Simulation geological block for tunneling and blasting machine test and test method
Through the simulated geological block combined with the integrated rock core and concrete, combined with blasting and pouring technology, the problem of high cost and environmental inaccessibility of traditional test methods has been solved, and the feasibility of the hollow cutterhead excavation scheme after the central core is pre-split has been verified. Improved the tunneling efficiency of the tunnel blasting machine.
Patent Information
- Application Number
- CN202411113077.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-18
AI Technical Summary
During the tunnel blasting machine test, the traditional simulated geological block test method has the problems of high transportation and procurement costs, the environment is not close to the actual construction environment, and it is difficult to effectively compare the efficiency of hollow cutterhead tunneling and first blasting and then tunneling conditions.
A simulated geological block composed of an integral rock core and concrete is used. By pre-splitting the core and setting up a support frame around it, blasting and pouring concrete are combined to form a test simulated geological block, which is used to verify the tunneling efficiency of the tunnel blasting machine.
The test cost was reduced, the geological environment was ensured to be close to the actual construction environment, and the feasibility of the hollow cutterhead excavation scheme after the central core was pre-split was verified by comparing the data of the two working conditions, and the excavation efficiency was improved by about 30%.
Smart Images

Figure CN118794772A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of excavation and blasting machine construction, and in particular to a simulated geological block for excavation and blasting machine testing. and its test methods. Background Art
[0002] During the test of the new equipment excavation and blasting machine, there are three working condition test requirements, namely, hollow cutter disc excavation working condition, hollow cutter disc blasting before excavation working condition, and full-section excavation working condition. During the test, the researchers found that there is an intermediate working condition between the hollow cutter disc excavation and the hollow cutter disc blasting before excavation working conditions, which may improve the efficiency of the future construction of the excavation and blasting machine. This intermediate working condition is to pre-split the core of the face and then use the hollow cutter disc for excavation.
[0003] There are two ways to provide simulated geological blocks for traditional tunneling tests. One is to directly drag the equipment to the actual construction site for tests under different working conditions. This method has great uncertainty in transportation, tools, manpower, mechanical equipment, etc. when the tunneling and blasting machine technology is not fully mature. The test cost is difficult to control. If the on-site problems are difficult to control, the test may be interrupted. The second method is to collect at least 2 pieces of integral granite blocks with a volume of more than 5.5m*4.5m*5.5m, and then support them in preparation for the test. This method has better control over all aspects of the tunneling and blasting machine equipment whose technology is not yet fully mature. However, the procurement cost of such a huge granite is extremely high, the transportation cost is extremely high, and the lifting of the stones also poses a huge challenge. Summary of the invention
[0004] The object of the present invention is to provide a simulated geological block and a test method for excavator testing, which can not only solve the problem that excavator equipment needs to be tested in a specific environment, but also reduce the test cost under the condition of ensuring that the geological environment is as close as possible to the actual construction environment.
[0005] The present invention is achieved in that: The present invention provides a simulated geological block for testing an excavator, which is characterized in that it comprises an integral rock core and a rock core buttress for supporting the integral rock core, a cast concrete layer is arranged around the rock core, the cast concrete layer and the rock core are integrally combined into a simulated geological block for testing, and a support frame is arranged outside the cast concrete.
[0006] According to the above technical solution, the core is a pre-splitting core.
[0007] According to the above technical solution, the rock core adopts a square block rock core, and its minimum cross-sectional size takes the central cutter disc as the inscribed circle.
[0008] A method for testing a simulated geological block for a digging and blasting machine test, characterized in that the test method comprises the following steps: S1. Select two granite rocks of the same size and label them as rock No. 1 and rock No. 2 respectively; S2, blasting pre-cracks the rock No. 2 to make it incompletely broken. The test requires that the diameter of the broken circle is smaller than the side length of the rock; S3, the monolithic rock No. 1 and the pre-cracked rock No. 2 are supported inside the protective support, poured with concrete, and cured to form the simulated geological blocks for the excavation and blasting machine test as described above; S4. Conduct excavation test on rock No. 1 using an excavator with a hollow cutter disc, with an excavation depth of N meters, where N is greater than or equal to 1 meter, and record the excavation test data; S5. A tunneling test was conducted on rock No. 2 using a tunneling blaster with a hollow cutter disc. The tunneling depth was also N meters. Other parameters and conditions were completely consistent with the tunneling test data for rock No. 1. S5. Comparative analysis of the two test conditions data in steps S4 and S5 verifies the feasibility of the plan of pre-splitting the central core followed by hollow cutter head excavation, and obtains the pre-splitting method and required parameters for advanced pre-splitting within a fixed radius of the core.
