Immersed tube tunnel reinforcing system penetrating through breakwater downwards and construction method of immersed tube tunnel reinforcing system

By adopting technologies such as prestressed high-strength concrete pipe piles and steel shell reinforced concrete force transmission systems where the immersed tube tunnel passes under the breakwater, the problems of uneven foundation settlement and poor load-bearing performance of the immersed tube tunnel are solved, and the safety of the reinforcement system is achieved. The stability and convenient construction ensure that the stability of the structure and navigation are not affected.

CN118793092APending Publication Date: 2024-10-18WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411096558.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

During the construction of the immersed tube tunnel, especially when it goes under the breakwater, there are problems of uneven foundation settlement and poor load-bearing performance. There are few existing reinforcement technologies and it is difficult to effectively solve them.

Method used

Adopt a reinforcement system including the first foundation trench, the second foundation trench, prestressed high-strength concrete pipe piles, underground diaphragm wall foundation, high-pressure jet grouting piles, cushion layer, steel shell reinforced concrete force transmission system, breakwater foundation and breakwater reinforcement layer , through a combination of factory prefabrication and on-site construction, the impact of the upper load is reduced and the connection between the breakwater and the foundation is enhanced.

Benefits of technology

It effectively reduces the internal force and deformation of the immersed tube tunnel, enhances the safety and stability of the overall structure, ensures the safety of the repaired structure, and has the advantages of convenient construction, short construction period, and low environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793092A_ABST
    Figure CN118793092A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of immersed tube tunnels, and discloses an immersed tube tunnel reinforcing system penetrating through a breakwater downwards and a construction method of the immersed tube tunnel reinforcing system. The reinforcing system comprises a first foundation trench, a second foundation trench, prestressed high-strength concrete pipe piles, an underground diaphragm wall foundation, high-pressure jet grouting piles, a cushion layer, an immersed tunnel, a steel shell reinforced concrete force transmission system, a breakwater foundation, a breakwater reinforcing layer and a rebuilding breakwater. The breakwater foundation is arranged on the upper portion of the top end of the steel shell reinforced concrete force transfer system, the breakwater reinforcing layer is arranged on the side face of the rebuilt breakwater, and the breakwater reinforcing layer and the rebuilt breakwater are arranged on the breakwater foundation. Therefore, on the basis that the original breakwater function is not damaged, the influence of the upper breakwater load and the external additional load on the immersed tube tunnel can be reduced, the problem of uneven settlement of the foundation caused by uneven overlying load is solved, the internal force and deformation of the immersed tube tunnel are reduced, and the effect of protecting the immersed tube tunnel is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of immersed tube tunnels, and in particular to a reinforcement system for an immersed tube tunnel passing under a breakwater and a construction method for the reinforcement system for an immersed tube tunnel passing under a breakwater. Background Art

[0002] With the rapid development of transportation facilities, immersed tube tunnels, as an important transportation link connecting coastal urban agglomerations, have significant social and economic benefits. However, in the construction process of immersed tube tunnels, various practical engineering problems are usually encountered. For example, in the construction process of some tunnels, the original breakwater structure is crossed on the nearshore side. In addition, there is a sudden change in the stratigraphic structure of dolomite and slate at the middle pipe section of some tunnels. The surface foundation is a complex soft soil layer composed of silt clay, fill, silt, etc., which has significant characteristics such as high water content, high compressibility, poor permeability, low strength, and poor engineering properties. There are relatively severe foundation settlement and uneven settlement problems. Therefore, when designing and constructing immersed tube tunnels under complex geological conditions and upper engineering conditions, the concentrated overburden load conditions will cause serious damage to the immersed tube tunnels, resulting in significant losses. Therefore, it is urgent to carry out research on the reinforcement technology of submarine immersed tube tunnels that pass through marine structures such as breakwaters under soft underlying conditions.

[0003] At present, there are few actual projects on the treatment methods of immersed tube tunnels passing under breakwaters, and there is very little research on reinforcement technology for such working conditions. Therefore, in order to solve the bearing performance problem of immersed tube tunnels passing under breakwaters, it is urgent to find a method with high safety and simple construction. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the first purpose of the present invention is to propose a reinforcement system for an immersed tube tunnel under a breakwater, which can reduce the influence of the upper breakwater load and the external additional load on the immersed tube tunnel without destroying the original breakwater function, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, protect the immersed tube tunnel, and effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0005] The second object of the present invention is to provide a construction method for a reinforcement system of an immersed tube tunnel passing under a breakwater.

[0006] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes a reinforcement system for an immersed tube tunnel passing under a breakwater, comprising a first foundation trench, a second foundation trench, prestressed high-strength concrete pipe piles, an underground continuous wall foundation, high-pressure rotary jet piles, a cushion layer, an immersed tube tunnel, a steel shell reinforced concrete force transmission system, a breakwater foundation, a breakwater reinforcement layer and a repaired breakwater; the first foundation trench is in an inverted trapezoidal shape, the high-pressure rotary jet piles are vertically arranged at the lower part of the bottom end of the first foundation trench, the second foundation trench is rectangular and is opened at the lower part of the bottom end of the first foundation trench, the prestressed high-strength concrete pipe piles are vertically arranged at the lower part of the bottom end of the second foundation trench, the underground continuous wall foundation is arranged in the second foundation trench, the steel shell reinforced concrete force transmission system is arranged in the first foundation trench and is arranged on the underground continuous wall foundation, the cushion layer is laid on the high-pressure rotary jet piles, the immersed tube tunnel is arranged on the cushion layer, the breakwater foundation is arranged on the top upper part of the steel shell reinforced concrete force transmission system, the breakwater reinforcement layer is arranged on the side of the repaired breakwater, and the breakwater reinforcement layer and the repaired breakwater are arranged on the breakwater foundation.

[0007] In addition, the immersed tube tunnel reinforcement system under the breakwater according to the above embodiment of the present invention may also have the following additional technical features:

[0008] According to some embodiments of the present invention, the renovated breakwater is located above the immersed tube tunnel and longitudinally crosses the immersed tube tunnel at a preset angle.

