Construction engineering project-oriented engineering quantity calculation method
By dividing the construction project into sub-projects and calculating the engineering quantity deviation index and correlation degree, the problem of mismatch in engineering quantity calculation and conflict of rules in the professional field in the existing technology is solved, and more accurate and consistent engineering quantity calculation is achieved. Reduced project risks and costs.
Patent Information
- Application Number
- CN202411249353.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-09-06
AI Technical Summary
The quantity calculation methods of existing construction projects are based on preset standards or models, which may not match the actual project requirements, leading to deviations in calculation results, and there are differences or conflicts in calculation rules in different professional fields, resulting in inconsistent quantity calculations result.
Divide the construction project into several sub-projects, establish the corresponding engineering quantity calculation model, calculate the engineering quantity deviation index and correlation degree through feature matching and similarity calculation, compare the engineering quantity comparison values of the sub-projects, and calculate the total engineering quantity Evaluation index. When the evaluation index is greater than the threshold, corrective instructions are issued to adjust calculation formulas and rules.
Through feature matching and similarity calculation, the accuracy and consistency of engineering quantity calculation can be improved, potential risk points can be identified, project risks can be reduced, resource waste and schedule delays can be reduced, and project management efficiency and quality can be improved.
Smart Images

Figure CN118760910A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a method for calculating the engineering quantity of a construction engineering project. Background Art
[0002] The quantity calculation of construction projects is a complex and important task, which involves knowledge from multiple professional fields, such as civil engineering, structural engineering, mechanical engineering, etc. The accuracy and efficiency of quantity calculation directly affect the budget, progress and quality control of the project. With the development of information technology, traditional quantity calculation methods can no longer meet the needs of modern construction projects.
[0003] In the Chinese invention patent with application publication number CN115907876A, a method, system and storage medium for estimating the quantity of decoration and renovation works are provided. The method includes: obtaining past project data, classifying them according to the basic category information of the building, and establishing a database of building category characteristics; sorting and analyzing the data of each type of project, statistically summarizing the engineering quantity calculation formula and calculation parameters, and establishing a calculation parameter database; obtaining the basic category information of the project to be estimated, searching the building category feature database, determining the project type and obtaining the corresponding calculation template; inputting relevant building information, searching the calculation parameter database through the calculation template, and obtaining the corresponding calculation formula and calculation parameter category; matching the building related information with the corresponding calculation formula and calculation parameter classification for engineering quantity calculation; summarizing the calculation results and outputting the engineering quantity list.
[0004] In a Chinese invention patent with application publication number CN115577424A, a method, device, equipment and storage medium for calculating construction engineering quantities are disclosed. The method includes: collecting current construction data, and constructing a three-dimensional building information model based on the current construction data; obtaining engineering quantity calculation rules, and determining engineering quantity information based on the three-dimensional building information model using the engineering quantity calculation rules; performing abnormal data processing on the engineering quantity information to generate engineering quantity data; obtaining list matching rules, and generating a bill of quantities based on the engineering quantity data using the list matching rules; obtaining database storage rules, and storing the bill of quantities using the database storage rules to generate construction engineering quantities.
[0005] In view of the above invention, the prior art has the following deficiencies: 1. The calculation formulas and rules in the existing technology are often based on pre-set standards or models. However, these pre-designed rules and formulas may not match or have errors with the specific needs, characteristics and environment of the actual project. Such mismatch may cause a large deviation between the calculation results of the engineering quantity and the actual situation. 2. Construction projects usually involve multiple professional fields, such as structural engineering, water supply and drainage engineering, electrical engineering, etc. Each professional field has its own unique calculation rules and standards. However, due to differences or conflicts between these rules, different professions may produce inconsistent results when calculating engineering quantities. Summary of the invention
[0006] 1. Technical issues to be resolved In view of the deficiencies in the prior art, the present invention provides a method for calculating the quantity of a construction project. The construction project is divided into several sub-projects, a corresponding quantity calculation model is established, several historical projects with similarities greater than a similarity threshold are taken as similar projects, and the quantity deviation index of the total project is calculated based on the quantity data of the similar projects and the sub-projects, the correlation between the parts where the coordinates of two sub-projects are located is calculated, the associated parts between different sub-projects are determined, and the quantity comparison value of the associated parts of the two sub-projects is calculated by comparing the quantities of the associated parts of the two sub-projects, and the quantity comparison index of the total project is further calculated. The quantity evaluation index of the total project is calculated through the quantity deviation index and the quantity comparison index of the total project. When the quantity evaluation index of the total project is greater than the evaluation threshold, a correction instruction is issued, thereby solving the problems mentioned in the background technology.
