Spray tower for waste gas treatment
By designing a spray tower and installation structure made of corrosion-resistant materials, the problem of toxic and harmful gas treatment in semiconductor production is solved, effective purification of waste gas and efficient maintenance of equipment are achieved, extending equipment life and improving maintenance efficiency.
Patent Information
- Application Number
- CN202310365966.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-15
AI Technical Summary
Toxic and harmful gases produced in semiconductor production cause serious harm to the human body and the environment. Existing waste gas treatment equipment cannot meet the special needs of various manufacturers, and poor internal facilities lead to high equipment losses and low maintenance efficiency.
Design a spray tower for waste gas treatment. It uses an upper tower body and a lower tower body made of corrosion-resistant materials. Liquid spray cleaning is performed through nozzles to remove fixed particles in the waste gas. The installation structure facilitates installation and disassembly, improving Initial installation and repair efficiency.
It effectively removes fixed particles in the exhaust gas, extends the service life of the equipment, improves installation and maintenance efficiency, and ensures the stability and safety of the equipment.
Smart Images

Figure CN118767576A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of waste gas treatment, and in particular relates to a spray tower for waste gas treatment. Background Art
[0002] Today's society has entered the information age with semiconductor technology as its core. Semiconductor technology is a reflection of a country's scientific and technological level, industrial level and comprehensive national strength, and is highly valued by countries around the world. However, a large amount of toxic and harmful gases will be produced in semiconductor production, some of which are highly toxic substances rarely used in traditional industries. If the concentration of these toxic and harmful substances exceeds the standard in the workshop, it will cause great harm to the operators. Most of these gases are seriously harmful to the human body and the environment. Therefore, the market demand for waste gas treatment equipment is very large. However, due to the different internal facilities and environments of semiconductor manufacturers, waste gas treatment equipment also has a large demand for various practical special devices. Therefore, it is necessary to design a washing tower specifically for waste gas treatment. Summary of the invention
[0003] The purpose of this application is to provide a spray tower for waste gas treatment that can solve the above problems.
[0004] The purpose of this application is to provide a spray tower for waste gas treatment, comprising:
[0005] An upper tower body, wherein the upper tower body is cylindrical, one end of the upper tower body along the axial direction thereof forms a first guide port for gas to enter the interior of the upper tower body from this end, and the other end of the upper tower body along the axial direction thereof forms an outlet for gas to be guided out of the interior of the upper tower body from this end;
[0006] The lower tower body is cylindrical and hollow, one end of the lower tower body along the axial direction thereof forms an inlet for gas to enter the lower tower body from this end, and the other end of the lower tower body along the axial direction thereof forms a second guide port for gas to be introduced into the upper tower body from this end;
[0007] A nozzle is arranged on the side of the lower tower body;
[0008] Wherein, a mounting structure is arranged between the upper tower body and the lower tower body, and the upper tower body and the lower tower body are fixed by the mounting structure.
[0009] The above-mentioned spray tower for waste gas treatment can effectively treat waste gas. The upper tower body and the lower tower body are made of corrosion-resistant materials, which can reduce the loss of the upper tower body and the lower tower body, thereby extending the service life. The upper tower body and the lower tower body are spliced and connected, and the two are fixed by a mounting structure. By setting the mounting structure, the washing tower body can be easily installed and disassembled, which improves the efficiency of initial installation and subsequent maintenance. At the same time, by installing a nozzle on the side of the lower tower body, at least two nozzles are installed, and the two nozzles are arranged at intervals up and down, and the nozzles are connected by a water pipe. The liquid sprayed by the nozzle can spray and clean the waste gas, thereby removing some fixed particles in the waste gas. The cleaned waste gas enters the upper tower body through the second guide port and the first guide port, and is finally guided out of the spray tower from the outlet.
[0010] Furthermore, holes are provided in the upper tower body near the first air guide port to facilitate airflow to pass through, and the holes are circular and evenly distributed.
[0011] By providing a plurality of holes, the introduced gas can be diverted, so that the gas treatment and purification can be more uniform.
[0012] Furthermore: a conduit connected to the outlet is arranged on the top of the upper tower body, and a negative pressure monitoring device, a temperature monitoring device and a processing efficiency detection device are arranged on the outer wall of the conduit.