[0009] According to some embodiments of the present invention, the preset angle ranges from 30 to 150 degrees.

[0010] According to some embodiments of the present invention, the outside of the underground continuous wall foundation is a first backfill layer.

[0011] According to some embodiments of the present invention, the N-shaped area between the outer side of the immersed tube tunnel and the inner wall of the steel shell reinforced concrete force transmission system is the first backfill area, the area between the two side walls of the steel shell reinforced concrete force transmission system and the two side walls of the first foundation trench is the second backfill area, the first backfill area and the second backfill area constitute a second backfill layer, and the second backfill layer is sequentially distributed with a compaction backfill area and a locking backfill area from top to bottom.

[0012] According to some embodiments of the present invention, the area outside the breakwater foundation and above the top of the second backfill layer is the third backfill layer.

[0013] According to some embodiments of the present invention, the breakwater reinforcement layer is provided with transverse reinforcement layer steel bars and longitudinal reinforcement layer steel bars that are staggered horizontally and vertically, the caisson structure of the breakwater reinforcement layer is provided with caisson structure steel bars that match the transverse reinforcement layer steel bars, and the breakwater reinforcement layer and the repaired breakwater are fixed by the caisson structure steel bars, the transverse reinforcement layer steel bars and the longitudinal reinforcement layer steel bars.

[0014] According to some embodiments of the present invention, the cushion layer is provided with a plurality of coarse sand and gravel platforms, and a trench is provided between two adjacent coarse sand and gravel platforms.

[0015] According to some embodiments of the present invention, the steel shell reinforced concrete force transmission system includes a top plate and a side plate, a concave platform is arranged on the top of the side plate, and the top plate is mounted on the concave platform.

[0016] According to an embodiment of the present invention, the immersed tube tunnel reinforcement system for passing under a breakwater comprises a first foundation trench, a second foundation trench, prestressed high-strength concrete pipe piles, an underground continuous wall foundation, high-pressure rotary jet piles, a cushion layer, an immersed tube tunnel, a steel shell reinforced concrete force transmission system, a breakwater foundation, a breakwater reinforcement layer and a repaired breakwater; the first foundation trench is in an inverted trapezoidal shape, the high-pressure rotary jet piles are vertically arranged at the lower part of the bottom end of the first foundation trench, the second foundation trench is in a rectangular shape and is opened at the lower part of the bottom end of the first foundation trench, the prestressed high-strength concrete pipe piles are vertically arranged at the lower part of the bottom end of the second foundation trench, the underground continuous wall foundation is arranged in the second foundation trench, the steel shell reinforced concrete force transmission system is arranged in the first foundation trench and arranged on the underground continuous wall foundation, the cushion layer is laid on the high-pressure rotary jet piles, the immersed tube tunnel is arranged on the cushion layer, the breakwater foundation is arranged on the top upper part of the steel shell reinforced concrete force transmission system, the breakwater reinforcement layer is arranged on the side of the repaired breakwater, and the breakwater reinforcement layer and the repaired breakwater are arranged on the breakwater foundation. Therefore, without destroying the original breakwater function, the reinforcement system can reduce the impact of the upper breakwater load and external additional load on the immersed tube tunnel, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, and protect the immersed tube tunnel. It can also effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0017] The second purpose of the present invention is to propose a construction method for a reinforcement system of an immersed tube tunnel passing under a breakwater. This method can reduce the impact of the upper breakwater load and external additional load on the immersed tube tunnel without destroying the original breakwater function, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, and protect the immersed tube tunnel. It can also effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0018] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a construction method for a reinforcement system of an immersed tube tunnel under a breakwater, which is applied to the above-mentioned reinforcement system of an immersed tube tunnel under a breakwater, and includes the following steps: prefabricating the rebuilt breakwater caisson, the pipe segments of the immersed tube tunnel, and the steel shell reinforced concrete force transmission system in the factory according to preset dimensions, reserving the connecting steel bars of the rebuilt breakwater reinforcement layer and the steel shell reinforced concrete force transmission system, and completing the quality inspection of the pipe segments of the immersed tube tunnel before floating out of the dock and the water injection test in the dock; carrying out the layout preparation before construction at the original breakwater position, cleaning the construction area, and dismantling the original breakwater in the area affected by the immersed tube tunnel, removing the surface silt in the construction area after the dismantling is completed, leveling the seabed, and demarcating the high-performance load transfer system area, the foundation trench area, the cushion layer area, and the immersed tube tunnel area; slope the seabed surface to form a first foundation trench; wherein the slope ratio of the first foundation trench excavation is 1:1.8 to 1:3; constructing high-pressure rotary jet piles at the bottom of the first foundation trench; Steel sheet piles are driven into the high-performance load transfer system area at the bottom of the first foundation trench, and the excavation is carried out to the designed height of the top surface of the prestressed high-strength concrete pipe piles. After the leveling work is completed, the second foundation trench is formed; prestressed high-strength concrete pipe piles are vertically constructed at the bottom of the second foundation trench; the underground continuous wall foundation on the upper part of the prestressed high-strength concrete pipe piles is arranged, and the prefabricated steel shell reinforced concrete force transfer system side panels are hoisted and installed to the top surface of the foundation, and compacted and backfilled to the height of the bottom surface of the first foundation trench to form the first backfill layer; the cushion layer is arranged, and the immersed tube tunnel is It is sunk to the surface of the cushion structure and backfilled to the top surface of the steel shell reinforced concrete force transmission system to form the second backfill layer; the top plate of the steel shell reinforced concrete force transmission system is hoisted and the structural steel bars are connected at the half point, and the pouring is completed to form the post-cast strip to form the final high-performance load transfer system area; the foundation backfill of the repaired breakwater is constructed on the upper part of the high-performance load transfer system area to form the third backfill layer; the breakwater foundation is arranged on the surface of the third backfill layer, the breakwater caisson is sunk, and the construction of the breakwater reinforcement layer is completed.