[0007] (II) Technical solution To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for calculating the engineering quantity of a construction project, comprising the following steps: Collect building structure data, material data and construction process parameters, divide the construction project into several sub-projects, and establish the corresponding engineering quantity calculation model; Match the features of the sub-projects with the historical projects, calculate the similarity of each feature, and take several projects with similarities greater than the similarity threshold as similar projects. Based on the engineering quantity data of similar projects and sub-projects, calculate the engineering quantity deviation index of the total project; Calculate the Euclidean distance between the coordinate points of two sub-projects. When the Euclidean distance between the coordinate points is less than the distance threshold, mark the current coordinate point, classify the marked coordinate points into several coordinate sets through clustering algorithm, calculate the correlation between the coordinate parts of the two sub-projects in the coordinate set, and determine the correlation parts between different sub-projects. By comparing the engineering quantities of the related parts of the two sub-projects, the engineering quantity comparison value of the related parts of the two sub-projects is calculated, and the engineering quantity comparison value of all sub-projects is calculated, and the engineering quantity comparison index of the total project is further calculated; The quantity evaluation index of the total project is calculated through the quantity deviation index and quantity comparison index of the total project. When the quantity evaluation index of the total project is greater than the evaluation threshold, a correction instruction is issued to correct the calculation formulas and rules of the sub-projects with the largest quantity deviation values and quantity comparison values until the quantity evaluation index is less than the evaluation threshold.
[0008] Furthermore, using existing databases and information systems, as well as design drawings of construction projects, we collect building structure data, material data, and construction process parameters; Divide the construction project into several sub-projects, including foundation engineering, main structure, enclosure structure, roof engineering, decoration engineering, water supply and drainage engineering, and electrical engineering. For each sub-project, establish a corresponding engineering quantity calculation model; Use the established engineering quantity calculation model, input the collected data, calculate the engineering quantity, and obtain the engineering quantity results of each sub-project.
[0009] Furthermore, based on historical data and big data, feature matching is performed between sub-projects and historical projects, the similarity of each feature is calculated and compared with a set similarity threshold, and several projects with similarities greater than the similarity threshold are regarded as similar projects.
[0010] Furthermore, the engineering quantity data of similar projects are used to perform error analysis on the engineering quantity of the sub-projects, and the engineering quantity deviation value of the sub-projects is calculated. The calculation formula is as follows: Among them, Qv represents the engineering quantity deviation value of the sub-project, Eq represents the engineering quantity of the sub-project, represents the engineering quantity of similar projects, j represents the mark of similar projects, , m is a positive integer.
[0011] Furthermore, by calculating the deviation values of the engineering quantities of all sub-projects, the engineering quantities of the total project are analyzed, and the engineering quantity deviation index of the total project is calculated. The calculation formula is as follows: Among them, EQI represents the engineering quantity deviation index of the total project. Indicates the deviation value of the engineering quantity of the sub-project. represents the mean value of the deviation of the engineering quantity, i represents the mark of the sub-project, , n is a positive integer.
[0012] Further, a coordinate set of the sub-projects in the construction project is obtained, and the Euclidean distance between the coordinate points of the two sub-projects is calculated through the coordinates of all the coordinate points in the two sub-projects; A distance threshold is set in advance. When the Euclidean distance between coordinate points is less than the distance threshold, the current coordinate point is marked. According to the distance between the coordinate points, all marked coordinate points are classified by clustering algorithm to obtain several types of coordinate sets.
[0013] Furthermore, the correlation between the locations of the two sub-project coordinate sets is calculated through the coordinates of the two sub-projects in each type of coordinate set. The calculation formula is as follows: Among them, Re represents the correlation between the locations of the two sub-project coordinate sets. It represents the Euclidean distance between the coordinates p and q of two sub-projects, where p represents the p-th coordinate of the sub-project, P represents the number of coordinates of the sub-project in the coordinate set, q represents the q-th coordinate of another sub-project, and Q represents the number of coordinates of another sub-project in the coordinate set; The correlation threshold is set in advance. When the correlation between two sub-projects is greater than the correlation threshold, the part where the current coordinate set is located is determined to be the associated part.
