A remote control computer operation method based on Internet of Things

By setting up control circuit modules in the Internet of Things and establishing a data control area relationship network, dynamically adjusting the priority status, the problem of low data transmission efficiency in remote control computers is solved, and system performance and stability are improved.

CN118764523BActive Publication Date: 2024-11-12CHENGDU PREDATOR TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411238243.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-12
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

In the existing remote control computer technology, data transmission efficiency is low, which affects control fluency, resulting in a large amount of additional data transmission when remote devices control computers, resulting in system performance bottlenecks and delays.

Method used

By setting up control circuit modules in the Internet of Things, establishing a data transmission connection between the control server and the remote device, dividing the computer system into multiple data control areas, and establishing a relationship network according to the control correlation, dynamically adjusting the priority status of the data control area to optimize Data transmission ensures the processing of high-priority tasks.

Benefits of technology

It significantly improves data transmission efficiency, reduces latency, avoids performance bottlenecks caused by resource competition, and ensures that the system operates stably under high load conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118764523B_ABST
    Figure CN118764523B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of remote control computers. The present invention relates to a remote control computer operation method based on the Internet of Things. It comprises the following steps: S1, setting a control circuit module, and enabling the control circuit module to obtain control authority of the computer; S2, establishing a control server through the Internet of Things, establishing a data transmission connection between the control server, the control circuit module and the remote device, and then providing computer control authority to the remote device in the control server; the present invention establishes a relationship network, and sets the data control area to be controlled to a priority state according to the control signal, and the system can preferentially process and transmit the data control area in the priority state, which will significantly improve the data transmission efficiency of key tasks, reduce delays and ensure that key tasks are processed first, and this dynamic resource allocation optimizes the overall system performance and avoids performance bottlenecks caused by resource competition.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of remote control computers, and in particular to a remote control computer operation method based on the Internet of Things. Background Art

[0002] With the rapid development of computer technology, most computers store a large amount of files and other information. However, due to work or other reasons, you always need to open a computer that is not nearby and perform certain operations on the files or applications in it.

[0003] At present, the computer and the remote device are connected to the cloud server, and the computer is controlled to operate by transmitting signals through the cloud server. However, when the remote device controls the computer to operate, a large amount of data will be generated when the computer operates according to the control signal, resulting in reduced data transmission efficiency and affecting the smoothness of the remote device controlling the computer operation. Therefore, a remote control computer operation method based on the Internet of Things is proposed. Summary of the invention

[0004] The purpose of the present invention is to provide a remote control computer operation method based on the Internet of Things to solve the problems raised in the above background technology.

[0005] To achieve the above purpose, a remote control computer operation method based on the Internet of Things is provided, comprising the following steps:

[0006] S1. Setting a control circuit module and enabling the control circuit module to obtain control authority of the computer;

[0007] S2. Establish a control server through the Internet of Things, establish a data transmission connection between the control server, the control circuit module and the remote device, and then provide computer control authority to the remote device in the control server;

[0008] S3. Allocate the computer system to different areas according to the control characteristics, obtain multiple data control areas, establish a relationship network between the data control areas according to the control correlation, make a subsequent control prediction for the data control areas according to the operation records of the remote devices, and then add the predicted data control areas to the relationship network;

[0009] S4, the control server receives the control signal input by the remote device and performs content analysis, and sends it to the control circuit module according to the signal content, and then the control circuit module sends it to the corresponding data control area according to the received control content, and then operates the computer according to the control content through the data control area, and adjusts the data control area that operates the computer to a priority state, and adjusts all data control areas related to the data control area relationship network to a priority state;

[0010] S5. Monitor the online status of the remote device. When the remote device is offline, restore the data control area in the priority state to a uniform state.

[0011] As a further improvement of the present technical solution, S1 sets a core control circuit in the computer motherboard, and names the core control circuit as a control circuit module. At the same time, the core control circuit connects the computer motherboard and computer components, and forwards control signals through the core control circuit to achieve control of the computer.

[0012] As a further improvement of the present technical solution, the remote device in S2 establishes a data transmission connection with the control server via Ethernet, and the control circuit module establishes a data transmission connection with the control server via a wifi module of the computer.

