Disassembly maintenance construction method of circuit breaker operating mechanism

By designing a construction method for disassembly and maintenance of the circuit breaker operating mechanism, the problem of complicated disassembly and maintenance steps of the circuit breaker and missing parts is solved. It provides a logical and clear maintenance process, ensures the correct disassembly and sealing of parts, and improves the efficiency of maintenance. Efficiency and accuracy.

CN118783285AInactive Publication Date: 2024-10-15CHINA YANGTZE POWER
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410731066.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The current disassembly and maintenance procedures for circuit breakers are complex, with many parts and components, and lack of unified maintenance guidance, making it prone to errors and omissions in parts and processes.

Method used

A construction method for disassembly and maintenance of the circuit breaker operating mechanism is designed, including the disassembly operation of the operating mechanism, component inspection and processing, seal replacement, reassembly of cylinder parts, oil filling and sealing test, and reassembly and adjustment of other components, providing A clear and logical disassembly and maintenance process.

Benefits of technology

It solves the problems of complicated steps and missing parts during circuit breaker disassembly and maintenance, provides a scientific maintenance method, ensures the correct disassembly and sealing of parts, and improves maintenance efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118783285A_ABST
    Figure CN118783285A_ABST
Patent Text Reader

Abstract

The invention discloses a circuit breaker operating mechanism disassembly maintenance construction method, which comprises the following steps of: firstly carrying out operating mechanism disassembly operation, then carrying out operating mechanism part inspection and processing and sealing replacement operation, and then carrying out operating mechanism cylinder part reassembly operation. And finally, oil injection and sealing test operation of the operating mechanism and reassembly and adjustment operation of other parts of the operating mechanism are completed. According to the method, the problems of complicated steps, more parts, lack of unified maintenance operation guidance and easiness in occurrence of part mistakes and omissions and process mistakes and omissions in disassembly maintenance operation of the circuit breaker in the prior art are solved, and the method has the advantages that a disassembly maintenance construction process with clear logic can be provided; and a scientific maintenance method is provided for disassembly maintenance operation of the circuit breaker.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of circuit breaker maintenance, in particular to a circuit breaker operating mechanism disassembly and maintenance construction method. Background Art

[0002] A circuit breaker is a switch device that can close, carry and disconnect current under normal circuit conditions and close, carry and disconnect current under abnormal circuit conditions within a specified time; circuit breakers can be used to distribute electrical energy, start asynchronous motors infrequently, protect power lines and motors, etc., and automatically cut off the circuit when they are seriously overloaded or short-circuited or undervoltage. Its function is equivalent to the combination of fuse switches and over- and under-temperature relays. In hydropower plants, circuit breakers are widely used electrical components; circuit breakers have many components and involve cumbersome operating steps during maintenance; for example, the ABB circuit breaker used in a large hydropower plant in the upper reaches of the Yangtze River Taking the AHMA-8.2 circuit breaker operating mechanism as an example, the maintenance work involves the disassembly, cleaning, seal replacement and reinstallation of various small parts; the existing disassembly and maintenance methods of circuit breaker operating mechanisms are often relatively extensive, and are generally performed by operators according to the instruction manual given by the equipment manufacturer. It is easy to cause problems such as missing parts after disassembly and assembly, disordered process sequence or omitted processes. Therefore, it is necessary to design a circuit breaker operating mechanism disassembly and maintenance construction method to solve the above problems. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for dismantling and repairing a circuit breaker operating mechanism, which aims to solve the problems of complicated steps, large number of parts, lack of unified repair work guidance, easy occurrence of parts and process errors and omissions in the dismantling and repair work of circuit breakers in the prior art. The present invention has the characteristics of being able to provide a logically clear dismantling and repair construction process and providing a scientific repair method for the dismantling and repair work of circuit breakers.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: The disassembly and maintenance construction method of the circuit breaker operating mechanism includes: S1, dismantling operation of the operating mechanism; S2, inspect and process the operating mechanism components; S3, seal replacement operation; S4, reinstallation of the cylinder parts of the operating mechanism; S5, oil filling and sealing test of operating mechanism; S6, reinstallation and adjustment of other parts of the operating mechanism.

[0005] Preferably, in step S1, the operation of disassembling the operating mechanism includes: S101, marking the disassembled parts; S102, removing the operating mechanism housing; S103, check whether all parts of the operating mechanism are intact and have no damage; check whether there are signs of hydraulic oil leakage; S104, remove the wiring of the motor and heater, and secure them with cable ties after untying; S105, remove the fixing bolts of the closing and opening coil valve bonnet and take off the valve bonnet; before removal, mark Y1 closing, Y2 opening and Y3 opening on the closing and opening coil valve bonnet; S106, remove the motor rectifier block, remove the fixing bolts of the motor and heater terminal block, and take down the terminal block; S107, remove the motor fixing bolts, take out the motor, and place the motor and the fixing bolts in a storage box with a corresponding mark; S108, remove the fixing nut of the coupling piece, and place the fixing nut in a storage box with a corresponding mark; the coupling piece is connected to the transmission rod through a thread, and the transmission rod is rotated clockwise, and the coupling piece gradually withdraws from the transmission rod under the action of the thread until it is separated from the transmission rod; wrap a pressure-sensitive tape around the thread of the transmission rod; S109, remove the travel switch fixing bolts, take out the travel switch, and place the travel switch and fixing nut in the corresponding storage box. Before removal, mark the intersection of the travel switch and the cylinder body; S110, remove the fixing bolts of the copper clamping plate of the travel switch, take off the copper clamping plate, and place the copper clamping plate and the fixing nut in a storage box with a corresponding mark; S111, hoist the operating mechanism to the rotary table, make the motor side of the operating mechanism face the opening of the U-shaped arm of the rotary table, slowly push the mechanism into the rotary table, keep the distance between the oil drain valve, the pressure relief valve and the secondary cable and the table, tighten the fixing bolts of the operating mechanism, and complete the operation of the mechanism on the table; S112, remove the fixing bolts of the bottom cover of the operating mechanism, take off the bottom cover, and place the bottom cover nuts in the storage box with the corresponding mark; S113, rotate the operating mechanism so that the bottom cover of the operating mechanism faces upward, install the special lifting lugs in the fixing screw holes of the bottom cover, lift the operating mechanism to the compression spring device, and place it stably; S114, adjusting the position of the operating mechanism; S115, remove the fixing bolts of the disc spring of the operating mechanism; S116, dismantling operation of the disc spring of the operating mechanism; S117, draining oil from the operating mechanism; S118, oil pump chamber components removal; S119, removal of the anti-slow separation device; S120, pressure relief valve removal; S121, loosen the fixing bolts of the opening / closing speed regulating valve, and take out the closing / opening speed regulating valve. Place the opening / closing speed regulating valve in a storage box with the corresponding mark; S122, low pressure cylinder removal; S123, energy storage rod removal; S124, energy storage piston removal; S125, removal of the plug at the bottom of the high-pressure cylinder; S126, drive rod removal; S127, removal of the copper sleeve of the energy storage rod seal; S128, use circlip pliers to remove the sealing copper sleeve circlip at the junction of the travel tie rod and the low-pressure cylinder, take out the copper sleeve, and place the copper sleeve circlip and the sealing copper sleeve in the storage box with the corresponding mark; S129, opening and closing coil removal; S130, switching valve removal; S131, turn counterclockwise to remove the oil level indicator, and clean the residual oil with a wipe. Place the oil level indicator in the corresponding storage box.

[0006] Preferably, in step S2, inspecting and processing the operating mechanism components includes: S201, cylinder inspection and cleaning; S202, check the oil pump motor assembly; S203, check the opening and closing coils; S204, check the auxiliary switch assembly; S205, check the heater; S206, check the travel switch assembly; S207, check the anti-slowness subassembly; S208, check the opening and closing indicator drive assembly; S209, check the oil level indicator; S210, check the switching valve; S211, check energy storage components; S212, check the transmission rod; S213, check the pressure relief valve assembly; S214, check and clean other parts, including checking whether the upper cover flange and bottom cover are deformed or damaged; checking whether the mechanism casing is deformed or damaged; checking whether the disc spring and wax coating are deformed or damaged, and checking whether the semicircular support ring is displaced; checking whether the secondary component wiring is loose and the circuit is damaged; if there is any abnormality in the parts, replace them.

