Method for exciting defects of petroleum injection and production equipment

Through a variety of step stress test methods, the problem that existing technology cannot quantitatively evaluate the environmental adaptability of oil injection and production equipment has been solved, and accurate evaluation of equipment limits and performance improvement have been achieved.

CN118776947APending Publication Date: 2024-10-15BEIJING INST OF SPACECRAFT ENVIRONMENT ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410949994.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Existing test methods can only qualitatively evaluate the environmental adaptability of oil injection and production equipment, and cannot quantitatively determine its working limits and damage limits, resulting in low efficiency of the equipment in high-temperature and high-pressure environments.

Method used

Various test methods such as low temperature step stress, high temperature step stress, temperature change cyclic step stress, vibration step stress, temperature change and vibration comprehensive step stress, and high temperature and high pressure comprehensive step stress are used to simulate different environmental conditions. Oil injection and production equipment is tested to determine its environmental stress resistance limits.

Benefits of technology

These test methods can quickly and accurately expose weak links in equipment design or processes, quantitatively determine the working limits and damage limits of oil injection and production equipment, and improve the environmental adaptability and efficiency of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776947A_ABST
    Figure CN118776947A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of oil exploration and development product tests, in particular to a method for exciting defects of oil injection and production equipment, which comprises the following steps of: performing a low-temperature step stress test on the oil injection and production equipment to excite the defects of the oil injection and production equipment, and determining a low-temperature working limit and a low-temperature damage limit; performing a high-temperature stepping stress test on the petroleum injection and production equipment to excite the defects of the petroleum injection and production equipment, and determining a high-temperature working limit and a high-temperature damage limit; carrying out a temperature change cycle stepping stress test on the petroleum injection and production equipment to excite the defects of the petroleum injection and production equipment; performing a vibration stepping stress test on the petroleum injection and production equipment to excite the defects of the petroleum injection and production equipment; performing a temperature change and vibration comprehensive stepping stress test on the petroleum injection and production equipment to excite the defects of the petroleum injection and production equipment; and performing a high-temperature and high-pressure comprehensive stepping stress test on the petroleum injection and production equipment to excite the defects of the petroleum injection and production equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil exploration and development product testing, and in particular to a method for stimulating defects in oil injection and production equipment. Background Art

[0002] In the process of oil field development, by injecting high-pressure water into the oil field, the oil layer pressure can be maintained or restored, so that the oil reservoir has a strong driving force, so as to improve the exploitation speed and recovery rate of the oil reservoir, and promote the exploitation of crude oil in the oil reservoir from multiple aspects. Generally speaking, the depth of the water injection well can reach several thousand meters. Studies have shown that within a certain depth, the temperature of the formation increases with the increase of depth. For every 100m increase in depth, the temperature will increase by about 3°C; at the same time, the intelligent oil injection and production equipment working in the oil field water injection well will also be affected by the combined pressure composed of hydrostatic pressure, overburden rock pressure and formation pressure, and the total pressure can reach tens of kilopascals. It can be seen that the oil injection and production equipment is in a harsh environment of high temperature and high pressure for a long time, and the oil injection and production equipment itself needs to have high reliability and strong adaptability to the environment.

[0003] In recent years, my country has begun to independently develop oil injection equipment. During the development process, due to the high temperature and high pressure working environment unique to this type of equipment, there is no research and development experience of similar products in China for reference. Moreover, for the oil injection equipment that has been successfully developed, the existing test methods can only qualitatively evaluate the environmental adaptability of the product, and cannot quantitatively determine the environmental stress resistance limits such as the working limit and damage limit of the oil injection equipment. Therefore, after the oil injection equipment is directly put into oil injection work, the failure rate is relatively high. Summary of the invention

[0004] The present invention provides a method for stimulating defects in oil injection and production equipment, so as to solve the problem that the existing test method can only qualitatively evaluate the environmental adaptability of the product but cannot quantitatively determine the environmental stress resistance limits such as the working limit and the damage limit of the oil injection and production equipment.

[0005] The present invention provides a method for stimulating defects in oil injection and production equipment, comprising the following steps:

[0006] Conducting a low-temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine the low-temperature working limit and the low-temperature damage limit;

[0007] Conducting a high-temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine the high-temperature working limit and high-temperature damage limit;

[0008] Performing a temperature change cycle step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment;

[0009] Performing a vibration step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine the vibration working limit and the vibration damage limit;

[0010] Conducting a temperature change and vibration comprehensive step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment;

[0011] A high-temperature and high-pressure comprehensive step stress test is performed on the oil injection and production equipment to stimulate the defects of the oil injection and production equipment and determine the high-temperature and high-pressure comprehensive working limit and the high-temperature and high-pressure comprehensive destruction limit.

[0012] In some of the embodiments, electrical stress tests are also performed on the oil injection and production equipment when conducting low-temperature step stress tests, high-temperature step stress tests, temperature change cycle step stress tests, vibration step stress tests, temperature change and vibration comprehensive step stress tests, and high-temperature and high-pressure comprehensive step stress tests.

[0013] In some embodiments, performing a low temperature step stress test on a petroleum injection and production equipment comprises the following steps:

[0014] Install the oil injection and production equipment in the low temperature step stress test equipment;

[0015] Analyze the components of oil injection and production equipment to determine the initial temperature and temperature step length of the low-temperature step stress test;

[0016] Determine the temperature change rate based on the low temperature step stress test equipment, and determine the temperature holding time at each temperature based on the weight of the oil injection and production equipment;

[0017] The low temperature step stress test equipment cools down the oil injection and production equipment based on the initial temperature, temperature step length, temperature change rate and temperature holding time;

[0018] At each temperature, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

[0019] In some embodiments, performing a high temperature step stress test on a petroleum injection and production equipment comprises the following steps:

[0020] Install the oil injection and production equipment in the high temperature step stress test equipment;

[0021] Analyze the components of oil injection and production equipment, and determine the initial temperature and temperature step length of the high-temperature step stress test according to the downhole temperature;

[0022] Determine the temperature change rate based on the high temperature step stress test equipment, and determine the temperature holding time at each temperature based on the weight of the oil injection and production equipment;

[0023] The high temperature step stress test equipment heats up the oil injection and production equipment based on the initial temperature, temperature step length, temperature change rate and temperature holding time;

[0024] At each temperature, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

[0025] In some embodiments, performing a temperature change cycle step stress test on a petroleum injection and production equipment comprises the following steps:

[0026] Install the oil injection and production equipment in the temperature change cycle step stress test equipment;

[0027] Calculate the temperature range of the temperature variation cycle step stress test based on the low temperature working limit and the high temperature working limit;

[0028] Determine the temperature change rate of the first stage, the temperature change rate of the second stage, the temperature change rate of the Nth stage and the step length of the temperature change rate according to the temperature change cycle step stress test equipment, and determine the temperature holding time at the highest temperature and the lowest temperature according to the weight of the oil injection and production equipment;

[0029] The temperature change cycle step stress test equipment performs temperature change treatment on the oil injection and production equipment based on the temperature stress range, the temperature change rate of the first stage, the temperature change rate of the second stage, the temperature change rate of the Nth stage, the step length of the temperature change rate and the insulation time;

[0030] At each maximum temperature and each minimum temperature, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

[0031] In some embodiments, performing a vibration step stress test on oil injection and production equipment includes the following steps:

