Staged arrangement structure and method for general anchorage for cable emergency protection

By arranging cable anchorage structures for emergency protection in grades on both sides of the bridge, and using cable eye rings and cables for graded arrangement, the problem in the existing technology that anchorages are difficult to adapt to multi-level lifting traffic is solved, and a more efficient construction and greater carrying capacity.

CN118779941APending Publication Date: 2024-10-15SHIJIAZHUANG TIEDAO UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410760159.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing anchorage structure for emergency cable protection is difficult to adapt to the increasing demand for multi-level lifting traffic. The construction period is long and it is difficult to flexibly adjust.

Method used

A hierarchically arranged cable anchorage structure for emergency protection is adopted. Main towers, cable saddles and single main cables are set up on both sides of the bridge, and single anchorages are set up at intervals outside the main tower. Cable eye rings and stay cables are used for grading. According to the layout, single anchorages are gradually added according to the load to enhance the overall bearing capacity.

Benefits of technology

It achieves flexible response to multi-level hoisting traffic, shortens the anchorage construction time, reduces the difficulty of foundation processing, and improves the construction efficiency and overall load-bearing capacity of a single anchorage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779941A_ABST
    Figure CN118779941A_ABST
Patent Text Reader

Abstract

The invention relates to a grading arrangement structure and method for general anchors for cable emergency protection. The grading arrangement structure comprises main towers arranged on the two sides of a bridge end, cable saddles installed at the top ends of the main towers, a single main cable erected on the cable saddles and a plurality of single anchors arranged on the outer sides of the main towers. The single anchors are arranged on the ground at intervals in the bridge direction. The method comprises the steps that a single main cable is arranged, inhaul cable eye rings are fixedly installed at the outer end of the single main cable, inhaul cables corresponding to the single anchors in number are installed on the inhaul cable eye rings, the tail end of each inhaul cable is fixed to the corresponding single anchor, and the arrangement process of the S1 stage, the S2 stage,..., the Sm stage is adopted; according to the method, the external loads acting on the anchors are graded according to the erecting and hoisting operation process of the cable emergency conveying system, the arrangement stages of the anchors are graded with the external loads as the standard, the overall bearing capacity of the anchors is gradually enhanced in the mode that the single anchors are increased one by one, and the bearing requirement for the multi-stage external loads is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a cable emergency rescue universal anchorage hierarchical arrangement structure and method, belonging to the field of cable emergency rescue. Background Art

[0002] my country's natural geographical conditions are characterized by vast mountainous areas and numerous rivers. In recent years, my country's bridge construction has achieved rapid development, and various large-span bridges have been built on mountain railways and highways. If large-span bridges in mountainous canyon areas are damaged by earthquakes, floods, and mudslides, transportation lines will be severely blocked, and post-disaster recovery will be extremely difficult. Using cable systems for emergency maintenance of large-span bridges will be an effective means, and anchors are the key to ensuring the normal fixation of cables. However, most existing anchors are permanent structures built at one time, with a long construction period, and it is difficult to adapt to the gradually increasing multi-level lifting and traffic needs. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a cable emergency universal anchorage graded arrangement structure and method which can arrange anchors in grades on both sides of the bridge along the bridge direction, adapt to the passage of multi-stage lifting weights that increase step by step, and ensure emergency cable transportation.

[0004] The present invention adopts the following technical solution:

[0005] The cable emergency protection universal anchor graded arrangement structure of the present invention comprises main towers arranged on both sides of the bridge end, saddles installed on the top of the main towers, a single main cable erected on the saddle and a plurality of single anchors arranged outside the main towers; the single anchors are arranged on the ground at intervals along the bridge direction; a cable eye is fixedly installed at the outer end of the single main cable, cables corresponding to the number of single anchors are installed on the cable eye, and the end of each cable is fixed to the corresponding single anchor.

