A method for automatically generating flood control dispatching schemes for reservoir groups based on human-computer interaction and flood control situation analysis
Through the automatic generation method of human-computer interactive flood control scheduling scheme for reservoir groups based on flood control situation analysis, we can identify the weak points of the basin and dispatch the reservoir groups, and generate instruction scheduling schemes, which solves the decision-making problems of existing systems when facing uncertain factors, and improves the decision-making problems of existing systems. The flexibility and adaptability of scheduling are reduced, and the risk of flood control and system complexity are reduced.
Patent Information
- Application Number
- CN202411259937.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-10
AI Technical Summary
The existing reservoir flood control scheduling system lacks overall flood control situation considerations when facing uncertainties, which makes decision makers difficult for human-computer interactive scheduling based on reasonable plans, which increases flood control risks, and has high system complexity and relatively cost of maintenance and management. high.
The automatic generation method of human-computer interactive flood control scheduling scheme for reservoir groups based on flood control situation analysis is adopted. Through the analysis of flood control situation in the basin, potential dangers in weak sections are identified, and the reservoir group is dispatched, and the scheduling scheme is generated. The model trial calculation is realized by combining the reservoir regulations and scheduling conditions. and automatic analysis, allowing decision makers to modify and optimize solutions.
It improves the flexibility and adaptability of reservoir scheduling, can respond to emergencies in a timely manner, reduces scheduling risks, and is easier to explain and accept, reduces the cost of manual intervention, and improves the transparency and credibility of decisions.
Smart Images

Figure CN118780643B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of reservoir flood control dispatching, and relates to a human-computer interactive flood control dispatching calculation model for a reservoir group based on multi-scenario flood control situation analysis. Background Art
[0002] Flood control has always occupied an important position in river basin planning. Although, with the passage of time, a number of control reservoirs have been established in major river basins to intercept and regulate floods, thus significantly improving the flood control situation, river basin flood control still faces great risks due to my country's natural geographical characteristics and uneven spatial and temporal distribution of rainfall. Under the premise of ensuring the safety of the project itself, the flood control dispatch of reservoirs needs to timely intercept and store floods and reduce flood peaks according to factors such as the designed flood control storage capacity, reservoir water storage, rainfall, and river water level, so as to reduce the risk of floods and protect the flood control safety of coastal areas. At present, reservoir flood control dispatch models are mainly divided into hydrological models, numerical simulation models, hydrodynamic models, and dispatch models. Among them, the dispatch model is further subdivided into conventional flood control dispatch, optimized flood control dispatch, and human-computer interactive flood control dispatch. Human-computer interactive flood control dispatch refers to the process of reservoir flood control dispatch, through information exchange, data processing, and decision-making between humans and computers or other intelligent systems, making full use of the advantages of computer models to assist relevant personnel in making decisions on reservoir flood control dispatch, thereby improving real-time response capabilities and decision-making efficiency. In the context of vigorously promoting the construction of digital twin river basins today, the construction of human-computer interactive flood control scheduling models is one of the core simulation models supporting the research and development of water conservancy professional model platforms, water conservancy project scheduling and other model integration applications. It is to accelerate the construction of a digital twin water conservancy system and provide forward-looking, scientific, precise and safe support key technologies for water conservancy management.
[0003] Generally speaking, when establishing a dispatching model, reservoirs mainly establish rule dispatching and optimization dispatching models (Liu G, Qin H, Shen Q, et al. Multi-Objective Optimal Scheduling Model of Dynamic Control of Flood Limit Water Level for Cascade Reservoirs[J]. Water, 2019, 11(9): 1836-1836.). Rule dispatching only uses reservoir rules for dispatching, while multi-objective optimization dispatching currently often uses the maximum peak reduction criterion, the shortest flood duration criterion, the minimum flood diversion amount criterion, etc. for dispatching (Wang Guoli, Liang Guohua, Peng Yong, et al. Reservoir flood control optimization dispatching model and application based on PSO algorithm[J]. Hydropower Energy Science, 2009, 27(01): 74-76+68.), which generally has the advantages of global optimization ability and high degree of automation (Ahmed AJ, Sarma KA. Genetic Algorithm for Optimal Operating Policy of a Multipurpose Reservoir[J]. Water resources management, 2005, 19(2): 145-161.), He Shaokun et al. (He Shaokun, Chen Kebing, Li Na et al. A multi-objective optimization dispatching method and system for cascade reservoirs with coupled ensemble forecast. ZL202410665442.1.2024.08.13) invented a multi-objective optimization dispatching method and system for cascade reservoirs with coupled ensemble forecasting. The multi-objective intelligent optimization method is used to find the optimal solution and obtain the final short-term optimal dispatching plan for cascade reservoirs. However, it lacks certain flexibility. The optimization algorithm is usually calculated under the predetermined objective function and constraint conditions, and may not be able to respond to emergencies or local changes in time. Moreover, the model accuracy is required to be high, and the decision results are not easy to explain. The optimal solution obtained by the optimization algorithm may be too complex, and the decision results are not easy for non-professionals to understand. In addition, the current reservoir dispatching system still has the problem of high complexity. Ma Meihong et al. (Ma Meihong, Hao Huiqing, Dong Jiankang et al. A reservoir flood control dispatching method and system. ZL202410708416.2. 2024.08.23) invented a reservoir flood control dispatching method and system, which integrates the laws of hydrological events, real-time meteorological forecast results, real-time rainfall conditions, and flow information entering the target reservoir into the reservoir dispatching model to formulate a dispatching strategy. However, when it was established, it overemphasized comprehensiveness and ignored simplification and ease of use. For example, system management, hydrological forecasting, reservoir dispatching and other functions are integrated into one system, which usually requires the integration of multiple models and algorithms, involving knowledge in multiple fields, and the system complexity is high, and the maintenance and management costs are also high.In contrast, the human-computer interactive dispatching system is simple and easy to understand, easy to operate, and can give full play to human subjective initiative. It allows decision makers to review, modify and optimize the dispatching scheme provided by the system based on their own experience and judgment. It has strong real-time response capabilities and can quickly adjust the dispatching scheme based on real-time data and intelligence to respond to emergencies in a timely manner. It has considerable flexibility and adaptability (Ji Chaoyang, Zhao Yufeng, Wang Zhenjie. Design of the interactive flood dispatching subsystem of Longtouqiao Reservoir [J]. Water Conservancy Science and Technology and Economy, 2006, (12): 842-843.). Finally, the decision results are highly interpretable. The decision-making process of human-computer interactive dispatching can be recorded and traced, and the decision results are easier to explain and understand, which helps to improve the transparency and credibility of the decision.
