Direct secondary injection molding process on carbon fiber composite material
By adding nano-scale metal powder to carbon fiber composite materials and performing nanopore processing, combined with CNC processing and laser engraving technology, the problem of insufficient bonding force in the secondary injection molding process of fiber composite materials is solved, and high-strength, low-weight products are achieved. Molded parts production improves process efficiency and product performance.
Patent Information
- Application Number
- CN202411157214.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing secondary injection molding process of fiber composite materials is difficult to form a strong bonding force, resulting in low overall strength, multiple workpieces, multiple processes, high energy consumption, and high cost.
Using the direct secondary injection molding process on carbon fiber composite materials, nano-scale metal powder is added to the carbon fiber composite board and nanopore processing is performed, combined with CNC processing and laser engraving technology to form nano-scale micropores, and high-pressure injection molding is used to form physical intersections Combining to improve the bonding strength of carbon fiber and plastic.
Significantly improve the strength and rigidity of molded parts, reduce weight, improve efficiency and performance, ensure that the product meets technical specifications and quality standards, and verify its performance under actual use conditions through functional testing.
Smart Images

Figure CN118769563A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of preparation and molding of lightweight multi-material composite components, and specifically relates to a direct secondary injection molding process on a carbon fiber composite material. Background Art
[0002] Carbon fiber reinforced composites are high-performance composite materials composed of carbon fibers and a matrix material (usually a resin), known for their excellent strength and stiffness as well as lightweight properties. Carbon fiber is much stronger than steel, while its density is much lower than steel, which makes CFRP excel in applications that require a high strength-to-weight ratio. At the same time, CFRP has excellent corrosion resistance and fatigue properties, can remain stable in harsh environments, and maintain structural stability under repeated loading. The material is widely used in aerospace, automotive industry, construction engineering and sports equipment, such as aircraft fuselages, racing car parts, bridge reinforcements and high-performance sports equipment. Despite the excellent performance of CFRP, its production cost is high, the manufacturing process is complex, and environmental impact and economic feasibility need to be considered during use and recycling.
[0003] The existing fiber composite materials are difficult to form by secondary injection molding, because the carbon fiber resin and the secondary injection molded plastic cannot form a twisted structure and the bonding force is weak. At the same time, because the carbon fiber has a low expansion coefficient, it basically does not shrink during this process, while the plastic will shrink, causing delamination and low overall strength. For this reason, we propose a direct secondary injection molding process on carbon fiber composite materials to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to provide a direct secondary injection molding process on a carbon fiber composite material, which can generate nanometer-scale micropores on a carbon fiber composite plate. When the composite plate is subjected to in-mold injection molding, the plastic enters the nanometer-scale micropores under high pressure to form a physical cross-bonding, thereby solving the bonding strength problem and solving the problem of separating the carbon fiber reinforced composite material molding process from the heterogeneous material connection process, which results in many workpieces, many processes, high energy consumption, low assembly efficiency and high cost.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A direct secondary injection molding process on a carbon fiber composite material, the injection molding process comprising the following steps:
[0007] Step 1. Processing of semi-finished carbon fiber composite panels: Lay the carbon fiber braided material in layers, and add special nano-scale metal powder to the area that needs to be formed. After laying the carbon fiber braided material, apply film on the top and bottom, remove bubbles through vacuum treatment, and put it into a high-temperature tank for pre-preg;
[0008] Step 2. Local processing: Use CNC processing and laser engraving technology to precisely process the surface of the carbon fiber composite plate to expose the metal powder;
[0009] Step 3. Nanopore treatment: In the area where forming is required, metal powder is treated by chemical or physical corrosion method to generate nanoscale micropores of 30nm to 3000nm;
[0010] Step 4. Injection molding: Place the treated carbon fiber composite panel semi-finished product and the reinforcing fasteners into the injection mold. After closing the mold, heat the mold to the required temperature for injection molding, inject the plastic material into the mold cavity, and after the mold temperature drops to an appropriate level, open the mold and take out the molded part.