[0013] As a further improvement of the technical solution, the steps of S2 are as follows:

[0014] S2.1. Establish a control server through the Internet of Things, set a separate key for each control circuit module, obtain control authority over the control circuit module through the remote device by unlocking the key, and input a control signal to the control circuit module;

[0015] S2.2. When a new remote device enters the server, it is authenticated and the control authority of the corresponding control circuit module is allocated according to the input key.

[0016] As a further improvement of the present technical solution, two states are set for the data control area, namely a priority state and a uniform state. When transmitting data to the server, the priority of the priority state is greater than the priority of the uniform state, so that the data control area in the priority state gives priority to feeding back the control result to the remote device.

[0017] As a further improvement of the technical solution, the steps of S3 are as follows:

[0018] S3.1. Analyze the control characteristics of the computer system to obtain the control characteristics of the computer system, and then divide the computer system into regions according to the control characteristics, thereby dividing the computer system into multiple data control regions to form distributed transmission data;

[0019] S3.2. Establish a relationship network between data control areas based on control relevance, predict the data control area involved in the next step of control of the remote device based on the operation record of the remote device, and add the predicted data control area to the relationship network.

[0020] As a further improvement of the technical solution, the computer proposed in S3.1 is composed of N components, which are divided into M data control areas, and the overall system optimization coefficient of the custom parameters characterizing the performance, resource requirements and data transmission requirements of each area is expressed by the following comprehensive formula:

[0021]

[0022] It consists of performance indicator formula, resource requirement formula and data transmission requirement formula;

[0023] The performance indicator formula is expressed as:

[0024]

[0025] in, is the response time of the region, is the resource demand ratio of the ith region, It is the data processing requirement. It is computing power;

[0026] The data transmission requirement formula is expressed as:

[0027]

[0028] in, is the data transmission rate of the ith region, is the amount of data, is the transmission time.

[0029] As a further improvement of the technical solution, the step of S4 is as follows:

[0030] S4.1. The remote device inputs a control signal to the control server, which parses the content and forwards it to the control circuit module. The control circuit module then sends the received control content to the corresponding data control area, and then operates the computer according to the control content through the data control area;

[0031] S4.2. When the data control area starts to work, it is adjusted to a priority state, and other data control areas in the relationship network of the data control area started by the control signal are also adjusted to a priority state.

[0032] As a further improvement of the technical solution, S5 monitors the online status of the remote device in the control server, and when the remote device is disconnected from the control server, it is considered that the remote device is offline.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] In the method for remotely controlling a computer based on the Internet of Things, by establishing a relationship network and setting the data control area to be controlled to a priority state according to the control signal, the system can preferentially process and transmit the data control area in the priority state, which will significantly improve the data transmission efficiency of key tasks, reduce delays and ensure that key tasks are processed first. This dynamic resource allocation optimizes the overall system performance and avoids performance bottlenecks caused by resource competition.

[0035] By dividing the system into priority state and uniform state, the system can remain stable when processing high-priority tasks. This mechanism helps to avoid system overload or crash caused by high load, so that the system can still run stably under various load conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is the overall flow chart of the present invention;

[0037] Figure 2 A flowchart of the present invention for allocating control authority of a corresponding control circuit module according to an input key;

[0038] Figure 3 A flowchart of adding the predicted acquired data control area to the relationship network of the present invention;

[0039] Figure 4 This is a flowchart of the data control area of ​​the present invention starting to operate the computer according to the control signal

[0040] Figure 5 It is a schematic diagram of the integrated chassis of the present invention. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] See also Figure 1-Figure 5 As shown, the purpose of this embodiment is to provide a remote control computer operation method based on the Internet of Things, comprising the following steps:

[0043] S1. Setting a control circuit module and enabling the control circuit module to obtain control authority of the computer;

[0044] The S1 sets a core control circuit in the computer motherboard, and names the core control circuit as a control circuit module. At the same time, the core control circuit connects the computer motherboard and computer components, and forwards control signals through the core control circuit to achieve control of the computer.

[0045] S2. Establish a control server through the Internet of Things, establish a data transmission connection between the control server, the control circuit module and the remote device, and then provide computer control authority to the remote device in the control server;

[0046] In S2, the remote device establishes a data transmission connection with the control server via Ethernet, and the control circuit module establishes a data transmission connection with the control server via the computer's Wi-Fi module.