[0004] However, there are some unavoidable problems in the current human-computer interaction scheduling system. There are many uncertain factors in the reservoir scheduling process, such as hydrological conditions, hydraulic conditions and real-time water conditions of the reservoir. The existing human-computer interaction system generally only makes decision-making scheduling based on the current reservoir operating conditions (such as inflow and reservoir water level changes), but ignores the comprehensive consideration of the overall flood control situation in the basin where the reservoir is located. This shortcoming will be magnified especially when joint scheduling of reservoir groups is required. In addition, the existing system lacks a reference scheduling plan, and decision makers cannot perform human-computer scheduling based on a reasonable plan, resulting in different degrees of flood control risks in the flood control scheduling system. The human-computer interaction scheduling system often requires decision makers to spend a lot of time and energy to review and modify the scheduling plan, thereby increasing the cost of manual intervention. Therefore, human-computer interaction scheduling should be combined with the comprehensive conditions of the current water conditions of the reservoir and the prediction of the flood control situation in the basin to reduce the scheduling risk. Summary of the invention
[0005] In view of the problems existing in the prior art, the present invention provides a method for automatically generating a flood control dispatching scheme for a reservoir group based on flood control situation analysis. The human-computer interactive command dispatching model involved is the core simulation model of the digital twin river basin construction and one of the key technologies for the system to realize the intelligent flood control dispatching function. The innovation of this method lies in identifying the potential dangerous conditions of weak sections under the analysis of the flood control situation in the river basin, realizing the identification of the dispatching objects of the reservoir group and the instruction dispatching objects and generating the final scheme, and allowing decision makers to modify it, which can give full play to people's subjective initiative. This method combines the flood control situation prediction of the key control sections of the river basin and the dispatching conditions of the reservoir regulations, and has considerable flexibility and adaptability, responds to emergencies in a timely manner, and has a simple interaction method. Compared with the rule scheme and the multi-objective optimization scheme, the instruction dispatching scheme is more in line with the actual dispatching outflow of the reservoir and is easier to be explained and accepted; compared with the ordinary instruction dispatching model technology, this method realizes the automatic identification and analysis function of the model trial calculation and finally generates the instruction scheme, and allows decision makers to modify and optimize the scheme according to their own experience. Finally, the rationality and effectiveness of the invention are verified by taking the dispatching application of the reservoir group above Laiwu and Laiwu to Beiwang sections in the Dawen River Basin of Shandong Province as an example.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0007] A method for automatically generating flood control scheduling schemes for reservoir groups based on human-computer interaction and flood control situation analysis. The method for automatically generating flood control scheduling schemes for reservoir groups based on human-computer interaction first analyzes the flood control situation in the basin and determines the dangerous situations that may occur in key flood control sections based on the prescribed scheduling scheme; secondly, combined with the flood control situation analysis, the main scheduling reservoir groups are identified according to the real-time water situation changes in the reservoirs and flood control sections and the location of the rainfall center; thirdly, based on the identified main scheduling reservoir groups, the scheduling indicators such as the flood control storage capacity and the remaining flood control storage capacity of each reservoir are analyzed in detail to identify the instruction scheduling reservoirs; finally, the discharge control instruction or pre-discharge instruction of the water project (group) is implemented to generate the corresponding scheduling scheme. The calculation framework diagram is shown in the attached figure. Figure 1 As shown. Specifically including the following steps:
[0008] Step 1: Analyze the flood control situation in the basin;
[0009] Based on the existing rainfall forecast and measured rainfall Data is input into the existing hydrological model to obtain the reservoir flood forecast process and interval flood forecasting process The predicted flood process is input into the reservoir group rule dispatching model to carry out flood forecast dispatching in the whole basin. The hydrological model adopts the Xin'anjiang hydrological model, and the water project dispatching model adopts the rule dispatching model.