[0014] Furthermore, by comparing the engineering quantities of the associated parts of the two sub-projects, the engineering quantity calculation results of the sub-projects are evaluated, and the engineering quantity comparison value of the associated parts of the two sub-projects is calculated. The calculation formula is as follows: Among them, Cq represents the comparative value of the engineering quantities of the related parts of the two sub-projects. Indicates the engineering quantity of the associated parts of the sub-project. Indicates the engineering quantity of another sub-project. It represents the standard value of the engineering quantity ratio between two sub-projects, and k represents the mark of the associated parts. , K is a positive integer.
[0015] Furthermore, the engineering quantity comparison values of all sub-projects are calculated, and the engineering quantity comparison index of the total project is calculated. The calculation formula is as follows: Among them, QCI represents the engineering quantity comparison index of the total project. It represents the a-th engineering quantity comparison value of the i-th sub-project, i represents the mark of the sub-project, , n is a positive integer, a represents the a-th engineering quantity comparison value of the sub-project, , A is a positive integer.
[0016] Furthermore, the engineering quantity deviation index and engineering quantity comparison index of the total project are obtained, and after linear normalization processing, the engineering quantity evaluation index of the total project is calculated. The calculation formula is as follows: Among them, QEI represents the engineering quantity evaluation index of the total project, EQI represents the engineering quantity deviation index of the total project, QCI represents the engineering quantity comparison index, α and β represent weight coefficients, , .
[0017] (III) Beneficial effects The present invention provides a method for calculating the engineering quantity of a construction project, which has the following beneficial effects: (1) Through feature matching and similarity calculation, we can find the historical projects that are closest to the current sub-project, so that we can use the engineering quantity data of these projects for reference and comparison, which helps to discover potential calculation errors or unreasonableness and improve its applicability and accuracy in future projects.
[0018] (2) By calculating the Euclidean distance, the associated parts between different sub-projects can be accurately identified. These associated parts are usually areas that require special attention or coordination during the construction process, including structural connection points, pipeline interfaces, etc. By marking the associated parts, potential risk points can be discovered in a timely manner, such as possible structural conflicts, insufficient space, etc., so that measures can be taken in advance to control and prevent risks.
[0019] (3) By comparing the quantities of related parts of two sub-projects and calculating the quantity comparison value, it is possible to identify which sub-projects have systematic errors in the quantity calculation and take corresponding measures to correct and prevent them, which helps to improve the efficiency and accuracy of project management, reduce project risks and promote the successful implementation of the project.
[0020] (4) By correcting the sub-projects with the largest quantity deviation and comparison value, the quality of the entire project quantity data can be significantly improved, and errors in quantity calculation can be discovered and corrected in a timely manner, which helps prevent potential project risks and reduce the risks of resource waste, schedule delays or cost overruns caused by inaccurate quantity calculations. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the steps of the method for calculating the engineering quantity of a construction project according to the present invention; Figure 2 The present invention is a flow chart of a method for calculating the engineering quantity of a construction project. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] See also Figure 1-Figure 2 The present invention provides a method for calculating the engineering quantity of a construction project, comprising the following steps: Step 1: Collect building structure data, material data and construction process parameters, divide the construction project into several sub-projects, and establish a corresponding engineering quantity calculation model; The step 1 includes the following contents: Step 101: Use existing databases and information systems, such as internal databases of construction companies, industry databases, etc., as well as design drawings of construction projects to collect building structure data, material data, and construction process parameters; It should be noted that the building structure data includes the floor plan, elevation, section, structural details, etc. of the building, including key information such as the length, width, height, number of floors, column grid layout, floor thickness, etc. of the building; the material data includes the type, specification, quantity, unit price and other information of various materials used in the project, such as concrete, steel bars, bricks, stones, insulation materials, coatings, etc.; the construction process parameters include the construction process flow, construction methods, construction machinery, construction schedule, etc. of the project, and extract parameters related to the calculation of engineering quantities; Step 102: Divide the construction project into several sub-projects, including foundation engineering, main structure, enclosure structure, roof engineering, decoration engineering, water supply and drainage engineering, and electrical engineering, etc. For each sub-project, establish a corresponding engineering quantity calculation model; For example, the foundation engineering calculation model calculates the concrete volume and steel bar usage of the foundation engineering according to the foundation type (such as independent foundation, strip foundation, raft foundation, etc.) and geological conditions; the main structure calculation model calculates the concrete volume and steel bar usage of beams, slabs, and columns, as well as the volume of stairs and elevator shafts according to the layout and size of the building structure; the decoration engineering calculation model calculates the amount of paint, tile or floor laying area, etc. according to the internal and external wall area, ground area, ceiling area, etc. of the building; Step 103: Use the established engineering quantity calculation model, input the collected data, calculate the engineering quantity, and obtain the engineering quantity results of each sub-project.
