Automatic construction method of stay cable high-toughness flame-retardant sealing protection structure
Through automated mechanical flow operations and automatic wrapping and scraping equipment, the automated construction of high-tenacity flame-retardant sealed protective structures for stay cables is realized, which solves the problems of low construction efficiency and difficult quality control in the existing technology, and significantly improves the construction progress and Safety, extending the service life of the cable stay.
Patent Information
- Application Number
- CN202411035077.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-18
AI Technical Summary
The existing construction method of cable-stayed flame-retardant sealed protective structures is labor-intensive, inefficient, and cannot achieve automated construction. It is especially difficult to ensure construction quality and safety under high temperatures.
Using automated mechanical flow operations, combined with automatic wrapping machines and automatic gluing machines, through independent motors, winding mechanisms, hanging baskets, glue coating components and other equipment, the fire-resistant heat insulation layer, flame-retardant sealing layer and weather-resistant wrapping layer are realized Automated construction ensures fast construction progress, high efficiency and reliable quality.
It greatly shortens the construction period, reduces the risk of high-altitude operations, ensures construction quality, realizes the reliability and safety of the high-tenacity flame-retardant sealed protective structure of the stay cable, and extends the service life of the stay cable.
Smart Images

Figure CN118792964A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to an automated construction method for a high-toughness flame-retardant sealing protective structure for a stay cable. Background Art
[0002] The corrosion and fire problems of the cables in the upper structure of cable-stayed bridges not only endanger the safety and service life of the bridge structure, but also cause significant economic losses during the repair and replacement of the cables. At the same time, the maintenance interrupts traffic, resulting in a decrease in the efficiency of transportation of people or vehicles. The high-toughness flame-retardant sealing protection structure of the cable is an effective solution to this problem. It still has certain strength and toughness under high temperature conditions. The construction of the protective structure system composed of composite fiber fire-resistant insulation belts, fire-resistant flame-retardant fiber sealants, fiber-reinforced professional cloths, and fire-resistant and weather-resistant sealing wrapping tapes is conducive to maintaining the long-term performance of the cable, extending the service life of the cable, preventing erosion from the marine corrosive environment and potential bridge fire hazards, and reducing bridge safety risks and losses.
[0003] The existing construction methods of flame-retardant sealed protection structures for inclined cables mainly include:
[0004] (1) The flame retardant sealant is applied manually by scraping, and the fiber-reinforced professional cloth and wrapping tape are wrapped manually.
[0005] The disadvantages are high labor intensity, low efficiency, high risks of long-term high-altitude work, and the difficulty in accurately controlling the quality of the scraping and coating, including flatness and thickness.
[0006] (2) Use a single automatic wrapping machine for construction.
[0007] The existing patent name is an automatic wrapping machine for protective film of inclined cables (202023118503.9), which solves the problems that the protective film cannot be automatically wrapped and the sliding mechanism is inconvenient to disassemble and assemble.
[0008] The disadvantage is that the automated construction function only has automatic wrapping but not automatic glue scraping. It is only suitable for automatic construction of wrapping tape and cannot be applied to high-toughness flame-retardant protective structure systems, especially the automated construction of fire-resistant flame-retardant fiber sealants and fiber-reinforced professional cloths. Summary of the invention
[0009] In order to solve the problem of construction of flame-retardant sealing protection structure of inclined cables in the prior art, the present invention provides an automated construction method of high-toughness flame-retardant sealing protection structure of inclined cables. The construction method adopts automated mechanical flow operation, with fast construction progress, high construction efficiency and reliable sealing protection quality of inclined cables.
