Dry-wet linkage dust removal control method for thermal power generating unit
By adopting the dry and wet linkage dust removal control method in thermal power units, using the PSO algorithm to optimize the feedforward control model of the RBF neural network, and combining the output signals of the PID controller to collaboratively control the dry and wet electrostatic precipitators, the vibration of dry electrostatic precipitators is solved. The problem of sudden changes in smoke concentration at the entrance of the wet electrostatic precipitator caused by disturbance has been solved, and the smoke and dust emissions have been up to standard and the system has been able to save energy and reduce consumption.
Patent Information
- Application Number
- CN202410820861.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-11
AI Technical Summary
The dry electrostatic precipitator and the wet electrostatic precipitator in thermal power units operate independently, which causes the smoke concentration at the entrance of the wet electrostatic precipitator to change sharply under the vibration disturbance conditions of the dry electrostatic precipitator, causing the smoke dust concentration at the chimney entrance to exceed the standard.
A dry and wet linkage dust removal control method for thermal power units is adopted. The difference signal between the actual smoke concentration and the set smoke concentration at the outlet of the wet electrostatic precipitator is obtained, input into the PID controller, and the vibration of the dry electrostatic precipitator is detected. When signaling, the PSO algorithm is used to optimize the RBF neural network to obtain a feedforward control model, and the output signal of the PID controller is integrated to control the wet electrostatic precipitator controller to ensure that the smoke concentration reaches the standard emission.
The coordinated linkage control of dry electrostatic precipitator and wet electrostatic precipitator is realized to ensure that smoke and dust emissions meet the standard, and the system energy consumption is reduced during the dry electrostatic precipitator and rapping period.
Smart Images

Figure CN118760253A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of thermal power dust removal, and in particular to a dry-wet linkage dust removal control method for a thermal power unit. Background Art
[0002] At present, it is difficult for the flue gas and dust of coal-fired power plants to meet the ultra-clean emission standards by only treating them with dry electrostatic precipitators. Therefore, it is necessary to add a wet electrostatic precipitator after the desulfurization system for further flue gas dust removal to ensure that the dust meets the emission standards. However, in the actual operation process, the dry electrostatic precipitator and the wet electrostatic precipitator operate independently, and the data information between them is not interacted with each other, resulting in their own information islands. The dry electrostatic precipitator only controls the dust concentration at the dry electrostatic outlet, and the wet electrostatic precipitator only controls the dust concentration at the wet electrostatic outlet. The two precipitators are controlled independently, and the coordination of the two levels of dry and wet electrostatic precipitators is not achieved under the same ultra-clean emission goal. It is very easy to cause a sharp change in the dust concentration at the inlet of the wet electrostatic precipitator under the vibration and vibration conditions of the dry electrostatic precipitator, thereby causing the dust concentration at the chimney inlet to exceed the standard.
[0003] Therefore, there is an urgent need for a dry-wet linkage dust removal control method for thermal power units to achieve two-stage dust removal coordinated linkage control of dry and wet electrostatic precipitators during the dry electrostatic precipitator vibration period, so as to achieve system energy saving and consumption reduction under the premise of ensuring that smoke and dust emissions meet the standards. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that the dry electrostatic precipitator and the wet electrostatic precipitator operate independently in the dust removal process of the thermal power unit, which is very easy to cause a sharp change in the smoke concentration at the inlet of the wet electrostatic precipitator under the vibration and disturbance conditions of the dry electrostatic precipitator, thereby causing the smoke concentration at the chimney inlet to exceed the standard. A dry-wet linkage dust removal control method for a thermal power unit is provided.
[0005] In order to achieve the above object, the present invention provides a dry-wet linkage dust removal control method for a thermal power unit, the dry-wet linkage dust removal control method for a thermal power unit comprising the following steps:
[0006] S1, obtain the difference signal between the actual smoke concentration at the outlet of the wet electrostatic precipitator controller and the set smoke concentration, and input it into the PID controller;
[0007] S2. When the vibration signal of the dry electrostatic precipitator controller is detected, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standards; wherein the PSO algorithm is used to optimize the RBF neural network to obtain the feedforward control model.
