Horizontal tail rear beam root butt joint experiment device

By designing the docking experimental device at the root of the flat tail beam, the real load transfer and support relationship is simulated, solving the verification problems in the existing technology, achieving low-cost experimental verification, reducing technical risks, and providing important support for the test at the root of the rear beam. .

CN118770568APending Publication Date: 2024-10-15BEIJING AERONAUTIC SCI & TECH RES INST OF COMAC +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411051613.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

It is difficult to accurately verify the load transfer and failure mode at the root of the horizontal tail beam with existing technology, and large-scale testing is costly and affects the aircraft development progress.

Method used

A kind of flat tail rear beam root docking experimental device is designed, including the flat tail rear beam root docking test piece, beam dummy, beam web support dummy, docking rib support dummy, oblique loading actuator and vertical loading actuator. Through reasonable The stiffness design and support dummy arrangement simulate the real load transfer and support relationship.

Benefits of technology

The low-cost, real boundary conditions test of the flat tail rear beam root is realized, which can effectively verify the load transfer and support relationship, reduce technical risks, and provide an important verification method for the static force, fatigue and damage tests of the rear beam root.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118770568A_ABST
    Figure CN118770568A_ABST
Patent Text Reader

Abstract

The invention discloses a butt joint experiment device for the root of a horizontal tail rear beam, which belongs to the technical field of airplane strength test and is used for performing test verification on a force transmission path and load distribution of the root of the horizontal tail rear beam with a dihedral angle and a sweepback angle. The butt joint test device comprises a horizontal tail rear beam root butt joint test piece, a beam web supporting fake piece, a butt joint rib supporting fake piece, an oblique loading actuator cylinder and a vertical loading actuator cylinder structure, and the butt joint rib supporting fake piece is used for supporting a central butt joint rib web fake piece in the middle of the horizontal tail rear beam root butt joint test piece and transmitting a loading load. A butt-joint rib loading lateral supporting strip is connected to the end face of the central butt-joint rib web false part, a butt-joint rib loading supporting base supports the lower side edge of the central butt-joint rib web false part, and the butt-joint rib loading supporting base is connected with a loading lug of a vertical loading actuator cylinder. The butt joint test device is used for static force, fatigue and damage tests of butt joint of the roots of the rear beams, and has good practical application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of aircraft strength testing, and in particular relates to a horizontal tail rear beam root docking test device. Background Art

[0002] The horizontal stabilizer is an important part of the aircraft, which has a significant impact on the flight quality of the whole aircraft. The horizontal stabilizer plays an important role in maintaining the longitudinal balance of the aircraft and performing pitch trim control. If the horizontal stabilizer structure is damaged, the aircraft will not be able to maintain flight stability, which will cause serious safety accidents such as aircraft destruction and death. Therefore, the integrity and reliability of the horizontal tail structure are crucial to the safe operation of the aircraft. The root of the rear beam of the horizontal stabilizer has the characteristics of large load transfer and complex connection relationship. It needs to be connected with the upper and lower wall panels, the docking rib edge strips, and the rear beam docking angle piece. It is the focus and difficulty in the design. It is difficult to obtain a more realistic load-bearing capacity, failure mode and load distribution ratio through simulation analysis. It is usually verified based on the horizontal tail box segment level and full-scale level tests. On the one hand, the test scale is large and the cost is high. On the other hand, it is in the late stage of aircraft development, and the connection interface and configuration are basically determined. If the risk points of the design scheme cannot be identified in advance, it will affect the progress of the project development. Therefore, it is of great significance to study a low-cost horizontal tail rear beam root docking test device that considers a more realistic design configuration. Summary of the invention

[0003] In view of the above problems, the present invention discloses a horizontal tail rear beam root docking experimental device.

