By adding a central control and simulation unit to the photovoltaic array series-parallel design for initial program screening, and combining the environmental monitoring unit to construct an environmental interval, the problems of photovoltaic array operating efficiency and operation and maintenance costs are solved, and a more efficient series-parallel connection is achieved. Operation and cost reduction.

CN118761193AInactive Publication Date: 2024-10-11HUANENG JIANGYIN GAS TURBINE THERMAL POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410680752.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

At this stage, the series-parallel design of photovoltaic arrays fails to fully consider environmental parameters, resulting in poor operating efficiency and high operation and maintenance costs.

Method used

By adding a central control unit and a simulation unit, multiple initial series and parallel schemes are established, and each scheme is simulated to screen out the scheme that can operate normally under extreme low temperature conditions; at the same time, an environmental monitoring unit is added to monitor historical environmental parameters. Construct temperature and light intensity intervals and select the best series-parallel connection scheme.

Benefits of technology

It improves the operating efficiency of photovoltaic arrays after series and parallel connection, reduces operation and maintenance costs, and ensures the continuous operation of photovoltaic arrays under extreme low temperature conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761193A_ABST
    Figure CN118761193A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of photovoltaic panels, in particular to a photovoltaic array series-parallel connection design system. Comprising a central control unit which is used for obtaining a single PV array parameter and the number of PV arrays of a factory, and generating a plurality of initial series-parallel connection schemes; the simulation unit is used for establishing simulation models of all the initial series-parallel connection schemes and establishing a simulation model sequence A, A = (a1, a2... an), n is the number of the initial series-parallel connection schemes, and ai is the simulation model of the ith initial series-parallel connection scheme; and the environment monitoring unit is used for acquiring historical environment parameters of the factory. A central control unit and a simulation unit are additionally arranged, a plurality of initial series-parallel connection schemes are established according to the number of PV arrays and parameters of a single PV array, analogue simulation is conducted on all the initial series-parallel connection schemes, all simulation models are screened by setting an ultimate low-temperature temperature interval, and therefore the simulation accuracy of the PV array is improved. Therefore, the photovoltaic arrays connected in series and in parallel can normally and continuously operate under the local extreme low temperature condition. And the operation efficiency of the photovoltaic array is ensured. And the operation stability of the photovoltaic array is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of photovoltaic panels, and in particular to a photovoltaic array series-parallel design system. Background Art

[0002] The output capacity of a single photovoltaic cell is limited. In actual projects, many photovoltaic cells are usually connected in series or in parallel to increase their output capacity. The output voltage can be increased by connecting in series, while the output current can be increased by connecting in parallel, so that the load can work at the rated state. Photovoltaic array series-parallel connection refers to a photovoltaic panel assembly whose photovoltaic panel connection circuit adopts a mixed connection of series and parallel. The series-parallel connection method can increase both voltage and current, and is suitable for medium-distance and medium-high voltage systems.

[0003] The operating efficiency of photovoltaic modules is greatly affected by factors such as temperature and light intensity. However, when designing the series and parallel connection of photovoltaic arrays at the current stage, only the parameters of the photovoltaic array itself are designed without considering the environmental parameters of the photovoltaic area. Therefore, the photovoltaic array cannot achieve the optimal operating efficiency. Summary of the invention

[0004] The purpose of this application is: to solve the above technical problems, this application provides a photovoltaic array series-parallel design system, aiming to improve the operating efficiency of the photovoltaic array after series-parallel connection and reduce operation and maintenance costs.

[0005] In some embodiments of the present application, by adding a central control unit and a simulation unit, multiple initial series-parallel schemes are established according to the number of PV arrays and the parameters of a single PV array, and each initial series-parallel scheme is simulated, and by setting an extreme low temperature range, each simulation model is screened, so that the photovoltaic array after series-parallel connection can operate normally and continuously under the local extreme low temperature conditions, ensuring the operating efficiency of the photovoltaic array.

[0006] In some embodiments of the present application, an environmental monitoring unit is added to monitor the historical environment of the photovoltaic plant, so as to construct corresponding temperature ranges and light intensity ranges, fully consider the impact of environmental factors on the operating efficiency of the photovoltaic array, and select the best series-parallel scheme based on overall considerations, thereby improving the operating efficiency of the photovoltaic array after series-parallel connection and reducing the overall operation and maintenance cost.

