Organic grease waste utilization method and system, storage medium and intelligent terminal

By automatically adjusting the process process through detection indicators and standard data, it solves the problems of incomplete gasification reaction and high cost caused by inappropriate proportions in the treatment of organic resin waste, and achieves rational resource utilization and high efficiency of the process.

CN118780784APending Publication Date: 2024-10-15NINGBO SIMING CHEM IND CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410761628.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In existing organic resin waste treatment methods, inappropriate proportions when preparing coal-water slurry may lead to incomplete gasification reaction or increased costs.

Method used

Determine the missing types and quantities through detection indicators and standard data, adjust the process to ensure the appropriate proportion of chemical substances, use intelligent terminals and storage media to realize automated replenishment and separation, and optimize the process flow.

Benefits of technology

It improves the rationality of resource utilization and the efficiency of the process, avoids resource waste and repeated unqualified testing, and ensures the smoothness and flexibility of the process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780784A_ABST
    Figure CN118780784A_ABST
Patent Text Reader

Abstract

The invention relates to an organic grease waste utilization method and system, a storage medium and an intelligent terminal, and relates to the technical field of industrial waste utilization. Searching a corresponding detection index type from a preset detection database based on the current process; performing detection based on the detection index type to obtain detection data; searching corresponding standard data from a preset standard database based on the current process; determining a lack type and a lack number based on the detection data and the standard data; determining a subsequent process based on the current process and a preset process sequence; the product corresponding to the missing type is made up according to the missing quantity until the detection data is equal to the standard data, and then the subsequent process progress is executed. The method has the advantages that the corresponding chemical substances are accurately made up by setting the detection indexes, so that the proper proportion and weight are always kept in the reaction process, and the resource utilization reasonability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of industrial waste utilization technology, and in particular to a method, system, storage medium and intelligent terminal for utilizing organic grease waste. Background Art

[0002] Ion exchange organic resins are often used in water treatment in the power, metallurgy and chemical industries, thus producing a large amount of non-ionic organic resins. Since they adsorb heavy metal ions or organic matter, they have long-term potential hazards and will cause serious pollution if they enter the environment.

[0003] The existing methods for treating organic resin waste mainly include physical recovery and chemical recovery. Chemical recovery is a method that uses chemical modification or decomposition to convert waste into other substances (such as gas and fuel oil) that can be recycled, such as incineration and pyrolysis.

[0004] For example, Chinese patent publication No. CN108467748A discloses a method for comprehensive utilization of organic resin waste, which comprises the following steps: (1) mixing the pretreated organic resin waste with water and an additive and slurrying to obtain a slurrying liquid; (2) mixing the slurrying liquid with a carbon source to prepare a water-coal slurry; (3) subjecting the water-coal slurry to a gasification reaction in an oxygen-containing atmosphere at 1100°C to 1600°C and 0.5MPa to 4.0MPa to obtain a gaseous product and liquid slag; (4) quenching and separating the gaseous product and the liquid slag to obtain a mixed gas and glassy slag.

[0005] The following problems exist in the prior art. There is a suitable ratio in each step. If the ratio is not suitable, a series of problems will occur. For example, the mass ratio of slurry to carbon source material in preparing water-coal slurry is preferably 100: (50-150). Once it exceeds this ratio, it will lead to failure to produce suitable water-coal slurry, resulting in incomplete gasification reaction and waste residue. If it is insufficient, it will lead to more carbon source material and higher cost. There is still room for improvement. Summary of the invention

[0006] In order to improve the problem that an inappropriate ratio will lead to an inability to produce a suitable water-coal slurry, resulting in an incomplete gasification reaction and waste residue, and if it is insufficient, it will lead to a large amount of carbon source material, the present application provides a method, system, storage medium and intelligent terminal for utilizing organic oil waste.

[0007] In the first aspect, the present application provides a method for utilizing organic grease waste, which adopts the following technical solution: A method for utilizing organic grease waste, comprising: Get the current process; Based on the current process, find the corresponding test index type from the preset test database; Conduct testing based on the types of testing indicators to obtain testing data; Find the corresponding standard data from the preset standard database based on the current process; Determine the missing types and quantities based on test data and standard data; Determine the subsequent process based on the current process and the preset process sequence; Make up the missing quantity with the corresponding products until the test data is equal to the standard data, and then execute the subsequent process.

[0008] By adopting the above technical solution, by setting the detection indicators, it is possible to accurately know which type is missing, and then accurately make up for the corresponding chemical substances to achieve the appropriate proportion and weight throughout the reaction process. There will be no waste of resources due to excessive amounts of certain substances, thereby improving the rationality of resource utilization.

[0009] Optional methods of making up for the missing quantity of products corresponding to the missing category include: Determine the previous process based on the current process and process sequence; Find the corresponding supplementary type from the preset process database based on the current process; Find the corresponding preceding product type from the process database based on the preceding process; When the missing category is a supplementary category, the corresponding product of the missing category shall be directly supplemented according to the missing quantity; When the missing product type is the previous product type, the entire process is stopped until the previous product type is produced and the corresponding quantity reaches the missing quantity; When the preceding product category is generated and the corresponding quantity reaches the missing quantity, the corresponding product of the missing category will be supplemented according to the missing quantity.

