Data processing method and system for monitoring data of wind power plant
Through the pre-built wind farm monitoring data processing model, the problem of high complexity of wind farm monitoring data processing is solved, efficient data processing and aggregation is achieved, and the wind farm operation and management decision support capabilities are improved.
Patent Information
- Application Number
- CN202410868583.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-01
AI Technical Summary
Wind farm monitoring data processing faces the problems of large data volume and high processing complexity. Traditional methods are difficult to meet the needs of large-scale wind farm monitoring data processing.
The pre-built wind farm monitoring data processing model is used to process the collected data in real time and parallel processing. The data is processed through the dimension determination module, equipment type definition module, equipment model template definition module and specific equipment determination module, and timed aggregation is performed. calculation to avoid repeated conversion and processing of data.
It achieves efficient data processing and aggregation, improves the real-time performance and response speed of the system, significantly improves processing efficiency, and supports flexible expansion and customization, making it suitable for wind power and other Internet of Things fields.
Smart Images

Figure CN118761647A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of wind power technology, and in particular to a data processing method and system for wind farm monitoring data. Background Art
[0002] As the scale of wind power expands, wind power companies are exploring and implementing new intensive and platform-based business models under the three-level management and control model of group-region-wind farm.
[0003] However, wind farm monitoring data processing faces problems such as large data volume and high processing complexity. Traditional data processing methods are difficult to meet the needs of large-scale wind farm monitoring data processing. Therefore, an efficient and reliable data processing method and system for wind farm monitoring data is needed. Summary of the invention
[0004] In view of the above problems, an object of the present invention is to provide a data processing method and system for wind farm monitoring data, which can solve the problems of large data volume and high processing complexity faced by wind farm monitoring data processing.
[0005] To achieve the above objectives, the present invention adopts the following technical solutions: In a first aspect, a method for processing wind farm monitoring data is provided, comprising: Using the pre-built wind farm monitoring data processing model, the wind farm monitoring data collected by the wind farm monitoring system is processed in real time; A pre-built wind farm monitoring data processing model is used to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timed aggregation calculation results of the wind farm.
[0006] Further, the wind farm monitoring data processing model includes a dimension determination module, an equipment type definition module, an equipment model template definition module and a specific equipment determination module; The dimension determination module is used to define the view of the user viewing the wind farm monitoring system, including the primary system dimension, the monitoring system dimension, the financial dimension and the operation monitoring dimension; The equipment type definition module is used to define the equipment type of the wind farm and encode each equipment type; The equipment model template definition module is used to define equipment model templates of different equipment of the same equipment type in the wind farm to standardize the data format of the equipment; The specific equipment determination module is used to determine the equipment details and associated measurement points of specific equipment in the wind farm.
[0007] Furthermore, the wind farm monitoring data collected by the wind farm monitoring system is processed in real time using a pre-built wind farm monitoring data processing model, including: Perform data conversion on wind farm monitoring data collected by the wind farm monitoring system; Load the pre-built wind farm monitoring data processing model and pre-process the converted wind farm monitoring data; The loaded wind farm monitoring data processing model is used to process the wind farm monitoring data in parallel.
[0008] Furthermore, the method of using a pre-built wind farm monitoring data processing model to process the wind farm monitoring data collected by the wind farm monitoring system in real time also includes: A method to prevent cyclic conversion is adopted to avoid repeated conversion and processing of wind farm monitoring data.
[0009] Furthermore, the loading of the pre-built wind farm monitoring data processing model and pre-processing of the converted wind farm monitoring data includes: Loading pre-built wind farm monitoring data processing models; Based on the wind farm monitoring data processing model, the converted wind farm monitoring data is converted to standard measurement points; Based on the wind farm monitoring data processing model, the alarm rules of wind turbines in the wind farm monitoring system are preloaded.
[0010] Furthermore, the pre-built wind farm monitoring data processing model is used to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timed aggregation calculation result of the wind farm, including: Perform scheduled task scheduling; Based on scheduled task scheduling, query the sub-equipment data of the wind farm monitoring system; Use fixed time windows or sliding time windows to process the queried sub-device data; Perform timestamp alignment on sub-device data after data processing; The wind farm monitoring data processing model is adopted to aggregate the sub-device data after time stamp alignment to obtain the timing aggregation calculation results of the wind farm.
[0011] Furthermore, the method of using a pre-built wind farm monitoring data processing model to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain a timed aggregation calculation result of the wind farm also includes: The intermediate and final results of the calculation are saved in the real-time database and time series database of the wind farm monitoring system.
