Vehicle driving electric quantity acquisition method and device, electronic equipment and computer readable storage medium

By obtaining navigation data in new energy vehicles and predicting the acceleration of the driving section, the problem of insufficient power of new energy vehicles during navigation is solved, and more accurate power prediction and usage are achieved.

CN118795338APending Publication Date: 2024-10-18CHONGQING JINKANG NEW ENERGY VEHICLE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411094676.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-10
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

It is difficult for new energy vehicles to accurately predict the power requirements of specific driving sections during navigation, which may lead to insufficient power, especially when there is a lack of refueling or charging stations.

Method used

By obtaining the vehicle's navigation data, the navigation route is divided into multiple connected driving sections, and the vehicle speed and driving time of each sub-section are predicted based on the navigation data. When it is detected that the acceleration between sub-sections is different, the predicted acceleration of the driving section is calculated, thereby Get more accurate vehicle driving power.

Benefits of technology

It improves the accuracy of vehicle driving power, ensuring that the vehicle can more accurately predict the power demand during driving and avoid vehicle stagnation due to insufficient power.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118795338A_ABST
    Figure CN118795338A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of vehicles, and discloses a vehicle driving electric quantity acquisition method and device, electronic equipment and a computer readable storage medium, and the vehicle driving electric quantity acquisition method comprises the following steps: acquiring navigation data of a vehicle, and acquiring a navigation route based on the navigation data; wherein the navigation route comprises a plurality of connected driving road sections; acquiring predicted vehicle speeds and predicted driving time corresponding to each sub-road section in the driving road section based on the navigation data; wherein the driving road section comprises a plurality of connected sub-road sections; when it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-road sections in the driving road section are different, the predicted acceleration corresponding to the driving road section is obtained, and the vehicle driving electric quantity corresponding to the driving road section is obtained based on the predicted acceleration. Therefore, when the predicted vehicle speeds of the sub-road sections of the driving road section are different, the predicted acceleration corresponding to the driving road section can be obtained, the vehicle driving electric quantity is further obtained based on the predicted acceleration, and the obtained vehicle driving electric quantity is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of vehicle technology, and in particular to a method, device, electronic device and computer-readable storage medium for obtaining vehicle driving power. Background Art

[0002] New energy vehicles are prone to low battery during navigation, and it is generally impossible to accurately predict where the low battery will occur. In this case, there may be no nearby refueling or charging stations near the location where the low battery occurs, which directly causes the vehicle to break down.

[0003] The root cause of the above problems is actually that the vehicle cannot predict the amount of electricity required for the vehicle to travel on a specific road section, or cannot accurately predict the amount of electricity required for the vehicle to travel on a specific road section. Summary of the invention

[0004] In view of the above problems, the present application provides a method, device, electronic device and computer-readable storage medium for obtaining vehicle driving power. When the predicted vehicle speeds of sub-sections of a driving section are different, the predicted acceleration corresponding to the driving section will be obtained to further obtain the vehicle driving power based on the predicted acceleration, so that the obtained vehicle driving power is more accurate.

[0005] The first aspect of the present application provides a method for obtaining vehicle driving power, comprising: obtaining navigation data of the vehicle, and obtaining a navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; obtaining a predicted vehicle speed and a predicted driving time corresponding to each sub-section in the driving section based on the navigation data; wherein the driving section includes a plurality of connected sub-sections; if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, then obtaining a predicted acceleration corresponding to the driving section, and obtaining the vehicle driving power corresponding to the driving section based on the predicted acceleration.

[0006] In some specific embodiments, if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in a driving section are different, the step of obtaining the predicted acceleration corresponding to the driving section includes: if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, then the predicted acceleration of the speed change section in the driving section is obtained; wherein the speed change section includes two adjacent sub-segments with different predicted vehicle speeds, and different speed change sections do not overlap with each other; the predicted accelerations corresponding to all the speed change sections in the driving section are used as the predicted acceleration corresponding to the driving section.

[0007] In some specific embodiments, the step of obtaining the predicted acceleration of a speed change section in a driving section includes: obtaining the predicted vehicle speeds and predicted driving times corresponding to two sub-sections in the speed change section in the driving section; obtaining the speed difference between the predicted vehicle speeds corresponding to the two sub-sections in the speed change section, and obtaining the time difference between the predicted driving times corresponding to the two sub-sections in the speed change section, and using the ratio of the speed difference to the time difference as the predicted acceleration of the speed change section.

[0008] In some specific embodiments, the step of obtaining the predicted acceleration of a speed change section in a driving section includes: obtaining the predicted midpoint speeds corresponding to the midpoints of two sub-sections in the driving section, and the driving time corresponding to the distance between the midpoints of the two sub-sections; obtaining the speed difference between the midpoint speeds of the two sub-sections, and taking the ratio of the midpoint speed difference to the driving time as the predicted acceleration of the speed change section.

[0009] In some specific embodiments, if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in a driving section are different, the step of obtaining the predicted acceleration of the speed change section in the driving section includes: if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the sub-segments in the driving section are combined in sequence according to the driving order to form a speed change section; and the predicted acceleration of the speed change section in the driving section is obtained.

[0010] In some specific embodiments, the method also includes: when it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in a driving section are different, obtaining the predicted average vehicle speed, predicted driving time and road slope of the driving section; obtaining the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, road slope and predicted acceleration, and obtaining the vehicle driving power corresponding to the driving section based on the vehicle driving power and the predicted driving time.