[0010] Optionally, the method of stopping the entire operation when the missing type is the preceding product type includes: Find the corresponding current product category from the process database based on the current process; Based on the current product categories and missing categories, the corresponding integration status is found from the preset integration database; When the blending state is a preset partial fusion state or a complete fusion state, the current process is stopped; When the blending state is the preset completely separated state, the stratification is determined based on the current product category, the missing category and the blending state; Determine the separation direction of the current product categories based on the stratification situation; Control the current product type to move in the separation direction, and then the products of the current product type enter the subsequent process, while the products corresponding to the supplementary type remain in the current process.

[0011] By adopting the above technical solution, when the product and the excess product can be separated, the current product is separated first and passed to the next process to ensure that the products produced by the current process will not stagnate due to the need for the products produced by the previous process, thereby improving the smoothness and efficiency of the process.

[0012] Optionally, it also includes a method for controlling the update of the subsequent process after the current product type enters the subsequent process, the method comprising: Based on the current process, the corresponding standard predecessor product quantity, standard current supplementary product quantity and standard current product quantity are found from the standard database; Based on the subsequent process, the corresponding standard subsequent supplementary product quantity and standard subsequent product quantity are found from the standard database; Calculate the actual current product quantity based on the standard predecessor product quantity, the missing quantity and the standard current product quantity; Find the corresponding subsequent standard data from the standard database based on the subsequent process; Find the corresponding subsequent supplementary types from the process database based on the subsequent process progress; Calculate actual subsequent standard data based on actual current product quantity, standard current product quantity and subsequent standard data; Calculate the actual subsequent replenishment product quantity based on the actual current product quantity, the standard current product quantity and the standard subsequent replenishment product quantity; If the number of previous product types has not increased, the standard subsequent supplementary product quantity shall be updated according to the actual subsequent supplementary product quantity, and the subsequent standard data shall be updated according to the actual subsequent standard data; When the previous product type increases, the actual current product quantity is updated.

[0013] By adopting the above technical solution, when the number of products entering the next process is not the standard number, the subsequent corresponding supplementary quantity and detection indicators need to be updated to avoid repeated unqualified detection, thereby improving the flexibility of process detection.

[0014] Optionally, the method of making up for the missing quantity with the product corresponding to the missing category also includes: Determine excess categories and excess quantities based on standard predecessor product quantities, standard current supplementary product quantities, and missing quantities; When the missing category is a supplementary category and a preset signal indicating that it cannot be supplemented is received, or when the missing category is a preceding product category, the corresponding impact degree is found from a preset impact database based on the redundant categories, the current process and the subsequent process; When the impact level is the preset harmful impact level, the subsequent process is not entered until the product corresponding to the missing type and the missing quantity is received; When the impact degree is a preset no impact degree or beneficial impact degree, the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity are controlled to enter the subsequent process and the products corresponding to the missing type with the missing quantity are received in the subsequent process; When receiving the product of the missing quantity or type, the subsequent process is carried out normally; When the missing types corresponding to the missing quantities are not received, the missing quantities are updated based on the inspection data corresponding to the subsequent process steps, and the impact degree and the redundant types are updated.

[0015] By adopting the above technical solution, when the missing species cannot be replenished in time and if the excess species do not affect the progress of subsequent processes, they can enter the next process together, reducing the slowness of the process flow caused by the inability to separate or the separation is too complicated, and improving the smoothness of the entire process flow.

[0016] Optionally, when the impact degree is completely unaffected or beneficially affected, the method of controlling the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity to enter the subsequent process and receiving the products corresponding to the missing type of the missing quantity in the subsequent process includes: Determine a subsequent process group based on the current process and the process sequence, wherein the subsequent process group includes the subsequent process and all process after the subsequent process; Based on the redundant types, the current process and the subsequent process group, the corresponding impact degree is found from the impact database respectively, and the impact degree is defined as the estimated impact degree; When there is a harmful impact degree in the estimated impact degree, the subsequent process group is screened based on the harmful impact degree to obtain an adjacent subsequent process group including the subsequent process and all the process are adjacent in process sequence, wherein the adjacent subsequent process group does not include the process corresponding to the harmful impact degree and the estimated impact degree corresponding to the next process is the harmful impact degree; When there is no beneficial impact level in the estimated impact levels corresponding to the process in the adjacent subsequent process group, receiving the product corresponding to the missing type in the missing quantity in the subsequent process; When there is a beneficial impact degree among the estimated impact degrees corresponding to the process processes in the adjacent subsequent process group, the last process whose impact degree is a beneficial impact degree is determined based on the process sequence and the adjacent subsequent process group, and the process is defined as the estimated process; Determine the group of process steps that have been carried out based on the expected process steps; Based on the process corresponding to the completed process group, the corresponding types of replenishment and quantities of replenishment are searched from the process database respectively; Receive the products corresponding to the replenished types and quantities in accordance with the process sequence, and perform the operations of the process corresponding to the process group in sequence.