[0010] To achieve the above object, the present invention provides the following solutions:
[0011] The present invention provides an automated construction method for a high-toughness flame-retardant sealing protection structure for a stay cable, wherein a fire-resistant heat-insulating layer, a flame-retardant sealing layer and a weather-resistant wrapping layer are sequentially arranged on the stay cable outward;
[0012] The construction of the high-toughness flame-retardant sealed protective structure of the inclined cable adopts automated equipment, including automatic wrapping machines and automatic glue scraping machines;
[0013] The automatic wrapping machine comprises an independent motor, a winding mechanism and a first hanging basket; the first hanging basket is arranged below the winding mechanism, the independent motor is transmission-connected to the winding mechanism; the first hanging basket is driven by a traction rope;
[0014] The automatic glue scraping machine mainly includes a motor and a controller, a glue coating component, a glue scraping component, a rotating component and a second hanging basket, wherein the second hanging basket is driven by a traction rope, and the motor and the controller are transmission-connected with the glue coating component, the glue scraping component and the rotating component;
[0015] The automated construction method of the high-toughness flame-retardant sealing protection structure of the inclined cable includes the following steps:
[0016] S1, installing the automatic glue scraping machine on the cable and filling it with cleaning solvent to clean the surface of the cable;
[0017] S2, according to the vertical height of the fire protection of the inclined cable, the end point position of the fire protection is calibrated with the help of a level;
[0018] S3, the automatic wrapping machine is installed at the bottom of the inclined cable, and the automatic wrapping machine climbs along the inclined cable at a uniform speed while automatically wrapping the fire-resistant heat insulation layer, and tightens it with a clamp at a certain interval until it reaches the fire protection end point, and then the automatic wrapping machine is removed;
[0019] S4, the automatic glue scraping machine is installed at the bottom of the inclined cable, and climbs along the inclined cable at a uniform speed while automatically scraping glue;
[0020] S5, waiting for the automatic glue coating machine to climb to a certain height and installing the automatic wrapping machine;
[0021] S6, the automatic scraping glue coating machine and the automatic wrapping machine work together to control the speed to ensure a reasonable spacing;
[0022] S7, when the automatic glue scraping machine runs to the top of the cable, it is unloaded first, and when the automatic wrapping machine reaches the top of the cable, it is unloaded in sequence;
[0023] S8, after a certain period of time after the flame retardant sealing layer is wound, the second layer of fire resistant flame retardant fiber sealant is completed by the same operation using the automatic glue scraping machine, and the protective construction of the outermost weather resistant wrapping layer is realized in cooperation with the automatic wrapping machine.
[0024] Optionally, the fire-resistant heat-insulating layer adopts a composite fiber fire-resistant insulation tape, the flame-retardant sealing layer adopts a fire-resistant flame-retardant fiber sealant and fiber-reinforced professional cloth, and the weather-resistant wrapping layer adopts a fire-resistant and weather-resistant sealing wrapping tape.
[0025] Optionally, in step S6, the control method includes the following sub-steps:
[0026] S61, the distance between the automatic scraping glue machine and the automatic wrapping machine needs to be estimated and calculated in advance, the distance between them should be as close as possible, the longest interval time should not exceed the surface drying time of the fire-resistant flame-retardant fiber sealant, and the equipment running speed should ensure the installation quality;
[0027] S62, if the running speed of the automatic scraping glue coating machine is slower than that of the automatic wrapping machine, or the distance between the two devices is insufficient, it is necessary to remotely use a remote control device to pause the automatic wrapping machine and wait until the distance meets the requirement before continuing to start;
[0028] S63, if the running speed of the automatic scraping glue coating machine is faster than that of the automatic wrapping machine, or the distance between the two devices is large, it is sufficient to track and observe without speed control.
[0029] Optionally, the height of the cable-stayed fire protection perpendicular to the bridge deck is 10 to 15 m, which is determined according to the fire scene parameters of different types of vehicles and the fire temperature field distribution height.
[0030] Optionally, the height of the cable-stayed fire protection perpendicular to the bridge deck is 12m.
[0031] Optionally, the wrapping overlap of the fire-resistant heat-insulating layer is a splicing overlap, and the overlap width should be 0 mm to minimize the phenomenon of bulging during the wrapping process.
[0032] Optionally, the fire-resistant heat-insulating layer is fastened around the starting end and the end with stainless steel clamps, with one clamp added every 1.5 meters, and the connection between the two belts is fastened with two stainless steel clamps.
[0033] Optionally, the fire-retardant fiber sealant coating used in the flame-retardant sealing layer has a coating thickness of 1000 μm, and there should be no missing coating or bubbling, and the surface after scraping should be uniform and smooth.
