Production management decision-making method based on supply chain
Through big data analysis and optimization models, the problems of low efficiency and insufficient decision-making of traditional production management methods in modern complex supply chain environments have been solved, and the scientificity and accuracy of production management have been improved.
Patent Information
- Application Number
- CN202410968979.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-15
AI Technical Summary
Traditional production schedule management methods have low efficiency, slow response speed and insufficient scientific decision-making in the modern complex and changeable supply chain environment, and cannot adapt to complex supply chain needs.
By collecting supply chain data and production data, we conduct big data analysis, establish a production management progress optimization model, optimize the supply chain and production progress, and update production plans and delivery and transportation times.
It improves the scientificity and accuracy of production management, improves response speed and efficiency, and provides scientific and systematic decision-making support.
Smart Images

Figure CN118780558A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of production management, and more specifically, to a production management decision-making method based on a supply chain. Background Art
[0002] Production schedule management refers to the monitoring, coordination and optimization of each link in the production process to ensure that production tasks are completed on time and meet the expected quality and cost targets; in modern manufacturing, production schedule management is particularly important because it directly affects the company's operational efficiency, market competitiveness and customer satisfaction.
[0003] At present, production schedule management mainly relies on manual records, traditional statistical analysis, static planning and manual coordination; it has problems such as data lag, insufficient analysis depth, lack of flexibility and poor real-time performance; it cannot adapt to the modern complex and changeable supply chain environment, resulting in technical problems such as low production management efficiency, slow response speed and insufficient scientific decision-making. Summary of the invention
[0004] The present invention provides a production management decision-making method based on the supply chain, which is intended to solve the technical problems that traditional methods cannot adapt to the modern complex and changeable supply chain environment, resulting in low production management efficiency, slow response speed and insufficient scientific decision-making.
[0005] A production management decision-making method based on a supply chain comprises the following steps:
[0006] Step 1: Collect supply chain data and production data, where supply chain data includes supplier data, logistics data, and raw material data; production data includes production plan, production capacity, and production quality;
[0007] Step 2: Preprocess the collected supply chain data and production data, and analyze the supply chain and production data through big data analysis technology to obtain data analysis results;
[0008] Step 3: Establish a production management schedule optimization model based on the data analysis results, optimize the supply chain and production schedule, and obtain the optimization results;
[0009] Step 4: Update the plan and production schedule based on the optimization results, and coordinate the delivery and transportation time of each supply chain.
[0010] The present invention collects supply chain data and production data, performs data analysis on the collected data, establishes a production management schedule optimization model based on the results of data analysis, optimizes the supply chain and production schedule, obtains optimization results, and finally updates the production plan, production schedule, and coordinates the delivery and transportation time of the supply chain according to the optimization results; thus, the technical problems of low efficiency, slow response and insufficient decision-making faced by traditional production management methods in the modern complex supply chain environment are fully solved; through big data analysis and optimization models, scientific and systematic decision-making support is provided, and the scientificity and accuracy of production management are improved.
[0011] Preferably, the pretreatment in step 2 comprises the following steps:
[0012] Missing value processing: Processing of missing data based on mean filling method:
[0013]
[0014] Where: x new Indicates the value after filling; x i are non-missing values; N represents the number of non-missing values;
[0015] Outlier processing: Identify outliers based on the interquartile range method:
[0016] IQR = Q3-Q1;
[0017] In the formula: values less than Q1-1.5×IQR or greater than Q3+1.5×IQR are outliers, where Q1 and Q3 are the 25th and 75th percentiles, respectively;
[0018] Delete the identified outliers and use mean imputation to fill the deleted values;
[0019] Data normalization: Scale the data after outlier processing to the range [0,1].
[0020] Preferably, the analysis of supply chain and production data by big data analysis technology comprises the following steps:
[0021] Supplier Analysis:
[0022]
[0023] Where: S score Indicates supplier rating; T delivery Indicates the delivery cycle; Q rate Indicates the quality pass rate; C cost represents the supply cost; w1, w2, w3 represent the weight coefficients respectively;
[0024] Logistics analysis:
[0025]
[0026] Where: L effciency represents logistics efficiency; D represents transportation distance; T transport Indicates the transportation time; C transport represents the transportation cost;
[0027] Raw material analysis:
[0028]
[0029] Where: I turnover represents inventory turnover rate; C oGS It represents the cost of goods sold; Average Inventory represents the average inventory;
[0030] Production capacity analysis:
[0031]
[0032] Where: U capacity Indicates capacity utilization; Actual Output indicates actual output; Maximum Capacity indicates maximum capacity;
[0033] Production plan analysis:
[0034]
[0035] Where: T prouction Represents the total production cycle; T i represents the time of the ith supply and demand; n represents the number of supply and demand;
[0036] Production quality analysis:
[0037]
[0038] Where: Q rate Indicates the pass rate; Q passed Indicates the number of qualified products; Q total Indicates the total production quantity.