[0007] In some embodiments of the present application, a photovoltaic array series-parallel design system is provided, comprising:

[0008] The central control unit is used to obtain the parameters of a single PV array and the number of PV arrays in the plant area, and generate multiple initial series and parallel schemes;

[0009] The simulation unit is used to establish the simulation model of each initial series-parallel scheme and establish the simulation model sequence A, A = (a1, a2...a n ), where n is the number of initial series-parallel schemes, a i is the simulation model of the i-th initial series-parallel scheme;

[0010] Environmental monitoring unit, used to obtain historical environmental parameters of the plant.

[0011] In some embodiments of the present application, the environment monitoring unit includes:

[0012] The first environment module is used to establish a temperature range sequence B, B = (b1, b2...b m1 ), where m1 is the number of temperature intervals, b i is the i-th temperature interval;

[0013] The second environment module is used to establish a series of light intensity intervals C, C = (c1, c2...c m2 ), where m2 is the number of light intensity intervals, c i is the i-th light intensity interval.

[0014] In some embodiments of the present application, the central control unit includes:

[0015] The first screening module is used to determine the operating status of each simulation model in the temperature range b1, and generate a first-level simulation model sequence A1 according to the determination result, A1 = (a'1, a'2 ... a' n1 ), where n-n1 is the number of simulation models to be eliminated, a' i is the i-th first-level simulation model;

[0016] The first processing module is used to select a' in sequence according to the first-level simulation model sequence A1 i Target level one simulation model;

[0017] The second processing module is used to establish a primary efficiency model, and generate the primary efficiency of the target primary simulation model according to the primary efficiency model and the temperature range series B;

[0018] The second processing module is also used to establish a secondary efficiency model, and generate the secondary efficiency of the target primary simulation model according to the secondary efficiency model and the illumination intensity interval sequence C;

[0019] The first decision module is used to generate the operation evaluation value of each first-level simulation model.

[0020] In some embodiments of the present application, the generating of the primary efficiency of the target primary simulation model includes:

[0021] Establish a first-level efficiency evaluation model;

[0022]

[0023] Among them, b i is the i-th temperature interval, f1(x) is the functional relationship between temperature and operating efficiency in the target first-level simulation model, β i is the weighting coefficient of the i-th temperature interval, k is the first-order efficiency of the target first-order simulation model;

[0024] The second processing module is also used to establish a primary efficiency series K, K = (k1, k2 ... k n1 ), where k i is the first-order efficiency of the ith first-order simulation model.

[0025] In some embodiments of the present application, the generating of the secondary efficiency of the target primary simulation model includes:

[0026] Establish a secondary efficiency evaluation model;

[0027]

[0028] Among them, c i is the i-th illumination intensity interval, f2(x) is the functional relationship between illumination intensity and operating efficiency in the target first-level simulation model; α i is the weighting coefficient of the i-th illumination intensity interval; q is the secondary efficiency of the target primary simulation model;

[0029] The second processing module is also used to establish a secondary efficiency series Q, Q = (q1, q2 ... q n1 ), where q i is the secondary efficiency of the ith primary simulation model.

[0030] In some embodiments of the present application, the first decision module is further used to:

[0031] Establishing evaluation model;

[0032] h i =p i *{[e1*(q i +k i ) / 2]+e2*(ΔG) / g i};

[0033] Among them, p i is the compensation coefficient of the i-th primary simulation model, e1 is the preset first weight coefficient, e2 is the preset second weight coefficient, ΔG is the fixed cost coefficient, g i is the sum of the expected construction cost and expected operation and maintenance cost of the initial series solution corresponding to the i-th level simulation model;

[0034] h i is the operation evaluation value of the i-th first-level simulation model;

[0035] The first decision module is also used to establish an operation evaluation value sequence H, H = (h1, h2...h n1 ), where h i is the operation evaluation value of the i-th first-level simulation model;

[0036] The first decision module is also used to select the maximum operation evaluation value h in the operation evaluation value sequence H. max The corresponding first-level simulation model is the second-level simulation model, and the initial series-parallel scheme corresponding to the second-level simulation model is set as the first-level series-parallel scheme.

