plurality of materials to be laid;

[0013] Based on the material information of each of the plurality of materials to be laid, generating a first identification code associated with the plurality of materials to be laid; wherein the first identification information includes the first identification code;

[0014] The target material receiving tool is determined among the plurality of material receiving tools based on the first identification codes of the plurality of materials to be laid up.

[0015] In some embodiments, generating a first identification code associated with the plurality of materials to be laid based on the material information of each of the plurality of materials to be laid comprises:

[0016] Based on the material information of each of the plurality of materials to be laid, determining the inter-laying station information corresponding to the plurality of materials to be laid;

[0017] Based on the inter-layer workstation information and the material information of each of the materials to be layered, generating first identification codes for the multiple materials to be layered;

[0018] The step of controlling the target material receiving tool to move to a target inter-layer position based on the first identification information includes:

[0019] Parsing the first identification code to obtain the inter-layer workstation information;

[0020] Based on the inter-ply workstation information, determining the target inter-ply workstation among a plurality of inter-ply workstations in the composite material production system;

[0021] The target material receiving tool is controlled to move to the target inter-layer station.

[0022] In some embodiments, there are multiple target material receiving tools, and at least one of the multiple materials to be laid is placed in each target material receiving tool;

[0023] The step of generating a first identification code associated with the plurality of materials to be laid based on the material information of each of the plurality of materials to be laid comprises:

[0024] Determining, based on the material information of the plurality of materials to be laid, laying process information corresponding to the plurality of materials to be laid; the laying process information includes information for indicating a laying order between the plurality of materials to be laid;

[0025] Generate first identification codes of the plurality of materials to be laid based on the laying process information and material information of each of the materials to be laid;

[0026] The controlling the target material receiving tool to move to the target inter-layer position includes:

[0027] Parsing the first identification code to obtain the layer laying process information;

[0028] Perform path planning according to the layer laying process information to generate a moving path corresponding to each of the target material receiving tools;

[0029] Each of the target receiving tools is controlled to move toward the target inter-layer workstation according to a corresponding moving path, so that the order in which the multiple target receiving tools arrive at the target inter-layer workstation is associated with the layer sequence.

[0030] In some embodiments, after controlling the target receiving tool to move to the target inter-ply station, the method further includes:

[0031] Parsing the first identification codes associated with the plurality of materials to be laid carried in the target material receiving tool to obtain material information of each material to be laid carried in the target material receiving tool;

[0032] According to the material information of the target material to be laid, the target laying robot is controlled to perform the laying operation of the target material to be laid, wherein the target material to be laid is any one of the materials to be laid carried in the target material receiving tool, and the target laying robot is a laying robot among multiple laying robots in the composite material production system, and is used for the operation on the target material to be laid.

[0033] In some embodiments, before acquiring the second identification information generated by the target inter-ply workstation, the method further includes:

[0034] Based on the material information of the plurality of materials to be laid, determining the information of the laid products corresponding to the plurality of materials to be laid;

[0035] Determining hot pressing production scheduling information associated with the laid-up product according to the information of the laid-up product;

[0036] generating a second identification code associated with the laminated product according to the hot pressing production scheduling information, wherein the second identification information includes the second identification code;

[0037] The step of controlling the hot pressing equipment in the composite material production system to perform a hot pressing operation on the laminated product based on the second identification information includes:

[0038] Parsing the second identification code to obtain the hot pressing production scheduling information;

[0039] According to the hot pressing production scheduling information, control the movement of the laminated product to the corresponding hot pressing station;

[0040] The hot pressing equipment located at the hot pressing station is controlled to perform hot pressing operation on the laminated product.

[0041] In some embodiments, the first identification code and the second identification code are graphic codes.

[0042] In some embodiments, after the hot pressing device performs a hot pressing operation on the laminated product to obtain a composite material, the method further comprises:

[0043] Based on the hot pressing production scheduling information, control the demoulding robot to perform a demoulding operation on the composite material carried in the target hot pressing mold to obtain the composite material after demoulding, and obtain third identification information, wherein the target hot pressing mold is a hot pressing mold in the target inter-layer station for carrying the laminated product, and the third identification information is used to indicate the composite material after demoulding;

[0044] Based on the third identification information, the demoulded composite material is controlled to move to a composite material storage area, and a detection robot is controlled to perform a detection operation on the demoulded composite material.

[0045] In some embodiments, after controlling the demoulding robot to perform a demoulding operation on the composite material carried in the target hot pressing mold based on the hot pressing production scheduling information to obtain the demoulded composite material, the method further includes:

[0046] When a plurality of hot pressing molds are obtained after being demolded by the demolding robot, fourth identification information is obtained, where the fourth identification information is used to indicate the plurality of hot pressing molds, and the plurality of hot pressing molds are all hot pressing molds of a batch associated with the hot pressing operation performed by the hot pressing equipment, and the plurality of hot pressing molds include the target hot pressing mold; according to the fourth identification information, the plurality of hot pressing molds are controlled to move to the mold storage area.

[0047] To achieve the above-mentioned purpose, a second aspect of an embodiment of the present application provides a control device for a composite material production system, the control device comprising:

[0048] A first information acquisition unit is used to acquire first identification information when a cutting machine in the composite material production system cuts a cut material and the cut material is placed in a target material receiving tool; wherein the target material receiving tool is at least one of a plurality of material receiving tools in the composite material production system, and the first identification information is used to indicate the target material receiving tool;

[0049] A tool movement control unit, configured to control the target material receiving tool to move to a target inter-ply station based on the first identification information; wherein the target inter-ply station is a station associated with the target material receiving tool among a plurality of inter-ply stations in the composite material production system;

[0050] A second information acquisition unit is used to acquire second identification information generated by the target inter-layer laying station when the target inter-layer laying station performs a layer laying process on the cut material to obtain a layered product, wherein the second identification information is used to indicate the layered product;

[0051] A hot pressing operation control unit is used to control the hot pressing equipment in the composite material production system to perform a hot pressing operation on the laminated product based on the second identification information to obtain a composite material.

[0052] To achieve the above-mentioned purpose, the third aspect of an embodiment of the present application proposes an electronic device, characterized in that it includes at least one controller and a memory for communicating with the controller; the memory stores instructions that can be executed by the at least one controller, and the instructions are executed by at least one of the controllers so that at least one of the controllers executes the control method of the composite material production system as described above.

[0053] To achieve the above-mentioned purpose, the fourth aspect of an embodiment of the present application proposes a computer-readable storage medium, characterized in that a computer program is stored on the computer-readable storage medium, and when the computer program is executed, the control method of the composite material production system as described above is implemented.