[0011] Step 5. High temperature baking: Place the molded workpiece into a high temperature oven, set the temperature to 120°C, and bake for 2 hours to remove the internal stress caused by injection molding;
[0012] Step 6. Post-molding processing: Take out the molded part from the baking oven, remove the excess part, and polish the overflow glue and burrs;
[0013] Step 7. Quality inspection: Conduct a comprehensive quality inspection on the molded parts, including dimensional accuracy, surface quality, and bonding strength. Use high-precision measuring tools and non-destructive testing technology to ensure that the products meet technical specifications and quality standards;
[0014] Step 8. Surface treatment: If necessary, perform additional surface treatment on the molded parts, including painting, electroplating or other decorative treatments;
[0015] Step 9. Functional testing and verification: Perform functional testing on the molded parts, including load testing and fatigue testing, to verify their performance under actual use conditions.
[0016] In a preferred embodiment, the processing of the semi-finished carbon fiber composite plate also includes selecting carbon fiber woven materials, including plain cloth or twill cloth, cutting the cloth into the required size and shape, selecting and screening special nano-scale metal powder, and evenly distributing the metal powder to the target area of the carbon fiber cloth according to design requirements. In the area where the bonding force needs to be enhanced, the metal powder is evenly spread on the surface of the carbon fiber cloth. A brush, spray gun or other uniform coating tool can be used to ensure the uniform distribution of the metal powder. A layer of film is affixed to the surface and bottom of the laid carbon fiber cloth to prevent leakage of the resin in subsequent processing. The film material used is usually a high-temperature resistant polyester film. The carbon fiber composite material after film affixing is placed in a vacuum bag, and a vacuum pump is used to extract air to remove bubbles between the cloth and the resin so that the cloth fits tightly.
[0017] In a preferred embodiment, the local processing also includes using a marking tool to mark the boundaries of the processing area on the carbon fiber composite plate, cleaning the surface of the carbon fiber composite plate, removing any contaminants or foreign matter that may affect the processing, setting the processing parameters of the CNC machine tool according to the shape and size to be processed, including the cutting speed, feed rate and cutting depth, fixing the carbon fiber composite plate on the workbench of the CNC machine tool, starting the CNC processing program, and accurately cutting out the required processing area. According to the design requirements, the power, focal length and scanning speed of the laser engraving machine are set, the carbon fiber composite plate is placed on the workbench of the laser engraving machine, and the engraving area is aligned, the laser engraving program is started, and engraving is performed according to the preset pattern and depth, and the processing area is cleaned with a detergent and a soft cloth to remove dust and residues generated during the processing.
[0018] In a preferred embodiment, the nanopore treatment also includes selecting a chemical corrosive agent according to the type of metal powder, placing the carbon fiber composite material in a corrosion tank, setting the corrosion time, adjusting the time according to the required pore size and material properties, and after the corrosion is completed, using a neutralizing solution to neutralize the residual corrosive agent, rinsing the carbon fiber composite material with a large amount of deionized water to remove all residual corrosive liquid and reaction products, and drying the cleaned material naturally in a well-ventilated place, or using a drying equipment to accelerate the drying process, configuring an ion beam etcher, setting appropriate etching parameters, including ion beam energy and etching rate, placing the carbon fiber composite material in the etcher, adjusting the direction and intensity of the ion beam so that it etches the metal powder, using plasma etching equipment, selecting a gas mixture and processing parameters, placing the carbon fiber composite material in a plasma etching chamber, starting a plasma treatment program, adjusting the etching parameters according to the processing progress, and cleaning the treated carbon fiber composite material to remove any possible residues.
[0019] In a preferred embodiment, the injection molding further includes cleaning the mold, removing possible impurities and residues, checking various components of the mold, including the centering accuracy, opening and closing status, and cooling system of the mold, placing the treated carbon fiber composite panel semi-finished product into the designated position of the injection mold, placing reinforcing fasteners into the mold according to design requirements to provide necessary mechanical support and fixation, setting the temperature of the mold heating system according to the melting temperature of the plastic material used, starting the mold closing system, closing the mold, and checking for any abnormalities, placing the plastic raw material into the hopper of the injection molding machine, heating the plastic raw material to a molten state through the screw or other heating device of the injection molding machine, injecting the molten plastic material into the mold cavity of the mold, setting the cooling time according to the characteristics of the plastic material and the design of the mold, starting the mold opening system after the cooling time, separating the molds, taking out the injection molded parts using a clamp or a robotic arm, and inspecting the appearance and size of the taken out molded parts.