[0047] Control server: manages all control circuit modules, processes requests from remote devices, and verifies keys.

[0048] Control circuit module: performs specific control operations.

[0049] Remote devices: Users send control commands through these devices. Remote devices need to provide the correct key to obtain control permissions.

[0050] The steps of S2 are as follows:

[0051] S2.1. Establish a control server through the Internet of Things, set a separate key for each control circuit module, and obtain the control authority of the control circuit module through the remote device by unlocking the key, so as to input the control signal to the control circuit module. The specific working principle is as follows:

[0052] Design of control server: Generate a unique key for each control circuit module. Use encryption algorithm (such as AES) to generate strong random keys, store the keys in the database of the control server, and ensure their security.

[0053] Remote device authentication: When requesting control authority, the remote device needs to provide identity authentication information (such as user name and password), and then the server verifies the correctness of the key. After the verification is passed, the server sends a control signal to the control circuit module;

[0054] Control signal transmission: The control signal is sent to the control circuit module through a secure communication protocol (such as HTTPS), and the control circuit module receives the signal and performs corresponding operations.

[0055] S2.2. When a new remote device enters the server, it is authenticated and the control authority of the corresponding control circuit module is allocated according to the input key. The specific working principle is as follows:

[0056] Authentication: Authentication using a key;

[0057] Authority allocation: according to the key input by the device, it is allocated to a specific control circuit module;

[0058] Control circuit module: On the server side, access and control of specific control circuit modules are granted based on the permissions possessed by the device.

[0059] The data control area is set to two states, namely, a priority state and a uniform state. When transmitting data to the server, the priority of the priority state is greater than the priority of the uniform state, so that the data control area in the priority state gives priority to feeding back the control result to the remote device. The specific working principle is as follows:

[0060] Define the state of the data control area: define two states of the data control area: priority state and uniform state. Each data control area requires an identifier to indicate its current state.

[0061] Design state management of control areas: Each data control area should have a mechanism to manage its state, which can be managed and updated by setting properties or methods;

[0062] Implement a data control mechanism with priority status: During data transmission, the priority is determined according to the status of the control area. The control area with priority status will give priority to data transmission and feedback of control results.

[0063] S3. Allocate the computer system to different areas according to the control characteristics, obtain multiple data control areas, establish a relationship network between the data control areas according to the control correlation, make a subsequent control prediction for the data control areas according to the operation records of the remote devices, and then add the predicted data control areas to the relationship network;

[0064] The steps of S3 are as follows:

[0065] S3.1. Analyze the control characteristics of the computer system, obtain the control characteristics of the computer system, and then divide the computer system into regions according to the control characteristics, so as to divide the computer system into multiple data control regions to form distributed transmission data. The specific working principle is as follows:

[0066] Control characteristics analysis: The purpose of control characteristics analysis is to identify the control capabilities and characteristics of each module in the system. This includes:

[0067] Functional analysis: Determine the functions of each component of the system and their role in the system.

[0068] Dependencies: Analyze the dependencies and interaction patterns between components.

[0069] Performance analysis: Evaluate the performance parameters of each component, such as response time, processing power, etc.

[0070] Security features: Determine the security requirements of system components, such as access control, data protection, etc.

[0071] Area division: After understanding the control characteristics of the system, the system can be divided into multiple data control areas based on these characteristics. This step includes:

[0072] Regional division standards: Divide regions based on function, performance, dependency, and other standards.

[0073] Region Boundaries: Determine the boundaries of each region and its control capabilities.

[0074] Inter-region interaction: defines the data exchange and communication protocols between regions.

[0075] After the area division is completed, design a distributed data transmission system.

[0076] The computer proposed in S3.1 is composed of N components, divided into M data control areas, and the overall system optimization coefficient of the custom parameters characterizing the performance, resource requirements and data transmission requirements of each area is expressed by the following comprehensive formula:

[0077]

[0078] It consists of performance indicator formula, resource requirement formula and data transmission requirement formula;

[0079] The performance indicator formula is expressed as:

[0080]

[0081] in, is the response time of the region, is the resource demand ratio of the ith region, It is the data processing requirement. It is computing power;

[0082] The performance indicator of each area is the inverse of the response time of the area. (response time) means a higher (performance), Indicates the ratio of data processing demand to computing power in each region. The higher the ratio, the greater the resource demand. The data transmission rate for each area is the ratio of data transmission volume to transmission time. A higher transmission rate means more efficient data transmission.

