Energy-saving high-rise building fabricated prefabricated part and construction method thereof
The sliding rod and lock tongue structure realizes quick connection in the prefabricated components, which solves the problem of high labor and time consumption of traditional connection methods, and improves the structural stability through snap-in components to adapt to the influence of subway vibration.
Patent Information
- Application Number
- CN202410823642.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-18
AI Technical Summary
The traditional prefabricated shear wall connection method requires a lot of manpower and time during the construction process, and is prone to loose connections due to subway vibrations, resulting in poor structural stability.
It adopts a sliding rod and lock tongue structure, realizes quick connection through lock holes and limit blocks, reduces bolt connections, improves construction efficiency, and fixes the position of the lock tongue through snap-in components to avoid loosening caused by concrete vibration.
It achieves rapid connection between prefabricated components, reduces manpower and time investment, improves connection stability, and reduces the impact of subway vibrations on the building.
Smart Images

Figure CN118793191A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to an energy-saving high-rise building assembled prefabricated component and a construction method thereof. Background Art
[0002] With the acceleration of urbanization, subway construction has become an important means to solve urban traffic problems. In order to make full use of land resources, high-rise buildings are usually built on top of subways. Since the subway will transmit vibrations when passing through, in this context, traditional construction methods have been unable to meet the needs of modern society for efficient and environmentally friendly buildings due to their inherent shortcomings, such as long construction period, high energy consumption, and serious pollution to the environment. Therefore, prefabricated buildings are gradually becoming a new trend in the construction industry with their significant advantages such as fast construction, simple quality control, and environmental friendliness.
[0003] Specifically, the patent with publication number CN116657794A discloses a method for connecting an extended steel all-bolt assembled shear wall. The patent utilizes components such as prefabricated walls, extended steel, high-strength bolts, channel steel frames, studs, and wall reinforcement skeletons. Compared with the wet connection method commonly used in traditional assembled shear walls, this solution has a higher degree of prefabrication, which means that all components can be prefabricated in the factory and then quickly assembled on site through bolt connections. This not only greatly reduces the pollution caused by on-site operations, but also saves a lot of manpower and time costs, which fully meets the requirements of the construction industry's transformation to green and high-quality development.
[0004] However, although the bolt connection method has obvious advantages in many aspects, a large number of bolt connection operations still require considerable manpower and time. In addition, when pouring concrete between two channel steel frames, the vibration process of the concrete can easily cause the bolts to loosen, resulting in poor connection effect and low structural stability.
[0005] In view of this, designing a quick connection structure to increase the connection speed between prefabricated components while avoiding loosening in the later stage and improving the connection stability of assembled prefabricated components has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0006] The present invention aims to provide an energy-saving high-rise building assembled prefabricated component and a construction method thereof to overcome the above-mentioned shortcomings.
[0007] In order to achieve the above-mentioned object, the first aspect of the present invention provides an energy-saving high-rise building assembled prefabricated component, comprising:
[0008] A grooved plate with two openings arranged back to back, the grooved plate being used to connect the prefabricated wall;
[0009] A web plate and a flange plate are fixedly connected in sequence on one side of the two groove plates, the groove plate, the web plate and the flange plate together form a goblet-shaped structure, the two flange plates are arranged opposite to each other and are evenly provided with oppositely arranged locking holes; and
[0010] A sliding rod is slidably connected to the lock hole, one end of the sliding rod is slidably connected to a lock tongue, and a limit block is arranged in the middle, the lock tongue and the limit block are selectively located on the same side of one of the flange plates, or are respectively clamped on both sides of the two flange plates.
[0011] Furthermore, it also includes:
[0012] The locking holes include a first locking hole and a second locking hole respectively arranged on one of the flange plates and the other of the flange plates; and
[0013] An unlocking component and a driving component, wherein the unlocking component selectively unlocks the locking tongue from one of the flange plates; and under the drive of the driving component, the sliding rod simultaneously passes through the first locking hole and the second locking hole, and the locking tongue and the limit block are respectively clamped on both sides of the two flange plates.
[0014] Furthermore, a plurality of first blind holes are arranged at one end of the sliding rod, a first elastic member is embedded in each of the plurality of first blind holes and a plurality of locking tongues are slidably connected thereto, the first elastic member is used to drive the locking tongue to move away from the first blind hole, an inclined surface is provided at one end of the locking tongue away from the first elastic member, and the inclined surface is inclined along the direction from the first lock hole to the second lock hole toward a direction close to the first blind hole.