[0020] In a preferred embodiment, the high-temperature baking also includes inspecting the appearance and size of the injection molded workpiece before sending it into the high-temperature oven, placing the prepared workpiece into the high-temperature oven, ensuring that there is sufficient spacing between the workpieces, closing the oven door, and starting the baking program. Under the action of high temperature, the molecular structure inside the workpiece will change, and the internal stress will gradually be released. Closing the oven door, starting the baking program, under the action of high temperature, the molecular structure inside the workpiece will change, and the internal stress will gradually be released, and observing whether the workpiece has any abnormal phenomena. After baking, turning off the heating system of the high-temperature oven, taking out the baked workpiece, and conducting a detailed inspection of the baked workpiece.
[0021] In a preferred embodiment, the post-molding treatment also includes using a cutter or scissors to remove obvious excess parts on the molded part, using a grinder or a grinding wheel machine for rough processing, using a scraper or a knife to remove plastic glue overflowing from the molded part, using a cutter or scissors to trim the burrs on the molded part, using medium-coarse sandpaper or a grinder for preliminary grinding to remove burrs and smooth the surface, and using fine sandpaper or a polishing pad for fine grinding.
[0022] In a preferred embodiment, the quality inspection also includes using a caliper, a vernier caliper, or a height gauge to accurately measure the size of the molded part. For molded parts with complex shapes, a three-coordinate measuring machine or an automated online measurement system is used to perform accurate size detection. A surface roughness measuring instrument is used to check the surface roughness of the molded part. Destructive tests such as tensile tests, shear tests, or peel tests are performed to evaluate the bonding strength between the carbon fiber and the plastic in the molded part.
[0023] In a preferred embodiment, the surface treatment also includes setting up spraying equipment, including a spray gun and an air pump, adjusting the spraying pressure and nozzle to adapt to different coatings and workpiece shapes, spraying primer first, then spraying topcoat, checking the surface after painting, polishing the painted surface, using acid or alkaline washing to remove oxides and oil stains on the surface of the molded part, selecting electroplating metal and electroplating solution, configuring an electroplating tank and power supply equipment, performing pre-plating treatment as needed, hanging the molded part in the electroplating tank, and applying power for electroplating.
[0024] In a preferred embodiment, the functional testing and verification also includes preparing required testing equipment, including a load testing machine, a fatigue testing machine, and an environmental simulation test chamber, selecting representative molded parts as test samples, installing the molded parts on the load testing machine, setting test parameters, gradually applying predetermined loads, observing the performance of the molded parts under different load conditions, installing the molded parts on the fatigue testing machine, setting the test frequency, stress amplitude and test cycle, applying cyclic stress according to the set conditions, simulating load changes in long-term use, monitoring the performance of the molded parts, using an environmental simulation test chamber to simulate the actual use environment, setting the corresponding temperature and humidity according to the product use environment, placing the molded parts in the testing equipment, conducting environmental testing according to the set conditions, and checking the performance of the molded parts after the environmental testing.
[0025] The technical effects achieved by the present invention are:
[0026] The application of carbon fiber composite materials can significantly improve the strength and rigidity of molded parts, which is suitable for application scenarios that require high strength and low weight. The lightweight characteristics of carbon fiber composite materials make molded parts lighter than traditional metal materials, which helps to reduce the weight of the overall structure and improve efficiency and performance. By using special nano-scale metal powder on carbon fiber composite materials and performing nanopore treatment, the bonding force between carbon fiber and plastic can be improved, thereby enhancing the overall performance of the composite material;
[0027] The use of CNC processing and laser engraving technology can achieve high-precision local processing, ensure that the size and shape of the molded parts meet the design requirements, and improve the consistency and precision of the product. The high-temperature baking step can effectively remove the internal stress generated during the injection molding process, reduce the warping or deformation of the material, and improve the stability of the molded parts. After fine surface treatment and post-processing, the surface finish and aesthetics of the molded parts can be significantly improved, and the wear resistance and corrosion resistance of the material can also be improved;
[0028] Functional testing and verification ensure that the performance of molded parts under actual use conditions meets expectations, which is especially important for critical applications. According to needs, various surface treatments can be performed on molded parts, such as painting, electroplating, etc., so that they not only have excellent performance but also meet different visual and durability requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of a direct secondary injection molding process on a carbon fiber composite material of the present invention. DETAILED DESCRIPTION
[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0031] See also Figure 1 As shown, the present invention provides a direct secondary injection molding process on a carbon fiber composite material, and the injection molding process comprises the following steps:
[0032] Step 1. Processing of semi-finished carbon fiber composite panels: Lay the carbon fiber braided material in layers, and add special nano-scale metal powder to the area that needs to be formed. After laying the carbon fiber braided material, apply film on the top and bottom, remove bubbles through vacuum treatment, and put it into a high-temperature tank for pre-preg;
[0033] Step 2. Local processing: Use CNC processing and laser engraving technology to precisely process the surface of the carbon fiber composite plate to expose the metal powder;
[0034] Step 3. Nanopore treatment: In the area where forming is required, metal powder is treated by chemical or physical corrosion method to generate nanoscale micropores of 30nm to 3000nm;
[0035] Step 4. Injection molding: Place the treated carbon fiber composite panel semi-finished product and the reinforcing fasteners into the injection mold. After closing the mold, heat the mold to the required temperature for injection molding, inject the plastic material into the mold cavity, and after the mold temperature drops to an appropriate level, open the mold and take out the molded part.
