Steel member conveying equipment for iron tower installation
By designing a steel component conveying equipment for transmission tower installation, using lock connection and loading notch structure, the problem of low installation efficiency caused by repeated transportation of steel components is solved, and efficient and safe steel component hoisting is achieved.
Patent Information
- Application Number
- CN202411048756.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-15
AI Technical Summary
During the installation process of transmission towers, repeated transportation of steel components results in a heavy workload and affects installation efficiency.
Design a steel component conveying equipment for tower installation. The connecting seats of eight steel component carriers are connected through locks to form a circular structure. The steel components are supported by loading notches and partitions, which reduces manual handling and improves hoisting efficiency.
It achieves stable and safe hoisting of steel components, reduces the handling pressure of workers, and improves installation efficiency.
Smart Images

Figure CN118774467A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of power transmission iron tower installation, in particular to a steel component conveying device for iron tower installation. Background Art
[0002] Transmission towers are used to support overhead wires, lightning arresters and other accessories. They are tall structures that keep a specified safe distance between wires, wires and towers, wires and lightning arresters, and wires to the ground or crossover objects. Their structural characteristics are that all types of towers are space truss structures, and the rods are mainly composed of single equilateral angle steel or combined angle steel. The rods are connected by rough bolts and connected by shear force. The whole tower is composed of angle steel, connecting steel plates and bolts. Some parts such as tower feet are welded from several steel plates into a combination, so hot-dip galvanizing, anti-corrosion, transportation and construction are extremely convenient.
[0003] When installing a transmission tower, it is necessary to go through on-site investigation, division of labor of construction management organization, tower construction entry, installation tower component inventory, construction plan, assembly and hoisting of each section - platform installation, hoisting, tightening of screws, correction of tower verticality, self-inspection and acceptance process. Among them, hoisting is the main means of transporting steel components to the construction site during the installation of the transmission tower, which is generally achieved by hoisting equipment equipped with hoisting ropes.
[0004] When installing existing transmission towers, it is necessary to place the steel components at corresponding positions on the ground according to the installation positions of different steel components so that they can be stably raised to the top during the hoisting process to reduce safety hazards. However, in actual application, due to the large amount of steel components and the heavy workload of repeatedly transporting the steel components, it is not conducive to improving the installation efficiency of the transmission tower. Summary of the invention
[0005] In order to overcome the problem that during the installation of existing transmission towers, it is necessary to place the steel components at corresponding positions on the ground according to the installation positions of different steel components, so that they can be stably lifted to the top during the lifting process. However, due to the large amount of steel components and the heavy workload of repeatedly transporting the steel components, it is not conducive to improving the installation efficiency of the transmission tower. An embodiment of the present application provides a steel component conveying equipment for tower installation. By connecting the eight steel component carriers to two adjacent connecting seats at the bottom by means of a lock, the eight steel component carriers carry several steel components with the help of loading slots to form a circle around the tower to be built, thereby ensuring the stability and safety of the structure. The steel components are respectively corresponding to the four sides and four corners of the tower, so as to support the lifting device to efficiently lift the steel components at the target position. There is no need for the staff to repeatedly carry the steel components to the bottom of the lifting position with the help of tools, which greatly alleviates the work pressure and improves the work efficiency.
[0006] The technical solution adopted by the embodiment of the present application to solve the technical problem is:
[0007] A steel component conveying device for tower installation includes a steel component carrier and a connecting seat, wherein two connecting seats are provided and are respectively located on both sides of the bottom of the steel component carrier;
[0008] Wherein, the steel component carrier comprises a carrier, a loading notch is processed inside the carrier, a plurality of partitions are processed at the side wall of the loading notch, a first seat is processed on the middle and bottom surfaces of one side of the carrier, a first support sleeve is rotatably connected inside the first seat, a second seat is processed on the top and middle of the other side of the carrier, a support bolt is processed on the top surface of one end of the second seat, a second support sleeve is sleeve-connected outside the support bolt, and a binding strap is wrapped between the outsides of the first support sleeve and the second support sleeve located at the same height;
[0009] The steel component carrier and two connecting seats are used in combination. The number of the steel component carriers is set to eight. The eight steel component carriers surround the base of the transmission tower. The two connecting seats on two adjacent steel component carriers are connected, and a lock is set between the two connected connecting seats.
[0010] In a possible implementation, a plurality of partitions divide the loading slot into a plurality of areas inside the carrier, the cross section of the loading slot is a right-angled trapezoid, and the iron tower steel member leans against the side wall of the loading slot.