[0006] The cable emergency protection universal anchorage hierarchical arrangement method of the present invention, according to the dead weight of the main cable, the number and weight of the hoisting trolley installed on the main cable and the weight of the heavy object hoisted on the hoisting trolley, the load acting on the anchorage is graded from small to large into P1, P2, ..., Pm, and the anchorage multi-level arrangement stages S1, S2, ..., Sm are divided. The anchorage hierarchical arrangement method is as follows:

[0007] The layout process of the S1 stage is:

[0008] 1. Extend one end of the main cable along the side span downward and intersect the ground at a point. Take this point as the first single anchorage arrangement point and build a single anchorage. Install the cable between the center point of the cable eye and the single anchorage. The distance between the center point of the cable eye and the single anchorage arrangement point is the cable length. The angle between the straight line determined by the center point of the cable eye and the single anchorage point and the horizontal plane is the cable inclination angle.

[0009] 2. Calculate the cable length and cable inclination angle corresponding to the first single anchor and use them as the initial values;

[0010] 3. Set the number of single anchors required for P1;

[0011] 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, and the length and inclination of the cables corresponding to each single anchor;

[0012] 5. Compare the bearing capacity N of the graded anchorage and the first-level load P1 acting on the anchorage;

[0013] When the bearing capacity N of the graded anchor is greater than or equal to the first-level load P1 acting on the anchor, the calculation stops;

[0014] When the bearing capacity N of the graded anchor is less than the first level load P1 acting on the anchor, add a single anchor and repeat the process from three to five until the bearing capacity N of the graded anchor is greater than or equal to the first level load P1 acting on the anchor, then stop the calculation;

[0015] 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the S1 stage can be completed;

[0016] The layout process of the Sm stage is:

[0017] 1. The anchorage arrangement state at the time when calculation was stopped in the Sm-1 stage is taken as the initial state of this stage;

[0018] 2. Inherit the cable length and cable inclination angle corresponding to each single anchor when the calculation is stopped in the Sm-1 stage as the initial value;

[0019] 3. Set the number of single anchors required for Pm;

[0020] 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, the length of each single anchor cable and the inclination of the cable;

[0021] 5. Compare the bearing capacity N of the graded anchorage and the mth grade load Pm acting on the anchorage.

[0022] When the bearing capacity N of the graded anchor is greater than or equal to the mth grade load Pm acting on the anchor, the calculation stops;

[0023] When the bearing capacity N of the graded anchor is less than the mth level load Pm acting on the anchor, add a single anchor and repeat the process three to five until the bearing capacity N of the graded anchor is greater than or equal to the mth level load Pm acting on the anchor, then stop the calculation;

[0024] 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the Sm stage can be completed;

[0025] The arrangement process of each stage in S2,…,Sm-1 is the same as the arrangement process of stage Sm.

[0026] In the method for arranging cable emergency anchorages of the present invention, in step 1 of the arrangement process of stage S1, the first single anchorage is anchor #1, the length of the cable corresponding to anchor #1 is L1, and the inclination angle of the cable is α1; the single anchorages added later are anchor #2, anchor #3, anchor #i, and the lengths of the corresponding cables are L2, L3, ... L i , the corresponding cable inclination angles are α2, α3...α i ; The design value of the single anchor bearing capacity is Q, and the graded anchor bearing capacity N is calculated using the following formula:

[0027]

[0028] In the formula, N is the bearing capacity of graded anchors, Q is the bearing capacity of a single anchor, L1 is the length of the initial No. 1 anchor cable, and the corresponding α1 is the inclination angle of the initial No. 1 anchor cable; L i is the length of the anchor cable i#, and the corresponding α i is the inclination angle of anchor cable; G max is the maximum value function, and n is the number of single anchors.

[0029] The present invention determines the maximum value function G defined by the following formula: max Value,

[0030]

[0031] In the formula, G max is the maximum value function; L1 is the initial length of the 1# anchor cable, and the corresponding α1 is the initial inclination angle of the 1# anchor cable; L n is the length of the anchor cable n#, and the corresponding α n is the inclination angle of the n# anchor cable; according to the number of single anchors n, the function G max The collection gets n items.