[0008] Preferably, in step S2, the adopting of the PSO algorithm to optimize the RBF neural network to obtain the feedforward control model specifically includes:
[0009] S21, initialize the size n of the particle population and the particle position X id , particle velocity V id and the maximum number of iterations T;
[0010] S22, establishing a mapping relationship between the PSO algorithm and the RBF neural network;
[0011] S23, calculating the fitness value fit(i) of each particle in the particle population;
[0012] S24, update the individual extreme value Pbest and the group extreme value Gbest in the particle population;
[0013] S25, the particle position X of each particle in the particle population id and particle velocity V id Carry out update iterations;
[0014] S26. Determine whether the current update iteration number is less than the maximum iteration number T. If so, a1. Determine whether the currently obtained fitness value meets the conditions of the global optimal solution. If so, b1. End the update iteration, decode the optimal group extreme value Gbest, obtain the optimal parameters of the RBF neural network, and obtain the feedforward control model based on the obtained optimal parameters of the RBF neural network.
[0015] Preferably, in step S26, if the currently obtained fitness value does not meet the conditions of the global optimal solution, b2, based on a set of new particle positions X id and particle velocity V id Return to step S23; if the current update iteration number is greater than the maximum iteration number T, a2, execute step b1.
[0016] Preferably, in step S22, establishing a mapping relationship between the PSO algorithm and the RBF neural network specifically includes:
[0017] The spread parameters to be optimized in the RBF neural network are set as random particles in the PSO algorithm, and the spread parameters include the coordinate vector of the center point of the hidden layer Gaussian basis function, the width of the hidden layer Gaussian basis function and the connection weight vector from the hidden layer to the output layer.
[0018] Preferably, in step S23, the calculating of the fitness value of each particle in the particle population specifically includes:
[0019] The fitness function is used to calculate the fitness value of each particle in the particle population. The fitness function is:
[0020]
[0021] R ijis the predicted value of the i-th particle for the j-th sample, y ij is the actual value of the i-th particle for the j-th sample.
[0022] Preferably, in step S24, updating the individual extreme value Pbest in the particle population specifically includes:
[0023] Compare the fitness value fit(i) of each particle with the individual extreme value Pbest. If fit(i) < Pbest, then assign fit(i) to Pbest; if fit(i) ≥ Pbest, then Pbest remains unchanged;
[0024] Updating the global extreme value Gbest in the particle population specifically includes:
[0025] Compare the fitness value fit(i) of each particle with the global extreme value Gbest. If fit(i) < Gbest, then assign fit(i) to Gbest; if fit(i) ≥ Gbest, then Gbest remains unchanged.
[0026] Preferably, in step S25, updating the particle positions X id and particle velocities V id of each particle in the particle population specifically includes:
[0027] Use equations (1) and (2) to update the particle positions X id and particle velocities V id ;
[0028] V id (t + 1) = ω·V id (t)+c1·r1·(P id (t)-X id (t))+c2·r2·(G(t)-X id (t)) Equation (1);
[0029] X id (t + 1) = X id (t)+V id (t + 1) Equation (2);
[0030]
[0031] Where: ω is the inertia weight coefficient, ω max is the maximum inertia weight, ω min is the minimum inertia weight; t is the current iteration number; T is the maximum iteration number; c1 and c2 are learning factors; r1 and r2 are independent random numbers between [0, 1]; V id(t) is the velocity of the ith particle at time t; X id (t) is the position of the i-th particle at time t; P id (t) is the individual extreme value of the ith particle at time t; G(t) is the group extreme value of the particle population at time t.
[0032] Preferably, in step S2, the RBF neural network is constructed using the following steps:
[0033] Step a, initializing the weights and thresholds of the hidden layer and output layer;
[0034] Step b, input training samples;
[0035] Step c, calculating the input and output of each neuron in the hidden layer and output layer according to the input training sample and the initial neural network;
[0036] Step d, calculating the errors of the hidden layer and the output layer according to the input and output of each neuron in the hidden layer and the output layer;
[0037] Step e, correcting the weights and thresholds of the hidden layer and the output layer according to the errors of the hidden layer and the output layer;
[0038] Step f, determine whether the training sample has been trained. If the training is completed, the parameters for constructing the RBF neural network are obtained and the training is terminated; if the training is not completed, the output layer error RMSE is compared with the preset error ε. If RMSE ≥ ε, return to step b; if RMSE < ε, the parameters for constructing the RBF neural network are obtained and the training is terminated.
[0039] Preferably, in step S2, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller, specifically including:
[0040] The feedforward control model controls the wet electrostatic precipitator controller based on the smoke humidity, temperature, load and air volume at the inlet of the wet electrostatic precipitator controller and the output signal of the PID controller.