[0032] Determine the vibration step stress application form according to the vibration step stress test equipment;

[0033] Determine the initial vibration magnitude, the vibration magnitude step length, and the holding time of each vibration magnitude according to the vibration step stress application form;

[0034] The oil injection and production equipment is installed in a vibration step stress test equipment, and the vibration step stress test equipment performs vibration treatment on the oil injection and production equipment based on the vibration step stress application form, the initial vibration magnitude, the vibration magnitude step length, and the holding time of each vibration magnitude;

[0035] At each vibration level, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

[0036] In some embodiments, performing a temperature change and vibration comprehensive step stress test on oil injection and production equipment includes the following steps:

[0037] Determine the temperature range and temperature change rate of the temperature change and vibration comprehensive step stress test based on the temperature range and temperature change rate of the temperature change cycle step stress test;

[0038] Calculate the initial vibration magnitude and vibration magnitude step length of the temperature change and vibration comprehensive step stress test according to the vibration working limit;

[0039] Determine the temperature holding time at the highest and lowest temperatures according to the weight of the oil injection and production equipment, and determine the holding time of each vibration level of the temperature change and vibration comprehensive step stress test according to the vibration step stress application form;

[0040] The oil injection and production equipment is installed in a temperature change and vibration comprehensive step stress test equipment; the temperature change and vibration comprehensive step stress test equipment performs temperature change treatment on the oil injection and production equipment based on the temperature range, temperature change rate and temperature holding time of the temperature change and vibration comprehensive step stress test; at each maximum temperature and each minimum temperature, the temperature change and vibration comprehensive step stress test equipment performs vibration treatment on the oil injection and production equipment based on the initial vibration level, the vibration level step length and the holding time of each vibration level; and at each maximum temperature and each minimum temperature, high voltage, nominal voltage and low voltage are sequentially applied to the oil injection and production equipment at equal intervals.

[0041] In some of the embodiments, the high-temperature and high-pressure comprehensive step stress test on the oil injection and production equipment includes a constant-pressure temperature increase test stage and a constant-temperature pressure increase test stage.

[0042] In some of the embodiments, the initial temperature of the constant pressure temperature rise test stage is between the initial temperature of the high temperature step stress test and the high temperature working limit, the maximum temperature is lower than the high temperature damage limit, and the temperature change rate is 1°C / min;

[0043] The initial pressure of the constant temperature and pressure test stage is 60 MPa, the pressure step length is less than or equal to 10 MPa / step, and the pressure change rate is 0.2 MPa / min.

[0044] In some of the embodiments, before performing a low-temperature step stress test on a petroleum injection and production device, the test parameters to be tested are determined;

[0045] The test parameters include ground current during power-on, ground current during communication, temperature during communication, valve state during communication, valve state during valve opening, motor current during valve opening, valve state during valve closing, motor current during valve closing and ground current during power-off.

[0046] The beneficial effects of the present invention are as follows: The method for stimulating defects of oil injection and production equipment of the present invention respectively uses low temperature stress, high temperature stress, rapid temperature change cycle stress, vibration stress, temperature change and vibration comprehensive stress, high temperature and high pressure comprehensive stress to stimulate defects of oil injection and production equipment, and determines the low temperature environment stress limit, high temperature environment stress limit, vibration environment stress limit, high temperature and high pressure environment stress limit, temperature change environment stress limit and temperature and vibration comprehensive environment stress limit of oil injection and production equipment. By performing a series of single or combined step stress simulation tests of heat, force, electricity, etc. on oil injection and production equipment, defects in the design or production of oil injection and production equipment can be quickly stimulated in a short time, which is helpful to expose weak links or deep defects in the design or process of oil injection and production equipment, and can quantitatively determine the working limit and damage limit of oil injection and production equipment. It can provide a large amount of reliable test data for the development of new oil injection and production equipment and the optimization and improvement of oil injection and production equipment, accelerate the development process, simulate real working conditions, and objectively and accurately evaluate the environmental adaptability of oil injection and production equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a flow chart of a method for stimulating defects in oil injection and production equipment according to the present invention;

[0048] Figure 2 It is a curve diagram of temperature variation with time during low temperature step stress test;

[0049] Figure 3 It is a curve diagram of temperature variation with time during high temperature step stress test;

[0050] Figure 4 It is a curve diagram of temperature variation with time during temperature change cycle step stress test;

[0051] Figure 5 It is a curve diagram showing the change of vibration stress over time during the vibration step stress test;

[0052] Figure 6 It is a curve diagram showing the change of temperature and vibration stress over time during the temperature change and vibration comprehensive step stress test;

[0053] Figure 7 It is a curve diagram of temperature and pressure changing with time during high temperature and high pressure comprehensive step stress test. DETAILED DESCRIPTION

[0054] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] For ease of understanding, the following professional terms are explained first:

[0056] Working limit: The working state of the oil injection and production equipment no longer meets the technical requirements, but after the stress is reduced, the product can still resume normal operation. The working limit includes low temperature working limit, high temperature working limit, vibration working limit, and high temperature and high pressure combined working limit.

[0057] Destruction limit: The stress intensity value at which the working state of the oil injection and production equipment no longer meets the technical requirements and the product cannot resume normal operation after the stress is reduced. Destruction limits include low temperature destruction limit, high temperature destruction limit, vibration destruction limit, and high temperature and high pressure combined destruction limit.

[0058] Performance test: Test the characteristic parameters of oil injection and production equipment to determine whether the product can complete the specified functions under the current environmental stress conditions and whether the technical performance has declined. Generally, it includes testing the performance parameters of key components of oil injection and production equipment or using the self-diagnosis function of oil injection and production equipment to detect its internal performance parameters.

[0059] Three-axis six-degree-of-freedom vibration: a vibration mode that simulates vibration in six directions along three axes.

[0060] Uniaxial vibration: A vibration mode that simulates independent vibrations in three axes.

[0061] Total root mean square acceleration (Grms): An indicator that describes the intensity of a random vibration test, calculated by taking the square root of the area under the random vibration spectrum curve.

[0062] As described in the background technology, during the development of oil injection and production equipment, due to the high temperature and high pressure working environment unique to this type of equipment, there is no research and development experience of similar products in China for reference. Moreover, for the oil injection and production equipment that has been successfully developed, the existing test methods can only qualitatively evaluate the environmental adaptability of the product, but cannot quantitatively determine the environmental stress resistance limits such as the working limit and damage limit of the oil injection and production equipment. Therefore, after the oil injection and production equipment is directly put into oil injection and production work, the failure rate is relatively high.

[0063] To solve the above problems, refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 The present invention provides a method for stimulating defects in oil injection and production equipment, comprising the following steps:

[0064] S100, determining the test parameters to be tested.

[0065] In this step, analyze the environmental conditions and corresponding performance requirements that the oil injection and production equipment is expected to encounter in the oil field water injection well. Determine all key components of the oil injection and production equipment based on its structure. Select appropriate low-temperature step stress test equipment, high-temperature step stress test equipment, temperature change cycle step stress test equipment, vibration step stress test equipment, temperature change and vibration comprehensive step stress test equipment, and high temperature and high pressure comprehensive step stress test equipment based on the weight and size of the oil injection and production equipment. Prepare a sufficient number of oil injection and production equipment and supporting performance testing equipment.