[0011] In one possible implementation, the top sleeve connection of the support bolt is provided with a limit plate, the diameter of the limit plate is larger than the diameter of the second support sleeve, and one end of the support bolt is threadedly connected with a nut, which limits the second support sleeve from moving toward the top along the axial direction outside the support bolt and supports the second support sleeve to rotate outside it.
[0012] In a possible implementation, a limiting plate is provided at the bottom of the loading slot, the bottom of the limiting plate is hingedly connected to the loading rack, and the tower steel member loaded into the loading slot is supported by the bottom of the limiting plate.
[0013] In one possible implementation, a sliding seat is processed at the center of one side surface of the limit plate, a limiting strip groove is processed inside the sliding seat, a support plate is slidably connected to the inside of the sliding seat, a sliding rod is pin-connected to the inside of one end of the support plate, a groove is processed at the bottom inner wall of the loading slot, the sliding rod is slidably connected to the inside of the limiting strip groove, the top of the support plate is inclined at the bottom of the limiting strip groove, and is supported at the bottom inner wall of the loading slot.
[0014] In a possible implementation, the bottoms of both sides of the cargo rack are processed with storage slots, the lock head includes a connecting plate, both ends of the connecting plate are processed with plug-in rods, the top center of the connecting seat is hinged and fixed to the bottom surface of one side of the cargo rack, one end of the connecting seat is retractably connected to the inside of the storage slot, and the two plug-in rods are respectively plugged into the two connected connecting seats.
[0015] In a possible implementation, the bottom surfaces on both sides of the cargo rack are welded to a fixed frame seat, the top and bottom of one end of the fixed frame seat are processed with storage column grooves, and the two corners of one end of the connecting seat are assembled with universal wheels, a connecting rod on the lock head passes through the interior of the connecting seat and is inserted into the interior of a storage column groove on the fixed frame seat, and the other connecting rod on the lock head is directly inserted into the interior of another storage column groove on the fixed frame seat.
[0016] In a possible implementation, a C-shaped ring is clamped on the inner wall of the storage column groove, a limiting ring groove is processed on the surface of one end of the plug-in rod, and the C-shaped ring is buckled inside the limiting ring groove.
[0017] In a possible implementation, a nameplate is inlaid on the surface of the bottom of the carrier, letters are formed on the surface of the nameplate, and the eight steel component carriers are distinguished by the letters on their respective nameplates.
[0018] The beneficial effects of this application are:
[0019] First, in this scheme, by using the lock head to connect between two adjacent connection seats at the bottom of the eight steel component carriers, the eight steel component carriers can carry several steel components with the help of loading slots to form a circle around the iron tower to be built, ensuring the stability and safety of the structure. The lock heads correspond to the four sides and four corners of the iron tower respectively, which can support the lifting device to efficiently lift the steel components at the target position. There is no need for the staff to repeatedly move the steel components to the bottom of the lifting position with the help of tools, which greatly relieves the work pressure and improves the work efficiency.
[0020] Second, in this solution, the connection seat is controlled to rotate around the hinge point between the connection seat and the load carrier, so that the connection seat is switched from a horizontal state to a vertical state. After a plug-in rod is inserted into a storage column slot through the connection seat, and another plug-in rod is directly inserted into another storage column slot, the connection seat can drive two universal wheels to be vertically fixed to the bottom of one side of the load carrier, so that when the load carrier is erected, the partition is supported on the ground, which facilitates the transfer of the steel component carrier;
[0021] Third, in this scheme, by controlling the limit plate to rotate around the hinge point with the carrier, and controlling the support plate to tilt at the bottom of the limit bar groove and support it at the bottom inner wall of the loading slot, the limit plate can be limited from rotating around the hinge point with the carrier, and when the support plate is retracted into the interior of the slide seat, the limit plate can be rotated around the hinge point with the carrier to release the space between the top of the limit plate and the partition, so that the steel structure inside the loading slot is controlled to be easy to tilt, which is convenient for controlling the steel structure to be stably stored inside the loading slot or controlling the steel structure to tilt inside the loading slot according to actual usage requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of a steel component conveying device for tower installation according to the present invention;
[0023] Figure 2 The present invention is a steel component conveying equipment for tower installation Figure 1 The enlarged schematic diagram of the middle A part;
[0024] Figure 3 It is a structural schematic diagram of a steel component carrier of a steel component conveying equipment for iron tower installation according to the present invention;
[0025] Figure 4 The present invention is a steel component conveying equipment for tower installation Figure 3 The enlarged schematic diagram of the middle part B;
[0026] Figure 5 This is a structural schematic diagram of the bottom of a carrier frame of a steel component conveying device for tower installation according to the present invention;
[0027] Figure 6 It is a structural schematic diagram of the side of a carrier frame of a steel component conveying equipment for tower installation according to the present invention;
[0028] Figure 7 A cross-sectional view of a fixing bracket of a steel component conveying equipment for installing an iron tower according to the present invention;
[0029] Figure 8 The present invention is a steel component conveying equipment for tower installation Figure 7 Enlarged schematic diagram of part C in the middle.