[0024] It should be noted that when using the established engineering quantity calculation model for calculation, a series of calculation formulas and rules need to be applied. These formulas and rules are usually based on industry standards and building specifications. They ensure the uniformity and comparability of the calculations. At the same time, these formulas and rules also need to be adjusted and optimized according to the actual situation of the project to adapt to the special needs of the project.
[0025] When using, combine the contents of step 101 to step 103: Dividing a construction project into several sub-projects helps break down complex projects into parts that are easier to manage and calculate. Each sub-project can perform engineering quantity calculations independently, which improves the orderliness and systematicness of the calculations. The division of sub-projects also helps to clarify the boundaries and responsibilities between various project parts, facilitating project management and coordination.
[0026] Step 2: Match the features of the sub-projects with the historical projects, calculate the similarity of each feature, and take several projects with similarities greater than the similarity threshold as similar projects. Based on the engineering quantity data of similar projects and sub-projects, calculate the engineering quantity deviation value of the sub-project, and calculate the engineering quantity deviation index of the total project based on the engineering quantity deviation values of all sub-projects; The step 2 includes the following contents: Step 201: Based on historical data and big data, feature matching is performed between sub-projects and historical projects, similarity of each feature is calculated, and compared with a set similarity threshold, and several projects with similarities greater than the similarity threshold are regarded as similar projects; It should be noted that it is necessary to determine which features are critical to judging whether two projects are similar. These features may include project type, structural form, scale, geographical location, usage function, etc. For each key feature, a similarity threshold is set. For example, if it is believed that the structural form similarity needs to be above 80% to be considered as similar projects, then the threshold is set to 80%; Step 202: Obtain the engineering quantity data of all similar projects, perform error analysis on the engineering quantity of the sub-projects based on the engineering quantity data of the similar projects, and calculate the engineering quantity deviation value of the sub-projects. The calculation formula is as follows: Among them, Qv represents the engineering quantity deviation value of the sub-project, Eq represents the engineering quantity of the sub-project, represents the engineering quantity of similar projects, j represents the mark of similar projects, , m is a positive integer; Step 203: Obtain the deviation values of the quantities of all sub-projects by calculation, further analyze the quantity of the total project, and calculate the deviation index of the quantity of the total project. The calculation formula is as follows: Among them, EQI represents the engineering quantity deviation index of the total project. Indicates the deviation value of the engineering quantity of the sub-project. represents the mean value of the deviation of the engineering quantity, i represents the mark of the sub-project, , n is a positive integer.
[0027] It should be noted that the greater the difference between the engineering quantity of a sub-project and that of similar projects, the higher the engineering quantity deviation value, which means that the possibility that there is a problem with the engineering quantity calculation result of the sub-project is higher; the greater the deviation value of all sub-projects, the higher the engineering quantity deviation index of the total project, which means that the possibility that there is a problem with the engineering quantity calculation result of the total project is higher.
[0028] When used, combine the contents of step 201 to step 203: Through feature matching and similarity calculation, we can find the historical projects that are closest to the current sub-project, so that we can use the engineering quantity data of these projects for reference and comparison, which will help to discover potential calculation errors or unreasonableness and improve its applicability and accuracy in future projects.