[0013] By installing a negative pressure monitoring device, a temperature monitoring device and a processing efficiency detection device on the washing tower, various data of the washing tower can be monitored in real time, the situation of the washing tower can be understood in time, and timely processing can be facilitated when an accident occurs, thereby protecting the entire equipment.
[0014] Furthermore, the installation structure includes:
[0015] A left snap ring, wherein both ends of the left snap ring are provided with first mounting blocks protruding outwards, and the first mounting blocks are provided with grooves recessed inwards;
[0016] A right snap ring, wherein both ends of the right snap ring are provided with second mounting blocks protruding outward, and the second mounting blocks are provided with protrusions adapted to the grooves;
[0017] The locking structure comprises a first threaded hole and a second threaded hole respectively arranged on the first mounting block and the protrusion, and also comprises a locking member arranged on the first threaded hole and the second threaded hole;
[0018] Positioning grooves are provided on both the left clamping ring and the right clamping ring, and both the upper tower body and the lower tower body are provided with mounting flanges adapted to the positioning grooves;
[0019] Wherein, the left snap ring and the right snap ring are spliced through grooves and protrusions to form a complete circular ring.
[0020] The upper tower body and the lower tower body can be fixed together by adopting the mounting structure. After the mounting structure is disassembled, the upper tower body and the lower tower body can be separated. When installing, the positioning grooves on the left snap ring and the right snap ring are respectively aligned with the mounting flange, and then the groove on the left snap ring is aligned with the protrusion on the right snap ring, and the protrusion is inserted into the groove, so as to preliminarily combine the left snap ring and the right snap ring together, and then fix the left snap ring, the snap ring, the upper tower body and the lower tower body through the locking structure, and use the locking member to connect with the first threaded hole and the second threaded hole in turn, so as to further fix the left snap ring and the right snap ring, and then fix the upper tower body and the lower tower body. When disassembly is required, it is only necessary to remove the locking member from the first threaded hole and the second threaded hole by a tool, and then separate the left snap ring and the right snap ring in opposite directions, which is quick and convenient.
[0021] Furthermore, the locking member comprises:
[0022] A screw head, wherein the screw head is provided with a screw rod integrally formed therewith, and the screw head is also provided with a mounting hole coaxial with the screw head axis, and a plurality of conical blocks are provided on the side wall of the mounting hole;
[0023] A protective ring is obliquely arranged at the connection between the screw head and the screw rod, and a plurality of strip grooves are opened on the bottom surface of the protective ring;
[0024] A nut is arranged on the screw rod, one end of the nut is provided with an outer ring extending outward, a limiting ring is provided at the bottom of the outer ring, one end of the limiting ring is provided with a limiting opening adapted to the outer ring, and an elastic gasket is also provided between the nut and the limiting ring;
[0025] The conical blocks are evenly arranged in an annular shape on the side wall of the mounting hole, the mounting hole extends downward and passes through the screw head, and after passing through the screw head, the mounting hole continues to extend downward to the inside of the screw rod, and the conical blocks extend downward along with the mounting hole.
[0026] A mounting hole is provided on the screw head, and a plurality of conical blocks are evenly distributed on the side wall of the mounting hole. The mounting hole passes through the screw head and extends into the screw rod, and the conical block extends downward with the mounting hole. Through the above structure, when installing the locking piece, it can be installed by tightening the screw head, or by tightening the mounting hole with a special tool. A variety of installation methods can cope with different installation situations. At the same time, if it is inconvenient to use the screw head for installation, the mounting hole can be used for installation. At the same time, using the mounting hole for installation has the advantage that the bolt can be installed in a deeper place, thereby improving the firmness after installation.
[0027] A protective ring extending outward in an inclined manner is provided at the connection between the screw head and the screw rod, and the protective ring is in the shape of a trumpet. When the screw head is gradually tightened, the protective ring will gradually squeeze the surface of the first mounting block, thereby increasing the contact area between the screw head and the first mounting block and improving the stability effect after installation. A plurality of strip grooves are provided on the bottom surface of the protective ring. The arrangement of the strip grooves can increase the friction between the locking member and the first mounting block after the locking member is installed in the first threaded hole and the second threaded hole, thereby further preventing the locking member from loosening or even falling off due to vibration during use of the device. At the same time, the trumpet shape can also play a waterproof role, thereby preventing liquid from entering the threaded hole and preventing rust.