[0054] The present application proposes a control method, device, equipment and storage medium for a composite material production system. When a cutting machine cuts a cut material placed in a target material receiving tool, the controller can control the target material receiving tool to move to a target inter-layer station according to the first identification information for indicating the target material receiving tool, so as to perform a layering operation; then, when a layered product is obtained after the layering operation, the controller controls the hot pressing equipment in the composite material production system to perform a hot pressing operation on the layered product according to the second identification information for indicating the layered product, so as to obtain the final composite material. The solution provided by the present application does not require manual intervention, and can perform the transportation of the cut material in the target material receiving tool and control the hot pressing operation of the hot pressing equipment on the layered product, so as to improve the production efficiency of composite materials.

[0055] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0057] Figure 1 is a flow chart of an embodiment of a control method for a composite material production system provided by the present application;

[0058] Figure 2 It is a flow chart of an embodiment of a method for determining a target material receiving tool provided by the present application;

[0059] Figure 3 is a schematic diagram of a process of an embodiment of a composite material production system provided by the present application;

[0060] Figure 4 is a structural schematic diagram of an embodiment of a control device provided by the present application;

[0061] Figure 5 It is a schematic structural diagram of an embodiment of an electronic device provided by the present application. DETAILED DESCRIPTION

[0062] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0063] Reference Figure 1An embodiment of the present application provides a control method for a composite material production system. The present application embodiment can take a controller as an example to realize the control of the composite material production system through the controller. The controller can be a controller of each workshop scheduling system, or a server, which is not specifically limited here. For details, please refer to the introduction of the subsequent embodiments. The method provided in this embodiment includes the following steps S110 to S140:

[0064] Step S110: when a cutting machine in the composite material production system cuts a cut material and the cut material is placed in a target material receiving tool, first identification information is obtained.

[0065] In this step, the cutting machine is an important component in the composite material production system, which is mainly used to cut the raw materials to obtain cut materials, and the cut materials are subsequently layered and hot-pressed to form new composite materials.

[0066] Between the cutting operation and the laying operation, the cut material needs to be transferred from the cutting and receiving station to the inter-laying station. In this field, the cut material is transferred by a manual forklift after loading with a receiving tool (such as a material frame, a material basket, etc.), which is not only costly but also inefficient. This step sets corresponding identification information for the receiving tool in the composite material production system. The identification information can indicate the identity of the receiving tool. For example, the identification information is an ID, and each receiving tool has a corresponding ID. Because the first identification information indicates the identity of the target receiving tool, when the controller obtains the first identification information, the target receiving tool can be obtained from multiple receiving tools. The target receiving tool is at least one receiving tool among the multiple receiving tools in the composite material production system. The detailed process of determining the target receiving tool can refer to the subsequent embodiments.

[0067] Step S120: Based on the first identification information, control the target material receiving tool to move to the target inter-layer station.

[0068] In this step, the target inter-layer station is a station associated with the target material receiving tool among multiple inter-layer stations in the composite material production system. The composite material production system has multiple inter-layer stations, and each inter-layer station has a corresponding mold (which can be called a layer mold or a hot pressing mold). Different molds are suitable for producing different composite materials. Therefore, the cut materials for realizing a specific composite material setting will be sent to an inter-layer station where the corresponding mold for realizing the specific composite material is located.

[0069] In some embodiments, the association relationship between the material receiving tool and the inter-layer workstation can be set in advance. For example, a table is set up, in which one column records the identification information of the material receiving tool, and the other column records the inter-layer workstation. The table also constructs a corresponding relationship between the data in the two columns. After obtaining the identification information of the material receiving tool, the corresponding inter-layer workstation information can be obtained (look up the table).

[0070] In some embodiments, the controller may issue a command to an automated guided vehicle (AGV) based on the first identification information, and the AGV moves the target receiving tool to the target inter-layer workstation based on the command. Alternatively, the controller may issue a command to a plate chain, and the plate chain performs the transportation.

[0071] Step S130: When the target inter-layer station performs a layering process on the cut material to obtain a layered product, obtain second identification information generated by the target inter-layer station, where the second identification information is used to indicate the layered product.

[0072] In this step, when the target inter-layer workstation performs a layering process on the cut materials to obtain a layered product, the target inter-layer workstation generates second identification information, and the layered product is indicated by the second identification information as an identification mark of the layered product. For example, the target inter-layer workstation has a target mold, and the materials are placed in the target mold, and a layering operation is performed to form a layered product, wherein the layering operation includes placing materials in order, vacuuming, and other operations, which are common knowledge in the field and will not be described in detail here.

[0073] In the step, when the target inter-ply station performs a ply processing on the cut material to obtain a ply product, the controller will obtain the second identification information generated by the target inter-ply station, and then use the second identification information to control the execution of subsequent steps, as detailed in the subsequent description.

[0074] Step S140: Based on the second identification information, control the hot pressing equipment in the composite material production system to perform hot pressing operations on the layered product to obtain a composite material.

[0075] In this embodiment, when the cutting machine cuts the cut material placed in the target material receiving tool, the controller can control the target material receiving tool to move to the target inter-layer station according to the first identification information for indicating the target material receiving tool, so as to perform the layering operation. Then, when the layered product is obtained after the layering operation, the controller controls the hot pressing equipment in the composite material production system to perform the hot pressing operation on the layered product according to the second identification information for indicating the layered product, so as to obtain the final composite material. This embodiment can automatically perform the transportation of the cut material in the target material receiving tool and control the hot pressing operation of the hot pressing equipment on the layered product without manual intervention, so as to improve production efficiency.

[0076] Reference Figure 2 , in some embodiments of the present application, the cut material includes a plurality of materials to be laid;

[0077] In step S110, when the cutting machine in the composite material production system cuts the cut material and the cut material is placed in the target material receiving tool, before obtaining the first identification information, the method further includes steps S210 to S230:

[0078] Step S210: When a plurality of materials to be laid are cut by a cutting machine, material information of the plurality of materials to be laid is obtained.

[0079] In this step, the cut materials include a variety of materials to be laid, where the materials to be laid refer to the materials that need to be laid, and a composite material is formed after the multiple materials to be laid are laid and hot pressed. The material information of the materials to be laid refers to the type, length, height, weight and other parameters of the materials to be laid. The material information of the materials to be laid can be obtained through the following process:

[0080] Before the raw materials are cut by the cutting machine to form the materials to be laid, the coding machine can generate the corresponding QR code according to the material information of each raw material. The QR code can be set on the raw materials. When the cutting machine receives the raw materials, it can scan the code to obtain the information of the raw materials. After cutting, the material information of each material to be laid can also be known according to the QR code. Alternatively, the material recognition can be realized through computer vision technology. For example, the controller sets the material information in advance, and then shoots it through the camera. The controller recognizes the material through the built-in algorithm and then matches the material information.

[0081] Step S220: Generate a first identification code associated with the plurality of materials to be laid based on the material information of each material to be laid.

[0082] In this step, a first identification code is generated according to the material information. The first identification information in step S110 includes a first identification code. The first identification code can be a graphic code such as a barcode or a QR code, or can be a related number (hash password) formed after encoding, which involves operations such as encoding and decoding.