[0083] The data transmission requirement formula is expressed as:

[0084]

[0085] in, is the data transmission rate of the ith region, is the amount of data, is the transmission time.

[0086] Calculates the degree of optimization of the overall system, taking into account the performance, resource requirements, and data transfer rates of each region. The numerator of the formula weights and sums these characteristics of all regions, and the denominator Used for normalization to ensure that the overall load of the system is within an acceptable range.

[0087] S3.2. Establish a relationship network between data control areas based on control relevance, and predict the data control area involved in the next step of remote device control based on the operation record of the remote device, and add the predicted data control area to the relationship network. The specific working principle is as follows:

[0088] First, we need to establish a graph model that represents the relationship between data control areas. Assume that there are N data control areas. Each node in the graph represents a control area, and the edge represents the correlation between the control areas.

[0089] Control dependencies define whether the operation of one region may affect the functionality of another region or whether two regions share the same computing resources.

[0090] The weight of each edge Represents the control correlation between region i and region j, and uses a weight matrix W to represent these relationships:

[0091]

[0092] in, is the data traffic between region i and region j, is the degree of functional dependency, a value between 0 and 1, indicating the strength of the dependency relationship. is the degree of resource sharing, and f is a function that takes these factors into consideration;

[0093]

[0094] in, , ,and is the weight coefficient, which is used to adjust the influence of each factor.

[0095] Predict the areas that the remote device will control next:

[0096] Collect historical operation records of remote devices , where each record contains a timestamp t and a control area :

[0097]

[0098] Extract features from operation records. The input of the model is the historical operation records, and the output is the predicted next control area. Assume that the prediction model is , the next area predicted is :

[0099]

[0100] The predicted control area Join the network if the predicted area It was not in the network before, so it can be added to the graph and a new edge can be created with the relevant region:

[0101]

[0102] After adding the new control area to the prediction results, the structure and weight of the relationship network are updated.

[0103] S4, the control server receives the control signal input by the remote device and performs content analysis, and sends it to the control circuit module according to the signal content, and then the control circuit module sends it to the corresponding data control area according to the received control content, and then operates the computer according to the control content through the data control area, and adjusts the data control area that operates the computer to a priority state, and adjusts all data control areas related to the data control area relationship network to a priority state;

[0104] The steps of S4 are as follows:

[0105] S4.1. The remote device inputs a control signal to the control server, which parses the content and forwards it to the control circuit module. The control circuit module then sends the received control content to the corresponding data control area, and then operates the computer according to the control content through the data control area;

[0106] Remote device input control signal: The remote device sends a control signal to the control server. The control signal may include information such as instructions, parameters, and target data area;

[0107] Parsing control signals: After receiving the control signals, the control server parses the signal content and extracts the instruction ID, parameters and target area information. The main function of the control server is to forward these signals to the corresponding control circuit module;

[0108] Forwarding control signal: The control server forwards the signal to the corresponding control circuit module according to the target area information;

[0109] Receiving control signals: After the control circuit module receives the signal from the control server, it performs corresponding operations according to the signal content.

[0110] Receiving instructions: The data control area receives operating instructions and parameters from the control circuit module, and operates the computer according to the operating instructions and parameters.

[0111] S4.2. When the data control area starts to work, it is adjusted to a priority state, and other data control areas in the relationship network of the data control area started by the control signal are also adjusted to a priority state;

[0112] When a data control area is activated, its state can be adjusted through control signals, and other data control areas in its relationship network can be updated at the same time.

[0113] S5. Monitor the online status of the remote device. When the remote device is offline, restore the data control area in the priority state to a uniform state.

[0114] The S5 monitors the online status of the remote device in the control server. When the remote device is disconnected from the control server, it is considered that the remote device is offline.