[0004] The present invention adopts the following technical solution:

[0005] A docking test device for the root of a horizontal tail rear beam, the docking test device is used to test and verify the force transmission path and load distribution of the root of a horizontal tail rear beam with an anhedral angle and a swept angle, and the docking test device comprises:

[0006] The horizontal tail rear beam root docking test piece is connected to the beam dummy, and the two beam dummy parts are connected through the horizontal tail rear beam root docking test piece, and the horizontal tail rear beam root docking test piece receives the force transmission path and load distribution of the beam dummy;

[0007] A beam web support dummy, used for supporting and fixing the beam dummy;

[0008] The docking rib support dummy is used to support and transfer the load of the central docking rib web dummy at the middle position of the docking test piece at the root of the horizontal tail rear beam;

[0009] The docking rib support dummy is connected to the end surface of the central docking rib web dummy through the docking rib loading lateral support strip, and the lower side of the central docking rib web dummy is supported by the docking rib loading support base;

[0010] An oblique loading actuator for applying a load on the beam dummy;

[0011] The vertical loading actuator is used to apply load to the central docking rib web dummy, and the action point of the vertical loading actuator is the docking rib loading support base.

[0012] Furthermore, the docking rib support dummy includes a docking rib fixed bulkhead, a docking rib loaded lateral support strip, a support rod and a docking rib loaded support base, the docking rib loaded lateral support strip is connected to the docking rib fixed bulkhead through the support rod, and the docking rib loaded support base is horizontally arranged at the lower end of the docking rib loaded lateral support strip.

[0013] Furthermore, the beam web supporting dummy comprises a beam web fixing bulkhead, a supporting rod and a beam web supporting plate, the beam web supporting plate is connected to the beam web fixing bulkhead via the supporting rod, and the fixing of the beam dummy by the beam web supporting plate is controlled by adjusting the supporting rod.

[0014] Furthermore, the oblique loading actuator cylinder includes an oblique actuator cylinder, an oblique loading ear piece and an oblique supporting base, the oblique loading ear piece is connected to the top of the oblique actuator cylinder through a pin shaft, and the oblique actuator cylinder is arranged at the upper side position of the oblique supporting base for oblique loading of the load.

[0015] Furthermore, the oblique loading actuator loads the load through the beam web clamping corner box, and the beam web clamping corner box includes a front corner box and a rear corner box.

[0016] Furthermore, the vertical loading actuator includes a vertical actuator, a vertical loading ear and a vertical support base. The vertical loading ear is connected to the top of the vertical actuator through a pin shaft. The vertical actuator is arranged at the upper central position of the vertical support base for loading the load vertically upward.

[0017] Furthermore, the middle position of the horizontal tail rear beam root docking test piece is a central docking rib, the two sides of the central docking rib are respectively connected to the rear beam, and the central docking rib web dummy is arranged in the middle position of the central docking rib.

[0018] Furthermore, an upper wall plate and a lower wall plate are respectively provided on the upper and lower sides of the rear beam; and angle pieces are provided on the inner sides of the upper wall plate and the lower wall plate.

[0019] Furthermore, the rear beam and the beam dummy are connected and fixed via a connecting belt plate.

[0020] Furthermore, the docking experimental device is arranged on a ground platform.

[0021] Beneficial effects:

[0022] The present invention discloses a docking test device that takes into account the real configuration of the rear beam of a horizontal tail, and is closer to the real boundary conditions of the docking structure. The docking test device takes into account the influence of the sweep angle and the dihedral angle of the rear beam configuration, and more realistically simulates the load transfer and support relationship at the root of the rear beam of the horizontal tail through reasonable stiffness design, support dummy design, and actuator position arrangement. The docking test device is used for static, fatigue and damage tests of the rear beam root docking. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 It is a schematic diagram of the overall connection of the docking test device of the present invention;

[0025] Figure 2 It is a schematic diagram of the connection between the test piece and the machine in the docking test device of the present invention;

[0026] Figure 3 It is a schematic diagram of the web support dummy of the beam in the docking test device of the present invention;

[0027] Figure 4 It is a schematic diagram of a docking rib supporting dummy in a docking test device of the present invention;

[0028] Figure 5 It is a schematic diagram of a fixed bulkhead in a docking test device of the present invention;

[0029] Figure 6 It is a schematic diagram of the web support plate and support rod of the beam in the docking test device of the present invention;

[0030] Figure 7 It is a schematic diagram of an obliquely loaded actuator in a docking test device of the present invention;

[0031] Figure 8 It is a schematic diagram of a vertically loaded actuator in a docking test device of the present invention;

[0032] Fig. 9 It is a schematic diagram of the front corner box and the rear corner box in the docking test device of the present invention.