[0032] The positive effects of the present invention are as follows: the present invention adopts a layout structure in which multiple single anchors are collaboratively stressed, which can make the volume of a single anchor smaller, reduce the construction difficulty of foundation treatment and anchor drilling during the construction of a single anchor, and improve the construction efficiency of a single anchor; each single anchor construction process is independent of each other, and the construction of a single anchor in the subsequent stage can be carried out without affecting the traffic in the previous stage. After the construction of a single anchor is completed, it is only necessary to install and adjust the corresponding cable during the traffic gap to achieve the conversion of the load-bearing stage. Multiple single anchors can be constructed simultaneously to shorten the overall anchor construction time.

[0033] The present invention grades the external loads acting on the anchor according to the erection and hoisting operation process of the cable emergency conveying system, and grades the arrangement stage of the anchor based on this standard. By increasing single anchors one by one, the overall bearing capacity of the anchor is gradually enhanced to meet the bearing requirements of multiple levels of external loads. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Attached Figure 1 The present invention is a flowchart of the hierarchical arrangement of anchorage;

[0035] Attached Figure 2 This is a schematic diagram of the graded anchoring structure of the present invention;

[0036] Attached Figure 3 This is a schematic diagram of the hierarchical arrangement of anchorages according to the present invention;

[0037] Attached Figure 4 This is a schematic diagram of the S1 stage arrangement structure of the present invention;

[0038] Attached Figure 5 This is a schematic diagram of the S2 stage arrangement structure of the present invention;

[0039] Attached Figure 6 This is a schematic diagram of the S3 stage structure arrangement of the present invention. DETAILED DESCRIPTION

[0040] As attached Figure 1 As shown, the cable emergency protection universal anchorage hierarchical arrangement structure of the present invention comprises a main tower 1 arranged on both sides of the bridge end, a saddle 2 installed on the top of the main tower 1, a single main cable 3 erected on the saddle 2, and a plurality of single anchors 4 arranged on the outside of the main tower 1; the single anchors 4 are arranged on the ground at intervals along the bridge direction; a cable eye 5 is fixedly installed on the outer end of the single main cable 3, and cables 6 corresponding to the number of single anchors 4 are installed on the cable eye 5, and the end of each cable 6 is fixed to the corresponding single anchor 4.

[0041] As attached Figure 2 , 3 As shown, the cable emergency protection universal anchorage hierarchical arrangement method of the present invention, according to the deadweight of the main cable 3, the number and weight of the trolley 7 installed on the main cable 3 and the weight of the heavy object 8 hoisted on the trolley, the load acting on the anchorage is graded from small to large into P1, P2, ..., Pm, and the anchorage multi-level arrangement stages S1, S2, ..., Sm are divided. The anchorage hierarchical arrangement method is as follows:

[0042] The layout process of the S1 stage is:

[0043] 1. Extend one end of the main cable 3 along the side span downward and intersect the ground at a point. Take this point as the first single anchorage arrangement point and build a single anchorage. Install the cable between the center point of the cable eye 5 and the single anchorage arrangement point; the distance between the center point of the cable eye 5 and the single anchorage arrangement point is the cable length, and the angle between the straight line determined by the center point of the cable eye 5 and the single anchorage point and the horizontal plane is the cable inclination angle;

[0044] 2. Calculate the cable length and cable inclination corresponding to a single anchor and use them as the initial values;

[0045] 3. Set the number of single anchors required for P1;

[0046] 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, and the length and inclination of the cables corresponding to each single anchor;

[0047] 5. Compare the graded anchor bearing capacity N and the first level load P1 acting on the anchor; when the graded anchor bearing capacity N is greater than or equal to the first level load P1 acting on the anchor, stop the calculation;