[0012] In a second aspect, a data processing system for wind farm monitoring data is provided, comprising: A data real-time processing module is used to process the wind farm monitoring data collected by the wind farm monitoring system in real time using a pre-built wind farm monitoring data processing model; The timing aggregation calculation module is used to use a pre-built wind farm monitoring data processing model to perform timing aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timing aggregation calculation results of the wind farm.
[0013] In a third aspect, a processing device is provided, comprising computer program instructions, wherein the computer program instructions, when executed by the processing device, are used to implement the steps corresponding to the above-mentioned data processing method for wind farm monitoring data.
[0014] In a fourth aspect, a computer-readable storage medium is provided, on which computer program instructions are stored, wherein the computer program instructions, when executed by a processor, are used to implement steps corresponding to the above-mentioned data processing method for wind farm monitoring data.
[0015] The present invention adopts the above technical solution, which has the following advantages: 1. The model structure in the present invention is the basis for the present invention to realize parallel processing and aggregate processing. The model structure adopts advanced data structures and algorithms to make data storage and access more efficient, while supporting flexible expansion and customization.
[0016] 2. The model of the present invention combines physical entity equipment with virtual systems and covers multiple dimensions, such as primary system, monitoring system, finance and operation monitoring, etc. It not only accurately describes the entity relationship in the wind power field, but also has scalability and can be applied to photovoltaic and other Internet of Things fields.
[0017] 3. In the complex systems in the field of wind power, a large amount of data often needs to be processed and analyzed, such as real-time monitoring of wind farms, fault prediction, performance optimization, etc. The present invention uses parallel processing technology to decompose these tasks into multiple subtasks and execute them simultaneously on multiple processors or computing cores, thereby greatly reducing processing time, improving the real-time performance and response speed of the system, and significantly improving processing efficiency.
[0018] 4. The present invention relates to the process of integrating and comprehensively analyzing a large amount of data. In a wind power system, different equipment and different latitudes may generate a large amount of data, which needs to be effectively integrated and used for analysis and decision-making. The present invention can screen, classify, aggregate and other operations on these data through aggregation processing technology, so as to extract valuable information, provide decision support for the operation and management of wind farms, and help the system discover the correlation and trend between data, providing strong support for the optimized operation and fault prediction of wind farms.
[0019] 5. The relevant parameters in the parallel processing of the present invention can be adjusted and optimized according to actual needs to achieve optimal processing performance; the specific parameters in the aggregation processing can be adjusted according to different application scenarios to meet the actual needs of users.
[0020] 6. The present invention can ensure the stability and reliability of the system while ensuring processing efficiency through reasonable parameter configuration and optimization.
[0021] In summary, the present invention can be widely applied in the field of wind power technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1 is a schematic diagram of a model structure provided by an embodiment of the present invention; Figure 2 is a schematic diagram of a wind farm monitoring system provided by an embodiment of the present invention; Figure 3 is a schematic diagram of a device model template definition module provided by an embodiment of the present invention; Figure 4 is a schematic diagram of a specific device determination module provided by an embodiment of the present invention; Figure 5 It is a schematic diagram of a timed aggregation process provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0023] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0024] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used herein may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps may be used.
[0025] Although the terms first, second, third, etc. can be used in the text to describe multiple elements, components, regions, layers and / or sections, these elements, components, regions, layers and / or sections should not be limited by these terms. These terms can only be used to distinguish an element, component, region, layer or section from another region, layer or section. Unless the context clearly indicates, terms such as "first", "second" and other numerical terms do not imply order or sequence when used in the text. Therefore, the first element, component, region, layer or section discussed below can be referred to as the second element, component, region, layer or section without departing from the teaching of the example embodiments.
[0026] Since wind farm monitoring data processing faces problems such as large data volume and high processing complexity, traditional data processing methods are difficult to meet the needs of large-scale wind farm monitoring data processing. Therefore, there is a need for an efficient and reliable data processing method and system for wind farm monitoring data. An embodiment of the present invention provides a data processing method for wind farm monitoring data, including: using a pre-built wind farm monitoring data processing model to perform real-time processing on wind farm monitoring data collected by a wind farm monitoring system; using a pre-built wind farm monitoring data processing model to perform timed aggregation calculations on the wind farm monitoring data after parallel processing to obtain timed aggregation calculation results of the wind farm. The present invention adopts a unique model to improve configuration and debugging efficiency, and adopts parallel processing to improve data processing performance.
