Detachable anchor rod connecting structure based on foundation pit slope protection and application method
By using detachable anchor rods to connect structures on the foundation pit slope protection, including precast concrete panels, internally threaded pipes and anchor rods, the problem of difficult removal of anchor rods is solved, enabling convenient installation and removal of anchor rods, and improving structural stability. and construction safety.
Patent Information
- Application Number
- CN202411109595.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The anchor rods in the existing foundation pit support structure are difficult to remove, affecting construction efficiency and environmental safety.
A detachable anchor connection structure based on foundation pit slope protection is used, including precast concrete slabs, internally threaded pipes and anchor rods. The electric tool drives the rotating part to rotate the anchor rod into the soil for installation and removal, and is equipped with a limiter device and an anti-theft device to prevent Improve stability and security.
It realizes the convenient removal and installation of anchors, improves the stability of internally threaded pipes and the safety of anchors, reduces the possibility of loss, and improves construction efficiency and safety.
Smart Images

Figure CN118774115A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of foundation pit support, and in particular to a detachable anchor rod connection structure based on foundation pit slope protection and an application method. Background Art
[0002] At present, foundation pit support is a measure of support, reinforcement and protection for the side walls of the foundation pit and the surrounding environment to ensure the safety of underground structure construction and the surrounding environment of the foundation pit.
[0003] The foundation pit supporting structure in the related art generally includes a supporting plate and an anchor rod installed on the supporting plate for connecting the supporting plate with the slope protection.
[0004] However, the above-mentioned anchor rods are generally directly driven into the slope protection, so it is inconvenient to remove the anchor rods. Summary of the invention
[0005] The present application provides a detachable anchor rod connection structure based on foundation pit slope protection, which is convenient for removing the anchor rod and adopts the following technical solutions:
[0006] A detachable anchor rod connection structure based on foundation pit slope protection, comprising a plurality of precast concrete panels in contact with the slope protection, each of the precast concrete panels being precast with an internally threaded pipe, each of the internally threaded pipes being internally threadedly connected with an anchor rod, one end of the anchor rod being provided with a rotating portion, and the other end being fixedly connected with a drill bit; a concrete layer is sprayed on one side of the plurality of precast concrete panels away from the slope protection; a drainage system for discharging water in the foundation pit is installed on the top of the foundation pit.
[0007] First, the precast concrete slab is laid. After the precast concrete slab is laid, the anchor rod is moved into the internal threaded tube, and then the anchor rod is rotated several times to make the anchor rod and the internal threaded tube preliminarily connected. Next, the rotating part is driven to rotate by the output end of the electric tool, and the rotation of the rotating part drives the anchor rod to rotate. At this time, the anchor rod can be rotated into the soil of the foundation pit slope under the action of the drill bit, so that the anchor rod can be installed; when the anchor rod needs to be removed, the anchor rod can be rotated out in the opposite direction by the electric tool; in summary, by adopting the above scheme, it is convenient to remove the anchor rod.
[0008] Preferably, the drainage system includes a drainage pump installed on the top of the foundation pit, a water inlet pipe connected to the water inlet of the drainage pump, and a drainage pipe connected to the drainage outlet of the drainage pump.
[0009] By adopting the above scheme, the drainage pump, water inlet pipe and drainage pipe are set up to facilitate the discharge of water in the foundation pit.
[0010] Preferably, a limiting device is installed in the internal threaded tube, and the limiting device includes a plurality of first sliding grooves opened on the inner wall of the internal threaded tube and a plurality of movable plates slidably connected to the plurality of first sliding grooves one by one; one end of each of the movable plates away from the rotating part is fixedly connected to a limiting pointed rod; a pushing mechanism for pushing the plurality of movable plates to move is installed on the anchor rod, and one end of each of the movable plates away from the rotating part is fixedly connected to a first spring, and one end of the first spring away from the movable plate is fixedly connected to the bottom of the first sliding groove.
