Existing tunnel reinforcing device and reinforcing method thereof
Through the reinforced concrete foundation beam and rib column structure, combined with anchor rods or anchor cables and anti-falling block components, the problems of resource waste and insufficient load-bearing capacity of existing tunnel reinforcement methods are solved, and efficient and safe tunnel reinforcement is achieved.
Patent Information
- Application Number
- CN202411073558.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-10-15
AI Technical Summary
Existing tunnel reinforcement methods waste resources, increase construction difficulty, and have limited bearing capacity, resulting in poor reinforcement effects.
The reinforced concrete foundation beam and rib column structure are used to form a unified whole through the synergy of anchor rods or anchor cables. Combined with the anti-falling block components and auxiliary reinforcement components, the side walls and top of the tunnel are reinforced.
It reduces the amount of work, increases the bearing capacity, enhances the reinforcement effect, improves construction safety, avoids injuries to workers from falling blocks, and improves the support capacity for the side walls and top of the tunnel.
Smart Images

Figure CN118774874A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering construction, and in particular to an existing tunnel reinforcement device and a reinforcement method thereof. Background Art
[0002] As the scale of urban construction gradually increases, people's demand for the development of underground space is also increasing, which has led to an increasing number of underground projects. For some existing underground structures, the impact of new underground structures on them was not considered during the original design and construction stages. New underground structures may change the depth of the original structure, resulting in an increase in the load of the original structure. At the same time, the construction of some large-scale ground buildings may also increase the load of existing underground tunnels. Due to the above reasons, the bearing capacity of the original tunnel structure may not meet the needs of today's construction, and the original structure needs to be reinforced. In addition, for some old tunnels, the bearing capacity of the tunnel structure may decrease due to certain diseases, and their structures also need to be reinforced.
[0003] At present, the conventional reinforcement method for tunnels is to add a lining inside the existing tunnel. This reinforcement method requires a large lining range, which is equivalent to building another tunnel in the original tunnel, making the project volume relatively large, not only wasting resources, but also increasing the construction period. Secondly, another conventional reinforcement method for tunnels is to set steel frame ribs in the tunnel, but there is no longitudinal connection between the steel ribs, so that they cannot form a unified whole, and the tunnel is supported only by the steel ribs, so its bearing capacity is limited and the effect is poor. For this reason, we provide an existing tunnel reinforcement device and a reinforcement method thereof. Summary of the invention
[0004] In order to solve the problem in the above background technology that conventional tunnel reinforcement methods not only waste resources but also increase construction difficulty, or have limited bearing capacity, resulting in poor reinforcement effect, the present invention provides an existing tunnel reinforcement device and a reinforcement method thereof.
[0005] The present invention is implemented by the following technical solution: an existing tunnel reinforcement device, comprising: Two reinforced concrete foundation beams are symmetrically arranged along the longitudinal direction of the tunnel, reinforced concrete rib columns are equidistantly arranged between the two reinforced concrete foundation beams along the circumferential direction of the tunnel, anchor holes are equidistantly opened on the reinforced concrete rib columns, and reinforcement anchor rods or anchor cables for reinforcing the tunnel are inserted into the anchor holes.
[0006] As a further improvement of the above scheme, the anti-drop block assembly includes four groups of vertical rods symmetrically fixedly connected between two adjacent groups of reinforced concrete rib columns, and a receiving frame for receiving local dropped blocks during the reinforcement process is arranged between the two adjacent groups of reinforced concrete rib columns, and sliders are symmetrically fixedly connected on both sides of the receiving frame and the sliders are slidably connected to the vertical rods, the external fixed sleeve of the vertical rod is provided with a limiting ring, and the external sleeve of the vertical rod is provided with a supporting spring for supporting the receiving frame.
[0007] As a further improvement of the above scheme, the lateral auxiliary reinforcement assembly includes two groups of guide brackets symmetrically fixedly connected to two adjacent groups of reinforced concrete rib columns for guiding, a horizontal rod symmetrically slidably connected to the guide bracket, one end of the two groups of horizontal rods on the same side is fixedly connected to the same side reinforcement bracket for abutting and reinforcing the side wall of the tunnel, and a connecting rod is hinged between the bottom of the supporting frame and the other end of the horizontal rod through a hinge.