[0066] S200, performing a low-temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine a low-temperature working limit and a low-temperature damage limit.

[0067] In this step, a low-temperature step stress test plan is formulated, and the test temperature is lowered in a step-by-step manner using low-temperature step stress test equipment. Electrical stress is applied to the oil injection and production equipment at each temperature level, and performance tests are carried out to analyze the impact of low-temperature stress on the performance of the oil injection and production equipment, quickly stimulate low-temperature sensitive defects of the oil injection and production equipment, and obtain the low-temperature working limit and low-temperature damage limit of the oil injection and production equipment.

[0068] S300, performing a high temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine a high temperature working limit and a high temperature damage limit.

[0069] In this step, a high-temperature step stress test plan is formulated, and the test temperature is increased in a step-by-step manner using high-temperature step stress test equipment. Electrical stress is applied to the oil injection and production equipment at each temperature level, and performance tests are carried out to analyze the impact of high-temperature stress on the performance of the oil injection and production equipment, quickly stimulate high-temperature sensitive defects of the oil injection and production equipment, and obtain the high-temperature working limit and high-temperature destruction limit of the oil injection and production equipment.

[0070] S400, performing a temperature variation cycle step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment.

[0071] In this step, a rapid temperature change cycle step stress test plan is formulated based on the test results of step S200 and step S300. The rapid temperature change cycle step stress is applied to the product using the temperature change cycle step stress test equipment to quickly stimulate the defects of the oil injection and production equipment, apply electrical stress to the oil injection and production equipment at each temperature level, and carry out performance tests to analyze the impact of rapid temperature change cycle stress on product performance.

[0072] S500, performing a vibration step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine a vibration working limit and a vibration damage limit.

[0073] In this step, a test plan for the vibration step stress test is formulated, and vibration step stress is applied to the oil injection and production equipment using vibration step stress test equipment to quickly stimulate the defects of the oil injection and production equipment. Electrical stress is applied to the oil injection and production equipment at each vibration level, and performance tests are carried out to analyze the impact of vibration stress on the performance of the oil injection and production equipment and determine the vibration working limit and vibration damage limit of the oil injection and production equipment.

[0074] S600, performing a temperature change and vibration comprehensive step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment.

[0075] In this step, based on the test results of step S400 and step S500, a temperature and vibration comprehensive step stress test plan is formulated, and temperature and vibration comprehensive step stress is applied to the oil injection and production equipment using temperature change and vibration comprehensive step stress test equipment to quickly stimulate the defects of the oil injection and production equipment. At each temperature, when the temperature of the oil injection and production equipment stabilizes, vibration begins, and electrical stress is applied to the oil injection and production equipment at the same time. Performance tests are carried out to analyze the impact of temperature change and vibration comprehensive stress on product performance.

[0076] S700, conducting a high-temperature and high-pressure comprehensive step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine the high-temperature and high-pressure comprehensive working limit and the high-temperature and high-pressure comprehensive destruction limit.

[0077] In this step, based on the test results of step S300, a high temperature and high pressure comprehensive step stress test plan is formulated, and a high temperature and high pressure comprehensive step stress is applied to the oil injection and production equipment using a high temperature and high pressure comprehensive step stress test device to quickly stimulate the defects of the oil injection and production equipment. At each temperature or pressure, when the temperature of the oil injection and production equipment is stable, electrical stress is applied to the oil injection and production equipment, and performance tests are carried out to analyze the impact of high temperature and high pressure comprehensive stress on product performance, and determine the high temperature and high pressure working limit and high temperature and high pressure destruction limit of the oil injection and production equipment.

[0078] In general, low temperature stress, high temperature stress, rapid temperature change cycle stress, vibration stress, temperature change and vibration combined stress, high temperature and high pressure combined stress are used to stimulate the defects of oil injection and production equipment, and determine the low temperature environment stress limit, high temperature environment stress limit, vibration environment stress limit, high temperature and high pressure environment stress limit, temperature change environment stress limit and temperature and vibration combined environment stress limit of oil injection and production equipment. By conducting a series of single or combined step stress simulation tests of heat, force, electricity, etc. on oil injection and production equipment, the defects in the design or production of oil injection and production equipment can be quickly stimulated in a short time, which is helpful to expose the weak links or deep defects in the design or process of oil injection and production equipment, and can quantitatively determine the environmental stress limits such as the working limit and damage limit of oil injection and production equipment, which can provide a large amount of reliable test data for the development of new oil injection and production equipment and the optimization and improvement of oil injection and production equipment, accelerate the development process, simulate real working conditions, and objectively and accurately evaluate the environmental adaptability of oil injection and production equipment.

[0079] It should be noted that in order to discover more failure modes of oil injection and production equipment, other stresses such as cyclic electrical stress, extreme voltage stress, extreme electrical frequency electrical stress and external load may be applied to the oil injection and production equipment when step stress is applied.

[0080] Specifically, in the exemplary embodiment, S100, determining the test parameters to be tested includes the following steps:

[0081] First, analyze the environmental conditions such as temperature and pressure that the oil injection and production equipment is expected to encounter when working in the oil field water injection well. After analysis, the temperature environment conditions that the oil injection and production equipment is expected to encounter when working in the oil field water injection well are 80℃~135℃, and the pressure environment conditions are about 60MPa.

[0082] Then, analyze the performance requirements of the oil injection and production equipment during actual operation, determine the performance parameters that need to be tested during the test and the normal range of each parameter, and form a performance test record sheet. The oil injection and production equipment must complete power-on, communication, valve opening, valve closing and power-off operations during actual operation. Therefore, the test parameters include ground current during power-on, ground current during communication, temperature during communication, valve state during communication, valve state during valve opening, motor current during valve opening, valve state during valve closing, motor current during valve closing, and ground current during power off. The details are shown in Table 1 below:

[0083]

[0084] Table 1

[0085] Next, analyze the structure and working principle of the oil injection and production equipment, determine all the key components of the oil injection and production equipment, and form a list of key components.

[0086] Afterwards, the test equipment for carrying out each step stress test is determined based on the weight and size of the oil injection and production equipment, combined with the environmental conditions such as temperature and pressure that the oil injection and production equipment is expected to be exposed to when working underground in the oil field water injection well.

[0087] Then, we designed and manufactured the tooling that combined the oil injection and production equipment with the test equipment to ensure that the temperature stress and vibration energy can be transmitted to the product to the greatest extent, so that the vibration amount of the test table can be transmitted to the oil injection and production equipment in a 1:1 ratio.

[0088] Next, prepare a sufficient number of oil injection and production equipment with qualified performance as oil injection and production equipment, and number each oil injection and production equipment. Since the step stress test is a destructive test, it is recommended that the number of oil injection and production equipment is not less than 6, and the matching performance test equipment is prepared. In addition, as needed, various sensors such as temperature sensors or acceleration sensors can be installed on key components to monitor parameters such as temperature or vibration value of key components during the test.

[0089] Specifically, in the exemplary embodiment, S200, performing a low temperature step stress test on the oil injection and production equipment includes the following steps:

[0090] First, the oil injection and production equipment is installed in the low-temperature step stress test equipment with the help of tooling, and the performance test equipment and electrical stress application equipment are connected as needed.