[0011] By adopting the above scheme, the anchor rod moves and drives the movable plate to move under the action of the pushing mechanism, and the movement of the movable plate drives the limit pointed rod to move, so that the limit pointed rod can be connected to the soil of the foundation pit slope, thereby improving the stability of the internal threaded pipe; in summary, the set limiting device can improve the stability of the internal threaded pipe.
[0012] Preferably, the pushing mechanism includes an annular plate rotatably connected to the outer wall of the anchor rod and a plurality of push rods fixed to the end of the annular plate away from the rotating part; the inner wall of the internal threaded tube is provided with an annular groove for the movement of the annular plate; the ends of the plurality of push rods away from the annular plate are respectively abutted against the ends of the plurality of movable plates close to the rotating part.
[0013] By adopting the above solution, the anchor rod drives the annular plate to move when it moves, the movement of the annular plate drives the push rod to move, and the movement of the push rod drives the moving plate to move, so that the moving plate can be driven to move; the set pushing mechanism facilitates the movement of the moving plate.
[0014] Preferably, a T-shaped block and a T-shaped groove are provided between two adjacent precast concrete slabs, the T-shaped block is slidably connected to the T-shaped groove, and one end of the T-shaped groove extends to the internal threaded pipe; a limiting component for limiting the T-shaped block is installed in the first sliding groove.
[0015] By adopting the above scheme, the T-shaped blocks and T-shaped grooves are provided, which facilitate the preliminary connection of two adjacent precast concrete slabs, and then the T-shaped blocks are limited by the limiting components, which facilitates the stable connection of the two adjacent precast concrete slabs, thereby improving the overall stability of the precast concrete slabs.
[0016] Preferably, one end of two adjacent precast concrete panels is provided with a pre-positioning block and a pre-positioning groove, and the pre-positioning block is plugged into the pre-positioning groove.
[0017] By adopting the above scheme, the pre-positioning block and the pre-positioning groove are provided, which facilitates the pre-positioning of the precast concrete slab, so that the limiting block is easily plugged into the limiting groove.
[0018] Preferably, the limit assembly includes a first through hole formed in the side wall of the first slide groove and a limit block slidably connected to the first through hole; the limit block is provided with an inclined surface at one end close to the movable plate, and the inclined surface matches the side wall of the movable plate; a limit groove is formed on one side of the T-shaped block, and the end of the limit block away from the inclined surface is inserted into the limit groove; a slider is fixedly connected to one side of the limit block, a second slide groove is formed on one side of the first through hole, the slider is slidably connected to the second slide groove, a second spring is fixedly connected to one side of the slider, and the end of the second spring away from the slider is fixedly connected to the inner wall of one end of the second slide groove.
[0019] By adopting the above solution, when the movable plate moves, the movable plate drives the limit block to be plugged into the limit groove under the action of the inclined surface, so that the T-shaped block can be limited; the set limit assembly facilitates the limitation of the T-shaped block.
[0020] Preferably, an observation rod is fixedly connected to the top of each movable plate, and a second through hole for allowing the observation rod to move is formed on the top wall of the first sliding groove.
[0021] By adopting the above solution, the observation rod is provided, which facilitates the observation of the movement of the movable plate.
[0022] Preferably, a plurality of anti-theft devices are installed on the top of the internally threaded tube, and each of the anti-theft devices includes a third slide groove opened on one side of the second through hole, a locking plate slidably connected to the third slide groove, and a third spring fixedly connected to one end of the locking plate; a third through hole is opened on the observation rod, a fourth through hole is opened on the side wall of the internally threaded tube, a hexagonal hole is opened on the top of the rotating part, and a slot is opened on the circumferential surface of the rotating part. When the observation rod is moved to make the third slide groove, the third through hole and the fourth through hole collinear, at this time, one end of the locking plate away from the third spring is inserted into the slot; one end of the third spring away from the locking plate is fixedly connected to the inner wall of one end of the third slide groove, and in the initial state, one end of the locking plate away from the third spring abuts against the side wall of the observation rod, at this time, the third spring is in a compressed state; a push block is fixedly connected to the top of the locking plate, a strip hole is opened on the top wall of the third slide groove for sliding the push block, and an elastic folding plate is arranged between the push block and one end of the strip hole.