[0030] Reference numerals:
[0031] 1. Steel component carrier; 101. Carrying rack; 102. Partition plate; 103. Limit plate; 104. First support sleeve; 105. First seat; 106. Second seat; 107. Second support sleeve; 108. Support bolt;
[0032] 2. Loading notch; 3. Nameplate; 4. Limit plate; 5. Sliding seat; 6. Connecting seat; 7. Lock; 701. Connecting rod; 702. Connecting plate; 8. Fixed frame seat; 9. Limiting strip groove; 10. Sliding rod; 11. Support plate; 12. Universal wheel; 13. Storage notch; 14. Storage column groove; 15. C-shaped ring; 16. Limiting ring groove. DETAILED DESCRIPTION
[0033] The technical solution in the embodiment of the present application is to solve the problems of the above-mentioned background technology, and the overall idea is as follows:
[0034] Embodiment 1:
[0035] This embodiment introduces a specific structure of a steel component conveying equipment for tower installation. Figure 1-Figure 8 As shown, it includes a steel component carrier 1 and two connecting seats 6 respectively located on both sides of the bottom of the steel component carrier 1, the steel component carrier 1 includes a carrier 101, the carrier 101 is processed with a loading slot 2 inside, and a plurality of partitions 102 are processed on the side wall of the loading slot 2, a first seat 105 is processed on the middle and bottom surfaces of one side of the carrier 101, and a first support sleeve 104 is rotatably connected inside the first seat 105, and a second seat 106 is processed on the top and middle of the other side of the carrier 101, a support bolt 108 is processed on the top surface of one end of the second seat 106, and a second support sleeve 107 is sleeve-connected to the outside of the support bolt 108,
[0036] The loading slot 2 is divided into a plurality of areas by using a plurality of partitions 102 inside the carrier 101, and the cross section of the loading slot 2 is set to a right-angle trapezoid. When the iron tower steel components are placed inside the loading slot 2, they can be classified by using a plurality of partitions 102, and the iron tower steel components lean against the inclined side walls of the loading slot 2, so that the steel components can be prevented from falling down when the carrier 101 is in an upright state.
[0037] At the same time, by wrapping the straps between the first support sleeve 104 and the second support sleeve 107 located at the same height, a barrier is formed at the middle and top openings of one side of the carrier 101 by means of the straps, which is helpful to prevent the steel components from falling out of the loading slot 2 during the transportation and handling of the carrier 101;
[0038] Secondly, in order to facilitate the binding of the strap between the first support sleeve 104 and the second support sleeve 107, as shown in FIG. Figure 3 and Figure 6As shown, the top sleeve of the support bolt 108 is connected to the limiting plate 103 in a sleeve-type manner. By setting the diameter of the limiting plate 103 to be larger than the diameter of the second support sleeve 107, and a nut is threadedly connected to one end of the support bolt 108, the second support sleeve 107 is limited to move toward the top along the axial direction outside the support bolt 108, and the second support sleeve 107 is supported to rotate outside it. Since the first support sleeve 104 is supported and assembled by the first sleeve seat 105, one end of the strap can pass through the gap between the first support sleeve 104 and the surface of the carrier 101. Although the top of the second support sleeve 107 is blocked by the limiting plate 103, there is still a gap between the limiting plate 103 and the surface of the carrier 101, so that when the strap is released, the strap connected to the outside of the second support sleeve 107 is loosened, and the strap is removed from the bottom to the top across the limiting plate 103;
[0039] In some examples, a steel component carrier 1 and two connecting seats 6 are used in combination, and the number of steel component carriers 1 is set to eight, and the eight steel component carriers 1 surround the base of the transmission tower. By connecting the two connecting seats 6 on two adjacent steel component carriers 1, and setting a lock 7 between the two connected connecting seats 6, the two adjacent connecting seats 6 at the bottom of the two adjacent steel component carriers 1 can be connected and fixed with the help of multiple locks 7, so that the eight steel component carriers 1 form a circle around the tower, and the eight steel component carriers 1 correspond to the four sides and four corners of the tower respectively, which is convenient for the lifting device to repeatedly and efficiently lift the steel components at a fixed position;