[0034] Optionally, the interval between the application of the fire-resistant flame-retardant fiber sealant and the winding process of the fiber-reinforced professional cloth is controlled within 10 to 30 minutes to prevent the fire-resistant flame-retardant fiber sealant from failing to play a bonding role after the surface is dried.
[0035] Optionally, the fiber-reinforced professional cloth used for the flame-retardant sealing layer has a width of 15 cm, and the overlap width between each piece is 2 cm. The equipment automatically tightens during the winding process to avoid hollowing.
[0036] Compared with the prior art, the present invention has achieved the following technical effects:
[0037] 1. The use of automated mechanical assembly line operations has fast construction progress and high construction efficiency. Two or two groups of four automated equipment work together on the same inclined cable, greatly shortening the construction period and reducing the safety risks of long-term manual operations at high altitudes.
[0038] 2. The quality of automated construction is controllable. The construction speed and interval time of the automatic scraping and coating machine and the automatic wrapping machine can be remotely controlled to ensure smooth process connection and control and prevent quality out of control.
[0039] 3. The quality of automated construction is reliable. The automatic glue-coating machine ensures that the flame-retardant sealant is evenly and smoothly coated and the thickness meets the requirements. The automatic wrapping machine ensures that the joints of the composite fiber fire-resistant insulation belt and the fire-resistant and weather-resistant sealing wrapping belt are dense, and the overlap width of the fiber-reinforced professional cloth and the surface are free of hollows. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 It is a structural schematic diagram of the automatic glue scraping machine of the present invention performing a cleaning operation of a stay cable;
[0042] Figure 2 It is a structural schematic diagram of the automatic wrapping machine in the present invention performing composite fiber fire-resistant heat-insulating wrapping tape operations;
[0043] Figure 3 It is a structural schematic diagram of the automatic wrapping machine and the automatic glue scraping machine in the present invention working in a coordinated flow on the same inclined cable;
[0044] Figure 4 It is a structural schematic diagram of the automatic wrapping machine and the automatic glue coating machine in the present invention forming two groups of a total of four devices working in a coordinated flow line on the same inclined cable.
[0045] Description of reference numerals:
[0046] 2. Automatic wrapping machine; 3. Automatic scraping and coating machine;
[0047] 11. Cable-stayed cable; 12. Composite fiber fire-resistant insulation belt; 13. Fire-resistant and flame-retardant fiber sealant; 14. Fiber-reinforced professional cloth; 15. Fire-resistant and weather-resistant sealing wrapping tape;
[0048] 21. Independent motor; 22. Winding mechanism; 23. First hanging basket;
[0049] 31. Motor and controller; 32. Glue coating assembly; 33. Glue scraping assembly; 34. Rotating assembly; 35. Second hanging basket. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] The purpose of the present invention is to provide an automated construction method for a high-toughness flame-retardant sealing protection structure of a cable-stayed cable, wherein a fire-resistant insulation layer, a flame-retardant sealing layer and a weather-resistant wrapping layer are sequentially arranged on the cable outward; automated mechanical flow operations are adopted, so that the construction progress is fast, the construction efficiency is high, and the sealing and protection quality of the cable-stayed cable is reliable.
[0052] The high-toughness flame-retardant sealing protective structure of the inclined cable in the present invention is constructed by automated equipment, including an automatic wrapping machine 2 and an automatic glue scraping machine 3; the automatic wrapping machine 2 includes an independent motor 21, a winding mechanism 22 and a first hanging basket 23; the first hanging basket 23 is arranged below the winding mechanism 22, and the independent motor 21 is connected to the winding mechanism 22 by transmission; the first hanging basket 23 is driven by a traction rope; the automatic glue scraping machine 3 mainly includes a motor and controller 31, a glue coating component 32, a glue scraping component 33, a rotating component 34 and a second hanging basket 35, the second hanging basket 35 is driven by a traction rope, and the motor and controller 31 is connected to the glue coating component 32, the glue scraping component 33 and the rotating component 34 by transmission.
