Environment-friendly flange blank machining technology capable of achieving excess material utilization
By designing a fully automated flange blank processing technology and using hot residual materials for secondary processing, the problem of utilization of residual materials in flange processing has been solved, the efficient use of resources and environmental protection goals have been achieved, and production efficiency and product quality have been improved.
Patent Information
- Application Number
- CN202411047207.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-15
AI Technical Summary
The remaining materials generated during flange processing cannot be used in time, resulting in resource waste and environmental protection problems.
An environmentally friendly flange blank processing technology is designed, which uses hot waste materials to directly enter the second production line for secondary processing, and performs forging and punching operations through electric heating furnaces, punches, screw presses and other equipment, combined with rotating circulating water tank cooling , realizing a fully automated production line and eliminating the need for secondary heating steps.
It improves work efficiency, realizes the secondary utilization of waste materials, reduces production costs, and prevents product distortion and unevenness through the flattening die, improving product quality.
Smart Images

Figure CN118768440A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flange processing, and in particular to an environmentally friendly flange blank processing technology capable of realizing the utilization of surplus materials. Background Art
[0002] Flange, also known as flange or flange, is a part that connects pipes to each other. It is mainly connected to the pipe end. There are holes on the flange. Bolts are used to connect the two flanges. Gaskets are used to seal the flanges. Flange is a disc-shaped part, which is most common in pipeline engineering. Flanges are used in pairs. Stainless steel flanges are mainly made of stainless steel materials. Stainless steel flanges have the characteristics of strong rigidity, corrosion resistance, pitting resistance, rust resistance and difficulty in wear.
[0003] During the processing of flanges, they need to undergo multiple forging and punching operations, which will generate a large amount of waste material, but it cannot be used in time and is not environmentally friendly. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide an environmentally friendly flange blank processing technology that can realize the utilization of waste materials, and provide a flange processing production line that can utilize hot waste materials. No secondary heating is required, and the waste materials can directly enter the second production line for secondary utilization, thereby reducing costs and improving work efficiency.
[0005] In order to solve the above technical problems, the present invention provides an environmentally friendly flange blank processing process that can realize the utilization of waste materials, which is characterized by comprising the following steps: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: It is divided into two stages, one of which is to transfer the material punched by the S5 punch press to a rotary circulating water tank for product cooling to obtain the final blank; In another stage, the hot residual material punched with inner diameter in step S5 is punched again to form a rough blank; S7: After the blank is made by the punch press in step S6, it is transferred to the screw press for mold forging. After forging, the outer diameter and thickness of the product meet the requirements; S8: The material forged in S7 is transferred to the third punch press for punching the inner diameter; S9: transporting the material punched by the punch press in step S8 to a rotary circulating water tank for product cooling to obtain a final blank; S10: Palletize the blanks after cooling in S6 and S9, and inspect and put them into storage after palletizing.
[0006] Furthermore, the maximum working pressure of the first punch in step S3 is 1250T, and the maximum working pressure of the second punch in step S5 is 800T.
[0007] Furthermore, the maximum working pressure of the second punch in step S5 is 450T, and the maximum working pressure of the third punch in step S8 is 315T.
[0008] Furthermore, the maximum working pressure of the screw press in step S4 is 1000T, and the maximum working pressure of the screw press in step S7 is 630T.
[0009] Furthermore, in step S5 and step S8, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted or uneven.
[0010] Furthermore, the electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace with the following parameters: power 1200w, furnace temperature 1250°C, and heating time 18 seconds.
[0011] Furthermore, industrial robots are arranged between the electric heating furnace, the first punching machine, the screw press, the second punching machine, and the rotary circulating water tank to perform material transfer operations.
[0012] Furthermore, in the steps S5-S10, industrial robots are also arranged between the devices to perform material transfer operations.
[0013] Beneficial effects of the present invention: 1. The present invention provides a complete flange production line with fully automated operation, which improves work efficiency and has good use effect; 2. The hot waste materials generated by the above equipment are used for secondary processing, which saves the heating operation of the general production line, is environmentally friendly and energy-saving, and also utilizes waste materials. 3. When punching the inner diameter, a flattening die is set to ensure that the flatness of the product will not be distorted, which solves the problem in the prior art that the raw materials are in a high temperature state and have a relatively soft hardness, which easily causes the plane to be distorted during punching. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a simplified process flow chart of the present invention. DETAILED DESCRIPTION
[0015] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.
[0016] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0017] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0018] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0019] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0020] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0021] Reference Figure 1 As shown, an embodiment of an environmentally friendly flange blank processing process that can realize the utilization of waste materials of the present invention includes the following steps: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: It is divided into two stages, one of which is to transfer the material punched by the S5 punch press to a rotary circulating water tank for product cooling to obtain the final blank; In another stage, the hot residual material punched with inner diameter in step S5 is punched again to form a rough blank; S7: After the blank is made by the punch press in step S6, it is transferred to the screw press for mold forging. After forging, the outer diameter and thickness of the product meet the requirements; S8: The material forged in S7 is transferred to the third punch press for punching the inner diameter; S9: transporting the material punched by the punch press in step S8 to a rotary circulating water tank for product cooling to obtain a final blank; S10: Palletize the blanks after cooling in S6 and S9, and inspect and put them into storage after palletizing.