[0015] Further, the unlocking component comprises:
[0016] an unlocking frame vertically slidingly passing through one of the flange plates, one end of the unlocking frame being fixedly connected to a first sliding pin, and
[0017] A first sliding groove is arranged on the side wall of the locking tongue protruding from the first blind hole, the first sliding pin is slidably connected to the first sliding groove, and when the unlocking frame slides with the flange plate, the inclined surface can be driven to be arranged opposite to or staggered with the first locking hole;
[0018] The drive assembly comprises:
[0019] A first housing fixedly connected to one of the flange plates and covering the periphery of the sliding rod, and
[0020] A second elastic member is installed in the first housing, and the second elastic member is used to drive the sliding rod to move toward the second locking hole.
[0021] Furthermore, the unlocking component comprises:
[0022] The inner wall of the first blind hole extends toward the center to form a fan-shaped extension plate, the extension plate and one of the flange plates are arranged in a stepped shape, the lock tongue is selectively snap-connected or slidably connected to the extension plate, and the extension plate is provided with a sliding hole, an unlocking rod is slidably connected in the sliding hole, and the length of the unlocking rod is equal to the thickness of the extension plate, and
[0023] A second blind hole is arranged on the bottom wall of the lock tongue opposite to the extension plate, a third elastic member is arranged in the second blind hole, and a key pin is slidably connected thereto, the third elastic member is used to drive the key pin to protrude out of the second blind hole and be embedded in the sliding hole, and the unlocking rod selectively causes the key pin to disengage from the sliding hole;
[0024] The drive assembly comprises:
[0025] A second housing fixedly connected to one of the flange plates and covering the periphery of the sliding rod,
[0026] The other end side wall of the sliding rod is provided with an inclined sliding groove, and the other end of the sliding rod is provided with a sliding end cover at intervals, the sliding end cover is slidably connected to the second shell body in a direction perpendicular to the flange plate, the edge of the sliding end cover extends toward the sliding rod to form a leg, the leg is provided with a second sliding pin, the second sliding pin is slidably connected to the sliding groove, and when the second sliding pin slides with the sliding groove, the inclined surface can be driven to be arranged opposite or staggered to the first locking hole, and
[0027] A fourth elastic member is installed in the second housing, and the fourth elastic member is used to drive the sliding end cover to move toward the second locking hole.
[0028] Furthermore, it also includes a clamping assembly, which is used to fix the locking tongue and the other flange plate when the locking tongue and the limiting block are clamped on both sides of the two flange plates.
[0029] Furthermore, the clamping assembly comprises:
[0030] Two clamping plates hinged at their upper ends to the other flange plate, two first magnets being mounted in one-to-one correspondence in the two clamping plates, the magnetic poles of the two first magnets facing each other being opposite, and a gap being arranged between the lower ends of the two clamping plates; and
[0031] The locking tongue protrudes from the top wall of the first blind hole and is provided with a locking groove, and a protrusion with a pointed end is formed in the locking groove. When the locking tongue slides with the other flange plate, the pointed end of the protrusion is used to separate the two snap-in plates and slide into the locking groove until the two snap-in plates are snap-fitted with the end face of the protrusion away from the pointed end.
[0032] Furthermore, the clamping assembly comprises:
[0033] A third blind hole is arranged on the lower surface of another flange plate, a fifth elastic member is arranged in the third blind hole, and a sliding sleeve is slidably connected thereto, the fifth elastic member is used to drive the sliding sleeve to be embedded in the third blind hole, and the sliding sleeve is made of a ferromagnetic material;
[0034] A fourth blind hole is arranged on the top wall of the locking tongue protruding from the first blind hole, a second magnet is arranged in the fourth blind hole, and the second magnet selectively attracts the sliding sleeve and is embedded in the fourth blind hole.
[0035] Furthermore, it also includes:
[0036] studs and vertical steel bars respectively vertically fixedly connected to the inner side wall and the inner bottom plate of the grooved plate, the studs and vertical steel bars being used to be embedded in the prefabricated wall; and
[0037] A reinforcing rib plate is vertically fixedly connected between the bottom plate, the web plate and the flange plate of the grooved plate, and circular holes are arranged on the reinforcing rib plate.
[0038] Compared with the prior art, the energy-saving high-rise building prefabricated components and construction methods thereof described in the present invention have the following advantages:
[0039] Before use, the locking tongue and the limit block of the sliding rod are located on the same side of the two flange plates. After the two flange plates are placed opposite each other, the locking holes are ensured to be relatively arranged, and the sliding rod is slid in the lock hole to pass through the two lock holes, and is respectively clamped on both sides of the two flange plates through the locking tongue and the limit block, thereby realizing the quick connection process of the two flange plates without the need for a large number of bolt connections, reducing the investment of manpower and time, and improving construction efficiency.
[0040] By using prefabricated construction methods, on-site wet work is reduced, and building deformation due to subway vibration can be avoided, thereby reducing the impact of subway operation on the building.