[0028] In addition, when installing, the bolts are gradually tightened, and the nuts apply pressure to the elastic gasket sleeved on the screw rod. The elastic gasket is compressed, so that the outer wall of the elastic gasket and the inner wall of the corresponding end of the limit ring fit together and clamp the screw rod, thereby increasing the pre-tightening force of the nut and the screw rod, making the nut less likely to loosen or fall off when subjected to strong vibrations and irregular strong force fluctuations, extending the service life of the nut, and thereby improving the connection stability between the upper tower body and the lower tower body.
[0029] Furthermore, an annular groove is provided on the screw head, the diameter of the annular groove is larger than the diameter of the mounting hole, a protective ring is provided in the annular groove, the cross-section of the protective ring is in the shape of a circular ring, a gap is formed between the protective ring and the outer wall of the annular groove, a thread is provided on the inner wall of the protective ring, the center of the protective ring, the center of the annular groove and the center of the mounting hole are all the same, and an inclined hole connected to the gap is provided on the side wall of the screw head.
[0030] An annular groove is provided on the screw head, and a protective ring with a circular cross-section is provided in the annular groove. A gap is formed between the protective ring and the outer wall of the annular groove. At the same time, an inclined hole connected to the gap is provided on the side wall of the screw head. Water in the gap can be discharged through the cooperation of the inclined hole and the gap. At the same time, a thread is provided on the inner wall of the protective ring, and a sealing cover can be installed on the protective ring. The sealing cover cooperates with the thread of the protective ring to shield and seal the annular groove and the mounting hole, thereby preventing foreign matter from invading the interior, thereby extending the service life.
[0031] Furthermore, a protective sleeve is provided at one end of the limiting ring away from the limiting opening, and the limiting opening is annular. The top surface of the protective sleeve is fitted with the elastic gasket, and the side of the elastic gasket that contacts the protective sleeve is a rounded surface protruding outward. The elastic gasket is fitted with the inner wall of the limiting ring, and an arc-shaped groove adapted to the elastic gasket is provided on the inner wall of the limiting ring.
[0032] The protective sleeve can protect the end of the screw. The annular limiting port, in cooperation with the arc-shaped card slot and the outer ring, can be used to limit the elastic gasket ring. By setting the surface of the elastic gasket ring in contact with the protective sleeve as a rounded surface protruding outward, it can better adapt to the elastic gasket ring, and the setting of the rounded surface can better protect the elastic gasket ring, enabling the elastic gasket to play a better role.
[0033] Furthermore, the mounting structure further includes a positioning frame which is in a "C" shape. The positioning frame is provided with an inwardly protruding positioning rod, and both the first mounting block and the second mounting block are provided with positioning slots adapted to the positioning rod.
[0034] By installing the positioning frame at the connection between the left clamping ring and the right clamping ring, the positioning frame can wrap the first mounting block and the second mounting block, and at the same time, can also shield the locking member, thereby protecting the connection between the left clamping ring and the right clamping ring and the locking member, preventing them from being exposed outside, reducing contact with external moisture and other liquids, and thus extending the service life. During installation, it only needs to align the positioning rod with the positioning slots on the first mounting block and the second mounting frame, which is fast and convenient.