[0023] By adopting the above scheme, the movement of the movable plate drives the movement of the observation rod. When the observation rod moves to make the third slide groove, the third through hole and the fourth through hole collinear, the locking plate is plugged into the slot under the action of the third spring, thereby reducing the possibility of the anchor rod being lost. In summary, the anti-theft device set up can reduce the possibility of the anchor rod being lost.
[0024] The present application provides an application method of a detachable anchor rod connection structure based on foundation pit slope protection, which adopts the following technical solution:
[0025] An application method of a detachable anchor rod connection structure based on foundation pit slope protection comprises the following steps:
[0026] S1. Splicing precast concrete panels: connecting the T-shaped blocks with the T-shaped slots and plugging the pre-positioning blocks with the pre-positioning slots by moving the precast concrete panels;
[0027] S2. Install the anchor rod: first move the anchor rod into the internal threaded tube, then rotate the anchor rod a few times to make the anchor rod and the internal threaded tube preliminarily connected, then insert the output end of the power tool into the internal hexagonal hole, then drive the rotating part to rotate through the power tool, the rotating part rotates to drive the anchor rod to rotate, at this time, the anchor rod can be rotated into the soil of the foundation pit slope under the action of the drill bit, so that the anchor rod can be installed; furthermore, the anchor rod drives the annular plate to move when it moves, the movement of the annular plate drives the push rod to move, the movement of the push rod drives the moving plate to move, the movement of the moving plate drives the limit pointed rod to move, In this way, the limiting pointed rod can be connected with the soil of the foundation pit slope, thereby improving the stability of the internal threaded pipe; in addition, when the moving plate moves, the moving plate drives the limiting block to be plugged into the limiting groove under the action of the inclined surface, so that the T-shaped block can be limited, thereby improving the overall stability of multiple precast concrete panels; furthermore, the movement of the moving plate drives the observation rod to move, and when the observation rod moves to make the third slide groove, the third through hole and the fourth through hole collinear, the locking plate is plugged into the slot under the action of the third spring, thereby reducing the possibility of the anchor rod being lost;
[0028] S3. Sprayed concrete layer: After the anchor rods are installed, the concrete layer is sprayed on the water-facing surfaces of multiple precast concrete slabs.
[0029] In summary, this application has the following beneficial effects:
[0030] 1. First, lay the precast concrete slab. After the precast concrete slab is laid, move the anchor rod into the internal threaded tube, and then rotate the anchor rod a few times to make the anchor rod and the internal threaded tube preliminarily connected. Next, the output end of the electric tool drives the rotating part to rotate, and the rotation of the rotating part drives the anchor rod to rotate. At this time, the anchor rod can be rotated into the soil of the foundation pit slope under the action of the drill bit, so that the anchor rod can be installed; when the anchor rod needs to be removed, the anchor rod can be rotated out in the opposite direction by the electric tool; in summary, by adopting the above scheme, it is convenient to remove the anchor rod;
[0031] 2. The anchor rod moves and drives the moving plate to move under the action of the pushing mechanism, and the moving plate drives the limiting pointed rod to move, so that the limiting pointed rod can be connected with the soil of the foundation pit slope, thereby improving the stability of the internal threaded pipe; in summary, the setting of the limiting device can improve the stability of the internal threaded pipe;
[0032] 3. The movement of the movable plate drives the movement of the observation rod. When the observation rod moves to make the third slide groove, the third through hole and the fourth through hole collinear, the locking plate is plugged into the slot under the action of the third spring, thereby reducing the possibility of the anchor rod being lost. In summary, the anti-theft device can reduce the possibility of the anchor rod being lost. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0034] Figure 2 This is a structural schematic diagram highlighting the connection of two adjacent precast concrete panels in an embodiment of the present application;
[0035] Figure 3 This is a cross-sectional view highlighting the connection between the anchor rod and the internally threaded pipe in the embodiment of the present application;
[0036] Figure 4 This is a cross-sectional view highlighting the anchor rod and the anti-theft device in the embodiment of the present application.