[0036] Step 5. High temperature baking: Place the molded workpiece into a high temperature oven, set the temperature to 120°C, and bake for 2 hours to remove the internal stress caused by injection molding;
[0037] Step 6. Post-molding processing: Take out the molded part from the baking oven, remove the excess part, and polish the overflow glue and burrs;
[0038] Step 7. Quality inspection: Conduct a comprehensive quality inspection on the molded parts, including dimensional accuracy, surface quality, and bonding strength. Use high-precision measuring tools and non-destructive testing technology to ensure that the products meet technical specifications and quality standards;
[0039] Step 8. Surface treatment: If necessary, perform additional surface treatment on the molded parts, including painting, electroplating or other decorative treatments;
[0040] Step 9. Functional testing and verification: Perform functional testing on the molded parts, including load testing and fatigue testing, to verify their performance under actual use conditions.
[0041] The semi-finished processing of carbon fiber composite panels also includes selecting carbon fiber woven materials, including plain or twill cloth, cutting the cloth into the required size and shape, selecting and screening special nano-scale metal powder, and evenly distributing the metal powder to the target area of the carbon fiber cloth according to design requirements. In areas where the bonding force needs to be enhanced, the metal powder is evenly spread on the surface of the carbon fiber cloth. A brush, spray gun or other uniform coating tool can be used to ensure the uniform distribution of the metal powder. A layer of film is affixed to the surface and bottom of the laid carbon fiber cloth to prevent the resin from leaking in subsequent processing. The membrane material used is usually a high-temperature resistant polyester film. The carbon fiber composite material after filming is placed in a vacuum bag, and a vacuum pump is used to extract air to remove bubbles between the cloth and the resin to make the cloth fit tightly.
[0042] Local processing also includes using marking tools to mark the boundaries of the processing area on the carbon fiber composite plate, cleaning the surface of the carbon fiber composite plate, removing any contaminants or foreign matter that may affect the processing, setting the processing parameters of the CNC machine tool according to the shape and size to be processed, including cutting speed, feed rate and cutting depth, fixing the carbon fiber composite plate on the workbench of the CNC machine tool, starting the CNC processing program, and accurately cutting out the required processing area. According to the design requirements, set the power, focal length and scanning speed of the laser engraving machine, place the carbon fiber composite plate on the workbench of the laser engraving machine, and align the engraving area, start the laser engraving program, engrave according to the preset pattern and depth, and use detergent and soft cloth to clean the processing area to remove dust and residue generated during the processing.
[0043] Nanopore treatment also includes selecting chemical corrosive agents according to the type of metal powder, placing the carbon fiber composite material in the etching tank, setting the etching time, adjusting the time according to the required pore size and material properties, and after the etching is completed, using a neutralizing solution to neutralize the residual corrosive agent, rinsing the carbon fiber composite material with a large amount of deionized water to remove all residual corrosive liquid and reaction products, and drying the cleaned material naturally in a well-ventilated place, or using a drying equipment to accelerate the drying process, configuring an ion beam etcher, setting appropriate etching parameters, including ion beam energy and etching rate, placing the carbon fiber composite material in the etcher, adjusting the direction and intensity of the ion beam so that it etches the metal powder, using plasma etching equipment, selecting a gas mixture and processing parameters, placing the carbon fiber composite material in a plasma etching chamber, starting a plasma treatment program, adjusting the etching parameters according to the processing progress, and cleaning the treated carbon fiber composite material to remove any possible residues.