[0010] The forecast dispatch value of important control sections is used to determine whether each flood control section exceeds the warning flow. Flood control sections that exceed the warning flow are considered to be sections where dangerous situations may occur. It is necessary to initiate flood control dispatching for the reservoir group to stagger and reduce the flow of the sections that exceed the warning flow, while ensuring the flood control safety of the reservoirs in the basin.
[0011] According to the regular dispatching model, the flow results of each flood control section after dispatching are compared with the warning flow of the flood control section. The section with the maximum flow less than or equal to the warning flow is considered to be a section without danger, as shown in formula (1):
[0012] (1);
[0013] In the formula, is the flow rate of the j flood control section, m 3 ; is the warning flow of the j flood control section, m 3 .
[0014] It should be pointed out that the rule-based dispatching model here adopts the dispatching method of the flood season dispatching plan of each reservoir, and it is established in the model at the same time as the instruction dispatching method.
[0015] Step 2: Identify the main reservoir groups;
[0016] Based on the analysis of the flood control situation results in step 1, whether there is a dangerous situation is determined by whether the flow of each flood control section exceeds the warning flow:
[0017] If the flood control section does not exceed the warning flow, that is, there is no danger, the reservoir group can be dispatched according to the original regulation plan;
[0018] If there is a flood control section that exceeds the warning level, that is, there is a dangerous situation, it is necessary to identify the main dispatching reservoir group and conduct joint dispatch of the reservoir group to stagger the peak of the flood control section that exceeds the warning level. Before identifying the main dispatching reservoir group, it is necessary to divide the reservoir group in the upstream basin of the flood control section that exceeds the warning level into reservoir groups with the main stream flood control section as the node, so as to obtain each reservoir group, and then identify it. The main indicators for identifying the main dispatching reservoir group are:
[0019] a. Peak flow of the main stream flood control section upstream of the flood control section exceeding the warning level Peak flow at the flood control section exceeding the warning level The ratio θ of θ is shown in formula (2). θ can reflect the influence of each reservoir group in the upstream basin on the downstream flood control section exceeding the warning level. When θ is large, it means that the flood in the mainstream control section has a greater impact on the flood control section exceeding the warning level. In this case, the reservoir group upstream of the section has a greater potential for peak shifting of the flood control section exceeding the warning level.
[0020] (2);
[0021] Where: is the peak flow of the kth main stream flood control section upstream of the flood control section exceeding the warning level, m 3 ; is the peak flow of the flood control section exceeding the warning level, m 3 .
[0022] b. The location of the rainfall center predicted by the known weather system: The location of the rainfall center predicted by the known weather system can determine the main flooding area. The area at the center of the rainfall has severe flooding and the reservoir group in the area has great potential for scheduling.
[0023] The above indicators are used to jointly identify the main dispatching reservoir group. When θ in indicator a is greater than 0.5, the corresponding upstream basin reservoir group is taken as the candidate reservoir group; the reservoir group where the rainfall center is located in indicator b is the candidate reservoir group. In the first identification, the priority of indicator a is greater than that of indicator b. If the reservoir groups identified by the two are different, the one identified by indicator (1) is the main one; in subsequent multiple identifications, the two indicators have the same priority.
[0024] Step 3: Based on the main dispatching reservoir group, identify the command dispatching reservoir;
[0025] Identify the command dispatch object based on the flood control storage capacity of each reservoir in the main dispatch reservoir group identified in step 2 Size, remaining flood control storage capacity at the time of crisis The size of the reservoir and the proportion of the downstream discharge flow in the flood at the downstream flood control section are determined based on the above three indicators to comprehensively judge the command-dispatched reservoirs and non-command-dispatched reservoirs.
[0026] a. The reservoir’s own flood control capacity : The flood accommodating capacity of the main dispatching reservoir group is different due to the different flood control storage capacity of each reservoir, so the peak reduction potential of the downstream flood control section is different. Reservoirs with relatively large flood control storage capacity have greater potential for flood control and peak shifting; conversely, reservoirs with relatively large flood control storage capacity have smaller potential.
[0027] b. Remaining flood control storage capacity at the time of crisis : The remaining flood control storage capacity at the moment of crisis can reflect the reservoir's ability to prevent floods at the current moment, as shown in formula (3). When the remaining flood control storage capacity at the moment of crisis is relatively large, it is considered that the flood control effect is strong and the flood reduction capacity of the current downstream flood control section is large; otherwise, it is small.
[0028] (3);
[0029] Where: is the flood control capacity of the reservoir, m 3 , It is the water level and storage capacity relationship curve function of the reservoir at period t0.
[0030] c. The proportion of the reservoir discharge in the flood volume of the downstream flood control section φ: The proportion of the reservoir discharge in the flood volume of the downstream flood control section can reflect the potential of the reservoir to reduce the flood volume of the downstream section, as shown in formula (4). The larger the proportion of the downstream flood discharge, the greater the flood reduction capacity; otherwise, it is smaller.