[0022] In general, it can be divided into two major steps. Steps S1-S6 (the first stage of S6) is a major step, at which a raw material is made into a finished blank; Steps S6 (the second stage of S6) to S9 are the second major step, in which the residual material in a hot state generated when the raw material is punched for the first time is processed to make a finished blank. Since the residual material generated when the raw material is punched for the first time is in a hot state, it can be directly processed without secondary heating, thus eliminating the heating operation of the first major step, which is environmentally friendly and energy-saving, and also performs waste material utilization operation; Step S10 is the third major step, which is also the final warehousing operation.
[0023] In the above steps, the parameters of the equipment used in each step are as follows: The maximum working pressure of the first punch in step S3 is 1250T, and the maximum working pressure of the punch in the second step in step S5 is 800T; the maximum working pressure of the second punch in step S5 is 450T, and the maximum working pressure of the third punch in step S8 is 315T; the maximum working pressure of the screw press in step S4 is 1000T, and the maximum working pressure of the screw press in step S7 is 630T; the electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace, and the parameters are as follows: power 1200w, furnace temperature 1250℃, heating time 18 seconds; In step S5 and step S8, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted, thereby solving the problem in the prior art that the raw materials are in a high temperature state and are relatively soft, which easily causes the plane to be distorted during punching.
[0024] Industrial robots are arranged between the electric heating furnace, the first punching machine, the screw press, the second punching machine and the rotary circulating water tank to perform material transfer operations. Industrial robots are also arranged between the various devices in steps S5-S10 to perform material transfer operations, turning the entire production line into a fully automated production line and reducing manual participation.
[0025] The above-described embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Equivalent substitutions or changes made by those skilled in the art based on the present invention are within the protection scope of the present invention. The protection scope of the present invention shall be subject to the claims.
Claims
1. An environmentally friendly flange blank processing process that can realize the utilization of surplus materials, characterized in that: The steps include: S1: Material preparation operation, prepare the raw materials for processing, carry out subsequent sawing, and cut the raw materials into rings at the same time; S2: putting the raw materials obtained in S1 into an electric heating furnace for heating; S3: sending the heated material obtained in S2 to the first punch press for punching and pressing into a blank to obtain a rough blank; S4: The material obtained in S3 is sent to a screw press for die forging, so that the outer diameter and thickness of the product after forging meet the requirements; S5: The material forged in S4 is transferred to the second punch press for punching the inner diameter; S6: It is divided into two stages, one of which is to transfer the material punched by the S5 punch press to a rotary circulating water tank for product cooling to obtain the final blank; In another stage, the hot residual material punched with inner diameter in step S5 is punched again to form a rough blank; S7: After the blank is made by the punch press in step S6, it is transferred to the screw press for mold forging. After forging, the outer diameter and thickness of the product meet the requirements; S8: The material forged in S7 is transferred to the third punch press for punching the inner diameter; S9: transporting the material punched by the punch press in step S8 to a rotary circulating water tank for product cooling to obtain a final blank; S10: Palletize the blanks after cooling in S6 and S9, and inspect and put them into storage after palletizing.
2. The high-efficiency flange blank processing process according to claim 1 is characterized in that: The maximum working pressure of the first punch in step S3 is 1250T, and the maximum working pressure of the second punch in step S5 is 800T.
3. The high-efficiency flange blank processing process according to claim 1 is characterized in that: The maximum working pressure of the second punch in step S5 is 450T, and the maximum working pressure of the third punch in step S8 is 315T.
4. The high-efficiency flange blank processing process according to claim 1 is characterized in that: The maximum working pressure of the screw press in step S4 is 1000T, and the maximum working pressure of the screw press in step S7 is 630T.
5. The high-efficiency flange blank processing process according to claim 1 is characterized in that: In step S5 and step S8, a flattening die is provided while punching the inner diameter to ensure that the flatness of the product will not be distorted or uneven.
6. The high-efficiency flange blank processing process according to claim 1 is characterized in that: The electric heating furnace in step S2 adopts a medium frequency induction electric heating furnace with the following parameters: power 1200w, furnace temperature 1250°C, and heating time 18 seconds.
7. The high-efficiency flange blank processing process according to claim 1 is characterized in that: Industrial robots are arranged between the electric heating furnace, the first punching machine, the screw press, the second punching machine and the rotary circulating water tank to perform material transfer operations.
8. The high-efficiency flange blank processing process according to claim 1 is characterized in that: In the steps S5-S10, industrial robots are also arranged between the devices to perform material transfer operations.
Citation Information
Patent Citations
Bearing ferrule workblank triple external member smithing and molding process
CN101402163A
Closed mold and process for producing automotive intake and exhaust flanges by virtue of closed mold
CN105880452A
Double-size flange forging technology
CN110919375A
Process for forging and forming welding neck flanges for connecting pipelines
CN112475203A