[0041] Preferably, in step S2, when the vibration signal of the dry electrostatic precipitator controller is not detected, the wet electrostatic precipitator controller is controlled by the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standards.
[0042] According to the above technical scheme, based on the dry-wet linkage dust removal control method of the thermal power unit, by synergistically controlling the two-stage dust removal of dry electrostatic precipitator and wet electrostatic precipitator during the vibration of the dry electrostatic precipitator, it can effectively ensure that the smoke dust emissions meet the standards and achieve system energy saving and consumption reduction. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1It is a flow chart of the dry-wet linkage dust removal control method for thermal power units;
[0044] Figure 2 It is the principle diagram of the dry-wet linkage dust removal control method for thermal power units;
[0045] Figure 3 It is a flowchart of optimizing RBF neural network using PSO algorithm. DETAILED DESCRIPTION
[0046] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.
[0047] The present invention provides a dry-wet linkage dust removal control method for a thermal power unit, such as Figure 1-3 As shown, the dry-wet linkage dust removal control method for a thermal power unit includes the following steps:
[0048] S1, obtain the difference signal between the actual smoke concentration at the outlet of the wet electrostatic precipitator controller and the set smoke concentration, and input it into the PID controller;
[0049] S2. When the vibration signal of the dry electrostatic precipitator controller is detected, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standard; wherein the feedforward control model is obtained by optimizing the RBF neural network using the PSO algorithm;
[0050] When the vibration signal of the dry electrostatic precipitator controller is not detected, the wet electrostatic precipitator controller is controlled by the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standards.
[0051] According to the above technical scheme, based on the dry-wet linkage dust removal control method of the thermal power unit, by synergistically controlling the two-stage dust removal of dry electrostatic precipitator and wet electrostatic precipitator during the vibration of the dry electrostatic precipitator, it can effectively ensure that the smoke dust emissions meet the standards and achieve system energy saving and consumption reduction.
[0052] In the dry-wet linkage dust removal control method for a thermal power unit of the present invention, preferably, in step S2, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller, specifically including:
[0053] The feedforward control model controls the wet electrostatic precipitator controller based on the flue gas humidity, temperature, load and air volume at the inlet of the wet electrostatic precipitator controller, and integrates the output signal of the PID controller to control the wet electrostatic precipitator controller, thereby further effectively ensuring that the smoke is discharged in compliance with the standard and achieving energy saving and consumption reduction of the system.
[0054] In the dry-wet linkage dust removal control method for a thermal power unit of the present invention, preferably, in step S2, the RBF neural network is constructed using the following steps:
[0055] Step a, initializing the weights and thresholds of the hidden layer and output layer;
[0056] Step b, input training samples;
[0057] Step c, calculating the input and output of each neuron in the hidden layer and output layer according to the input training sample and the initial neural network;
[0058] Step d, calculating the errors of the hidden layer and the output layer according to the input and output of each neuron in the hidden layer and the output layer;
[0059] Step e, correcting the weights and thresholds of the hidden layer and the output layer according to the errors of the hidden layer and the output layer;
[0060] Step f, determine whether the training sample is completed. If the training is completed, the parameters for constructing the RBF neural network are obtained and the training is terminated; if the training is not completed, the output layer error RMSE is compared with the preset error ε. If RMSE ≥ ε, return to step b; if RMSE < ε, the parameters for constructing the RBF neural network are obtained and the training is terminated. The specific parameters include the coordinate vector of the center point of the hidden layer Gaussian basis function, the width of the hidden layer Gaussian basis function, and the connection weight vector from the hidden layer to the output layer.
[0061] In the present invention, a feedforward controller is designed by a radial basis neural network (RBFNN, Radial Basis Function NeyralNetwork), which can play a compensatory role in feedback control optimization. The radial basis neural network includes a three-layer network of an input layer, a hidden layer and an output layer, which can approximate any nonlinear function and has the advantages of strong generalization ability and fast learning convergence speed. Specifically, the radial basis function (RBF) is a scalar function with the characteristics of radial symmetry. RBFNN is structurally composed of an input layer, a hidden layer and an output layer, wherein the input layer is different from other neural networks in that it does not process the signal in any way, that is, directly transmits the signal to the hidden layer without any weight matrix; the hidden layer uses RBF as an activation function, which contains multiple neurons, and its function is to realize the nonlinear transformation of the signal from the input space to the hidden space process; after obtaining the output of the hidden layer, the output layer uses a linear function to perform a linear combination on it to realize the response output to the neural network input signal.