[0019] According to the construction method of the reinforcement system of the immersed tube tunnel under the breakwater of the embodiment of the present invention, the caisson of the rebuilt breakwater, the pipe segments of the immersed tube tunnel and the steel shell reinforced concrete force transmission system are prefabricated in the factory according to the preset size, the connecting steel bars of the rebuilt breakwater reinforcement layer and the steel shell reinforced concrete force transmission system are reserved, and the quality inspection and water injection test in the dock before the pipe segments of the immersed tube tunnel are undocking and floating are completed; the layout preparation before construction is carried out at the original breakwater position, the construction area is cleaned, and the original breakwater in the area affected by the immersed tube tunnel is demolished. After the demolition is completed, the surface silt in the construction area is removed and the seabed is leveled to delineate the high-performance load transfer system area, the foundation trench area, the cushion layer area and the immersed tube tunnel area; the seabed surface is sloped to form a first foundation trench; wherein the slope ratio of the first foundation trench excavation is 1:1.8 to 1:3; high-pressure rotary jet piles at the lower part of the immersed tube tunnel are constructed at the bottom of the first foundation trench; steel sheet piles are driven into the high-performance load transfer system area at the bottom of the first foundation trench, Excavate to the designed height of the top surface of the prestressed high-strength concrete pipe piles, and form the second foundation trench after completing the leveling work; construct prestressed high-strength concrete pipe piles vertically at the bottom of the second foundation trench; arrange the underground continuous wall foundation on the upper part of the prestressed high-strength concrete pipe piles, hoist and install the prefabricated steel shell reinforced concrete force transmission system side panels to the top surface of the foundation, and compact and backfill to the height of the bottom surface of the first foundation trench to form the first backfill layer; arrange the cushion layer, sink the immersed tube tunnel to the surface of the cushion layer structure and backfill to the top surface of the steel shell reinforced concrete force transmission system to form the second backfill layer; complete the hoisting of the top plate of the steel shell reinforced concrete force transmission system and the connection of the structural steel bars at the half point, and complete the pouring to form the post-casting strip to form the final high-performance load transfer system area; construct the foundation backfill of the repaired breakwater on the upper part of the high-performance load transfer system area to form the third backfill layer; arrange the breakwater foundation on the surface of the third backfill layer and sink the breakwater caisson, and complete the construction of the breakwater reinforcement layer. Therefore, this method can reduce the impact of the upper breakwater load and external additional load on the immersed tube tunnel, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, and protect the immersed tube tunnel. It can also effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0020] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic cross-sectional view of a reinforcement system for an immersed tunnel passing under a breakwater according to some embodiments of the present invention;

[0022] Figure 2 A schematic cross-sectional view of a steel shell reinforced concrete force transmission system according to some embodiments of the present invention;

[0023] Figure 3 is a schematic cross-sectional view of a cushion layer portion according to some embodiments of the present invention;

[0024] Figure 4 is a cross-sectional schematic diagram of a second backfill layer according to some embodiments of the present invention;

[0025] Figure 5 A schematic cross-sectional view of a reinforcement system for an immersed tube tunnel passing under a breakwater according to some embodiments of the present invention;

[0026] Figure 6 Schematic diagram of the overall structure of a reinforcement system for an immersed tunnel passing under a breakwater according to some embodiments of the present invention;

[0027] Figure 7 The present invention is a flowchart of a construction method of a reinforcement system for an immersed tube tunnel passing under a breakwater according to some embodiments of the present invention.

[0028] Description of reference numerals:

[0029] 13-first foundation trench, 16-second foundation trench, 6-prestressed high-strength concrete pipe piles, 5-underground continuous wall foundation, 18-high-pressure rotary jet piles, 15-cushion, 10-immersed tube tunnel, 4-steel shell reinforced concrete force transmission system, 9-breakwater foundation, 901-pile pipe, 902-water collecting hose, 903-pumping device, 2-breakwater reinforcement layer, 3-anti-scouring layer, 1-repaired breakwater, 101-caisson structure steel bars, 17-first backfill layer, 14-second backfill layer, 141-compacted backfill area, 142-locked backfill area, 12-third backfill layer, 201-reinforcement layer transverse steel bars, 202-reinforcement layer longitudinal steel bars, 151-several coarse sand and gravel platforms, 152-trench, 401-top plate, 402-side plate, 7-seawater layer, 8-geotextile and 11-foundation soil. DETAILED DESCRIPTION

[0030] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings.

[0031] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0032] In the process of realizing the present invention, the applicant discovered that there are currently few actual projects for solving the problem of immersed tube tunnels passing under breakwaters, and there is very little research on reinforcement technology for such working conditions. Therefore, in order to solve the problem of the bearing performance of immersed tube tunnels passing under breakwaters, it is urgent to find a method with high safety and simple construction.

[0033] The following describes, with reference to the accompanying drawings, a reinforcement system for an immersed tube tunnel passing under a breakwater and a construction method for the reinforcement system for an immersed tube tunnel passing under a breakwater proposed in an embodiment of the present invention.

[0034] refer to Figure 1 , is a schematic cross-sectional view of a reinforcement system for an immersed tunnel passing under a breakwater according to some embodiments of the present invention.

[0035] The immersed tube tunnel reinforcement system for passing under the breakwater provided by the present invention includes a first foundation trench 13, a second foundation trench 16, prestressed high-strength concrete pipe piles 6, an underground continuous wall foundation 5, high-pressure rotary jet piles 18, a cushion layer 15, an immersed tube tunnel 10, a steel shell reinforced concrete force transmission system 4, a breakwater foundation 9, a breakwater reinforcement layer 2 and a repaired breakwater 1.