[0041] A second aspect of the present invention provides a construction method for energy-saving high-rise building prefabricated components, comprising the following steps:
[0042] Pre-embedding the grooved plate at one end or both ends of the prefabricated wall;
[0043] The prefabricated walls are assembled from bottom to top in sequence during installation, and the flange plates are arranged opposite to each other when adjacent prefabricated walls are connected;
[0044] The locking tongue and the limiting block are respectively clamped on both sides of the two flange plates by moving the sliding rod;
[0045] A formwork is set up between the two grooved plates and filled with concrete. After the concrete hardens, the formwork is removed to complete the vertical assembly connection of the prefabricated wall.
[0046] The advantages of the energy-saving high-rise building prefabricated components and their construction methods are the same as those of the above-mentioned energy-saving high-rise building prefabricated components and their construction methods over the prior art, which will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0048] Figure 1 This is a rendering of the use status of the first embodiment of the energy-saving high-rise building prefabricated component of the present invention;
[0049] Figure 2 This is a schematic diagram of the overall structure of the first embodiment of the energy-saving high-rise building prefabricated component of the present invention;
[0050] Figure 3 It is a cross-sectional view of the energy-saving high-rise building prefabricated component embodiment 1 of the present invention when two flange plates are in an unconnected state;
[0051] Figure 4 Another cross-sectional view of the energy-saving high-rise building prefabricated component embodiment 1 of the present invention when the two flange plates are in an unconnected state;
[0052] Figure 5 It is a schematic diagram of assembling two clamping plates of the present invention;
[0053] Figure 6 It is a schematic diagram of assembling two clamping plates of the present invention in another direction;
[0054] Figure 7 It is a cross-sectional view of the energy-saving high-rise building prefabricated component embodiment 1 of the present invention when two flange plates are in a connected state;
[0055] Figure 8 For the present invention Figure 7 A partial enlarged view of the middle A area;
[0056] Fig. 9 This is a rendering of the use status of the second embodiment of the energy-saving high-rise building prefabricated component of the present invention;
[0057] Fig.10This is a schematic diagram of the overall structure of Embodiment 2 of the energy-saving high-rise building prefabricated component assembly of the present invention;
[0058] Fig.11 It is a cross-sectional view of the two flange plates in the unconnected state in the second embodiment of the energy-saving high-rise building prefabricated component of the present invention;
[0059] Fig.12 For the present invention Fig.11 A partial enlarged view of the middle B area;
[0060] Fig.13 Another cross-sectional view of the energy-saving high-rise building prefabricated component embodiment 2 of the present invention when the two flange plates are in an unconnected state;
[0061] Fig.14 It is a cross-sectional view of two flange plates in a connected state in Embodiment 2 of the energy-saving high-rise building prefabricated component of the present invention;
[0062] Fig.15 Another cross-sectional view of the energy-saving high-rise building prefabricated component embodiment 2 of the present invention when two flange plates are in a connected state;
[0063] Fig.16 For the present invention Fig.15 A partial enlarged view of the middle C area.
[0064] Figure numerals: 1, prefabricated wall; 2, groove plate; 3, stud; 4, vertical reinforcement; 5, web; 6, reinforcing rib plate; 7, round hole; 8, flange plate; 9, first lock hole; 10, second lock hole; 11, sliding rod; 12, first blind hole; 13, first elastic member; 14, locking tongue; 15, limit block; 16, unlocking frame; 17, first sliding pin; 18, first slide groove; 19, first shell; 20, second elastic member; 21, extension Display board; 22, sliding hole; 23, unlocking rod; 24, second blind hole; 25, third elastic member; 26, key pin; 27, second shell; 28, sliding groove; 29, sliding end cover; 30, second sliding pin; 31, fourth elastic member; 32, snap-on plate; 33, first magnet; 34, locking groove; 35, protrusion; 36, third blind hole; 37, fifth elastic member; 38, sliding sleeve; 39, fourth blind hole; 40, second magnet. DETAILED DESCRIPTION
[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0066] To make the above objects, features, and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0067] Embodiment 1:
[0068] In high-rise buildings, reinforced concrete wall panels are used to replace the beams and columns in the frame structure to bear the internal forces caused by various loads and can effectively control the horizontal force acting on the structure. This structural form using reinforced concrete wall panels to bear vertical and horizontal forces is called a shear wall structure.