[0039] Preferably, the production management schedule optimization model includes a supply chain optimization model and a production schedule optimization model;
[0040] The supply chain optimization model is solved using a linear programming method, where the objective function and constraints of the supply chain optimization model are as follows:
[0041] Objective function: in represents the procurement cost from supplier i to demand point j; represents the transportation cost from supplier i to demand point j; represents the inventory cost of demand point j; x ij represents the quantity purchased from supplier i to demand point j;
[0042] Constraints:
[0043]
[0044] Where: D j represents the demand at demand point j; S i represents the supply capacity of supplier i; I j represents the inventory capacity of work demand point j;
[0045] The production schedule optimization model is optimized using mixed integer linear programming, where the objective function and constraints of the production schedule optimization model are as follows:
[0046] Objective function: Where: t production represents the total production cycle; p represents the total number of production tasks; z k represents the end time of the kth production task; y k represents the start time of the kth production task; U equipment Indicates equipment utilization; TotalProductionTime indicates the total production time of all production tasks; AvailableProductionTime indicates the total available production time of the equipment;
[0047] Constraints:
[0048] y k ≥Previous task end time;
[0049] z k ≤Order deadline;
[0050] Where: y k Indicates the start time of the kth production task; Previous task end time indicates the end time of the previous production task; z k The end time of the kth production task; Order deadline indicates the delivery deadline of the order.
[0051] Preferably, step 3 comprises the following steps:
[0052] Initial supply chain optimization: Optimize the supply chain based on the supply chain optimization model to obtain the initial supply chain configuration;
[0053] Production schedule optimization: Optimize the production schedule based on the supply chain optimization results and production schedule optimization model;
[0054] Feedback adjustment: According to the production schedule optimization results, adjust the parameters of the supply chain model and re-optimize the supply chain;
[0055] Iterative solution: Repeat the initialization supply chain optimization, production schedule optimization, and feedback adjustment steps until the results of the two models tend to be stable, and obtain the supply chain optimization results and production schedule optimization results.
[0056] Preferably, adjusting the parameters of the supply chain model according to the production schedule optimization result and re-optimizing the supply chain includes the following steps:
[0057] Update suppliers on lead times and inventory levels;
[0058] Adjust production plans to accommodate new supply chain configurations;
[0059] Recalculate the start and end times of production tasks.
[0060] The beneficial effects of the present invention include:
[0061] The present invention collects supply chain data and production data, performs data analysis on the collected data, establishes a production management schedule optimization model based on the results of data analysis, optimizes the supply chain and production schedule, obtains optimization results, and finally updates the production plan, production schedule, and coordinates the delivery and transportation time of the supply chain according to the optimization results; thus, the technical problems of low efficiency, slow response and insufficient decision-making faced by traditional production management methods in the modern complex supply chain environment are fully solved; through big data analysis and optimization models, scientific and systematic decision-making support is provided, and the scientificity and accuracy of production management are improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0063] Figure 1 An overall step block diagram provided for an embodiment of the present invention. DETAILED DESCRIPTION
[0064] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0065] See also Figure 1 As shown, the best embodiment of the present invention is further described;
[0066] A production management decision-making method based on a supply chain comprises the following steps:
[0067] Step 1: Collect supply chain data and production data, where supply chain data includes supplier data, logistics data, and raw material data; production data includes production plan, production capacity, and production quality;
[0068] Step 2: Preprocess the collected supply chain data and production data, and analyze the supply chain and production data through big data analysis technology to obtain data analysis results;
[0069] The pre-treatment in step 2 comprises the following steps:
[0070] Missing value processing: Processing of missing data based on mean filling method:
[0071]
[0072] Where: x new Indicates the value after filling; x i are non-missing values; N represents the number of non-missing values;
[0073] Outlier processing: Identify outliers based on the interquartile range method:
[0074] IQRR=Q3-Q1;
[0075] In the formula: values less than Q1-1.5×IQR or greater than Q3+1.5×IQR are outliers, where Q1 and Q3 are the 25th and 75th percentiles, respectively;
[0076] Delete the identified outliers and use mean imputation to fill the deleted values;
[0077] Data normalization: Scale the data after outlier processing to the range [0,1].