[0036] The first foundation trench 13 is in an inverted trapezoidal shape, and the second foundation trench 16 is in a rectangular shape. The second foundation trench 16 is opened at the lower part of the bottom end of the first foundation trench 13, wherein the second foundation trench 16 is formed after rigid sheet piles are driven into the first foundation trench 13 and excavation is performed. During the excavation process, stiffening ribs are used as support structures to maintain the stability of the foundation pit. After the first backfill layer 17 is completed, the support structure and the rigid sheet piles are removed.

[0037] The high-performance load transfer system includes prestressed high-strength concrete piles 6, underground continuous wall foundation 5, and steel shell reinforced concrete force transfer system 4. The underground continuous wall foundation 5 is arranged in the second foundation trench 16. The underground continuous wall foundation 5 adopts a stepped arrangement, which is an amplified structure and plays a role in transferring and dispersing the load on the steel shell reinforced concrete force transfer system 4. The height-to-width ratio of the step is in the range of 0.3 to 0.6.

[0038] The prestressed high-strength concrete pipe pile 6 is vertically arranged at the lower part of the bottom end of the second foundation trench 13, and the prestressed high-strength concrete pipe pile 6 is vertically arranged at the lower part of the underground continuous wall foundation 5. The prestressed high-strength concrete pipe pile 6 is composed of a cylindrical pile body, an end plate and a steel sleeve, etc., wherein the diameter of the pipe pile is 1.0m, the wall thickness is 0.125m, the pile length is more than 25m, the concrete grade is C60 and above, and the replacement rate should be more than 50%.

[0039] The steel shell reinforced concrete force transmission system 4 is arranged in the first foundation trench 13 and is disposed on the underground continuous wall foundation 5 .

[0040] In some embodiments of the present invention, the steel shell reinforced concrete force transmission system 4 includes a top plate 401 and a side plate 402 . A concave platform is provided on the top of the side plate 402 , and the top plate 401 is mounted on the concave platform.

[0041] Specifically, refer to Figure 2 , is a cross-sectional schematic diagram of a steel shell reinforced concrete force transmission system according to some embodiments of the present invention, wherein the steel shell reinforced concrete force transmission system 4 comprises a top plate 401, a side plate 402 and a connection part, wherein the connection part may be a rigid support, a concave platform is provided on the top of the side plate 402, and the top plate 401 is erected on the concave platform. The top plate 401 and the side plate 402 are cast using self-compacting concrete, wherein the strength grade of the concrete is C50. During construction, the two side plates are first installed on the underground continuous wall foundation 5 through the connection part to ensure that the steel shell concrete force transmission system 4 is firmly connected to the foundation part. When the construction reaches the top surface of the second backfill layer 14, the top plate 401 is hoisted in place between the two side plates, the reserved structural steel bars at the positions of the two side plate corbels are firmly welded to the top plate 401, and self-compacting concrete is cast to complete the overall construction, and anti-corrosion coating is applied to the outside of the steel shell, and sacrificial anode protection measures are taken during the entire life cycle. By adopting the steel shell reinforced concrete force transmission system 4, it can have the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact when prefabricated in the factory.

[0042] The high-pressure jet grouting piles 18 are vertically arranged at the bottom of the first foundation trench 13 , the cushion layer 15 is laid on the high-pressure jet grouting piles 18 , and the immersed tube tunnel 10 is arranged on the cushion layer 15 .

[0043] In some embodiments of the present invention, the cushion layer 15 is provided with a plurality of coarse sand and gravel platforms 151 , and a trench 152 is provided between two adjacent coarse sand and gravel platforms 151 .

[0044] Specifically, refer to Figure 3 , is a schematic cross-sectional view of a cushion layer according to some embodiments of the present invention, wherein a cushion layer 15 is further arranged between the immersed tube tunnel 10 and the first foundation trench 13, the cushion layer 15 comprising a geotextile cushion layer on the upper surface of the bottom end of the first foundation trench 13 and a coarse sand and gravel cushion layer on the geotextile cushion layer, wherein the geotextile cushion layer is paved with a geotextile 8 having a tensile strength greater than 30 kN / m; the coarse sand and gravel cushion layer is formed by a plurality of coarse sand and gravel platforms 151 having a particle size in the range of 1 to 40 mm and a mud content less than 5%, the upper width of the plurality of coarse sand and gravel platforms 151 being in the range of 3.5 to 4.5 m, the height being in the range of 800 mm, the leveling error of the platform being less than ±20 mm, a trench 152 being arranged between two adjacent coarse sand and gravel platforms 151, and the spacing between the trenches 152 being in the range of 1.0 to 1.4 m.

[0045] A high-pressure jet-jet pile 18 is also provided at the lower end of the cushion layer 15. The distance between the high-pressure jet-jet piles 18 is in the range of 0.8 to 1.5 m, and the vertical ultimate bearing capacity of a single pile is not less than 1000 KN.

[0046] In some embodiments of the present invention, the outside of the underground continuous wall foundation 5 is a first backfill layer 17 .

[0047] Specifically, the outside of the underground continuous wall foundation 5 is a first backfill layer 17, and the first backfill layer 17 is well-assembled coarse sand.

[0048] In some embodiments of the present invention, the N-shaped area between the outer side of the immersed tube tunnel 10 and the inner wall of the steel shell reinforced concrete force transmission system 4 is the first backfill area, and the area between the two side walls of the steel shell reinforced concrete force transmission system 4 and the two side walls of the second foundation trench 16 is the second backfill area. The first backfill area and the second backfill area constitute the second backfill layer 14, and the second backfill layer 14 is sequentially distributed with a compaction backfill area and a locking backfill area from top to bottom.