[0009] According to the above technical solution, in step S3, when pouring concrete, it is poured in two times. The first pouring is to the middle of the rock, and the rock positioning size is measured to be within the tolerance range, and then the second pouring is carried out.
[0010] According to the above technical solution, in step S3, when pouring concrete, it is poured in two times. The first pouring is to the middle of the rock, and the rock positioning size is measured to be within the tolerance range, and then the second pouring is carried out.
[0011] According to the above technical solution, in step S2, when the blasting fracturing only occurs inside rock No. 2, it not only forms an enlarged cavity at the charge, but also forms a crushing circle, a crack circle and a vibration circle. The test requires that the diameter of the vibration circle is smaller than the side length of the rock. The radius of the charge hole is calculated through the boundary conditions of the vibration circle and the stress wave action: 1) The calculation formula of the vibration circle radius is as follows: (1) Where: is the radius of the vibration circle, in m; is the Poisson's ratio of the rock; is the initial radial stress peak value of the stress wave, in MPa; is the tensile strength of rock, in MPa; is the attenuation coefficient of the stress wave, =2- / (1- ); is the blasthole radius, in m; If the radius of the vibration circle is known, the formula for calculating the radius of the blasthole is as follows: =r / [ ] (2) 2) Initial radial stress peak of the stress wave of the uncoupled charge The calculation formula is: (3) Where: is the charge density kg / m; is the explosion speed of the explosive, in m / s; is the radius of the charge, in mm; n is the multiple of the pressure increase, usually 8 to 11; is the charge length, in mm; is the depth of the blasthole in mm.
[0012] Note: In formula (3) , 、n、 etc. are all known fixed values; and The initial value of is an empirical value. Based on the empirical value, the initial radial stress peak value is calculated. .
[0013] Formula (2) is derived from formula (1) by reverse deduction, where , , , , etc. are all known fixed values, so the blasthole radius can be calculated according to formula (2). , The value of the test is used to drill holes, and the experiment results in the final charge length that meets the overall experimental needs. The test records provide data support for subsequent actual excavation and blasting construction.
[0014] The beneficial effects of the present invention are: 1. The method of central core and concrete casting can not only solve the problem that the excavator equipment needs to be tested in a specific environment, but also reduce the test cost while ensuring that the geological environment is as close as possible to the actual construction environment, which is more efficient and energy-saving.
[0015] 2. Solve the problems existing in the traditional solution. With the lowest investment and the most suitable test environment, complete the comparison of the tunneling efficiency of the excavator under the condition of central core pre-cracking and the condition of central core non-pre-cracking with the hollow cutter disc. Verify that in the construction of the hollow cutter disc of the excavator, the advanced pre-cracking condition improves the construction efficiency by 30% compared with the overall working condition of the face, which is more efficient and energy-saving. It also further verifies the feasibility of the scheme of pre-cracking the central core first and then the hollow cutter disc excavation. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 A front view of a simulated geological block for testing an excavator and blaster provided in an embodiment of the present invention.
[0018] Figure 2 A side view of a simulated geological block for testing an excavator and blaster according to an embodiment of the present invention.
[0019] Figure 3 A side view of a simulated geological block for testing an excavator and blaster according to an embodiment of the present invention.
[0020] Figure 4 A schematic diagram of the cross section of an integral core provided in an embodiment of the present invention.
[0021] Figure 5 A schematic diagram of a cross section of a pre-splitting core provided in an embodiment of the present invention.
[0022] Figure 6 A schematic diagram of rock fracturing provided by an embodiment of the present invention.
[0023] Figure 7 A comparison chart of cutter head penetration and excavation speed between working conditions 1 and 2 provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0025] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0027] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the product of the application is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0028] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0029] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0031] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.