[0017] By adopting the above technical solution, the current redundant products can be used to cover as many process flows as possible that can accelerate the completion of the process flows due to the redundant products without damaging the progress of the subsequent process flows, and then the corresponding products of the supplementary categories can be added to make the entire process flow more efficient.

[0018] Optionally, the method for determining the missing type and missing quantity based on the detection data and standard data includes: Decomposing the inspection data to obtain previous product data, supplementary product data and current product data; When both the previous product data and the supplementary product data exist, continue to execute the current process until the previous product data and / or the supplementary product data no longer exist; When the preceding product data exists but the supplementary product data does not, the missing category is defined as a supplementary category; When the preceding product data does not exist but the supplementary product data exists, the missing category is defined as the preceding product category; Define missing categories as supplementary categories and predecessor product categories when only current product data exists.

[0019] In a second aspect, the present application provides an organic grease waste utilization system, which adopts the following technical solution: An organic grease waste utilization system, comprising: Acquisition module, used to obtain current process and detection data; A memory for storing a program of a control method for any of the above-mentioned methods for utilizing organic grease waste; The program in the processor and the memory can be loaded and executed by the processor to implement the control method of any of the above-mentioned organic grease waste utilization methods.

[0020] By adopting the above technical solution, by setting the detection indicators, it is possible to accurately know which type is missing, and then accurately make up for the corresponding chemical substances to achieve the appropriate proportion and weight throughout the reaction process. There will be no waste of resources due to excessive amounts of certain substances, thereby improving the rationality of resource utilization.

[0021] In the third aspect, the present application provides a smart terminal, which adopts the following technical solution: The intelligent terminal comprises a memory and a processor, wherein the memory stores a computer program which can be loaded by the processor and execute any one of the above-mentioned organic grease waste utilization methods.

[0022] By adopting the above technical solution, by setting the detection indicators, it is possible to accurately know which type is missing, and then accurately make up for the corresponding chemical substances to achieve the appropriate proportion and weight throughout the reaction process. There will be no waste of resources due to excessive amounts of certain substances, thereby improving the rationality of resource utilization.

[0023] Fourthly, the present application provides a computer storage medium that can store corresponding programs and has the characteristics of fast interaction with memory big data.

[0024] Computer readable storage medium, using the following technical solution: A computer-readable storage medium stores a computer program that can be loaded by a processor and execute any of the above-mentioned methods for utilizing organic grease waste.

[0025] By adopting the above technical solution, by setting the detection indicators, it is possible to accurately know which type is missing, and then accurately make up for the corresponding chemical substances to achieve the appropriate proportion and weight throughout the reaction process. There will be no waste of resources due to excessive amounts of certain substances, thereby improving the rationality of resource utilization.

[0026] In summary, the present application includes at least the following beneficial technical effects: 1. By setting the detection indicators and accurately making up for the corresponding chemical substances, the appropriate proportion and weight can be achieved during the reaction process, thus improving the rationality of resource utilization; 2. The corresponding subsequent supplementary quantity and test indicators need to be updated to avoid repeated unqualified tests, thus improving the flexibility of process testing; 3. Without compromising the progress of subsequent process flows, the current excess products should cover as many process flows as possible that can be accelerated due to the excess products, making the entire process flow more efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flow chart of a method for utilizing organic grease waste in an embodiment of the present application.

[0028] Figure 2 It is a flow chart of a method for making up for the missing products of the corresponding types according to the missing quantities in an embodiment of the present application.

[0029] Figure 3 It is a flow chart of stopping the entire working method when the missing type is the preceding product type in an embodiment of the present application.

[0030] Figure 4 It is a flowchart of a method for controlling the update of a subsequent process after the current product type enters a subsequent process in an embodiment of the present application.

[0031] Figure 5 It is a flowchart of a further method for making up for the missing products of the corresponding types according to the missing quantities in an embodiment of the present application.

[0032] Figure 6 It is a flowchart of a method in an embodiment of the present application for controlling the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity to enter the subsequent process and receiving the products corresponding to the missing type with the missing quantity in the subsequent process when the degree of influence is completely uninfluenced or beneficially influenced.

[0033] Figure 7 It is a flowchart of a method for determining missing types and missing quantities based on detection data and standard data in an embodiment of the present application.

[0034] Figure 8 It is a system module diagram of a method for utilizing organic grease waste in an embodiment of the present application. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-Figure 8 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0036] The present application embodiment discloses a method for utilizing organic grease waste. Figure 1 A method for utilizing organic grease waste comprises: Step 100: Get the current process progress.

[0037] The current process is the process step currently being carried out in the organic oil waste utilization process. The acquisition method can be a manual input method, or it can be an automatic statistical method of the system, that is, the system automatically accumulates once each step is completed, and each number represents a step, and then gradually accumulates to zero and accumulates again after the end. In general, the process flow is as follows: organic resin waste will be pretreated, then pulped to form a pulping liquid, and then a carbon source is added to form a water-coal slurry, and then pressurized and gasified to form a gaseous product and liquid slag, and then quenched and separated to obtain a mixed gas and glassy slag, and finally the mixed gas is desulfurized and dechlorinated to obtain a mixed gas containing hydrogen and carbon monoxide, and the rest is discharged to obtain glassy slag.