[0037] Description of reference numerals: 1. slope protection; 2. precast concrete slab; 21. concrete layer; 22. T-shaped block; 23. T-shaped slot; 24. pre-positioning block; 25. pre-positioning slot; 3. internal threaded pipe; 31. anchor rod; 32. rotating part; 321. hexagonal hole; 33. drill bit; 4. drainage system; 41. drainage pump; 42. water inlet pipe; 43. drainage pipe; 5. limiting device; 51. first slide groove; 511. second through hole; 52. moving plate; 53. limiting sharp rod; 54. first spring; 55. Push mechanism; 551. Annular plate; 552. Push rod; 553. Annular groove; 6. Limiting assembly; 61. First through hole; 62. Limiting block; 621. Inclined surface; 63. Limiting groove; 64. Sliding block; 65. Second sliding groove; 66. Second spring; 7. Observation rod; 8. Anti-theft device; 81. Third sliding groove; 811. Strip hole; 82. Locking plate; 83. Third spring; 84. Third through hole; 85. Fourth through hole; 86. Slot; 87. Pushing block; 88. Elastic folding plate. DETAILED DESCRIPTION
[0038] The following is combined with Figure 1-4 This application is described in further detail.
[0039] The same parts are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper", "lower", "bottom" and "top" used in the following description refer to directions in the drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.
[0040] The present application discloses a detachable anchor rod connection structure based on foundation pit slope protection, comprising a plurality of precast concrete panels 2 in contact with the slope protection 1, each precast concrete panel 2 being precast with an internal threaded tube 3, each internal threaded tube 3 being internally threadedly connected with an anchor rod 31, one end of the anchor rod 31 being provided with a rotating portion 32, and the other end being fixedly connected with a drill bit 33; a concrete layer 21 is sprayed on one side of the plurality of precast concrete panels 2 away from the slope protection 1; a drainage system 4 for discharging water in the foundation pit is installed on the top of the foundation pit. First, the precast concrete slab 2 is laid. After the precast concrete slab 2 is laid, the anchor rod 31 is moved into the internal threaded tube 3, and then the anchor rod 31 is rotated several times to make the anchor rod 31 and the internal threaded tube 3 preliminarily connected. Next, the rotating part 32 is driven to rotate by the output end of the electric tool, and the rotation of the rotating part 32 drives the anchor rod 31 to rotate. At this time, the anchor rod 31 can be rotated into the soil of the foundation pit slope under the action of the drill bit 33, so that the anchor rod 31 can be installed; when the anchor rod 31 needs to be removed, the anchor rod 31 can be rotated out in the opposite direction by the electric tool; in summary, by adopting the above scheme, it is convenient to remove the anchor rod 31.
[0041] The drainage system 4 includes a drainage pump 41 vertically installed on the top of the foundation pit, a water inlet pipe 42 connected to the water inlet of the drainage pump 41 through a flange, and a drainage pipe 43 connected to the drainage outlet of the drainage pump 41 through a flange. The drainage pump 41, the water inlet pipe 42 and the drainage pipe 43 are arranged to facilitate the discharge of water in the foundation pit.