[0008] As a further improvement of the above scheme, the top auxiliary reinforcement component includes a supporting grid arranged above the receiving frame for abutting the top of the reinforced tunnel, a guide bracket 2 for guiding is fixedly connected to the reinforced concrete rib column, connecting rods are symmetrically fixedly connected to both sides of the bottom of the supporting grid, and the connecting rods are slidably connected to the guide bracket 2 on the same side, a guide bracket 3 for guiding is symmetrically fixedly connected to the reinforced concrete rib column, a horizontal rod 2 is slidably connected to the guide bracket 3, a connecting rod 2 is hinged between one end of the horizontal rod 2 and the bottom of the receiving frame through a hinge, and a connecting rod 3 is hinged between the horizontal rod 2 and the connecting rod through a hinge.
[0009] As a further improvement of the above solution, transverse lattice beams for reinforcing the strength of the reinforced concrete rib columns are fixedly connected between adjacent reinforced concrete rib columns.
[0010] As a further improvement of the above solution, both ends of the support spring are fixedly connected to the slider and the limiting ring respectively.
[0011] As a further improvement of the above solution, the distance between the side reinforcement bracket and the tunnel side wall is consistent with the distance between the support grid and the tunnel top.
[0012] As a further improvement of the above solution, the overall supporting grid is an arc-shaped structure and is adapted to the curvature of the tunnel top.
[0013] As a further improvement of the above solution, the spacing between two adjacent groups of reinforced concrete rib columns is 3-5m, and the reinforced concrete rib columns and the reinforced concrete foundation beams are an integrated structure.
[0014] A method for reinforcing an existing tunnel comprises the following steps: S1. Determine the scope of reinforcement according to needs; S2, test drilling is performed on the original tunnel structure within the reinforcement range to determine whether the drilled hole conflicts with the original tunnel primary support steel frame. If not, the drilled hole position is determined as the first reinforced concrete rib column position. If so, re-drilling is performed to determine the reinforced concrete rib column position. S3, chiseling out the location of the reinforced concrete foundation beam on the original tunnel invert layer. If there is no invert, chiseling out the location of the reinforced concrete foundation beam on the rock; S4. Construct reinforced concrete foundation beams and reinforced concrete rib columns; S5, drilling holes, installing reinforcing anchor rods or anchor cables and tensioning them; S6. Grouting and sealing the anchor hole; S7. If necessary, the tunnel side walls and vault shall be decoratively sealed.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention only constructs reinforced concrete rib columns or reinforced concrete lattices, and then installs anchor cables (anchor rods), and utilizes the synergistic effect between the two to jointly bear the upper load, which not only reduces the engineering workload but is also more economical.
[0016] 2. The present invention uses the combined effect of reinforced concrete rib columns and anchor cables (anchor rods), and connects the rib columns into a unified whole through foundation beams or transverse lattice beams, so that the bearing capacity is greater and the reinforcement effect is better.
[0017] 3. The present invention can receive the blocks that fall from the tunnel top and automatically peel off during drilling by means of an additional receiving frame, thereby effectively avoiding the problem that the blocks fall directly and easily injure the operators, and improving the safety of the device.
[0018] 4. In the present invention, as the number of dropped blocks collected inside the receiving frame increases, its overall mass also increases. At this time, the receiving frame will compress the supporting spring, so that the receiving frame will slide downward on the vertical rod, and utilize the sliding cooperation between the horizontal rod 1 and the guide bracket 1, the hinge effect between the horizontal rod 1 and the receiving frame and the connecting rod 1, so that the side reinforcement bracket can be pushed to approach the tunnel side wall and contact it, thereby realizing the abutment reinforcement of the tunnel side wall to reduce the dropped blocks.
[0019] 5. During the vertical downward movement of the receiving frame, the present invention utilizes the sliding cooperation between the horizontal rod two and the guide bracket three, the hinge action between the horizontal rod two and the receiving frame and the connecting rod two, the sliding cooperation between the connecting rod and the guide bracket two, and the hinge action between the horizontal rod two and the connecting rod and the connecting rod three, so that the supporting grid can be pushed vertically upward to contact the top of the tunnel, thereby realizing the abutment reinforcement of the top of the tunnel to reduce block falling.
[0020] 6. In the present invention, as the number of falling blocks inside the receiving frame increases, the overall mass of the receiving frame also increases, and the greater the overall mass of the receiving frame, the better the supporting effect on the side walls and top of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the longitudinal section structure of the tunnel reinforcement device of the present invention; Figure 2 It is a schematic diagram of the side section structure of the tunnel reinforcement device of the present invention; Figure 3 It is a side sectional schematic diagram of the transverse lattice beam connection structure of the present invention; Figure 4 It is a schematic diagram of the three-dimensional structure of the anti-drop block assembly, the lateral auxiliary reinforcement assembly and the top auxiliary reinforcement assembly of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of the lateral auxiliary reinforcement assembly and the top auxiliary reinforcement assembly of the present invention; Figure 6 It is a bottom view schematic diagram of the three-dimensional structure of the lateral auxiliary reinforcement assembly and the top auxiliary reinforcement assembly of the present invention; Figure 7 It is a schematic flow chart of the steps of the reinforcement method of the reinforcement device of the present invention.