[0078] The analysis of supply chain and production data by big data analysis technology includes the following steps:
[0079] Supplier Analysis:
[0080]
[0081] Where: S score Indicates supplier rating; T delivery Indicates the delivery cycle; Q rate Indicates the quality pass rate; C cost represents the supply cost; w1, w2, w3 represent the weight coefficients respectively;
[0082] Logistics analysis:
[0083]
[0084] Where: L effciency represents logistics efficiency; D represents transportation distance; T transport Indicates the transportation time; C transport represents the transportation cost;
[0085] Raw material analysis:
[0086]
[0087] Where: I turnover represents inventory turnover rate; C OGs It represents the cost of goods sold; Average Inventory represents the average inventory;
[0088] Production capacity analysis:
[0089]
[0090] Where: U capacity Indicates capacity utilization; Actual Output indicates actual output; Maximum Capacity indicates maximum capacity;
[0091] Production plan analysis:
[0092]
[0093] Where: T prouction Represents the total production cycle; T i represents the time of the ith supply and demand; n represents the number of supply and demand;
[0094] Production quality analysis:
[0095]
[0096] Where: Q rate Indicates the pass rate; Q passed Indicates the number of qualified products; Q total Indicates the total production quantity.
[0097] Step 3: Establish a production management schedule optimization model based on the data analysis results, optimize the supply chain and production schedule, and obtain the optimization results;
[0098] The production management schedule optimization model includes a supply chain optimization model and a production schedule optimization model;
[0099] The supply chain optimization model is solved using a linear programming method, where the objective function and constraints of the supply chain optimization model are as follows:
[0100] Objective function: in represents the procurement cost from supplier i to demand point j; represents the transportation cost from supplier i to demand point j; represents the inventory cost of demand point j; x ij represents the quantity purchased from supplier i to demand point j;
[0101] Constraints:
[0102]
[0103]
[0104] Where: D j represents the demand at demand point j; S i represents the supply capacity of supplier i; I j represents the inventory capacity of work demand point j;
[0105] The production schedule optimization model is optimized using mixed integer linear programming, where the objective function and constraints of the production schedule optimization model are as follows:
[0106] Objective function: Where: T production represents the total production cycle; p represents the total number of production tasks; z k represents the end time of the kth production task; y k represents the start time of the kth production task; U equipment Indicates equipment utilization; TotalProductionTime indicates the total production time of all production tasks; AvailableProductionTime indicates the total available production time of the equipment;
[0107] Constraints:
[0108] y k ≥Previous task end time;
[0109] zk ≤Order deadline;
[0110] Where: y k Indicates the start time of the kth production task; Previous task end time indicates the end time of the previous production task; z k The end time of the kth production task; Order deadline indicates the delivery deadline of the order.
[0111] The step 3 comprises the following steps:
[0112] Initial supply chain optimization: Optimize the supply chain based on the supply chain optimization model to obtain the initial supply chain configuration;
[0113] Production schedule optimization: Optimize the production schedule based on the supply chain optimization results and production schedule optimization model;
[0114] Feedback adjustment: According to the production schedule optimization results, adjust the parameters of the supply chain model and re-optimize the supply chain;
[0115] Iterative solution: Repeat the initialization supply chain optimization, production schedule optimization, and feedback adjustment steps until the results of the two models tend to be stable, and obtain the supply chain optimization results and production schedule optimization results.
[0116] Preferably, adjusting the parameters of the supply chain model according to the production schedule optimization result and re-optimizing the supply chain includes the following steps:
[0117] Update suppliers on lead times and inventory levels;
[0118] Adjust production plans to accommodate new supply chain configurations;
[0119] Recalculate the start and end times of production tasks.
[0120] Step 4: Update the plan and production schedule based on the optimization results, and coordinate the delivery and transportation time of each supply chain.
[0121] The present invention collects supply chain data and production data, performs data analysis on the collected data, establishes a production management schedule optimization model based on the results of data analysis, optimizes the supply chain and production schedule, obtains optimization results, and finally updates the production plan, production schedule, and coordinates the delivery and transportation time of the supply chain according to the optimization results; thus, the technical problems of low efficiency, slow response and insufficient decision-making faced by traditional production management methods in the modern complex supply chain environment are fully solved; through big data analysis and optimization models, scientific and systematic decision-making support is provided, and the scientificity and accuracy of production management are improved.