[0062] Where x = [x i ] T , i=1,2,...,n is the input of RBFNN, h=[hj ] T ,j=1,2,...,p is the hidden layer output, y=[y k ] T , k=1,2,...,m is the output of RBFNN, W k =[ω 1k ,2k,..., pk ] T ,k=1,2,...,m is the weight of RBFNN.
[0063] Obviously, the mapping of RBFNN is divided into two parts:
[0064] (1) From the input layer to the hidden layer output, the signal is mapped from the linear signal to the nonlinear space through the radial basis function. Here, the Gaussian function with stable analytical performance is selected as the radial basis function. Its basic form is:
[0065]
[0066] Among them, C j is the coordinate vector of the center point of the Gaussian basis function of the jth neuron in the hidden layer, σ j is the width of the Gaussian basis function of the jth neuron in the hidden layer, and its value determines the sensitivity of the RBFNN.
[0067] (2) The linear combination mapped from the hidden layer space to the output layer space has the following function formula:
[0068]
[0069] Among them, W k is the connection weight vector from the hidden layer to the output layer, which represents the contribution of the k-th sub-class network to a certain type of output. The RBFNN connection weight W k This enables it to have good approximation function and improves the prediction effect.
[0070] The process of building RBFNN is to determine C in training and learning. j , σ j , W k The gradient descent method is often used to train the RBFNN model. The specific steps are as follows:
[0071] STEP1: Determine RBF parameters. i ] T ,i=1,2,...,n, n is the number of input layer nodes, y=[y k ] T , k = 1, 2, ..., m, m is the number of output layer categories, the expected output vector o = [o k ]T ,k=1,2,...,m; initialize C j , σ j , W k .
[0072] Initialize the connection weights as follows:
[0073]
[0074] In the formula, k max , k min - are the maximum and minimum values of all expected output values in the Gaussian basis function of the j-th output neuron in the sample training set of the input model.
[0075] Initialize C j =(c j1 ,j2,..., jn ) T ,=1,2,...,, specifically:
[0076]
[0077] In the formula, i max 、i min - are the maximum and minimum values of all input information of the i-th feature in the sample training set.
[0078] Initialize σ j =(σ j1 ,σ j2 ,...,σ jn ) T ,j=1,2,...,p, specifically:
[0079]
[0080] In the formula, σ f - Width adjustment factor, which ranges from [0,1].
[0081] STEP2: Calculate the output h of the hidden layer node j , the output layer outputs y k , specifically
[0082]
[0083]
[0084] STEP3: Iteratively calculate network parameters. Adjust RBFNN parameters through adaptive learning, specifically:
[0085]
[0086]
[0087]
[0088] Where η is the learning factor and t is the number of iterations.
[0089] STEP4: Determine the end of iteration. By comparing the root mean square error RMSE with the set termination accuracy ε, when RMSE < ε, the adaptive learning training ends and sufficient parameters are obtained. This can prevent the iterative training RBFNN model from entering an infinite loop or training for too long. The RMSE calculation formula is:
[0090]
[0091] In the dry-wet linkage dust removal control method for a thermal power unit of the present invention, preferably, in step S2, the PSO algorithm is used to optimize the RBF neural network to obtain the feedforward control model, which specifically includes:
[0092] S21, initialize the size n of the particle population and the particle position X id , particle velocity V id and the maximum number of iterations T;
[0093] S22, establishing a mapping relationship between the PSO algorithm and the RBF neural network;
[0094] S23, calculating the fitness value fit(i) of each particle in the particle population;
[0095] S24, update the individual extreme value Pbest and the group extreme value Gbest in the particle population;
[0096] S25, the particle position X of each particle in the particle population id and particle velocity V id Carry out update iterations;
[0097] S26, determine whether the current update iteration number is less than the maximum iteration number T, if it is less than, a1, determine whether the currently obtained fitness value meets the conditions of the global optimal solution, if it meets the conditions of the global optimal solution, b1, end the update iteration, decode the optimal group extreme value Gbest, obtain the optimal parameters of the RBF neural network, and obtain the feedforward control model based on the obtained optimal parameters of the RBF neural network;
[0098] If the current fitness value does not meet the conditions of the global optimal solution, b2, based on a new set of particle positions X id and particle velocity V id Return to step S23; if the current update iteration number is greater than the maximum iteration number T, a2, execute step b1.