[0083] In this step, multiple materials to be laid need to be placed in corresponding material receiving tools (i.e., target material receiving tools) and then transported. Here, the material information of the multiple materials to be laid needs to be recorded through the first identification code. After scanning the code to obtain the material information of the multiple materials to be laid in the first identification code, the controller uses this information to find the target material receiving tool.

[0084] The number of first identification codes may be consistent with the number of target material receiving tools (which may be multiple), or may be only one. For example, the number of first identification codes is one, and the number of target material receiving tools is three, that is, three target material receiving tools correspond to the same first identification code. Three types of materials to be laid are placed in each target material receiving tool, so the first identification code can record the material information of the three materials to be laid, as well as information indicating the three materials to be laid carried by each target material receiving tool. After the controller obtains the material information of the three materials to be laid obtained by the cutting machine, the three target material receiving tools can be found from a large number of material receiving tools based on the first identification code. Alternatively, the number of first identification codes is three, which are two-dimensional codes, and the number of target material receiving tools is three, and each target material receiving tool corresponds to a two-dimensional code. There are three types of materials to be laid, and one type of material to be laid is placed in each target material receiving tool. The two-dimensional code on each target material receiving tool is associated with the material to be laid placed in the target material receiving tool. Then the three material receiving tools are all affixed with a QR code associated with the materials to be laid placed therein, and the QR code records the material information of the materials to be laid. When the controller obtains the three cut materials, it finds the corresponding three material receiving tools through the QR code.

[0085] The first identification code is used to indicate the target receiving tool, which is at least one of the multiple receiving tools in the composite material production system. For example, when the target receiving tool includes the target receiving tool A and the target receiving tool B, the target receiving tool A and the target receiving tool B both have a corresponding first identification code (assuming it is a QR code). The target receiving tool is used to load a variety of materials to be laid. Assuming there are four materials, namely, material a to be laid, material b to be laid, material c to be laid, and material d to be laid. At this time, the QR code of the target receiving tool A is associated with the material information of material a to be laid and material b to be laid, and the QR code of the target receiving tool B is associated with the material information of material c to be laid and material d to be laid. Material a to be laid and material b to be laid can be placed on the target receiving tool A, and material c to be laid and material d to be laid can be placed on the target receiving tool B. Assume that the QR code of target receiving tool A is associated with material a to be laid, material b to be laid, and material c to be laid, and the QR code of target receiving tool B is associated with material d to be laid. You can also place material a to be laid, material b to be laid, and material c to be laid in target receiving tool A, and place material d in target receiving tool B. Assume that there are two materials, material a to be laid and material b to be laid, then the QR codes of the two target receiving tools are associated with one material respectively, and each material is placed in a corresponding target receiving tool, so that a special frame is used for a special purpose. It should be noted that three examples are listed here. In the first two, there is a situation where a target material receiving tool includes at least two materials. Since scanning the QR code can only know the specific materials included therein, but cannot distinguish between at least two materials in the same target material receiving tool, in order to solve the problem of distinguishing between materials in a target material receiving tool, a QR code can be set in the material to be laid, and the material can be distinguished by the QR code carried by the material itself. The current computer vision technology can also be used to identify the corresponding material through image recognition, which can ensure that the material is correctly distinguished and avoid errors between processes.

[0086] In some embodiments, the first identification code may be set on the target material receiving tool, so that when the target material receiving tool moves to each position, the controller uses a barcode scanner to scan the relevant information.

[0087] In some embodiments, a target material receiving tool may include a plurality of different materials to be laid, which can reduce the number of material receiving tools used, and the first identification code on the target material receiving tool contains material information of the plurality of different materials to be laid. For example, the target material receiving tool is a material receiving frame, and a two-dimensional code (first identification code) is set on the material receiving frame, and the two-dimensional code contains material information of three materials. After the cutting machine cuts out three materials to be laid, each material to be laid carries a two-dimensional code (with information about the material), which is set when the material leaves the factory. By scanning the two-dimensional code on each material to be laid with a barcode scanner, the material information of the material to be laid can be obtained, and then the material information scanned from the material is matched with the material information scanned on the material receiving frame. If the information is consistent, the three materials to be laid are placed in the material receiving frame. It should be noted that when the present embodiment needs to distinguish the three materials to be laid in the receiving frame, for example, when laying the materials, it is necessary to take them out in sequence according to the order in which the materials are laid in the receiving frame. However, only scanning the receiving frame cannot distinguish the three specific materials to be laid. At this time, the scanning device can be used to scan the QR code carried by the material to be laid itself, and then the three materials in the target receiving tool can be distinguished.

[0088] In some embodiments, a target material receiving tool contains only one type of material to be laid, so that a dedicated frame is used for a specific purpose. After the cutter cuts out the corresponding material, it can be directly framed and then transported to improve efficiency. For example, the target material receiving tool is a material receiving frame with a QR code on it, which contains material information of one material. After the cutter cuts out the material to be laid, the QR code of the material to be laid is scanned to obtain the material information, and the two types of material information are matched. If they are consistent, they are framed and transported.

[0089] Step S230: determining a target material receiving tool from a plurality of material receiving tools based on the first identification codes of the plurality of materials to be laid.

[0090] In this step, after knowing the first identification codes of the various materials to be laid, the target material receiving tool can be determined from the multiple material receiving tools, and then the various materials to be laid can be placed on the target material receiving tool to avoid errors in the entire production process caused by the materials being placed on the wrong material receiving tool. The subsequent target material receiving tool will be sent to the designated laying position. It should be noted that in the process of collecting the materials to be laid, the material can be collected by controlling the robot located at the cutting station, or by the robotic arm located at the station.

[0091] In this embodiment, when the cutting machine cuts a variety of materials to be laid, it can obtain material information of each material to be laid, then control the generation of a first identification code associated with the multiple materials to be laid, and finally determine the target material receiving tool for placing the multiple materials to be laid based on the first identification code.

[0092] This implementation can automatically determine the material collection tools for various materials to be laid without manual intervention, thereby improving production efficiency.

[0093] In some embodiments of the present application, step S220 generates a first identification code associated with a plurality of materials to be laid based on material information of each of the plurality of materials to be laid, including the following steps S310 and S320:

[0094] Step S310: Based on the material information of each of the multiple materials to be laid, determine the inter-laying station information corresponding to the multiple materials to be laid.

[0095] The inter-layup workstation information includes position information of corresponding inter-layup workstations for performing a layup operation on materials to be laid up.