[0091] Then, analyze the components of the oil injection and production equipment to determine the initial temperature and temperature step length of the low-temperature step stress test. The starting temperature should be less than or equal to 20°C, but not less than the minimum operating temperature of the components in the key components of the oil injection and production equipment. The temperature step length is -5°C / step to -10°C / step.

[0092] Next, determine the temperature change rate based on the low-temperature step stress test equipment. The temperature change rate should not be less than 10°C / min. Determine the temperature holding time at each temperature based on the time it takes for the internal temperature sensor of the oil injection and production equipment to reach stability during the first low-temperature step, or determine the temperature holding time at each temperature based on the weight of the oil injection and production equipment. If the temperature holding time at each temperature is determined based on the weight of the oil injection and production equipment, when the weight of the oil injection and production equipment is less than or equal to 1.5kg, the temperature holding time is 1h; when the weight of the oil injection and production equipment is greater than 1.5kg, but less than or equal to 15kg, the temperature holding time is 2h; when the weight of the oil injection and production equipment is greater than 15kg, but less than or equal to 150kg, the temperature holding time is 3h; when the weight of the oil injection and production equipment is greater than 150kg, the temperature holding time is 4h.

[0093] Then, the low temperature step stress test equipment cools down the oil injection and production equipment based on the initial temperature, temperature step length, temperature change rate and temperature holding time.

[0094] Afterwards, at each temperature, when the temperature of the oil injection and production equipment is stable, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are sequentially supplied to the oil injection and production equipment at equal intervals, completing three power-on and power-off processes, and the oil injection and production equipment is subjected to performance tests, and the measured values ​​are recorded. It should be noted that each interval is 3 minutes.

[0095] It should be noted that when the performance test of the oil injection and production equipment fails at a certain temperature, the temperature stress is restored to the previous order of magnitude, and the performance test is carried out after the temperature stabilizes. If the function and performance of the oil injection and production equipment can be restored to normal, the temperature when the oil injection and production equipment fails is the low-temperature working limit of the oil injection and production equipment; if the oil injection and production equipment still does not work properly, the temperature before the oil injection and production equipment fails is the low-temperature working limit of the oil injection and production equipment, and the temperature when the oil injection and production equipment fails is the low-temperature destruction limit of the oil injection and production equipment. At this time, the low-temperature step stress test should be terminated and the impact of low-temperature stress on product performance should be analyzed; if the test temperature reaches the minimum temperature capacity of the low-temperature step stress test equipment and the oil injection and production equipment still has not failed, the low-temperature step stress test can be terminated and this temperature is used as the low-temperature working limit of the oil injection and production equipment.

[0096] In some embodiments, such as Figure 2 As shown, when the low-temperature step stress test is carried out on the oil injection and production equipment, the starting temperature is 0°C, and then the temperature is reduced at a temperature step length of -5°C / step. The temperature change rate is 10°C / min, and the temperature is maintained for 2 hours. When the temperature of the oil injection and production equipment is stable, the oil injection and production equipment is powered on and off three times at each temperature. The first time, a voltage of 150V is applied, and a performance test is carried out, and then the power is turned off for 3 minutes. The second time, a voltage of 120V is applied, and a performance test is carried out, and then the power is turned off for 3 minutes. The third time, a voltage of 70V is applied, and a performance test is carried out. When the test temperature reaches the minimum temperature capacity of the low-temperature step stress test equipment -55°C, the oil injection and production equipment still has no failures. Therefore, the low-temperature working limit T of the oil injection and production equipment is determined. L It is -55℃.

[0097] Specifically, in the exemplary embodiment, S300, performing a high temperature step stress test on the oil injection and production equipment includes the following steps:

[0098] First, the oil injection and production equipment is installed in the high-temperature step stress test equipment with the help of tooling, and the performance test equipment and electrical stress application equipment are connected as needed.

[0099] Then, analyze the components of the oil injection and production equipment, and determine the initial temperature and temperature step length of the high temperature step stress test according to the downhole temperature. The starting temperature should not be lower than 60°C, but not higher than the maximum temperature of the downhole temperature conditions or the maximum operating temperature of the components in the key parts of the oil injection and production equipment. The temperature step length is +5°C / step to +10°C / step.

[0100] Next, determine the temperature change rate based on the high-temperature step stress test equipment. The temperature change rate is not less than 10°C / min. Determine the temperature holding time at each temperature based on the time it takes for the internal temperature sensor of the oil injection and production equipment to reach stability during the first high-temperature step, or determine the temperature holding time at each temperature based on the weight of the oil injection and production equipment. If the temperature holding time at each temperature is determined based on the weight of the oil injection and production equipment, when the weight of the oil injection and production equipment is less than or equal to 1.5kg, the temperature holding time is 1h; when the weight of the oil injection and production equipment is greater than 1.5kg, but less than or equal to 15kg, the temperature holding time is 2h; when the weight of the oil injection and production equipment is greater than 15kg, but less than or equal to 150kg, the temperature holding time is 3h; when the weight of the oil injection and production equipment is greater than 150kg, the temperature holding time is 4h.

[0101] Then, the high temperature step stress test equipment performs a temperature treatment on the oil injection and production equipment based on the initial temperature, the temperature step length, the temperature change rate and the temperature holding time.

[0102] Afterwards, at each temperature, when the temperature of the oil injection and production equipment is stable, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are sequentially supplied to the oil injection and production equipment at equal intervals, completing three power-on and power-off processes, and the oil injection and production equipment is subjected to performance tests, and the measured values ​​are recorded. It should be noted that each interval is 3 minutes.

[0103] It should be noted that when the performance test of the oil injection and production equipment fails at a certain temperature, the temperature stress is restored to the previous order of magnitude, and the performance test is carried out after the temperature stabilizes. If the function and performance of the oil injection and production equipment can be restored to normal, the temperature when the oil injection and production equipment fails is the high-temperature working limit of the oil injection and production equipment; if the oil injection and production equipment still does not work properly, the temperature before the oil injection and production equipment fails is the high-temperature working limit of the oil injection and production equipment, and the temperature when the oil injection and production equipment fails is the high-temperature destruction limit of the oil injection and production equipment. At this time, the high-temperature step stress test should be terminated and the impact of high-temperature stress on product performance should be analyzed; if the test temperature reaches the maximum temperature capacity of the high-temperature step stress test equipment and the oil injection and production equipment still has not failed, the high-temperature step stress test can be terminated, and this temperature is used as the high-temperature working limit of the oil injection and production equipment.

[0104] In some embodiments, such as Figure 3 As shown, when the high-temperature step stress test is carried out on the oil injection and production equipment, the starting temperature is 90°C, and the temperature is increased at a temperature step length of +5°C / step. The temperature change rate is 10°C / min, and the temperature is maintained for 2 hours. When the temperature of the oil injection and production equipment is stable, the oil injection and production equipment is powered on and off three times at each temperature. The first time, a voltage of 150V is applied, and a performance test is carried out, and then the power is turned off for 3 minutes. The second time, a voltage of 120V is applied, and a performance test is carried out, and then the power is turned off for 3 minutes. The third time, a voltage of 70V is applied, and a performance test is carried out. When the temperature stress reaches 175°C, the performance of the oil injection and production equipment fails after testing. The temperature stress is restored to 170°C, and the performance test is carried out after the temperature stabilizes. The oil injection and production equipment still does not work normally, and the high-temperature step stress test is ended. The test results show that the high-temperature step stress has stimulated the defects of the oil injection and production equipment, and the high-temperature working limit T of the oil injection and production equipment is determined. U =170℃, the high temperature damage limit of oil injection and production equipment is 175℃.