[0037] In some embodiments of the present application, the central control unit further includes:

[0038] The third processing module is used to generate the modified evaluation value of each primary simulation model and establish a modified evaluation value sequence T, T = (t1, t2...t n1 ), where t i is the corrected evaluation value of the i-th first-level simulation model;

[0039] The first correction module is used to set the compensation coefficient of each primary simulation model according to the correction evaluation value sequence T.

[0040] In some embodiments of the present application, the first correction module is further used to:

[0041] Presetting a first modified evaluation value interval (T1, T2), a second modified evaluation value interval (T2, T3) and a third modified evaluation value interval (T3, T4);

[0042] If the corrected evaluation value t i When the preset first correction evaluation value interval is reached, the compensation coefficient gi is set to the preset first compensation coefficient G1, that is, g i =G1;

[0043] If the corrected evaluation value t i When it is in the preset second correction evaluation value interval, the compensation coefficient gi is set to the preset second compensation coefficient G2, that is, g i =G2;

[0044] If the corrected evaluation value t i When the preset third correction evaluation value interval is reached, the compensation coefficient gi is set to the preset third compensation coefficient G3, that is, g i =G3; wherein, G3<G2<G1<1.

[0045] Compared with the prior art, the photovoltaic array series-parallel design system of the embodiment of the present application has the following beneficial effects:

[0046] By adding a central control unit and a simulation unit, multiple initial series-parallel schemes are established according to the number of PV arrays and the parameters of a single PV array, and each initial series-parallel scheme is simulated. By setting the extreme low temperature range, each simulation model is screened so that the photovoltaic array after series-parallel connection can operate normally and continuously under the local extreme low temperature conditions, ensuring the operating efficiency of the photovoltaic array.

[0047] By adding environmental monitoring units, the historical environment of the photovoltaic plant is monitored, so as to construct corresponding temperature ranges and light intensity ranges, fully consider the impact of environmental factors on the operating efficiency of the photovoltaic array, and select the best series-parallel solution based on overall considerations, thereby improving the operating efficiency of the photovoltaic array after series-parallel connection and reducing the overall operation and maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a structural schematic diagram of a photovoltaic array series-parallel design system in the preferred embodiment of the present application. DETAILED DESCRIPTION

[0049] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0050] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0051] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0052] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0053] like Figure 1 As shown, a photovoltaic array series-parallel design system according to a preferred embodiment of the present application includes:

[0054] The central control unit is used to obtain the parameters of a single PV array and the number of PV arrays in the plant area, and generate multiple initial series and parallel schemes;

[0055] The simulation unit is used to establish the simulation model of each initial series-parallel scheme and establish the simulation model sequence A, A = (a1, a2...a n ), where n is the number of initial series-parallel schemes, and ai is the simulation model of the i-th initial series-parallel scheme;

[0056] Environmental monitoring unit, used to obtain historical environmental parameters of the plant.

[0057] Specifically, the environmental monitoring unit includes:

[0058] The first environment module is used to establish a temperature range sequence B, B = (b1, b2...b m1 ), where m1 is the number of temperature intervals, b i is the i-th temperature interval;

[0059] The second environment module is used to establish a series of light intensity intervals C, C = (c1, c2...c m2 ), where m2 is the number of light intensity intervals, c i is the i-th light intensity interval.

[0060] Specifically, based on the historical environmental parameters of the current plant area, temperature range series and light intensity series are established to comprehensively evaluate the operating efficiency of each initial series-parallel scheme in each temperature range and light intensity range, thereby improving the stable operation of the photovoltaic array after series-parallel connection and avoiding the impact of changes in environmental parameters on the operating efficiency of the photovoltaic array.

[0061] Specifically, the central control unit includes:

[0062] The first screening module is used to determine the operating status of each simulation model in the temperature range b1, and generate a first-level simulation model sequence A1 according to the determination result, A1 = (a'1, a'2 ... a'n1 ), where n-n1 is the number of simulation models to be eliminated, a' i is the i-th first-level simulation model;

[0063] The first processing module is used to select a' in sequence according to the first-level simulation model sequence A1 i Target level one simulation model;

[0064] The second processing module is used to establish a primary efficiency model, and generate the primary efficiency of the target primary simulation model according to the primary efficiency model and the temperature range series B;

[0065] The second processing module is also used to establish a secondary efficiency model, and generate the secondary efficiency of the target primary simulation model according to the secondary efficiency model and the illumination intensity interval sequence C;

[0066] The first decision module is used to generate the operation evaluation value of each first-level simulation model.