[0049] Specifically, the N-shaped area between the outer side of the immersed tube tunnel 10 and the inner wall of the steel shell reinforced concrete force transmission system 4 is the first backfill area, and the area between the two side walls of the steel shell reinforced concrete force transmission system 4 and the two side walls of the first foundation trench 13 is the second backfill area. The first backfill area and the second backfill area constitute the second backfill layer 14. Figure 4, is a cross-sectional schematic diagram of the second backfill layer according to some embodiments of the present invention, wherein the second backfill layer 14 is sequentially distributed from top to bottom with a compaction backfill area 141 and a locking backfill area 142. The compaction backfill area 141 is backfilled with a mixture of crushed stone and sand, which is well-assembled, and the mud content of the crushed stone is not more than 5%; the locking backfill area 142 is backfilled with gravel, with a particle size in the range of 2 to 8 cm, a moisture content of 2%, a bulk density of 1.7 g / cm3, and a repose angle of 25°.

[0050] The breakwater foundation 9 is arranged at the top of the steel shell reinforced concrete force transmission system 4. The breakwater foundation 9 is in a stepped shape and is a grouting concrete structure. Before the construction of the third backfill layer 12, refer to Figure 5 , is a schematic cross-sectional view of a reinforcement system for an immersed tube tunnel under a breakwater according to some embodiments of the present invention. A thin water-collecting hose 902 is arranged on the construction surface. The diameter of the thin water-collecting hose 902 is in the range of 4 to 8 mm. After the construction of the third backfill layer 12 is completed, a hole is made on the top surface of the construction surface by a vibration method, and then buried in a pile pipe 901 with a circular hole on the side wall and a tapered lower end and an opening. The diameter of the circular hole is in the range of 0.1 to 0.4 m, the spacing is in the range of 0.1 to 0.2 m, the depth of the pile pipe 901 is in the range of 0.8 to 3.5 m, and the deeper the pile pipe 901 is buried, the greater the depth of the pile pipe 901 is, so as to ensure that the breakwater foundation 9 forms a stepped structure. A square arrangement is adopted to squeeze cement slurry into the foundation soil 11 layer by pressure. At the same time, a pumping device 903 is used to connect the thin water-collecting hose 902, and the seepage of cement slurry is accelerated by pumping water. After the grouting is completed, the pile pipe 901 is pulled out to finally form the breakwater foundation 9. The use of grouting in the foundation 9 of the breakwater can effectively enhance the strength of the soil, strengthen the surface strength of the sand and high-performance load transfer system, etc. It has the advantages of enhancing the bearing capacity of the foundation, enhancing the integrity of the foundation, preventing hydraulic erosion of the immersed tube tunnel 10, reducing the breakwater load, and enhancing the bearing capacity of the system.

[0051] Among them, the vibroflotation method refers to a foundation reinforcement method developed based on the principle that sandy soil foundations can be compacted by adding water and vibration. Later, it was used to set vibroflotation replacement gravel piles in clay layers. The vibroflotation method is a foundation reinforcement treatment method to improve poor foundations to meet the foundation requirements of buildings.

[0052] In some embodiments of the present invention, the area outside the breakwater foundation 9 and above the top of the second backfill layer 14 is the third backfill layer 12 .

[0053] Specifically, the area outside the breakwater foundation 9 and above the top of the second backfill layer 14 is the third backfill layer 12. The third backfill layer 12 is set by compacting and vibrating well-assembled sand layers, with each layer thickness ranging from 1 to 1.5 m, and an impermeable geotextile 8 is arranged between each layer, wherein vibration compaction refers to a type of foundation treatment method that uses blasting, tamping, extrusion and vibration to make the soil dense, increase the shear strength of the soil, and reduce the compressibility. Geotextile is a permeable geosynthetic material made of synthetic fibers through needle punching or weaving. Geotextile is one of the new geosynthetics. The finished product is in the form of cloth, generally with a width of 4 to 6 m and a length of 50 to 100 m. Geotextiles are divided into woven geotextiles and non-woven filament geotextiles.

[0054] refer to Figure 6 , is a schematic diagram of the overall structure of the immersed tube tunnel reinforcement system under the breakwater according to some embodiments of the present invention, the breakwater reinforcement layer 2 is arranged on the side of the repaired breakwater 1 to wrap the repaired breakwater 1, and the breakwater reinforcement layer 2 and the repaired breakwater 1 are arranged on the breakwater foundation 9.

[0055] In some embodiments of the present invention, the breakwater reinforcement layer 2 is provided with transverse reinforcement layer steel bars 201 and longitudinal reinforcement layer steel bars 202 that are staggered horizontally and vertically; the caisson structure of the breakwater reinforcement layer 2 is provided with caisson structure steel bars 101 that match the reinforcement layer transverse steel bars 201, and the breakwater reinforcement layer 2 and the repaired breakwater 1 are fixed by the caisson structure steel bars 101, the reinforcement layer transverse steel bars 201 and the reinforcement layer longitudinal steel bars 202.

[0056] Specifically, continue to refer to Figure 5 The breakwater reinforcement layer 2 is provided with transverse reinforcement layer steel bars 201 and longitudinal reinforcement layer steel bars 202 that are staggered horizontally and vertically. The transverse reinforcement layer steel bars 201 are used to fix the breakwater reinforcement layer 2 and the repaired breakwater 1 in the horizontal direction, and the longitudinal reinforcement layer steel bars 202 are used to fix the breakwater reinforcement layer 2 and the breakwater foundation 9 in the vertical direction.

[0057] The breakwater reinforcement layer 2 is covered with an anti-scour layer 3. The protective layer steel bars are first welded to the caisson structural steel bars 101 using a welding sleeve. The welding should meet the welding requirements. The embedded steel bar strength can be 500MPa. When arranging the spacing, the structural steel bars in the caisson are the same, and the steel bar diameter is in the range of 22 to 30mm. They are tied with the reinforcement layer longitudinal steel bars 202 to form a steel cage structure. By pouring high-performance concrete that is resistant to chloride ion penetration, a certain protective layer thickness is provided. Additional anti-corrosion measures are set on the outside of the concrete. Epoxy resin sealing paint and epoxy resin paint are applied to the bottom layer and the middle layer in turn. Among them, the epoxy resin paint of the middle layer should not be thinner than 300μm. The surface layers are coated with fluorocarbon topcoat, polysiloxane topcoat, polyurethane topcoat, acrylic resin paint and chlorinated rubber paint in turn.