[0042] A limiting device 5 is installed in the internal threaded tube 3. The limiting device 5 includes a plurality of first chutes 51 provided on the inner wall of the internal threaded tube 3 and a plurality of movable plates 52 correspondingly connected to the plurality of first chutes 51 along the axial direction of the internal threaded tube 3; one end of each movable plate 52 away from the rotating part 32 is fixedly connected to a limiting sharp rod 53; a pushing mechanism 55 for pushing the plurality of movable plates 52 to move is installed on the anchor rod 31, and one end of each movable plate 52 away from the rotating part 32 is fixedly connected to a first spring 54, which is arranged along the axial direction of the internal threaded tube 3, and one end of the first spring 54 away from the movable plate 52 is fixedly connected to the bottom of the first chutes 51. The anchor rod 31 moves and drives the movable plate 52 to move under the action of the pushing mechanism 55, and the movement of the movable plate 52 drives the limiting sharp rod 53 to move, so that the limiting sharp rod 53 can be connected to the soil of the foundation pit slope, thereby improving the stability of the internal threaded tube 3; in summary, the setting of the limiting device 5 can improve the stability of the internal threaded tube 3.
[0043] The pushing mechanism 55 includes an annular plate 551 rotatably connected to the outer wall of the anchor rod 31 and a plurality of push rods 552 fixed to the end of the annular plate 551 away from the rotating part 32; the inner wall of the internal threaded tube 3 is provided with an annular groove 553 for the annular plate 551 to move along the axial direction of the internal threaded tube 3, the upper half of the inner wall of the internal threaded tube 3 is a smooth annular groove 553, and the lower half is a threaded groove; the ends of the plurality of push rods 552 away from the annular plate 551 are in one-to-one correspondence with the ends of the plurality of moving plates 52 close to the rotating part 32. When the anchor rod 31 moves, the annular plate 551 is driven to move, the movement of the annular plate 551 drives the push rods 552 to move, and the movement of the push rods 552 drives the moving plate 52 to move, so that the moving plate 52 can be driven to move; the setting of the pushing mechanism 55 facilitates the moving plate 52 to move.
[0044] A T-shaped block 22 and a T-shaped groove 23 are provided between two adjacent precast concrete panels 2. The T-shaped block 22 is slidably connected to the T-shaped groove 23 along the length direction of the precast concrete panel 2, and one end of the T-shaped groove 23 extends to the internal threaded tube 3. A limiting assembly 6 for limiting the T-shaped block 22 is installed in the first slide groove 51. The provided T-shaped block 22 and the T-shaped groove 23 facilitate the preliminary connection of the two adjacent precast concrete panels 2, and then the T-shaped block 22 is limited by the limiting assembly 6, so that the two adjacent precast concrete panels 2 are stably connected, thereby improving the overall stability of the precast concrete panels 2.
[0045] One end of two adjacent precast concrete panels 2 is provided with a pre-positioning block 24 and a pre-positioning groove 25, and the pre-positioning block 24 is plugged into the pre-positioning groove 25. The pre-positioning block 24 and the pre-positioning groove 25 are provided to facilitate pre-positioning of the precast concrete panels 2, so that the limiting block 62 is plugged into the limiting groove 63.
[0046] The limiting assembly 6 includes a first through hole 61 provided on the side wall of the first slide groove 51 and a limiting block 62 connected to the first through hole 61 by sliding along the radial direction of the internal threaded tube 3; an end of the limiting block 62 close to the movable plate 52 is provided with an inclined surface 621, and the inclined surface 621 matches the side wall of the movable plate 52; a limiting groove 63 is provided on one side of the T-shaped block 22, and an end of the limiting block 62 away from the inclined surface 621 is inserted into the limiting groove 63; a slider 64 is fixedly connected to one side of the limiting block 62, a second slide groove 65 is provided on one side of the first through hole 61, and the slider 64 is connected to the second slide groove 65 by sliding along the radial direction of the internal threaded tube 3, and a second spring 66 is fixedly connected to one side of the slider 64, and the second spring 66 is arranged along the radial direction of the internal threaded tube 3, and the end of the second spring 66 away from the slider 64 is fixedly connected to the inner wall of one end of the second slide groove 65. When the movable plate 52 moves, the movable plate 52 drives the limiting block 62 to engage with the limiting groove 63 under the action of the inclined surface 621 , so that the T-shaped block 22 can be limited; the provided limiting component 6 facilitates the limiting of the T-shaped block 22 .