[0029] Step 3: Calculate the Euclidean distance between the coordinate points of two sub-projects. When the Euclidean distance between the coordinate points is less than the distance threshold, mark the current coordinate point, classify the marked coordinate points into several coordinate sets through clustering algorithm, calculate the correlation between the coordinate parts of the two sub-projects in the coordinate set, and determine the correlation parts between different sub-projects. The step three includes the following contents: Step 301: Obtain the coordinate set of the sub-projects in the construction project, and calculate the Euclidean distance between the coordinate points of the two sub-projects through the coordinates of all the coordinate points in the two sub-projects. The calculation formula is as follows: in, Represents the Euclidean distance between the coordinates p and q of two sub-projects, , , They represent the x, y, and z coordinates of the pth coordinate point of the sub-project respectively. , , Respectively represent the first The x, y, and z coordinates of the coordinate points; Step 302: pre-set a distance threshold, and when the Euclidean distance between coordinate points is less than the distance threshold, mark the current coordinate point, and classify all marked coordinate points according to the distance between the coordinate points through a clustering algorithm to obtain several class coordinate sets; It should be noted that the clustering algorithm is an unsupervised machine learning method used to group similar objects together to form "clusters" or "classes" so that objects in the same cluster are as similar as possible, while objects in different clusters are as different as possible. Common clustering algorithms include K-means, hierarchical clustering, DBSCAN, and clustering trees. Each type of coordinate set includes the coordinates of two sub-projects; Step 303: Calculate the correlation between the locations of the two sub-project coordinate sets through the coordinates of the two sub-projects in each type of coordinate set. The calculation formula is as follows: Among them, Re represents the correlation between the locations of the two sub-project coordinate sets. It represents the Euclidean distance between the coordinates p and q of two sub-projects, where p represents the p-th coordinate of the sub-project, P represents the number of coordinates of the sub-project in the coordinate set, q represents the q-th coordinate of another sub-project, and Q represents the number of coordinates of another sub-project in the coordinate set; Step 304: pre-set an association threshold, and when the association degree between two sub-projects is greater than the association threshold, determine that the part where the current coordinate set is located is the associated part.
[0030] It should be noted that there are several coordinate points in the sub-project. By calculating the distance between the coordinate points in different sub-projects, it is possible to determine whether there is a connection between the two sub-projects, as well as the coordinates near the connection point. At this time, the parts where all the marked coordinates are located are the associated parts.
[0031] Combined with the contents of step 301 to step 304: By calculating the Euclidean distance, the associated parts between different sub-projects can be accurately identified. These associated parts are usually areas that require special attention or coordination during the construction process, including structural connection points, pipeline interfaces, etc. By marking the associated parts, potential risk points can be discovered in a timely manner, such as possible structural conflicts, insufficient space, etc., so that measures can be taken in advance to control and prevent risks.
[0032] Step 4: By comparing the engineering quantities of the related parts of the two sub-projects, the engineering quantity comparison value of the related parts of the two sub-projects is calculated, and the engineering quantity comparison value of all sub-projects is calculated, and the engineering quantity comparison index of the total project is further calculated; The step 4 includes the following contents: Step 401: Obtain the engineering quantities of the associated parts of the two sub-projects, evaluate the engineering quantity calculation results of the sub-projects by comparing the engineering quantities of the associated parts of the two sub-projects, and calculate the engineering quantity comparison value of the associated parts of the two sub-projects. The calculation formula is as follows: Among them, Cq represents the comparative value of the engineering quantities of the related parts of the two sub-projects. Indicates the engineering quantity of the associated parts of the sub-project. Indicates the engineering quantity of another sub-project. It represents the standard value of the engineering quantity ratio between two sub-projects, and k represents the mark of the associated parts. , K is a positive integer; Step 402: Obtain the engineering quantity comparison values of all sub-projects by calculation, and further calculate the engineering quantity comparison index of the total project. The calculation formula is as follows: Among them, QCI represents the engineering quantity comparison index of the total project. It represents the a-th engineering quantity comparison value of the i-th sub-project, i represents the mark of the sub-project, , n is a positive integer, a represents the a-th engineering quantity comparison value of the sub-project, , A is a positive integer.
[0033] It should be noted that each sub-project and different sub-projects may have associated parts, so there will be multiple engineering quantity comparison values, and the standard values of engineering quantity ratios between different sub-projects are different. The standard value is obtained by taking the average value of the engineering quantity ratios between sub-projects in historical data; When used, combine the contents of step 401 to step 402: By comparing the quantities of related parts of two sub-projects and calculating the quantity comparison value, it is possible to identify which sub-projects have systematic errors in their quantity calculations and take corresponding measures to correct and prevent them, which helps to improve the efficiency and accuracy of project management, reduce project risks, and promote the successful implementation of projects.