[0105] Specifically, in the exemplary embodiment, S400, performing a temperature change cycle step stress test on the oil injection and production equipment includes the following steps:

[0106] First, the oil injection and production equipment is installed in the temperature change cycle step stress test equipment with the help of tooling, and the performance test equipment and electrical stress application equipment are connected as needed.

[0107] Then, the temperature range of the temperature change cycle step stress test is calculated based on the low temperature working limit and the high temperature working limit. The temperature range of the temperature change cycle step stress test includes the minimum temperature and the maximum temperature. Among them, the minimum temperature = low temperature working limit + 5 ° C, the maximum temperature = high temperature working limit - 5 ° C, and a single complete cycle is reduced from room temperature to the minimum temperature, then increased to the maximum temperature, and then restored to room temperature.

[0108] Next, determine the temperature change rate of the first stage, the temperature change rate of the second stage, the temperature change rate of the Nth stage and the step length of the temperature change rate according to the temperature change cycle step stress test equipment. The temperature change rate of the first stage shall not be less than 10°C / min, the temperature change rate of the second stage shall not be less than 25°C / min, the temperature change rate of the Nth stage shall be (N×15-5)°C / min, and the temperature change rate step length from the first stage to the Nth stage shall be +10(°C / min) / step to +20(°C / min) / step. The number of cycles for each stage shall not be less than 3 times. Determine the temperature holding time at the highest and lowest temperatures according to the weight of the oil injection and production equipment. When the weight of the oil injection and production equipment is less than or equal to 1.5kg, the maximum and minimum temperatures are maintained for 1h respectively; when the weight of the oil injection and production equipment is greater than 1.5kg but less than or equal to 15kg, the maximum and minimum temperatures are maintained for 2h respectively; when the weight of the oil injection and production equipment is greater than 15kg but less than or equal to 150kg, the maximum and minimum temperatures are maintained for 3h respectively; when the weight of the oil injection and production equipment is greater than 150kg, the maximum and minimum temperatures are maintained for 4h respectively.

[0109] Then, the high temperature step stress test equipment performs variable temperature treatment on the oil injection and production equipment based on the temperature stress range, the temperature change rate in the first stage, the temperature change rate in the second stage, the temperature change rate in the first stage, the temperature change rate in the Nth stage, the temperature change rate step length and the insulation time.

[0110] Afterwards, at each maximum temperature and each minimum temperature, when the temperature of the oil injection and production equipment is stable, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are respectively supplied to the oil injection and production equipment at equal intervals, and the power-on and power-off processes are completed three times respectively, and the performance test of the oil injection and production equipment is carried out, and the measured values ​​are recorded. It should be noted that each interval is 3 minutes.

[0111] It should be noted that when a failure occurs during the performance test of the oil injection and production equipment, the rapid temperature change cycle step stress test should be suspended, and the oil injection and production equipment should be restored to normal temperature. When the temperature of the oil injection and production equipment is stable, a performance test should be performed to observe whether the performance of the oil injection and production equipment can return to normal. If the performance of the oil injection and production equipment can return to normal, the rapid temperature change cycle step stress test should continue; if the product performance cannot return to normal, the rapid temperature change cycle step stress test should be terminated, and the impact of the rapid temperature change cycle stress on the performance of the oil injection and production equipment should be analyzed, and the maximum temperature change rate when the performance of the oil injection and production equipment does not fail should be recorded; if the temperature change rate reaches the maximum capacity of the test equipment and the product still does not fail, the rapid temperature change cycle step stress test can be terminated and the current temperature change rate should be recorded.

[0112] In some embodiments, such as Figure 4 As shown in Figure 2, when the temperature variation cycle step stress test is carried out on the petroleum injection and production equipment, the minimum temperature of the temperature variation cycle step stress test is T L +5℃, the highest temperature is T U -5℃, the temperature stress range is -50℃~165℃, the temperature change rate of the first stage is not less than 10℃ / min, the temperature change rate of the second stage is not less than 25℃ / min, the temperature change rate of the Nth stage is not less than (N×15-5)℃ / min, the temperature change rate step length of each stage is +15(℃ / min) / step, and the number of cycles in each stage is 3 times. The temperature holding time of each maximum temperature and each minimum temperature is 2h respectively. The test starts at room temperature and is maintained at a maximum temperature of 165℃ or a minimum temperature of -50℃ for 2h each. When the temperature of the oil injection and production equipment is stable, the oil injection and production equipment is powered on and off three times at each maximum temperature and each minimum temperature. The first time, a 150V voltage is applied and a performance test is carried out, and then the power is turned off for 3min. The second time, a 120V voltage is applied and a performance test is carried out, and then the power is turned off for 3min. The third time, a 70V voltage is applied and a performance test is carried out. In the second cycle with a temperature change rate of 85°C / min, the performance test of the oil injection and production equipment failed, the rapid temperature change cycle step stress test was suspended, and the temperature of the oil injection and production equipment was restored to normal temperature. When the temperature of the oil injection and production equipment stabilized, the performance test was carried out, and the product performance could not return to normal, so the temperature change cycle step stress test was terminated. The test results showed that the temperature change cycle step stress had triggered product defects.

[0113] Specifically, in the exemplary embodiment, S500, performing a vibration step stress test on the oil injection and production equipment includes the following steps:

[0114] First, the vibration step stress application form is determined according to the capability of the vibration step stress test equipment. The vibration form can be divided into three-axis six-degree-of-freedom vibration and uniaxial vibration.

[0115] Then, the initial vibration magnitude, vibration magnitude step length, and holding time of each vibration magnitude are determined according to the vibration step stress application form. If the vibration form is three-axis six-degree-of-freedom vibration, the initial vibration magnitude should not be higher than 12 Grms, the vibration magnitude step length should not be higher than 6 Grms / step, and the holding time of each vibration magnitude should not be less than the duration of a complete electrical stress application and performance test; if the vibration form is uniaxial vibration, the initial vibration magnitude should not be higher than 4 Grms, the vibration magnitude step length should not be higher than 2 Grms / step, and the holding time of each vibration magnitude of the oil injection and production equipment in each axial direction should not be less than the duration of a complete electrical stress application and performance test.

[0116] Next, the oil injection and production equipment is installed in the vibration step stress test equipment with the help of tooling, and the performance test equipment and electrical stress application equipment are connected as needed.

[0117] Afterwards, the vibration step stress testing equipment performs vibration treatment on the oil injection and production equipment based on the vibration step stress application form, initial vibration level, vibration level step length and holding time of each vibration level.

[0118] Then, at each vibration level, a high voltage of 150V, a nominal voltage of 120V, and a low voltage of 70V are applied to the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed respectively. The performance test of the oil injection and production equipment is carried out, and the measured values ​​are recorded. It should be noted that each interval is 3 minutes. If the vibration form is three-axis six-degree-of-freedom vibration, the test of the next level is directly transferred to the next level after each vibration level is completed; if the vibration form is uniaxial vibration, the three-axis separate vibration is completed at each vibration level before transferring to the next level.