[0047] An observation rod 7 is vertically fixed to the top of each moving plate 52, and a second through hole 511 is provided on the top wall of the first slide groove 51 for the observation rod 7 to move along the axial direction of the internal threaded tube 3. The observation rod 7 is provided to facilitate observation of the movement of the moving plate 52.
[0048] A plurality of anti-theft devices 8 are installed on the top of the internally threaded tube 3, each of which includes a third slide groove 81 opened on one side of the second through hole 511, a locking plate 82 connected to the third slide groove 81 by sliding along the radial direction of the internally threaded tube 3, and a third spring 83 fixed to one end of the locking plate 82; a third through hole 84 is opened on the observation rod 7, a fourth through hole 85 is opened on the side wall of the internally threaded tube 3, an inner hexagonal hole 321 is opened on the top of the rotating part 32, and a slot 86 is opened on the peripheral surface of the rotating part 32. The slot 86 is annular and is plugged into multiple locking plates 82. When the observation rod 7 moves to make the third slide groove 81 When the third through hole 84 and the fourth through hole 85 are in a collinear line, the end of the locking plate 82 away from the third spring 83 is inserted into the slot 86; the end of the third spring 83 away from the locking plate 82 is fixedly connected to the inner wall of one end of the third slide groove 81. In the initial state, the end of the locking plate 82 away from the third spring 83 abuts against the side wall of the observation rod 7, and the third spring 83 is in a compressed state. A push block 87 is fixedly connected to the top of the locking plate 82, and a strip hole 811 is provided on the top wall of the third slide groove 81 for the push block 87 to slide, and an elastic folding plate 88 is provided between the push block 87 and one end of the strip hole 811. The movement of the movable plate 52 drives the observation rod 7 to move. When the observation rod 7 moves to make the third slide groove 81, the third through hole 84 and the fourth through hole 85 collinear, the locking plate 82 is plugged into the slot 86 under the action of the third spring 83, thereby reducing the possibility of the anchor rod 31 being lost. In summary, the anti-theft device 8 set up can reduce the possibility of the anchor rod 31 being lost.
[0049] The present application discloses an application method of a detachable anchor rod connection structure based on foundation pit slope protection, comprising the following steps:
[0050] S1, splicing the precast concrete slab 2: moving the precast concrete slab 2 to connect the T-shaped block 22 with the T-shaped slot 23 and to plug the pre-positioning block 24 with the pre-positioning slot 25;
[0051] S2, installing the anchor rod 31: first move the anchor rod 31 into the internal threaded tube 3, then rotate the anchor rod 31 several times to make the anchor rod 31 and the internal threaded tube 3 preliminarily connected, then insert the output end of the power tool into the hexagonal hole 321, then drive the rotating part 32 to rotate through the power tool, the rotation of the rotating part 32 drives the anchor rod 31 to rotate, at this time, the anchor rod 31 can be transferred into the soil of the foundation pit slope under the action of the drill bit 33, so that the anchor rod 31 can be installed; furthermore, when the anchor rod 31 moves, it drives the annular plate 551 to move, the movement of the annular plate 551 drives the push rod 552 to move, the push rod 552 drives the moving plate 52 to move, the moving plate 52 drives the limiting pointed rod 53 moves, so that the limiting pointed rod 53 can be connected to the soil of the foundation pit slope, thereby improving the stability of the internal threaded pipe 3; in addition, when the moving plate 52 moves, the moving plate 52 drives the limiting block 62 to be plugged into the limiting groove 63 under the action of the inclined surface 621, so that the T-shaped block 22 can be limited, thereby improving the overall stability of the multiple precast concrete panels 2; furthermore, the movement of the moving plate 52 drives the observation rod 7 to move, and when the observation rod 7 moves to make the third slide groove 81, the third through hole 84 and the fourth through hole 85 collinear, the locking plate 82 is plugged into the slot 86 under the action of the third spring 83, thereby reducing the possibility of the anchor rod 31 being lost;
[0052] S3, spraying concrete layer 21: after the anchor rods 31 are installed, the concrete layer 21 is sprayed on the water-facing surfaces of the plurality of precast concrete panels 2 .