[0031] (4);
[0032] Where: is the flood discharge from reservoir i in this flood, m 3 , is the flood volume of section j in this flood, m 3 .
[0033] The above indicators are used to jointly identify the command dispatch reservoirs in the main dispatch reservoir group. The priority of each indicator is the same. The reservoirs with φ greater than 0.1 in indicator c are selected as candidate reservoirs; the top 30% of reservoirs in indicators a and b are selected as candidate reservoirs. The intersection of the candidate reservoirs of each indicator can be used to identify the command dispatch reservoir.
[0034] Step 4: Generate an instruction dispatching plan based on the instruction dispatching reservoir;
[0035] The command dispatch model is adopted to implement command dispatch for the command dispatch reservoir identified in step 3. The command dispatch model involved in this method is constructed based on the principle of water balance. It is the core simulation model of digital twin basin construction. Its main functions include command discharge dispatch, command reservoir gate opening and opening dispatch, and command water level dispatch. The command discharge dispatch is to discharge the command dispatch reservoir according to the fixed discharge flow given before the start of dispatch within a certain period of time; the command reservoir gate opening and opening dispatch is to discharge the command dispatch reservoir according to the number of gate openings and openings given before the start of dispatch within a certain period of time to solve the gate opening discharge curve function; the command water level dispatch is to discharge the command dispatch reservoir according to the fixed water level given before the start of dispatch within a certain period of time using the water balance equation to back calculate the discharge flow in each period. The dispatch method adopted by this method for the command dispatch reservoir identified in step 3 is command discharge dispatch.
[0036] The implementation of command discharge scheduling adopts two scheduling methods: controlled discharge command and pre-discharge command. The controlled discharge command refers to the consideration of the inflow flow. And the warning flow of the downstream flood control section Under the influence of the flood inflow section and the water withdrawal section, the scheduling calculation is carried out according to the fixed discharge flow; the pre-discharge instruction refers to freeing up the reservoir capacity before the flood arrives to store the impending flood, so as to increase a part of the flood control reservoir capacity, and also consider the inflow flow And the warning flow of the downstream flood control section Under the influence of the flood, the flood section, flood regulation section and water withdrawal section are dispatched and calculated according to the fixed discharge flow. Both can achieve the effect of peak reduction for the reservoir and peak shift for the downstream, ensuring the safety of the reservoir and the downstream flood control section.
[0037] The solution to the command scheduling model is to directly solve the water balance equation based on various constraints.
[0038] Furthermore, the constraints of the instruction scheduling model are as follows:
[0039] (1) Water level constraints:
[0040] (6);
[0041] Where: represents the water level of reservoir i in time period t, m; are the upper and lower limits of the water level allowed during operation of reservoir i, in m.
[0042] (2) Constraints on water balance in reservoirs at different time periods:
[0043] (7);
[0044] Where: is the water storage capacity of reservoir i at the time period t+1 and t, m 3 ; is the inflow to reservoir i in period t, m 3 / s; is the outflow flow of reservoir i in period t, m 3 / s; is the calculation period step.
[0045] (3) Water level-reservoir capacity relationship and reservoir discharge capacity constraints:
[0046] (8);
[0047] (9);
[0048] Where: is the reservoir capacity during period t, 10,000 m 3 ; is the water level and storage capacity relationship curve function of the reservoir at period t; is the discharge capacity of reservoir i at period t, m 3 / s.
[0049] (4) Constraints on safe discharge volume of reservoir discharge:
[0050] (10);
[0051] Where: is the safe discharge flow of reservoir i, m 3 / s.
[0052] (5) Downstream flood control safety constraints:
[0053] (11)
[0054] Where: is the interval flow, m 3 / s; is the maximum flow allowed in the downstream flood control section, m 3 / s.
[0055] (6) Discharge flow rate fluctuation constraints:
[0056] (12);
[0057] In the formula, is the maximum outflow amplitude of reservoir i, m 3 / s.
[0058] (7) Non-negative constraints:
[0059] The water level, storage capacity, discharge flow and other variables of the reservoir are not negative in the command dispatch. Based on the command dispatch reservoir identified in step 3, the command dispatch model in step 4 is used to establish a discharge control command plan and a pre-discharge command plan for the command dispatch reservoir. When implementing the discharge control command plan, the discharge volume of the command dispatch reservoir is controlled. and duration of control Trial calculation; when implementing the pre-discharge instruction plan, pre-discharge the instruction dispatching reservoir , Pre-ejaculation duration , control leakage , duration of leakage control After the above trial calculations are completed, the control-release command scheduling and pre-release command scheduling can generate the control-release command plan and pre-release command plan; if the control-release command scheduling plan results and the pre-release command scheduling plan do not exceed the warning level, the corresponding command plan is saved; if the warning level is still exceeded after the command scheduling is implemented, return to step 2 to re-identify the scheduling reservoir group. If the decision maker is not satisfied with the plan, he can manually modify the reservoir outflow and regenerate the plan.