[0053] In the present invention, the fireproof heat insulation layer adopts the composite fiber fireproof insulation belt 12, the flame retardant sealing layer adopts the fireproof and flame retardant fiber sealant 13 and the fiber reinforced professional cloth 14, and the weather-resistant wrapping layer adopts the fireproof and weather-resistant sealing wrapping tape 15. The composite fiber fireproof insulation belt 12 and the fiber reinforced professional cloth 14, and the fiber reinforced professional cloth 14 and the fireproof and weather-resistant sealing wrapping tape 15 are bonded by the fireproof and flame retardant fiber sealant 13.
[0054] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0055] Embodiment 1:
[0056] This embodiment provides an automated construction method for a high-toughness flame-retardant sealed protective structure for a stay cable, comprising the following steps:
[0057] S1, install the automatic glue scraping machine 3 on the cable 11 and fill it with cleaning solvent to clean the surface of the cable 11; drive the glue coating component 32 to open by the traction rope, use the spray cleaning solvent to clean the surface, and simultaneously open the glue scraping component 33 to remove dust, cement and other solid attachments. After the cable 11 is cleaned, remove the equipment. Please refer to the attached Figure 1 .
[0058] S2, according to the height of the fire protection of the inclined cable 11 perpendicular to the bridge deck, the optional range is 10 to 15 m, and the end point position of the fire protection is calibrated with the help of a level.
[0059] In this specific embodiment, the height of the fire protection of the inclined cable 11 perpendicular to the bridge deck is 12m.
[0060] S3, install the automatic wrapping machine 2, load the composite fiber fireproof insulation belt 12 into the winding mechanism 22, and after the equipment is installed in place, turn on the independent motor 21, climb along the inclined cable 11 at a uniform speed and automatically wind the composite fiber fireproof insulation belt 12, and tighten it with stainless steel clamps at regular intervals until it reaches the calibrated fire protection end point. Figure 2 .
[0061] In this specific embodiment, according to the technical requirements of the composite fiber fire-resistant insulation belt 12, a splicing overlap is adopted, and the overlap width should be 0mm. In order to reduce the phenomenon of bulging during the winding process, the product width should be 150mm; during the winding process, the joints should be reduced as much as possible to ensure continuity and aesthetic requirements; the starting and ending ends of the winding are tightened with stainless steel clamps, and a clamp is added every 1.5 meters, and the connection between the two belts is tightened with two stainless steel clamps.
[0062] S4, an automatic glue-spreading machine 3 is installed at the bottom of the inclined cable 11, and the fire-resistant and flame-retardant fiber sealant 13 is loaded into the glue-spreading mechanism. After the equipment is installed in place, the independent motor 21 is turned on, and the fire-resistant and flame-retardant fiber sealant 13 is automatically scraped and spread while climbing along the inclined cable 11 at a uniform speed.
[0063] In this specific embodiment, according to the technical requirements of the fire-resistant flame-retardant fiber sealant 13, the coating thickness is about 1000μm, and there must be no missing coating, bubbling and the like. The surface should be uniform and smooth after scraping; it is controlled according to the spraying speed and the amount of glue used, and the slicing method can be used for measurement after it is actually dry; the scraping surface is as flat as possible, and within 10 to 30 minutes after scraping the glue, it needs to be wrapped with a fiber-reinforced professional cloth 14 to avoid the fire-resistant flame-retardant fiber sealant 13 failing to play a bonding role after the surface is dry.
[0064] S5, wait for the automatic scraper and glue coating machine 3 to climb to a certain height, install the automatic wrapping machine 2, load the fiber-reinforced professional cloth 14 into the winding mechanism 22, and after the equipment is installed in place, start the independent motor 21, climb along the inclined cable 11 at a uniform speed while automatically winding the fiber-reinforced professional cloth 14.
