Reinforcing steel bar protective layer and plate surface thickness control mechanism
By designing an adjustable steel protective layer and slab thickness control mechanism, and using adjustable rods and fluorescent positioning disks, the problem of difficult observation of the control surface at night during the concrete pouring process is solved, and accurate control of the steel protective layer and slab thickness is achieved. Adjust and monitor.
Patent Information
- Application Number
- CN202411004616.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-15
AI Technical Summary
During the concrete pouring process, the thickness of the protective layer of steel bars and the thickness of the slab are difficult to effectively control at night, especially because the height of the steel bars on the wall columns is difficult to observe, making it difficult to ensure the accuracy of the design parameters during the concrete pouring process.
A steel protective layer and plate thickness control mechanism including lower pads and upper pads is designed. Through the adjustable first, second and third adjustment rods, and fluorescent positioning plates, the bottom steel bars and plate thickness can be adjusted at night. The thickness of the slab ensures surface control accuracy during concrete pouring.
This mechanism can adjust the thickness of the underlying steel bars and slabs as needed, and can effectively observe and control the design surface of pouring even at night, ensuring that the parameters during the concrete pouring process meet the design requirements.
Smart Images

Figure CN118774334A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of concrete construction, and in particular relates to a steel bar protective layer and a plate surface thickness control mechanism. Background Art
[0002] During the concrete pouring construction process, the thickness of the steel bar protection layer is generally controlled by concrete pads and steel stirrups. Once determined, it cannot be adjusted. The slab thickness is generally controlled by observing the downward height of the steel bars on the wall columns. However, concrete pouring is usually carried out at night, and the downward height of the steel bars on the wall columns is not easy to observe. Summary of the invention
[0003] The purpose of the present invention is to provide a steel bar protective layer and plate surface thickness control mechanism, which can adjust the bottom steel bar and the installation height of the bottom steel bar and the plate surface thickness as needed, and the pouring control surface can be well observed even at night.
[0004] The technical solution adopted by the present invention is: A steel bar protective layer and plate surface thickness control mechanism comprises a lower pad and an upper pad; the lower pad is provided with a first leg around the bottom, a first cross groove for accommodating the bottom steel bar is opened on the top surface, and a positioning installation groove is opened around the top surface, and a first height-adjustable first adjustment rod is provided at the bottom end of the first leg; the upper pad is provided with a second leg around the bottom, a second cross groove for accommodating the top steel bar is opened on the top surface, and a third height-adjustable third adjustment rod is provided around the top surface, and a second height-adjustable second adjustment rod is provided at the bottom end of the second leg, the second adjustment rod corresponds to the positioning installation groove one by one and can be inserted into the corresponding positioning installation groove, and a positioning plate is provided at the top end of the third adjustment rod, and the top surface of the positioning plate is a fluorescent surface provided with fluorescent powder.
[0005] Preferably, the first adjusting rod comprises a first screw and a first sleeve, the upper portion of the first screw is embedded in the first leg, and the first sleeve is threadedly engaged with the lower portion of the first screw.
[0006] Preferably, the second adjusting rod includes a second screw and a second sleeve, the upper portion of the second screw is embedded in the second leg, the second sleeve is threadedly engaged with the lower portion of the second screw, and the aperture of the positioning and mounting groove is the same as the outer diameter of the second sleeve.
[0007] Preferably, the third adjusting rod comprises a third screw and a third sleeve, the lower portion of the third screw is embedded in the upper pad, the third sleeve is threadedly engaged with the upper portion of the third screw, and the positioning plate is fixed on the third sleeve.
[0008] Preferably, the lower pad and the upper pad are made of concrete blocks or cement blocks.