[0053] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A detachable anchor rod connection structure based on foundation pit slope protection, characterized in that: The invention comprises a plurality of precast concrete panels (2) in contact with a slope protection (1), each of the precast concrete panels (2) being precast with an internally threaded pipe (3), each of the internally threaded pipes (3) being internally threadedly connected to an anchor rod (31), one end of the anchor rod (31) being provided with a rotating portion (32), and the other end being fixedly connected to a drill bit (33); a concrete layer (21) is sprayed on a side of the plurality of precast concrete panels (2) away from the slope protection (1); and a drainage system (4) for discharging water in the foundation pit is installed at the top of the foundation pit.
2. A detachable anchor rod connection structure based on foundation pit slope protection according to claim 1, characterized in that: The drainage system (4) comprises a drainage pump (41) installed on the top of the foundation pit, a water inlet pipe (42) connected to the water inlet of the drainage pump (41), and a drainage pipe (43) connected to the drainage outlet of the drainage pump (41).
3. The detachable anchor rod connection structure based on foundation pit slope protection according to claim 1 is characterized in that: A limiting device (5) is installed in the internally threaded tube (3), and the limiting device (5) comprises a plurality of first sliding grooves (51) opened on the inner wall of the internally threaded tube (3) and a plurality of movable plates (52) slidably connected to the plurality of first sliding grooves (51) in a one-to-one manner; one end of each movable plate (52) away from the rotating part (32) is fixedly connected to a limiting pointed rod (53); a pushing mechanism (55) for pushing the plurality of movable plates (52) to move is installed on the anchor rod (31), and one end of each movable plate (52) away from the rotating part (32) is fixedly connected to a first spring (54), and one end of the first spring (54) away from the movable plate (52) is fixedly connected to the bottom of the first sliding groove (51).
4. The detachable anchor rod connection structure based on foundation pit slope protection according to claim 3 is characterized in that: The pushing mechanism (55) comprises an annular plate (551) rotatably connected to the outer wall of the anchor rod (31) and a plurality of push rods (552) fixed to one end of the annular plate (551) away from the rotating part (32); an annular groove (553) for allowing the annular plate (551) to move is formed on the inner wall of the internal threaded tube (3); one end of the plurality of push rods (552) away from the annular plate (551) is in one-to-one correspondence with one end of the plurality of movable plates (52) close to the rotating part (32).
5. A detachable anchor rod connection structure based on foundation pit slope protection according to claim 4, characterized in that: A T-shaped block (22) and a T-shaped groove (23) are provided between two adjacent precast concrete panels (2); the T-shaped block (22) is slidably connected to the T-shaped groove (23), and one end of the T-shaped groove (23) extends to the internal threaded pipe (3); a limiting component (6) for limiting the T-shaped block (22) is installed in the first sliding groove (51).
6. A detachable anchor rod connection structure based on foundation pit slope protection according to claim 5, characterized in that: One end of two adjacent precast concrete panels (2) is provided with a pre-positioning block (24) and a pre-positioning groove (25), and the pre-positioning block (24) is plugged into the pre-positioning groove (25).
7. The detachable anchor rod connection structure based on foundation pit slope protection according to claim 5 is characterized in that: The limiting assembly (6) comprises a first through hole (61) provided on the side wall of the first slide groove (51) and a limiting block (62) slidably connected to the first through hole (61); an end of the limiting block (62) close to the movable plate (52) is provided with an inclined surface (621), and the inclined surface (621) matches the side wall of the movable plate (52); a limiting groove (63) is provided on one side of the T-shaped block (22), and an end of the limiting block (62) away from the inclined surface (621) is inserted into the limiting groove (63); a sliding block (64) is fixedly connected to one side of the limiting block (62), a second slide groove (65) is provided on one side of the first through hole (61), and the sliding block (64) is slidably connected to the second slide groove (65), a second spring (66) is fixedly connected to one side of the sliding block (64), and an end of the second spring (66) away from the sliding block (64) is fixedly connected to an inner wall of one end of the second slide groove (65).