[0033] Illustration: The horizontal tail rear beam root docking test piece and its connection dummy-1, beam web support dummy-2, oblique loading actuator-3, vertical loading actuator-4, docking rib support dummy-5, ground stand-6, beam web clamping corner box-7, central docking rib-11, upper wall plate-12, rear beam-13, connecting strip plate-14, beam dummy-15, central docking rib web dummy-16, corner piece-17, lower wall plate-18, beam web support dummy fixed frame-21, support plate-22, beam web support dummy support rod-23, upper cross beam-211, longitudinal beam-2 12, diagonal bracing beam -213, lower cross beam -214, front support plate of beam web -221, rear support plate -222, support rod -231, support rod -232, support rod -233, support rod -234, oblique loading ear -31, oblique actuator -32, oblique support base -33, vertical loading ear -41, vertical actuator -42, vertical support base -43, docking rib fixed bulkhead -51, docking rib loading lateral support strip -52, docking rib loading support base -53, docking rib support dummy support rod -54, front corner box -71, rear corner box -72. DETAILED DESCRIPTION

[0034] In order to better understand the technical solution of the present invention, the embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0035] It should be clear that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Example 1

[0037] A docking test device for the root of a horizontal tail rear beam, the docking test device is used to test and verify the force transmission path and load distribution of the root of a horizontal tail rear beam with an anhedral angle and a swept angle, and the docking test device comprises:

[0038] The horizontal tail rear beam root docking test piece 1, such as Figure 1 , Figure 2 As shown, it is connected with the beam dummy 15, and the two beam dummy 15 are connected through the horizontal tail rear beam root docking test piece 1, and the horizontal tail rear beam root docking test piece 1 receives the force transmission path and load distribution of the beam dummy 15;

[0039] Beam web support dummy 2, such as Figure 1 As shown, it is used for supporting and fixing the beam dummy 15;

[0040] The butt rib supports the dummy 5, such as Figure 1 , Figure 2As shown, it is used for supporting and transferring the load of the central docking rib web dummy 16 at the middle position of the horizontal tail rear beam root docking test piece;

[0041] like Figure 1 , 2 As shown in 4, the docking rib support dummy 5 is connected to the end surface of the central docking rib web dummy 16 through the docking rib loading lateral support strip 52, and at the same time, the lower side of the central docking rib web dummy 16 is supported by the docking rib loading support base 53;

[0042] Oblique loading actuator 3, such as Figure 1 , 2 As shown, it is used to add load on the beam dummy 15;

[0043] Vertical loading actuator 4, such as Figure 1 , 2 As shown, it is used to add load to the central docking rib web dummy 16, and the action point of the vertical loading actuator 4 is the docking rib loading support base 53.

[0044] Furthermore, if Figure 4 As shown, the docking rib support dummy 5 includes a docking rib fixed bulkhead 51, a docking rib loaded lateral support strip 52, a support rod 54 and a docking rib loaded support base 53. The docking rib loaded lateral support strip 52 is connected to the docking rib fixed bulkhead 51 through the support rod 54. The docking rib loaded support base 53 is horizontally arranged at the lower end of the docking rib loaded lateral support strip 52. The docking rib loaded lateral support strip 52 is used to abut against the cross section of the central docking rib web dummy 16. The docking rib loaded support base 53 is used to support the side of the central docking rib web dummy 16. Figure 1 , 2 shown.

[0045] Furthermore, if Figure 3 As shown, the beam web support dummy 2 includes a beam web fixed bulkhead 21, a support rod 23 and a beam web support plate 22. The beam web support plate 22 is connected to the beam web fixed bulkhead 21 through the support rod 23. The beam web support plate 22 is controlled to fix the beam dummy 15 by adjusting the support rod 23. Figure 1 , 2 shown. Figure 6 yes Figure 3 The subdivision of the structure of the middle support plate 22 and the support rod 23 specifically includes: the subdivision structure of the front support plate 221 of the web, the rear support plate 222, the support rod 231, the support rod 232, the support rod 233 and the support rod 234, Figure 5 yes Figure 3The subdivided structure of the center beam web fixed bulkhead 21 specifically includes: an upper cross beam 211, a longitudinal beam 212, a diagonal bracing beam 213 and a cross beam 214 subdivided structure.