[0122] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A production management decision-making method based on supply chain, characterized in that: The following steps are involved: Step 1: Collect supply chain data and production data, where supply chain data includes supplier data, logistics data, and raw material data; production data includes production plan, production capacity, and production quality; Step 2: Preprocess the collected supply chain data and production data, and analyze the supply chain and production data through big data analysis technology to obtain data analysis results; Step 3: Establish a production management schedule optimization model based on the data analysis results, optimize the supply chain and production schedule, and obtain the optimization results; Step 4: Update the plan and production schedule based on the optimization results, and coordinate the delivery and transportation time of each supply chain.
2. A production management decision-making method based on supply chain according to claim 1, characterized in that: The pre-treatment in step 2 comprises the following steps: Missing value processing: Processing of missing data based on mean filling method: Where: x new Indicates the value after filling; x i are non-missing values; N represents the number of non-missing values; Outlier processing: Identify outliers based on the interquartile range method: IQR = Q3-Q1; In the formula: values less than Q1-1.5×IQR or greater than Q3+1.5×IQR are outliers, where Q1 and Q3 are the 25th and 75th percentiles, respectively; Delete the identified outliers and use mean imputation to fill the deleted values; Data normalization: Scale the data after outlier processing to the range [0,1].
3. A production management decision-making method based on supply chain according to claim 1, characterized in that: The analysis of supply chain and production data by big data analysis technology includes the following steps: Supplier Analysis: Where: S score Indicates supplier rating; T delivery Indicates the delivery cycle; Q rate Indicates the quality pass rate; C cost represents the supply cost; w1, w2, w3 represent the weight coefficients respectively; Logistics analysis: Where: L effciency represents logistics efficiency; D represents transportation distance; T transport Indicates the transportation time; C transport represents the transportation cost; Raw material analysis: Where: I turnover represents inventory turnover rate; C OGs It represents the cost of goods sold; Average Inventory represents the average inventory; Production capacity analysis: Where: U capacity Indicates capacity utilization; Actual Output indicates actual output; Maximum Capacity indicates maximum capacity; Production plan analysis: Where: T prouction Represents the total production cycle; T i represents the time of the ith supply and demand; n represents the number of supply and demand; Production quality analysis: Where: Q rate Indicates the pass rate; Q passed Indicates the number of qualified products; Q total Indicates the total production quantity.
4. The production management decision-making method based on supply chain according to claim 1 is characterized in that: The production management schedule optimization model includes a supply chain optimization model and a production schedule optimization model; The supply chain optimization model is solved using a linear programming method, where the objective function and constraints of the supply chain optimization model are as follows: Objective function: in represents the procurement cost from supplier i to demand point j; represents the transportation cost from supplier i to demand point j; represents the inventory cost of demand point j; x ij represents the quantity purchased from supplier i to demand point j; Constraints: Where: D j represents the demand at demand point j; S i represents the supply capacity of supplier i; I j represents the inventory capacity of work demand point j; The production schedule optimization model is optimized using mixed integer linear programming, where the objective function and constraints of the production schedule optimization model are as follows: Objective function: Where: T production represents the total production cycle; p represents the total number of production tasks; z k represents the end time of the kth production task; y k represents the start time of the kth production task; U equipment Indicates equipment utilization; Available Production Time indicates the total production time of all production tasks; Available Production Time indicates the total available production time of the equipment; Constraints: y k ≥Previous task end time; z k ≤Order deadline; Where: y k Indicates the start time of the kth production task; Previous task end time indicates the end time of the previous production task; z k The end time of the kth production task; Order deadline indicates the delivery deadline of the order.
5. A production management decision-making method based on supply chain according to claim 4, characterized in that: The step 3 comprises the following steps: Initial supply chain optimization: Optimize the supply chain based on the supply chain optimization model to obtain the initial supply chain configuration; Production schedule optimization: Optimize the production schedule based on the supply chain optimization results and production schedule optimization model; Feedback adjustment: According to the production schedule optimization results, adjust the parameters of the supply chain model and re-optimize the supply chain; Iterative solution: Repeat the initialization supply chain optimization, production schedule optimization, and feedback adjustment steps until the results of the two models tend to be stable, and obtain the supply chain optimization results and production schedule optimization results.
6. A production management decision-making method based on supply chain according to claim 5, characterized in that: The method of adjusting the parameters of the supply chain model according to the production schedule optimization result and re-optimizing the supply chain includes the following steps: Update suppliers on lead times and inventory levels; Adjust production plans to accommodate new supply chain configurations; Recalculate the start and end times of production tasks.