[0034] Step 5: Calculate the engineering quantity assessment index of the total project through the engineering quantity deviation index and engineering quantity comparison index of the total project. When the engineering quantity assessment index of the total project is greater than the assessment threshold, issue a correction instruction.
[0035] The step five includes the following contents: Step 501: Obtain the engineering quantity deviation index and engineering quantity comparison index of the total project, and after linear normalization processing, calculate the engineering quantity assessment index of the total project. The calculation formula is as follows: Among them, QEI represents the engineering quantity evaluation index of the total project, EQI represents the engineering quantity deviation index of the total project, QCI represents the engineering quantity comparison index, α and β represent weight coefficients, , ; Step 502: Pre-set an evaluation threshold. When the engineering quantity evaluation index of the total project is greater than the evaluation threshold, issue a correction instruction to correct the calculation formula and rules of the sub-project with the largest engineering quantity deviation value and engineering quantity comparison value until the engineering quantity evaluation index is less than the evaluation threshold.
[0036] It should be noted that when the engineering quantity assessment index of the total project exceeds the threshold, it indicates that there are significant deviations or inconsistencies in the engineering quantity calculation. Timely issuance of corrective instructions and adjustment of the calculation formulas and rules of the problematic sub-projects can quickly correct the errors and prevent the problems from expanding.
[0037] When used, combine the contents of step 501 to step 502: By correcting the sub-projects with the largest quantity deviation and comparison values, the quality of the quantity data of the entire project can be significantly improved, and quantity calculation errors can be discovered and corrected in a timely manner, which will help prevent potential project risks and reduce the risks of resource waste, schedule delays or cost overruns caused by inaccurate quantity calculations.
[0038] In the application, the several formulas involved are all calculated by removing dimensions and taking their numerical values. The formula is a formula of the most recent real situation obtained by collecting a large amount of data and performing software simulation. The coefficients in the formula are set by technicians in this field according to actual conditions.
[0039] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product. A person of ordinary skill in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented in combination with electronic hardware, computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution.
[0040] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0041] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A method for calculating the quantity of construction projects, characterized in that: The following steps are involved: Collect building structure data, material data and construction process parameters, divide the construction project into several sub-projects, and establish the corresponding engineering quantity calculation model; Match the features of the sub-projects with the historical projects, calculate the similarity of each feature, and take several projects with similarities greater than the similarity threshold as similar projects. Based on the engineering quantity data of similar projects and sub-projects, calculate the engineering quantity deviation index of the total project; Calculate the Euclidean distance between the coordinate points of two sub-projects. When the Euclidean distance between the coordinate points is less than the distance threshold, mark the current coordinate point, classify the marked coordinate points into several coordinate sets through clustering algorithm, calculate the correlation between the coordinate parts of the two sub-projects in the coordinate set, and determine the correlation parts between different sub-projects. By comparing the engineering quantities of the related parts of the two sub-projects, the engineering quantity comparison value of the related parts of the two sub-projects is calculated, and the engineering quantity comparison value of all sub-projects is calculated, and the engineering quantity comparison index of the total project is further calculated; The quantity evaluation index of the total project is calculated through the quantity deviation index and quantity comparison index of the total project. When the quantity evaluation index of the total project is greater than the evaluation threshold, a correction instruction is issued to correct the calculation formulas and rules of the sub-projects with the largest quantity deviation values and quantity comparison values until the quantity evaluation index is less than the evaluation threshold.
2. A method for calculating the quantity of construction projects according to claim 1, characterized in that: Use existing databases and information systems, as well as design drawings of construction projects, to collect building structure data, material data, and construction process parameters; The construction project is divided into several sub-projects, and a corresponding engineering quantity calculation model is established for each sub-project; using the established engineering quantity calculation model, the collected data is input, the engineering quantity is calculated, and the engineering quantity results of each sub-project are obtained.
3. A method for calculating the engineering quantity of a construction project according to claim 1, characterized in that: Based on historical data and big data, feature matching is performed between sub-projects and historical projects, the similarity of each feature is calculated and compared with the set similarity threshold, and several projects with similarities greater than the similarity threshold are regarded as similar projects.