[0009] During operation, first adjust the height of the first adjusting rod according to the installation height of the bottom steel bars, adjust the height of the second adjusting rod according to the spacing between the top steel bars and the bottom steel bars, and adjust the height of the third adjusting rod according to the thickness of the board surface; then distribute the lower pads, and then place the bottom steel bars in the first cross groove to ensure that the bottom steel bars are at the designed height; then place the upper pads on the lower pads, so that the second adjusting rod is inserted into the corresponding positioning installation groove, and then place the top steel bars in the second cross groove to ensure that the top steel bars are at the designed height; finally, pour concrete, observe the fluorescent surface of the positioning plate during the pouring process and use it as the control surface for pouring to ensure that the board surface meets the designed thickness.
[0010] The beneficial effects of the present invention are: The mechanism can adjust the installation height of the bottom reinforcement and the bottom reinforcement as well as the thickness of the slab surface as needed, and the pouring control surface can be well observed even at night. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 Schematic diagram of the lower pad in the embodiment of the present invention.
[0012] Figure 2 Schematic diagram of an upper pad in an embodiment of the present invention.
[0013] Figure 3 It is a schematic diagram of the lower pad and the upper pad after installation in the embodiment of the present invention.
[0014] In the figure: 1-lower pad; 11-first leg; 12-first adjusting rod; 121-first screw; 122-first sleeve; 13-first cross slot; 14-positioning mounting slot; 2-upper pad; 21-second leg; 22-second adjusting rod; 221-second screw; 222-second sleeve; 23-second cross slot; 24-third adjusting rod; 241-third screw; 242-third sleeve; 25-positioning plate; 251-fluorescent surface. DETAILED DESCRIPTION
[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0016] This embodiment discloses a steel bar protective layer and a plate thickness control mechanism, such as Figures 1 to 3 As shown: it includes a lower pad 1 and an upper pad 2. Figure 1 and Figure 3 As shown, the bottom of the lower pad 1 is provided with a first leg 11, the top surface is provided with a first cross groove 13 for accommodating the bottom steel bar, the top surface is provided with a positioning installation groove 14, and the bottom end of the first leg 11 is provided with a first height-adjustable adjustment rod 12; Figure 2 and Figure 3As shown, the upper pad 2 is provided with second legs 21 around the bottom, a second cross groove 23 for accommodating the top layer of steel bars is opened on the top surface, and a third adjusting rod 24 with adjustable height is provided around the top surface. A second adjusting rod 22 with adjustable height is provided at the bottom end of the second leg 21. The second adjusting rod 22 corresponds to the positioning and mounting groove 14 one by one and can be inserted into the corresponding positioning and mounting groove 14. A positioning plate 25 is provided on the top of the third adjusting rod 24, and the top surface of the positioning plate 25 is a fluorescent surface 251 provided with fluorescent powder.
[0017] like Figure 1 As shown, in this embodiment, preferably: the first adjusting rod 12 includes a first screw rod 121 and a first sleeve 122 , the upper portion of the first screw rod 121 is embedded in the first leg 11 , and the first sleeve 122 is threadedly engaged with the lower portion of the first screw rod 121 .
[0018] like Figure 2 As shown, in this embodiment, preferably: the second adjusting rod 22 includes a second screw 221 and a second sleeve 222, the upper part of the second screw 221 is embedded in the second leg 21, the second sleeve 222 is threadedly engaged with the lower part of the second screw 221, and the aperture of the positioning installation groove 14 is the same as the outer diameter of the second sleeve 222; the third adjusting rod 24 includes a third screw 241 and a third sleeve 242, the lower part of the third screw 241 is embedded in the upper pad 2, the third sleeve 242 is threadedly engaged with the upper part of the third screw 241, and the positioning plate 25 is fixed on the third sleeve 242.
[0019] The lower pad 1 and the upper pad 2 are preferably made of concrete blocks or cement blocks.