[0060] Compared with the prior art, the present invention has the following advantages and effects:
[0061] (1) The present invention provides a method for automatically generating a flood control dispatching scheme for a reservoir group based on human-computer interaction based on flood control situation assessment. The human-computer interaction command dispatching model involved is the core simulation model of the digital twin system and one of the key technologies for the system to realize the intelligent flood control dispatching function. It is widely applicable to various river basin flood scenarios. By establishing a connection between command dispatching and river basin flood control situation forecasting to generate a command scheme for a command reservoir, this method shows advantages of being more efficient and more practical than traditional forecast dispatching in the actual dispatching process. The method is also more intuitive and easy to understand, making it easier for decision makers to understand and operate.
[0062] (2) Compared with ordinary command scheduling schemes, the present invention adopts this human-computer interaction scheduling method to take into account the flood control situation in the river basin more comprehensively, and can timely identify the weak points or potential dangerous situations in the flood control of the river basin. It generates command scheduling schemes for reservoirs through model calculations, which provides strong decision-making support for decision makers and allows decision makers to modify and optimize the scheduling schemes based on their own experience, which is more conducive to the smooth implementation of flood control and rescue work in actual scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 This is a flow chart of reservoir group command dispatching based on flood control situation prediction of the present invention;
[0064] Figure 2 This is a generalized map of the reservoir group. DETAILED DESCRIPTION
[0065] The present invention is further described below in conjunction with specific embodiments.
[0066] The present invention takes the sections above Laiwu and Laiwu to Beiwang in the Dawen River Basin as examples, and describes the specific implementation method in detail in combination with the technical scheme and the accompanying drawings, which specifically includes the following steps:
[0067] Step 1: Analyze the flood control situation in the basin;
[0068] Based on known forecast rainfall and measured rainfall Data is input into the existing hydrological model to obtain the reservoir flood forecast process and interval flood forecasting process The predicted flood process is input into the reservoir group regular dispatching model to carry out flood forecast dispatching in the whole basin. According to the predicted dispatching value of the important control section, formula (1) is used to calculate and judge whether each flood control section exceeds the warning flow. The flood control section that exceeds the warning flow is considered to be a section where dangerous situations may occur. The results are shown in Tables 1 to 3.
[0069] From the results of the regular dispatching schemes in Tables 1 to 3, it can be seen that for the downstream flood control section, the peak flow of the Laiwu section is 482 m 3 / s, not exceeding the warning flow rate of 1300 m3 / s; the peak flow of Beiwang section is 2123m 3 / s, over-alert flow 2100 m 3 / s, there may be dangerous situations. Under the premise of ensuring the flood control safety of the reservoirs in the basin, the reservoir group needs to conduct joint flood control dispatching to stagger or reduce the peak of the over-alert section. The highest flood control water level of each reservoir is lower than the high flood control water level. The flood control situation of the reservoir group itself is relatively safe. The reservoir group can be identified as the over-alert section for peak shifting dispatching.
[0070] Table 1 Results of regular dispatching of reservoirs above Laiwu.
[0071]
[0072] Table 2 Regular dispatching results of reservoirs from Laiwu to Beiwang.
[0073]
[0074] Table 3 Rules for dispatching peak flow at flood control sections.
[0075]
[0076] Step 2: Identify the main reservoir groups;
[0077] Based on the results of the basin flood control situation in step 1, the Beiwang section has exceeded the warning flow, and there may be a dangerous situation. It is necessary to identify the main dispatching reservoir groups and conduct joint dispatching of the reservoir groups to stagger the peak flow of the flood control sections that have exceeded the warning level.
[0078] (1) Reservoir group division: The reservoir group in the upstream basin of the super-warning flood control section is divided into reservoir groups with the main stream flood control section as the node, so as to obtain each reservoir group, and then identify them. Figure 2 As shown, it is divided into the reservoir group above Laiwu and the reservoir group from Laiwu to Beiwang.
[0079] (2) Calculate and identify the indicators for the main dispatching reservoir groups:
[0080] a. Peak flow of the main stream flood control section upstream of the flood control section exceeding the warning level Peak flow of flood control sections exceeding warning level The ratio θ of θ is shown in formula (2). θ can reflect the influence of each reservoir group in the upstream basin on the downstream flood control section exceeding the warning level. When θ is large, it means that the flood in the mainstream control section has a greater impact on the flood control section exceeding the warning level. In this case, the reservoir group upstream of the section has a greater potential for peak shifting of the flood control section exceeding the warning level.
[0081] b. The known location of the rainfall center predicted by the weather system: The known location of the rainfall center predicted by the weather system can determine the main flooding area. The area at the rainfall center has a large flood and the reservoir group in the area has a large dispatching potential. When θ in indicator a is greater than 0.5, the corresponding upstream basin reservoir group is taken as the candidate reservoir group; the reservoir group at the rainfall center of indicator b is the candidate reservoir group. In the first identification, the priority of indicator a is greater than that of indicator b. If the reservoir groups identified by the two are different, the one identified by indicator a is the main one; in subsequent multiple identifications, the two indicators have the same priority.