[0035] The beneficial effects of this application are:
[0036] 1. By adopting the above-mentioned spray tower for waste gas treatment, the waste gas can be effectively treated. Both the upper tower body and the lower tower body are made of corrosion-resistant materials, which can reduce the loss of the upper tower body and the lower tower body, thereby extending the service life. At the same time, by installing nozzles on the side of the lower tower body, at least two nozzles are installed, and the two nozzles are arranged at intervals up and down and are connected by a water pipe. The liquid sprayed by the nozzles can spray and wash the waste gas, thereby removing some fixed particles in the waste gas and playing an effective purification role;
[0037] 2. The upper tower body and the lower tower body are spliced and connected, and the two are fixed through the mounting structure. By setting the mounting structure, it is convenient to install and disassemble the scrubbing tower body, improving the efficiency of initial installation and subsequent maintenance;
[0038] 3. By setting the mounting structure, it is convenient to install and disassemble the upper tower body. Among them, by providing a protective ring extending obliquely outward at the connection between the screw head and the screw, when the screw head is gradually tightened, the protective ring will gradually squeeze the surface of the first mounting block, which can increase the contact area between the screw head and the first mounting block and improve the stability effect after installation. Multiple strip-shaped grooves are opened on the bottom surface of the protective ring. The setting of the strip-shaped grooves can increase the friction between the locking member and the first mounting block after the locking member is installed in the first threaded hole and the second threaded hole, thereby further preventing the locking member from loosening or even falling off due to vibration during the use of the equipment. At the same time, being set in a flared shape can also play a waterproof role, preventing liquid from entering the threaded hole and avoiding rust. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a schematic diagram of the structure of the present invention;
[0040] Figure 2 is a cross-sectional view of the present invention;
[0041] Figure 3 A schematic structural diagram of the installation structure of the present invention;
[0042] Figure 4 It is a structural schematic diagram of the locking member of the present invention;
[0043] Figure 5 is an exploded view of the locking member of the present invention;
[0044] Figure 6 is a schematic structural diagram of the locking member of the present invention from another perspective;
[0045] Figure 7 It is a cross-sectional view of the locking member of the present invention.
[0046] The reference numerals in the figure are: 100, upper tower body; 110, first flow guide port; 120, outlet; 130, hole; 140, conduit; 150, negative pressure monitoring device; 160, temperature monitoring device; 170, treatment efficiency detection device; 200, lower tower body; 210, inlet; 220, second flow guide port; 300, nozzle; 400, mounting structure; 410, left snap ring; 411, first mounting block; 412, groove; 420, right snap ring; 421, second mounting block; 422, protrusion; 430, Positioning groove; 440, mounting flange; 500, locking piece; 510, screw head; 511, screw rod; 512, mounting hole; 513, tapered block; 520, protective ring; 521, strip groove; 530, nut; 551, outer ring; 552, limiting ring; 553, limiting opening; 554, elastic gasket; 560, annular groove; 561, protective ring; 562, gap; 563, inclined hole; 570, protective sleeve; 580, arc-shaped slot; 600 positioning frame; 610, positioning rod; 620, positioning slot. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0048] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0049] The spray tower for waste gas treatment provided in the embodiment of the present application is described in detail below through specific embodiments and their application scenarios in conjunction with the accompanying drawings.
[0050] Embodiment 1:
[0051] like Figures 1 to 3 As shown, the embodiment of the present application provides a spray tower for waste gas treatment, comprising:
[0052] The upper tower body 100 is cylindrical, and one end of the upper tower body 100 along the axial direction thereof forms a first guide port 110 for allowing gas to enter the interior of the upper tower body 100 from this end, and the other end of the upper tower body 100 along the axial direction thereof forms an outlet 120 for allowing gas to be guided out of the interior of the upper tower body 100 from this end;
[0053] The lower tower body 200 is cylindrical and hollow. One end of the lower tower body 200 along the axial direction thereof forms an inlet 210 for allowing gas to enter the lower tower body 200 from this end, and the other end of the lower tower body 200 along the axial direction thereof forms a second guide port 220 for allowing gas to be introduced from this end into the upper tower body 100;
[0054] The nozzle 300 is disposed on the side of the lower tower body 200;
[0055] A mounting structure 400 is disposed between the upper tower body 100 and the lower tower body 200 , and the upper tower body 100 and the lower tower body 200 are fixed by the mounting structure 400 .
[0056] In some implementations of the embodiments of the present application, Figure 1As shown, the above-mentioned spray tower for waste gas treatment can effectively treat the waste gas. The upper tower body 100 and the lower tower body 200 are both made of corrosion-resistant materials, which can reduce the loss of the upper tower body 100 and the lower tower body 200, thereby extending the service life. The upper tower body 100 and the lower tower body 200 are spliced and connected, and the two are fixed by a mounting structure 400. By setting the mounting structure 400, the washing tower body can be easily installed and disassembled, thereby improving the efficiency of the initial installation and subsequent maintenance. At the same time, by installing a nozzle 300 on the side of the lower tower body 200, at least two nozzles 300 are installed, and the two nozzles 300 are arranged at intervals up and down, and the nozzles 300 are connected by a water pipe. The liquid sprayed by the nozzle 300 can spray and clean the waste gas, thereby removing some fixed particles in the waste gas. The cleaned waste gas enters the upper tower body 100 through the second guide port 220 and the first guide port 110, and is finally guided out of the spray tower from the outlet 120.