[0022] Description of main symbols: 1. Reinforced concrete foundation beam; 2. Reinforced concrete rib column; 3. Reinforcement anchor rod or anchor cable; 4. Transverse lattice beam; 101. Vertical rod; 102. Support frame; 103. Slider; 104. Limiting ring; 105. Support spring; 201. Guide bracket one; 202. Horizontal rod one; 203. Side reinforcement bracket; 204. Connecting rod one; 301. Support grid; 302. Guide bracket two; 303. Connecting rod; 304. Guide bracket three; 305. Horizontal rod two; 306. Connecting rod two; 307. Connecting rod three. DETAILED DESCRIPTION
[0023] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment. Example
[0024] Please combine Figure 1-7 , an existing tunnel reinforcement device of this embodiment includes: Two reinforced concrete foundation beams 1 are symmetrically arranged along the longitudinal direction of the tunnel. Reinforced concrete rib columns 2 are equidistantly arranged between the two reinforced concrete foundation beams 1 along the circumferential direction of the tunnel. The newly constructed rib columns and the original tunnel secondary lining are formed into a whole by embedding reinforcement, roughening, etc., and transverse lattice beams 4 for strengthening the strength of the reinforced concrete rib columns 2 are fixedly connected between adjacent reinforced concrete rib columns 2. The spacing between two adjacent groups of reinforced concrete rib columns 2 is 3-5m. The reinforced concrete rib columns 2 and the reinforced concrete foundation beams 1 are an integrated structure. Anchor holes are equidistantly opened on the reinforced concrete rib columns 2, and reinforcement anchor rods or anchor cables 3 for reinforcing the tunnel are inserted inside the anchor holes.
[0025] The anti-block-dropping assembly includes four groups of vertical rods 101 symmetrically and fixedly connected between two adjacent groups of reinforced concrete rib columns 2. A receiving frame 102 is arranged between the two adjacent groups of reinforced concrete rib columns 2 for accommodating local block drops during the reinforcement process. Sliders 103 are symmetrically and fixedly connected to both sides of the receiving frame 102, and the slides 103 are slidably connected to the vertical rods 101. A limiting ring 104 is provided on the external fixed sleeve of the vertical rod 101. A supporting spring 105 for supporting the receiving frame 102 is provided on the external sleeve of the vertical rod 101. The two ends of the supporting spring 105 are respectively fixedly connected to the slide 103 and the limiting ring 104.
[0026] The lateral auxiliary reinforcement assembly includes two groups of guide brackets 201 symmetrically fixedly connected to two adjacent groups of reinforced concrete rib columns 2 for guiding, a horizontal rod 202 is symmetrically slidably connected to the guide bracket 201, one end of the two groups of horizontal rods 202 on the same side is fixedly connected to the same side reinforcement bracket 203 for abutting and reinforcing the side wall of the tunnel, and a connecting rod 204 is hinged between the bottom of the receiving frame 102 and the other end of the horizontal rod 202 through a hinge.
[0027] The top auxiliary reinforcement assembly includes a support grid 301 arranged above the receiving frame 102 for abutting against the top of the reinforced tunnel, a guide bracket 2 302 for guiding is fixedly connected to the reinforced concrete rib column 2, connecting rods 303 are symmetrically fixedly connected to both sides of the bottom of the support grid 301, and the connecting rods 303 are slidably connected to the guide bracket 2 302 on the same side, and the guide bracket 3 304 for guiding is symmetrically fixedly connected to the reinforced concrete rib column 2, and a horizontal rod 2 305 is slidably connected to the guide bracket 304, one end of the horizontal rod 2 305 is hinged to the bottom of the receiving frame 102 by a hinge with a connecting rod 2 306, and the horizontal rod 2 305 is hinged to the connecting rod 303 by a hinge. The distance between the side reinforcement bracket 203 and the tunnel side wall is consistent with the distance between the support grid 301 and the top of the tunnel. The anti-drop block assembly, the lateral auxiliary reinforcement assembly and the top auxiliary reinforcement assembly can be removed together with the removal of the reinforced concrete rib column 2.