[0040] The bottom of both sides of the carrier 101 is processed with a receiving slot 13, the lock head 7 includes a connecting plate 702, both ends of the connecting plate 702 are processed with a plug-in rod 701, one end of the connecting seat 6 is retractably connected to the inside of the receiving slot 13, and the two plug-in rods 701 are respectively plugged into the inside of the two connected connecting seats 6;
[0041] At the same time, in order to distinguish the eight steel component carriers 1, the eight steel component carriers 1 can be accurately placed around the iron tower to be installed, such as Figure 1 As shown, a nameplate 3 is inlaid on the surface of the bottom of the carrier 101. By molding letters on the surface of the nameplate 3, the letters are specific, so that the eight steel component carriers 1 can be distinguished by the letters on their respective nameplates 3;
[0042] In addition, the number of steel component carriers 1 can also be set to four to correspond to the four sides of the bottom of the iron tower, and the size of the connecting seat 6 can be adjusted to meet actual usage requirements;
[0043] Furthermore, a limit plate 4 is provided at the bottom of the loading slot 2, and the bottom of the limit plate 4 is hingedly connected to the load rack 101. The tower steel member loaded into the loading slot 2 is supported at the bottom of the limit plate 4, which can prevent the bottom of the steel member from being supported at the bottom inner wall of the loading slot 2 and sliding outward from the inside of the loading slot 2, thereby ensuring the safety of use;
[0044] At the same time, in order to take out the steel component from the inside of the loading slot 2, the limiting plate 4 can be adjusted to block the bottom movement of the steel component, such as Figure 3 and Figure 4 As shown, a slide 5 is processed at the center of one side surface of the limit plate 4, and a limit strip groove 9 is processed inside the slide 5. The slide 5 is slidably connected to a support plate 11 inside, and a slide rod 10 is pin-connected to one end of the support plate 11. A groove is processed at the bottom inner wall of the loading slot 2 to allow the slide rod 10 to slide inside the limit strip groove 9. After controlling the top of the support plate 11 to tilt at the bottom of the limit strip groove 9 and support it at the bottom inner wall of the loading slot 2, the limit plate 4 can be limited to rotate around the hinge point with the carrier 101, so that the surface of the limit plate 4 fits with the surface of the partition 102. When the support plate 11 is retracted into the interior of the slide 5, the limit plate 4 can be rotated around the hinge point with the carrier 101 to release the space between the top of the limit plate 4 and the partition 102, so that the steel structure inside the loading slot 2 can be tilted under control.
[0045] Embodiment 2:
[0046] Based on Example 1, this example introduces the specific structure of the carrier 101. The bottom surfaces on both sides of the carrier 101 are welded with fixed frame seats 8, the top and bottom of one end of the fixed frame seat 8 are processed with storage column grooves 14, and the two corners of one end of the connecting seat 6 are assembled and connected with universal wheels 12;
[0047] The top center of the connecting seat 6 is hinged and fixed on the bottom surface of one side of the carrier 101. By controlling the connecting seat 6 to rotate around the hinge point between the connecting seat 6 and the carrier 101, the connecting seat 6 is switched from a horizontal state to a vertical state. After a plug-in rod 701 on the lock head 7 is inserted into a storage column groove 14 on the fixing frame seat 8 through the inside of the connecting seat 6, and another plug-in rod 701 on the lock head 7 is directly inserted into another storage column groove 14 on the fixing frame seat 8, the connecting seat 6 can be vertically fixed to the bottom of one side of the carrier 101, and the universal wheel 12 is driven to switch to a vertical state, so that when the carrier 101 is erected, the partition 102 is supported on the ground to assist the transfer of the carrier 101.