[0057] In addition, holes 130 are provided in the upper tower body 100 near the first air guide port 110 to facilitate air flow. The holes 130 are circular and evenly distributed.
[0058] In the embodiment of the present application, by providing a plurality of holes 130 , the introduced gas can be diverted, so that the gas treatment and purification can be more uniform.
[0059] Furthermore, a conduit 140 connected to the outlet 120 is disposed at the top of the upper tower body 100 , and a negative pressure monitoring device 150 , a temperature monitoring device 160 and a processing efficiency detection device 170 are disposed on the outer wall of the conduit 140 .
[0060] In the embodiment of the present application, by installing a negative pressure monitoring device 150, a temperature monitoring device 160 and a processing efficiency detection device 170 on the washing tower, various data of the washing tower can be monitored in real time, the situation of the washing tower can be understood in time, and timely processing is facilitated when an accident occurs, thereby protecting the entire equipment.
[0061] Embodiment 2:
[0062] An embodiment of the present application provides a spray tower for waste gas treatment. In addition to the above-mentioned technical features, the spray tower for waste gas treatment in the embodiment of the present application also includes the following technical features.
[0063] like Figure 3 As shown, the mounting structure 400 includes:
[0064] A left snap ring 410, with first mounting blocks 411 protruding outwards at both ends of the left snap ring 410, and a groove 412 recessed inwards is provided on the first mounting block 411;
[0065] A right snap ring 420, with second mounting blocks 421 protruding outwards at both ends of the right snap ring 420, and a protrusion 422 matching the groove 412 is provided on the second mounting block 421;
[0066] The locking structure includes a first threaded hole and a second threaded hole respectively disposed on the first mounting block 411 and the protrusion 422, and also includes a locking member 500 disposed on the first threaded hole and the second threaded hole;
[0067] Positioning groove 430, the positioning groove 430 is provided on both the left snap ring 410 and the right snap ring 420, and the upper tower body 100 and the lower tower body 200 are both provided with a mounting flange 440 adapted to the positioning groove 430;
[0068] The left snap ring 410 and the right snap ring 420 are spliced together through the groove 412 and the protrusion 422 to form a complete circular ring.
[0069] In the embodiment of the present application, the upper tower body 100 and the lower tower body 200 can be fixed together by using the mounting structure 400. After the mounting structure 400 is disassembled, the upper tower body 100 and the lower tower body 200 can be separated. When installing, the positioning grooves 430 on the left snap ring 410 and the right snap ring 420 are aligned with the mounting flange 440, and then the groove 412 on the left snap ring 410 is aligned with the protrusion 422 on the right snap ring 420, and the protrusion 422 is inserted into the groove 412, so that the left snap ring 410 and the right snap ring 420 are preliminarily combined together. Then, the left snap ring 410, the right snap ring, the upper tower body 100 and the lower tower body 200 are fixed by the locking structure, and the locking piece 500 is used to connect with the first threaded hole and the second threaded hole in sequence, so as to further fix the left snap ring 410 and the right snap ring 420, and then fix the upper tower body 100 and the lower tower body 200. When disassembly is required, it is only necessary to remove the locking piece 500 from the first threaded hole and the second threaded hole with a tool, and then separate the left snap ring 410 and the right snap ring 420 in opposite directions, which is quick and convenient.
[0070] Embodiment 3:
[0071] An embodiment of the present application provides a spray tower for waste gas treatment. In addition to the above-mentioned technical features, the spray tower for waste gas treatment in the embodiment of the present application also includes the following technical features.