[0096] Because the manufacture of different composite materials may be achieved by different inter-layer workstations. Therefore, the corresponding inter-layer workstations can be configured in advance according to the corresponding composite materials manufactured by the various materials to be laid, and the association between the two can be established. For example, the association between the material receiving tool, the material to be laid and the inter-layer workstation can be set in advance. For example, a table is set, in which one column records the identification information of the material receiving tool, one column sets the material information of the material to be laid, one column sets the inter-layer workstation information, and one column sets the composite material information. By looking up the table, the corresponding information can be quickly obtained.

[0097] Step S320: Generate first identification codes of multiple materials to be laid based on the inter-layer workstation information and the material information of each material to be laid.

[0098] In this step, the controller can generate a first identification code based on the material information and the inter-layer workstation information. The first identification code can be set on the target material receiving tool, for example, a QR code is generated and pasted in the material frame for subsequent operations.

[0099] Controlling the target receiving tool to move to the target inter-layer station based on the first identification information in step S120 includes the following steps S340 to S360:

[0100] Step S340: parse the first identification code to obtain inter-layer workstation information.

[0101] In this step, it is necessary to move the target material receiving tool to the target inter-layer station. The tool movement can be achieved by an AGV or a plate chain. Assuming that the transfer is achieved by an AGV, the barcode scanner configured on the AGV can be controlled to parse the first identification code to obtain the inter-layer station information, that is, the inter-layer position to which the target material receiving tool needs to be sent.

[0102] Step S350: determining a target inter-ply workstation among a plurality of inter-ply workstations in the composite material production system based on the inter-ply workstation information.

[0103] Step S360: Control the target material receiving tool to move to the target inter-layer station.

[0104] In this step, tool movement can be achieved by an AGV trolley or a plate chain, etc. When the position of the target layer inter-workstation is determined, the controller can control the AGV trolley or the plate chain to move the target material receiving tool to the designated location by sending instructions.

[0105] The first identification code of this embodiment includes inter-layer workstation information corresponding to a variety of materials to be laid; then, based on the inter-layer workstation information, the target material receiving tool can be sent to the corresponding inter-layer workstation to perform the laying operation. The entire operation does not require human participation, which can improve production efficiency.

[0106] In some embodiments of the present application, there are multiple target material receiving tools, and at least one material to be laid out of multiple materials to be laid out is placed in each target material receiving tool.

[0107] The number of target receiving tools can be set according to the actual situation. For example, if the entire factory area is large, there are many receiving tools, and there are enough laying rooms, then the number of target receiving tools can be set to be consistent with the number of materials to be laid. For example, if there are three types of multiple materials to be laid, then three target receiving tools can be set, and each target receiving tool can only place one type of material to be laid. Or, if there are three types of multiple materials to be laid, then two target receiving tools can be set, one of which can only place one type of material to be laid, and the other target receiving tool can place two types of materials to be laid.

[0108] Step S220 generates a first identification code associated with the plurality of materials to be laid based on the material information of each of the plurality of materials to be laid, including the following steps S410 and S420:

[0109] Step S410: Based on the material information of the multiple materials to be laid, determine the laying process information corresponding to the multiple materials to be laid.

[0110] In this step, the layering process information refers to information used to indicate the layering sequence between multiple materials to be layered. Since composite materials require multiple materials to be layered and combined in the correct order and then hot-pressed, the layering process information corresponding to the multiple materials to be layered is determined based on the material information of the multiple materials to be layered. As in the above embodiment, a table can be set, and each column in the table records corresponding information, and then there is also an association relationship between the information. By looking up the table, the layering process information corresponding to the multiple materials to be layered can be found according to the material information of the multiple materials to be layered.

[0111] Step S420: Generate first identification codes of multiple materials to be laid based on the laying process information and the material information of each material to be laid.

[0112] In this step, the controller can generate a first identification code based on the material information and the laying process information. The first identification code can be set on the target material receiving tool. For example, a QR code is generated and pasted in the material frame to facilitate subsequent scanning and identification.

[0113] Controlling the target receiving tool to move to the target inter-layer station in step S360 includes the following steps S440 to S460:

[0114] Step S440: parse the first identification code to obtain laying process information.

[0115] In this step, the materials to be laid in the target material receiving tool need to be laid in a predetermined laying order. At this time, the barcode scanner configured by the relevant laying robot can be controlled to parse the first identification code to obtain the laying process information.

[0116] Step S450: Perform path planning according to the layer laying process information to generate a moving path corresponding to each target material receiving tool.

[0117] In this step, since different target receiving tools are placed with different materials to be laid, after knowing the laying process information, the moving path corresponding to each target receiving tool can be designed according to the laying sequence of the materials to be laid. The design of the moving path of this embodiment can be based on the current mainstream path design algorithm, taking into account the order of transfer, the time of transfer, the road conditions and other constraints to achieve implementation, which will not be described in detail here.

[0118] Step S460: Control each target receiving tool to move to the target inter-layer station according to the corresponding moving path, so that the arrival of multiple target receiving tools at the target inter-layer station is associated with the layer sequence.

[0119] In this step, it is assumed that the target inter-layer station is determined, the number of target material receiving tools is three, there are three materials to be laid, one material to be laid is placed in each target material receiving tool, the first identification code is a QR code, and each target material receiving tool has a corresponding QR code, the QR code records the laying process information of the three materials to be laid, and the material information corresponding to one material to be laid. The controller can control the AGV trolley to move each target material receiving tool to the target inter-layer station according to the preset moving path after scanning the code, so that the arrival of multiple material receiving tools at the target inter-layer station is associated with the laying sequence, which can avoid the conflict of the transfer paths of multiple material receiving tools and avoid a large number of material receiving tools arriving at the inter-layer station at the same time in a short time, causing congestion, etc., and can also facilitate the laying operation of the laying robot, and avoid the laying robot from matching and verifying a large amount of first identification information from the material receiving tool in a short time.

[0120] Assume that the target layer-laying station is determined, there are two target material receiving tools, namely target material receiving tool A and target material receiving tool B, and there are three materials to be laid: material a to be laid, material b to be laid, and material c to be laid, wherein target material receiving tool A is used to place material a to be laid, and target material receiving tool B is used to place material b and material c to be laid, the first identification code is a QR code, and each target material receiving tool has a corresponding QR code, the QR code in target material receiving tool A records the material information of material a to be laid, the QR code in target material receiving tool B records the material information of material b to be laid and material c to be laid, and both QR codes record the laying process information of the three materials to be laid. Assuming that the laying process information of the three materials to be laid provides a laying order of material a to be laid first, material b to be laid second, and material c to be laid third, the laying robot can scan the code to first determine the target material receiving tool A and the material a to be laid therein, and first place the material in the mold of the target laying station, and then scan the code to determine the target material receiving tool B and the two materials contained therein. It should be noted that since there are two materials to be laid in the target material receiving tool B, scanning the code can only tell that the material b to be laid and the material c to be laid are included, but the two materials cannot be distinguished. At this time, the target material receiving tool B can be scanned by the material to be laid. The robot can identify the QR code it carries with it. For example, material a to be laid, material b to be laid, and material c to be laid are all provided with QR codes, and the QR codes record material information. After scanning the codes, the material b to be laid and the material c to be laid in the target material receiving tool B can be distinguished. Computer vision technology can also be used. For example, a camera is set on the laying robot, and the image of the material receiving tool B is collected by the camera. Then, the built-in visual algorithm is used for analysis to determine the material b to be laid and the material c to be laid. Then, the material b to be laid is placed in the mold first, and the material c to be laid is placed last, so as to avoid errors in the laying order.