[0038] Step 101: Find the corresponding detection index type from a preset detection database based on the current process.

[0039] The type of detection index is the type of index that can detect the progress of the current process step. For example, the content of sulfur and chlorine in the gas is detected in the desulfurization and dechlorination process. The content of carbon source can be measured in the process of preparing water-coal slurry. The database stores the mapping relationship between the current process and the type of detection index. The staff in this field will obtain the corresponding detection method based on the actual process conditions and the substances that can change in quantity or even from nothing to something, or from something to nothing in this process, and then combine common sense to enter it into the detection database. When the system receives the corresponding current process, it automatically finds the corresponding detection index type from the database.

[0040] Step 102: Perform detection based on the detection indicator type to obtain detection data.

[0041] The test data is the data corresponding to the test indicator type. For example: the sulfur content in the desulfurization and dechlorination process. The method of obtaining the data can be through the corresponding detection method, such as mixing the sample to be tested with nitric acid and heating it to oxidize it to generate sulfuric acid, and then measuring the sulfuric acid content by titration or colorimetry to obtain the sulfur content.

[0042] Step 103: Find corresponding standard data from a preset standard database based on the current process.

[0043] The standard data is the data corresponding to the standard detection index type after the current process is completed. For example, if the detection index type in the desulfurization and dechlorination process is sulfur content, the standard data should be 0g / L, but it is not so absolute, so the standard data can be set to 0.1g / L. The mapping relationship between the current process and the standard data is stored in the database, which is set by the staff in this field based on the theoretical situation and the actual situation. When the system receives the corresponding current process, it automatically finds the corresponding standard data from the database for output.

[0044] Step 104: Determine the missing type and missing quantity based on the detection data and the standard data.

[0045] The missing type is the type that is still missing in the current process and is required for this step. The missing quantity is the number of the missing types, which can be a unit specified by humans. The specific determination steps are introduced in the subsequent method and will not be repeated here.

[0046] Step 105: Determine the subsequent process based on the current process and the preset process sequence.

[0047] The process sequence is a process sequence set manually and carried out in accordance with the specification. The subsequent process is the process after the current process, and the subsequent process is adjacent to the current process. The determination method is that each process can be numbered, and then the number of the current process plus one is the subsequent process.

[0048] Step 106: Make up for the missing quantity with products corresponding to the missing type until the test data is equal to the standard data, and then execute the subsequent process.

[0049] Here, if operation is required after the products corresponding to the missing types are supplemented by the missing quantities, such as mixing, mixing is performed first, and then the data is continued to be tested.

[0050] Reference Figure 2 , the methods of making up for the missing products of the missing categories according to the missing quantity include: Step 200: Determine a previous process based on the current process and process sequence.

[0051] The preceding process is a process that is one process before the current process, and the preceding process is adjacent to the current process.

[0052] Step 201: Find the corresponding supplementary type from a preset process database based on the current process.

[0053] The supplementary category is the category of the newly added product in the current process. For example, additives and water are added to the pulping liquid step. The database stores the mapping relationship between the current process and the supplementary category, which is obtained by the staff in this field after observation and operation based on the actual process flow. When the system receives the corresponding current process, it automatically finds the corresponding supplementary category from the database and outputs it.

[0054] Step 202: Find the corresponding preceding product type from the process database based on the preceding process.

[0055] The previous product category is the final result of the previous process. The database also stores the mapping relationship between the previous process and the previous product category. It is obtained by the staff in this field after observation and operation based on the actual process flow. When the system receives the corresponding previous process, it automatically finds the corresponding previous product category from the database and outputs it.

[0056] Step 203: When the missing category is a supplementary category, the product corresponding to the missing category is directly supplemented according to the missing quantity.

[0057] When the missing species is a supplementary species, and the supplementary species can be directly added in the current process, it can be directly added.

[0058] Step 204: When the missing type is the previous product type, the entire operation is stopped until the previous product type is generated and the corresponding quantity reaches the missing quantity.

[0059] If the missing type is the previous product type, it means that the previous process needs to be completed or the previous product type needs to be produced before the mixing can continue. Therefore, in order to avoid unnecessary trouble, the work of this product process can be stopped, and the previous process continues to generate the previous product type, and then added to the current process for mixing. If other operations are required, they can be performed simultaneously.

[0060] Step 205: When the preceding product type is generated and the corresponding quantity reaches the missing quantity, the product corresponding to the missing type is supplemented according to the missing quantity.

[0061] When the generation is completed, it is added to the current process and proceeds to the next step.

[0062] Reference Figure 3 , when the missing type is the previous product type, the entire working method is stopped, including: Step 300: Find the corresponding current product category from the process database based on the current process progress.

[0063] The current product category is the final result of the current process. The establishment of the database is introduced in step 202 and will not be repeated here. When the system receives the current process, it automatically searches the database for the corresponding current product category.

[0064] Step 301: Find the corresponding blending status from a preset database based on the current product category and the missing category.

[0065] The blending state is the state of the current product type and the remaining products except the missing type after being put together, for example: dissolving into each other, separating from each other, etc. The database stores the mapping relationship between the current product type, the missing type and the blending state. It is obtained by the staff in this field based on common sense and their own experiments. When the system receives the corresponding current product type and the missing type, it automatically finds the corresponding blending state from the database and outputs it.