[0058] In some embodiments of the present invention, the renovated breakwater 1 is located above the immersed tube tunnel 10 and passes through the immersed tube tunnel 10 at a preset angle in the longitudinal direction.

[0059] Furthermore, in some embodiments of the present invention, the preset angle ranges from 30° to 150°.

[0060] Specifically, the rebuilt breakwater 1 is located above the immersed tube tunnel 10. The rebuilt breakwater 1 is rebuilt after the construction of the immersed tube tunnel 10 is completed by excavating the original breakwater. The rebuilt breakwater 1 adopts a caisson structure. The prefabricated caisson should reserve connection ports for structural steel bars to construct the breakwater reinforcement layer 2 and be anti-corrosive treated before leaving the factory. The rebuilt breakwater 1 should adopt methods such as enlarging the bottom area and using lighter materials to reduce the load applied to the foundation, so as to effectively reduce the impact of the overlying load on the immersed tube tunnel 10, and the area should preferably be enlarged by 2 to 3 times, the width should be more than twice the original, and the longitudinal angle should cross the immersed tube tunnel 10 within the range of 30 to 150°.

[0061] In summary, the immersed tube tunnel reinforcement system under the breakwater according to the embodiment of the present invention includes a first foundation trench, a second foundation trench, prestressed high-strength concrete pipe piles, an underground continuous wall foundation, high-pressure rotary jet piles, a cushion layer, an immersed tube tunnel, a steel shell reinforced concrete force transmission system, a breakwater foundation, a breakwater reinforcement layer and a repaired breakwater; the first foundation trench is in an inverted trapezoidal shape, the high-pressure rotary jet piles are vertically arranged at the lower part of the bottom end of the first foundation trench, the second foundation trench is rectangular and is opened at the lower part of the bottom end of the first foundation trench, the prestressed high-strength concrete pipe piles are vertically arranged at the lower part of the bottom end of the second foundation trench, the underground continuous wall foundation is arranged in the second foundation trench, the steel shell reinforced concrete force transmission system is arranged in the first foundation trench and arranged on the underground continuous wall foundation, the cushion layer is laid on the high-pressure rotary jet piles, the immersed tube tunnel is arranged on the cushion layer, the breakwater foundation is arranged on the top upper part of the steel shell reinforced concrete force transmission system, the breakwater reinforcement layer is arranged on the side of the repaired breakwater, and the breakwater reinforcement layer and the repaired breakwater are arranged on the breakwater foundation. Therefore, without destroying the original breakwater function, the reinforcement system can reduce the impact of the upper breakwater load and external additional load on the immersed tube tunnel, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, and protect the immersed tube tunnel. It can also effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0062] refer to Figure 7 , which is a flow chart of a construction method of a reinforcement system for an immersed tube tunnel passing under a breakwater according to some embodiments of the present invention.

[0063] like Figure 7 As shown, the construction method of the immersed tube tunnel reinforcement system under the breakwater according to the embodiment of the present invention may include the following steps:

[0064] S701, prefabricate the rebuilt breakwater caisson, the pipe segments of the immersed tube tunnel and the steel shell reinforced concrete force transmission system in the factory according to the preset dimensions, reserve the connecting steel bars for the rebuilt breakwater reinforcement layer and the steel shell reinforced concrete force transmission system, and complete the quality inspection of the pipe segments of the immersed tube tunnel before floating out of the dock and the water injection test in the dock.

[0065] S702, prepare for the construction by laying out the lines at the original breakwater location, clean up the construction area, and demolish the original breakwater in the area affected by the immersed tube tunnel. After the demolition is completed, remove the surface silt in the construction area and level the seabed, delineate the high-performance load transfer system area, foundation trench area, cushion area and immersed tube tunnel area.

[0066] Among them, the demolition length should be a multiple of the length of the repaired breakwater caisson, the damage surface should be as flat as possible and should not damage other original breakwater caissons, and a construction connection area should be left at the interface.

[0067] S703, slope the seabed surface to form a first foundation trench; wherein the slope ratio of the first foundation trench excavation is 1:1.8 to 1:3.

[0068] S704: construct high-pressure jet grouting piles at the bottom of the immersed tube tunnel at the bottom of the first foundation trench.

[0069] S705: Drive steel sheet piles into the high-performance load transfer system area at the bottom of the first foundation trench, and excavate to the designed height of the top surface of the prestressed high-strength concrete pipe piles. After completing the leveling work, the second foundation trench is formed.

[0070] S706, construct prestressed high-strength concrete pipe piles vertically at the bottom of the second foundation trench.

[0071] S707, arrange the underground continuous wall foundation on the upper part of the prestressed high-strength concrete pipe piles, hang and install the prefabricated steel shell reinforced concrete force transmission system to the top surface of the foundation, and compact and backfill to the height of the bottom surface of the first foundation trench to form the first backfill layer.

[0072] S708, arrange the cushion layer, sink the immersed tube tunnel to the surface of the cushion layer structure and backfill to the top surface of the steel shell reinforced concrete force transmission system to form a second backfill layer.

[0073] S709, complete the hoisting of the top plate of the steel shell reinforced concrete force transfer system and the connection of the structural steel bars at the half point, and complete the pouring to form the post-cast joint, forming the final high-performance load transfer system area.

[0074] S710, construct and repair the foundation backfill of the breakwater in the upper part of the high-performance load transfer system area to form the third backfill layer.

[0075] S711: Arrange the breakwater foundation on the surface of the third backfill layer and sink the breakwater caisson, and complete the construction of the breakwater reinforcement layer.