[0072] like Figures 4 to 7 As shown, the locking member 500 includes:
[0073] A screw head 510, on which a screw rod 511 is formed integrally therewith is disposed, and a mounting hole 512 having the same axis as the screw head 510 is also disposed on the screw head 510, and a plurality of conical blocks 513 are disposed on the side wall of the mounting hole 512;
[0074] The protection ring 520 is obliquely disposed at the connection between the screw head 510 and the screw rod 511, and a plurality of strip grooves 521 are formed on the bottom surface of the protection ring 520;
[0075] The nut 530 is disposed on the screw rod 511. An outer ring 551 extending outward is disposed at one end of the nut 530. A limiting ring 552 is disposed at the bottom of the outer ring 551. A limiting opening 553 matching the outer ring 551 is disposed at one end of the limiting ring 552. An elastic gasket 554 is disposed between the nut 530 and the limiting ring 552.
[0076] Among them, the conical block 513 is evenly arranged on the side wall of the mounting hole 512 in an annular shape. The mounting hole 512 extends downward and passes through the screw head 510. After passing through the screw head 510, the mounting hole 512 continues to extend downward to the inside of the screw rod 511, and the conical block 513 extends downward along with the mounting hole 512.
[0077] In the embodiment of the present application, a mounting hole 512 is provided on the screw head 510, and a plurality of conical blocks 513 are evenly distributed on the side wall of the mounting hole 512. The mounting hole 512 passes through the screw head 510 and extends into the screw rod 511. The conical blocks 513 extend downwardly along with the mounting hole 512. Through the above structure, when installing the locking member 500, it can be installed by tightening the screw head 510, or by tightening the mounting hole 512 with a special tool. A variety of installation methods can cope with different installation situations. At the same time, if it is inconvenient to use the screw head 510 for installation, the mounting hole 512 can be used for installation. At the same time, using the mounting hole 512 for installation has the advantage of being able to install the bolt to a deeper place, thereby improving the firmness after installation.
[0078] By providing a protective ring 520 extending outward in an inclined manner at the connection between the screw head 510 and the screw rod 511, the protective ring 520 is in the shape of a trumpet. When the screw head 510 is gradually tightened, the protective ring 520 will gradually squeeze the surface of the first mounting block 411, which can increase the contact area between the screw head 510 and the first mounting block 411 and improve the stability after installation. A plurality of strip grooves 521 are provided on the bottom surface of the protective ring 520. The arrangement of the strip grooves 521 can increase the friction between the locking member 500 and the first mounting block 411 after the locking member 500 is installed in the first threaded hole and the second threaded hole, thereby further preventing the locking member 500 from loosening or even falling off due to vibration during use of the device. At the same time, the trumpet shape can also play a waterproof role, prevent liquid from entering the threaded hole, and prevent rust.
[0079] In addition, when installing, the bolts are gradually tightened, and the nut 530 applies pressure to the elastic gasket 554 sleeved on the screw rod 511. The elastic gasket 554 is compressed, so that the outer wall of the elastic gasket 554 and the inner wall of the corresponding end of the limiting ring 552 fit together and clamp the screw rod 511, thereby increasing the pre-tightening force of the nut 530 and the screw rod 511, making it difficult for the nut 530 to loosen or fall off when subjected to strong vibrations and irregular strong force fluctuations, thereby extending the service life of the nut 530 and further improving the connection stability between the upper tower body 100 and the lower tower body 200.
[0080] Embodiment 4:
[0081] An embodiment of the present application provides a spray tower for waste gas treatment. In addition to the above-mentioned technical features, the spray tower for waste gas treatment in the embodiment of the present application also includes the following technical features.
[0082] like Figures 4 to 7 As shown, an annular groove 560 is provided on the screw head 510, and the diameter of the annular groove 560 is larger than the diameter of the mounting hole 512. A protective ring 561 is provided in the annular groove 560. The cross-section of the protective ring 561 is in the shape of a circular ring. A gap 562 is formed between the protective ring 561 and the outer wall of the annular groove 560. A thread is provided on the inner wall of the protective ring 561. The center of the protective ring 561, the center of the annular groove 560 and the center of the mounting hole 512 are all the same, and an inclined hole 563 connected to the gap 562 is provided on the side wall of the screw head 510.