[0065] In this specific embodiment, according to the technical requirements of the fiber-reinforced professional cloth 14, the fiber-reinforced professional cloth 14 is 15 cm wide, and the overlap width between each piece is about 2 cm. During the winding process, the equipment automatically tightens to avoid hollowing. The fiber-reinforced professional cloth 14 has joints every 50 meters. The winding joints need to be fixed by personnel using clamps. Before fixing, replace the fiber-reinforced professional cloth and lock the joints before continuing the winding operation. The cable needs to be wound in advance at 0.5 meters on both ends to ensure that the equipment joints are fully covered. Please refer to the attached Figure 3 .
[0066] S6, the automatic scraping and coating machine 3 and the automatic wrapping machine 2 work in a coordinated flow process, and the speed is controlled to ensure a reasonable spacing. The control method includes the following steps:
[0067] S61, the distance between the automatic scraping glue machine 3 and the automatic wrapping machine 2 needs to be estimated and calculated in advance, the distance should be as close as possible, and the longest interval time should not exceed the surface drying time of the fire-resistant flame-retardant fiber sealant 13. The equipment running speed should be prioritized to ensure the installation quality;
[0068] S62, if the running speed of the automatic scraping glue machine 3 is slower than that of the automatic wrapping machine 2, or the distance between the two devices is insufficient, it is necessary to use a remote control device to remotely pause the automatic wrapping machine 2 and wait until the distance meets the requirement before continuing to start;
[0069] S63, if the running speed of the automatic scraping and coating machine 3 is faster than that of the automatic wrapping machine 2, or the distance between the two devices is large, it is sufficient to track and observe without speed control.
[0070] S7, when the automatic glue scraping machine 3 runs to the top of the inclined cable 11, it is unloaded first, and then the automatic wrapping machine 2 is unloaded in sequence after it reaches the top of the cable.
[0071] S8, after a certain period of time after the first layer of cloth is wrapped, the second layer of fire-resistant flame-retardant fiber sealant 13 is completed by the automatic scraping glue machine 3 in the same operation, and the automatic wrapping machine 2 is cooperated to realize the protective construction of the outermost layer of fire-resistant and weather-resistant sealing wrapping tape 15.
[0072] In this specific embodiment, according to the technical requirements of the fire-resistant and weather-resistant sealing wrapping tape 15, it is required to adopt splicing overlap, and the overlap width should be 0mm. In order to reduce the phenomenon of bulging during the winding process, the product width should be 150mm; the surface of the fire-resistant and weather-resistant sealing wrapping tape 15 should be flat and smooth.
[0073] Embodiment 2:
[0074] In this specific embodiment, construction steps S1 to S5 are the same as those in the first embodiment, and the technical requirements are also the same as those in the first embodiment.
[0075] Construction step S6, using two automatic scraping glue machines 3 and two automatic wrapping machines 2, through two groups of four equipment to coordinate the flow operation to further improve the construction speed of sealing protection, suitable for long-length inclined cables 11 and projects with tight construction schedules, refer to the attached Figure 4 .
[0076] In construction step S7, the first set of equipment is unloaded first when it reaches the top of the cable 11, and then the second set of equipment is unloaded in sequence after it reaches the top of the cable.