[0066] Step 302: Stop the current process when the blending state is a preset partial fusion state or a complete fusion state.

[0067] The partially fused state is a state where the degree of fusion is not high and is not 100% fused. The fully fused state is a state where the degree of fusion is 100%. When the fusion state is a partially fused state or a fully fused state, it means that it is temporarily impossible to separate the two by simple means, and it is impossible to enter the next process. You can only wait until the transformation to the current product type is completed here before entering the subsequent process.

[0068] Step 303: When the blending state is the preset completely separated state, the stratification status is determined based on the current product category, the missing category and the blending state.

[0069] The complete separation state is the state in which the current product type and the rest of the products except the missing type are completely separated after being put together, which can be the state of upper and lower stratification or solid-liquid separation. The stratification situation is the situation of upper and lower stratification or solid-liquid separation. The determination method can also be the method of direct database analysis, or the separation direction can be obtained according to the state, and then the stratification situation can be obtained, for example: gas moves upward, while liquid settles downward; or solid settles downward in liquid.

[0070] Step 304: Determine the separation direction of the current product category based on the stratification situation.

[0071] The separation direction is a direction that can separate the current product type from the mixture of the current product type and the remaining products except the missing type. For example, if the stratification situation is that the current product type is in the lower layer, the separation direction is from top to bottom, that is, moving downward to separate from the remaining products except the missing type.

[0072] Step 305: Control the current product type to move in the separation direction, and then the products of the current product type enter the subsequent process, while the products corresponding to the supplementary type remain in the current process.

[0073] Reference Figure 4 , and also includes a method for updating the subsequent process after the current product type enters the subsequent process, the method comprising: Step 400: Based on the current process, the corresponding standard preceding product quantity, standard current supplementary product quantity and standard current product quantity are searched from the standard database.

[0074] The number of standard predecessor products is the number of standards for the predecessor products entering the current process. The number of standard current supplementary products is the number of standards for the supplementary products entering the current process. The number of standard current products is the number of standards for the resulting products produced in the current process. The database here also stores the mapping relationship between the current process, the number of standard predecessor products, the number of standard current supplementary products, and the number of standard current products, which are set by the staff in this field based on the mechanical properties of the current equipment and their own human experience. When the system receives the corresponding current process, it automatically searches the database for the corresponding number of standard predecessor products, the number of standard current supplementary products, and the number of standard current products for output.

[0075] Step 401: Based on the subsequent process, the corresponding standard subsequent supplementary product quantity and standard subsequent product quantity are found from the standard database.

[0076] The standard subsequent supplementary product quantity is the standard quantity of the subsequent supplementary product entering the subsequent process. The standard subsequent product quantity is the standard quantity of the result product produced in the subsequent process. The corresponding predecessor product here is the current product, so there is no need to find the quantity of the predecessor product. The establishment of the database has been introduced in the previous step, and will not be repeated here. When the system receives the subsequent process, it automatically finds the corresponding standard subsequent supplementary product quantity and standard subsequent product quantity from the database for output.

[0077] Step 402: Calculate the actual current product quantity based on the standard predecessor product quantity, the missing quantity and the standard current product quantity.

[0078] The actual current product quantity is the actual quantity of the currently generated product. The calculation method is to subtract the missing quantity from the standard previous product quantity to get the actual previous product quantity, then divide it by the standard previous product quantity to get the ratio of the two, and multiply the ratio by the standard current product quantity to get the actual current product quantity.

[0079] Step 403: searching for corresponding subsequent standard data from a standard database based on the subsequent process.

[0080] Subsequent standard data is the data corresponding to the type of inspection indicators of the standard after the subsequent process is completed. The establishment of the database has been introduced in the previous step and will not be repeated here. When the system receives the corresponding subsequent process, it automatically finds the corresponding subsequent standard data from the database and outputs it.

[0081] Step 404: Find the corresponding subsequent supplementary category from the process database based on the subsequent process progress.

[0082] Subsequent supplementary categories are supplementary categories for subsequent process steps. The establishment of the database has been introduced in the previous steps and will not be repeated here. When the system receives the corresponding subsequent process, it automatically finds the corresponding subsequent supplementary category from the database for output.

[0083] Step 405: Calculate actual subsequent standard data based on the actual current product quantity, the standard current product quantity and the subsequent standard data.

[0084] The actual subsequent standard data is the standard data detected in the subsequent process. The calculation method is to divide the actual current product quantity by the standard current product quantity to get the ratio, and then multiply the ratio by the subsequent standard data to get the actual subsequent standard data.

[0085] Step 406: Calculate the actual subsequent replenishment product quantity based on the actual current product quantity, the standard current product quantity and the standard subsequent replenishment product quantity.

[0086] The actual subsequent replenishment product quantity is the actual standard value of the subsequent replenishment product quantity. The calculation method is to divide the actual current product quantity by the standard current product quantity to obtain a ratio, and then multiply the ratio by the standard subsequent replenishment product quantity to obtain the actual subsequent replenishment product quantity.