[0048] When the bearing capacity N of the graded anchor is less than the first level load P1 acting on the anchor, add a single anchor and repeat the process from three to five until the bearing capacity N of the graded anchor is greater than or equal to the first level load P1 acting on the anchor, then stop the calculation;

[0049] 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the S1 stage can be completed;

[0050] The layout process of the S2 stage is:

[0051] 1. The anchorage arrangement state at the time when calculation is stopped in stage S1 is taken as the initial state of this stage;

[0052] 2. Inherit the cable length and cable inclination of each single anchor when the operation is stopped in stage S1 as the initial value;

[0053] 3. Determine the number of single anchors required for S2;

[0054] 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, the length of each single anchor cable and the inclination of the cable;

[0055] 5. Compare the graded anchor bearing capacity N and the second level load P2 acting on the anchor. When the graded anchor bearing capacity N is greater than or equal to the second level load P2 acting on the anchor, stop the calculation;

[0056] When the bearing capacity N of the graded anchor is less than the second level load P2 acting on the anchor, add a single anchor and repeat the process three to five until the bearing capacity N of the graded anchor is greater than or equal to the second level load P2 acting on the anchor, then stop the operation;

[0057] 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the S2 stage can be completed;

[0058] The arrangement process of the S3 stage is arranged on the basis of the arrangement process of the S2 stage, which will not be described in detail here;

[0059] …

[0060] The layout process of the Sm stage is:

[0061] 1. The anchorage arrangement state at the time when calculation was stopped in the Sm-1 stage is taken as the initial state of this stage;

[0062] 2. Inherit the cable length and cable inclination angle corresponding to each single anchor when the calculation is stopped in the Sm-1 stage as the initial value;

[0063] 3. Determine the number of single anchors required for Pm;

[0064] 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the design value of the single anchorage bearing capacity, the length of each single anchorage cable and the inclination of the cable;

[0065] 5. Compare the graded anchor bearing capacity N and the nth level load Pn acting on the anchor. When the graded anchor bearing capacity N is greater than or equal to the mth level load Pm acting on the anchor, stop the calculation;

[0066] When the bearing capacity N of the graded anchor is less than the mth load Pm acting on the anchor, add a single anchor and repeat processes three to five until the bearing capacity N of the graded anchor is greater than or equal to the mth load Pm acting on the anchor. Then stop the calculation; arrange the single anchors according to the arrangement status of the single anchors when the calculation is stopped, and the Sm stage can be completed.

[0067] Each single anchor is arranged on the same side of the bridge, distributed and arranged on the ground along the direction of the bridge, and transmits the load after being connected with the corresponding cables.

[0068] As attached Figure 2 As shown in the figure, in the first step of the arrangement process of stage S1, the first single anchor is anchor #1, the corresponding cable length of anchor #1 is L1, and the cable inclination angle is α1; then the single anchors added later are anchor #2, anchor #3, ... anchor #i, and the corresponding cable lengths are L2, L3, ... L i , the corresponding cable inclination angles are α2, α3...α i ; The design value of the single anchor bearing capacity is Q, and the graded anchor bearing capacity N is calculated using the following formula:

[0069]

[0070] In the formula, N is the bearing capacity of graded anchorage, Q is the bearing capacity of single anchorage, L1 is the length of initial No. 1 anchor cable, and the corresponding α1 is the inclination angle of initial No. 1 anchor cable; L i is the length of the anchor cable i#, and the corresponding α i is the inclination angle of anchor cable; G max is the maximum value function, and n is the number of single anchors.

[0071] The maximum value function G defined is determined by the following formula max Value:

[0072]

[0073] In the formula, G max is the maximum value function; L1 is the initial length of the 1# anchor cable, and the corresponding α1 is the initial inclination angle of the 1# anchor cable; L n is the length of the anchor cable n#, and the corresponding α n is the inclination angle of the n# anchor cable; according to the number of single anchors n, the function G max The collection gets n items.

[0074] The implementation process of the present invention is described in detail below by taking an actual working condition as an example.

