Foundation pile construction device for constructional engineering
By introducing the guide column and chute mechanism into the foundation pile construction device, combined with the motor-driven winch and push assembly, the problem of offset during the descent of the drill bit is solved, the accuracy and stability of the pile foundation are improved, and the service life of the equipment is extended. service life.
Patent Information
- Application Number
- CN202411134325.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing foundation pile construction equipment is prone to deflection due to wind, equipment vibration and uneven ground during the lowering process of the drill bit, causing the drilling position to be inconsistent with the designed position, affecting the accuracy and stability of the pile foundation.
A pile construction device including a base, an installation frame, a pile driving component and a positioning component is designed. The guide post and chute mechanism are used to maintain positioning during the descent of the drill bit. The motor drives the winch and the push component to adjust the position of the guide post to ensure that the drill bit is drilled. hole accuracy.
It effectively avoids drilling deviation, improves the accuracy and stability of the pile foundation, reduces drill bit wear through rolling friction, extends the service life, and increases the versatility of the device.
Smart Images

Figure CN118774591A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a construction engineering foundation pile construction device. Background Art
[0002] Pile construction equipment, as an indispensable and important equipment in modern construction projects, mainly serves the pile foundation construction process to ensure the stability and safety of the building foundation. Such devices usually include various types, such as pile drivers, vibrating pile sinkers, bored pile drilling machines, etc., each of which has different working principles and scopes of application. In the existing pile construction equipment, when the drill bit is driven down by the wire rope so that the drill bit can drill holes in the ground, the drill bit may be offset during the descent process due to factors such as wind force, equipment vibration, and uneven ground, resulting in the drilling position not being consistent with the designed position, affecting the accuracy and stability of the pile foundation. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a construction engineering pile foundation construction device, which solves the problem that when the steel wire rope drives the drill bit to descend so that the drill bit can drill a hole in the ground, the drill bit may shift during the descent due to factors such as wind force, equipment vibration, and uneven ground, resulting in the drilling position not being consistent with the designed position, thereby affecting the accuracy and stability of the pile foundation.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] A construction engineering foundation pile construction device comprises a base, a plurality of mounting frames are fixedly mounted on the upper surface of the base, and a piling assembly for piling is commonly arranged on the upper end of each of the mounting frames;
[0006] A positioning component for positioning is arranged on the upper surface of the base.
[0007] Preferably, the piling assembly comprises a mounting frame, which is fixedly mounted on the upper end of each mounting frame, and vertical plates are fixedly mounted on both sides of the upper surface of the mounting frame, and a winch is rotatably mounted between the two vertical plates, a steel wire rope is wound on the surface of the winch, and the lower end of the steel wire rope passes through the mounting frame and is provided with an integral drill bit;
[0008] A first motor is fixedly mounted on one side of one of the vertical plates through a bracket, and an output shaft end of the first motor passes through the corresponding vertical plate and is fixedly connected to the output shaft end of the first motor.
[0009] Preferably, the positioning assembly comprises a plurality of right-angle brackets, each of which is movably arranged on the upper surface of the base, and each of which is fixedly mounted with a guide column on one side of the right-angle bracket close to the integral drill bit.
[0010] Preferably, a plurality of spherical grooves are provided on the surface of each guide column body, and a spherical block is rotatably mounted in each spherical groove.
[0011] Preferably, the upper surface of the base is provided with a plurality of slide grooves, each of which is provided with a sliding block, and the upper surface of each sliding block is fixedly connected to a corresponding right-angle frame;
[0012] A slide bar is fixedly installed between the two sides of the inner wall of each slide groove, and each slide block is slidably arranged on one side of the corresponding slide bar body;
[0013] A triangular plate is fixedly mounted on one side of each right-angle frame away from the spherical block, and a pushing component for pushing the right-angle frame is arranged on one side of the upper surface of the base.