[0082] The calculation results of index a are shown in Table 4. The calculation result of θ in Laiwu section is 0.227, which is less than 0.5. Therefore, the reservoir group above Laiwu is not considered as a candidate reservoir group. The rainfall center of index b is located in the Laiwu to Beiwang section, see Appendix. Figure 1 Therefore, the Laiwu to Beiwang section reservoir group is selected as the candidate reservoir group. The final identified dispatching reservoir group is the Laiwu to Beiwang reservoir group, and 9 reservoirs such as Xueye and Huangqian are the main dispatching objects. The reservoir group above Laiwu can currently be dispatched according to the original rules.
[0083] Table 4 Instruction dispatch reservoir indicators.
[0084]
[0085] Step 3: Based on the main dispatching reservoir group, identify the command dispatching reservoir;
[0086] Identify the command dispatch object based on the flood control storage capacity of each reservoir in the main dispatch reservoir group identified in step 2 Size, remaining flood control storage capacity at the time of crisis The size of the reservoir and the proportion of the downstream discharge flow in the flood at the downstream flood control section are determined based on the above three indicators to comprehensively judge the command-dispatched reservoirs and non-command-dispatched reservoirs.
[0087] a. The reservoir's own flood control capacity : The flood accommodating capacity of the main dispatching reservoir group is different due to the different flood control storage capacity of each reservoir, so the peak reduction potential of the downstream flood control section is different. Reservoirs with relatively large flood control storage capacity have greater potential for flood control and peak shifting; conversely, reservoirs with relatively large flood control storage capacity have smaller potential.
[0088] b. Remaining flood control storage capacity at the time of crisis : The remaining flood control storage capacity at the moment of crisis can reflect the reservoir's ability to prevent floods at the current moment, as shown in formula (3). When the remaining flood control storage capacity at the moment of crisis is relatively large, it is considered that the flood control effect is strong and the flood reduction capacity of the current downstream flood control section is large; otherwise, it is small.
[0089] c. The proportion of the reservoir discharge in the flood volume of the downstream flood control section φ: The proportion of the reservoir discharge in the flood volume of the downstream flood control section can reflect the potential of the reservoir to reduce the flood volume of the downstream section, as shown in formula (4). The larger the proportion of the downstream flood discharge, the greater the flood reduction capacity; otherwise, it is smaller.
[0090] The above indicators are used to jointly identify the command dispatch reservoirs in the main dispatch reservoir group. The priority of each indicator is the same. The reservoirs with φ greater than 0.1 in indicator c are selected as candidate reservoirs; the top 30% of reservoirs in indicators a and b are selected as candidate reservoirs. The intersection of the candidate reservoirs of each indicator can be used to identify the command dispatch reservoir.
[0091] The calculation results of each reservoir index are shown in Table 5.
[0092] The top 30% of reservoirs in index a are Xueye, Huangqian and Daye reservoirs as candidate reservoirs; the top 30% of reservoirs in index b are Xueye, Huangqian and Daye reservoirs as candidate reservoirs; the reservoirs with φ greater than 0.1 in index c are Xueye and Huangqian reservoirs as candidate reservoirs. The intersection of candidate reservoirs for each index is used to identify Xueye and Huangqian reservoirs as command dispatching reservoirs, and the rest of the reservoirs are non-command dispatching reservoirs. The inflow of non-command dispatching reservoirs is small and the regular dispatching scheme is maintained. The dispatching methods of each reservoir are shown in Table 6.
[0093] Table 5 Calculation results of reservoir indexes for command dispatching.
[0094]
[0095] Table 6 Reservoir dispatching methods.
[0096]
[0097] Step 4: Generate an instruction dispatching plan based on the instruction dispatching reservoir;
[0098] The command-discharge dispatching is implemented for the command-discharge dispatching reservoirs Xueye and Huangqian identified in step 3, and two dispatching methods, control-discharge dispatching and pre-discharge dispatching, are adopted. The control-discharge dispatching refers to the dispatching of the reservoir in consideration of the inflow flow. And the warning flow of the downstream flood control section Under the influence of the flood inflow section and the water withdrawal section, the scheduling calculation is carried out according to the fixed discharge flow; the pre-discharge instruction refers to freeing up the reservoir capacity before the flood arrives to store the impending flood, so as to increase a part of the flood control reservoir capacity, and also consider the inflow flow And the warning flow of the downstream flood control section Under the influence of the flood, the flood section, flood regulation section and water withdrawal section are dispatched and calculated according to the fixed discharge flow. Both can achieve the effect of peak reduction for the reservoir and peak shift for the downstream, ensuring the safety of the reservoir and the downstream flood control section.
[0099] Two command dispatching schemes are established for the command dispatching reservoirs Xueye and Huangqian Reservoir identified in step 3. Scheme 1 implements controlled discharge command dispatching, and the model calculates the controlled discharge volume of Xueye and Huangqian Reservoirs. and duration of control The results are shown in Table 6. Scheme 2 implements pre-discharge command scheduling, and the model calculates the pre-discharge volume of Xueye and Huangqian reservoirs. , Pre-ejaculation duration , control leakage , duration of leakage control The results are shown in Table 7. Both instruction schemes are to reduce the peak of the downstream Beiwang key flood control section. The dispatching results are shown in Tables 8 to 11.