[0121] It should be noted that there is no limitation on the order of implementation between steps S410 to S420 and steps S310 to S320 of the above embodiment, because steps S310 to S320 of the above embodiment are a process for introducing how the controller determines the target inter-ply station. If it is necessary to determine the target inter-ply station in the present embodiment, the inter-ply station information corresponding to the target inter-ply station can be set on the first identification code. This has been introduced in the above embodiment and will not be repeated here.

[0122] This embodiment takes into account the scenario where the target material receiving tool includes multiple material receiving tools. First, first identification codes of multiple materials to be laid are generated based on the layup process information. Then, before sending them to the layup station, the first identification code is parsed to obtain the layup process information. Then, the layup process information is used to plan the movement path of each material receiving tool. Finally, each material receiving tool is controlled to move according to the preset movement path, so that the multiple material receiving tools arrive at the target layup station and are associated with the layup sequence, which can improve production efficiency.

[0123] In some embodiments of the present application, after controlling the target receiving tool to move to the target inter-layer station in the above step S120, the method further includes the following steps S510 and S520:

[0124] Step S510: parsing first identification codes associated with a plurality of materials to be laid up carried in a target material receiving tool to obtain material information of each material to be laid up carried in the target material receiving tool.

[0125] Step S520: Control the target laying robot to perform the laying operation of the target material to be laid according to the material information of the target material to be laid, wherein the target material to be laid is any type of material to be laid carried in the target material receiving tool, and the target laying robot is a laying robot among multiple laying robots in the composite material production system, which is used for the operation on the target material to be laid.

[0126] It should be emphasized that since the above-mentioned steps S310 to S320 and steps S410 to S420 all introduce the process of sending the target material receiving tool to the target inter-layer station, the steps S510 and S520 provided in this embodiment introduce the process of performing the layer laying operation at the target inter-layer station, so this embodiment occurs before the above-mentioned steps S310 to S320, or occurs after the above-mentioned steps S410 to S420.

[0127] Because the composite material production system has multiple laying robots, and one laying station may also have multiple laying robots, after the material to be laid arrives, the corresponding target laying robot can be determined based on the material information of the material to be laid. For example, if the material to be laid is a flexible and relatively fine material, then it is necessary to control a laying robot that is specifically designed to lay this material to avoid damaging the material to be laid or affecting the accuracy of the laying. Or, for example, if the material to be laid is a large-sized material, then it is necessary to control a laying robot that is specifically designed to lay large-sized materials. Here are just two examples, and in the actual production process, you can select according to the actual situation.

[0128] This embodiment, under the premise that multiple material receiving tools arrive in sequence, performs material confirmation and laying operations on the arrived material receiving tools, and realizes that different robots can be selected for laying operations based on different material information, which embodies refined laying operations. This embodiment does not require human participation and can also improve production efficiency.

[0129] In some embodiments of the present application, before obtaining the second identification information generated by the target inter-ply workstation in step S130, the method further includes the following steps S610 to S630:

[0130] Step S610: Based on the material information of the multiple materials to be laid, determine the information of the laid products corresponding to the multiple materials to be laid.

[0131] Similar to the above-mentioned embodiment, the association relationship between different materials to be laid and the corresponding products after laying can be set in advance. When in use, the information of the products after laying corresponding to the various materials to be laid can be found from the association relationship based on the material information of the various materials to be laid.

[0132] Step S620: Determine hot pressing production scheduling information associated with the laid-up product according to the information of the laid-up product.

[0133] Similarly, the association between the information of the product after lamination and the hot pressing production scheduling information can be configured in advance. When in use, the hot pressing production scheduling information associated with the product after lamination is determined based on the information of the product after lamination.

[0134] The hot pressing production scheduling information here includes but is not limited to: hot pressing parameters, hot pressing equipment location, and hot pressing equipment model.

[0135] Step S630: Generate a second identification code associated with the laid-up product according to the hot pressing production scheduling information, wherein the second identification information includes the second identification code.

[0136] In this embodiment, the second identification information includes a second identification code; based on the hot pressing production scheduling information control, such as a coding machine generates the second identification code, and the second identification code can be set in the mold for loading the laminated product.

[0137] It should be noted that during the entire production process, between the lamination and hot pressing operations, the mold loaded with the laminated product is directly transferred to the hot pressing station, and then hot-pressed by the hot pressing equipment (such as an autoclave), and then demolded to obtain the hot-pressed composite material.

[0138] The step S140 of controlling the hot pressing equipment in the composite material production system to perform hot pressing operation on the laminated product based on the second identification information includes the following steps S650 to S670:

[0139] Step S650: parse the second identification code to obtain hot pressing production scheduling information.

[0140] This can be achieved by controlling an AGV equipped with a barcode scanner, or by controlling a laying robot.

[0141] Step S660: According to the hot pressing production scheduling information, control the movement of the layered product to the corresponding hot pressing station.

[0142] Here, the AGV can be controlled to move the laid products to the corresponding hot pressing station.

[0143] Step S670: Control the hot pressing equipment at the hot pressing station to perform hot pressing operations on the laminated product.

[0144] This embodiment determines the relevant information of the product after layering based on the material information, and then obtains the hot pressing production scheduling information; then based on the hot pressing production scheduling information, it can control, for example, a coding machine to generate a second identification code; then, it can control, for example, an AGV vehicle to be sent to the hot pressing station according to the set route according to the hot pressing production scheduling information, and finally control the hot pressing process according to the hot pressing production scheduling information. This embodiment provides the ability to automatically generate hot pressing production scheduling information, and then automatically control the sending of the layered product to the hot pressing station and control the hot pressing operation based on the production scheduling information. The entire process does not require manual participation, which can improve production efficiency.

[0145] In some embodiments, after the hot pressing device performs a hot pressing operation on the laminated product to obtain a composite material in step S140, the method further includes the following steps S710 and S720:

[0146] Step S710: Based on the hot pressing production scheduling information, control the demolding robot to perform a demolding operation on the composite material carried in the target hot pressing mold to obtain the composite material after demolding, and obtain third identification information, wherein the target hot pressing mold is a hot pressing mold in the target lamination station for carrying the product after lamination, and the third identification information is used to indicate the composite material after demolding.