[0027] Example 1 This embodiment provides a data processing method for wind farm monitoring data, comprising the following steps: 1) Construct a wind farm monitoring data processing model.
[0028] Specifically, Figure 1 As shown, the wind farm monitoring data processing model includes a dimension determination module, an equipment type definition module, an equipment model template definition module and a specific equipment determination module.
[0029] The dimension determination module is used to define the view of the user to view the wind farm monitoring system (including real-time operation monitoring, equipment control, historical data analysis, alarm processing, booster station primary system monitoring, real-time database, time series database and other components), such as Figure 2 As shown in the figure, the dimensions include primary system dimension, monitoring system dimension, financial dimension and operation monitoring dimension according to the needs of different users. The view of each dimension contains different equipment of the wind farm, the data points associated with various equipment and the relationship between the equipment. Defining dimensions can use the same equipment information to provide different structures and information for different users.
[0030] The equipment type definition module is used to define the equipment types of the wind farm, such as wind turbines, energy meters, gateway meters, substation equipment and transmission lines, and encode each equipment type. The purpose of defining equipment types is to achieve unified management and data processing of different types of equipment in the wind farm. The same equipment type has similar characteristics. For example, each wind turbine has a box transformer, and each wind turbine has some similar measurement points such as wind speed and power.
[0031] The equipment model template definition module is used to define equipment model templates for different equipment of the same equipment type in a wind farm, including measurement points, conversion rules, alarm conditions and aggregation rules, so as to standardize the data format of the equipment for unified management and processing. Figure 3 As shown, the device models of the same device type have a parent-child inheritance relationship. Generally, the parent model defines standardized information such as measurement points and conversion rules. The child model inherits all the defined measurement points, conversion rules and other information of the parent model, and can overwrite, delete, and specialize some information definitions, so as to achieve the purpose of both standardization and management of specialized data between different models of the same type of equipment.
[0032] The specific equipment determination module is used to determine the equipment details and associated measurement points of the specific equipment in the wind farm. The equipment details include the detailed information of specific equipment such as wind turbines, substation equipment and transmission lines defined in the equipment type definition module. The purpose of determining the equipment details and associated measurement points of specific equipment is to accurately monitor and manage the status of each equipment. Figure 4 As shown, the specific device must belong to a certain device model. The specific device generally applies the definition of the measurement points and conversion rules of the device model template to which it belongs. This makes it easy to quickly modify the measurement points, conversion rules, alarm conditions, etc. of all devices under a certain model.
[0033] Specifically, the types of equipment in a wind farm include actual physical equipment such as wind turbines, energy meters, gateway meters, booster stations, substation equipment, and transmission lines, as well as virtual or logical equipment such as wind farms, fire protection areas, wind turbine SCADA monitoring systems, and energy management systems (EMS).
[0034] Specifically, the device model template defined by the device model template definition module needs to define the standard name, standard code and model inheritance tree; the measurement points of the device model include the measurement point code, measurement point name and unit; the alarm rules include the alarm measurement point, alarm value, alarm level, alarm type, alarm code, whether the alarm sounds and whether the alarm needs to be confirmed, etc.; the aggregation rules include the aggregation type (sum, average) and aggregation conditions (how long the interval is, from which data types and measurement points to aggregate, and which dimension structure to use for aggregation).
[0035] Specifically, the sub-model will inherit all the definitions of the parent model, unless the sub-model defines the configuration of the same code. For example, if the parent model has a GEP power generation measurement point in kWh, the sub-model will also inherit this measurement point; if the sub-model defines a GEP power generation measurement point in MWh, the sub-model will follow its own definition (i.e., it will override the definition of the parent model).
[0036] 2) Using the pre-built wind farm monitoring data processing model, the wind farm monitoring data collected by the wind farm monitoring system is processed in real time, specifically: 2.1) Perform data conversion on the wind farm monitoring data collected by the wind farm monitoring system (including SCADA data collected by wind turbines, as well as data collected by AGC, AVC, energy management system and booster station SCADA, etc.).
[0037] Specifically, the collected original wind farm monitoring data is converted into the data format used for data processing, mainly by adding information such as the equipment's measurement points (measurement point type, unit, etc.), conversion rules and alarm conditions, as well as the association information between devices in various dimensions to the original wind farm monitoring data; data conversion is to improve the efficiency of data processing in subsequent steps and avoid performance problems caused by multiple readings of model configurations.