[0115] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A remote control computer operation method based on the Internet of Things, characterized in that: The following steps are involved: S1. Setting a control circuit module and enabling the control circuit module to obtain control authority of the computer; S2. Establish a control server through the Internet of Things, establish a data transmission connection between the control server, the control circuit module and the remote device, and then provide computer control authority to the remote device in the control server; S3. Allocate the computer system to different areas according to the control characteristics, obtain multiple data control areas, establish a relationship network between the data control areas according to the control correlation, make a subsequent control prediction for the data control areas according to the operation records of the remote devices, and then add the predicted data control areas to the relationship network; The steps of S3 are as follows: S3.

1. Analyze the control characteristics of the computer system to obtain the control characteristics of the computer system, and then divide the computer system into regions according to the control characteristics, thereby dividing the computer system into multiple data control regions to form distributed transmission data; S3.

2. Establish a relationship network between data control areas based on control relevance, predict the data control area involved in the next control of the remote device based on the operation record of the remote device, and add the predicted data control area to the relationship network; The computer proposed in S3.1 is composed of N components, divided into M data control areas, and the overall system optimization coefficient of the custom parameters characterizing the performance, resource requirements and data transmission requirements of each area is expressed by the following comprehensive formula: It consists of performance indicator formula, resource requirement formula and data transmission requirement formula; The performance indicator formula is expressed as: in, is the response time of the region, is the resource demand ratio of the ith region, It is the data processing requirement. It is computing power; The data transmission requirement formula is expressed as: in, is the data transmission rate of the ith region, is the amount of data, is the transmission time; S4, the control server receives the control signal input by the remote device and performs content analysis, and sends it to the control circuit module according to the signal content, and then the control circuit module sends it to the corresponding data control area according to the received control content, and then operates the computer according to the control content through the data control area, and adjusts the data control area that operates the computer to a priority state, and adjusts all data control areas related to the data control area relationship network to a priority state; S5. Monitor the online status of the remote device. When the remote device is offline, restore the data control area in the priority state to a uniform state.

2. According to claim 1, a remote control computer operation method based on the Internet of Things is characterized in that: The S1 sets a core control circuit in the computer motherboard, and names the core control circuit as a control circuit module. At the same time, the core control circuit connects the computer motherboard and computer components, and forwards control signals through the core control circuit to achieve control of the computer.

3. According to the method of remotely controlling a computer based on the Internet of Things in claim 1, it is characterized in that: In S2, the remote device establishes a data transmission connection with the control server via Ethernet, and the control circuit module establishes a data transmission connection with the control server via the computer's Wi-Fi module.

4. The method for remotely controlling a computer based on the Internet of Things according to claim 1, characterized in that: The steps of S2 are as follows: S2.

1. Establish a control server through the Internet of Things, set a separate key for each control circuit module, obtain control authority over the control circuit module through the remote device by unlocking the key, and input a control signal to the control circuit module; S2.

2. When a new remote device enters the server, it is authenticated and the control authority of the corresponding control circuit module is allocated according to the input key.

5. The method for remotely controlling a computer based on the Internet of Things according to claim 1, characterized in that: The S4 sets two states for the data control area, namely, a priority state and a uniform state. When transmitting data to the server, the priority of the priority state is greater than that of the uniform state, so that the data control area in the priority state gives priority to feeding back the control result to the remote device.

6. The method for remotely controlling a computer based on the Internet of Things according to claim 1, characterized in that: The steps of S4 are as follows: S4.

1. The remote device inputs a control signal to the control server, which parses the content and forwards it to the control circuit module. The control circuit module then sends the received control content to the corresponding data control area, and then operates the computer according to the control content through the data control area; S4.

2. When the data control area starts to work, it is adjusted to a priority state, and other data control areas in the relationship network of the data control area started by the control signal are also adjusted to a priority state.

7. The method for remotely controlling a computer based on the Internet of Things according to claim 1, characterized in that: The S5 monitors the online status of the remote device in the control server. When the remote device is disconnected from the control server, it is considered that the remote device is offline.

Citation Information

Patent Citations

  • Cloud area control method and cloud area control system based on intelligent Internet of things

    CN110426986A

  • Distributed modularized electrical safety control terminal

    CN114390083A

  • Computer firmware remote upgrading system and method based on Internet of Things

    CN115904457A

  • Using method for integrating various networks and video conference equipment

    CN118158089A

  • Computer remote control method and system

    CN118567731A