[0044] Injection molding also includes cleaning the mold, removing possible impurities and residues, checking the various components of the mold, including the centering accuracy, opening and closing status, and cooling system of the mold, placing the treated carbon fiber composite panel semi-finished product into the designated position of the injection mold, placing reinforcing fasteners into the mold according to design requirements to provide necessary mechanical support and fixation, setting the temperature of the mold heating system according to the melting temperature of the plastic material used, starting the mold closing system, closing the mold, and checking for any abnormalities, placing the plastic raw material into the hopper of the injection molding machine, heating the plastic raw material to a molten state through the screw or other heating device of the injection molding machine, injecting the molten plastic material into the mold cavity of the mold, setting the cooling time according to the characteristics of the plastic material and the design of the mold, starting the mold opening system after the cooling time is over, separating the molds, taking out the injection molded parts using a clamp or a robotic arm, and inspecting the appearance and size of the taken-out molded parts.
[0045] High-temperature baking also includes inspecting the appearance and dimensions of the injection molded workpieces before sending them into the high-temperature oven, placing the prepared workpieces into the high-temperature oven, ensuring that there is enough spacing between the workpieces, closing the oven door, and starting the baking program. Under the action of high temperature, the molecular structure inside the workpiece will change, and the internal stress will gradually release. Close the oven door, start the baking program, and under the action of high temperature, the molecular structure inside the workpiece will change, and the internal stress will gradually release. Observe whether there are any abnormalities in the workpiece. After baking, turn off the heating system of the high-temperature oven, take out the baked workpiece, and conduct a detailed inspection of the baked workpiece.
[0046] Post-molding processing also includes using a knife or scissors to remove obvious excess parts on the molded part, using a grinder or grinder for rough processing, using a scraper or knife to remove the plastic glue overflowing from the molded part, using a knife or scissors to trim the burrs on the molded part, using medium-coarse sandpaper or a grinder for preliminary grinding to remove burrs and smooth the surface, and using fine sandpaper or polishing pads for detailed grinding.
[0047] Quality inspection also includes the use of calipers, vernier calipers, and height gauges to accurately measure the dimensions of molded parts. For molded parts with complex shapes, three-coordinate measuring machines or automated online measurement systems are used for precise dimensional detection. Surface roughness measuring instruments are used to check the surface roughness of molded parts. Destructive tests such as tensile tests, shear tests, or peel tests are used to evaluate the bonding strength between carbon fiber and plastic in molded parts.
[0048] Surface treatment also includes setting up spraying equipment, including spray guns and air pumps, adjusting spraying pressure and nozzles to adapt to different coatings and workpiece shapes, spraying primer first, then spraying topcoat, checking the surface after painting, polishing the painted surface, using acid or alkaline washing to remove oxides and oil stains on the surface of the molded parts, selecting electroplating metals and electroplating solutions, configuring electroplating tanks and power supply equipment, performing pre-plating treatment as needed, hanging the molded parts in the electroplating tank, and applying power for electroplating.
[0049] Functional testing and verification also includes preparing the required testing equipment, including load testing machines, fatigue testing machines, and environmental simulation test chambers, selecting representative molded parts as test samples, installing the molded parts on the load testing machine, setting test parameters, gradually applying predetermined loads, observing the performance of the molded parts under different load conditions, installing the molded parts on the fatigue testing machine, setting the test frequency, stress amplitude, and test cycle, applying cyclic stress according to the set conditions, simulating load changes in long-term use, monitoring the performance of the molded parts, using environmental simulation test chambers to simulate the actual use environment, setting the corresponding temperature and humidity according to the product use environment, placing the molded parts in the test equipment, conducting environmental tests according to the set conditions, and checking the performance of the molded parts after the environmental test.
[0050] In the present invention, the strength and rigidity of the molded parts can be significantly improved through the application of carbon fiber composite materials, which is suitable for application scenarios requiring high strength and low weight. The lightweight characteristics of carbon fiber composite materials make the molded parts lighter than traditional metal materials, which helps to reduce the weight of the overall structure and improve efficiency and performance. By using special nano-scale metal powder on the carbon fiber composite material and performing nanopore treatment, the bonding force between the carbon fiber and the plastic can be improved, thereby enhancing the overall performance of the composite material;
[0051] The use of CNC processing and laser engraving technology can achieve high-precision local processing, ensure that the size and shape of the molded parts meet the design requirements, and improve the consistency and precision of the product. The high-temperature baking step can effectively remove the internal stress generated during the injection molding process, reduce the warping or deformation of the material, and improve the stability of the molded parts. After fine surface treatment and post-processing, the surface finish and aesthetics of the molded parts can be significantly improved, and the wear resistance and corrosion resistance of the material can also be improved;
[0052] Functional testing and verification ensure that the performance of molded parts under actual use conditions meets expectations, which is especially important for critical applications. According to needs, various surface treatments can be performed on molded parts, such as painting, electroplating, etc., so that they not only have excellent performance but also meet different visual and durability requirements.