[0087] Step 407: When the number of previous product types has not increased, the standard subsequent supplementary product quantity is updated according to the actual subsequent supplementary product quantity, and the subsequent standard data is updated according to the actual subsequent standard data.

[0088] When the number of previous product types has not increased, it means that there is no additional production. In this case, the standard subsequent supplementary product quantity can be updated according to the actual subsequent supplementary product quantity, and the subsequent standard data can be updated according to the actual subsequent standard data.

[0089] Step 408: Re-update the actual current product quantity when the previous product type increases.

[0090] When it increases, it means that the actual current product quantity is incorrect, so it needs to be recalculated.

[0091] Reference Figure 5 The method of making up for the missing products of the missing types according to the missing quantity also includes: Step 500: Determine excess categories and excess quantities based on standard predecessor product quantities, standard current replenishment product quantities, and missing quantities.

[0092] The redundant categories are the categories of items that have not been converted into the current products. The determination method is to reversely deduce from the missing categories, that is, all the categories that are not missing are redundant categories. The redundant quantity is the standard previous product quantity or the standard current supplementary product quantity converted in proportion, and then the missing quantity is multiplied by the proportion.

[0093] Step 501: When the missing category is a supplementary category and a preset signal that it cannot be supplemented is received, or when the missing category is a previous product category, the corresponding impact degree is found from a preset impact database based on the redundant categories, the current process and the subsequent process.

[0094] The signal that cannot be supplemented is a signal that the supplementary type cannot be supplemented. The output method is text output or electronic signal output. The degree of influence is the degree of influence of the redundant type on the subsequent process when it enters the subsequent process. The database stores the mapping relationship between the redundant type, the current process, the subsequent process and the degree of influence. The staff in this field obtains and estimates the degree of influence on the entire subsequent process based on the actual redundant type placed in the subsequent process and records it. When the system receives the corresponding missing type, current process, and subsequent process, it automatically finds the corresponding degree of influence from the database and outputs it.

[0095] Step 502: When the impact level is the preset harmful impact level, the subsequent process is not entered until the product corresponding to the missing type and the missing quantity is received.

[0096] The degree of harmful impact is the degree to which the subsequent process is harmful or even affects the reaction of the subsequent process. When the degree of impact is harmful, it means that if the subsequent process is entered, the development of the subsequent process will be affected, so the subsequent process cannot be carried out.

[0097] Step 503: When the impact degree is the preset degree of no impact or beneficial impact degree, the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity are controlled to enter the subsequent process and the products corresponding to the missing type corresponding to the missing quantity are received in the subsequent process.

[0098] The degree of no influence at all means that it has nothing to do with the subsequent process and has no influence. The degree of beneficial influence means that it can promote the subsequent process. When the degree of influence is no influence at all or beneficial influence, it means that it does not affect the subsequent process, or even promotes the subsequent process. In order to reduce the tediousness of separation work, the subsequent process can be directly entered, and the current process can be carried out while the subsequent process is carried out.

[0099] Step 504: When the product corresponding to the missing quantity and the missing type is received, the subsequent process is carried out normally.

[0100] When the product corresponding to the missing quantity and the missing type is received, it means that there is no reduction at this time, and there is no need to reduce it according to the method of steps 400-408, and the subsequent process is output normally. Step 505: When the missing types corresponding to the missing quantities are not received, the missing quantities are updated based on the detection data corresponding to the subsequent process steps, and the impact degree and the redundant types are updated.

[0101] When the missing category corresponding to the missing quantity is not received, the missing quantity is updated, and the impact degree and redundant category are updated. Reference Figure 6 , when the impact degree is completely unaffected or beneficially affected, the method of controlling the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity to enter the subsequent process and receiving the products corresponding to the missing type of the missing quantity in the subsequent process includes: Step 600: Determine a subsequent process group based on the current process and process sequence.

[0102] The subsequent process group includes the subsequent process and all the processes after the subsequent process. The determination method is a simple numbering method, that is, by determining the number of the current process, and then knowing the subsequent processes with numbers greater than the number, all the processes corresponding to the numbers that meet the requirements are the processes in the subsequent process group.

[0103] Step 601: Based on the redundant types, the current process and the subsequent process group, the corresponding impact degrees are respectively found from the impact database, and the impact degrees are defined as the estimated impact degrees.

[0104] The estimated impact is the impact of the redundant species on the process in the subsequent process group. The establishment of the database has been explained in the previous steps and will not be repeated here. When the system receives the corresponding redundant species, the current process and the process of the subsequent process group, it automatically finds the corresponding estimated impact and outputs it.

[0105] Step 602: When there is a harmful impact degree in the estimated impact degree, the subsequent process group is screened based on the harmful impact degree to obtain an adjacent subsequent process group including the subsequent process and all the process are adjacent in process sequence.

[0106] The adjacent subsequent process group does not contain the process corresponding to the harmful impact level and the estimated impact level corresponding to the next process is the harmful impact level.

[0107] Step 603: When there is no beneficial impact level in the estimated impact levels corresponding to the process in the adjacent subsequent process group, receiving the products corresponding to the missing types and the missing quantities in the subsequent process.