[0028] A method for reinforcing an existing tunnel comprises the following steps: The first step is to determine the scope of reinforcement according to needs; The second step is to test drill holes on the original tunnel structure within the reinforcement range and determine whether the drill holes conflict with the original tunnel primary support steel frame. If not, the drill hole position is determined as the first reinforced concrete rib column 2 position. If conflicting, re-drill holes to determine the reinforced concrete rib column 2 position. Step 3: chisel out the position of reinforced concrete foundation beam 1 on the original tunnel invert layer. If there is no invert, chisel out the position of reinforced concrete foundation beam 1 on the rock. Step 4: construct reinforced concrete foundation beam 1 and reinforced concrete rib column 2; Step 5: Drill holes, install reinforcement anchor rods or anchor cables 3 and tension them; Step 6: Grouting and sealing the anchor holes; Step 7: If necessary, decorate and seal the tunnel side walls and vault.
[0029] The implementation principle of an existing tunnel reinforcement device and reinforcement method in the embodiment of the present application is as follows: first, the length, width, height and top curvature of the tunnel are measured to facilitate the determination of the size of the reinforcement device and the required reinforcement range, and then a trial drilling is performed on the original tunnel structure within the reinforcement range to determine whether the drill hole conflicts with the original tunnel primary support steel frame. If there is no conflict, the drill hole position is determined as the first reinforced concrete rib column 2 position. If there is a conflict, the original drill hole is first grouting-sealed, and then the drill hole is re-drilled to determine the position of the reinforced concrete rib column 2, and then the position of the reinforced concrete foundation beam 1 is chiseled out on the original tunnel invert layer. If there is no invert, the position of the reinforced concrete foundation beam 1 is chiseled out on the rock, and then the reinforced concrete Concrete foundation beam 1 and reinforced concrete rib column 2, the reinforced concrete foundation beam 1 is fixed on the tunnel ground by pouring reinforced concrete, and the reinforced concrete rib column 2 is made close to the inner wall of the tunnel. After the reinforced concrete foundation beam 1 and the reinforced concrete rib column 2 are arranged, holes are drilled, and reinforcement anchor rods or anchor cables 3 are driven into the anchor holes and tensioned to improve the support effect of the tunnel. Through the joint action of the reinforced concrete rib column 2 and the reinforcement anchor rod or anchor cable 3, and the rib columns are connected into a unified whole through the foundation beam or the transverse lattice beam 4, its bearing capacity is greater and the reinforcement effect is better. At the same time, during the drilling process, the fallen glass on the tunnel wall will automatically fall into the receiving frame 102, which effectively avoids The problem that the falling blocks may easily injure the operators when they fall directly is solved, and the safety of the device is improved. Moreover, as the falling blocks collected inside the receiving frame 102 increase, the overall mass thereof also increases. At this time, the receiving frame 102 will compress the supporting spring 105, so that the receiving frame 102 will slide downward on the vertical rod 101, and utilize the sliding cooperation between the horizontal rod 102 and the guide bracket 101, the hinged action between the horizontal rod 102 and the receiving frame 102 and the connecting rod 1 204, so that the side reinforcement bracket 203 can be pushed to approach the tunnel side wall and contact it, so that the abutment reinforcement of the tunnel side wall can be realized to reduce the falling blocks. At the same time, in the process of the receiving frame 102 sliding down vertically, the horizontal rod 102 is utilized to The sliding fit between the second 305 and the guide bracket three 304, the hinged action between the horizontal rod two 305 and the receiving frame 102 and the connecting rod two 306, the sliding fit between the connecting rod 303 and the guide bracket two 302, and the hinged action between the horizontal rod two 305 and the connecting rod 303 and the connecting rod three 307, make it possible to push the supporting grid 301 to move vertically upward to contact the top of the tunnel, thereby achieving abutment reinforcement of the top of the tunnel, further reducing block falling, and the greater the overall mass of the receiving frame 102, the better the support effect on the side walls and top of the tunnel, finally, the anchor holes are grouted and sealed to reinforce the anchor rods or anchor cables 3, and if necessary, the side walls and arch of the tunnel can be decoratively closed. Example
[0030] The present embodiment is further improved on the basis of the embodiment 1 in that the supporting grid 301 is an overall arc-shaped structure and is adapted to the curvature of the tunnel top, so as to better support the tunnel top.
[0031] The above-mentioned embodiments are only preferred embodiments of the present invention and cannot be used to limit the scope of protection of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.