[0075] The proposed design parameters are as follows:

[0076] Table 1: Proposed design parameters

[0077]

[0078] The process of grading the anchorage is shown in the attached figure. Figure 4-6 As shown, the calculation results of each layout parameter and each layout state are as follows:

[0079] Combined with Figure 4 As shown in Table 2: Single anchor state layout parameters and calculation results

[0080]

[0081] Combined with the proposed parameters, single anchors are added to accommodate the first level external load P1;

[0082] Combined with Figure 4 As shown in Table 3: Dual-anchor state related parameters and calculation results

[0083]

[0084] At this point, the anchorage arrangement can meet the first level of main cable force P1 = 80t. It is necessary to continue to increase single anchorages in combination with the proposed parameters to adapt to the second level of external load P2.

[0085] Combined with Figure 5 As shown in Table 4: Three anchor state related parameters and calculation results:

[0086]

[0087] At this point, the anchorage arrangement can meet the second level P2 = 160t main cable force. It is necessary to continue to increase single anchorages in combination with the proposed parameters to adapt to the third level external load P3.

[0088] Combined with Figure 6 As shown in Table 5: Related parameters and calculation results of the four anchor states

[0089]

[0090] Single anchors are further added in combination with the proposed parameters to accommodate the third level external load P3.

[0091] Combined with Figure 6 As shown in Table 6: Five anchor state related parameters and calculation results

[0092]

[0093] At this point, the anchorage arrangement can meet the third level external load P3 = 240t.

[0094] In order to describe the implementation process as briefly as possible and fully illustrate the implementation process, the above embodiment is an arrangement process assuming that m=3; when m>3, the arrangement process up to Pm can be achieved by continuing to increase the arrangement of single anchors.

[0095] It can be seen from the above calculation results that under any of the above assumed initial parameters, the second, third and fifth anchor states can meet the three-level load requirements of P1, P2 and P3 respectively, and the anchor arrangement that meets the S1, S2 and S3 stages can be achieved.

[0096] The present invention adopts a layout structure in which multiple single anchors are cooperatively stressed, which can make the volume of a single anchor smaller, reduce the construction difficulty of foundation treatment and anchor hole drilling during the construction of the single anchor, and improve the construction efficiency of the single anchor; the construction processes of each single anchor are independent of each other, and the construction of the single anchor in the subsequent stage can be carried out without affecting the traffic in the previous stage. After the construction of the single anchor is completed, it is only necessary to install and adjust the corresponding cable during the traffic gap to achieve the conversion of the load-bearing stage. Multiple single anchors can be constructed simultaneously to shorten the overall anchor construction time.

[0097] The present invention grades the external loads acting on the anchor according to the erection and hoisting operation process of the cable emergency conveying system, and grades the arrangement stage of the anchor based on this standard. By increasing single anchors one by one, the overall bearing capacity of the anchor is gradually enhanced to meet the bearing requirements of multiple levels of external loads.

[0098] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A cable emergency anchorage hierarchical arrangement structure, It is characterized in that It comprises a main tower (1) arranged on both sides of the bridge end, a saddle (2) installed on the top of the main tower (1), a single main cable (3) erected on the saddle (2), and a plurality of single anchors (4) arranged outside the main tower (1); the single anchors (4) are arranged on the ground at intervals along the bridge direction; A cable eye (5) is fixedly installed at the outer end of a single main cable (3), and cables (6) corresponding to the number of single anchors (4) are installed on the cable eye (5), and the end of each cable (6) is fixed to the corresponding single anchor (4).