[0038] 2.2) Load the pre-built wind farm monitoring data processing model and pre-process the converted wind farm monitoring data: 2.2.1) Load the pre-built wind farm monitoring data processing model.
[0039] 2.2.2) Based on the wind farm monitoring data processing model, the converted wind farm monitoring data is converted to standard measurement points.
[0040] Specifically, standard measuring points refer to measuring points with unified names and units. For example, the "wind speed" and "power" of wind turbines can be defined as standard measuring points. Original measuring points refer to data directly collected by the wind farm monitoring system. For example, "wind speed 1" and "wind speed 2" collected from wind turbine SCADA are original measuring points.
[0041] Specifically, since in most cases only the original measurement points collected are submitted directly during wind farm monitoring data collection, it is necessary to convert the original measurement points of the converted wind farm monitoring data into standard measurement points according to the conversion definition of standard measurement points in the wind farm monitoring processing model, for example, converting the original measurement point "wind speed 1" into the standard measurement point "wind speed".
[0042] 2.2.3) Preload the wind turbine alarm rules based on the wind farm monitoring data processing model.
[0043] Specifically, a general wind turbine alarm is an alarm list composed of multiple measuring points. The increase or decrease alarm of a wind turbine needs to be determined based on the data of all alarm measuring points. This is different from the simple measuring point alarm logic, so the alarm rules of the wind turbine need to be preloaded based on the wind farm monitoring and processing model.
[0044] 2.3) Using the loaded wind farm monitoring data processing model, the wind farm monitoring data is processed in parallel.
[0045] Specifically, parallel processing includes partial data conversion, fan standard state calculation, original alarm processing, customized alarm processing, real-time page refresh, real-time database storage, and time series database storage.
[0046] More specifically, part of the data conversion includes unit conversion between original measurement points and standard measurement points, such as calculating the theoretical power of a wind turbine based on wind speed.
[0047] More specifically, the standard state calculation of the wind turbine is a comprehensive calculation based on the AGC and AVC states in the wind farm, the original state of the wind turbine (original state code, wind speed, power) and the environmental information of the wind turbine (temperature, humidity, weather conditions).
[0048] More specifically, the original alarm is processed as an alarm message similar to that reported by a booster station or a wind turbine box transformer using the 104 protocol, and after reading the alarm configuration, an alarm with complete information is generated or the alarm record is restored.
[0049] More specifically, the customized alarm processing is based on alarm definitions such as limit value, jump and remote signal change. When the value of the measuring point changes and meets the alarm definition, an alarm is generated or the alarm record is restored.
[0050] More specifically, the real-time page refresh means pushing the change data of equipment such as fans to the user page in real time.
[0051] More specifically, saving the real-time database is saving the device data in the real-time database.
[0052] More specifically, saving the time series database is to write the data with timestamps into the time series database in sequence.
[0053] Various data have different timeliness, accuracy, display units, and storage requirements. Parallel processing can improve the efficiency of data processing. Multiple data processing does not affect each other. Arranging system resources with different configurations according to different characteristics can effectively utilize CPU / memory / IO resources.
[0054] 2.4) Use methods to prevent cyclic conversion to avoid repeated conversion and processing of wind farm monitoring data.
[0055] Specifically, due to the complexity of the above processing process and configuration, some data may undergo multiple rounds of processing, and a mechanism must be provided to avoid infinite loops. Here, the key data key value checking method is generally used.
[0056] 3) If Figure 5 As shown in the figure, a pre-built wind farm monitoring data processing model is used to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timed aggregation calculation results of the wind farm, including the total power generation, average wind speed, real-time power, and the number of wind turbines in various states, etc., which need to be calculated. Specifically, they are: 3.1) Perform scheduled task scheduling.
[0057] Specifically, according to the time interval, scheduled task scheduling is divided into six levels: second level, minute level, hour level, day level, month level, and year level. Second-level scheduling is executed once per second; minute level, hour level, day level, month level, and year level are generally defined as being executed once per minute. Second-level scheduling requires high resources, and second-level scheduling tasks can be assigned to a higher-configuration computing infrastructure. Differentiated scheduling can balance the pressure of aggregate computing.
[0058] 3.2) Based on scheduled task scheduling, query the sub-equipment data of the wind farm monitoring system.
[0059] Specifically, according to the aggregation rule definition, to query the measurement point data of the lowest-level sub-equipment of the wind farm, for example, to calculate the real-time power generation index of the wind farm, it is necessary to query the power generation of all wind turbine equipment in the wind farm (from the system monitoring dimension, wind turbine equipment is a sub-equipment of the wind farm).