[0007] Preferably, in step S3, the seal replacement includes: S301, replacement of the valve hole seal of the switching valve; S302, replacement of the valve body seal of the switching valve; S303, energy storage rod seal copper sleeve seal replacement; S304, replace the seal of the energy storage pull rod oil scraper copper sleeve, install a new seal, and keep the relative positions of the seals consistent with those before removal. When installing the oil scraper ring, the step surface faces the oil side of the operating mechanism; S305, transmission rod seal replacement; S306, energy storage piston steel seal replacement; S307, replacement of copper seal of energy storage piston; S308, replace the seal of the plug at the bottom of the high-pressure cylinder, install a new seal, keep the relative position of each seal the same as before removal, and the groove of the support ring points to the seal ring; S309, oil pump chamber shaft seal replacement; S310, replace the oil pump chamber end cover seal and install a new oil pump chamber end cover seal; S311, replace the seal at the junction of the transmission rod and the low-pressure cylinder; S312, replace the seal at the junction of the travel tie rod and the low-pressure cylinder; S313, install new seal of low pressure cylinder body; S314, install the pressure relief valve seal ring; S315, replacement of the seal of the mechanical locking rod to prevent slow separation; S316, install new seals on the speed control valve, and keep the relative positions of the seals the same as before removal; S317, install new seal on oil level indicator.

[0008] Preferably, in step S4, reinstalling the cylinder parts of the operating mechanism includes: S401, marking the reinstalled parts; S402, switch valve body back to install; S403, reinstall the opening and closing coil; S404, reinstall the energy storage rod sealing copper sleeve and the oil scraping copper sleeve; S405, reinstall the transmission rod; S406, evenly apply MOLYKOTE-55 lubricating silicone grease on the outer surface of the opening brake buffer block, and then reinstall the opening brake buffer block in situ; S407, reinstall the bottom seal of the high-pressure cylinder; After evenly applying MOLYKOTE-55 lubricating silicone grease on the contact surface between the bottom seal of the high-pressure cylinder and the cylinder body, reinstall the bottom seal of the high-pressure cylinder in situ; install the fastening bolts of the bottom seal of the high-pressure cylinder with a tightening torque of 101 N·m; S408, reinstall the energy storage rod; S409, reinstall the energy storage piston; S410, reinstall the oil pump chamber components; S411, reinstall the opening / closing speed regulating valve; S412, install a new check valve at the pressure relief valve; S413, prevent the mechanical locking rod and end cover from being reinstalled in sequence. Note that the spring should not be reinstalled for the time being. They will be reinstalled after the oil is replenished. S414, low pressure cylinder reinstallation; S415, reinstall the oil level indicator.

[0009] Preferably, in step S5, the oil filling and sealing test of the operating mechanism includes: S501, vacuuming and oiling; S502, pressurization sealing test of operating mechanism.

[0010] Preferably, in step S6, reinstalling and adjusting other components of the operating mechanism includes: S601, disc spring reinstallation; S602, rotating the operating mechanism to a horizontal direction, and reinstalling the bottom cover of the operating mechanism; S603, reinstall the energy storage motor; S604, reinstallation of coupling parts; S605, reinstall the travel switch; S606, travel switch action node debugging.

[0011] Preferably, the disc spring reinstallation in S601 includes: Rotate the operating mechanism to a vertical position, with the bottom cover facing upwards, install the lifting lugs, lift the operating mechanism onto the compression spring workbench, and place it steadily; Place an anti-collision device at the lower end of the travel tie rod; Reinstall the semicircular support ring between the disc spring and the cylinder body, with the joint of the semicircular support ring away from the end cover of the switching valve; Use a puller to lift the disc spring assembly to the top of the operating mechanism body and smoothly drop it down for installation. The marking band on the disc spring should be in the same direction as the oil level indicator. Reinstall the semicircular support ring between the disc spring and the disc spring support ring, and reinstall the disc spring support ring; Adjust the position of the operating mechanism until the center of the disc spring is aligned with the hydraulic jack, observe that the gap between the support plate of the compression spring device and the slide rails on both sides is uniform, and fix the limit block of the operating mechanism; Install the compression spring support on the disc spring support ring. The support is concentric with the support ring and does not block the fixing screw hole of the disc spring. Start the pressure device to make the hydraulic jack compress the disc spring until the energy storage rod thread extends out of the disc spring support ring. First install the nut corresponding to the travel rod and tighten it, then install the remaining fixed nuts and tighten them symmetrically; Check the nut torque in sequence; Slowly release the jack pressure, remove the compression spring support, and lift the operating mechanism to the rotating workbench and fix it.

[0012] Preferably, the travel switch action node debugging in S606 includes: Install the travel meter support platform tooling, install the connection tooling for fixing the travel meter, install the travel meter toward the pressure relief valve side, and adjust the travel meter to zero; Connect the power switch on the test box, loosen the pressure relief valve to release the pressure and then tighten it; close the switch F1 on the test box, the energy storage motor starts to pressurize and store energy, and the travel rod gradually moves upward; When the maximum stroke is reached, the motor stops pressurizing and the overpressure valve operates; connect the pressure gauge to the high-pressure cylinder plug to measure the pressure at each stroke node.

[0013] Preferably, the overall steps of trip debugging are as follows: a. After the operating mechanism stores energy, release the pressure relief valve, and the energy storage rod releases pressure from the stop pressure position to the energy storage start initial position. According to the node change sound, and the auxiliary test box signal light change state or the multimeter measurement of the node on-off state, the stroke node logic problem and the overall stroke deviation problem can be preliminarily judged; b. Trip node logic debugging: When the operating mechanism releases pressure, if no node change sound is heard, or the signal light of the test box changes disorderly, it indicates that there is a logic problem in the travel node; at this time, add or remove gaskets on the upper end of the travel switch node panel, and adjust the forward and backward progress of the nut on the lower end; c. Stroke deviation debugging: Overall travel deviation: The overall data of the stop or start pressure node, O-CO alarm lock, CO alarm lock, and O alarm lock deviate a lot from the standard value. At this time, adjust the stroke switch node panel up and down as a whole; Partial itinerary deviation: The O alarm lockout, CO alarm lockout on the left side of the travel switch node panel, or the O-CO alarm lockout, stop or start pressure node on the right side deviate from the standard value. At this time, rotate the travel switch node panel left and right to adjust; Debugging of individual node positions: When stopping or starting the pressure node, or when other individual nodes deviate very slightly from the standard value, the travel switch node panel is fixed as a whole and the individual node switch is adjusted up and down.

[0014] The beneficial effects of the present invention are as follows: The present invention solves the problems of complicated steps, large number of parts, lack of unified maintenance operation guidance, easy occurrence of parts and process errors and omissions in the dismantling and maintenance operations of circuit breakers in the prior art, and can provide a logically clear dismantling and maintenance construction process, providing a scientific maintenance method for the dismantling and maintenance operations of circuit breakers. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0016] Figure 1 A schematic diagram of the disassembly process of the operating mechanism of the invention; Figure 2 It is a schematic diagram of the reinstallation process of the operating mechanism of the present invention. DETAILED DESCRIPTION

[0017] Embodiment 1: like Figure 1 As shown, the circuit breaker operating mechanism disassembly and maintenance construction method includes: S1, dismantling operation of the operating mechanism; S2, inspect and process the operating mechanism components; S3, seal replacement operation; S4, reinstallation of the cylinder parts of the operating mechanism; S5, oil filling and sealing test of operating mechanism; S6, reinstallation and adjustment of other parts of the operating mechanism.