[0147] In the above introduction, the hot pressing mold is located in the inter-layer station and is used to carry the materials after layering. The mold will move to the hot pressing station with the AGV. In this step, the demoulding robot is a robot set up in the entire system for demoulding operations, which can improve production efficiency. The demoulding robot demoulds the composite material in the mold.

[0148] In this step, the third identification information may include relevant information of the composite material, such as the composition and type of the composite material, and may be expressed in the form of a QR code. The QR code may then be pasted onto the composite material after demolding for subsequent identification. The QR code may be generated by a demolding robot or a hot pressing device.

[0149] Step S720: Based on the third identification information, control the demoulded composite material to move to the composite material storage area, and control the inspection robot to perform an inspection operation on the demoulded composite material.

[0150] In this step, the third identification information can be obtained through the AGV cart, for example, by scanning the QR code with a configured scanner, and then, under the control of the controller, the demoulding robot can place the demoulded composite material on the AGV cart, which will be transported to the composite material storage area, and then the inspection robot can perform inspection operations on the demoulded composite material, for example, appearance inspection, quality inspection, density inspection, etc.

[0151] The method does not require manual participation in demoulding, material transportation and testing operations, and can improve efficiency.

[0152] In some embodiments, after controlling the demoulding robot to perform a demoulding operation on the composite material carried in the target hot pressing mold based on the hot pressing production scheduling information to obtain the demoulded composite material, the method further includes the following steps S810 and S820:

[0153] Step S810: When multiple hot pressing molds are demolded by the demolding robot, fourth identification information is obtained, where the fourth identification information is used to indicate multiple hot pressing molds. The multiple hot pressing molds are all hot pressing molds of a batch associated with the hot pressing operation performed by the hot pressing equipment, and the multiple hot pressing molds include the target hot pressing mold.

[0154] Step S820: Control multiple hot pressing molds to move to the mold storage area according to the fourth identification information.

[0155] In this embodiment, the hot pressing equipment can process hot pressing molding of multiple composite materials simultaneously by performing one hot pressing operation, and one composite material requires a corresponding carrier mold. Therefore, after completing one hot pressing operation, there will be multiple hot pressing molds to be demolded. After the demolding robot completes the demolding, the fourth identification information can be set to indicate the multiple hot pressing molds. For example, multiple QR codes are generated and pasted, and then the controller controls the mold transport vehicle to send all the hot pressing molds of one hot pressing operation to the mold storage area at one time to reduce the frequency of transfer, thereby improving the overall production efficiency.

[0156] Reference Figure 3 In one embodiment of the present application, a production process of a composite material production system is provided. The control process of the entire process is implemented by a workshop scheduling system (which may be multiple workshop scheduling systems, and the multiple workshop scheduling systems are located in different workshops). The background of the production process includes:

[0157] Based on the lightweight development of the automotive industry, more and more lightweight materials are used in the development of automotive parts. Composite materials represented by carbon fiber can be used in many parts because of their excellent strength and lightweight contribution. In addition, since the pattern and brightness of the carbon fiber material itself will greatly improve the appearance of the car, many exterior parts also tend to use this material. At present, one of the important factors restricting the widespread application of this material is the high cost. The high cost comes from the raw materials themselves on the one hand and the labor costs on the other.

[0158] The production process includes:

[0159] like Figure 3 The process of composite material production system mainly includes: raw material delivery, automatic cutting, automatic laying, autoclave hot pressing operation, product demoulding, product inspection and product warehousing. For the convenience of explanation, the figure adds raw material rack, fixed material rack, cutting material receiving frame, laid-up products, and mold storage area subdivision stations.

[0160] Step S911, the raw materials in the raw material warehouse are transferred to the fixed material receiving area by a forklift. The fixed material receiving area is equipped with a coding machine and a workshop scheduling system. Any raw materials shipped out of the warehouse are coded by the workshop scheduling system according to the demand information and the material information of the raw materials, and are shipped out after the identification code is formed.

[0161] Step S912: The raw material warehouse forklift places the raw materials on the raw material rack. The raw material rack is used in conjunction with the automatic guided vehicle. Assuming there are multiple cutting machines, the AGV is transferred to the fixed material rack of the corresponding cutting machine according to demand.

[0162] The delivery of raw materials out of the warehouse has been changed from personnel delivery to AGV automatic delivery, and the work of personnel has been changed from long-path transfer to point-to-point interaction. The required raw materials of composite materials will be placed on the AGV in the raw material warehouse, and the AGV delivery point will be set in advance. The AGV will automatically transfer the raw materials, and then use the sling to automatically lift the raw materials to the material rack.

[0163] Step S913: Use a sling to place the raw materials from the fixed material rack onto the cutting machine. The cutting machine is equipped with a coding machine, which is associated with the workshop scheduling system. The coding machine identifies the material information according to the instructions of the workshop scheduling system.

[0164] Step S914: Cutting by a cutting machine to obtain cut materials.

[0165] Before introducing step S915, the setting of the identification code of the receiving tool is first introduced:

[0166] Assuming that the identification code is a QR code, the QR code is set on the material receiving tool by the coding machine equipped with the cutting machine. The QR code is set with material information, layer position information, layer process information and information of the final generated composite material. This information and the relationship between the information are recorded in the cache of the workshop scheduling system.

[0167] Step S915, a sorting robot is arranged near the cutting machine station. The sorting robot performs automatic material receiving under the control of the scheduling system. When receiving materials for the first time, a code is first affixed to the material receiving tool (such as a material frame), and then automatic material receiving is performed, that is, the material to be laid is placed in the corresponding material receiving tool. For subsequent material receiving, the code is first scanned to confirm that the material information of the material receiving tool and the collected cut material (i.e., the material to be laid) is consistent before framing. The assembled material frame is placed on the AGV by the sorting robot, and the corresponding scheduling system gives instructions to control the AGV to automatically transport the material receiving tool to the corresponding inter-layer station.

[0168] Step S916: A laying robot is arranged at the laying room workstation. The laying robot is equipped with a barcode scanner and a code printer. The barcode scanner can scan the QR code pasted on the tool to confirm the information in the QR code. Then, based on the control of the workshop scheduling system, the laying robot starts the laying work. Each layer of material will be confirmed according to the above-mentioned laying process information to ensure the correct progress of the laying work.

[0169] The following provides a set of specific layering operation procedures:

[0170] (1) Each set of molds is equipped with a positioning point, which serves as the starting point of the layup robot. The layup work starts from this point according to the layup process information. Under the control of the workshop scheduling system, the robot calls different process routes according to the shape of the product to be laid;

[0171] (2) Design the operation trajectory of the laying robot for the entire laying area, and design the operation track in a targeted manner. One operation track covers multiple laying stations, and the robot runs on the track, so that one laying robot can work at multiple laying stations, greatly improving the robot utilization rate and reducing costs;

[0172] (3) Laying tool trays are set on both sides of the track to provide tools for the laying robot to select and quickly change when laying different materials or different products;

[0173] (4) The laying process requires vacuuming, which is integrated into the laying tool tray as one of the tools. The laying robot performs the vacuuming work according to the laying process information, realizing fully automatic unmanned operation of the entire laying process.