[0069] Referring to Figure 1-2 , the present invention provides, in a first aspect, an energy-saving prefabricated component for high-rise buildings, which is used to achieve the rapid connection between two adjacent shear walls. The specific structure includes a trough-shaped plate 2, a web 5, a flange plate 8, and a sliding rod 11. The cross-section of the trough-shaped plate 2 is in a "U" shape and is used to connect the precast wall 1, and the precast wall 1 is a shear wall. During use, the openings of the two trough-shaped plates 2 are arranged back to back and are respectively connected to the upper and lower precast walls 1; on one side adjacent to the two trough-shaped plates 2, a web 5 and a flange plate 8 are sequentially fixedly connected, and these three together form a goblet-shaped structure. The two flange plates 8 are arranged opposite to each other, and locking holes are uniformly arranged on the two flange plates 8 and are arranged opposite to each other. These locking holes are for facilitating subsequent connection operations; a sliding rod 11 is slidably connected in the locking holes, one end of the sliding rod 11 is slidably connected with a locking tongue 14, and a limiting block 15 is arranged in the middle. The locking tongue 14 and the limiting block 15 are selectively located on the same side of one of the flange plates 8, or are respectively clamped on both sides of the two flange plates 8.
[0070] Before use, the locking tongue 14 and the limiting block 15 of the sliding rod 11 are located on the same side of the two flange plates 8. After the two flange plates 8 are opposed to each other, ensure that the locking holes are arranged opposite to each other. Slide the sliding rod 11 in the locking holes so that it passes through the locking holes of the two flange plates 8, and further clamp the locking tongue 14 and the limiting block 15 on both sides of the two flange plates 8 respectively, so as to be able to realize the rapid connection process of the two flange plates 8. During use, a large number of bolt connections are not required, reducing the input of manpower and time and improving the construction efficiency.
[0071] By using the prefabricated construction method, the on-site wet operation work is reduced, and situations such as building deformation caused by subway vibration can be avoided, so as to reduce the impact of subway operation on building construction.
[0072] Referring to Figure 3-8As shown in the figure, the keyholes of the present invention include a first keyhole 9 and a second keyhole 10, which are respectively disposed on one of the flange plates 8 and the other flange plate 8. When the lock tongue 14 and the limit block 15 of the sliding rod 11 are on the same side of one of the flange plates 8, the unlocking assembly selectively unlocks the lock tongue 14 from one of the flange plates 8. The driving assembly is used to drive the sliding rod 11 to penetrate through the first keyhole 9 and the second keyhole 10 at the same time, and the lock tongue 14 and the limit block 15 are respectively clamped on both sides of the two flange plates 8. Thus, the whole process of connecting the two flange plates 8 is completed.
[0073] In the present invention, a plurality of first blind holes 12 are disposed at one end of the sliding rod 11. A first elastic member 13 is respectively embedded in each of these first blind holes 12 and slidably connected with a plurality of lock tongues 14. The function of the first elastic member 13 is to drive the lock tongue 14 to move away from the first blind hole 12. The first elastic member 13 is preferably a compression spring. An inclined surface is provided at one end of the lock tongue 14 away from the first elastic member 13. When the inclined surface faces the first keyhole 9, under the action of the driving assembly, the lock tongue 14 can be embedded in the first blind hole 12 against the elastic force of the first elastic member 13, so that the sliding rod 11 can pass through the first keyhole 9 and the second keyhole 10.
[0074] The unlocking assembly of the present invention includes an unlocking frame 16, a first sliding pin 17 and a first chute 18. Among them, the unlocking frame 16 is in a "U" shape. The two vertical rods of the unlocking frame 16 vertically penetrate through one of the flange plates 8. One ends of the two vertical rods of the unlocking frame 16 are fixedly connected with the first sliding pin 17. The first sliding pin 17 is located on the side of one of the flange plates 8 away from the other flange plate 8. An installation groove is disposed on the surface of one of the flange plates 8 close to the other flange plate 8. During the process of the two flange plates 8 approaching each other, the two vertical rods of the unlocking frame 16 can be driven to slide perpendicular to the flange plates 8. Finally, the cross bar of the unlocking frame 16 can be embedded in the installation groove. A first chute 18 is disposed on the side wall of the lock tongue 14 protruding from the first blind hole 12. The first sliding pin 17 is slidably connected with the first chute 18. When the unlocking frame 16 slides with the flange plate 8, it can drive the inclined surface to be opposite or misaligned with the first keyhole 9. The first chute 18 has the same inclination direction as the flange plate 8, and the included angle between the first chute 18 and the flange plate 8 is smaller than the included angle between the inclined surface and the flange plate 8.
[0075] It should be noted that in this embodiment, the sizes and shapes of the first keyhole 9 and the second keyhole 10 are the same and are oppositely arranged, and both the first keyhole 9 and the second keyhole 10 are adapted to the outer side wall size of the sliding rod 11.
[0076] Before use, the bottom wall of the lock tongue 14 protruding from the first blind hole 12 is clamped on the surface of one of the flange plates 8 away from the other flange plate 8, and the inclined surface is staggered with the first lock hole 9. When in use, the two flange plates 8 approach each other, driving the two vertical rods of the unlocking frame 16 to slide in the direction away from the other flange plate 8, and the first sliding pin 17 slides on the first sliding groove 18, which can drive the lock tongue 14 to gradually embed into the first blind hole 12, and further the inclined surface is arranged opposite to the first lock hole 9, and is gradually embedded in the first blind hole 12, so as to achieve the effect that the sliding rod 11 can pass through the first lock hole 9 and the second lock hole 10.