[0083] In the embodiment of the present application, an annular groove 560 is provided on the screw head 510, and a protective ring 561 with a circular cross-section is provided in the annular groove 560. A gap 562 is formed between the protective ring 561 and the outer wall of the annular groove 560. At the same time, an inclined hole 563 connected to the gap 562 is provided on the side wall of the screw head 510. Through the cooperation of the inclined hole 563 and the gap 562, water in the gap 562 can be discharged. At the same time, a thread is provided on the inner wall of the protective ring 561, and a sealing cover can also be installed on the protective ring 561. The sealing cover cooperates with the thread of the protective ring 561 to shield and seal the annular groove 560 and the mounting hole 512, thereby preventing foreign matter from invading the interior, thereby extending the service life.
[0084] Embodiment 5:
[0085] An embodiment of the present application provides a spray tower for waste gas treatment. In addition to the above-mentioned technical features, the spray tower for waste gas treatment in the embodiment of the present application also includes the following technical features.
[0086] like Figures 4 to 7As shown in the figure, a protective sleeve 570 is provided at one end of the limit ring 552 away from the limit port 553. The limit port 553 is annular. The top surface of the protective sleeve 570 is in contact with the elastic gasket ring 554. The surface of the elastic gasket ring 554 in contact with the protective sleeve 570 is a rounded surface protruding outward. The elastic gasket ring 554 is in contact with the inner wall of the limit ring 552, and an arc-shaped card slot adapted to the elastic gasket ring 554 is provided on the inner wall of the limit ring 552.
[0087] In the embodiment of the present application, the protective sleeve 570 can protect the end of the screw 511. The annular limit port 553, in cooperation with the arc-shaped card slot and the outer ring 551, can be used to limit the elastic gasket ring 554. By setting the surface of the elastic gasket ring 554 in contact with the protective sleeve 570 to be a rounded surface protruding outward, the elastic gasket ring 554 can be better adapted, and the setting of the rounded surface can better protect the elastic gasket ring 554, enabling the elastic gasket to play a better role.
[0088] Embodiment 6:
[0089] The embodiment of the present application provides a spray tower for waste gas treatment. In addition to including the above technical features, the spray tower for waste gas treatment in the embodiment of the present application further includes the following technical features.
[0090] As Figure 3 shown in the figure, the mounting structure 400 further includes a positioning frame 600. The positioning frame is in a "C" shape. The positioning frame is provided with an inwardly protruding positioning rod 610. Positioning slots 620 adapted to the positioning rod 610 are provided on both the first mounting block 411 and the second mounting block 421.
[0091] In the embodiment of the present application, by installing the positioning frame 600 at the connection between the left snap ring 410 and the right snap ring 420, the positioning frame 600 can wrap the first mounting block 411 and the second mounting block 421, and at the same time can also shield the locking member 500, thereby protecting the connection between the left snap ring 410 and the right snap ring and the locking member 500, preventing them from being exposed outside and reducing contact with external water vapor and other liquids, thereby extending the service life. When installing, only need to align the positioning rod 610 with the positioning slots 620 on the first mounting block 411 and the second mounting frame, which is fast and convenient.
[0092] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.
[0093] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A spray tower for waste gas treatment, characterized in that: include: An upper tower body (100), wherein the upper tower body (100) is cylindrical, one end of the upper tower body (100) along the axial direction thereof forms a first flow guide port (110) for allowing gas to enter the interior of the upper tower body (100) from this end, and the other end of the upper tower body (100) along the axial direction thereof forms an outlet (120) for allowing gas to be guided out of the interior of the upper tower body (100) from this end; A lower tower body (200), wherein the lower tower body (200) is cylindrical and has a hollow structure, one end of the lower tower body (200) along the axial direction thereof forms an inlet (210) for allowing gas to enter the interior of the lower tower body (200) from this end, and the other end of the lower tower body (200) along the axial direction thereof forms a second guide port (220) for allowing gas to be introduced from this end into the interior of the upper tower body (100); A nozzle (300) is disposed on the side of the lower tower body (200); Wherein, a mounting structure (400) is arranged between the upper tower body (100) and the lower tower body (200), and the upper tower body (100) and the lower tower body (200) are fixed via the mounting structure (400).
2. A spray tower for waste gas treatment according to claim 1, characterized in that: Holes (130) are provided in the upper tower body (100) at a position close to the first air guide port (110) to facilitate airflow to pass through. The holes (130) are circular and evenly distributed.