[0108] When there is no beneficial impact degree in the estimated impact degree corresponding to the process in the adjacent subsequent process group, it means that all of them have no impact degree at all. Therefore, it is set to have no impact in any process. However, in order to avoid trouble in the subsequent process, it is best to receive in the previous process. If it still cannot be received in the subsequent process, you can continue to the next process. However, all parameters in the subsequent process group here need to be updated according to steps 400-408.

[0109] Step 604: When there is a beneficial impact degree among the estimated impact degrees corresponding to the process processes in the adjacent subsequent process group, determine the last process whose impact degree is a beneficial impact degree based on the process sequence and the adjacent subsequent process group, and define the process as the estimated process.

[0110] When there is a beneficial impact, in order to still assist the progress of the expected process when the expected process is obtained, the products corresponding to the missing types and missing quantities can be received only after the expected process is finished.

[0111] Step 605: Determine a group of performed process steps based on the expected process steps.

[0112] The group of completed process is a combination formed from the subsequent process to the expected process. The determination method is to determine from the subsequent process to the expected process.

[0113] Step 606: Based on the process corresponding to the completed process group, the corresponding completed replenishment types and completed replenishment quantities are searched from the process database.

[0114] The types of replenishment that have been made are the types of replenishment that are directly added to the process corresponding to the process group. The number of replenishments that have been made is the number of the types of replenishment that are directly added to the process corresponding to the process group. The establishment of the database has been introduced in the previous steps and will not be repeated here. When the system receives the process corresponding to the corresponding process group, it automatically finds the corresponding types of replenishment and the number of replenishments that have been made from the database and outputs them.

[0115] Step 607: Receive the products of the replenished types and quantities in accordance with the process sequence, and perform the operations of the process corresponding to the process group in sequence.

[0116] Reference Figure 7 , the methods for determining the missing types and missing quantities based on the test data and standard data include: Step 700: Decompose the inspection data to obtain previous product data, supplementary product data and current product data.

[0117] The previous product data is the data of the previous product. The supplementary product data is the data of the supplementary category product. The current product data is the data of the product after the current process.

[0118] Step 701: When both the previous product data and the supplementary product data exist, continue to execute the current process until the previous product data and / or the supplementary product data do not exist.

[0119] When both are present, it means that the reaction has not been fully completed and mixing is required.

[0120] Step 702: Define the missing category as a supplementary category when the preceding product data exists but the supplementary product data does not exist.

[0121] Step 703: When the preceding product data does not exist but the supplementary product data exists, define the missing category as the preceding product category.

[0122] A species is absent if either one exists but the other does not.

[0123] Step 704: Define the missing categories as supplementary categories and preceding product categories when only current product data exists.

[0124] When there is only current product data, it means that everything is missing at this time, and the missing categories are defined as supplementary categories and preceding product categories.

[0125] Based on the same inventive concept, an embodiment of the present invention provides an organic grease waste utilization system.

[0126] Reference Figure 8 , an organic grease waste utilization system, comprising: Acquisition module, used to obtain current process and detection data; A memory for storing a program of a control method for a method for utilizing organic grease waste; The program in the processor memory can be loaded and executed by the processor to realize a control method for utilizing organic grease waste.

[0127] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0128] An embodiment of the present invention provides a computer-readable storage medium storing a computer program that can be loaded and executed by a processor and that is capable of executing a method for utilizing organic grease waste.

[0129] Computer storage media include, for example, various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0130] Based on the same inventive concept, an embodiment of the present invention provides an intelligent terminal, including a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executed by a method for utilizing organic grease waste.

[0131] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

Claims

1. A method for utilizing organic grease waste, characterized in that: include: Get the current process; Based on the current process, find the corresponding test index type from the preset test database; Conduct testing based on the types of testing indicators to obtain testing data; Find the corresponding standard data from the preset standard database based on the current process; Determine the missing types and quantities based on test data and standard data; Determine the subsequent process based on the current process and the preset process sequence; Make up the missing quantity with the corresponding products until the test data is equal to the standard data, and then execute the subsequent process.

2. The method for utilizing organic grease waste according to claim 1, characterized in that: Methods for making up for missing quantities of products corresponding to missing categories include: Determine the previous process based on the current process and process sequence; Find the corresponding supplementary type from the preset process database based on the current process; Find the corresponding preceding product type from the process database based on the preceding process; When the missing category is a supplementary category, the corresponding product of the missing category shall be directly supplemented according to the missing quantity; When the missing product type is the previous product type, the entire process is stopped until the previous product type is produced and the corresponding quantity reaches the missing quantity; When the preceding product category is generated and the corresponding quantity reaches the missing quantity, the corresponding product of the missing category will be supplemented according to the missing quantity.

3. The method for utilizing organic grease waste according to claim 2, characterized in that: The method of stopping the entire operation when the missing type is the preceding product type includes: Find the corresponding current product category from the process database based on the current process; Based on the current product categories and missing categories, the corresponding integration status is found from the preset integration database; When the blending state is a preset partial fusion state or a complete fusion state, the current process is stopped; When the blending state is the preset completely separated state, the stratification is determined based on the current product category, the missing category and the blending state; Determine the separation direction of the current product categories based on the stratification situation; Control the current product type to move in the separation direction, and then the products of the current product type enter the subsequent process, while the products corresponding to the supplementary type remain in the current process.