[0020] When working: S1. Adjust the height of the first adjusting rod 12 according to the installation height of the bottom steel bar, adjust the height of the second adjusting rod 22 according to the distance between the top steel bar and the bottom steel bar, and adjust the height of the third adjusting rod 24 according to the thickness of the board surface; S2, distribute the lower pads 1, and then place the bottom steel bars in the first cross groove 13 to ensure that the bottom steel bars are at the designed height; S3, place the upper pad 2 on the lower pad 1, insert the second adjustment rod 22 into the corresponding positioning installation groove 14, and then place the top layer of steel bars in the second cross groove 23 to ensure that the top layer of steel bars is at the designed height; S4, pouring concrete. During the pouring process, observe the fluorescent surface 251 of the positioning plate 25 and use it as a control surface for pouring to ensure that the board surface meets the designed thickness.
[0021] The mechanism can adjust the installation height of the bottom reinforcement and the bottom reinforcement as well as the thickness of the slab surface as needed, and the pouring control surface can be well observed even at night.
[0022] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
Claims
1. A steel bar protective layer and plate surface thickness control mechanism, characterized in that: It includes a lower pad and an upper pad; the lower pad is provided with a first leg around the bottom, a first cross groove for accommodating the bottom layer of steel bars is opened on the top surface, and a positioning installation groove is opened around the top surface, and a first height-adjustable first adjustment rod is provided at the bottom end of the first leg; the upper pad is provided with a second leg around the bottom, a second cross groove for accommodating the top layer of steel bars is opened on the top surface, and a third height-adjustable third adjustment rod is provided around the top surface, and a second height-adjustable second adjustment rod is provided at the bottom end of the second leg, the second adjustment rod corresponds to the positioning installation groove one by one and can be inserted into the corresponding positioning installation groove, and a positioning plate is provided at the top end of the third adjustment rod, and the top surface of the positioning plate is a fluorescent surface provided with fluorescent powder.
2. The steel bar protective layer and plate thickness control mechanism according to claim 1, characterized in that: The first adjusting rod comprises a first screw rod and a first sleeve. The upper portion of the first screw rod is pre-buried in the first leg, and the first sleeve is threadedly engaged with the lower portion of the first screw rod.
3. The steel bar protective layer and plate thickness control mechanism according to claim 1, characterized in that: The second adjusting rod includes a second screw and a second sleeve. The upper part of the second screw is embedded in the second leg. The second sleeve is threadedly engaged with the lower part of the second screw. The aperture of the positioning installation slot is the same as the outer diameter of the second sleeve.
4. The steel bar protective layer and plate thickness control mechanism according to claim 1, characterized in that: The third adjusting rod comprises a third screw and a third sleeve. The lower part of the third screw is embedded in the upper pad. The third sleeve is threadedly matched with the upper part of the third screw. The positioning plate is fixed on the third sleeve.
5. The steel bar protective layer and plate thickness control mechanism according to claim 1, characterized in that: The lower pad and the upper pad are made of concrete blocks or cement blocks.
6. The steel bar protective layer and plate thickness control mechanism according to any one of claims 1 to 5, characterized in that: During operation, first adjust the height of the first adjusting rod according to the installation height of the bottom steel bars, adjust the height of the second adjusting rod according to the spacing between the top steel bars and the bottom steel bars, and adjust the height of the third adjusting rod according to the thickness of the board surface; then distribute the lower pads, and then place the bottom steel bars in the first cross groove to ensure that the bottom steel bars are at the designed height; then place the upper pads on the lower pads, so that the second adjusting rod is inserted into the corresponding positioning installation groove, and then place the top steel bars in the second cross groove to ensure that the top steel bars are at the designed height; finally, pour concrete, observe the fluorescent surface of the positioning plate during the pouring process and use it as the control surface for pouring to ensure that the board surface meets the designed thickness.
Citation Information
Patent Citations
Floor slab concrete and reinforcing steel bar protective layer thickness control device and using method thereof
CN113187158A
Multi-layer floor steel bar spacing and protective layer controller
CN114351946A
Toilet caisson plate thickness control construction tool
CN211873880U
Adjustable concrete cushion block based on double-layer bidirectional steel bars
CN217439356U