[0014] Preferably, the pushing assembly includes a second motor, which is fixedly mounted on one side of the upper surface of the base, a screw is fixedly mounted on the output shaft end of the second motor, an annular plate is threadedly provided on the screw rod body, and a plurality of pushing columns are fixedly mounted on the inner wall of the annular plate.
[0015] Preferably, a limiting rod is fixedly mounted on the other side of the upper surface of the base, and the annular plate is slidably arranged on one side of the limiting rod body.
[0016] Preferably, a groove is formed on the surface of one end of each of the push columns away from the annular plate, and a rotating ball is rotatably installed in each of the grooves.
[0017] Preferably, an elastic member capable of compression and reset is sleeved on the other side of each slide rod body.
[0018] Preferably, the elastic member is a spring.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The staff controls the rotation of the drilling part of the integral drill bit, and then controls the first motor to make its output shaft drive the winch to rotate, so that the wire rope drives the integral drill bit to descend, so that the integral drill bit opens a hole on the working surface. During the descent of the integral drill bit, the positioning effect of the guide column can prevent the integral drill bit from deviating during the descent process, prevent the drilling position from being inconsistent with the designed position, thereby greatly increasing the accuracy and stability of the pile foundation.
[0021] 2. The staff starts the second motor so that its output shaft drives the annular plate to move along the slide rod, so that the pushing column pushes the inclined surface of the triangular plate, so that the triangular plate drives the right-angle frame and the guide column to move along the direction of the slide groove, thereby facilitating the staff to adjust the position of the guide column according to the diameter of the integral drill bit, thereby increasing versatility. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of a construction engineering foundation pile construction device of the present invention;
[0023] Figure 2 It is a schematic diagram of the top view of the structure of a construction engineering foundation pile construction device of the present invention;
[0024] Figure 3 A construction pile construction device for a building project according to the present invention Figure 2 Schematic diagram of the cross-section structure at AA in the middle;
[0025] Figure 4 This is a schematic diagram of the structure of another side of a construction engineering foundation pile construction device of the present invention;
[0026] Figure 5 A construction pile construction device for a building project according to the present invention Figure 3 The enlarged structural diagram at A in the middle;
[0027] Figure 6 A construction pile construction device for a building project according to the present invention Figure 4 Schematic diagram of the structure enlarged at B
[0028] In the figure: 1. base; 2. mounting frame; 3. piling assembly; 301. mounting frame; 302. vertical plate; 303. capstan; 304. wire rope; 305. integral drill bit; 306. bracket; 307. first motor; 4. positioning assembly; 401. right-angle frame; 402. guide column; 5. spherical block; 6. slide groove; 601. slider; 7. slide rod; 8. elastic member; 9. triangle plate; 10. pushing assembly; 1001. second motor; 1002. screw rod; 1003. annular plate; 1004. pushing column; 11. limit rod; 12. rotating ball. DETAILED DESCRIPTION
[0029] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0030] like Figure 1-Figure 6 As shown, a construction engineering foundation pile construction device comprises a base 1, a plurality of mounting frames 2 are fixedly mounted on the upper surface of the base 1, and a pile driving assembly 3 for pile driving is commonly arranged on the upper end of each mounting frame 2;
[0031] A positioning assembly 4 for positioning is disposed on the upper surface of the base 1 .
[0032] The piling assembly 3 includes a mounting frame 301, which is fixedly mounted on the upper end of each mounting frame 2. Vertical plates 302 are fixedly mounted on both sides of the upper surface of the mounting frame 301. A winch 303 is rotatably mounted between the two vertical plates 302. A steel wire rope 304 is wound on the surface of the winch 303. The lower end of the steel wire rope 304 passes through the mounting frame 301 and is provided with an integral drill bit 305.
[0033] A first motor 307 is fixedly mounted on one side of one of the vertical plates 302 via a bracket 306 , and an output shaft end of the first motor 307 passes through the corresponding vertical plate 302 and is fixedly connected to the output shaft end of the first motor 307 .