[0077] It should be noted that it is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
[0078] The present specification uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. An automated construction method for a high-toughness flame-retardant sealed protective structure for a cable-stayed cable. It is characterized in that The stay cables are provided with a fire-resistant insulation layer, a flame-retardant sealing layer and a weather-resistant wrapping layer in sequence from the outside; The construction of the high-toughness flame-retardant sealed protective structure of the inclined cable adopts automated equipment, including automatic wrapping machines and automatic glue scraping machines; The automatic wrapping machine comprises an independent motor, a winding mechanism and a first hanging basket; the first hanging basket is arranged below the winding mechanism, the independent motor is transmission-connected to the winding mechanism; the first hanging basket is driven by a traction rope; The automatic glue scraping machine mainly includes a motor and a controller, a glue coating component, a glue scraping component, a rotating component and a second hanging basket, wherein the second hanging basket is driven by a traction rope, and the motor and the controller are transmission-connected with the glue coating component, the glue scraping component and the rotating component; The automated construction method of the high-toughness flame-retardant sealing protection structure of the inclined cable includes the following steps: S1, installing the automatic glue scraping machine on the cable and filling it with cleaning solvent to clean the surface of the cable; S2, according to the vertical height of the fire protection of the inclined cable, the end point position of the fire protection is calibrated with the help of a level; S3, the automatic wrapping machine is installed at the bottom of the inclined cable, and the automatic wrapping machine climbs along the inclined cable at a uniform speed while automatically wrapping the fire-resistant heat insulation layer, and tightens it with a clamp at a certain interval until it reaches the fire protection end point, and then the automatic wrapping machine is removed; S4, the automatic glue scraping machine is installed at the bottom of the inclined cable, and climbs along the inclined cable at a uniform speed while automatically scraping glue; S5, waiting for the automatic glue coating machine to climb to a certain height and installing the automatic wrapping machine; S6, the automatic scraping glue coating machine and the automatic wrapping machine work together to control the speed to ensure a reasonable spacing; S7, when the automatic glue scraping machine runs to the top of the cable, it is unloaded first, and when the automatic wrapping machine reaches the top of the cable, it is unloaded in sequence; S8, after a certain period of time after the flame retardant sealing layer is wound, the second layer of fire resistant flame retardant fiber sealant is completed by the same operation using the automatic glue scraping machine, and the protective construction of the outermost weather resistant wrapping layer is realized in cooperation with the automatic wrapping machine.
2. The automated construction method of the high-toughness flame-retardant sealing protection structure of the inclined cable according to claim 1, It is characterized in that The fireproof heat-insulating layer adopts a composite fiber fireproof insulation belt, the flame-retardant sealing layer adopts a fire-resistant flame-retardant fiber sealant and fiber-reinforced professional cloth, and the weather-resistant wrapping layer adopts a fire-resistant and weather-resistant sealing wrapping tape.
3. The automated construction method of the high-toughness flame-retardant sealing protection structure of the inclined cable according to claim 1, It is characterized in that In step S6, the control method includes the following sub-steps: S61, the distance between the automatic scraping glue machine and the automatic wrapping machine needs to be estimated and calculated in advance, the distance between them should be as close as possible, the longest interval time should not exceed the surface drying time of the fire-resistant flame-retardant fiber sealant, and the equipment running speed should ensure the installation quality; S62, if the running speed of the automatic scraping glue coating machine is slower than that of the automatic wrapping machine, or the distance between the two devices is insufficient, it is necessary to remotely use a remote control device to pause the automatic wrapping machine and wait until the distance meets the requirement before continuing to start; S63, if the running speed of the automatic scraping glue coating machine is faster than that of the automatic wrapping machine, or the distance between the two devices is large, it is sufficient to track and observe without speed control.
4. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The height of the cable-stayed fire protection perpendicular to the bridge deck is 10 to 15 m, which is determined according to the fire scene parameters of different types of vehicles and the fire temperature field distribution height.
5. The height of the fire protection of the cable-stayed cable according to claim 4 is perpendicular to the bridge deck. It is characterized in that The height of the cable-stayed fire protection perpendicular to the bridge deck is 12m.
6. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The wrapping overlap of the fire-resistant heat-insulating layer is a splicing overlap, and the overlap width should be 0 mm to minimize the bulging phenomenon during the wrapping process.
7. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The fireproof heat-insulating layer is fastened with stainless steel clamps around the starting end and the end, with one clamp added every 1.5 meters, and the connection between the two belts is fastened with two stainless steel clamps.
8. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The fire-resistant flame-retardant fiber sealant coating has a thickness of 1000 μm, and there shall be no missing coating or bubbling, and the surface after scraping shall be uniform and smooth.
9. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The interval time between the process of scraping the fire-resistant flame-retardant fiber sealant and winding the fiber-reinforced professional cloth is controlled within 10 to 30 minutes to prevent the fire-resistant flame-retardant fiber sealant from failing to play a bonding role after the surface is dried.
10. The automated construction method of the high-toughness flame-retardant sealed protective structure of the inclined cable according to claim 1, It is characterized in that The fiber-reinforced professional cloth of the flame-retardant sealing layer has a width of 15 cm, and the overlap width between each piece is 2 cm. The equipment automatically tightens during the winding process to avoid hollowing.