[0060] 3.3) Use a fixed time window or a sliding time window to process the queried sub-device data, such as calculating the average, maximum, and difference.
[0061] Specifically, a fixed time window means that the time period for aggregation calculation is fixed, such as a 5-minute average value. Fixed time window calculation is calculated every 5 minutes on the hour. A sliding time window means sliding calculation based on the time point during calculation. For example, a 5-minute average value is calculated every 1 minute. A sliding time window calculation is calculated 5 times in 5 minutes. The time series database will save all values: one value for 00:00-05:00, one value for 01:00-06:00, one value for 02:00-07:00, one value for 03:00-08:00, and one value for 04:00-09:00.
[0062] 3.4) Perform timestamp alignment on the sub-device data after data processing.
[0063] Specifically, some devices are missing data due to various reasons (network interruption, underlying hardware / software system failure), and it is necessary to supplement the data of all devices at each timestamp based on the calculated timestamp. The supplementation methods include supplementing the previous value, supplementing the average value, supplementing the linear value, etc.
[0064] 3.5) Using the wind farm monitoring data processing model, the sub-device data with aligned timestamps are aggregated into parent and child devices to obtain the timing aggregation calculation results of the wind farm.
[0065] Specifically, the dimensions defined by the dimension determination module in the wind farm monitoring data processing model are aggregated and calculated, from the child equipment data at the bottom layer of the wind farm to the parent equipment data at the top layer of the wind farm. For example, in the monitoring system dimension, a wind farm includes multiple projects, a project includes multiple lines, and a line includes multiple wind turbines. When aggregating the average wind speed of the wind farm: first, the wind speed of the wind turbines under the line is averaged to aggregate the average wind speed of the line; then the average wind speed of the line under the project is averaged to aggregate the average wind speed of the project; finally, the average wind speed of the projects under the wind farm is averaged to aggregate the average wind speed of the wind farm.
[0066] 3.6) The intermediate results and final results calculated in the above steps are saved in the real-time database and time series database of the wind farm monitoring system.
[0067] Example 2 This embodiment provides a data processing system for wind farm monitoring data, including: The data real-time processing module is used to use a pre-built wind farm monitoring data processing model to perform real-time processing on the wind farm monitoring data collected by the wind farm monitoring system.
[0068] The timing aggregation calculation module is used to use a pre-built wind farm monitoring data processing model to perform timing aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timing aggregation calculation results of the wind farm.
[0069] The system provided in this embodiment is used to execute the above-mentioned method embodiments. Please refer to the above-mentioned embodiments for specific processes and detailed contents, which will not be repeated here.
[0070] Example 3 This embodiment provides a processing device corresponding to the data processing method for wind farm monitoring data provided in Embodiment 1. The processing device can be applicable to a client processing device, such as a mobile phone, a laptop computer, a tablet computer, a desktop computer, etc., to execute the method of Embodiment 1.
[0071] The processing device includes a processor, a memory, a communication interface and a bus, and the processor, the memory and the communication interface are connected through the bus to complete mutual communication. The memory stores a computer program that can be run on the processing device, and the processing device executes the data processing method for wind farm monitoring data provided in this embodiment 1 when running the computer program.
[0072] In some implementations, the memory may be a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage.
[0073] In some other implementations, the processor may be a central processing unit (CPU), a digital signal processor (DSP), or other general-purpose processors of various types, which are not limited herein.
[0074] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on such an understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0075] Those skilled in the art will understand that the structure of the above-mentioned computing device is only a partial structure related to the solution of the present invention, and does not constitute a limitation on the computing device to which the solution of the present invention is applied. The specific computing device may include more or fewer components, or combine certain components, or have a different arrangement of components.
[0076] Example 4 This embodiment provides a computer program product corresponding to the data processing method for wind farm monitoring data provided in Embodiment 1. The computer program product may include a computer-readable storage medium on which computer-readable program instructions for executing the data processing method for wind farm monitoring data described in Embodiment 1 are loaded.
[0077] Computer readable storage media can be tangible devices that hold and store instructions used by instruction execution devices. Computer readable storage media can be, for example, but not limited to, electronic storage devices, magnetic storage devices, optical storage devices, electromagnetic storage devices, semiconductor storage devices, or any combination thereof.
[0078] The above embodiment provides a computer-readable storage medium, whose implementation principle and technical effect are similar to those of the above method embodiment, and will not be repeated here.