[0077] The driving assembly includes a first shell 19 and a second elastic member 20. The first shell 19 is fixedly connected to one of the flange plates 8 and is covered on the peripheral side of the sliding rod 11. The first shell 19 can be a cylindrical structure with an opening toward one of the flange plates 8. In addition, the first shell 19 can also be a semi-enclosed structure. The first shell 19 includes at least a top cover and a side wall; the second elastic member 20 is installed in the first shell 19. The function of the second elastic member 20 is to drive the sliding rod 11 to move toward the second lock hole 10. The second elastic member 20 is preferably a compression spring. The two ends of the second elastic member 20 are respectively connected to the top cover of the first shell 19 and the other end of the sliding rod 11.
[0078] After the two flange plates 8 are connected, concrete needs to be filled between the two grooved plates 2 to prevent the locking tongue 14 from retracting into the first blind hole 12 during the pouring or vibrating process of the concrete. The present invention is also provided with a clamping assembly to ensure that when the locking tongue 14 is clamped with the other flange plate 8, the position of the locking tongue 14 can be fixed to improve the stability of the connection between the two flange plates 8.
[0079] Preferably, the snap-on assembly includes two snap-on plates 32, whose upper ends are hinged to the other flange plates 8, and whose lower ends protrude from the end surface of the other flange plates 8 away from one of the flange plates 8. Two first magnets 33 are installed in the two snap-on plates 32 in a one-to-one correspondence, and the magnetic poles of the opposite surfaces of the two first magnets 33 are opposite, and a gap is provided between the lower ends of the two snap-on plates 32; a locking groove 34 is provided on the top wall of the lock tongue 14 protruding from the first blind hole 12, and a protrusion 35 with a pointed end is formed in the locking groove 34. When the lock tongue 14 slides with the other flange plates 8, the tip of the protrusion 35 separates the two snap-on plates 32 through the gap between the two snap-on plates 32 and slides into the locking groove 34 until the two snap-on plates 32 are snap-on with the end surfaces away from the tip of the protrusion 35.
[0080] In a specific embodiment of the present invention, the projection 35 is a triangle, one corner of the triangle faces the gap between the lower ends of the two clamping plates 32, and after the two clamping plates 32 contact one corner of the triangle, they gradually separate and slide into the locking groove 34, and further when sliding to the side corresponding to one corner of the triangle, the two clamping plates 32 are attracted together under the mutual attraction of the two first magnets 33, and abut against the side corresponding to one corner of the triangle, so that the locking tongue 14 can be limited. In addition, the projection 35 can also be selected from trapezoidal, regular polygonal, heart-shaped and other shapes.
[0081] Preferably, the inner wall of the grooved plate 2 of the present invention is vertically fixedly connected with bolts 3, and the provision of bolts 3 enhances the bonding force between the embedded components and the prefabricated wall 1, and ensures the connection strength. The inner bottom plate of the grooved plate 2 is fixedly connected with vertical steel bars 4, and the vertical steel bars 4 are used to be arranged in the prefabricated wall 1; the bottom plate, web plate 5 and flange plate 8 of the grooved plate 2 are vertically fixedly connected with reinforcing rib plates 6, and the purpose of this is to enhance the stability of the structure, and circular holes 7 are also arranged on the reinforcing rib plates 6, and the provision of circular holes 7 can achieve an interlocking effect between the reinforcing rib plates 6 and the concrete, and enhance the connection strength with the concrete.
[0082] Embodiment 2:
[0083] Reference Figure 9-16 The difference between this embodiment and the first embodiment lies in the different unlocking components, driving components and clamping structures.
[0084] The unlocking assembly includes an extension plate 21, an unlocking rod 23, a third elastic member 25 and a key pin 26. The inner wall of the first blind hole 12 extends toward the center to form the extension plate 21, which is in a fan-shaped arc shape. The extension plate 21 and one of the flange plates 8 are arranged in a stepped manner. The lock tongue 14 can be selectively snapped or slidably connected to the extension plate 21. The extension plate 21 is also provided with a sliding hole 22, in which the unlocking rod 23 is slidably connected, and the length of the unlocking rod 23 is equal to the thickness of the extension plate 21. A second blind hole 24 is provided on the bottom wall of the lock tongue 14 opposite to the extension plate 21, in which the third elastic member 25 is provided and slidably connected to the key pin 26. The function of the third elastic member 25 is to drive the key pin 26 to protrude from the second blind hole 24 and be embedded in the sliding hole 22, and the unlocking rod 23 can selectively make the key pin 26 escape from the sliding hole 22. Specifically, the third elastic member 25 is preferably a compression spring, and two ends of the third elastic member 25 are respectively connected to the end wall of the second blind hole 24 and the key pin 26 .