[0018] Preferably, in step S1, the operation of disassembling the operating mechanism includes: S101, marking the disassembled parts; S102, removing the operating mechanism housing; S103, check whether all parts of the operating mechanism are intact and have no damage; check whether there are signs of hydraulic oil leakage; S104, remove the wiring of the motor and heater, and secure them with cable ties after untying; S105, remove the fixing bolts of the closing and opening coil valve bonnet and take off the valve bonnet; before removal, mark Y1 closing, Y2 opening and Y3 opening on the closing and opening coil valve bonnet; S106, remove the motor rectifier block, remove the fixing bolts of the motor and heater terminal block, and take down the terminal block; S107, remove the motor fixing bolts, take out the motor, and place the motor and the fixing bolts in a storage box with a corresponding mark; S108, remove the fixing nut of the coupling piece, and place the fixing nut in a storage box with a corresponding mark; the coupling piece is connected to the transmission rod through a thread, and the transmission rod is rotated clockwise, and the coupling piece gradually withdraws from the transmission rod under the action of the thread until it is separated from the transmission rod; wrap a pressure-sensitive tape around the thread of the transmission rod; S109, remove the travel switch fixing bolts, take out the travel switch, and place the travel switch and fixing nut in the corresponding storage box. Before removal, mark the intersection of the travel switch and the cylinder body; S110, remove the fixing bolts of the copper clamping plate of the travel switch, take off the copper clamping plate, and place the copper clamping plate and the fixing nut in a storage box with a corresponding mark; S111, hoist the operating mechanism to the rotary table, make the motor side of the operating mechanism face the opening of the U-shaped arm of the rotary table, slowly push the mechanism into the rotary table, keep the distance between the oil drain valve, the pressure relief valve and the secondary cable and the table, tighten the fixing bolts of the operating mechanism, and complete the operation of the mechanism on the table; S112, remove the fixing bolts of the bottom cover of the operating mechanism, take off the bottom cover, and place the bottom cover nuts in the storage box with the corresponding mark; S113, rotate the operating mechanism so that the bottom cover of the operating mechanism faces upward, install the special lifting lugs in the fixing screw holes of the bottom cover, lift the operating mechanism to the compression spring device, and place it stably; S114, adjusting the position of the operating mechanism; S115, remove the fixing bolts of the disc spring of the operating mechanism; S116, dismantling operation of the disc spring of the operating mechanism; S117, draining oil from the operating mechanism; S118, oil pump chamber components removal; S119, removal of the anti-slow separation device; S120, pressure relief valve removal; S121, loosen the fixing bolts of the opening / closing speed regulating valve, and take out the closing / opening speed regulating valve. Place the opening / closing speed regulating valve in a storage box with the corresponding mark; S122, low pressure cylinder removal; S123, energy storage rod removal; S124, energy storage piston removal; S125, removal of the plug at the bottom of the high-pressure cylinder; S126, drive rod removal; S127, removal of the copper sleeve of the energy storage rod seal; S128, use circlip pliers to remove the sealing copper sleeve circlip at the junction of the travel tie rod and the low-pressure cylinder, take out the copper sleeve, and place the copper sleeve circlip and the sealing copper sleeve in the storage box with the corresponding mark; S129, opening and closing coil removal; S130, switching valve removal; S131, turn counterclockwise to remove the oil level indicator, and clean the residual oil with a wipe. Place the oil level indicator in the corresponding storage box.

[0019] Preferably, in step S2, inspecting and processing the operating mechanism components includes: S201, cylinder inspection and cleaning; S202, check the oil pump motor assembly; S203, check the opening and closing coils; S204, check the auxiliary switch assembly; S205, check the heater; S206, check the travel switch assembly; S207, check the anti-slowness subassembly; S208, check the opening and closing indicator drive assembly; S209, check the oil level indicator; S210, check the switching valve; S211, check energy storage components; S212, check the transmission rod; S213, check the pressure relief valve assembly; S214, check and clean other parts, including checking whether the upper cover flange and bottom cover are deformed or damaged; checking whether the mechanism casing is deformed or damaged; checking whether the disc spring and wax coating are deformed or damaged, and checking whether the semicircular support ring is displaced; checking whether the secondary component wiring is loose and the circuit is damaged; if there is any abnormality in the parts, replace them.

[0020] Preferably, in step S3, the seal replacement includes: S301, replacement of the valve hole seal of the switching valve; S302, replacement of the valve body seal of the switching valve; S303, energy storage rod seal copper sleeve seal replacement; S304, replace the seal of the energy storage pull rod oil scraper copper sleeve, install a new seal, and keep the relative positions of the seals consistent with those before removal. When installing the oil scraper ring, the step surface faces the oil side of the operating mechanism; S305, transmission rod seal replacement; S306, energy storage piston steel seal replacement; S307, copper seal of energy storage piston replaced; S308, replace the seal of the plug at the bottom of the high-pressure cylinder, install a new seal, keep the relative position of each seal the same as before removal, and the groove of the support ring points to the seal ring; S309, oil pump chamber shaft seal replacement; S310, replace the oil pump chamber end cover seal and install a new oil pump chamber end cover seal; S311, replace the seal at the junction of the transmission rod and the low-pressure cylinder; S312, replace the seal at the junction of the travel tie rod and the low-pressure cylinder; S313, install new seal of low pressure cylinder body; S314, install the pressure relief valve seal ring; S315, replacement of the seal of the mechanical locking rod to prevent slow separation; S316, install new seals on the speed control valve, and keep the relative positions of the seals the same as before removal; S317, install new seal on oil level indicator.

[0021] Preferably, in step S4, reinstalling the cylinder parts of the operating mechanism includes: S401, marking the reinstalled parts; S402, switch valve body back to install; S403, reinstall the opening and closing coil; S404, reinstall the energy storage rod sealing copper sleeve and the oil scraping copper sleeve; S405, reinstall the transmission rod; S406, evenly apply MOLYKOTE-55 lubricating silicone grease on the outer surface of the opening brake buffer block, and then reinstall the opening brake buffer block in situ; S407, reinstall the bottom seal of the high-pressure cylinder; After evenly applying MOLYKOTE-55 lubricating silicone grease on the contact surface between the bottom seal of the high-pressure cylinder and the cylinder body, reinstall the bottom seal of the high-pressure cylinder in situ; install the fastening bolts of the bottom seal of the high-pressure cylinder with a tightening torque of 101 N·m; S408, reinstall the energy storage rod; S409, reinstall the energy storage piston; S410, reinstall the oil pump chamber components; S411, reinstall the opening / closing speed regulating valve; S412, install a new check valve at the pressure relief valve; S413, prevent the mechanical locking rod and end cover from being reinstalled in sequence. Note that the spring should not be reinstalled for the time being. They will be reinstalled after the oil is replenished. S414, low pressure cylinder reinstallation; S415, reinstall the oil level indicator.

[0022] Preferably, in step S5, the oil filling and sealing test of the operating mechanism includes: S501, vacuuming and oiling; S502, pressurization sealing test of operating mechanism.

[0023] Preferably, in step S6, reinstalling and adjusting other components of the operating mechanism includes: S601, disc spring reinstallation; S602, rotating the operating mechanism to a horizontal direction, and reinstalling the bottom cover of the operating mechanism; S603, reinstall the energy storage motor; S604, reinstallation of coupling parts; S605, reinstall the travel switch; S606, travel switch action node debugging.

[0024] Preferably, the disc spring reinstallation in S601 includes: Rotate the operating mechanism to a vertical position, with the bottom cover facing upwards, install the lifting lugs, lift the operating mechanism onto the compression spring workbench, and place it steadily; Place an anti-collision device at the lower end of the travel tie rod; Reinstall the semicircular support ring between the disc spring and the cylinder body, with the joint of the semicircular support ring away from the end cover of the switching valve; Use a puller to lift the disc spring assembly to the top of the operating mechanism body and smoothly drop it down for installation. The marking band on the disc spring should be in the same direction as the oil level indicator. Reinstall the semicircular support ring between the disc spring and the disc spring support ring, and reinstall the disc spring support ring; Adjust the position of the operating mechanism until the center of the disc spring is aligned with the hydraulic jack, observe that the gap between the support plate of the compression spring device and the slide rails on both sides is uniform, and fix the limit block of the operating mechanism; Install the compression spring support on the disc spring support ring. The support is concentric with the support ring and does not block the fixing screw hole of the disc spring. Start the pressure device to make the hydraulic jack compress the disc spring until the energy storage rod thread extends out of the disc spring support ring. First install the nut corresponding to the travel rod and tighten it, then install the remaining fixed nuts and tighten them symmetrically; Check the nut torque in sequence; Slowly release the jack pressure, remove the compression spring support, and lift the operating mechanism to the rotating workbench and fix it.

[0025] Preferably, the travel switch action node debugging in S606 includes: Install the travel meter support platform tooling, install the connection tooling for fixing the travel meter, install the travel meter toward the pressure relief valve side, and adjust the travel meter to zero; Connect the power switch on the test box, loosen the pressure relief valve to release the pressure and then tighten it; close the switch F1 on the test box, the energy storage motor starts to pressurize and store energy, and the travel rod gradually moves upward; When the maximum stroke is reached, the motor stops pressurizing and the overpressure valve operates; connect the pressure gauge to the high-pressure cylinder plug to measure the pressure at each stroke node.

[0026] Preferably, the overall steps of trip debugging are as follows: a. After the operating mechanism stores energy, release the pressure relief valve, and the energy storage rod releases pressure from the stop pressure position to the energy storage start initial position. According to the node change sound, and the auxiliary test box signal light change state or the multimeter measurement of the node on-off state, the stroke node logic problem and the overall stroke deviation problem can be preliminarily judged; b. Trip node logic debugging: When the operating mechanism releases pressure, if no node change sound is heard, or the signal light of the test box changes disorderly, it indicates that there is a logic problem in the travel node; at this time, add or remove gaskets on the upper end of the travel switch node panel, and adjust the forward and backward progress of the nut on the lower end; c. Stroke deviation debugging: Overall travel deviation: The overall data of the stop or start pressure node, O-CO alarm lock, CO alarm lock, and O alarm lock deviate a lot from the standard value. At this time, adjust the stroke switch node panel up and down as a whole; Partial itinerary deviation: The O alarm lockout, CO alarm lockout on the left side of the travel switch node panel, or the O-CO alarm lockout, stop or start pressure node on the right side deviate from the standard value. At this time, rotate the travel switch node panel left and right to adjust; Debugging of individual node positions: When stopping or starting the pressure node, or when other individual nodes deviate very slightly from the standard value, the travel switch node panel is fixed as a whole and the individual node switch is adjusted up and down.