[0046] Furthermore, if Figure 7 As shown, the oblique loading actuator cylinder 3 includes an oblique actuator cylinder 32, an oblique loading ear piece 31 and an oblique supporting base 33. The oblique loading ear piece 31 is connected to the top of the oblique actuator cylinder 32 through a pin shaft. The oblique actuator cylinder 32 is arranged at the upper side position of the oblique supporting base 33 for oblique loading of loads.

[0047] Furthermore, if Figure 1 , 9 As shown, the oblique loading actuator 3 loads the load through the beam web clamping corner box, and the beam web clamping corner box includes a front corner box 71 and a rear corner box 72.

[0048] Furthermore, if Figure 1 , 4 As shown in FIG. 8 , the vertical loading actuator 4 includes a vertical actuator 42, a vertical loading ear 41 and a vertical support base 43. The vertical loading ear is connected to the top of the vertical actuator 42 through a pin shaft. The vertical actuator 42 is arranged at the upper central position of the vertical support base 43 for vertically loading the load upward.

[0049] Furthermore, if Figure 2 As shown, the middle position of the horizontal tail rear beam root docking test piece 1 is a central docking rib 11, and the two sides of the central docking rib 11 are respectively connected to the rear beam 13, and the central docking rib web dummy 16 is arranged in the middle position of the central docking rib 11.

[0050] Furthermore, if Figure 2 As shown, an upper wall plate 12 and a lower wall plate 18 are respectively provided on the upper and lower sides of the rear beam 13; and corner pieces 17 are provided on the inner sides of the upper wall plate 12 and the lower wall plate.

[0051] Furthermore, if Figure 2 As shown, the rear beam 13 and the beam dummy 15 are connected and fixed by a connecting belt plate 14.

[0052] Furthermore, if Figure 1 As shown, the docking experimental device is arranged on a ground platform 6 .

[0053] Example 2

[0054] A docking test device that takes into account the more realistic configuration of the horizontal tail rear beam at the same time, and is closer to the real boundary conditions of the docking structure. This technical solution takes into account the influence of the sweep angle and the dihedral angle of the rear beam configuration, and simulates the load transfer and support relationship at the root of the horizontal tail rear beam more realistically through reasonable stiffness design, support dummy design, and actuator position arrangement. This docking test device can be used for static, fatigue and damage tests of the rear beam root docking.

[0055] A horizontal stabilizer rear beam root docking test device includes a horizontal tail rear beam root docking test piece and its connection dummy 1, a beam web support dummy 2 and a docking rib support dummy 5, an oblique loading actuator cylinder and its accessory structure 3, a vertical loading actuator cylinder and its accessory structure 4, a ground stand 6 and a beam web clamping angle box 7.

[0056] The horizontal tail rear beam root docking test piece and its connection dummy 1 are composed of a central docking rib 11, an upper wall plate 12, a rear beam 13, a connecting strip plate 14, a beam dummy 15, a central docking rib web dummy 16, an angle piece 17 and a lower wall plate 18.

[0057] The beam web support dummy 2 includes a beam dummy fixing bulkhead 21, a beam web support plate 22 and a support rod 23, which are mainly used to constrain the test piece, can simulate the connection relationship between the rib web and the beam web, prevent the beam web from premature instability and damage, and provide a more realistic boundary support. The fixed support dummy 2 is located on both sides of the aircraft symmetry plane, and the spacing of the bulkheads is consistent with the spacing of the horizontal tail ribs.

[0058] The oblique loading actuator and its accessory structure 3 are composed of an oblique loading ear 31, an oblique actuator 32 and an oblique support base 33, and the vertical loading actuator 4 is composed of a vertical loading ear 41, a vertical actuator 42 and a vertical support base 43, which are used for load application and obtaining dynamic load changes.