[0099] In the present invention, by specifically using the PSO algorithm as described above to optimize the RBF neural network, the prediction accuracy of the feedforward control model can be effectively improved, thereby effectively ensuring the up-to-standard emission of soot.
[0100] Further preferably, in step S22, establishing the mapping relationship between the PSO algorithm and the RBF neural network specifically includes:
[0101] Set the spread parameter to be optimized in the RBF neural network as the random particles in the PSO algorithm, that is, each particle in the particle swarm represents the parameter to be optimized in the RBFNN. Then, the result of the particle swarm optimization, that is, the particle with the optimal output in the solution space, is the optimal parameter of the RBFNN. Among them, the spread parameter includes the coordinate vector of the center point of the hidden layer Gaussian basis function, the width of the hidden layer Gaussian basis function, and the connection weight vector from the hidden layer to the output layer; more specifically, the spread parameter includes the coordinate vector C j of the center point of the Gaussian basis function of the j-th neuron in the hidden layer, the width σ j of the Gaussian basis function of the j-th neuron in the hidden layer, and the connection weight vector W k .
[0102] Further preferably, in step S23, calculating the fitness value of each particle in the particle population specifically includes:
[0103] Calculate the fitness value of each particle in the particle population by using the fitness function, and the fitness function is:
[0104]
[0105] R ij is the predicted value of the i-th particle for the j-th sample, and y ij is the actual value of the i-th particle for the j-th sample.
[0106] Further preferably, in step S24, updating the individual extreme value Pbest in the particle population specifically includes:
[0107] Compare the fitness value fit(i) of each particle with the individual extreme value Pbest. If fit(i) < Pbest, then assign fit(i) to Pbest; if fit(i) ≥ Pbest, then Pbest remains unchanged;
[0108] Updating the global extreme value Gbest in the particle population specifically includes:
[0109] Compare the fitness value fit(i) of each particle with the global extreme value Gbest. If fit(i) < Gbest, then assign fit(i) to Gbest. If fit(i) ≥ Gbest, then Gbest remains unchanged.
[0110] Further preferably, in step S25, the particle positions X id and particle velocities V id of each particle in the particle population are updated, specifically including:
[0111] Update the particle positions X id and particle velocities V id of each particle in the particle population using formulas (1) and (2); this can effectively accelerate the speed of global search;
[0112] V id (t + 1) = ω·V id (t) + c1·r1·(P id (t) - X id (t)) + c2·r2·(G(t) - X id (t)) Formula (1);
[0113] X id (t + 1) = X id (t) + V id (t + 1) Formula (2);
[0114]
[0115] Where: ω is the inertia weight coefficient, ω max is the maximum inertia weight, ω min is the minimum inertia weight. When the inertia weight is larger, it is beneficial for global search. When the inertia weight is smaller, it is beneficial for local search; t is the current iteration number; T is the maximum iteration number; c1 and c2 are learning factors; r1 and r2 are independent random numbers between [0, 1]; V id (t) is the velocity of the i-th particle at time t; X id (t) is the position of the i-th particle at time t; P id (t) is the personal extreme value of the i-th particle at time t; G(t) is the global extreme value of the particle population at time t.
[0116] Specifically, particle swarm optimization (PSO) originates from the observation and study of the predation behavior of wild birds. According to the idea of bird flocks foraging, the particle swarm is initially initialized in the multidimensional solution space. Each particle in the particle swarm dynamically adjusts its own movement behavior by sharing its own position information. Each particle is compared with the optimal particle after each iteration. The condition for the particle not to change its individual position is that the selected global position is optimal. If it is not the global optimal position, the global historical optimal position is changed. Random particles update their respective positions by tracking individual extreme values (Pbest) and group extreme values (Gbest). Pbest refers to the optimal position obtained by calculating the fitness value among all the positions passed by the individual particles, and Gbest refers to the optimal position obtained by calculating the fitness value among all the particles in the particle swarm. That is, the feedforward control model obtained by optimizing the RBF neural network by the PSO algorithm in the present invention has a high prediction accuracy, thereby effectively ensuring the standard emission of smoke.
[0117] The present invention will be described in detail below through examples, but the protection scope of the present invention is not limited thereto.