[0100] It can be seen that the implementation of the control and discharge command dispatch can reduce the peak flow of the flood in Beiwang Reduced to 1960 m 3 / s, the peak reduction rate of Xueye Reservoir reached 33.6%, and the peak reduction rate of Huangqian Reservoir reached 27.1%; the implementation of pre-discharge command dispatching can reduce the peak flow of Beiwang to 1679 m 3 / s, the peak-cutting rate of Xueye Reservoir reached 44.4%, and the peak-cutting rate of Huangqian Reservoir reached 51.3%. Compared with the regular dispatching scheme, the flood control storage capacity utilization rate of the reservoir implementing the command dispatching scheme is higher. The cross-section results of the two command schemes did not exceed the warning level, and the peak-cutting effect was very significant. Both can be saved as the final plan for reference by decision makers.
[0101] Table 7 The dispatching results of each reservoir in Scheme 1 control-discharge command dispatching scheme.
[0102]
[0103] Table 8 The dispatching results of each reservoir in Scheme 1 control-discharge command dispatching scheme.
[0104]
[0105] Table 9 The dispatching results of each reservoir in the pre-discharge instruction dispatching scheme of Scheme 2.
[0106]
[0107] Table 10 Peak flow rates at each downstream control section of Scheme 1 control and discharge instruction dispatching scheme.
[0108]
[0109] Table 11 Peak flow rates at each downstream control section of the pre-discharge instruction scheduling scheme of Scheme 2.
[0110]
[0111] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for automatically generating flood control dispatching plans for a reservoir group based on human-computer interaction based on flood control situation analysis, characterized in that: The method for automatically generating flood control scheduling schemes for reservoir groups through human-computer interaction firstly analyzes the flood control situation in the basin and determines the possible dangerous situations in key flood control sections based on the regulation scheduling scheme; secondly, combined with the flood control situation analysis, the main scheduling reservoir groups are identified according to the real-time water situation changes of the reservoirs and flood control sections and the location of the rainfall center; thirdly, according to the identified main scheduling reservoir groups, the scheduling indicators such as the flood control storage capacity and the remaining flood control storage capacity of each reservoir are analyzed in detail to identify the command scheduling reservoir; finally, the control discharge instruction or pre-discharge instruction of the water project or water project group is implemented to generate the corresponding scheduling scheme; the steps include: Step 1: Analyze the flood control situation in the basin; Based on the existing rainfall forecast and measured rainfall Data is input into the hydrological model to obtain the reservoir flood forecast process and interval flood forecasting process , the predicted flood process is input into the reservoir group rule dispatching model to carry out flood forecast dispatching in the whole basin; According to the regular dispatching model, the flow results of each flood control section after dispatching are compared with the warning flow of the flood control section. The section with the maximum flow less than or equal to the warning flow is considered to be a section without danger, as shown in formula (1): (1); In the formula, is the flow rate of the j flood control section, m 3 ; is the warning flow of the j flood control section, m 3 ; Step 2: Identify the main reservoir groups; Based on the analysis of the flood control situation results in step 1, whether there is a dangerous situation is determined by whether the flow of each flood control section exceeds the warning flow: If the flood control section does not exceed the warning flow, that is, there is no danger, the reservoir group will be dispatched according to the original regulation plan; If there is a flood control section that exceeds the warning level, that is, there is a dangerous situation, it is necessary to identify the main dispatching reservoir group and conduct joint dispatch of the reservoir group to stagger the peak of the flood control section that exceeds the warning level; before identifying the main dispatching reservoir group, it is necessary to divide the reservoir group in the upstream basin of the flood control section that exceeds the warning level into reservoir groups with the main stream flood control section as the node, so as to obtain each reservoir group, and then identify them; Step 3: Based on the main dispatching reservoir group, identify the command dispatching reservoir; Identify the command dispatch object based on the flood control storage capacity of each reservoir in the main dispatch reservoir group identified in step 2 Size, remaining flood control storage capacity at the time of crisis The size and proportion of the discharge volume of the reservoir in the flood of the downstream flood control section are determined based on the above three indicators to comprehensively judge the command-controlled reservoir and the non-command-controlled reservoir; The priority of each indicator is the same, and the reservoir with a flood discharge ratio greater than φ0.1 is selected as a candidate reservoir; the flood control capacity of the reservoir itself , facing the remaining flood control storage capacity The top 30% of reservoirs are selected as candidate reservoirs; the intersection of candidate reservoirs of each index can be used to identify the command dispatch reservoir; Step 4: Generate an instruction dispatching plan based on the instruction dispatching reservoir; A command dispatch model is constructed based on the water balance principle, and the command dispatch model is adopted to implement command dispatch on the command dispatch reservoir identified in step 3, and the dispatch mode is command discharge dispatch; The implementation of command discharge dispatch adopts two dispatching methods: controlled discharge command and pre-discharge command; Solve the command scheduling model and directly solve the water balance equation with various constraints; According to the command dispatching reservoir identified in step 3, a discharge control command scheme and a pre-discharge command scheme are established for the command dispatching reservoir through the command dispatching model in step 4; when implementing the discharge control command scheme, the discharge control volume of the command dispatching reservoir is controlled. and duration of control Trial calculation; when implementing the pre-discharge instruction plan, pre-discharge the instruction dispatching reservoir , Pre-ejaculation duration , control leakage , duration of leakage control Trial calculation; control release command scheduling and pre-release command scheduling After completing the above trial calculation, the control release command plan and the pre-release command plan can be generated; if the control release command scheduling plan results and the pre-release command scheduling plan do not exceed the warning level, save the corresponding command plan; if it still exceeds the warning level after the command scheduling is implemented, return to step 2 to re-identify the scheduling reservoir group; if the decision maker is not satisfied with the plan, he can manually modify the reservoir outflow and regenerate the plan.