[0027] Embodiment 2: The dismantling and maintenance methods of the ABB AHMA-8.2 ABB circuit breaker operating mechanism undertaken by our factory are as follows: The disassembly and maintenance construction methods of the circuit breaker operating mechanism include: S1, dismantling operation of the operating mechanism; S2, inspect and process the operating mechanism components; S3, seal replacement operation; S4, reinstallation of the cylinder parts of the operating mechanism; S5, oil filling and sealing test of operating mechanism; S6, reinstallation and adjustment of other parts of the operating mechanism.

[0028] Preferably, in step S1, the operation of disassembling the operating mechanism includes: S101, marking the disassembled parts; S102, use a 13mm wrench to remove the operating mechanism housing; S103, check whether all parts of the operating mechanism are intact and have no damage; check whether there are signs of hydraulic oil leakage; S104, use a flat head screwdriver to remove the wiring of the motor and heater, and secure them with cable ties after untying. S105, use a flathead screwdriver to remove the fixing bolts of the closing and opening coil valve bonnet and take off the valve bonnet; before removal, mark Y1 closing, Y2 opening and Y3 opening on the closing and opening coil valve bonnet; S106, use L4 hexagon socket to remove the motor rectifier block, use a flathead screwdriver to remove the four fixing bolts (2 long and 2 short) of the motor and heater terminal block, and remove the terminal block; S107, use L5 hexagon socket to remove the two motor fixing bolts, remove the motor, and place the motor and fixing bolts in the yellow storage box with the corresponding mark; S108, use a 30mm socket to remove the fixing nut of the coupling, and place the fixing nut in the yellow storage box with the corresponding mark; the coupling is connected to the transmission rod through threads, and the transmission rod is rotated clockwise with an L6 hexagonal wrench. The coupling gradually withdraws from the transmission rod under the action of the threads until it is separated from the transmission rod; wrap pressure-sensitive tape around the threads of the transmission rod; the tape should be tightly attached to prevent the threads from damaging the sealing surface S109, use L6 hexagon socket to remove the two travel switch fixing bolts, remove the travel switch, and place the travel switch and fixing nut in the corresponding yellow storage box. Before removal, draw a double horizontal line mark at the intersection of the travel switch and the cylinder body; S110, use L5 hexagon socket to remove the four bolts fixing the copper clamping plate of the travel switch, remove the copper clamping plate, and place the copper clamping plate and fixing nut in the yellow storage box with the corresponding mark; S111, hoist the operating mechanism to the rotary table, make the motor side of the operating mechanism face the opening of the U-shaped arm of the rotary table, slowly push the mechanism into the rotary table, keep the oil drain valve, pressure relief valve and secondary cable away from the table, tighten the three operating mechanism fixing bolts with a 24mm wrench, and complete the operation of the mechanism on the table; S112, use L8 hexagon socket to remove the five bolts fixing the bottom cover of the actuator, remove the bottom cover, and place the bottom cover nuts in the yellow storage box with the corresponding mark; S113, rotate the operating mechanism so that the bottom cover of the operating mechanism faces upward, install two special lifting ears in the fixing screw holes of the bottom cover, lift the operating mechanism to the compression spring device, and place it stably; S114, adjusting the position of the operating mechanism; Adjust the position of the operating mechanism until the center of the disc spring is aligned with the hydraulic jack. Pay attention to the uniform clearance between the support plate of the compression spring device and the slide rails on both sides. Use L6 hexagon socket to fix the limit block of the operating mechanism. Place an anti-collision device at the lower end of the travel tie rod; Install the compression spring support on the disc spring support ring. The support is concentric with the support ring and does not block the fixing screw hole of the disc spring. Install compression spring devices to protect fences; S115, remove the fixing bolts of the disc spring of the operating mechanism; Start the pressure device to slowly press down the hydraulic jack of the compression spring device until the fixing bolt is no longer affected by the disc spring; Use a 36mm wrench to loosen all six operating mechanism energy storage rod fixing nuts and remove them quickly; place the disc spring fixing nuts in the yellow storage box with the corresponding mark; Observe the position of the travel rod during the disc spring compression process to prevent the travel rod from being squeezed downward and causing deformation of the rod; Slowly release the pressure from the pressure device and remove the compression spring support; S116, dismantling operation of the disc spring of the operating mechanism; Push the operating mechanism out of the compression spring area, use a puller to lift the disc spring out and transfer it to the special round sleeper. Before lifting the disc spring, use a tightening belt to tighten the three fixed claws of the puller to prevent the puller from loosening during the lifting process and causing the disc spring to fall off; Remove the two semicircular support rings at the bottom of the disc spring; Install special lifting lugs to transfer the operating mechanism to the rotary table and fix it securely; S117, draining oil from the operating mechanism; Use a 22mm wrench to remove the intake valve (oil filling hole) and the drain valve plug, and place them in the yellow storage box with the corresponding mark; Connect the oil pipe to the oil drain valve, open the oil drain valve, and drain the hydraulic oil into the oil drum; When the hydraulic oil is basically exhausted and the flow rate is slow, fill the compressed air from the air inlet valve hole to discharge the residual oil; S118, oil pump chamber components removal; Use an L6 hexagonal wrench to remove the four fixing bolts of the oil pump, take off the umbrella wheel and the oil pump cover, and place the oil pump cover and fixing nuts in the yellow storage box with the corresponding mark; Take out the plunger pump, spring, eccentric sleeve and check valve in the oil pump chamber; Use an L10 hexagonal wrench to loosen the filter cover and remove the filter. If the filter cover is difficult to loosen, tighten it first and then loosen it. Repeat this process until the filter cover is removed. Do not use brute force to remove it to avoid damaging the thread. Place the plunger pump, spring, eccentric sleeve, and filter cover in the yellow storage box with the corresponding mark; place the filter and check valve in the red storage box with the corresponding mark. S119, removal of the anti-slow separation device; Use an L17 hexagon wrench to remove the plug of the anti-slow separation device, and place the plug of the anti-slow separation device in the yellow storage box with the corresponding mark; Take out the spring on the mechanical locking rod, take out the mechanical locking rod, and place the mechanical locking rod in the yellow storage box with the corresponding mark; Use a tie band to fix the anti-slow separation spring on the oil drain valve to prevent the spring from being lost; S120, pressure relief valve removal; Use a 22mm wrench to loosen the fixing screw of the pressure relief valve, take out the pressure relief valve, and place the pressure relief valve in the yellow storage box with the corresponding mark; Use a TX30 bit to remove the check valve at the bottom of the pressure relief valve, and place the check valve in the red storage box with the corresponding mark; S121, use a 27mm wrench to loosen the fixing bolts of the opening / closing speed regulating valve, and take out the closing / opening speed regulating valve. Place the opening / closing speed regulating valve in the yellow storage box with the corresponding mark; S122, low pressure cylinder removal; Install the lifting ring, remove the six low-pressure cylinder fixing bolts with an L14 hexagonal wrench, and place the low-pressure cylinder fixing nuts in the yellow storage box with the corresponding mark; Separate the low-pressure cylinder part from the high-pressure cylinder and transfer it to the workbench; S123, energy storage rod removal; Remove the positioning copper column, rotate the operating mechanism to a horizontal position, and install the disc spring support ring to fix the energy storage rod; Use a 36mm wrench to loosen the 6 fixing nuts on the energy storage piston side, and place the fixing nuts on the energy storage piston side in the yellow storage box with the corresponding mark. Use an insulating sleeve to protect the travel rod and the transmission rod to prevent the torque wrench from bumping and damaging the travel rod and the transmission rod during operation; Remove the disc spring support ring, take out the 6 energy storage rods one by one, and place the energy storage rods vertically on the horizontally placed disc spring support ring; during the process of taking out the energy storage rods, always keep them in the same direction as the cylinder body installation hole to prevent damage to the sealing surface of the energy storage rods; After removing the energy storage rod, immediately clean the surface oil with lint-free paper and check whether the surface is smooth and intact; S124, energy storage piston removal; Manually pull the high-pressure cylinder energy storage piston out of the high-pressure cylinder slowly in the horizontal direction; Use a TX30 bit to remove the overpressure / pressure relief check valve. Place the overpressure / pressure relief check valve in the corresponding red storage box; S125, removal of the plug at the bottom of the high-pressure cylinder; Use an L10 hexagonal wrench to remove the six fixing bolts of the plug at the bottom of the high-pressure cylinder, and place the fixing bolts of the plug at the bottom of the high-pressure cylinder in the yellow storage box with the corresponding mark; Install two lifting rings at the screw holes of the bottom cover fixing bolts, rotate them half a circle each time, and tighten the two lifting rings inwards at the same time, so that the bottom plug and the cylinder body are gradually separated. Pull out the bottom plug of the high-pressure cylinder horizontally, and be careful to prevent the residual oil in the high-pressure cylinder from splashing; S126, drive rod removal; Take out the opening brake buffer block and place it in the yellow storage box with the corresponding mark; gently tap the end of the low-pressure cylinder side of the transmission rod with a nylon hammer in the horizontal direction, and take out the transmission rod, taking care to avoid damage to the sealing surface; After the drive rod is removed, clean the surface with lint-free paper immediately to check whether the surface is clean and intact; S127, removal of the copper sleeve of the energy storage rod seal; Use circlip pliers to remove the copper sleeve circlip of the energy storage pull rod seal, and place the copper sleeve circlip in the yellow storage box with the corresponding mark. Use wiping paper to take out 6 oil scraping copper sleeves, and place the oil scraping copper sleeves in the yellow storage box with the corresponding mark; Rotate the mechanism to a horizontal state, select nylon rods of corresponding sizes to push out six sealed copper sleeves from the bottom cover side in sequence, and place the sealed copper sleeves in the yellow storage box with the corresponding mark; S128, use circlip pliers to remove the sealing copper sleeve circlip at the junction of the travel tie rod and the low-pressure cylinder, take out the copper sleeve, and place the copper sleeve circlip and the sealing copper sleeve in the yellow storage box with the corresponding mark; S129, opening and closing coil removal; Before dismantling, mark the Y1 closing, Y2 opening and Y3 opening coils, and mark the opening and closing positions and installation directions on the opening and closing coil installation positions of the operating mechanism cylinder body; Use L4 hexagon socket to remove the 4 fixing bolts of the opening and closing coil, and remove the opening and closing coil. Collect the sealing ring and metal washer at the bottom of the opening and closing coil to prevent loss. Place the fixing bolts, opening and closing coil and metal washer in the yellow storage box with the corresponding mark, and place the sealing ring in the red storage box with the corresponding mark; S130, switching valve removal; Use a special connector and a 30mm sleeve to remove the end covers on both sides of the switching valve, and place the end covers in the yellow storage box with the corresponding mark; Use round-head pliers to pull out the end of the switching valve close to the bottom cover; Use a special nylon rod and a nylon hammer to push out the other end of the switching valve; place the switching valve in a yellow storage box with the corresponding mark; S131, turn counterclockwise to remove the oil level indicator, and clean the residual oil with a wipe. Place the oil level indicator in the yellow storage box with the corresponding mark.