[0067] Specifically, temperature range b1 is the extreme low temperature range of the current plant area set according to historical environmental parameters. By adjusting the operating parameters of each simulation model in the extreme low temperature area, some series-parallel schemes that cannot operate stably in the extreme low temperature range are eliminated, thereby ensuring that the photovoltaic array after series-parallel connection can operate normally and continuously under local extreme low temperature conditions.

[0068] In a preferred embodiment of the present application, when generating the first-level efficiency of the target first-level simulation model, it includes:

[0069] Establish a first-level efficiency evaluation model;

[0070]

[0071] Among them, b i is the i-th temperature interval, f1(x) is the functional relationship between temperature and operating efficiency in the target first-level simulation model, β i is the weighting coefficient of the i-th temperature interval, k is the first-order efficiency of the target first-order simulation model;

[0072] The second processing module is also used to establish a primary efficiency series K, K = (k1, k2 ... k n1 ), where k i is the first-order efficiency of the ith first-order simulation model.

[0073] Specifically, when generating the secondary efficiency of the target primary simulation model, it includes:

[0074] Establish a secondary efficiency evaluation model;

[0075]

[0076] Among them, c i is the i-th illumination intensity interval, f2(x) is the functional relationship between illumination intensity and operating efficiency in the target first-level simulation model; α i is the weighting coefficient of the i-th illumination intensity interval; q is the secondary efficiency of the target primary simulation model;

[0077] The second processing module is also used to establish a secondary efficiency series Q, Q = (q1, q2 ... q n1 ), where q i is the secondary efficiency of the ith primary simulation model.

[0078] Specifically, by adding a first-level efficiency model, the operating efficiency of each first-level simulation model in each temperature range is comprehensively calculated, so as to obtain the first-level efficiency of each first-level simulation model.

[0079] Specifically, the higher the primary efficiency, the more the series-parallel scheme corresponding to the current primary simulation model can adapt to the temperature environment of the factory.

[0080] Specifically, β i It can be set according to the proportion of the duration of the i-th temperature interval in the monitoring period.

[0081] Specifically, by adding a secondary efficiency model, the operating efficiency of each primary simulation model in each light intensity range is comprehensively calculated, so as to obtain the secondary efficiency of each primary simulation model.

[0082] Specifically, the higher the secondary efficiency, the more the series-parallel scheme corresponding to the current primary simulation model can adapt to the lighting environment of the factory.

[0083] Specifically, α i The weighted coefficient of the i-th light intensity interval can be set according to the proportion of the duration in the monitoring period.

[0084] Specifically, the first decision module is also used for:

[0085] Establishing evaluation model;

[0086] h i =p i *{[e1*(q i +k i ) / 2]+e2*(ΔG) / g i};

[0087] Among them, pi is the compensation coefficient of the i-th primary simulation model, e1 is the preset first weight coefficient, e2 is the preset second weight coefficient, ΔG is the fixed cost coefficient, g iis the sum of the expected construction cost and expected operation and maintenance cost of the initial series solution corresponding to the i-th level simulation model;

[0088] hi is the operation evaluation value of the i-th first-level simulation model;

[0089] The first decision module is also used to establish an operation evaluation value sequence H, H = (h1, h2...h n1 ), where h i is the operation evaluation value of the i-th first-level simulation model;

[0090] The first decision module is also used to select the maximum operation evaluation value h in the operation evaluation value sequence H max The corresponding first-level simulation model is the second-level simulation model, and the initial series-parallel scheme corresponding to the second-level simulation model is set as the first-level series-parallel scheme.

[0091] Specifically, by adding an evaluation model, the operating efficiency benefits of each first-level simulation model and the cost of the corresponding series-parallel scheme are comprehensively considered, and by setting the first weight coefficient and the second weight coefficient, optimization processing in different directions is achieved, so as to select the best series-parallel scheme, reduce the overall operation and maintenance costs, and improve the operating efficiency of the photovoltaic array.