[0032] like Figure 1-5 As shown, this embodiment provides a simulated geological block for excavation and blasting machine testing, including an integral rock core 1, a core pier 6 for supporting the integral rock core, a C30 cast concrete layer 2 is provided around the rock core 1, the cast concrete layer 2 and the rock core are combined as a whole to form a simulated geological block for testing, and a support frame is provided on the periphery of the cast concrete, the support frame includes a left support member 3, a right support member 4, and a tunneling reaction force support 5, and the support frame is used to fix the simulated geological block. In this embodiment, the rock core adopts a square block rock core, and its minimum cross-sectional size is an inscribed circle with the center cutter head, and preferably a granite rock of 1.5m*1.5m*2.7m is selected. The volume of the simulated geological block finally formed exceeds 5.5m*4.5m*5.5m. Among them, the integral rock core can be a pre-cracked rock core.
[0033] This embodiment also provides a method for conducting a comparative test on a simulated geological block for a digging and blasting machine test, comprising the following steps: S1. Select two granite rocks of the same size and label them as rock No. 1 and rock No. 2 respectively, where both rocks are monolithic rocks; S2. Pre-crack the rock No. 2 by blasting so that it is not completely broken. Small-scale multiple blasting is performed, and the fracture effect is expected to be achieved through cumulative damage. When the blasting fracture only occurs inside the rock, it not only forms an expanded cavity 7 at the charge, but also forms a crushing circle 8, a crack circle 9 and a vibration circle 10. The test requires that the diameter of the vibration circle is smaller than the side length of the rock. The radius of the charge hole 11 is calculated through the boundary conditions of the vibration circle and the stress wave action: 1) The calculation formula of the vibration circle radius is as follows: (1) Where: is the radius of the vibration circle, in m; is the Poisson's ratio of the rock; is the initial radial stress peak value of the stress wave, in MPa; is the tensile strength of rock, in MPa; is the attenuation coefficient of the stress wave, =2- / (1- ); is the radius of the blasthole, in m.
[0034] If the radius of the vibration circle is known, the formula for calculating the radius of the blasthole is as follows: =r / [ ] (2) 2) Initial radial stress peak of the stress wave of the uncoupled charge The calculation formula is: (3) Where: is the charge density kg / m; is the explosion velocity of the explosive, in m / s; is the radius of the charge, in mm; n is the multiple of the pressure increase, usually 8 to 11; is the charge length, in mm; is the depth of the blasthole in mm.
[0035] Note: In formula (3) , 、n、 etc. are all known fixed values; and The initial value of is an empirical value. Based on the empirical value, the initial radial stress peak value is calculated. .
[0036] Formula (2) is derived from formula (1) by reverse deduction, where , , , , etc. are all known fixed values, so the blasthole radius can be calculated according to formula (2). , The value of the test is used to drill holes, and the experiment results in the final charge length that meets the overall experimental needs. The test records provide data support for subsequent actual excavation and blasting construction.
[0037] S3, the integral rock No. 1 and the pre-cracked rock No. 2 are supported inside the protective support, and concrete is poured. After qualified curing, the above-mentioned simulated geological blocks are formed. Among them, the positioning of the rock block after pouring is similar to that of a concealed project, so it is poured twice, the first time to the middle of the rock; the second pouring is carried out after the rock positioning size is measured to be within the tolerance range. Avoid the change of the position of the central rock block caused by one-time pouring; S4. Use a blasting machine with a hollow cutter disc to conduct excavation tests on rock No. 1, with an excavation depth of 2 meters, and record the excavation test data, which is called working condition 1 in this test; S5. A tunneling test was conducted on rock No. 2 using a tunneling blaster with a hollow cutter disc. The tunneling depth was also 2 meters. Other parameters and conditions were completely consistent with the tunneling test data of rock No. 1. This test is called working condition 2. S5, such as Figure 6 As shown in the figure, the two test working condition data in steps S4 and S5 are compared and analyzed. According to the comparison of the data in the two tables, when the cutter head torque is 65KN / m and the rotation speed is 6r / m, the excavation speed of working condition 1 is 14mm / min and the penetration reaches 2.3mm / r; the excavation speed of working condition 2 reaches 18mm / min and the penetration reaches 3mm / r. After the central core is pre-splitting, the advancement efficiency is improved by 30%, which verifies the feasibility of the plan of pre-splitting the central core first and then the hollow cutter head excavation, and obtains the pre-splitting method and required parameters of the advanced pre-splitting within the fixed radius of the core.