[0029] Preferably, in step S2, inspecting and processing the operating mechanism components includes: S201, cylinder inspection and cleaning; Check whether the inner surface of the cylinder is smooth and flat, whether there are scratches or cracks in various parts of the cylinder, whether the oil path is unobstructed, and use a scouring pad to polish the minor scratches; Check the bolt tightening torque of the four process holes on the cylinder body. The torque standard is 20N·m; Clean the residual hydraulic oil and impurities in the cylinder body, and clean the cylinder body thoroughly with wiping paper and dry air; S202, check the oil pump motor assembly; Check the oil pump motor assembly for oil stains, rust, mildew, and clean all parts; Check the length of the motor carbon brush. If it is less than 11mm (the length of a new carbon brush is about 22mm), the carbon brush needs to be replaced. Manually rotate the motor to check if it is stuck. Use a megohmmeter to measure the insulation resistance of the energy storage motor winding. Use a multimeter to measure the DC resistance of the energy storage motor winding (usually around 3.5Ω). If there is any abnormality, replace the motor. Check whether the parts inside the oil pump chamber are deformed or damaged. If there are any abnormalities, they need to be replaced; Check the bevel gear appearance, meshing and rotation status to see if they are normal. If there are any abnormalities, they need to be replaced; Remove and replace the oil filter element; S203, check the opening and closing coils; Check whether the opening and closing coils are greasy, rusty or mildewed, and clean them; Use a multimeter to measure the DC resistance (154±10%Ω) to confirm whether it is intact. If there is any abnormality, it needs to be replaced; Check whether the valve needle is flexible. If there is any abnormality, the coil needs to be replaced; Check whether the terminal block and wiring are in good contact; S204, check the auxiliary switch assembly; Check the auxiliary switch components for oil stains, rust, mildew, and clean them; Replace any components if they are damaged or cracked; S205, check the heater; Check the heater for oil stains and clean it; Check the heater and wires for damage or debonding, and replace them if any abnormality is found; Use a multimeter to measure whether the DC resistance of the heater is within the qualified range; S206, check the travel switch assembly; Check the switch components on site for oil stains, rust, mildew, and clean them; If there is any abnormality in the parts, replace them; S207, check the anti-slowness subassembly; Check whether the anti-slow components are oily or rusty, and clean them; Check whether the anti-slow separation spring has good elasticity and whether the mechanical locking rod has any abnormalities such as deformation; If there is any abnormality in the parts, replace them; S208, check the opening and closing indicator drive assembly; Check whether the opening and closing indicator drive components are greasy, rusty, or mildewed, and clean them; Check whether the opening and closing indicator drive components are deformed or loose; If there is any abnormality in the parts, replace them; S209, check the oil level indicator; Check the oil level indicator for oil stains and clean it; Check the oil level indicator for damage or cracks, and replace it if abnormal; S210, check the switching valve; Check whether the switching valve is oily or not and clean it; Check whether there are burrs or scratches on each sealing part, and polish the fine burrs and scratches with a scouring pad; Check whether the valve core inside the switching valve is stuck; If there is any abnormality in the parts, replace the switching valve as a whole; S211, check energy storage components; Check the energy storage rod for signs of oil leakage. If there is oil leakage, find the leaking location; Check whether the energy storage components are oily or not and clean them; Check whether the energy storage rod, energy storage piston cylinder, and energy storage piston are deformed or scratched, and use a scouring pad to polish the minor scratches; S212, check the transmission rod; Check whether the surface of the transmission rod is intact, deformed or damaged, and polish the minor scratches with a scouring pad; If there is any abnormality, replace it; S213, check the pressure relief valve assembly; Check whether the pressure relief valve is damaged and whether the ejector pin on the head is deformed; Check whether there are burrs or scratches on each sealing part, and polish the fine burrs and scratches with a scouring pad; Check whether there is any abnormality on the thread of the pressure relief valve body; If there is any abnormality, replace it; S214, check and clean other parts, including checking whether the upper cover flange and bottom cover are deformed or damaged; checking whether the mechanism casing is deformed or damaged; checking whether the disc spring and wax coating are deformed or damaged, and checking whether the semicircular support ring is displaced; checking whether the secondary component wiring is loose and the circuit is damaged; if there is any abnormality in the parts, replace them.