4. The method for utilizing organic grease waste according to claim 3, characterized in that: The method also includes a method for controlling the update of the subsequent process after the current product type enters the subsequent process, the method comprising: Based on the current process, the corresponding standard predecessor product quantity, standard current supplementary product quantity and standard current product quantity are found from the standard database; Based on the subsequent process, the corresponding standard subsequent supplementary product quantity and standard subsequent product quantity are found from the standard database; Calculate the actual current product quantity based on the standard predecessor product quantity, the missing quantity and the standard current product quantity; Find the corresponding subsequent standard data from the standard database based on the subsequent process; Find the corresponding subsequent supplementary types from the process database based on the subsequent process progress; Calculate actual subsequent standard data based on actual current product quantity, standard current product quantity and subsequent standard data; Calculate the actual subsequent replenishment product quantity based on the actual current product quantity, the standard current product quantity and the standard subsequent replenishment product quantity; If the number of previous product types has not increased, the standard subsequent supplementary product quantity shall be updated according to the actual subsequent supplementary product quantity, and the subsequent standard data shall be updated according to the actual subsequent standard data; When the previous product type increases, the actual current product quantity is updated.

5. The method for utilizing organic grease waste according to claim 4, characterized in that: Methods for making up for the missing quantity of products corresponding to the missing category also include: Determine excess categories and excess quantities based on standard predecessor product quantities, standard current supplementary product quantities, and missing quantities; When the missing category is a supplementary category and a preset signal indicating that it cannot be supplemented is received, or when the missing category is a preceding product category, the corresponding impact degree is found from a preset impact database based on the redundant categories, the current process and the subsequent process; When the impact level is the preset harmful impact level, the subsequent process is not entered until the product corresponding to the missing type and the missing quantity is received; When the impact degree is a preset no impact degree or beneficial impact degree, the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity are controlled to enter the subsequent process and the products corresponding to the missing type with the missing quantity are received in the subsequent process; When receiving the product of the missing quantity or type, the subsequent process is carried out normally; When the missing types corresponding to the missing quantities are not received, the missing quantities are updated based on the inspection data corresponding to the subsequent process steps, and the impact degree and the redundant types are updated.

6. The method for utilizing organic grease waste according to claim 5, characterized in that: When the influence degree is completely uninfluenced or beneficially influenced, the method of controlling the current product type corresponding to the actual current product quantity of the current process and the products corresponding to the excess type corresponding to the excess quantity to enter the subsequent process and receiving the products corresponding to the missing type of the missing quantity in the subsequent process includes: Determine a subsequent process group based on the current process and the process sequence, wherein the subsequent process group includes the subsequent process and all process after the subsequent process; Based on the redundant types, the current process and the subsequent process group, the corresponding impact degree is found from the impact database respectively, and the impact degree is defined as the estimated impact degree; When there is a harmful impact degree in the estimated impact degree, the subsequent process group is screened based on the harmful impact degree to obtain an adjacent subsequent process group including the subsequent process and all the process are adjacent in process sequence, wherein the adjacent subsequent process group does not include the process corresponding to the harmful impact degree and the estimated impact degree corresponding to the next process is the harmful impact degree; When there is no beneficial impact level in the estimated impact levels corresponding to the process in the adjacent subsequent process group, receiving the product corresponding to the missing type in the missing quantity in the subsequent process; When there is a beneficial impact degree among the estimated impact degrees corresponding to the process processes in the adjacent subsequent process group, the last process whose impact degree is a beneficial impact degree is determined based on the process sequence and the adjacent subsequent process group, and the process is defined as the estimated process; Determine the group of process steps that have been carried out based on the expected process steps; Based on the process corresponding to the completed process group, the corresponding types of replenishment and quantities of replenishment are searched from the process database respectively; Receive the products corresponding to the replenished types and quantities in accordance with the process sequence, and perform the operations of the process corresponding to the process group in sequence.

7. The method for utilizing organic grease waste according to claim 1, characterized in that: Methods for determining missing types and quantities based on test data and standard data include: Decomposing the inspection data to obtain previous product data, supplementary product data and current product data; When both the previous product data and the supplementary product data exist, continue to execute the current process until the previous product data and / or the supplementary product data no longer exist; When the preceding product data exists but the supplementary product data does not, the missing category is defined as a supplementary category; When the preceding product data does not exist but the supplementary product data exists, the missing category is defined as the preceding product category; Define missing categories as supplementary categories and predecessor product categories when only current product data exists.

8. An organic grease waste utilization system, characterized in that: include: Acquisition module, used to obtain current process and detection data; A memory for storing a program of a control method for a method for utilizing organic grease waste according to any one of claims 1 to 7; The program in the processor memory can be loaded and executed by the processor to implement a control method for a method for utilizing organic grease waste as described in any one of claims 1 to 7.

9. Intelligent terminal, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program which can be loaded by the processor and executes a method for utilizing organic grease waste as claimed in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that A computer program is stored which can be loaded by a processor and executes a method for utilizing organic grease waste as claimed in any one of claims 1 to 7.