[0034] The positioning assembly 4 includes a plurality of right-angle brackets 401 , each of which is movably arranged on the upper surface of the base 1 , and a guide column 402 is fixedly installed on one side of each right-angle bracket 401 close to the integral drill bit 305 .
[0035] Through the above technical solution, the staff controls the rotation of the drilling part of the integral drill bit 305, and then controls the first motor 307 to make its output shaft drive the winch 303 to rotate, so that the wire rope 304 drives the integral drill bit 305 to descend, so that the integral drill bit 305 drills a hole on the working surface. During the descent of the integral drill bit 305, the positioning effect of the guide column 402 can prevent the integral drill bit 305 from deviating during the descent process, prevent the drilling position from being inconsistent with the designed position, and greatly increase the accuracy and stability of the pile foundation.
[0036] In this embodiment, a plurality of spherical grooves are formed on the surface of each guide column 402, and a spherical block 5 is rotatably mounted in each spherical groove.
[0037] By providing the spherical block 5, after the guide column 402 contacts the integral drill bit 305, the sliding friction generated between the integral drill bit 305 and the guide column 402 when the integral drill bit 305 rotates is converted into rolling friction, which greatly reduces the wear of the integral drill bit 305 and prolongs the service life of the integral drill bit 305.
[0038] It can be understood that in the present application, a plurality of slide grooves 6 are provided on the upper surface of the base 1, a slider 601 is slidably provided in each slide groove 6, and the upper surface of each slider 601 is fixedly connected to the corresponding right-angle bracket 401;
[0039] A slide bar 7 is fixedly installed between the two sides of the inner wall of each slide groove 6, and each slider 601 is slidably arranged on one side of the corresponding slide bar 7;
[0040] A triangular plate 9 is fixedly mounted on one side of each right-angle frame 401 away from the spherical block 5 , and a pushing component 10 for pushing the right-angle frame 401 is provided on one side of the upper surface of the base 1 .
[0041] The pushing assembly 10 includes a second motor 1001, which is fixedly mounted on one side of the upper surface of the base 1. A screw rod 1002 is fixedly mounted on the output shaft end of the second motor 1001. The screw rod 1002 is threadedly provided with an annular plate 1003. A plurality of pushing columns 1004 are fixedly mounted on the inner wall of the annular plate 1003.
[0042] A limiting rod 11 is fixedly mounted on the other side of the upper surface of the base 1 , and the annular plate 1003 is slidably disposed on one side of the rod body of the limiting rod 11 .
[0043] The staff starts the second motor 1001 so that its output shaft drives the annular plate 1003 to move along the limiting rod 11, so that the pushing column 1004 pushes the inclined surface of the triangular plate 9, so that the triangular plate 9 drives the right-angle frame 401 and the guide column 402 to move along the direction of the slide groove 6, thereby facilitating the staff to adjust the position of the guide column 402 according to the diameter of the integral drill bit 305, thereby increasing versatility.
[0044] It can be understood that in the present application, a groove is provided on the surface of one end of each push column 1004 away from the annular plate 1003, and a rotating ball 12 is rotatably installed in each groove.
[0045] By providing the rotating ball 12, the sliding friction between the pushing column 1004 and the inclined surface of the triangular plate 9 when pushing the triangular plate 9 is changed into rolling friction, which greatly prolongs the service life of the triangular plate 9.
[0046] It can be understood that in the present application, an elastic member 8 capable of compression and reset is respectively sleeved on the other side of the shaft of each slide rod 7 .
[0047] The elastic member 8 is a spring.
[0048] By setting a spring, when the push column 1004 moves in the reverse direction, the guide column 402 can move in the reverse direction under the elastic force generated by the spring reset, and the staff does not need to manually move the guide column 402 in the reverse direction, thereby reducing the workload of the staff.