[0119] It should be pointed out that when the oil injection and production equipment fails after performance testing at a certain vibration level, the vibration level is adjusted to the initial vibration level after maintaining the vibration for a certain period of time. At this time, electrical stress is applied again and performance testing is carried out. If the performance of the oil injection and production equipment returns to normal, the test is continued at the next vibration level. The last vibration level when no failure occurs is the vibration working limit of the product; if the performance of the oil injection and production equipment cannot return to normal, the last vibration level when no failure occurs is the vibration working limit of the oil injection and production equipment, and the vibration level when failure occurs is the vibration damage limit of the oil injection and production equipment. At this time, the vibration step stress test should be terminated and the impact of vibration stress on product performance should be analyzed; if the vibration level reaches the maximum vibration capacity of the vibration step stress test equipment and the oil injection and production equipment still has no failure, the vibration step stress test can be terminated and the vibration level is used as the vibration working limit of the oil injection and production equipment.

[0120] In some embodiments, such as Figure 5As shown, when the vibration step stress test is carried out on the oil injection and production equipment, the vibration form is three-axis six-degree-of-freedom vibration, the initial vibration level is 5Grms, and the vibration level is gradually increased with a step length of 5Grms / step. The holding time of each vibration level is 15min. At each vibration level, the oil injection and production equipment is powered on and off three times. The first time, a 150V voltage is applied, and a performance test is carried out, and then the power is turned off for 3min. The second time, a 120V voltage is applied, and a performance test is carried out, and then the power is turned off for 3min. The third time, a 70V voltage is applied, and a performance test is carried out. When the vibration level reaches 60Grms, the performance test of the oil injection and production equipment fails. After maintaining this level for 15min, the vibration level is adjusted to 5Grms, and the oil injection and production equipment is powered on and off three times, and a performance test is carried out. The performance of the oil injection and production equipment returns to normal. The vibration level was adjusted to 65Grms, but the performance test of the oil injection and production equipment still failed. After maintaining this level for 15 minutes, the vibration level was adjusted to 5Grms, and the oil injection and production equipment was powered on and off three times, and a performance test was carried out. The performance of the oil injection and production equipment returned to normal. The vibration level was adjusted to 70Grms, but the performance test of the oil injection and production equipment still failed. After maintaining this level for 15 minutes, the vibration level was adjusted to 5Grms, and the oil injection and production equipment was powered on and off three times, and a performance test was carried out. The performance of the oil injection and production equipment could not return to normal, and the vibration step stress test was ended. The test results showed that the vibration step stress had stimulated the defects of the oil injection and production equipment, and the vibration working limit A of the oil injection and production equipment was determined. U =55Grms, the vibration damage limit of oil injection and production equipment is 70Grms.

[0121] Specifically, in the exemplary embodiment, S600, the temperature change and vibration comprehensive step stress test on the oil injection and production equipment includes the following steps:

[0122] First, the temperature range and temperature change rate of the temperature change and vibration comprehensive step stress test are determined according to the temperature range and temperature change rate of the temperature change cycle step stress test. The temperature stress range is -50℃~165℃, and the temperature change rate is 55℃ / min. A complete cycle includes cooling from room temperature to the lowest temperature, combining vibration with the lowest temperature at the lowest temperature stage, and then heating from the lowest temperature to the highest temperature. At the highest temperature stage, combining vibration with the highest temperature, and then returning to room temperature. The total number of cycles is not less than 5 times.

[0123] Then, the initial vibration magnitude and vibration magnitude step length of the temperature change and vibration comprehensive step stress test are calculated according to the vibration working limit. The initial vibration magnitude and vibration magnitude step length of the temperature change and vibration comprehensive step stress test are both 1 / 5 of the vibration working limit. Starting from the 5th cycle, the vibration magnitude reaches and remains at the vibration working limit. It should be pointed out that if the vibration form is uniaxial vibration, the sensitive direction of the vibration step stress test also needs to be determined in advance according to the vibration step stress test.

[0124] Next, the temperature holding time at the highest and lowest temperatures is determined according to the weight of the oil injection and production equipment. When the weight of the oil injection and production equipment is less than or equal to 1.5kg, the temperature holding time at the highest and lowest temperatures is 1h respectively; when the weight of the oil injection and production equipment is greater than 1.5kg and less than or equal to 15kg, the temperature holding time at the highest and lowest temperatures is 2h respectively; when the weight of the oil injection and production equipment is greater than 15kg and less than or equal to 150kg, the temperature holding time at the highest and lowest temperatures is 3h respectively; when the weight of the oil injection and production equipment is greater than 150kg, the temperature holding time at the highest and lowest temperatures is 4h respectively. The holding time of each vibration magnitude of the temperature change and vibration comprehensive step stress test is determined according to the vibration step stress application form. If the vibration form is three-axis six-degree-of-freedom vibration, the holding time of each vibration magnitude shall not be less than the duration of a complete electrical stress application and performance test; if the vibration form is uniaxial vibration, the holding time of each vibration magnitude of the oil injection and production equipment in each axial direction shall not be less than the duration of a complete electrical stress application and performance test.

[0125] Afterwards, the oil injection equipment is installed in the temperature change and vibration comprehensive step stress test equipment with the help of tooling. If the vibration form is uniaxial vibration, it should also be noted that the vibration direction is consistent with the sensitive direction of the oil injection equipment. Connect the performance test equipment and electrical stress application equipment as needed.

[0126] Next, the temperature change and vibration comprehensive step stress test equipment performs temperature change treatment on the oil injection and production equipment based on the temperature range, temperature change rate and temperature holding time of the temperature change and vibration comprehensive step stress test. At each maximum temperature and each minimum temperature, the temperature change and vibration comprehensive step stress test equipment performs vibration treatment on the oil injection and production equipment based on the initial vibration magnitude, vibration magnitude step length, and holding time of each vibration magnitude. And at each maximum temperature and each minimum temperature, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are respectively introduced into the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed respectively, and the oil injection and production equipment is subjected to performance testing, and the measured values ​​are recorded. It should be noted that the duration of each interval is 3 minutes.

[0127] It should be pointed out that when a fault occurs during the performance test of the oil injection and production equipment, the temperature change and vibration comprehensive step stress test should be suspended, the vibration should be stopped, and the temperature should be restored to normal temperature. After the temperature of the oil injection and production equipment stabilizes, a performance test should be carried out to observe whether the performance of the oil injection and production equipment can return to normal. If the performance of the oil injection and production equipment returns to normal, the temperature change and vibration comprehensive step stress test should continue; if the performance of the oil injection and production equipment cannot return to normal, the temperature and vibration comprehensive step stress test should be terminated, and the impact of temperature change and vibration comprehensive stress on product performance should be analyzed.