[0048] Secondly, in order to fix the lock head 7 between the connecting seat 6 and the fixing frame seat 8 when the connecting seat 6 is in a vertical state, so as to limit the rotation of the connecting seat 6 around the hinge point between the connecting seat 6 and the carrier 101, as shown in FIG. Figure 7 and Figure 8 As shown, a C-shaped ring 15 is clamped on the inner wall of the storage column groove 14, and a limiting ring groove 16 is processed on the surface of one end of the connecting rod 701. By applying pressure on the C-shaped ring 15 with the help of one end of the connecting rod 701 so that the C-shaped ring 15 is buckled into the inside of the limiting ring groove 16, the connecting rod 701 can be restricted from detaching from the inside of the storage column groove 14 in the absence of axial force.
[0049] Specifically, when the steel component conveying equipment for tower installation is used to pack the steel components of the transmission tower:
[0050] First, in the factory, the steel structure parts are distinguished according to the steel structure installation and lifting positions, and the steel components are matched with the steel component carrier 1 with reference to the letter marks on the nameplate 3;
[0051] Then, according to the size of the steel component, it is loaded into the loading slot 2 on the carrier 101 and separated by a plurality of partitions 102. The limiting plate 4 is controlled to rotate around the hinge point between the limiting plate 4 and the carrier 101 so that the surface of the limiting plate 4 fits with the surface of the partition 102. Then, the top of the support plate 11 is controlled to rotate at the bottom of the limiting strip groove 9 and supported inside the strip groove at the bottom inner wall of the loading slot 2, so that the bottom of the steel component is located on the side of the limiting plate 4 close to the partition 102, and the limiting plate 4 restricts the bottom of the steel component from sliding out of the loading slot 2 along the bottom inner wall of the loading slot 2.
[0052] Next, pass the strap through the gap between the first support sleeve 104 and the surface of one side of the carrier 101, and tie the strap when passing through the gap between the second support sleeve 107 and the other side of the carrier 101. Because the first support sleeve 104 is supported by the first seat 105, the up and down movement of the strap can be restricted, and the second support sleeve 107 is supported by the second seat 106 and the support bolt 108. The top of the support bolt 108 is equipped with a limit plate 103 to restrict the strap from sliding from the outside of the second support sleeve 107 to the top, which is beneficial to ensure safety.
[0053] At the same time, when using the steel component conveying equipment for tower installation to install the steel components of the transmission tower:
[0054] First, insert one plug rod 701 on the lock head 7 through the interior of the connecting seat 6 and insert it into the interior of a storage column groove 14 on the fixing frame seat 8, so that another plug rod 701 on the lock head 7 is directly inserted into the interior of another storage column groove 14 on the fixing frame seat 8, and then the C-shaped ring 15 inside the storage column groove 14 is buckled into the limiting ring groove 16 at one end of the plug rod 701 to limit the plug rod 701 from being separated from the interior of the storage column groove 14, so as to ensure that the connecting seat 6 drives the universal wheel 12 to be stably in a vertically set state, and the universal wheel 12 can assist the carrier 101 to be transported to the tower construction area;
[0055] Then, according to the specific orientation of the tower, with the help of the mark on the nameplate 3, the eight steel component carriers 1 are placed on the ground in the corresponding manner, and an axial pulling force is applied to the plug rod 701, so that one end of the plug rod 701 overcomes the resistance of the first set seat 105 and detaches from the inside of the storage column slot 14, so that the connecting seat 6 rotates around the hinge point between it and the carrier 101, and after one end of the connecting seat 6 drives the universal wheel 12 to be retracted into the inside of the storage slot 13, the carrier 101 is erected;
[0056] Next, eight steel component carriers 1 are assembled and arranged in a circle, so that the two connection seats 6 at the bottom of two adjacent steel component carriers 1 are connected, and two plug-in rods 701 are respectively inserted into the two connection seats 6 to fix the two adjacent connection seats 6, thereby connecting and fixing the two steel component carriers 1. After the eight steel component carriers 1 are connected and fixed, the form of surrounding the circle can prevent any one of the steel component carriers 1 from tipping over, thereby ensuring construction safety.
[0057] Finally, the support plate 11 is retracted into the interior of the slide 5, and the limit plate 4 is rotated around the hinge point between the limit plate 4 and the load rack 101, releasing the space between the top of the limit plate 4 and the partition 102, and the straps tied between the first support sleeve 104 and the second support sleeve 107 are loosened, so that the steel structure inside the loading slot 2 can be tilted under control, making it easier to tie the steel structure to the lifting device for lifting work.