[0118] Example 1
[0119] Use Figure 1-3 The dry-wet linkage dust removal control method for a thermal power unit shown in the figure is implemented. Specifically, the dry-wet linkage dust removal control method for a thermal power unit comprises the following steps:
[0120] S1, obtain the difference signal between the actual smoke concentration at the outlet of the wet electrostatic precipitator controller and the set smoke concentration, and input it into the PID controller;
[0121] S2. When the vibration signal of the dry electrostatic precipitator controller is detected, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standard; wherein the feedforward control model is obtained by optimizing the RBF neural network using the PSO algorithm;
[0122] When the vibration signal of the dry electrostatic precipitator controller is not detected, the wet electrostatic precipitator controller is controlled by the output signal of the PID controller so that the smoke concentration at its outlet meets the emission standards;
[0123] In step S2, the feedforward control model controls the wet electrostatic precipitator controller by integrating the output signal of the PID controller, specifically including:
[0124] The feedforward control model controls the wet electrostatic precipitator controller based on the flue gas humidity, temperature, load and air volume at the inlet of the wet electrostatic precipitator controller and the output signal of the PID controller.
[0125] After testing, it is found that the dry-wet linkage dust removal control method for thermal power units described in the present invention, compared with the solution in which dry and wet electrostatic precipitators operate independently, can accurately control the wet electrostatic precipitator controller based on the output signal of the PID controller integrated with the feedforward control model when receiving the dry electrostatic precipitator vibration signal, thereby effectively ensuring that smoke emissions meet the standards and achieving system energy saving and consumption reduction.
[0126] Example 2
[0127] The implementation is carried out with reference to Example 1, except that, in step S2, the PSO algorithm is used to optimize the RBF neural network to obtain the feedforward control model, which specifically includes:
[0128] S21, initialize the size n of the particle population and the particle position X id , particle velocity V id and the maximum number of iterations T;
[0129] S22, establishing a mapping relationship between the PSO algorithm and the RBF neural network;
[0130] S23, calculating the fitness value fit(i) of each particle in the particle population;
[0131] S24, update the individual extreme value Pbest and the group extreme value Gbest in the particle population;
[0132] S25, the particle position X of each particle in the particle population id and particle velocity V id Carry out update iterations;
[0133] S26, determine whether the current update iteration number is less than the maximum iteration number T, if it is less than, a1, determine whether the currently obtained fitness value meets the conditions of the global optimal solution, if it meets the conditions of the global optimal solution, b1, end the update iteration, decode the optimal group extreme value Gbest, obtain the optimal parameters of the RBF neural network, and obtain the feedforward control model based on the obtained optimal parameters of the RBF neural network;
[0134] If the current fitness value does not meet the conditions of the global optimal solution, b2, based on a new set of particle positions X id and particle velocity V id Return to step S23; if the current update iteration number is greater than the maximum iteration number T, a2, execute step b1;
[0135] In step S22, the mapping relationship between the PSO algorithm and the RBF neural network is established, specifically including:
[0136] Set the spread parameter to be optimized in the RBF neural network as a random particle in the PSO algorithm. The spread parameter includes the coordinate vector C of the center point of the Gaussian basis function of the j-th neuron in the hidden layer j , the width σ of the Gaussian basis function of the j-th neuron in the hidden layer j and the connection weight vector W from the hidden layer to the output layer k ;
[0137] In step S23, calculating the fitness value of each particle in the particle population specifically includes:
[0138] Calculate the fitness value of each particle in the particle population using the fitness function. The fitness function is:
[0139]
[0140] R ij is the predicted value of the i-th particle for the j-th sample, and y ij is the actual value of the i-th particle for the j-th sample;
[0141] In step S24, updating the personal best Pbest in the particle population specifically includes:
[0142] Compare the fitness value fit(i) of each particle with the personal best Pbest. If fit(i) < Pbest, then assign fit(i) to Pbest; if fit(i) ≥ Pbest, then Pbest remains unchanged;
[0143] Updating the global best Gbest in the particle population specifically includes:
[0144] Compare the fitness value fit(i) of each particle with the global best Gbest. If fit(i) < Gbest, then assign fit(i) to Gbest; if fit(i) ≥ Gbest, then Gbest remains unchanged;
[0145] In step S25, updating the particle position X id and particle velocity V id , specifically includes:
[0146] Update the particle position X id and particle velocity V id ;
[0147] V id (t + 1) = ω·V id (t)+c1·r1·(P id (t)-X id( ))+c2·2·(G(t)-X id ( )) Formula (1);
[0148] X id ( +1) = X id ( )+V id ( +1) Formula (2);
[0149]
[0150] Where: ω is the inertia weight coefficient, ω max is the maximum inertia weight, ω min is the minimum inertia weight; t is the current iteration number; T is the maximum iteration number; c1 and c2 are learning factors; r1 and r2 are independent random numbers between [0,1]; V id (t) is the velocity of the ith particle at time t; X id (t) is the position of the i-th particle at time t; P id (t) is the individual extreme value of the ith particle at time t; G(t) is the group extreme value of the particle population at time t.