[0076] Therefore, the method of using lightweight building materials and enlarging the bottom surface in the repaired breakwater area of ​​the present invention can reduce and disperse the upper load, and can effectively reduce the influence of the overlying load on the immersed tube tunnel. In addition, adding a protective layer on the outside of the repaired breakwater can effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. On the other hand, the use of high-performance concrete that resists chloride ion penetration can effectively protect the breakwater structure. Since the corrosion and erosion damage of marine buildings are mainly caused by chloride ions in seawater, such high-performance concrete is used. The use of a structural form that wraps the breakwater and the provision of an outer anti-scouring layer outside the protective layer can reduce the scouring of the soil caused by the presence of waves and currents at the bottom of the caisson, and can prevent the rollover of the breakwater. The use of grouting in the foundation part of the breakwater can effectively enhance the strength of the soil, strengthen the surface strength of the sand and high-performance load transfer system, and has the advantages of enhancing the bearing capacity of the foundation, enhancing the integrity of the foundation, preventing hydraulic erosion of the immersed tube tunnel, reducing the breakwater load, and enhancing the bearing capacity of the system.

[0077] The high-performance load transfer system adopts the method of steel shell reinforced concrete force transfer system, which can have the advantages of high safety, convenient construction, short construction period, no impact on navigation, and small environmental impact when prefabricated in the factory. In addition, steel shell reinforced concrete has the advantages of high strength and high integrity, and can effectively transfer the load of the overlying breakwater to the underground continuous wall foundation and prestressed high-strength concrete pipe piles to achieve the protection of the immersed tube tunnel. The existence of the high-performance load transfer system strengthens the strength of the foundation, ensures the stability of the soil in the area, can enhance the bearing capacity of the soft soil foundation, enhance the stability of the backfill layer, reduce the foundation settlement and uneven settlement, and has high construction reliability, mature anti-corrosion technology, can prevent hydraulic erosion of the immersed tube tunnel, increase the integrity and safety of the foundation, etc., to protect the immersed tube tunnel and prevent the immersed tube tunnel from becoming unstable and being destroyed. Both prestressed high-strength concrete pipe piles and high-pressure rotary jet grouting piles replace soft foundations and adopt a compaction construction method, which puts the foundation soil around the piles in a state of lateral compression, plays a compacting role on the foundation, and shares the load with the foundation soil and bears the force synergistically.

[0078] In summary, according to the construction method of the reinforcement system of the immersed tube tunnel under the breakwater of the embodiment of the present invention, the caisson of the rebuilt breakwater, the pipe segments of the immersed tube tunnel and the steel shell reinforced concrete force transmission system are prefabricated in the factory according to the preset size, the connecting steel bars of the rebuilt breakwater reinforcement layer and the steel shell reinforced concrete force transmission system are reserved, and the quality inspection and water injection test in the dock before the pipe segments of the immersed tube tunnel are undocking and floating are completed; the layout preparation before construction is carried out at the original breakwater position, the construction area is cleaned, and the original breakwater in the area affected by the immersed tube tunnel is demolished. After the demolition is completed, the surface silt in the construction area is removed and the seabed is leveled to delineate the high-performance load transfer system area, the foundation trench area, the cushion layer area and the immersed tube tunnel area; the seabed surface is sloped to form a first foundation trench; wherein the slope ratio of the first foundation trench excavation is 1:1.8 to 1:3; high-pressure rotary jet piles at the lower part of the immersed tube tunnel are constructed at the bottom of the first foundation trench; steel is driven into the high-performance load transfer system area at the bottom of the first foundation trench Sheet piles are constructed and excavated to the designed height of the top surface of the prestressed high-strength concrete pipe piles. After the leveling work is completed, the second foundation trench is formed; prestressed high-strength concrete pipe piles are constructed vertically at the bottom of the second foundation trench; the underground continuous wall foundation on the upper part of the prestressed high-strength concrete pipe piles is arranged, and the prefabricated steel shell reinforced concrete force transmission system is hoisted and installed to the top surface of the foundation, and compacted and backfilled to the height of the bottom surface of the first foundation trench to form the first backfill layer; the cushion layer is arranged, and the immersed tube tunnel is sunk to the surface of the cushion layer structure and backfilled to the top surface of the steel shell reinforced concrete force transmission system to form the second backfill layer; the top plate of the steel shell reinforced concrete force transmission system is hoisted and the structural steel bars are connected at the half point, and the pouring is completed to form a post-casting strip to form the final high-performance load transfer system area; the foundation backfill of the repaired breakwater is constructed on the upper part of the high-performance load transfer system area to form the third backfill layer; the breakwater foundation is arranged on the surface of the third backfill layer, and the breakwater caisson is sunk, and the construction of the breakwater reinforcement layer is completed. Therefore, this method can reduce the impact of the upper breakwater load and external additional load on the immersed tube tunnel, reduce the problem of uneven foundation settlement caused by uneven overlying loads, reduce the internal force and deformation of the immersed tube tunnel, and protect the immersed tube tunnel. It can also effectively strengthen the connection between the breakwater and the foundation soil, enhance the integrity, and ensure the safety of the repaired structure. It has the advantages of high safety, convenient construction, short construction period, no impact on navigation, and little environmental impact in factory prefabrication.

[0079] It should be noted that some embodiments of the present invention are described above. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0080] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0081] Although the spirit and principle of the present invention have been described with reference to several specific embodiments, it should be understood that the present invention is not limited to the disclosed specific embodiments, and the division of various aspects does not mean that the features in these aspects cannot be combined to benefit, and this division is only for the convenience of expression. The present invention is intended to cover various modifications and equivalent arrangements included in the spirit and scope of the attached claims. The scope of the attached claims conforms to the broadest interpretation, thereby including all such modifications and equivalent structures and functions.