[0174] At present, carbon fiber laying is the most labor-intensive workstation in the industry, and due to the limitation of human arm span, each laying station needs to be equipped with at least 2 people. At present, the mainstream carbon fiber parts are equipped with 4-6 people / station. Not only does the laying quality rely on visual inspection, but the laying / vacuum confirmation is constantly carried out back and forth, which is extremely inefficient. This embodiment controls the use of laying robots for laying operations to adapt to the height adjustment of the working surface caused by the laying of various materials, and the robot can also perform laying and vacuuming operations, which greatly improves work efficiency and laying quality.

[0175] Step S917: After receiving the completion signal from the laying robot, the workshop scheduling system controls the coding machine of the laying robot to code a QR code in the mold. This QR code records the information of the product after laying and the hot pressing production schedule. It should be noted that the code here is not the same as the QR code set on the receiving tool.

[0176] Step S918: The workshop scheduling system controls the AGV to transfer the mold containing the laminated product to the hot pressing station. The workshop scheduling system can also plan the route and find the correct hot pressing equipment (such as an autoclave).

[0177] Step S919: After the autoclave system confirms that the incoming materials are correct, the scheduling system allows the AGV to transport the incoming materials to the autoclave. Under the control of the workshop scheduling system, the autoclave performs autoclave product molding.

[0178] Step S920: After the autoclave is formed, the robot demoulds and packs the product. After packing, the AGV transfers the product to the product inspection area.

[0179] A highly versatile multi-layer rack can be used to accommodate the packing needs of all types of products in a batch of cans. After packing, the AGV will transfer them to the product inspection area, where robots will unload materials and simultaneously complete visual appearance inspection and load-bearing inspection. Personnel will perform wall thickness and contour inspections that require the use of measuring tools / gauges. The human-machine cooperation here reduces the work of unloading boxes, improves ergonomics, and improves the efficiency of appearance inspection and load-bearing inspection.

[0180] Step S921: The mold is taken by a forklift and placed on a mold transport vehicle, and the mold transport vehicle transports the mold to a mold storage area.

[0181] Considering that the mold temperature is still high at this time, the mold is picked up by a forklift and placed on a mold transport vehicle, which then transports the mold to the mold storage area. The purpose of using a mold transport vehicle is to transport all the molds in the tank at one time, reducing the frequency of transfer and improving efficiency. The design uses AGV transfer to enhance flexibility.

[0182] Reference Figure 4 One embodiment of the present application provides a control device for a composite material production system, the control device comprising a first information acquisition unit 1100, a tool movement control unit 1200, a second information acquisition unit 1300, and a hot pressing operation control unit 1400, including:

[0183] The first information acquisition unit 1100 is used to acquire first identification information when a cutting machine in a composite material production system cuts a cut material and the cut material is placed in a target material receiving tool; wherein the target material receiving tool is at least one of multiple material receiving tools in the composite material production system, and the first identification information is used to indicate the target material receiving tool.

[0184] The tool movement control unit 1200 is used to control the target material receiving tool to move to the target inter-ply station based on the first identification information; wherein the target inter-ply station is a station associated with the target material receiving tool among multiple inter-ply stations in the composite material production system.

[0185] The second information acquisition unit 1300 is used to acquire second identification information generated by the target inter-ply station when the target inter-ply station performs a layup process on the cut material to obtain a laid-up product, and the second identification information is used to indicate the laid-up product.

[0186] The hot pressing operation control unit 1400 is used to control the hot pressing equipment in the composite material production system to perform a hot pressing operation on the laminated product based on the second identification information to obtain a composite material.

[0187] It should be noted that this embodiment and the above method embodiment are based on the same inventive concept, so the relevant contents of the above method embodiment are also applicable to this embodiment and will not be described in detail here.

[0188] Reference Figure 5 The present application also provides an electronic device, which includes:

[0189] at least one memory;

[0190] at least one processor;

[0191] at least one program;

[0192] The programs are stored in the memory, and the processor executes at least one program to implement the control method of the composite material production system implemented in the present disclosure.

[0193] The electronic device may be any intelligent terminal including a mobile phone, a tablet computer, a personal digital assistant (PDA), a vehicle-mounted computer, etc.

[0194] The electronic device according to the embodiment of the present application is described in detail below.

[0195] The processor 1600 may be implemented by a general-purpose central processing unit (CPU), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application;

[0196] The memory 1700 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 1700 can store an operating system and other application programs. The program code for implementing the technical solution provided in the embodiment of this specification by software or firmware is stored in the memory 1700, and the processor 1600 calls and executes the control method of the composite material production system of the embodiment of this application.

[0197] Input / output interface 1800, used to implement information input and output;

[0198] The communication interface 1900 is used to realize the communication interaction between the device and other devices. The communication can be realized through a wired manner (such as USB, network cable, etc.) or a wireless manner (such as mobile network, WIFI, Bluetooth, etc.);

[0199] Bus 2000 , which transmits information between various components of the device (e.g., processor 1600 , memory 1700 , input / output interface 1800 , and communication interface 1900 );

[0200] The processor 1600 , the memory 1700 , the input / output interface 1800 , and the communication interface 1900 are connected to each other in communication within the device via the bus 2000 .

[0201] An embodiment of the present application further provides a storage medium, which is a computer-readable storage medium. The computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are used to enable a computer to execute the control method of the composite material production system.

[0202] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0203] The embodiments described in this application are intended to more clearly illustrate the technical solutions of the embodiments of this application and do not constitute a limitation on the technical solutions provided by the embodiments of this application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided by the embodiments of this application are also applicable to similar technical problems.

[0204] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.

[0205] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0206] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.

[0207] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0208] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.

[0209] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0210] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0211] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0212] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable an electronic device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of each embodiment method of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store programs.

[0213] The above is a specific description of the preferred implementation of the embodiments of the present application, but the embodiments of the present application are not limited to the above-mentioned implementation methods. Technical personnel familiar with the field can also make various equivalent modifications or substitutions without violating the spirit of the embodiments of the present application. These equivalent modifications or substitutions are all included in the scope defined by the claims of the embodiments of the present application.

Claims

1. A control method for a composite material production system, characterized in that: The method comprises: When a cutting machine in the composite material production system cuts a cut material and the cut material is placed in a target material receiving tool, first identification information is obtained; wherein the target material receiving tool is at least one material receiving tool among a plurality of material receiving tools in the composite material production system, and the first identification information is used to indicate the target material receiving tool; Based on the first identification information, control the target material receiving tool to move to a target inter-ply station; wherein the target inter-ply station is a station associated with the target material receiving tool among a plurality of inter-ply stations in the composite material production system; When the target inter-layer laying station performs a layer laying process on the cut material to obtain a layered product, obtaining second identification information generated by the target inter-layer laying station, wherein the second identification information is used to indicate the layered product; Based on the second identification information, a hot pressing device in the composite material production system is controlled to perform a hot pressing operation on the laminated product to obtain a composite material.