[0079] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0080] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0081] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0082] The above embodiments are only used to illustrate the present invention, wherein the structure, connection mode and manufacturing process of each component may be changed. Any equivalent transformations and improvements based on the technical solution of the present invention should not be excluded from the protection scope of the present invention.
Claims
1. A data processing method for wind farm monitoring data, characterized in that: include: Using the pre-built wind farm monitoring data processing model, the wind farm monitoring data collected by the wind farm monitoring system is processed in real time; A pre-built wind farm monitoring data processing model is used to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timed aggregation calculation results of the wind farm.
2. A method for processing wind farm monitoring data according to claim 1, characterized in that: The wind farm monitoring data processing model includes a dimension determination module, an equipment type definition module, an equipment model template definition module and a specific equipment determination module; The dimension determination module is used to define the view of the user viewing the wind farm monitoring system, including the primary system dimension, the monitoring system dimension, the financial dimension and the operation monitoring dimension; The equipment type definition module is used to define the equipment type of the wind farm and encode each equipment type; The equipment model template definition module is used to define equipment model templates of different equipment of the same equipment type in the wind farm to standardize the data format of the equipment; The specific equipment determination module is used to determine the equipment details and associated measurement points of specific equipment in the wind farm.
3. A method for processing wind farm monitoring data according to claim 1, characterized in that: The wind farm monitoring data processing model constructed in advance is used to process the wind farm monitoring data collected by the wind farm monitoring system in real time, including: Perform data conversion on wind farm monitoring data collected by the wind farm monitoring system; Load the pre-built wind farm monitoring data processing model and pre-process the converted wind farm monitoring data; The loaded wind farm monitoring data processing model is used to process the wind farm monitoring data in parallel.
4. A method for processing wind farm monitoring data according to claim 3, characterized in that: The method of using a pre-built wind farm monitoring data processing model to process the wind farm monitoring data collected by the wind farm monitoring system in real time also includes: A method to prevent cyclic conversion is adopted to avoid repeated conversion and processing of wind farm monitoring data.
5. The method for processing wind farm monitoring data according to claim 3, characterized in that: The loading of the pre-built wind farm monitoring data processing model and pre-processing of the converted wind farm monitoring data includes: Loading pre-built wind farm monitoring data processing models; Based on the wind farm monitoring data processing model, the converted wind farm monitoring data is converted to standard measurement points; Based on the wind farm monitoring data processing model, the alarm rules of wind turbines in the wind farm monitoring system are preloaded.
6. A method for processing wind farm monitoring data according to claim 1, characterized in that: The pre-built wind farm monitoring data processing model is used to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timed aggregation calculation result of the wind farm, including: Perform scheduled task scheduling; Based on scheduled task scheduling, query the sub-equipment data of the wind farm monitoring system; Use fixed time windows or sliding time windows to process the queried sub-device data; Perform timestamp alignment on sub-device data after data processing; The wind farm monitoring data processing model is adopted to aggregate the sub-device data after time stamp alignment to obtain the timing aggregation calculation results of the wind farm.
7. A method for processing wind farm monitoring data according to claim 6, characterized in that: The method uses a pre-built wind farm monitoring data processing model to perform timed aggregation calculation on the wind farm monitoring data after parallel processing to obtain a timed aggregation calculation result of the wind farm, and further includes: The intermediate and final results of the calculation are saved in the real-time database and time series database of the wind farm monitoring system.
8. A data processing system for wind farm monitoring data, characterized in that: include: A data real-time processing module is used to process the wind farm monitoring data collected by the wind farm monitoring system in real time using a pre-built wind farm monitoring data processing model; The timing aggregation calculation module is used to use a pre-built wind farm monitoring data processing model to perform timing aggregation calculation on the wind farm monitoring data after parallel processing to obtain the timing aggregation calculation results of the wind farm.
9. A processing device, characterized in that: The method comprises computer program instructions, wherein the computer program instructions are used to implement the steps corresponding to the data processing method for wind farm monitoring data according to any one of claims 1 to 7 when the computer program instructions are executed by a processing device.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer program instructions, wherein the computer program instructions, when executed by a processor, are used to implement steps corresponding to the method for processing wind farm monitoring data according to any one of claims 1 to 7.
Citation Information
Patent Citations
Wind farm data analysis and application model
CN102722655A
Integrated platform system for remote management and control of wind power field cluster
CN102736593A
Centralized monitoring system platform for wind power plants
CN103516051A
Wind -powered electricity generation field remote monitering system
CN207623774U
Automated streaming data model generation with parallel processing capability
US11550643B1