Claims

1. A reinforcement system for an immersed tunnel under a breakwater, characterized in that: It comprises a first foundation trench (13), a second foundation trench (16), prestressed high-strength concrete pipe piles (6), an underground continuous wall foundation (5), high-pressure jet grouting piles (18), a cushion layer (15), an immersed tube tunnel (10), a steel shell reinforced concrete force transmission system (4), a breakwater foundation (9), a breakwater reinforcement layer (2), and a repaired breakwater (1); The first foundation trench (13) is in an inverted trapezoidal shape, the high-pressure jet grouting pile (18) is vertically arranged at the lower part of the bottom end of the first foundation trench (13), the second foundation trench (16) is rectangular and is opened at the lower part of the bottom end of the first foundation trench (13), the prestressed high-strength concrete pipe pile (6) is vertically arranged at the lower part of the bottom end of the second foundation trench (13), the underground continuous wall foundation (5) is arranged in the second foundation trench (16), and the steel shell reinforced concrete force transmission system (4) is arranged in the first foundation trench (16). 3) and arranged on the underground continuous wall foundation (5), the cushion layer (15) is laid on the high-pressure jet grouting piles (18), the immersed tube tunnel (10) is arranged on the cushion layer (15), the breakwater foundation (9) is arranged on the top of the steel shell reinforced concrete force transmission system (4), the breakwater reinforcement layer (2) is arranged on the side of the repaired breakwater (1), and the breakwater reinforcement layer (2) and the repaired breakwater (1) are arranged on the breakwater foundation (9).

2. The immersed tube tunnel reinforcement system under the breakwater according to claim 1 is characterized in that: The renovated breakwater (1) is located above the immersed tube tunnel (10) and longitudinally crosses the immersed tube tunnel (10) at a preset angle.

3. The immersed tube tunnel reinforcement system under the breakwater according to claim 2 is characterized in that: The preset angle ranges from 30° to 150°.

4. The immersed tube tunnel reinforcement system under the breakwater according to claim 1, characterized in that: The outside of the underground continuous wall foundation (5) is a first backfill layer (17).

5. The immersed tube tunnel reinforcement system under the breakwater according to claim 1, characterized in that: The N-shaped area between the outer side of the immersed tube tunnel (10) and the inner wall of the steel shell reinforced concrete force transmission system (4) is a first backfill area, and the area between the two side walls of the steel shell reinforced concrete force transmission system (4) and the two side walls of the first foundation trench (13) is a second backfill area. The first backfill area and the second backfill area constitute a second backfill layer (14), and the second backfill layer (14) is sequentially distributed with a compaction backfill area (141) and a locking backfill area (142) from top to bottom.

6. The immersed tube tunnel reinforcement system under the breakwater according to claim 5, characterized in that: The area outside the breakwater foundation (9) and above the top of the second backfill layer (14) is the third backfill layer (12).

7. The immersed tube tunnel reinforcement system under the breakwater according to claim 1, characterized in that: The breakwater reinforcement layer (2) is provided with reinforcement layer transverse steel bars (201) and reinforcement layer longitudinal steel bars (202) that are staggered in a horizontal and vertical manner; the caisson structure of the breakwater reinforcement layer (2) is provided with caisson structure steel bars (101) that match the reinforcement layer transverse steel bars (201); the breakwater reinforcement layer (2) and the repaired breakwater (1) are fixed by means of the caisson structure steel bars (101), the reinforcement layer transverse steel bars (201) and the reinforcement layer longitudinal steel bars (202).

8. The immersed tube tunnel reinforcement system under the breakwater according to claim 1, characterized in that: The cushion layer (15) is provided with a plurality of coarse sand and gravel platforms (151), and a trench (152) is provided between two adjacent coarse sand and gravel platforms (151).

9. The immersed tube tunnel reinforcement system under the breakwater according to claim 1, characterized in that: The steel shell reinforced concrete force transmission system (4) comprises a top plate (401) and a side plate (402), a concave platform is arranged on the top of the side plate (402), and the top plate (401) is mounted on the concave platform.

10. A construction method for a reinforcement system of an immersed tube tunnel passing under a breakwater, characterized in that: The immersed tube tunnel reinforcement system for underpass breakwater as claimed in claims 1 to 9 comprises the following steps: Prefabricate the caisson of the rebuilt breakwater, the pipe segments of the immersed tube tunnel and the steel shell reinforced concrete force transmission system in the factory according to the preset dimensions, reserve the connecting steel bars of the reinforcement layer of the rebuilt breakwater and the steel shell reinforced concrete force transmission system, and complete the quality inspection of the pipe segments of the immersed tube tunnel before floating out of the dock and the water injection test in the dock; Conduct pre-construction layout preparation at the original breakwater location, clean up the construction area, and dismantle the original breakwater in the area affected by the immersed tube tunnel. After the dismantling is completed, remove the surface silt in the construction area and level the seabed, delineate the high-performance load transfer system area, foundation trench area, cushion area and immersed tube tunnel area; The seabed surface is sloped to form a first foundation trench; wherein the slope ratio of the first foundation trench excavation is 1:1.8 to 1:3; Construct high-pressure jet grouting piles at the bottom of the first foundation trench for the lower part of the immersed tube tunnel; Drive steel sheet piles into the high-performance load transfer system area at the bottom of the first foundation trench, and excavate to the designed height of the top surface of the prestressed high-strength concrete pipe piles. After completing the leveling work, the second foundation trench is formed; Constructing prestressed high-strength concrete pipe piles vertically at the bottom of the second foundation trench; Arrange the underground continuous wall foundation on the upper part of the prestressed high-strength concrete pipe piles, hang and install the prefabricated steel shell reinforced concrete force transmission system side panels to the top surface of the foundation, and compact and backfill to the height of the bottom surface of the first foundation trench to form the first backfill layer; Arrange the cushion layer, sink the immersed tube tunnel to the surface of the cushion layer structure and backfill to the top surface of the steel shell reinforced concrete force transmission system to form the second backfill layer; Complete the hoisting of the top plate of the steel shell reinforced concrete force transfer system and the connection of the structural steel bars at the halfway point, and complete the pouring to form the post-cast strip to form the final high-performance load transfer system area; The foundation backfill of the repaired breakwater is constructed on the upper part of the high-performance load transfer system area to form the third backfill layer; The breakwater foundation is arranged on the surface of the third backfill layer, the breakwater caisson is sunk, and the construction of the breakwater reinforcement layer is completed.