[0085] The driving assembly includes a second shell 27, a sliding end cover 29 and a fourth elastic member 31. The second shell 27 is fixedly connected to one of the flange plates 8 and is covered on the periphery of the sliding rod 11. The second shell 27 can be a cylindrical structure with an opening toward one of the flange plates 8. In addition, the second shell 27 can also be a semi-closed structure. The second shell 27 includes at least a top cover and side walls. An inclined sliding groove 28 is arranged on the side wall of the other end of the sliding rod 11, and a sliding end cover 29 is arranged at intervals on the other end of the sliding rod 11. The edge of the sliding end cover 29 extends downward to form a plurality of legs. The sliding end cover 29 can be slidably connected to the second shell body 27 in a direction perpendicular to the flange plate 8. A second sliding pin 30 is installed on the leg. The second sliding pin 30 is slidably connected to the sliding groove 28. At the same time, a vertical sliding groove is arranged on the inner wall of the second shell body 27. The second sliding pin 30 is slidably connected to the vertical sliding groove at the same time. When the second sliding pin 30 slides with the sliding groove 28, the inclined surface can be driven to be opposite to or staggered with the first lock hole 9; a fourth elastic member 31 is installed in the second shell body 27. The function of the fourth elastic member 31 is to drive the sliding end cover 29 to move toward the second lock hole 10. The fourth elastic member 31 is preferably a compression spring. The two ends of the fourth elastic member 31 are respectively connected to the top cover of the second shell body 27 and the sliding end cover 29.
[0086] Before use, the second blind hole 24 is arranged opposite to the sliding hole 22. At this time, the key pin 26 is embedded in the second blind hole 24 and the sliding hole 22 at the same time under the action of the third elastic member 25. One end of the unlocking rod 23 close to the other flange plate 8 protrudes from the end face of one of the flange plates 8. At this time, the locking tongue 14 is clamped on the extension plate 21. When in use, the two flange plates 8 are arranged opposite to each other. When the two flange plates 8 approach each other, the unlocking rod 23 is squeezed to move away from the other flange plate 8, further making the unlocking rod 23 completely embedded in the sliding hole 22, so that the key pin 26 can be completely embedded in the second blind hole 24. At this time, the lock tongue 14 can slide relatively along the extension plate 21. Under the action of the fourth elastic member 31, the sliding end cover 29 moves downward, and the second sliding pin 30 and the sliding groove 28 slide relative to each other, which can drive the sliding rod 11 to rotate, and further drive the inclined surface of the lock tongue 14 to slide to the first lock hole 9. At this time, the sliding rod 11 will slide toward the second lock hole 10, and the lock tongue 14 is gradually embedded in the first blind hole 12. After the sliding rod 11 passes through the second lock hole 10, the lock tongue 14 is disengaged from the first blind hole 12 under the action of the first elastic member 13. At this time, the lock tongue 14 is clamped with the other flange plate 8, and the limit block 15 is clamped with one of the flange plates 8, thereby realizing the connection process of the two flange plates 8.
[0087] The clamping assembly in this embodiment includes the following structure:
[0088] A third blind hole 36 is provided on the lower surface of the other flange plate 8, a fifth elastic member 37 is provided in the third blind hole 36, and a sliding sleeve 38 is slidably connected thereto. The fifth elastic member 37 drives the sliding sleeve 38 to be embedded in the third blind hole 36. The fifth elastic member 37 is preferably a tension spring, and the sliding sleeve 38 is made of ferromagnetic material. A fourth blind hole 39 is provided on the top wall of the lock tongue 14 protruding from the first blind hole 12, a second magnet 40 is provided in the fourth blind hole 39, and the second magnet 40 can selectively attract the sliding sleeve 38 and is embedded in the fourth blind hole 39.
[0089] Before use, the sliding sleeve 38 is embedded in the third blind hole 36 under the action of the fifth elastic member 37. When the lock tongue 14 slides on the lower surface of the other flange plate 8, when the fourth blind hole 39 is opposite to the third blind hole 36, the second magnet 40 attracts the sliding sleeve 38 to be embedded in the fourth blind hole 39, so as to achieve the effect of fixing the lock tongue 14 and the groove plate 2.
[0090] It should be understood that the unlocking components, driving components and snap-on structures in Embodiment 1 and Embodiment 2 having the same use effect can be used interchangeably, that is, the unlocking components, driving components of Embodiment 1 and the snap-on structure of Embodiment 2 can be combined into a new embodiment, or the unlocking components, driving components of Embodiment 2 and the snap-on structure of Embodiment 1 can be combined into another new embodiment.