[0038] The beneficial effects achieved by the present invention are as follows: 1. Through the method of casting the center core with concrete, it can not only solve the problem that the excavation and blasting machine equipment needs to be tested under a specific environment, but also reduce the test cost under the condition of ensuring that the geological environment is as close as possible to the actual construction environment. 2. The feasibility of the plan of pre-cracking the center core and then excavating with the hollow cutter disc has been verified. 3. The problems existing in the traditional plan are solved, and with the lowest investment and the most suitable test environment, the excavation efficiency of the excavation and blasting machine with the hollow cutter disc under the condition of pre-cracking the center core and the condition of not pre-cracking the center core is compared. It is verified that in the construction of the hollow cutter disc of the excavation and blasting machine, the advanced pre-cracking condition improves the construction efficiency by 30% compared with the overall working condition of the face, which is more efficient and energy-saving.
[0039] The embodiments described above are part of the embodiments of the present invention, rather than all of the embodiments. The detailed description of the embodiments of the present invention is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
Claims
1. A simulated geological block for excavation and blasting machine testing, It is characterized in that The invention comprises an integral rock core and a rock core buttress for supporting the integral rock core. A cast concrete layer is arranged around the rock core. The cast concrete layer and the rock core are integrally combined into a simulated geological block for the test. A supporting frame is arranged outside the cast concrete.
2. The simulated geological block for excavation and blasting machine testing according to claim 1, It is characterized in that The core is a pre-splitting core.
3. The simulated geological block for excavation and blasting machine testing according to claim 1 or 2, It is characterized in that The rock core is a square block rock core, and the minimum cross-sectional size of the rock core takes the central cutter disc as an inscribed circle.
4. A test method for a simulated geological block for excavation and blasting machine testing, It is characterized in that The test method includes the following steps: S1. Select two granite rocks of the same size and label them as rock No. 1 and rock No. 2 respectively; S2, blasting pre-cracks the rock No. 2 to make it incompletely broken. The test requires that the diameter of the broken circle is smaller than the side length of the rock; S3, the monolithic rock No. 1 and the pre-cracked rock No. 2 are respectively supported inside the protective support, and concrete is poured, and the curing is qualified to form the simulated geological block for the excavation and blasting machine test as claimed in any one of claims 1 to 3; S4. Conduct excavation test on rock No. 1 using an excavator with a hollow cutter disc, with an excavation depth of N meters, where N is greater than or equal to 1 meter, and record the excavation test data; S5. A tunneling test was conducted on rock No. 2 using a tunneling blaster with a hollow cutter disc. The tunneling depth was also N meters. Other parameters and conditions were completely consistent with the tunneling test data for rock No.
1. S5. Compare and analyze the data of the two test conditions in steps S4 and S5, thereby verifying the feasibility of the plan of pre-splitting the central core followed by hollow cutter head excavation, and obtaining the pre-splitting method and required parameters for advanced pre-splitting within a fixed radius of the core.
5. The test method according to claim 4, It is characterized in that In step S3, when pouring concrete, it is poured in two times. The first pouring is to the middle of the rock, and the rock positioning size is measured to be within the tolerance range, and then the second pouring is performed.
6. The test method according to claim 3, It is characterized in that In step S2, when blasting fracturing only occurs inside rock No. 2, it not only forms an enlarged cavity at the charge, but also forms a crushing circle, a crack circle, and a vibration circle. The test requires that the diameter of the vibration circle is smaller than the side length of the rock. The radius of the charge hole is calculated based on the boundary conditions of the vibration circle and the stress wave: 1) The calculation formula of the vibration circle radius is as follows: (1) Where: is the radius of the vibration circle, in m; is the Poisson's ratio of the rock; is the initial radial stress peak value of the stress wave, in MPa; is the tensile strength of rock, in MPa; is the attenuation coefficient of the stress wave, =2- / (1- ); is the blasthole radius, in m; If the radius of the vibration circle is known, the formula for calculating the radius of the blasthole is as follows: =r / [ ](2) 2) Initial radial stress peak of the stress wave of the uncoupled charge The calculation formula is: (3) Where: is the charge density kg / m; is the explosion velocity of the explosive, in m / s; is the radius of the charge, in mm; n is the multiple of the pressure increase, usually 8 to 11; is the charge length, in mm; is the depth of the blasthole in mm.