Claims
1. An existing tunnel reinforcement device, characterized in that: include: Two reinforced concrete foundation beams (1), the two reinforced concrete foundation beams (1) are symmetrically arranged along the longitudinal direction of the tunnel, reinforced concrete rib columns (2) are equidistantly arranged between the two reinforced concrete foundation beams (1) along the circumferential direction of the tunnel, anchor holes are equidistantly opened on the reinforced concrete rib columns (2), and reinforcement anchor rods or anchor cables (3) for reinforcing the tunnel are inserted into the anchor holes.
2. The existing tunnel reinforcement device according to claim 1, characterized in that: The anti-drop block assembly comprises four groups of vertical bars (101) symmetrically fixedly connected between two adjacent groups of reinforced concrete rib columns (2); a receiving frame (102) for receiving local dropped blocks during the reinforcement process is provided between the two adjacent groups of reinforced concrete rib columns (2); sliders (103) are symmetrically fixedly connected to both sides of the receiving frame (102); and the sliders (103) are slidably connected to the vertical bars (101); a limiting ring (104) is provided on the external fixed sleeve of the vertical bar (101); and a supporting spring (105) for supporting the receiving frame (102) is provided on the external sleeve of the vertical bar (101).
3. An existing tunnel reinforcement device as claimed in claim 2, characterized in that: The transverse auxiliary reinforcement assembly comprises two groups of guide brackets (201) symmetrically fixedly connected to two adjacent groups of reinforced concrete rib columns (2) for guiding, a horizontal rod (202) being symmetrically slidably connected to the guide bracket (201), one end of the two groups of horizontal rods (202) on the same side being fixedly connected to the same side reinforcement bracket (203) for abutting against and reinforcing the side wall of the tunnel, and a connecting rod (204) being hingedly connected between the bottom of the receiving frame (102) and the other end of the horizontal rod (202) via a hinge.
4. The existing tunnel reinforcement device according to claim 3, characterized in that: The top auxiliary reinforcement component comprises a support grid (301) arranged above the receiving frame (102) for abutting against the top of the reinforced tunnel; a second guide bracket (302) for guiding is fixedly connected to the reinforced concrete rib column (2); connecting rods (303) are symmetrically fixedly connected to both sides of the bottom of the support grid (301); and the connecting rods (303) are slidably connected to the second guide bracket (302) on the same side; a third guide bracket (304) for guiding is symmetrically fixedly connected to the reinforced concrete rib column (2); a second horizontal rod (305) is slidably connected to the third guide bracket (304); a second connecting rod (306) is hinged between one end of the second horizontal rod (305) and the bottom of the receiving frame (102) via a hinge; and a third connecting rod (307) is hinged between the second horizontal rod (305) and the connecting rod (303) via a hinge.
5. The existing tunnel reinforcement device according to claim 4, characterized in that: A transverse lattice beam (4) for reinforcing the strength of the reinforced concrete rib columns (2) is fixedly connected between adjacent reinforced concrete rib columns (2).
6. The existing tunnel reinforcement device according to claim 5, characterized in that: The two ends of the support spring (105) are respectively fixedly connected to the slider (103) and the limiting ring (104).
7. The existing tunnel reinforcement device according to claim 6, characterized in that: The distance between the side reinforcement bracket (203) and the tunnel side wall is consistent with the distance between the support grid (301) and the tunnel top.
8. The existing tunnel reinforcement device according to claim 7, characterized in that: The supporting grid (301) is an overall arc-shaped structure and is adapted to the curvature of the tunnel top.
9. The existing tunnel reinforcement device according to claim 8, characterized in that: The distance between two adjacent groups of reinforced concrete rib columns (2) is 3-5 m, and the reinforced concrete rib columns (2) and the reinforced concrete foundation beam (1) are an integrated structure.
10. An existing tunnel reinforcement method according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Determine the scope of reinforcement according to needs; S2, test drilling is performed on the original tunnel structure within the reinforcement range to determine whether the drilled hole conflicts with the original tunnel primary support steel frame. If not, the drilled hole position is determined as the first reinforced concrete rib column (2) position. If so, re-drilling is performed to determine the reinforced concrete rib column (2) position. S3, chiseling out the position of the reinforced concrete foundation beam (1) on the original tunnel invert layer. If there is no invert, chiseling out the position of the reinforced concrete foundation beam (1) on the rock; S4, constructing a reinforced concrete foundation beam (1) and a reinforced concrete rib column (2); S5, drilling holes, installing reinforcing anchor rods or anchor cables (3) and tensioning them; S6. Grouting and sealing the anchor hole; S7. If necessary, the tunnel side walls and vaults shall be decoratively sealed.