[0058] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A steel component conveying equipment for tower installation, characterized in that: include: Steel component carrier (1); Two connecting seats (6) are provided and are respectively located on two sides of the bottom of the steel component carrier (1); The steel component carrier (1) comprises a carrier (101), a loading slot (2) is processed inside the carrier (101), a plurality of partitions (102) are processed at the side wall of the loading slot (2), a first seat (105) is processed on the middle and bottom surfaces of one side of the carrier (101), a first support sleeve (104) is rotatably connected inside the first seat (105), a second seat (106) is processed on the top and middle of the other side of the carrier (101), a support bolt (108) is processed on the top surface of one end of the second seat (106), a second support sleeve (107) is sleeve-connected on the outside of the support bolt (108), and a binding strap is wrapped around the outside of the first support sleeve (104) and the second support sleeve (107) located at the same height; The steel component carrier (1) and two connecting seats (6) are used in combination, the number of the steel component carriers (1) is set to eight, the eight steel component carriers (1) surround the base of the power transmission tower, the two connecting seats (6) on two adjacent steel component carriers (1) are connected, and a lock (7) is provided between the two connected connecting seats (6).
2. The steel component conveying equipment for tower installation according to claim 1, characterized in that: The plurality of partitions (102) divide the loading slot (2) into a plurality of areas inside the carrier (101); the cross section of the loading slot (2) is a right-angled trapezoid, and the iron tower steel member rests on the side wall of the loading slot (2).
3. The steel component conveying equipment for tower installation according to claim 1, characterized in that: The top of the support bolt (108) is sleeve-connected with a limit plate (103), the diameter of the limit plate (103) is larger than the diameter of the second support sleeve (107), and one end of the support bolt (108) is threadedly connected with a nut, which limits the second support sleeve (107) from moving toward the top along the axial direction outside the support bolt (108) and supports the second support sleeve (107) to rotate outside it.
4. The steel component conveying equipment for tower installation according to claim 1, characterized in that: A limiting plate (4) is provided at the bottom of the loading slot (2), the bottom of the limiting plate (4) is hingedly connected to the object carrier (101), and the iron tower steel component loaded into the loading slot (2) is supported on the bottom of the limiting plate (4).
5. The steel component conveying equipment for tower installation according to claim 4, characterized in that: A slide seat (5) is processed at the center of one side surface of the limit plate (4), a limit strip groove (9) is processed inside the slide seat (5), a support plate (11) is slidably connected inside the slide seat (5), a slide rod (10) is pin-connected inside one end of the support plate (11), and a strip groove is processed at the bottom inner wall of the loading slot (2); The slide bar (10) is slidably connected inside the limiting groove (9), and the top of the support plate (11) is inclined at the bottom of the limiting groove (9) and supported on the bottom inner wall of the loading slot (2).
6. The steel component conveying equipment for tower installation according to claim 1, characterized in that: The bottoms of both sides of the object carrier (101) are processed with receiving notches (13), the lock head (7) comprises a connecting plate (702), and both ends of the connecting plate (702) are processed with plug-in rods (701); The top center of the connecting seat (6) is hingedly fixed to the bottom surface of one side of the loading rack (101), one end of the connecting seat (6) is retractably connected to the inside of the receiving slot (13), and the two plug-in rods (701) are respectively plugged into the inside of the two connected connecting seats (6).
7. The steel component conveying equipment for tower installation according to claim 6, characterized in that: The bottom surfaces of both sides of the object carrier (101) are welded to fixed frames (8), the top and bottom of one end of the fixed frames (8) are processed with storage column grooves (14), and the two corners of one end of the connection seat (6) are assembled and connected with universal wheels (12); Wherein, one plug-in rod (701) on the lock head (7) passes through the interior of the connecting seat (6) and is plugged into the interior of a storage column groove (14) on the fixing frame seat (8), and another plug-in rod (701) on the lock head (7) is directly plugged into the interior of another storage column groove (14) on the fixing frame seat (8).
8. The steel component conveying equipment for tower installation according to claim 7, characterized in that: A C-shaped ring (15) is clamped on the inner wall of the storage column groove (14), and a limiting ring groove (16) is processed on one end surface of the plug-in rod (701), and the C-shaped ring (15) is buckled inside the limiting ring groove (16).
9. The steel component conveying equipment for tower installation according to claim 1, characterized in that: A nameplate (3) is inlaid on the surface of the bottom of the object carrier (101), and letters are formed on the surface of the nameplate (3). The eight steel component carriers (1) are distinguished by the letters on their respective nameplates (3).