[0059] The central butt rib 11, upper wall plate 12, rear beam 13, angle piece 17 and lower wall plate 18 are real structural cut parts, connected by fasteners. The width of the central butt rib 11, upper wall plate 12 and lower wall plate 18 is flush with the edge of the beam edge strip, and the length of the rear beam 13 is 1.5 times the rib spacing from the root. The beam dummy 15 is made of welded steel plates to ensure that it is consistent with the height of the real beam. The connecting strip 14 is made of steel plates and connected to the rear beam 13 and the beam dummy 15 by bolts. The central butt rib web dummy 16 is made of aluminum alloy plate and connected to the central butt rib 11 and angle piece 17 by bolts.

[0060] The beam dummy 15 is respectively connected to the web and flange of the rear beam test piece. Through reasonable stiffness design, the error between the load transfer ratio of the web and flange and the actual load transfer ratio is within 10%. Local thickening is performed in the connection area between the rear beam support dummy and the rear beam test piece to prevent the damage position from occurring in this connection area.

[0061] The beam web fixed bulkhead 21 includes an upper crossbeam 211, a longitudinal beam 212, a diagonal bracing beam 213 and a lower crossbeam 214, which are made of I-shaped channel steel and are connected by welding. The lower crossbeam 214 is connected to the ground stand by fasteners. The beam web support plate 22 includes a front support plate 221 and a rear support plate 222. Thick plates are used to ensure rigidity. The surface of the beam web is covered with a rubber pad to ensure that the support surface and the web of the beam dummy are in surface contact. The support rods 231, 232, 233, and 234 use I-shaped steel as guide rails and are connected to the beam web fixed bulkhead 21 by welding. U-shaped channel steels are embedded on both sides of the I-shaped steel. The U-shaped channel steels are connected to the beam web support plate 22 by welding. The I-shaped channel steels and the U-shaped channel steels are connected by oblong holes and bolts to achieve adjustable support length.

[0062] The oblique support base 33 is connected to the ground frame by bolts. The beam web clamping angle box 7 is composed of a front angle box 71 and a rear angle box 72. The oblique loading lug 31, the oblique support base 33, and the angle boxes 71 and 72 are machined from steel. The long side of the angle box is connected to the web of the beam dummy by fasteners, and the end side is connected to the beam dummy 15 and the oblique support base 31 by bolts, ensuring that the oblique loading actuator 3 is coordinated to load the beam dummy 15 and then transferred to the test piece.

[0063] The docking rib loading lateral support strip 52 of the docking rib support dummy 5 is machined from steel, and its cross-section is preferably T-shaped. It is connected to the central docking rib web dummy 16 through fasteners. The docking rib support dummy support rod 54 is a steel pipe, and the vertical follow-up is achieved through a U-shaped slide rail. The docking rib support dummy support rod 54 slides along the slide rail along the docking rib fixed bulkhead 51, and is connected to the docking rib fixed bulkhead 51 and the docking rib loading lateral support strip 52 through welding as the actuator moves up and down; the docking rib loading support base 53 is made of steel plate, and is connected to the vertical support base 43 of the vertical loading actuator 4 through connecting bolts, to ensure that the loading actuator is coordinated with the loading lateral support strip 52 to be loaded to the docking rib, and then transmitted to the test piece.

[0064] The connection method between the horizontal tail rear beam test piece and the test fixture truly considers the upward dihedral angle and the sweep angle of the actual configuration of the horizontal tail rear beam root connection area; the structural layout of the horizontal tail rear beam root docking test device is symmetrical about the left and right, and the interval arrangement of the fixed bulkhead and the supporting dummy can more realistically simulate the load transfer of the rear beam and prevent out-of-plane buckling; the coordinated loading of the loading actuator can avoid the problem of deformation mismatch during the loading process of the span and heading direction of the horizontal tail rear beam root; the loading actuator and the support base can adjust the loading direction with ears, which can simultaneously consider the influence of vertical, heading and span loads.

[0065] The horizontal tail rear beam root docking test device of the present invention has passed the test plan review, and the simulation analysis results show that the device can simulate the load transfer at the root of the horizontal tail rear beam well; it provides an important test verification means for the design and strength analysis of the rear beam root docking structure, and obtains the bearing capacity and failure mode of the rear beam root docking structure; this test can reduce the technical risks that arise in model verification at a relatively low cost, and provide technical support for the typical box section test and full-scale test of the horizontal tail.