[0053] The above is only a preferred embodiment of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the art unless otherwise specified and limited.
Claims
1. A direct secondary injection molding process on a carbon fiber composite material, characterized in that: The injection molding process comprises the following steps: Step 1. Processing of semi-finished carbon fiber composite panels: Lay the carbon fiber braided material in layers, and add special nano-scale metal powder to the area that needs to be formed. After laying the carbon fiber braided material, apply film on the top and bottom, remove bubbles through vacuum treatment, and put it into a high-temperature tank for pre-preg; Step 2. Local processing: Use CNC processing and laser engraving technology to precisely process the surface of the carbon fiber composite plate to expose the metal powder; Step 3. Nanopore treatment: In the area where forming is required, metal powder is treated by chemical or physical corrosion method to generate nanoscale micropores of 30nm to 3000nm; Step 4. Injection molding: Place the treated carbon fiber composite panel semi-finished product and the reinforcing fasteners into the injection mold. After closing the mold, heat the mold to the required temperature for injection molding, inject the plastic material into the mold cavity, and after the mold temperature drops to an appropriate level, open the mold and take out the molded part. Step 5. High temperature baking: Place the molded workpiece into a high temperature oven, set the temperature to 120°C, and bake for 2 hours to remove the internal stress caused by injection molding; Step 6. Post-molding processing: Take out the molded part from the baking oven, remove the excess part, and polish the overflow glue and burrs; Step 7. Quality inspection: Conduct a comprehensive quality inspection on the molded parts, including dimensional accuracy, surface quality, and bonding strength. Use high-precision measuring tools and non-destructive testing technology to ensure that the products meet technical specifications and quality standards; Step 8. Surface treatment: If necessary, perform additional surface treatment on the molded parts, including painting, electroplating or other decorative treatments; Step 9. Functional testing and verification: Perform functional testing on the molded parts, including load testing and fatigue testing, to verify their performance under actual use conditions.
2. A direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The semi-finished processing of the carbon fiber composite plate also includes selecting carbon fiber woven materials, including plain cloth or twill cloth, cutting the cloth into the required size and shape, selecting and screening special nano-scale metal powder, and evenly distributing the metal powder to the target area of the carbon fiber cloth according to design requirements. In the area where the bonding force needs to be enhanced, the metal powder is evenly spread on the surface of the carbon fiber cloth. A brush, spray gun or other uniform coating tool can be used to ensure the uniform distribution of the metal powder. A layer of film is attached to the surface and bottom of the laid carbon fiber cloth to prevent leakage of resin in subsequent processing. The film material used is usually a high-temperature resistant polyester film. The carbon fiber composite material after film attachment is placed in a vacuum bag, and a vacuum pump is used to extract air to remove bubbles between the cloth and the resin so that the cloth fits tightly.
3. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The local processing also includes using a marking tool to mark the boundaries of the processing area on the carbon fiber composite plate, cleaning the surface of the carbon fiber composite plate, removing any contaminants or foreign matter that may affect the processing, setting the processing parameters of the CNC machine tool according to the shape and size to be processed, including the cutting speed, feed rate and cutting depth, fixing the carbon fiber composite plate on the workbench of the CNC machine tool, starting the CNC processing program, accurately cutting out the required processing area, setting the power, focal length and scanning speed of the laser engraving machine according to the design requirements, placing the carbon fiber composite plate on the workbench of the laser engraving machine and aligning the engraving area, starting the laser engraving program, engraving according to the preset pattern and depth, and cleaning the processing area with a detergent and a soft cloth to remove dust and residues generated during the processing.
4. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The nanopore treatment also includes selecting a chemical corrosive agent according to the type of metal powder, placing the carbon fiber composite material in a corrosion tank, setting the corrosion time, adjusting the time according to the required pore size and material properties, using a neutralizing solution to neutralize the residual corrosive agent after the corrosion is completed, rinsing the carbon fiber composite material with a large amount of deionized water to remove all residual corrosive liquid and reaction products, drying the cleaned material naturally in a well-ventilated place, or using a drying device to accelerate the drying process, configuring an ion beam etcher, setting appropriate etching parameters, including ion beam energy and etching rate, placing the carbon fiber composite material in the etcher, adjusting the direction and intensity of the ion beam so that it etches the metal powder, using a plasma etching device, selecting a gas mixture and processing parameters, placing the carbon fiber composite material in a plasma etching chamber, starting a plasma treatment program, adjusting the etching parameters according to the processing progress, and cleaning the treated carbon fiber composite material to remove any possible residues.
5. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The injection molding also includes cleaning the mold, removing possible impurities and residues, checking various components of the mold, including the centering accuracy, opening and closing status, and cooling system of the mold, placing the processed carbon fiber composite panel semi-finished product into the designated position of the injection mold, placing reinforcing fasteners into the mold according to design requirements to provide necessary mechanical support and fixation, setting the temperature of the mold heating system according to the melting temperature of the plastic material used, starting the mold closing system, closing the mold, and checking whether there is any abnormality, placing the plastic raw material into the hopper of the injection molding machine, heating the plastic raw material to a molten state through the screw or other heating device of the injection molding machine, injecting the molten plastic material into the mold cavity of the mold, setting the cooling time according to the characteristics of the plastic material and the design of the mold, starting the mold opening system after the cooling time is over, separating the molds, taking out the injection molded parts using a clamp or a robotic arm, and inspecting the appearance and size of the taken out molded parts.
6. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The high temperature baking also includes inspecting the appearance and size of the injection molded workpiece before sending it into the high temperature oven, placing the prepared workpiece into the high temperature oven, ensuring that there is enough spacing between the workpieces, closing the oven door, and starting the baking program. Under the action of high temperature, the molecular structure inside the workpiece will change, and the internal stress will gradually be released. The oven door is closed, the internal stress will gradually be released, and the workpiece is observed for abnormal phenomena. After baking, the heating system of the high temperature oven is turned off, the baked workpiece is taken out, and the baked workpiece is inspected in detail.
7. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The post-molding treatment also includes using a knife or scissors to remove obvious excess parts on the molded part, using a grinder or a grinding wheel machine for rough processing, using a scraper or a knife to remove plastic glue overflowing from the molded part, using a knife or scissors to trim the burrs on the molded part, using medium-coarse sandpaper or a grinder for preliminary grinding to remove burrs and smooth the surface, and using fine sandpaper or a polishing pad for detailed grinding.
8. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The quality inspection also includes using calipers, vernier calipers, and height gauges to accurately measure the dimensions of the molded parts. For molded parts with complex shapes, a three-coordinate measuring machine or an automated online measurement system is used to perform accurate dimensional inspection. A surface roughness measuring instrument is used to inspect the surface roughness of the molded parts. Destructive tests such as tensile tests, shear tests, or peel tests are used to evaluate the bonding strength between carbon fiber and plastic in the molded parts.
9. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The surface treatment also includes setting up spraying equipment, including a spray gun and an air pump, adjusting the spraying pressure and nozzle to adapt to different coatings and workpiece shapes, spraying primer first, then spraying topcoat, checking the surface after painting, polishing the painted surface, using acid or alkaline washing to remove oxides and oil stains on the surface of the molded parts, selecting electroplating metal and electroplating solution, configuring electroplating tanks and power supply equipment, performing pre-plating treatment as needed, hanging the molded parts in the electroplating tank, and applying power for electroplating.
10. The direct secondary injection molding process on a carbon fiber composite material according to claim 1, characterized in that: The functional testing and verification also includes preparing the required testing equipment, including a load testing machine, a fatigue testing machine, and an environmental simulation test chamber, selecting representative molded parts as test samples, installing the molded parts on the load testing machine, setting test parameters, gradually applying predetermined loads, observing the performance of the molded parts under different load conditions, installing the molded parts on the fatigue testing machine, setting the test frequency, stress amplitude and test cycle, applying cyclic stress according to the set conditions, simulating load changes in long-term use, monitoring the performance of the molded parts, using an environmental simulation test chamber to simulate the actual use environment, setting the corresponding temperature and humidity according to the product use environment, placing the molded parts in the test equipment, conducting environmental testing according to the set conditions, and checking the performance of the molded parts after the environmental testing.