[0128] In some embodiments, such as Figure 6 As shown in the figure, when the temperature change and vibration comprehensive step stress test is carried out on the oil injection and production equipment, the temperature stress range is -50℃~165℃, and the temperature change rate is 55℃ / min. The vibration form is three-axis six-degree-of-freedom vibration, the initial vibration magnitude is 11Grms, and the vibration magnitude is increased with a step length of 11Grms / step. From the 5th cycle, the vibration magnitude is kept at 55Grms. The test starts at room temperature and is maintained for 2h at each maximum temperature of 165℃ or each minimum temperature of -50℃. When the temperature of the oil injection and production equipment is stable, vibration stress is applied for 15min. At each maximum temperature and each vibration magnitude, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are passed to the oil injection and production equipment in turn at equal intervals. And at each minimum temperature and each vibration magnitude, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are passed to the oil injection and production equipment in turn at equal intervals. When the test reached the 7th cycle, the performance test of the oil injection and production equipment failed, and the temperature change and vibration comprehensive step stress test was suspended, the vibration was stopped, and the temperature was restored to normal. When the temperature of the oil injection and production equipment stabilized, the performance test was carried out. The product performance could not return to normal, and the temperature and vibration comprehensive step stress test was ended. The test results showed that the temperature and vibration comprehensive step stress had stimulated product defects.

[0129] Specifically, in the exemplary embodiment, S700, the high-temperature and high-pressure comprehensive step stress test on the oil injection and production equipment includes a constant-pressure temperature increase test phase and a constant-temperature pressure increase test phase.

[0130] First, according to the results of the high-temperature step stress test and the capabilities of the high-temperature and high-pressure comprehensive step stress test equipment, the temperature stress range of the constant pressure temperature rise test stage is determined. During the constant pressure temperature rise test stage, the initial temperature should not be lower than the initial temperature of the high-temperature step stress test, and should not be higher than the high-temperature working limit. During the constant pressure temperature rise test stage, the maximum temperature should be lower than the high-temperature damage limit.

[0131] Then, it is determined that the initial pressure of the constant temperature and pressure increase test phase is not higher than the maximum value of the actual working pressure that the oil injection and production equipment will be subjected to in the oil field water injection well.

[0132] After that, the components of the oil injection and production equipment are analyzed, and the temperature step length of the constant pressure and temperature test phase and the pressure step length of the constant temperature and pressure test phase are determined according to the downhole working conditions. The pressure step length generally does not exceed 10MPa / step.

[0133] Next, according to the capability of the high temperature and high pressure comprehensive step stress test equipment, the temperature change rate in the constant pressure temperature rise test phase and the pressure change rate in the constant temperature pressure rise test phase are determined.

[0134] Afterwards, the temperature holding time at each temperature is determined according to the weight of the oil injection and production equipment. When the weight of the oil injection and production equipment is less than or equal to 1.5kg, the temperature holding time is 1h; when the weight of the oil injection and production equipment is greater than 1.5kg but less than or equal to 15kg, the temperature holding time is 2h; when the weight of the oil injection and production equipment is greater than 15kg but less than or equal to 150kg, the temperature holding time is 3h; when the weight of the oil injection and production equipment is greater than 150kg, the temperature holding time is 4h.

[0135] Next, with the help of tooling, the oil injection and production equipment is installed in the high-temperature and high-pressure comprehensive step stress testing equipment, and the performance testing equipment and electrical stress application equipment are connected as needed.

[0136] Afterwards, the high temperature and high pressure comprehensive step stress test equipment starts the constant pressure heating stage based on the initial temperature and initial pressure, keeps the pressure constant, and gradually increases the test temperature with the determined temperature step length. At each temperature, after the temperature is maintained for a determined time, when the temperature of the oil injection and production equipment is stable, a high voltage of 150V, a nominal voltage of 120V, and a low voltage of 70V are successively introduced to the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed. The oil injection and production equipment is subjected to performance tests, and the measured values ​​are recorded. When the temperature rises to the high temperature working limit, it is transferred to the constant temperature and pressure test stage. During the constant temperature and pressure test stage, the temperature is constant and always 170°C. The test pressure is gradually increased with the previously determined pressure step length. After each pressure is stable, a high voltage of 150V, a nominal voltage of 120V, and a low voltage of 70V are successively introduced to the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed. The oil injection and production equipment is subjected to performance tests, and the measured values ​​are recorded. It should be noted that the interval time for each time is 3 minutes.

[0137] It should be pointed out that in the constant pressure and temperature rise test stage, when the performance test of the oil injection and production equipment fails at a certain temperature, the temperature stress will be restored to the previous order of magnitude, and the performance test will be carried out after the temperature stabilizes. If the function and performance of the oil injection and production equipment return to normal, the temperature and pressure when the oil injection and production equipment fails are the high temperature and high pressure working limits of the oil injection and production equipment; if the oil injection and production equipment still does not work properly, the temperature and pressure before the oil injection and production equipment fails are the high temperature and high pressure working limits of the tested product, and the temperature and pressure when the oil injection and production equipment fails are the high temperature and high pressure destruction limits of the oil injection and production equipment. At this time, the high temperature and high pressure comprehensive step stress test should be ended, and the influence of the high temperature and high pressure comprehensive stress on the performance of the oil injection and production equipment should be analyzed; if the test temperature reaches the highest temperature and the oil injection and production equipment still has not failed, the constant pressure and temperature rise test stage can be ended and the constant temperature and pressure rise test stage can be entered. During the constant temperature and pressure increase stage, when the performance test of the oil injection and production equipment fails at a certain pressure, the pressure will be restored to the previous level, and the performance test will be carried out after the pressure stabilizes. If the function and performance of the oil injection and production equipment return to normal, the temperature and pressure when the oil injection and production equipment fails are the high temperature and high pressure working limits of the oil injection and production equipment; if the oil injection and production equipment still does not work properly, the temperature and pressure before the oil injection and production equipment fails are the high temperature and high pressure working limits of the tested oil injection and production equipment, and the temperature and pressure when the oil injection and production equipment fails are the high temperature and high pressure destruction limits of the oil injection and production equipment. At this time, the high temperature and high pressure comprehensive step stress test should be terminated, and the influence of the high temperature and high pressure comprehensive stress on the performance of the oil injection and production equipment should be analyzed; if the test pressure reaches the maximum capacity of the test equipment and the oil injection and production equipment still has not failed, the high temperature and high pressure comprehensive step stress test can be terminated, and the temperature and pressure are used as the high temperature and high pressure working limits of the oil injection and production equipment.

[0138] In some embodiments, such as Figure 7As shown in the figure, when the high temperature and high pressure comprehensive step stress test is carried out on the oil injection and production equipment, the initial temperature in the constant pressure and temperature rise test stage is 125℃, the initial pressure is 60MPa, the pressure is kept constant, and the test temperature is gradually increased with a temperature step length of 5℃ / step, maintained at each temperature for 2h, the highest temperature is 170℃, and the temperature change rate is 1℃ / min. At each temperature, when the temperature of the oil injection and production equipment is stable, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are successively passed to the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed. The performance test of the oil injection and production equipment is carried out, and the measured values ​​are recorded. When the temperature reaches the highest temperature of 170℃ in the constant pressure and temperature rise test stage, the oil injection and production equipment still has no faults, the constant pressure and temperature rise test stage is ended, and the constant temperature and pressure rise test stage is entered. In the constant temperature and pressure rising stage, the initial temperature is 170℃, and the temperature remains constant. The initial pressure is 60MPa. The test pressure is gradually increased with a pressure step length of 5MPa / step, and the pressure change rate is 0.2MPa / min. After each pressure stabilization, a high voltage of 150V, a nominal voltage of 120V and a low voltage of 70V are successively supplied to the oil injection and production equipment at equal intervals, and three power-on and power-off processes are completed. The oil injection and production equipment is subjected to performance tests and the measured values ​​are recorded. In the constant temperature and pressure rising test stage, when the pressure rises to 95MPa, the performance test of the oil injection and production equipment fails. The pressure is restored to 90MPa. After the pressure stabilizes, the performance test is carried out. The performance of the oil injection and production equipment cannot be restored to normal, and the high temperature and high pressure comprehensive step stress test is ended. The test results show that the high temperature and high pressure comprehensive stress has stimulated the defects of the product, and the high temperature and high pressure working limit of the oil injection and production equipment is determined to be 170℃, 90MPa, and the high temperature and high pressure destruction limit of the oil injection and production equipment is 170℃, 95MPa.