[0092] Specifically, the fixed cost coefficient ΔG can be set based on historical operation and maintenance data.

[0093] Specifically, the greater the operational evaluation value, the higher the overall feasibility of the current series-parallel scheme, and the higher the overall benefit.

[0094] It can be understood that in the above embodiments, by constructing corresponding temperature ranges and light intensity ranges, the impact of environmental factors on the operating efficiency of the photovoltaic array is fully considered, and the best series-parallel scheme is selected based on overall considerations, thereby improving the operating efficiency of the photovoltaic array after series-parallel connection and reducing the overall operation and maintenance cost.

[0095] In a preferred embodiment of the present application, the central control unit further includes:

[0096] The third processing module is used to generate the modified evaluation value of each primary simulation model and establish a modified evaluation value sequence T, T = (t1, t2...t n1 ), where t i is the corrected evaluation value of the i-th first-level simulation model;

[0097] The first correction module is used to set the compensation coefficient of each primary simulation model according to the correction evaluation value sequence T.

[0098] Specifically, the revised evaluation value can be set according to the sum of the variance values ​​of the operating efficiency of each primary simulation model in each temperature range and the variance values ​​of the operating efficiency in each light intensity range. The larger the sum, the greater the operating fluctuation of the series-parallel scheme corresponding to the current primary simulation model when the environmental parameters change. The corresponding revised evaluation value is also larger.

[0099] Specifically, the first correction module is also used to:

[0100] Presetting a first modified evaluation value interval (T1, T2), a second modified evaluation value interval (T2, T3) and a third modified evaluation value interval (T3, T4);

[0101] If the corrected evaluation value t i When the preset first correction evaluation value interval is reached, the compensation coefficient gi is set to the preset first compensation coefficient G1, that is, g i =G1;

[0102] If the corrected evaluation value t i When it is in the preset second correction evaluation value interval, the compensation coefficient gi is set to the preset second compensation coefficient G2, that is, g i =G2;

[0103] If the corrected evaluation value t i When the preset third correction evaluation value interval is reached, the compensation coefficient gi is set to the preset third compensation coefficient G3, that is, g i =G3; wherein, G3<G2<G1<1.

[0104] It can be understood that in the above embodiment, by adding a modified evaluation value interval and setting the corresponding compensation coefficient according to the modified evaluation value of each primary simulation model, the stability of the operation of each scheme is fully considered, so that the photovoltaic array finally constructed has good operation stability.

[0105] According to the first concept of the present application, by adding a central control unit and a simulation unit, multiple initial series-parallel schemes are established according to the number of PV arrays and the parameters of a single PV array, and each initial series-parallel scheme is simulated, and by setting an extreme low temperature range, each simulation model is screened, so that the photovoltaic array after series-parallel connection can operate normally and continuously under the local extreme low temperature conditions, ensuring the operating efficiency of the photovoltaic array.

[0106] According to the second concept of the present application, by adding an environmental monitoring unit, the historical environment of the photovoltaic plant is monitored, so as to construct corresponding temperature ranges and light intensity ranges, fully consider the impact of environmental factors on the operating efficiency of the photovoltaic array, and select the best series-parallel scheme based on overall considerations, so as to improve the operating efficiency of the photovoltaic array after series-parallel connection and reduce the overall operation and maintenance cost.

[0107] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A photovoltaic array series-parallel design system, characterized in that: include: The central control unit is used to obtain the parameters of a single PV array and the number of PV arrays in the plant area, and generate multiple initial series and parallel schemes; The simulation unit is used to establish the simulation model of each initial series-parallel scheme and establish the simulation model sequence A, A = (a1, a2...a n ), where n is the number of initial series-parallel schemes, and ai is the simulation model of the i-th initial series-parallel scheme; Environmental monitoring unit, used to obtain historical environmental parameters of the plant.

2. The photovoltaic array series-parallel design system according to claim 1, characterized in that: The environmental monitoring unit comprises: The first environment module is used to establish a temperature range sequence B, B = (b1, b2...b m1 ), where m1 is the number of temperature intervals, b i is the i-th temperature interval; The second environment module is used to establish a series of light intensity intervals C, C = (c1, c2...c m2 ), where m2 is the number of light intensity intervals, c i is the i-th light intensity interval.