[0030] Preferably, in step S3, the seal replacement includes: S301, replacement of the valve hole seal of the switching valve; Use a hard plastic round rod with a smooth surface to clamp the sealing ring and press it into the sealing groove of the switching valve hole. Install the new sealing ring and support ring. The sealing ring and support ring should be completely inserted into the groove without warping or flanging; Note that the positions of the sealing ring (black) and the support ring (white) should be consistent with those before the seal was removed; S302, replacement of the valve body seal of the switching valve; Install new seals and support rings. The seals and support rings should be fully inserted into the grooves without any warping or flanging. Note that the positions of the sealing ring (black) and the support ring (white) should be consistent with those before the seal was removed; S303, energy storage rod seal copper sleeve seal replacement; Install the energy storage rod seal copper sleeve seal. The relative positions of the seals should be kept consistent with those before removal. Note that when installing the Teflon support ring, the step surface should face the oil side of the operating mechanism; Put three kinds of stainless steel rods with diameters of Φ16, Φ25 and Φ26 mm into the oven and heat them at a temperature of 110℃~130℃ for about 2 hours. After the sealing ring is replaced, put the sealing copper sleeve on the Φ26 stainless steel rod and let it stand for 30 minutes to shape it; S304, replace the seal of the energy storage pull rod oil scraper copper sleeve, install a new seal, and keep the relative positions of the seals consistent with those before removal. When installing the oil scraper ring, the step surface faces the oil side of the operating mechanism; S305, transmission rod seal replacement; Heat the new Teflon ring in Aero Shell Fluid 4 hydraulic oil at 80°C for 2 hours; Use special tools to install new sealing rubber rings and Teflon rings in sequence, and then put them into a special stainless steel sleeve and let them stand for 30 minutes to shape; S306, energy storage piston steel seal replacement; Heat the new Teflon ring in 80℃ hydraulic oil for 2 hours, and install the new sealing rubber ring and Teflon ring in sequence; Heat a φ25mm stainless steel rod in an environment of 110℃~130℃ for 2 hours, insert it into the steel part of the energy storage piston and let it stand for 30 minutes to shape it; S307, replacement of copper seal of energy storage piston; Install new seals, keeping the relative positions of the seals consistent with those before removal. Note that the step surface of the blue oil scraper ring should face the low-pressure cylinder side when installing; Slowly press the copper part of the energy storage piston vertically into the steel part of the energy storage piston, install the fixing bolts, and tighten the torque to 6N·m; Heat the new Teflon ring in hydraulic oil at 80°C for 2 hours; Use special tools to install new sealing rings and Teflon support rings in sequence, and then put them into a special stainless steel cup and let them stand for 30 minutes to shape; S308, replace the seal of the plug at the bottom of the high-pressure cylinder, install a new seal, keep the relative position of each seal the same as before removal, and the groove of the support ring points to the seal ring; S309, oil pump chamber shaft seal replacement; Clean the shaft seal with alcohol wipes to prevent the shaft seal from being contaminated again during installation; Put the shaft seal on the special nylon rod and evenly apply Loctite 495 instant adhesive on the outside, keeping the glue mark continuous; Note that the shaft seal groove is facing the oil pump chamber; before the instant adhesive is cured, vertically insert the shaft seal into the oil pump chamber end cover, tap the nylon rod, and install the shaft seal in place; check whether the edge of the shaft seal is flat and fits tightly with the oil pump chamber end cover; Before the instant adhesive is cured, clean the residual adhesive on the surface of the shaft seal, and pay special attention to check whether the appearance of the shaft seal is damaged; Reinstall the eccentric shaft and the umbrella wheel, and replace the shaft pin. After applying grease to the shaft, reinstall it in place, fix the motor end cover firmly with a vise, and fix the new umbrella wheel on the shaft with the male and female pins. Note that the opening direction of the male and female pins is 180°; S310, replace the oil pump chamber end cover seal and install a new oil pump chamber end cover seal; S311, replace the seal at the junction of the transmission rod and the low-pressure cylinder; Install new seals, keeping the relative positions of the seals consistent with those before removal. Note that the step surface of the support ring should face the oil-stricken side of the operating mechanism; Heat the φ25 stainless steel rod in an environment of 110℃~130℃ for about 2 hours, install the sealing rubber ring and Teflon ring in sequence, insert it into the junction and let it stand for 30 minutes to shape; S312, replace the seal at the junction of the travel tie rod and the low-pressure cylinder; Install the new seal, keeping the relative positions of the seals consistent with those before removal; note that the step surface of the support ring should face the oil side; Heat the φ16 stainless steel rod in an environment of 110℃~130℃ for about 2 hours, install the sealing rubber ring and Teflon ring in sequence, insert the steel rod and let it stand for 30 minutes to shape; S313, install new seal of low pressure cylinder body; S314, install the pressure relief valve seal ring; S315, replacement of the seal of the mechanical locking rod to prevent slow separation; Heat the new Teflon ring in hydraulic oil at 80°C for 2 hours; Use special tools to install the sealing ring and Teflon support ring in sequence. After installation, put the mechanical locking rod into a special stainless steel cup and let it stand for 30 minutes to shape. S316, install new seals on the speed control valve, and keep the relative positions of the seals the same as before removal; S317, install new seal on oil level indicator.

[0031] Preferably, in step S4, reinstalling the cylinder parts of the operating mechanism includes: S401, marking the reinstalled parts; S402, switch the valve body back to install; Apply Loctite 243 locking glue to the end cover thread, use special tooling to reinstall the low-pressure cylinder side switching valve body and end cover and tighten the torque, then reinstall the bottom cover side switching valve body and end cover, the tightening torque is 80N·m; Use compressed air to blow out the residual glue on the end cover and clean it up; S403, reinstall the opening and closing coil; Reinstall the opening and closing coil in place, evenly apply MOLYKOTE-55 lubricating silicone grease to the metal gasket and sealing ring to make them close to the opening and closing coil, and avoid the metal gasket and sealing ring from falling during installation; tighten the bolts symmetrically with a tightening torque of 6N·m; S404, reinstall the energy storage rod sealing copper sleeve and the oil scraping copper sleeve; Rotate the operating mechanism to a vertical position, and use a special tooling with a nylon rod to press the sealing copper sleeve; Reinstall the oil scraper copper sleeve and the retaining ring, with the opening of the retaining ring facing outwards; S405, reinstall the transmission rod; Install a protective cap on the end of the transmission rod, and evenly apply MOLYKOTE-55 lubricating silicone grease on the surface of the transmission rod piston and the protective cap; Reinstall the transmission rod in the horizontal direction. Do not pull back the transmission rod to prevent the protective cap from falling off and damaging the sealing surface. S406, evenly apply MOLYKOTE-55 lubricating silicone grease on the outer surface of the opening brake buffer block, and then reinstall the opening brake buffer block in situ; S407, the bottom of the high-pressure cylinder is plugged and reinstalled; After evenly applying MOLYKOTE-55 lubricating silicone grease on the contact surface between the bottom seal of the high-pressure cylinder and the cylinder body, reinstall the bottom seal of the high-pressure cylinder in situ; install the fastening bolts of the bottom seal of the high-pressure cylinder with a tightening torque of 101 N·m; S408, reinstall the energy storage rod; Put a stainless steel protective cap on the upper end of the energy storage rod and apply MOLYKOTE-55 lubricating silicone grease. Reinstall the six energy storage rods in sequence along the horizontal direction. It is forbidden to withdraw the energy storage rod to prevent the protective cap from falling off and damaging the sealing surface. Install the disc spring support ring and the tooling to prevent the energy storage rod from slipping off; S409, reinstall the energy storage piston; Adjust the mechanism to the vertical position, install the threaded protective cap of the travel tie rod and apply MOLYKOTE-55 lubricating silicone grease; Install the nylon cylinder, knock the nylon cylinder vertically, reinstall the energy storage piston, and make sure that the hole of the energy storage piston is aligned with the step surface of the travel tie rod; Apply 243 thread lock glue to the threads of the energy storage rod, reinstall the fastening nut, and tighten the torque to 200N·m; use an insulating sleeve to protect the travel rod and the transmission rod to prevent the wrench from knocking and damaging the travel rod and the transmission rod during operation; Replace the energy storage piston check valve, tightening torque 20N·m, and reinstall the positioning copper column; Use compressed air to blow out the residual glue on the nut and clean it up; S410, reinstall the oil pump chamber components; Clean the oil filter element fixing cover and apply MOLYKOTE-55 lubricating silicone grease on the fixing cover thread. Install the new oil filter element and tighten the fixing cover until the oil filter element does not shake; Replace the new check valve, reinstall the plunger pump, spring, and eccentric sleeve in situ, and evenly apply MOLYKOTE-55 lubricating silicone grease on the surface of the components before reinstallation; Reinstall the oil pump chamber end cover, replace the sealing gasket of the oil pump sealing cover fixing bolts, and tighten the fixing bolts to 20N·m; S411, reinstall the opening / closing speed regulating valve, tightening torque 40N·m; S412, install a new check valve at the pressure relief valve; tightening torque 20N·m; S413, prevent the mechanical locking rod and end cover from being reinstalled in sequence. Note that the spring should not be reinstalled for the time being. They will be reinstalled after the oil is replenished. S414, low pressure cylinder reinstallation; Put a protective cap on the thread of the travel tie rod, and evenly apply MOLYKOTE-55 lubricating silicone grease on the joint and the surface of the protective cap; After aligning the low-pressure cylinder and the high-pressure cylinder, slowly reinstall the low-pressure cylinder and install the fixing bolts with a tightening torque of 120 N·m; remove the protective cap; S415, reinstall the oil level indicator.

[0032] Preferably, in step S5, the oil filling and sealing test of the operating mechanism includes: S501, vacuuming and oiling; Rotate the operating mechanism to a vertical state, with the high-pressure cylinder side at the bottom, open the pressure relief valve, close the oil drain valve, and connect the oil pipe; Remove the plug of the oil replenishment valve or the air suction valve and connect the vacuum pump assembly; Evacuate to 1-1.5kPa, keep the vacuum pump running, open the oil drain valve, and add oil to the operating mechanism. When a little oil appears in the glass tube of the vacuum pump, close the oil drain valve; Continue to evacuate for 5 minutes, alternately switch the opening and closing coils during the process, turn the umbrella wheel at the oil pump to make the oil path in the mechanism unobstructed and exhaust fully; add oil to the upper limit of the oil level indicator. Continue to evacuate until a small amount of hydraulic oil appears in the glass tube, close the drain valve, break the vacuum and let the hydraulic oil in the glass tube flow back into the mechanism; Turn off the vacuum pump and remove it; S502, pressure sealing test of operating mechanism; Rotate the operating mechanism to a horizontal position, connect one end of the pressure gauge to the low-pressure cylinder oil replenishing valve and the other end to the air compressor, set the pressure to 0.4Mpa and maintain it for 12 hours, and observe whether the mechanism has any oil leakage.