[0091] The second aspect of the present invention provides a construction method based on the above-mentioned energy-saving high-rise building prefabricated components, comprising the following steps:
[0092] First, the groove plate 2 is embedded in one or both ends of the prefabricated wall 1. The prefabricated wall 1 is prefabricated in the factory. Taking the prefabricated wall 1 as a shear wall as an example, the longitudinal reinforcement of the shear wall is welded to the vertical reinforcement 4, and then concrete is poured to embed the groove plate 2 in the shear wall. It should be understood that when the groove plate 2 is prefabricated at one end of the shear wall, it is a construction environment where the upper end or the lower end of the shear wall does not need to be connected. When the prefabricated groove plates 2 are installed at both ends of the shear wall, the shear wall is the middle construction part at this time, and the two ends need to be connected to other shear walls;
[0093] Then, the prefabricated walls 1 are assembled from bottom to top, and the flange plates 8 are arranged opposite to each other when adjacent prefabricated walls 1 are connected;
[0094] Next, the sliding rod 11 is moved so that the locking tongue 14 and the limiting block 15 are respectively engaged with the two sides of the two flange plates 8, thereby realizing the connection process of the two flange plates 8;
[0095] Finally, a formwork is set between the two grooved plates 2 and filled with concrete. After the concrete hardens, the formwork is removed to complete the vertical assembly connection of the shear wall.
[0096] The construction method of the energy-saving high-rise building prefabricated components has the same advantages as the above-mentioned energy-saving high-rise building prefabricated components over the prior art, and will not be repeated here.
[0097] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0098] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. An energy-saving high-rise building prefabricated component, characterized in that: include: Two grooved plates (2) with openings arranged back to back, the grooved plates (2) being used to connect the prefabricated wall (1); A web plate (5) and a flange plate (8) are fixedly connected in sequence on the adjacent sides of the two groove plates (2), the groove plates (2), the web plate (5) and the flange plate (8) together form a goblet-shaped structure, and the two flange plates (8) are arranged opposite to each other and are evenly provided with oppositely arranged locking holes; as well as A sliding rod (11) is slidably connected to the lock hole, one end of the sliding rod (11) is slidably connected to a locking tongue (14), and a limiting block (15) is arranged in the middle, and the locking tongue (14) and the limiting block (15) are selectively located on the same side of one of the flange plates (8), or are respectively clamped on both sides of the two flange plates (8).
2. The energy-saving high-rise building prefabricated component according to claim 1 is characterized in that: Also includes: The locking hole comprises a first locking hole (9) and a second locking hole (10) which are respectively arranged on one of the flange plates (8) and the other of the flange plates (8); as well as An unlocking assembly and a driving assembly, wherein the unlocking assembly selectively unlocks the locking tongue (14) from one of the flange plates (8); And under the drive of the driving component, the sliding rod (11) simultaneously passes through the first locking hole (9) and the second locking hole (10), and the locking tongue (14) and the limiting block (15) are respectively clamped on the two sides of the two flange plates (8).
3. The energy-saving high-rise building prefabricated component according to claim 2 is characterized in that: A plurality of first blind holes (12) are arranged at one end of the sliding rod (11), and a first elastic member (13) is embedded in each of the plurality of first blind holes (12) in correspondence with each other and is slidably connected with a plurality of locking tongues (14), and the first elastic member (13) is used to drive the locking tongue (14) to move in a direction away from the first blind hole (12), and an inclined surface is provided at one end of the locking tongue (14) away from the first elastic member (13), and the inclined surface is inclined along the direction from the first locking hole (9) to the second locking hole (10) toward a direction close to the first blind hole (12).
4. The energy-saving high-rise building prefabricated component according to claim 3 is characterized in that: The unlocking component comprises: an unlocking frame (16) vertically slidingly penetrating one of the flange plates (8), one end of the unlocking frame (16) being fixedly connected to a first sliding pin (17), and The locking tongue (14) protrudes from the side wall of the first blind hole (12) and is provided with a first sliding groove (18); the first sliding pin (17) is slidably connected to the first sliding groove (18); when the unlocking frame (16) and the flange plate (8) slide, the inclined surface can be driven to be arranged opposite to or staggered with the first locking hole (9); The drive assembly comprises: a first housing (19) fixedly connected to one of the flange plates (8) and covering the circumference of the sliding rod (11); and A second elastic member (20) is installed in the first housing (19), and the second elastic member (20) is used to drive the sliding rod (11) to move towards the second locking hole (10).