[0151] After testing, it is found that the dry-wet linkage dust removal control method for thermal power units described in the present invention, compared with the scheme in Example 1, when receiving the dry electrostatic precipitator vibration signal, the output signal of the PID controller is integrated based on the feedforward control model to further accurately control the wet electrostatic precipitator controller, thereby effectively ensuring that the smoke dust is discharged in compliance with the standard and achieving system energy saving and consumption reduction.
[0152] Example 3
[0153] Refer to Example 2 for implementation, except that in step S2, the RBF neural network is constructed using the following steps:
[0154] Step a, initializing the weights and thresholds of the hidden layer and output layer;
[0155] Step b, input training samples;
[0156] Step c, calculating the input and output of each neuron in the hidden layer and the output layer according to the input training sample and the initial neural network;
[0157] Step d, calculating the errors of the hidden layer and the output layer according to the input and output of each neuron in the hidden layer and the output layer;
[0158] Step e, correcting the weights and thresholds of the hidden layer and the output layer according to the errors of the hidden layer and the output layer;
[0159] Step f, determine whether the training sample has been trained. If the training is completed, the parameters for constructing the RBF neural network are obtained and the training is terminated; if the training is not completed, the output layer error RMSE is compared with the preset error ε. If RMSE ≥ ε, return to step b; if RMSE < ε, the parameters for constructing the RBF neural network are obtained and the training is terminated.
[0160] After testing, it is found that the dry-wet linkage dust removal control method for thermal power units described in the present invention, compared with the scheme in Example 2, when receiving the dry electrostatic precipitator vibration signal, the output signal of the PID controller is integrated based on the feedforward control model to further accurately control the wet electrostatic precipitator controller, thereby effectively ensuring that the smoke dust is discharged in compliance with the standard and achieving system energy saving and consumption reduction.
[0161] The dry-wet linkage dust removal control method for a thermal power unit provided by the present invention can effectively ensure that smoke dust meets emission standards and achieve energy saving and consumption reduction of the system by enabling coordinated linkage control of two-stage dust removal of dry electrostatic precipitator and wet electrostatic precipitator during the vibration of dry electrostatic precipitator.
[0162] The preferred embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. However, these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.
Claims
1. A dry-wet combined dust removal control method for thermal power units, characterized in that, the dry-wet combined dust removal control method for thermal power units includes the following steps: S1. Obtain the difference signal between the actual dust concentration and the set dust concentration at the outlet of the wet electrostatic precipitator controller, and input it into the PID controller; S2. When the rapping signal of the dry electrostatic precipitator controller is detected, the feedforward control model comprehensively controls the wet electrostatic precipitator controller according to the output signal of the PID controller to make the dust concentration at its outlet meet the discharge standard; among them, the feedforward control model is obtained by optimizing the RBF neural network using the PSO algorithm.
2. The dry-wet combined dust removal control method for thermal power units according to claim 1, characterized in that, in step S2, the feedforward control model obtained by optimizing the RBF neural network using the PSO algorithm specifically includes: S21, initialize the size n of the particle population and the particle position X id , particle velocity V id and the maximum number of iterations T; S22. Establish the mapping relationship between the PSO algorithm and the RBF neural network; S23. Calculate the fitness value fit(i) of each particle in the particle population; S24. Update the personal best value Pbest and the global best value Gbest in the particle population; S25, the particle position X of each particle in the particle population id and particle velocity V id Carry out update iterations; S26. Judge whether the current update iteration times is less than the maximum iteration times T. If it is less, a1. Judge whether the currently obtained fitness value meets the conditions of the global optimal solution. If it meets the conditions of the global optimal solution, b1. End the update iteration, decode the optimal global best value Gbest, obtain the optimal parameters of the RBF neural network, and obtain the feedforward control model based on the obtained optimal parameters of the RBF neural network.