8. The detachable anchor rod connection structure based on foundation pit slope protection according to claim 3 is characterized in that: An observation rod (7) is fixedly connected to the top of each movable plate (52), and a second through hole (511) for allowing the observation rod (7) to move is provided on the top wall of the first sliding groove (51).
9. A detachable anchor rod connection structure based on foundation pit slope protection according to claim 8, characterized in that: A plurality of anti-theft devices (8) are installed on the top of the internally threaded tube (3), and each group of the anti-theft devices (8) includes a third slide groove (81) opened on one side of the second through hole (511), a locking plate (82) slidably connected to the third slide groove (81), and a third spring (83) fixed to one end of the locking plate (82); a third through hole (84) is opened on the observation rod (7), a fourth through hole (85) is opened on the side wall of the internally threaded tube (3), a hexagonal hole (321) is opened on the top of the rotating part (32), and a slot (86) is opened on the circumferential surface of the rotating part (32). When the observation rod (7) moves to make the third slide groove (81), the third through hole (84) and the fourth through hole (85) open, the observation rod (7) is locked. When the through holes (85) are in line, the end of the locking plate (82) away from the third spring (83) is inserted into the slot (86); the end of the third spring (83) away from the locking plate (82) is fixedly connected to the inner wall of one end of the third slide groove (81); in the initial state, the end of the locking plate (82) away from the third spring (83) abuts against the side wall of the observation rod (7), and the third spring (83) is in a compressed state; a push block (87) is fixedly connected to the top of the locking plate (82), and a strip hole (811) is provided on the top wall of the third slide groove (81) for the push block (87) to slide, and an elastic folding plate (88) is provided between the push block (87) and one end of the strip hole (811).
10. The application method of the detachable anchor rod connection structure based on foundation pit slope protection according to claim 1, based on the detachable anchor rod connection structure based on foundation pit slope protection according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, splicing precast concrete panels: moving the precast concrete panels (2) to connect the T-shaped blocks (22) with the T-shaped grooves (23) and to plug the pre-positioning blocks (24) with the pre-positioning grooves (25); S2. Installing the anchor rod: first move the anchor rod (31) into the internal threaded tube (3), then rotate the anchor rod (31) several times to preliminarily connect the anchor rod (31) with the internal threaded tube (3), then insert the output end of the electric tool into the internal hexagonal hole (321), then drive the rotating part (32) to rotate by the electric tool, and the rotation of the rotating part (32) drives the anchor rod (31) to rotate, at this time, the anchor rod (31) can be rotated into the soil of the foundation pit slope under the action of the drill bit (33), so that the anchor rod (31) can be installed; furthermore, when the anchor rod (31) moves, it drives the annular plate (551) to move, and the movement of the annular plate (551) drives the push rod (552) to move, and the movement of the push rod (552) drives the moving plate (52) to move, and the moving plate (52) drives the limiting pointed rod (551) to move. 3) movement, so that the limiting pointed rod (53) can be connected to the soil of the foundation pit slope, thereby improving the stability of the internal threaded pipe (3); in addition, when the movable plate (52) moves, the movable plate (52) drives the limiting block (62) to be plugged into the limiting groove (63) under the action of the inclined surface (621), so that the T-shaped block (22) can be limited, thereby improving the overall stability of the plurality of precast concrete panels (2); furthermore, the movement of the movable plate (52) drives the observation rod (7) to move, and when the observation rod (7) moves to make the third slide groove (81), the third through hole (84) and the fourth through hole (85) collinear, the locking plate (82) is plugged into the slot (86) under the action of the third spring (83), thereby reducing the possibility of the anchor rod (31) being lost; S3, spraying concrete layer: after the anchor rods (31) are installed, a concrete layer (21) is sprayed on the water-facing surfaces of the plurality of prefabricated concrete panels (2).