2. A method for arranging cable anchorages in a hierarchical manner for emergency protection. It is characterized in that According to the deadweight of the main cable (3), the number and weight of the trolley (7) installed on the main cable (3), and the weight of the heavy object (8) hoisted on the trolley, the load acting on the anchor is graded from small to large into P1, P2, ..., Pm, and the anchor is divided into multiple-level arrangement stages S1, S2, ..., Sm. The graded arrangement method of the anchor is as follows: The layout process of the S1 stage is:

1. Extend one end of the side span main cable (3) downward and intersect the ground at a point, take this point as the first single anchor arrangement point and build a single anchor, and install the cable between the center point of the cable eye (5) and the single anchor; The distance between the center point of the cable eye (5) and the single anchoring arrangement point is the cable length, and the angle between the straight line determined by the center point of the cable eye (5) and the single anchoring point and the horizontal plane is the cable inclination angle; 2. Calculate the cable length and cable inclination angle corresponding to the first single anchor and use them as the initial values; 3. Set the number of single anchors required for P1; 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, and the length and inclination of the cables corresponding to each single anchor; 5. Compare the bearing capacity N of the graded anchorage and the first-level load P1 acting on the anchorage; When the bearing capacity N of the graded anchor is greater than or equal to the first-level load P1 acting on the anchor, the calculation stops; When the bearing capacity N of the graded anchor is less than the first level load P1 acting on the anchor, add a single anchor and repeat the process from three to five until the bearing capacity N of the graded anchor is greater than or equal to the first level load P1 acting on the anchor, then stop the calculation; 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the S1 stage can be completed; The layout process of the Sm stage is:

1. The anchorage arrangement state at the time when calculation was stopped in the Sm-1 stage is taken as the initial state of this stage; 2. Inherit the cable length and cable inclination angle corresponding to each single anchor when the operation is stopped in the Sm-1 stage as the initial value; 3. Set the number of single anchors required for Pm; 4. Calculate the graded anchorage bearing capacity N based on the number of single anchors, the bearing capacity of single anchors, the length of each single anchor cable and the inclination of the cable; 5. Compare the bearing capacity N of the graded anchorage and the mth grade load Pm acting on the anchorage. When the bearing capacity N of the graded anchor is greater than or equal to the mth grade load Pm acting on the anchor, the calculation stops; When the bearing capacity N of the graded anchor is less than the mth level load Pm acting on the anchor, add a single anchor and repeat the process three to five until the bearing capacity N of the graded anchor is greater than or equal to the mth level load Pm acting on the anchor, then stop the calculation; 6. Arrange the anchors according to the arrangement status of each anchor when the operation is stopped, and the Sm stage can be completed; The arrangement process of each stage in S2,…,Sm-1 is the same as the arrangement process of stage Sm.

3. A method for arranging anchors in stages for emergency cable protection according to claim 2, It is characterized in that In the first step of the S1 stage arrangement process, the first single anchor is anchor #1, and the length of the cable corresponding to anchor #1 is L 1 , the cable inclination angle is α 1 ; Then the single anchors added later are 2# anchor, 3# anchor, ... i# anchor, and the corresponding cable lengths are L 2 , L 3 , ...L i , the corresponding cable inclination angles are α 2 , α 3 ...α i ; The design value of the single anchor bearing capacity is Q, and the graded anchor bearing capacity N is calculated using the following formula: In the formula, N is the bearing capacity of graded anchors, Q is the bearing capacity of a single anchor, and L is 1 is the initial length of the 1# anchor cable, and the corresponding α 1 is the initial 1# anchor cable inclination angle; L i is the length of the anchor cable i#, and the corresponding α i is the inclination angle of anchor cable; G max is the maximum value function, and n is the number of single anchors.

4. A method for arranging anchors in stages for emergency cable protection according to claim 3, It is characterized in that The maximum value function G defined is determined by the following formula max Value In the formula, G max is the maximum value function; L 1 is the initial length of the 1# anchor cable, and the corresponding α 1 is the initial 1# anchor cable inclination angle; L n is the length of the anchor cable n#, and the corresponding α n is the inclination angle of the n# anchor cable; according to the number of single anchors n, the function G max The collection gets n items.

Citation Information

Cited By

  • Multi-stage anchoring tunnel type anchorage

    CN119800836A