3. The dry-wet combined dust removal control method for thermal power units according to claim 2, characterized in that, In step S26, if the currently obtained fitness value does not meet the conditions of the global optimal solution, b2, based on a new set of particle positions X id and particle velocity V id Return to step S23; if the current update iteration number is greater than the maximum iteration number T, a2, execute step b1.
4. The dry-wet combined dust removal control method for thermal power units according to claim 2, characterized in that, in step S22, the establishment of the mapping relationship between the PSO algorithm and the RBF neural network specifically includes: Set the spread parameter to be optimized in the RBF neural network as a random particle in the PSO algorithm. The spread parameter includes the coordinate vector of the center point of the hidden layer Gaussian basis function, the width of the hidden layer Gaussian basis function, and the connection weight vector from the hidden layer to the output layer.
5. The dry-wet combined dust removal control method for thermal power units according to claim 2, characterized in that, in step S23, the calculation of the fitness value of each particle in the particle population specifically includes: Calculate the fitness value of each particle in the particle population using the fitness function. The fitness function is: R ij is the predicted value of the i-th particle in the j-th sample, y ij is the actual value of the i-th particle in the j-th sample.
6. The dry-wet combined dust removal control method for thermal power units according to claim 2, characterized in that, in step S24, the update of the personal best value Pbest in the particle population specifically includes: Compare the fitness value fit(i) of each particle with the personal best value Pbest. If fit(i) < Pbest, then assign fit(i) to Pbest; if fit(i) ≥ Pbest, then Pbest remains unchanged; The update of the global best value Gbest in the particle population specifically includes: Compare the fitness value fit(i) of each particle with the global best value Gbest. If fit(i) < Gbest, then assign fit(i) to Gbest. If fit(i) ≥ Gbest, then Gbest remains unchanged.
7. The wet-dry combined dust removal control method for thermal power units according to claim 2, characterized in that, In step S25, the particle position X of each particle in the particle population is updated. id and particle velocity V id , including: Use formula (1) and formula (2) to update the particle position X of each particle in the particle population id and particle velocity V id ; V id (t + 1) = ω·V id (t) + c 1 ·r 1 ·(P id (t) - X id (t)) + c 2 ·r 2 ·(G(t) - X id (t)) Formula (1); X id (t+1)=X id (t)+V id (t+1) Formula (2); Where: ω is the inertia weight coefficient, ω max is the maximum inertia weight, ω min is the minimum inertia weight; t is the current iteration number; T is the maximum iteration number; c 1 and c 2 is the learning factor; r 1 and r 2 is an independent random number between [0,1]; V id (t) is the velocity of the ith particle at time t; X id (t) is the position of the i-th particle at time t; P id (t) is the individual extreme value of the ith particle at time t; G(t) is the group extreme value of the particle population at time t.
8. The wet-dry combined dust removal control method for thermal power units according to claim 1, characterized in that, In step S2, the RBF neural network is constructed by the following steps: Step a, initialize the weights and thresholds of the hidden layer and the output layer; Step b, input the training samples; Step c, calculate the inputs and outputs of each neuron in the hidden layer and the output layer according to the input training samples and the initial neural network; Step d, calculate the errors of the hidden layer and the output layer according to the inputs and outputs of each neuron in the hidden layer and the output layer; Step e, correct the weights and thresholds of the hidden layer and the output layer according to the errors of the hidden layer and the output layer; Step f, determine whether the training samples are trained. If the training is completed, obtain the parameters for constructing the RBF neural network and end the training. If the training is not completed, compare the root mean square error (RMSE) of the output layer with the preset error ε. If RMSE ≥ ε, return to step b. If RMSE < ε, obtain the parameters for constructing the RBF neural network and end the training.
9. The wet-dry combined dust removal control method for thermal power units according to claim 1, characterized in that, In step S2, the feedforward control model controls the wet electrostatic precipitator controller by synthesizing the output signal of the PID controller, specifically including: The feedforward control model controls the wet electrostatic precipitator controller based on the flue gas humidity, temperature, load and air volume at the inlet of the wet electrostatic precipitator controller and by synthesizing the output signal of the PID controller.
10. The wet-dry combined dust removal control method for thermal power units according to claim 1, characterized in that, In step S2, when the rapping signal of the dry electrostatic precipitator controller is not detected, control the wet electrostatic precipitator controller by the output signal of the PID controller to make the dust concentration at its outlet meet the discharge standard.