[0139] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0140] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0141] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for stimulating defects in oil injection and production equipment, characterized in that: The following steps are involved: Conducting a low-temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine the low-temperature working limit and the low-temperature damage limit; Performing a high-temperature step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine a high-temperature working limit and a high-temperature damage limit; Performing a temperature change cycle step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment; Performing a vibration step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment and determine a vibration working limit and a vibration damage limit; Performing a temperature change and vibration comprehensive step stress test on the oil injection and production equipment to stimulate defects of the oil injection and production equipment; A high-temperature and high-pressure comprehensive step stress test is performed on the oil injection and production equipment to stimulate the defects of the oil injection and production equipment and determine the high-temperature and high-pressure comprehensive working limit and the high-temperature and high-pressure comprehensive destruction limit.

2. The method for stimulating defects in oil injection and production equipment according to claim 1, characterized in that: When conducting the low-temperature step stress test, the high-temperature step stress test, the temperature change cycle step stress test, the vibration step stress test, the temperature change and vibration comprehensive step stress test, and the high-temperature and high-pressure comprehensive step stress test, the oil injection and production equipment is also subjected to an electrical stress test.

3. The method for stimulating defects in oil injection and production equipment according to claim 2, characterized in that: The low temperature step stress test on the oil injection and production equipment comprises the following steps: Installing the oil injection and production equipment in a low-temperature step stress testing device; Analyze the components constituting the oil injection and production equipment to determine the initial temperature and temperature step length of the low temperature step stress test; Determine the temperature change rate according to the low temperature step stress test equipment, and determine the temperature holding time at each temperature according to the weight of the oil injection and production equipment; The low temperature step stress test equipment performs a cooling process on the oil injection and production equipment based on the initial temperature, the temperature step length, the temperature change rate and the temperature holding time; At each temperature, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

4. The method for stimulating defects in oil injection and production equipment according to claim 2, characterized in that: The high temperature step stress test on the oil injection and production equipment comprises the following steps: Installing the oil injection and production equipment in a high-temperature step stress testing device; Analyze the components constituting the oil injection and production equipment, and determine the initial temperature and temperature step length of the high temperature step stress test according to the downhole temperature; Determine the temperature change rate according to the high temperature step stress test equipment, and determine the temperature holding time at each temperature according to the weight of the oil injection and production equipment; The high temperature step stress test equipment performs a temperature raising process on the oil injection and production equipment based on the initial temperature, the temperature step length, the temperature change rate and the temperature holding time; At each temperature, high voltage, nominal voltage and low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

5. The method for stimulating defects in oil injection and production equipment according to claim 2, characterized in that: The temperature variation cycle step stress test on the oil injection and production equipment comprises the following steps: Installing the oil injection and production equipment in a temperature change cycle step stress test equipment; Calculate the temperature range of the temperature variation cycle step stress test according to the low temperature working limit and the high temperature working limit; Determine the temperature change rate of the first stage, the temperature change rate of the second stage, the temperature change rate of the Nth stage and the step length of the temperature change rate according to the temperature change cycle step stress test equipment, and determine the temperature holding time at the highest temperature and the lowest temperature according to the weight of the oil injection and production equipment; The temperature variation cycle step stress test equipment performs temperature variation treatment on the oil injection and production equipment based on the temperature stress range, the temperature variation rate of the first stage, the temperature variation rate of the second stage, the temperature variation rate of the Nth stage, the temperature variation rate step length and the insulation time; At each of the highest temperatures and each of the lowest temperatures, a high voltage, a nominal voltage and a low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

6. The method for stimulating defects in oil injection and production equipment according to claim 5, characterized in that: The vibration step stress test on the oil injection and production equipment comprises the following steps: Determine the vibration step stress application form according to the vibration step stress test equipment; Determining the initial vibration magnitude, the vibration magnitude step length, and the holding time of each vibration magnitude according to the vibration step stress application form; The oil injection and production equipment is installed in the vibration step stress testing equipment, and the vibration step stress testing equipment performs vibration treatment on the oil injection and production equipment based on the vibration step stress application form, the initial vibration magnitude, the vibration magnitude step length, and the holding time of each vibration magnitude; At each vibration level, the high voltage, the nominal voltage and the low voltage are sequentially supplied to the oil injection and production equipment at equal intervals.

7. The method for stimulating defects in oil injection and production equipment according to claim 6, characterized in that: The temperature change and vibration comprehensive step stress test on the oil injection and production equipment comprises the following steps: Determine the temperature range and temperature change rate of the temperature change and vibration comprehensive step stress test according to the temperature range and temperature change rate of the temperature change cycle step stress test; Calculate the initial vibration magnitude and vibration magnitude step length of the temperature change and vibration comprehensive step stress test according to the vibration working limit; Determine the temperature holding time at the highest temperature and the lowest temperature according to the weight of the oil injection and production equipment, and determine the holding time of each vibration level of the temperature change and vibration comprehensive step stress test according to the vibration step stress application form; The oil injection and production equipment is installed in a temperature change and vibration comprehensive step stress testing equipment; the temperature change and vibration comprehensive step stress testing equipment performs temperature change treatment on the oil injection and production equipment based on the temperature range, the temperature change rate and the temperature holding time of the temperature change and vibration comprehensive step stress test; at each of the highest temperature and each of the lowest temperature, the temperature change and vibration comprehensive step stress testing equipment performs vibration treatment on the oil injection and production equipment based on the initial vibration level, the vibration level step length and the holding time of each vibration level; and at each of the highest temperature and each of the lowest temperature, high voltage, nominal voltage and low voltage are sequentially applied to the oil injection and production equipment at equal intervals.

8. The method for stimulating defects in oil injection and production equipment according to claim 4, characterized in that: The high-temperature and high-pressure comprehensive step stress test on the oil injection and production equipment includes a constant-pressure temperature increase test stage and a constant-temperature pressure increase test stage.

9. The method for stimulating defects in oil injection and production equipment according to claim 8, characterized in that: The initial temperature of the constant pressure temperature rise test stage is between the initial temperature of the high temperature step stress test and the high temperature working limit, the maximum temperature is lower than the high temperature damage limit, and the temperature change rate is 1°C / min; The initial pressure of the constant temperature and pressure increase test stage is 60 MPa, the pressure step length is less than or equal to 10 MPa / step, and the pressure change rate is 0.2 MPa / min.

10. The method for stimulating defects in oil injection and production equipment according to claim 1, characterized in that: Before performing the low-temperature step stress test on the oil injection and production equipment, determining the test parameters to be tested; The test parameters to be measured include ground current when power is on, ground current during communication, temperature during communication, valve state during communication, valve state when valve is opened, motor current when valve is opened, valve state when valve is closed, motor current when valve is closed and ground current when power is off.