3. A spray tower for waste gas treatment according to claim 2, characterized in that: A conduit (140) connected to the outlet (120) is arranged at the top of the upper tower body (100), and a negative pressure monitoring device (150), a temperature monitoring device (160) and a treatment efficiency detection device (170) are arranged on the outer wall of the conduit (140).
4. The spray tower for waste gas treatment according to claim 1, characterized in that: The mounting structure (400) comprises: A left snap ring (410), wherein both ends of the left snap ring (410) are provided with outwardly protruding first mounting blocks (411), and the first mounting blocks (411) are provided with inwardly recessed grooves (412); A right snap ring (420), wherein both ends of the right snap ring (420) are provided with second mounting blocks (421) protruding outward, and the second mounting blocks (421) are provided with protrusions (422) matching the grooves (412); A locking structure, comprising a first threaded hole and a second threaded hole respectively arranged on the first mounting block (411) and the protruding block (422), and also comprising a locking member (500) arranged on the first threaded hole and the second threaded hole; A positioning groove (430), wherein the positioning groove (430) is provided on both the left snap ring (410) and the right snap ring (420), and the upper tower body (100) and the lower tower body (200) are both provided with a mounting flange (440) adapted to the positioning groove (430); The left snap ring (410) and the right snap ring (420) are spliced together via the groove (412) and the protrusion (422) to form a complete circular ring.
5. The spray tower for waste gas treatment according to claim 4, characterized in that: The locking member (500) comprises: A screw head (510), wherein the screw head (510) is provided with a screw rod (511) integrally formed therewith, and the screw head (510) is also provided with a mounting hole (512) having the same axis as the screw head (510), and a plurality of conical blocks (513) are provided on the side wall of the mounting hole (512); The protective ring (520) is inclined and arranged at the connection of the screw head (510) and the screw rod (511), and a plurality of strip-shaped grooves (521) are formed on the bottom surface of the protective ring (520); The nut (530) is arranged on the screw rod (511). An outer ring (551) extending outward is provided at one end of the nut (530). A limiting ring (552) is provided at the bottom of the outer ring (551). A limiting port (553) adapted to the outer ring (551) is provided at one end of the limiting ring (552). An elastic gasket ring (554) is further provided between the nut (530) and the limiting ring (552); Wherein, the conical blocks (513) are evenly arranged in a ring on the side wall of the installation hole (512). The installation hole (512) extends downward and penetrates through the screw head (510), and continues to extend downward into the screw rod (511) after penetrating through the screw head (510), and the conical blocks (513) extend downward along with the installation hole (512).
6. A spray tower for waste gas treatment according to claim 5, characterized in that: A ring-shaped groove (560) is formed on the screw head (510). The diameter of the ring-shaped groove (560) is larger than the diameter of the installation hole (512). A protective ring (561) is arranged in the ring-shaped groove (560). The cross section of the protective ring (561) is in a ring shape. A gap (562) is formed between the outer wall of the protective ring (561) and the ring-shaped groove (560). Threads are formed on the inner wall of the protective ring (561). The centers of the protective ring (561), the ring-shaped groove (560), and the installation hole (512) are the same, and an inclined hole (563) communicating with the gap (562) is provided on the side wall of the screw head (510).
7. A spray tower for waste gas treatment according to claim 6, characterized in that: A protective sleeve (570) is provided at one end of the limiting ring (552) away from the limiting port (553). The limiting port (553) is in a ring shape. The top surface of the protective sleeve (570) is attached to the elastic gasket ring (554). The surface of the elastic gasket ring (554) in contact with the protective sleeve (570) is a rounded surface protruding outward. The elastic gasket ring (554) is attached to the inner wall of the limiting ring (552), and an arc-shaped clamping groove adapted to the elastic gasket ring (554) is formed on the inner wall of the limiting ring (552).
8. The spray for waste gas treatment according to claim 7, characterized in that: The installation structure (400) further includes a positioning frame (600). The positioning frame (600) is in a "C" shape. A positioning rod (610) protruding inward is provided on the positioning frame (600). Positioning slots (620) adapted to the positioning rod (610) are provided on both the first installation block (411) and the second installation block (421).