[0066] The horizontal tail rear beam root docking test device according to the present invention has passed the test plan review, and the simulation analysis results show that the device can simulate the load transfer at the root of the horizontal tail rear beam well; it provides an important test verification method for the design and strength analysis of the rear beam root docking structure, and obtains the bearing capacity and failure mode of the rear beam root docking structure; this test can reduce the technical risks in model verification at a relatively low cost, and provide technical support for the typical box section test and full-scale test of the horizontal tail.

[0067] The embodiments of the present invention are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A docking test device for the root of a horizontal tail rear beam, which is used to test and verify the force transmission path and load distribution of the root of a horizontal tail rear beam with an anhedral angle and a swept angle, and is characterized in that: The docking test device comprises: The horizontal tail rear beam root docking test piece is connected to the beam dummy, and the two beam dummy parts are connected through the horizontal tail rear beam root docking test piece, and the horizontal tail rear beam root docking test piece receives the force transmission path and load distribution of the beam dummy; A beam web support dummy, used for supporting and fixing the beam dummy; The docking rib support dummy is used to support and transfer the load of the central docking rib web dummy at the middle position of the docking test piece at the root of the horizontal tail rear beam; The docking rib support dummy is connected to the end surface of the central docking rib web dummy through the docking rib loading lateral support strip, and the lower side of the central docking rib web dummy is supported by the docking rib loading support base; An oblique loading actuator for applying a load on the beam dummy; The vertical loading actuator is used to apply load to the central docking rib web dummy, and the action point of the vertical loading actuator is the docking rib loading support base.

2. The docking experimental device according to claim 1, characterized in that: The docking rib support dummy includes a docking rib fixed bulkhead, a docking rib loaded lateral support strip, a support rod and a docking rib loaded support base, the docking rib loaded lateral support strip is connected to the docking rib fixed bulkhead through the support rod, and the docking rib loaded support base is horizontally arranged at the lower end of the docking rib loaded lateral support strip.

3. The docking experimental device according to claim 2, characterized in that: The beam web supporting dummy comprises a beam web fixing bulkhead, a supporting rod and a beam web supporting plate. The beam web supporting plate is connected to the beam web fixing bulkhead via the supporting rod. The fixing of the beam dummy to the beam web supporting plate is controlled by adjusting the supporting rod.

4. The docking experimental device according to claim 3, characterized in that: The oblique loading actuator cylinder includes an oblique loading actuator cylinder, an oblique loading ear piece and an oblique supporting base. The oblique loading ear piece is connected to the top of the oblique actuator cylinder through a pin shaft. The oblique actuator cylinder is arranged at the upper side position of the oblique supporting base for oblique loading of loads.

5. The docking experimental device according to claim 4, characterized in that: The oblique loading actuator loads the load through the beam web clamping corner box, and the beam web clamping corner box includes a front corner box and a rear corner box.

6. The docking experimental device according to claim 5, characterized in that: The vertical loading actuator includes a vertical actuator, a vertical loading ear and a vertical support base. The vertical loading ear is connected to the top of the vertical actuator through a pin. The vertical actuator is arranged at the upper center position of the vertical support base for loading the load vertically upward.

7. The docking experimental device according to claim 6, characterized in that: The middle position of the horizontal tail rear beam root docking test piece is a central docking rib, both sides of the central docking rib are respectively connected to the rear beam, and the central docking rib web dummy is arranged in the middle position of the central docking rib.

8. The docking experimental device according to claim 7, characterized in that: An upper wall plate and a lower wall plate are respectively arranged on the upper and lower sides of the rear beam; and angle pieces are arranged on the inner sides of the upper wall plate and the lower wall plate.

9. The docking experimental device according to claim 8, characterized in that: The rear beam and the beam dummy are connected and fixed via a connecting belt plate.

10. The docking experimental device according to claim 9, characterized in that: The docking experimental device is arranged on a ground platform.

Citation Information

Patent Citations

  • Fuselage panel combined load test device

    CN104807694A

  • Ear fork-box section structure static strength testing device

    CN110282153A

  • Helicopter composite material tail section defect tolerance test verification method

    CN114112348A

  • Device and method for testing butt joint structure of wing root beam of aircraft wing with dihedral angle

    CN117864419A