5. The energy-saving high-rise building prefabricated component according to claim 3 is characterized in that: The unlocking component comprises: The inner wall of the first blind hole (12) extends toward the center to form an extension plate (21) in a fan-shaped shape, the extension plate (21) and one of the flange plates (8) are arranged in a step-like manner, the lock tongue (14) is selectively snap-connected or slidably connected to the extension plate (21), and the extension plate (21) is provided with a sliding hole (22), and an unlocking rod (23) is slidably connected in the sliding hole (22), and the length of the unlocking rod (23) is equal to the thickness of the extension plate (21), and A second blind hole (24) is arranged on the bottom wall of the lock tongue (14) opposite to the extension plate (21), a third elastic member (25) is arranged in the second blind hole (24), and a key pin (26) is slidably connected thereto, the third elastic member (25) is used to drive the key pin (26) to protrude out of the second blind hole (24) and be embedded in the sliding hole (22), and the unlocking rod (23) selectively allows the key pin (26) to escape from the sliding hole (22); The drive assembly comprises: A second housing (27) is fixedly connected to one of the flange plates (8) and covers the circumference of the sliding rod (11). The side wall of the other end of the sliding rod (11) is provided with an inclined sliding groove (28), and the other end of the sliding rod (11) is provided with a sliding end cover (29) at intervals, the sliding end cover (29) is slidably connected to the second shell (27) in a direction perpendicular to the flange plate (8), the edge of the sliding end cover (29) extends toward the sliding rod (11) to form a leg, and a second sliding pin (30) is installed on the leg, the second sliding pin (30) is slidably connected to the sliding groove (28), and when the second sliding pin (30) slides with the sliding groove (28), it can drive the inclined surface and the first lock hole (9) to be arranged opposite or staggered, and A fourth elastic member (31) is installed in the second housing (27), and the fourth elastic member (31) is used to drive the sliding end cover (29) to move towards the second locking hole (10).
6. The energy-saving high-rise building prefabricated component according to any one of claims 1 to 5, characterized in that: It also comprises a clamping assembly, which is used to fix the locking tongue (14) and the other flange plate (8) when the locking tongue (14) and the limiting block (15) are clamped on both sides of the two flange plates (8).
7. The energy-saving high-rise building prefabricated component according to claim 6 is characterized in that: The clamping assembly comprises: Two clamping plates (32) whose upper ends are hinged to the other flange plate (8), two first magnets (33) are mounted in the two clamping plates (32) in a one-to-one correspondence, the magnetic poles of the two first magnets (33) facing each other are opposite, and a gap is arranged between the lower ends of the two clamping plates (32); and The locking tongue (14) protrudes from the top wall of the first blind hole (12) and is provided with a locking groove (34). A protrusion (35) with a pointed end is formed in the locking groove (34). When the locking tongue (14) slides with the other flange plate (8), the pointed end of the protrusion (35) is used to separate the two clamping plates (32) and slide into the locking groove (34) until the two clamping plates (32) are clamped with the end faces of the protrusion (35) away from the pointed end.
8. The energy-saving high-rise building prefabricated component according to claim 6 is characterized in that: The clamping assembly comprises: A third blind hole (36) is arranged on the lower surface of the other flange plate (8), a fifth elastic member (37) is arranged in the third blind hole (36), and a sliding sleeve (38) is slidably connected thereto, the fifth elastic member (37) is used to drive the sliding sleeve (38) to be embedded in the third blind hole (36), and the sliding sleeve (38) is made of a ferromagnetic material; The locking tongue (14) protrudes from the top wall of the first blind hole (12) and is provided with a fourth blind hole (39). A second magnet (40) is provided in the fourth blind hole (39). The second magnet (40) selectively attracts the sliding sleeve (38) and is embedded in the fourth blind hole (39).
9. The energy-saving high-rise building prefabricated component according to claim 1 is characterized in that: Also includes: studs (3) and vertical steel bars (4) respectively vertically fixedly connected to the inner side wall and the inner bottom plate of the grooved plate (2), the studs (3) and vertical steel bars (4) being used to be embedded in the prefabricated wall (1); and A reinforcing rib plate (6) is vertically fixedly connected between the bottom plate, the web plate (5) and the flange plate (8) of the grooved plate (2), and circular holes (7) are arranged on the reinforcing rib plate (6).
10. The construction method of energy-saving high-rise building prefabricated components according to any one of claims 1 to 9, characterized in that: The following steps are involved: Pre-embedding the grooved plate (2) at one end or both ends of the prefabricated wall (1); The prefabricated walls (1) are assembled sequentially from bottom to top during installation, and the flange plates (8) are arranged opposite to each other when adjacent prefabricated walls (1) are connected; The locking tongue (14) and the limiting block (15) are respectively clamped on both sides of the two flange plates (8) by moving the sliding rod (11); A template is set between the two grooved plates (2), and concrete is filled inside the template. After the concrete hardens, the template is removed to complete the vertical assembly connection of the prefabricated wall (1).