2. According to claim 1, a method for automatically generating flood control dispatching plans for a reservoir group based on human-computer interaction and flood control situation analysis is characterized in that: In the step 1, the hydrological model adopts the Xin'anjiang hydrological model, and the water project scheduling model adopts the rule scheduling model.
3. The method for automatically generating flood control dispatching schemes for a group of reservoirs based on flood control situation analysis and judgment according to claim 1 is characterized in that: In step 2, the indicators for identifying the main dispatching reservoir groups are mainly: a. Flood peak flow at the main stream flood control section upstream of the flood control section exceeding the warning level Peak flow of flood control sections exceeding warning level The ratio θ is as shown in formula (2); (2); Where: is the peak flow of the kth main stream flood control section upstream of the flood control section exceeding the warning level, m 3 ; is the peak flow of the flood control section exceeding the warning level, m 3 ; b. Determine the main flood-prone areas through the location of rainfall centers predicted by the weather system; The above indicators are used to jointly identify the main dispatching reservoir group; when θ in indicator a is greater than 0.5, the corresponding upstream basin reservoir group is taken as the candidate reservoir group; the reservoir group where the rainfall center is located in indicator b is the candidate reservoir group; in the first identification, the priority of indicator a is greater than that of indicator b. If the reservoir groups identified by the two are different, the one identified by indicator (1) is the main one; in subsequent multiple identifications, the two indicators have the same priority.
4. The method for automatically generating flood control dispatching plans for a group of reservoirs based on flood control situation analysis and judgment according to claim 1 is characterized in that: In step 3: a. The reservoir's own flood control capacity : The flood accommodating capacity of each reservoir in the main dispatching reservoir group is different due to the different flood control storage capacity, so the peak reduction potential of the downstream flood control section is different; the reservoir with relatively large flood control storage capacity has greater potential for flood control and peak shifting; otherwise, it is smaller; b. Remaining flood control storage capacity at the time of crisis : The remaining flood control storage capacity at the moment of facing the flood can reflect the reservoir's ability to prevent floods at the current moment, as shown in formula (3); when the remaining flood control storage capacity at the moment of facing the flood is relatively large, it is believed that the flood control effect is strong and the flood reduction capacity of the current downstream flood control section is large; otherwise, it is small; (3); Where: is the flood control capacity of the reservoir, m 3 , It is the water level and storage capacity relationship curve function of the reservoir at period t0; c. The proportion of the reservoir discharge in the flood volume of the downstream flood control section φ: The proportion of the reservoir discharge in the flood volume of the downstream flood control section can reflect the potential of the reservoir to reduce the flood volume of the downstream section in this flood, as shown in formula (4); the larger the proportion of the downstream flood discharge, the greater the flood reduction capacity; otherwise, the smaller; (4); Where: is the flood discharge from reservoir i in this flood, m 3 , is the flood volume of section j in this flood, m 3 .
5. The method for automatically generating flood control dispatching schemes for reservoir groups based on flood control situation analysis and judgment according to claim 1 is characterized in that: In the step 4, the command discharge scheduling is to discharge the command scheduling reservoir within a certain period of time according to the fixed discharge rate given before the scheduling starts.
6. The method for automatically generating flood control dispatching plans for a group of reservoirs based on flood control situation analysis and judgment according to claim 1 is characterized in that: In step 4, the leakage control instruction refers to taking into account the inflow flow And the warning flow of the downstream flood control section Under the influence of the flood inflow section and the water withdrawal section, the scheduling calculation is carried out according to the fixed discharge flow; the pre-discharge instruction refers to freeing up the reservoir capacity before the flood arrives to store the impending flood, so as to increase a part of the flood control reservoir capacity, and also consider the inflow flow And the warning flow of the downstream flood control section Under the influence of the flood, the flood section, flood regulation section and water retreat section are dispatched and calculated according to the fixed discharge flow; both can achieve the effect of peak shaving for the reservoir and peak shifting for the downstream, ensuring the safety of the reservoir and the downstream flood control section.
7. The method for automatically generating flood control dispatching schemes for a group of reservoirs based on flood control situation analysis and judgment according to claim 1 is characterized in that: In step 4, the constraints of the instruction scheduling model are as follows: (1) Water level constraints; (2) Constraints on water balance in reservoirs at different time periods; (3) Water level-reservoir capacity relationship and reservoir discharge capacity constraints; (4) Constraints on safe discharge volume of reservoir discharge; (5) Downstream flood control safety constraints; (6) Discharge flow rate fluctuation constraint; (7) Non-negative constraints.