2. The control method of the composite material production system according to claim 1, characterized in that: The cut materials include a variety of materials to be laid; When the cutting machine in the composite material production system cuts the cut material and the cut material is placed in a target material receiving tool, before obtaining the first identification information, the method further includes: When the cutting machine cuts the plurality of materials to be laid, obtaining material information of the plurality of materials to be laid; Based on the material information of each of the plurality of materials to be laid, generating a first identification code associated with the plurality of materials to be laid; wherein the first identification information includes the first identification code; The target material receiving tool is determined among the plurality of material receiving tools based on the first identification codes of the plurality of materials to be laid up.

3. The control method of the composite material production system according to claim 2, characterized in that: The step of generating a first identification code associated with the plurality of materials to be laid based on the material information of each of the plurality of materials to be laid comprises: Based on the material information of each of the plurality of materials to be laid, determining the inter-layer laying station information corresponding to the plurality of materials to be laid; Generate first identification codes of the plurality of materials to be laid based on the inter-layer workstation information and the material information of each of the materials to be laid; The step of controlling the target material receiving tool to move to a target inter-layer position based on the first identification information includes: Parsing the first identification code to obtain the inter-layer workstation information; Based on the inter-ply workstation information, determining the target inter-ply workstation among a plurality of inter-ply workstations in the composite material production system; The target material receiving tool is controlled to move to the target inter-layer station.

4. The control method of the composite material production system according to claim 2, characterized in that: There are multiple target material receiving tools, and at least one of the multiple materials to be laid is placed in each target material receiving tool; The step of generating a first identification code associated with the plurality of materials to be laid based on the material information of each of the plurality of materials to be laid comprises: Determining, based on the material information of the plurality of materials to be laid, laying process information corresponding to the plurality of materials to be laid; the laying process information includes information for indicating a laying order between the plurality of materials to be laid; Generate first identification codes of the plurality of materials to be laid based on the laying process information and material information of each of the materials to be laid; The controlling the target material receiving tool to move to the target inter-layer position includes: Parsing the first identification code to obtain the layer laying process information; Perform path planning according to the layer laying process information to generate a moving path corresponding to each of the target material receiving tools; Each of the target receiving tools is controlled to move toward the target inter-layer workstation according to a corresponding moving path, so that the order in which the multiple target receiving tools arrive at the target inter-layer workstation is associated with the layer sequence.

5. The control method of the composite material production system according to claim 2, characterized in that: After controlling the target receiving tool to move to the target inter-layer position, the method further includes: Parsing the first identification codes associated with the plurality of materials to be laid carried in the target material receiving tool to obtain material information of each material to be laid carried in the target material receiving tool; According to the material information of the target material to be laid, the target laying robot is controlled to perform the laying operation of the target material to be laid, wherein the target material to be laid is any one of the materials to be laid carried in the target material receiving tool, and the target laying robot is a laying robot among multiple laying robots in the composite material production system, and is used for the operation on the target material to be laid.

6. The control method of the composite material production system according to claim 4, characterized in that: Before acquiring the second identification information generated by the target inter-ply workstation, the method further includes: Based on the material information of the plurality of materials to be laid, determining the information of the laid products corresponding to the plurality of materials to be laid; Determining hot pressing production scheduling information associated with the laid-up product according to the information of the laid-up product; generating a second identification code associated with the laminated product according to the hot pressing production scheduling information, wherein the second identification information includes the second identification code; The step of controlling the hot pressing equipment in the composite material production system to perform a hot pressing operation on the laminated product based on the second identification information includes: Parsing the second identification code to obtain the hot pressing production scheduling information; According to the hot pressing production scheduling information, control the movement of the laminated product to the corresponding hot pressing station; The hot pressing equipment located at the hot pressing station is controlled to perform hot pressing operation on the laminated product.

7. The control method of the composite material production system according to claim 6, characterized in that: The first identification code and the second identification code are graphic codes.

8. The control method of the composite material production system according to claim 6, characterized in that: After the hot pressing device performs a hot pressing operation on the laminated product to obtain a composite material, the method further includes: Based on the hot pressing production scheduling information, control the demoulding robot to perform a demoulding operation on the composite material carried in the target hot pressing mold to obtain the composite material after demoulding, and obtain third identification information, wherein the target hot pressing mold is a hot pressing mold in the target inter-layer station for carrying the laminated product, and the third identification information is used to indicate the composite material after demoulding; Based on the third identification information, the demoulded composite material is controlled to move to a composite material storage area, and a detection robot is controlled to perform a detection operation on the demoulded composite material.

9. The control method of the composite material production system according to claim 8, characterized in that: After controlling the demoulding robot to perform a demoulding operation on the composite material carried in the target hot pressing mold based on the hot pressing production scheduling information to obtain the demoulded composite material, the method further includes: In the case of obtaining a plurality of hot pressing molds demolded by the demoulding robot, obtaining fourth identification information, wherein the fourth identification information is used to indicate the plurality of hot pressing molds, the plurality of hot pressing molds are all hot pressing molds of a batch associated with the hot pressing operation performed by the hot pressing equipment, and the plurality of hot pressing molds include the target hot pressing mold; According to the fourth identification information, the plurality of hot pressing molds are controlled to move to the mold storage area.

10. A control device for a composite material production system, characterized in that: The control device comprises: A first information acquisition unit is used to acquire first identification information when a cutting machine in the composite material production system cuts a cut material and the cut material is placed in a target material receiving tool; wherein the target material receiving tool is at least one of a plurality of material receiving tools in the composite material production system, and the first identification information is used to indicate the target material receiving tool; A tool movement control unit, configured to control the target material receiving tool to move to a target inter-ply station based on the first identification information; wherein the target inter-ply station is a station associated with the target material receiving tool among a plurality of inter-ply stations in the composite material production system; A second information acquisition unit is used to acquire second identification information generated by the target inter-layer laying station when the target inter-layer laying station performs a layer laying process on the cut material to obtain a layered product, wherein the second identification information is used to indicate the layered product; A hot pressing operation control unit is used to control the hot pressing equipment in the composite material production system to perform a hot pressing operation on the laminated product based on the second identification information to obtain a composite material.

11. An electronic device, characterized in that: It includes at least one controller and a memory for communicating with the controller; the memory stores instructions that can be executed by the at least one controller, and the instructions are executed by the at least one controller to enable the at least one controller to execute the control method of the composite material production system as described in any one of claims 1 to 9.

12. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed, the control method for the composite material production system according to any one of claims 1 to 9 is implemented.