3. The photovoltaic array series-parallel design system according to claim 2, characterized in that: The central control unit comprises: The first screening module is used to determine the operating status of each simulation model in the temperature range b1, and generate a first-level simulation model sequence A1 according to the determination result, A1 = (a'1, a'2 ... a' n1 ), where n-n1 is the number of simulation models to be eliminated, a' i is the i-th first-level simulation model; The first processing module is used to select a' in sequence according to the first-level simulation model sequence A1 i Target level one simulation model; The second processing module is used to establish a primary efficiency model, and generate the primary efficiency of the target primary simulation model according to the primary efficiency model and the temperature range series B; The second processing module is also used to establish a secondary efficiency model, and generate the secondary efficiency of the target primary simulation model according to the secondary efficiency model and the illumination intensity interval sequence C; The first decision module is used to generate the operation evaluation value of each first-level simulation model.

4. The photovoltaic array series-parallel design system according to claim 3, characterized in that: The generating of the first-level efficiency of the target first-level simulation model includes: Establish a first-level efficiency evaluation model; Among them, b i is the i-th temperature interval, f1(x) is the functional relationship between temperature and operating efficiency in the target first-level simulation model, β i is the weighting coefficient of the i-th temperature interval, k is the first-order efficiency of the target first-order simulation model; The second processing module is also used to establish a primary efficiency series K, K = (k1, k2 ... k n1 ), where ki is the first-order efficiency of the ith first-order simulation model.

5. The photovoltaic array series-parallel design system according to claim 4, characterized in that: The generating of the secondary efficiency of the target primary simulation model includes: Establish a secondary efficiency evaluation model; Among them, ci is the i-th illumination intensity interval, f2(x) is the functional relationship between illumination intensity and operating efficiency in the target first-level simulation model; α i is the weighting coefficient of the i-th illumination intensity interval; q is the secondary efficiency of the target primary simulation model; The second processing module is also used to establish a secondary efficiency series Q, Q = (q1, q2 ... q n1 ), where q i is the secondary efficiency of the ith primary simulation model.

6. The photovoltaic array series-parallel design system according to claim 5, characterized in that: The first decision module is also used for: Establishing evaluation model; h i =p i *{[e1*(q i +k i ) / 2]+e2*(ΔG) / g i }; Among them, p i is the compensation coefficient of the i-th primary simulation model, e1 is the preset first weight coefficient, e2 is the preset second weight coefficient, ΔG is the fixed cost coefficient, g i is the sum of the expected construction cost and expected operation and maintenance cost of the initial series solution corresponding to the i-th level simulation model; hi is the operation evaluation value of the i-th first-level simulation model; The first decision module is also used to establish an operation evaluation value sequence H, H = (h1, h2...h n1 ), where h i is the operation evaluation value of the i-th first-level simulation model; The first decision module is also used to select the maximum operation evaluation value h in the operation evaluation value sequence H. max The corresponding first-level simulation model is the second-level simulation model, and the initial series-parallel scheme corresponding to the second-level simulation model is set as the first-level series-parallel scheme.

7. The photovoltaic array series-parallel design system according to claim 6, characterized in that: The central control unit also includes: The third processing module is used to generate the modified evaluation value of each primary simulation model and establish a modified evaluation value sequence T, T = (t1, t2...t n1 ), where ti is the corrected evaluation value of the i-th primary simulation model; The first correction module is used to set the compensation coefficient of each primary simulation model according to the correction evaluation value sequence T.

8. The photovoltaic array series-parallel design system according to claim 7, characterized in that: The first correction module is also used for: Presetting a first modified evaluation value interval (T1, T2), a second modified evaluation value interval (T2, T3) and a third modified evaluation value interval (T3, T4); If the corrected evaluation value t i When in the preset first correction evaluation value interval, set the compensation coefficient g i The first compensation coefficient G1 is preset, that is, g i =G1; If the corrected evaluation value ti is within the preset second corrected evaluation value interval, the compensation coefficient g is set i The second compensation coefficient G2 is preset, that is, g i =G2; If the corrected evaluation value ti is within the preset third corrected evaluation value interval, the compensation coefficient g is set i The third compensation coefficient G3 is preset, that is, g i =G3; wherein, G3<G2<G1<1.