[0049] The working principle of this construction engineering pile construction device:
[0050] When in use, first, the staff controls the rotation of the drilling part of the integral drill bit 305, and then controls the first motor 307 to make its output shaft drive the winch 303 to rotate, so that the wire rope 304 drives the integral drill bit 305 to descend, so that the integral drill bit 305 drills a hole on the working surface. During the descent of the integral drill bit 305, the positioning effect of the guide column 402 can prevent the integral drill bit 305 from deviating during the descent process, prevent the drilling position from being inconsistent with the designed position, and greatly increase the accuracy and stability of the pile foundation.
[0051] The above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not limitations on the implementation methods of the present invention. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is impossible to list all the implementation methods here. All obvious changes or modifications derived from the technical solution of the present invention are still within the scope of protection of the present invention.
Claims
1. A construction pile construction device for a building project, comprising a base (1), characterized in that: A plurality of mounting frames (2) are fixedly mounted on the upper surface of the base (1), and a piling assembly (3) for piling is commonly arranged at the upper end of each of the mounting frames (2); The upper surface of the base (1) is provided with a positioning component (4) for positioning.
2. A construction engineering pile construction device according to claim 1, characterized in that: The piling assembly (3) comprises a mounting frame (301), the mounting frame (301) being fixedly mounted on the upper end of each mounting frame (2), vertical plates (302) being fixedly mounted on both sides of the upper surface of the mounting frame (301), a winch (303) being rotatably mounted between the two vertical plates (302), a steel wire rope (304) being wound on the surface of the winch (303), the lower end of the steel wire rope (304) passing through the mounting frame (301) and being provided with an integral drill bit (305); A first motor (307) is fixedly mounted on one side of one of the vertical plates (302) via a bracket (306); an output shaft end of the first motor (307) passes through the corresponding vertical plate (302) and is fixedly connected to the output shaft end of the first motor (307).
3. A construction engineering foundation pile construction device according to claim 2, characterized in that: The positioning assembly (4) comprises a plurality of right-angle brackets (401), each of which is movably arranged on the upper surface of the base (1), and each of which is fixedly mounted with a guide column (402) on one side of the right-angle bracket (401) close to the integral drill bit (305).
4. A construction engineering pile construction device according to claim 3, characterized in that: A plurality of spherical grooves are provided on the surface of the body of each guide column (402), and a spherical block (5) is rotatably mounted in each spherical groove.
5. A construction engineering foundation pile construction device according to claim 3, characterized in that: The upper surface of the base (1) is provided with a plurality of slide grooves (6), each of which is provided with a sliding block (601) for sliding movement, and the upper surface of each sliding block (601) is fixedly connected to a corresponding right-angle frame (401); A slide bar (7) is fixedly installed between the two sides of the inner wall of each slide groove (6), and each slider (601) is slidably arranged on one side of the corresponding slide bar (7); A triangular plate (9) is fixedly mounted on the side of each right-angle frame (401) away from the spherical block (5), and a pushing component (10) for pushing the right-angle frame (401) is provided on one side of the upper surface of the base (1).
6. A construction engineering pile construction device according to claim 5, characterized in that: The pushing assembly (10) comprises a second motor (1001), the second motor (1001) being fixedly mounted on one side of the upper surface of the base (1), a screw rod (1002) being fixedly mounted on the output shaft end of the second motor (1001), a shaft of the screw rod (1002) being threadedly provided with an annular plate (1003), and a plurality of pushing columns (1004) being fixedly mounted on the inner wall of the annular plate (1003).
7. A construction engineering pile construction device according to claim 6, characterized in that: A limiting rod (11) is fixedly mounted on the other side of the upper surface of the base (1), and the annular plate (1003) is slidably arranged on one side of the rod body of the limiting rod (11).
8. A construction engineering pile construction device according to claim 7, characterized in that: A groove is formed on the surface of one end of each of the push columns (1004) away from the annular plate (1003), and a rotating ball (12) is rotatably mounted in each of the grooves.
9. A construction engineering pile construction device according to claim 5, characterized in that: The other side of the shaft of each sliding rod (7) is respectively sleeved with an elastic member (8) capable of compression and reset.
10. A construction engineering pile construction device according to claim 9, characterized in that: The elastic member (8) is a spring.