4. A method for calculating the engineering quantity of a construction project according to claim 3, characterized in that: Through the engineering quantity data of similar projects, the error analysis of the engineering quantity of the sub-project is carried out, and the engineering quantity deviation value of the sub-project is calculated. The calculation formula is as follows: ; Among them, Qv represents the engineering quantity deviation value of the sub-project, Eq represents the engineering quantity of the sub-project, represents the engineering quantity of similar projects, j represents the mark of similar projects, , m is a positive integer.
5. A method for calculating the engineering quantity of a construction project according to claim 4, characterized in that: By calculating the deviation values of the engineering quantities of all sub-projects, analyzing the engineering quantities of the total project, and calculating the engineering quantity deviation index of the total project, the calculation formula is as follows: ; Among them, EQI represents the engineering quantity deviation index of the total project. Indicates the deviation value of the engineering quantity of the sub-project. represents the mean value of the deviation of the engineering quantity, i represents the mark of the sub-project, , n is a positive integer.
6. A method for calculating the engineering quantity of a construction project according to claim 5, characterized in that: Obtain the coordinate set of the sub-project in the construction project, and calculate the Euclidean distance between the coordinate points of the two sub-projects through the coordinates of all the coordinate points in the two sub-projects; when the Euclidean distance between the coordinate points is less than the distance threshold, mark the current coordinate point, and classify all the marked coordinate points according to the distance between the coordinate points through the clustering algorithm to obtain several types of coordinate sets.
7. A method for calculating the engineering quantity of a construction project according to claim 6, characterized in that: The correlation between the parts where the two sub-projects' coordinate sets are located is calculated through the coordinates of the two sub-projects in each type of coordinate set. When the correlation between the two sub-projects is greater than the correlation threshold, the part where the current coordinate set is located is determined to be the associated part, where: ; Among them, Re represents the correlation between the locations of the two sub-project coordinate sets. It represents the Euclidean distance between the coordinates p and q of two sub-projects, where p represents the p-th coordinate of the sub-project, P represents the number of coordinates of the sub-project in the coordinate set, q represents the q-th coordinate of another sub-project, and Q represents the number of coordinates of another sub-project in the coordinate set.
8. A method for calculating the engineering quantity of a construction project according to claim 7, characterized in that: By comparing the engineering quantities of the associated parts of the two sub-projects, the engineering quantity calculation results of the sub-projects are evaluated, and the engineering quantity comparison value of the associated parts of the two sub-projects is calculated. The calculation formula is as follows: ; Among them, Cq represents the comparative value of the engineering quantities of the related parts of the two sub-projects. Indicates the engineering quantity of the associated parts of the sub-project. Indicates the engineering quantity of another sub-project. It represents the standard value of the engineering quantity ratio between two sub-projects, and k represents the mark of the associated parts. , K is a positive integer.
9. A method for calculating the engineering quantity of a construction project according to claim 8, characterized in that: By calculating the engineering quantity comparison values of all sub-projects, the engineering quantity comparison index of the total project is calculated. The calculation formula is as follows: ; Among them, QCI represents the engineering quantity comparison index of the total project. It represents the a-th engineering quantity comparison value of the i-th sub-project, i represents the mark of the sub-project, , n is a positive integer, a represents the a-th engineering quantity comparison value of the sub-project, , A is a positive integer.
10. A method for calculating the engineering quantity of a construction project according to claim 9, characterized in that: The engineering quantity deviation index and engineering quantity comparison index of the total project are obtained. After linear normalization, the engineering quantity assessment index of the total project is calculated. The calculation formula is as follows: ; Among them, QEI represents the engineering quantity evaluation index of the total project, EQI represents the engineering quantity deviation index of the total project, QCI represents the engineering quantity comparison index, α and β represent weight coefficients, , .
Citation Information
Patent Citations
Method and device for determining project amount control targets of ultrahigh-voltage transmission and transformation projects
CN108921334A
BIM (Building Information Modeling)-based building progress deviation adjustment method, system and equipment and medium
CN116579583A
Project unit price rapid calculation method and system based on list item characteristic value
CN116663964A
House building project cost estimation method and device and storage medium
CN117934035A
Building component calculation quantity difference identification system and method
CN118569514A
Cited By
Automatic generation method, system and equipment of road engineering project and medium
CN120124995A