[0033] Preferably, in step S6, reinstalling and adjusting other components of the operating mechanism includes: S601, disc spring reinstallation; S602, rotate the operating mechanism to the horizontal direction and reinstall the bottom cover of the operating mechanism; the tightening torque is 45N·m; S603, reinstall the energy storage motor; Apply thread locker 243 to the fixing bolts, tightening torque 15N·m; Check whether the bevel gear and the bevel gear are stuck; S604, reinstallation of coupling parts; Insert an L6 hexagon wrench into the top of the transmission rod and rotate it counterclockwise until the coupling is inserted into the transmission rod; Install the coupling fixing nut, apply thread locking glue 243 inside the nut, and tighten the torque to 120 N·m.

[0034] The installation depth of the nut of the tie rod is measured with a T-shaped special tool. When the T-shaped tool is placed stably on the plane of the cylinder body, the depth of the nut tightening the tie rod just touches the T-shaped special tool. S605, reinstall the travel switch; Lift the operating mechanism from the rotating table to the debugging area, reinstall the copper clamping plate of the travel switch, adjust the copper clamping plate to be basically parallel to the fixing plane of the travel switch, install the fixing bolts, apply thread locking glue 243 to the bolts, and tighten the torque to 6N·m; Take the fixed plane of the travel switch as the reference plane, and use a depth gauge to measure the distance between the bosses on the left and right sides of the copper clamp and the reference plane. The difference should not exceed 0.3mm. Reinstall the travel switch and fixing bolts, with a bolt tightening torque of 20 N·m; S606, travel switch action node debugging.

[0035] Preferably, the disc spring reinstallation in S601 includes: Rotate the operating mechanism to a vertical position, with the bottom cover facing upwards, install the lifting lugs, lift the operating mechanism onto the compression spring workbench, and place it steadily; Place an anti-collision device at the lower end of the travel tie rod; Reinstall the semicircular support ring between the disc spring and the cylinder body, with the joint of the semicircular support ring away from the end cover of the switching valve; Use a puller to lift the disc spring assembly to the top of the operating mechanism body and smoothly drop it down for installation. The marking band on the disc spring should be in the same direction as the oil level indicator. Reinstall the semicircular support ring between the disc spring and the disc spring support ring, and reinstall the disc spring support ring; Adjust the position of the operating mechanism until the center of the disc spring is aligned with the hydraulic jack, observe that the gap between the support plate of the compression spring device and the slide rails on both sides is uniform, and use L6 hexagon socket to fix the limit block of the operating mechanism; Install the compression spring support on the disc spring support ring. The support is concentric with the support ring and does not block the fixing screw hole of the disc spring. Start the pressure device and make the hydraulic jack compress the disc spring until the energy storage rod thread extends out of the disc spring support ring. First install the corresponding nut of the travel rod and tighten it with a tightening torque of 200N·m, then install the remaining five fixed nuts and tighten them symmetrically; when installing the disc spring group, pay special attention to safety and arrange for someone to control the pressure device to prevent the pressure relief handle of the pressure device from automatically loosening. At the same time, when installing the nuts, use a torque wrench to tighten them symmetrically in place quickly, and do not tighten the nuts by hand; Check the nut torque in sequence; Slowly release the jack pressure, remove the compression spring support, and lift the operating mechanism to the rotating workbench and fix it.

[0036] Preferably, the travel switch action node debugging in S606 includes: Use an M4 hexagonal wrench to install the travel meter support platform fixture, use an M19 open fork wrench to install the connection fixture for fixing the travel meter, install the travel meter toward the pressure relief valve side, and adjust the travel meter to zero; Connect the power switch on the test box, loosen the pressure relief valve to release the pressure and then tighten it; close the switch F1 on the test box, the energy storage motor starts to pressurize and store energy, and the travel rod gradually moves upward; When the maximum stroke is reached, the motor stops pressurizing and the overpressure valve operates; connect the pressure gauge to the high-pressure cylinder plug to measure the pressure at each stroke node.

[0037] Preferably, the overall steps of trip debugging are as follows: a. After the operating mechanism stores energy, release the pressure relief valve, and the energy storage rod releases pressure from the stop pressure position to the energy storage start initial position. According to the node change sound, and the auxiliary test box signal light change state or the multimeter measurement of the node on-off state, the stroke node logic problem and the overall stroke deviation problem can be preliminarily judged; b. Trip node logic debugging: When the operating mechanism is depressurized, if no sound of 7 or 8 nodes changing is heard, or the signal lights in the test box change disorderly (abnormal node on / off status), it indicates that there is a logic problem in the travel node; at this time, add or remove gaskets on the upper end of the travel switch node panel, and adjust the forward and backward progress of the nut on the lower end; c. Stroke deviation debugging: Overall travel deviation: The overall data of the stop or start pressure node, O-CO alarm lock, CO alarm lock, and O alarm lock deviate a lot from the standard value. At this time, adjust the stroke switch node panel up and down as a whole; Partial itinerary deviation: The O alarm lockout, CO alarm lockout on the left side of the travel switch node panel, or the O-CO alarm lockout, stop or start pressure node on the right side deviate from the standard value. At this time, rotate the travel switch node panel left and right to adjust; Debugging of individual node locations: When stopping or starting the pressure node, or when other individual nodes deviate very slightly from the standard value, the travel switch node panel is fixed as a whole and the individual node switch is adjusted up and down.

[0038] During overall stroke debugging and individual node position debugging, the relative position of each node should also be observed. There is no upper or lower adjustment margin for individual nodes. The overall stroke debugging and individual node position debugging should be combined for comprehensive consideration.

[0039] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. Disassembly and maintenance method of circuit breaker operating mechanism, It is characterized in that include: S1, dismantling operation of the operating mechanism; S2, inspect and process the operating mechanism components; S3, seal replacement operation; S4, reinstallation of the cylinder parts of the operating mechanism; S5, oil filling and sealing test of operating mechanism; S6, reinstallation and adjustment of other parts of the operating mechanism.

2. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S1, the disassembly operation of the operating mechanism includes: S101, marking the disassembled parts; S102, removing the operating mechanism housing; S103, check whether all parts of the operating mechanism are intact and have no damage; check whether there are signs of hydraulic oil leakage; S104, remove the wiring of the motor and heater, and secure them with cable ties after untying; S105, remove the fixing bolts of the closing and opening coil valve bonnet and take off the valve bonnet; before removal, mark Y1 closing, Y2 opening and Y3 opening on the closing and opening coil valve bonnet; S106, remove the motor rectifier block, remove the fixing bolts of the motor and heater terminal block, and take down the terminal block; S107, remove the motor fixing bolts, take out the motor, and place the motor and the fixing bolts in a storage box with a corresponding mark; S108, remove the fixing nut of the coupling piece, and place the fixing nut in a storage box with a corresponding mark; the coupling piece is connected to the transmission rod through a thread, and the transmission rod is rotated clockwise, and the coupling piece gradually withdraws from the transmission rod under the action of the thread until it is separated from the transmission rod; wrap a pressure-sensitive tape around the thread of the transmission rod; S109, remove the travel switch fixing bolts, take out the travel switch, and place the travel switch and fixing nut in the corresponding storage box. Before removal, mark the intersection of the travel switch and the cylinder body; S110, remove the fixing bolts of the copper clamping plate of the travel switch, take off the copper clamping plate, and place the copper clamping plate and the fixing nut in a storage box with a corresponding mark; S111, hoist the operating mechanism to the rotary table, make the motor side of the operating mechanism face the opening of the U-shaped arm of the rotary table, slowly push the mechanism into the rotary table, keep the distance between the oil drain valve, the pressure relief valve and the secondary cable and the table, tighten the fixing bolts of the operating mechanism, and complete the operation of the mechanism on the table; S112, remove the fixing bolts of the bottom cover of the operating mechanism, take off the bottom cover, and place the bottom cover nuts in the storage box with the corresponding mark; S113, rotate the operating mechanism so that the bottom cover of the operating mechanism faces upward, install the special lifting lugs in the fixing screw holes of the bottom cover, lift the operating mechanism to the compression spring device, and place it stably; S114, adjusting the position of the operating mechanism; S115, remove the fixing bolts of the disc spring of the operating mechanism; S116, dismantling operation of the disc spring of the operating mechanism; S117, draining oil from the operating mechanism; S118, oil pump chamber components removal; S119, removal of the anti-slow separation device; S120, pressure relief valve removal; S121, loosen the fixing bolts of the opening / closing speed regulating valve, and take out the closing / opening speed regulating valve. Place the opening / closing speed regulating valve in a storage box with the corresponding mark; S122, low pressure cylinder removal; S123, energy storage rod removal; S124, energy storage piston removal; S125, removal of the plug at the bottom of the high-pressure cylinder; S126, drive rod removal; S127, removal of the copper sleeve of the energy storage rod seal; S128, use circlip pliers to remove the sealing copper sleeve circlip at the junction of the travel tie rod and the low-pressure cylinder, take out the copper sleeve, and place the copper sleeve circlip and the sealing copper sleeve in the storage box with the corresponding mark; S129, opening and closing coil removal; S130, switching valve removal; S131, turn counterclockwise to remove the oil level indicator, and clean the residual oil with a wipe. Place the oil level indicator in the corresponding storage box.

3. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S2, the inspection and processing of the operating mechanism components include: S201, cylinder inspection and cleaning; S202, check the oil pump motor assembly; S203, check the opening and closing coils; S204, check the auxiliary switch assembly; S205, check the heater; S206, check the travel switch assembly; S207, check the anti-slowness subassembly; S208, check the opening and closing indicator drive assembly; S209, check the oil level indicator; S210, check the switching valve; S211, check energy storage components; S212, check the transmission rod; S213, check the pressure relief valve assembly; S214, check and clean other parts, including checking whether the upper cover flange and bottom cover are deformed or damaged; checking whether the mechanism casing is deformed or damaged; checking whether the disc spring and wax coating are deformed or damaged, and checking whether the semicircular support ring is displaced; checking whether the secondary component wiring is loose and the circuit is damaged; if there is any abnormality in the parts, replace them.

4. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S3, the seal replacement includes: S301, replacement of the valve hole seal of the switching valve; S302, replacement of the valve body seal of the switching valve; S303, energy storage rod seal copper sleeve seal replacement; S304, replace the seal of the energy storage pull rod oil scraper copper sleeve, install a new seal, and keep the relative positions of the seals consistent with those before removal. When installing the oil scraper ring, the step surface faces the oil side of the operating mechanism; S305, transmission rod seal replacement; S306, energy storage piston steel seal replacement; S307, replacement of copper seal of energy storage piston; S308, replace the seal of the plug at the bottom of the high-pressure cylinder, install a new seal, keep the relative position of each seal the same as before removal, and the groove of the support ring points to the seal ring; S309, oil pump chamber shaft seal replacement; S310, replace the oil pump chamber end cover seal and install a new oil pump chamber end cover seal; S311, replace the seal at the junction of the transmission rod and the low-pressure cylinder; S312, replace the seal at the junction of the travel tie rod and the low-pressure cylinder; S313, install new seal of low pressure cylinder body; S314, install the pressure relief valve seal ring; S315, replacement of the seal of the mechanical locking rod to prevent slow separation; S316, install new seals on the speed control valve, and keep the relative positions of the seals the same as before removal; S317, install new seal on oil level indicator.

5. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S4, the reinstallation of the operating mechanism cylinder parts includes: S401, marking the reinstalled parts; S402, switch valve body back to install; S403, reinstall the opening and closing coil; S404, reinstall the energy storage rod sealing copper sleeve and the oil scraping copper sleeve; S405, reinstall the transmission rod; S406, evenly apply MOLYKOTE-55 lubricating silicone grease on the outer surface of the opening brake buffer block, and then reinstall the opening brake buffer block in situ; S407, reinstall the bottom seal of the high-pressure cylinder; After evenly applying MOLYKOTE-55 lubricating silicone grease on the contact surface between the bottom seal of the high-pressure cylinder and the cylinder body, reinstall the bottom seal of the high-pressure cylinder in situ; install the fastening bolts of the bottom seal of the high-pressure cylinder with a tightening torque of 101 N·m; S408, reinstall the energy storage rod; S409, reinstall the energy storage piston; S410, reinstall the oil pump chamber components; S411, reinstall the opening / closing speed regulating valve; S412, install a new check valve at the pressure relief valve; S413, prevent the mechanical locking rod and end cover from being reinstalled in sequence. Note that the spring should not be reinstalled for the time being. They will be reinstalled after the oil is replenished. S414, low pressure cylinder reinstallation; S415, reinstall the oil level indicator.

6. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S5, the operating mechanism oil filling and sealing test includes: S501, vacuuming and oiling; S502, pressurization sealing test of operating mechanism.

7. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 1, It is characterized in that In step S6, the reinstallation and adjustment of other components of the operating mechanism include: S601, disc spring reinstallation; S602, rotating the operating mechanism to a horizontal direction, and reinstalling the bottom cover of the operating mechanism; S603, reinstall the energy storage motor; S604, reinstallation of coupling parts; S605, reinstall the travel switch; S606, travel switch action node debugging.

8. The method for disassembling and repairing the circuit breaker operating mechanism according to claim 7, It is characterized in that The disc spring reinstallation in step S601 includes: Rotate the operating mechanism to a vertical position, with the bottom cover facing upwards, install the lifting lugs, lift the operating mechanism onto the compression spring workbench, and place it steadily; Place an anti-collision device at the lower end of the travel tie rod; Reinstall the semicircular support ring between the disc spring and the cylinder body, with the joint of the semicircular support ring away from the end cover of the switching valve; Use a puller to lift the disc spring assembly to the top of the operating mechanism body and smoothly drop it down for installation. The marking band on the disc spring should be in the same direction as the oil level indicator. Reinstall the semicircular support ring between the disc spring and the disc spring support ring, and reinstall the disc spring support ring; Adjust the position of the operating mechanism until the center of the disc spring is aligned with the hydraulic jack, observe that the clearance between the support plate of the compression spring device and the slide rails on both sides is uniform, and fix the limit block of the operating mechanism; Install the compression spring support on the disc spring support ring. The support is concentric with the support ring and does not block the fixing screw hole of the disc spring. Start the pressure device to make the hydraulic jack compress the disc spring until the energy storage rod thread extends out of the disc spring support ring. First install the nut corresponding to the travel rod and tighten it, then install the remaining fixed nuts and tighten them symmetrically; Check the nut torque in sequence; Slowly release the jack pressure, remove the compression spring support, and lift the operating mechanism to the rotating workbench and fix it.

9. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 7, It is characterized in that The travel switch action node debugging in step S606 includes: Install the travel meter support platform tooling, install the connection tooling for fixing the travel meter, install the travel meter toward the pressure relief valve side, and adjust the travel meter to zero; Connect the power switch on the test box, loosen the pressure relief valve to release the pressure and then tighten it; close the switch F1 on the test box, the energy storage motor starts to pressurize and store energy, and the travel rod gradually moves upward; When the maximum stroke is reached, the motor stops pressurizing and the overpressure valve operates; connect the pressure gauge to the high-pressure cylinder plug to measure the pressure at each stroke node.

10. The circuit breaker operating mechanism disassembly and maintenance construction method according to claim 9, It is characterized in that The overall steps of itinerary debugging are as follows: a. After the operating mechanism stores energy, release the pressure relief valve, and the energy storage rod releases pressure from the stop pressure position to the energy storage start initial position. According to the node change sound, and the auxiliary test box signal light change state or the multimeter measurement of the node on-off state, the stroke node logic problem and the overall stroke deviation problem can be preliminarily judged; b. Trip node logic debugging: When the operating mechanism releases pressure, if no node change sound is heard, or the signal light of the test box changes disorderly, it indicates that there is a logic problem in the travel node; at this time, add or remove gaskets on the upper end of the travel switch node panel, and adjust the forward and backward progress of the nut on the lower end; c. Stroke deviation debugging: Overall travel deviation: The overall data of the stop or start pressure node, O-CO alarm lock, CO alarm lock, and O alarm lock deviate a lot from the standard value. At this time, adjust the stroke switch node panel up and down as a whole; Partial itinerary deviation: The O alarm lockout, CO alarm lockout on the left side of the travel switch node panel, or the O-CO alarm lockout, stop or start pressure node on the right side deviate from the standard value. At this time, rotate the travel switch node panel left and right to adjust; Debugging of individual node positions: When stopping or starting the pressure node, or when other individual nodes deviate very slightly from the standard value, the travel switch node panel is fixed as a whole and the individual node switch is adjusted up and down.

Citation Information

Patent Citations

  • Overhauling method of spring energy-storing breaker

    CN104752979A

  • Maintenance and replacement method for hydraulic disc spring operating mechanism of 500kV circuit breaker

    CN112803288A

  • High-voltage circuit breaker maintenance tool

    CN220475265U