[0011] In some specific embodiments, after the steps of obtaining the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, the road slope and the predicted acceleration, and obtaining the vehicle driving power corresponding to the driving section based on the vehicle driving power and the predicted driving time, the method includes: obtaining the current ambient temperature of the vehicle's environment; determining the corresponding preset power correction amount based on the current ambient temperature, correcting the vehicle driving power based on the preset power correction amount, and determining the corrected vehicle driving power based on the corrected vehicle driving power and the predicted driving time.

[0012] According to a second aspect of the present application, there is provided a device for acquiring vehicle driving power, comprising: an acquisition module for acquiring navigation data of a vehicle, and acquiring a navigation route based on the navigation data; wherein the navigation route comprises a plurality of connected driving sections; acquiring a predicted vehicle speed and a predicted driving time corresponding to each sub-section in the driving section based on the navigation data; wherein the driving section comprises a plurality of connected sub-sections; and a processing module for acquiring a predicted acceleration corresponding to the driving section upon detecting that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, and acquiring the vehicle driving power corresponding to the driving section based on the predicted acceleration.

[0013] A third aspect of the present application provides an electronic device, comprising: a processor; and a memory for storing a computer program, wherein when the computer program is executed by the processor, any of the above-mentioned methods for obtaining vehicle driving power is implemented.

[0014] A fourth aspect of the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, a method for obtaining vehicle driving power as described in any of the above items is implemented.

[0015] The present application has at least the following beneficial technical effects: Based on the vehicle driving power acquisition method, device, electronic device and computer-readable storage medium provided by the present application, the vehicle driving power acquisition method includes: acquiring the navigation data of the vehicle, and acquiring the navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; acquiring the predicted vehicle speed and predicted driving time corresponding to each sub-section in the driving section based on the navigation data; wherein the driving section includes a plurality of connected sub-sections; if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, the predicted acceleration corresponding to the driving section is acquired, and the vehicle driving power corresponding to the driving section is acquired based on the predicted acceleration. Therefore, when the predicted vehicle speeds of the sub-sections of the driving section are different, the predicted acceleration corresponding to the driving section will be acquired, so as to further acquire the vehicle driving power based on the predicted acceleration, so that the acquired vehicle driving power is more accurate.

[0016] The above description is only an overview of the technical solution of the embodiment of the present application. In order to more clearly understand the technical means of the embodiment of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the embodiment of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are only used to illustrate the embodiments and are not to be considered as limiting the present application. In addition, the same reference symbols are used to represent the same components throughout the accompanying drawings. In the accompanying drawings:

[0018] Figure 1It is a flow chart of an embodiment of a method for obtaining vehicle driving power provided by the present application;

[0019] Figure 2 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0020] Figure 3 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0021] Figure 4 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0022] Figure 5 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0023] Figure 6 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0024] Figure 7 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application;

[0025] Figure 8 It is a structural block diagram of an embodiment of a device for obtaining vehicle driving power provided by the present application;

[0026] Fig. 9 It is a schematic diagram of the structural framework of an embodiment of the electronic device provided by the present application;

[0027] Fig.10 It is a schematic diagram of the structural framework of an embodiment of the computer-readable storage medium provided by the present application. DETAILED DESCRIPTION

[0028] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0029] If there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if the meaning of "and / or" appearing in the full text is to include three parallel schemes, taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0030] A first aspect of the present application provides a method for obtaining vehicle driving power, which is applied to new energy vehicles driven by a driving motor. Figure 1 is a flow chart of an embodiment of a method for obtaining vehicle driving power provided by the present application, combined with Figure 1 , the method comprises the following steps:

[0031] S11: Obtain navigation data of the vehicle, and obtain a navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections.

[0032] The vehicle controller can obtain navigation data from the cloud and process the navigation data to obtain a navigation route based on the navigation data. The starting point and the end point of the navigation route can be the current position of the vehicle and the destination position, respectively, without specific limitation.

[0033] When the navigation route includes multiple connected driving sections, the navigation route is composed of multiple driving sections. Among them, different driving sections do not overlap with each other, and the lengths of different driving sections can be different. In this case, the number of driving sections can be divided into more, and then the navigation information of the entire navigation route can be specifically understood through the navigation information of each driving section.

[0034] S12: Acquire the predicted vehicle speed and predicted driving time corresponding to each sub-segment in the driving segment based on the navigation data; wherein the driving segment includes a plurality of connected sub-segments.

[0035] At this time, the driving section is further divided into multiple sub-sections, that is, each driving section is composed of multiple sub-sections, that is, each driving section includes at least two sub-sections. The lengths of the sub-sections of each driving section can be the same or different, and no specific limitation is made here.

[0036] For different sub-segments, the predicted vehicle speed and predicted travel time corresponding to the sub-segment obtained based on the navigation data may be different. In this case, the sub-segment may be a segment with a shorter distance, the predicted vehicle speed corresponding to the sub-segment may be an average vehicle speed, and the predicted travel time corresponding to the sub-segment may be the predicted travel time of the entire sub-segment.

[0037] S13: If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the predicted acceleration corresponding to the driving section is obtained, and the vehicle driving power corresponding to the driving section is obtained based on the predicted acceleration.

[0038] If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in a driving section are different, it means that the vehicle will accelerate or decelerate in the driving section, which leads to different predicted vehicle speeds in at least two adjacent sub-sections. At this time, the predicted acceleration corresponding to the vehicle in the driving section is obtained, and the vehicle driving power corresponding to the driving section is obtained based on the predicted acceleration. The driving power here is the driving power required for the vehicle to drive the motor through this section.

[0039] It should be understood that in the prior art, although there are technologies for obtaining the amount of electricity required for a vehicle to drive on certain driving sections, the effect of acceleration on the vehicle's driving power is not fully considered. During the driving process, the power required for the acceleration process is relatively high, while the power required for the acceleration process is relatively low. Therefore, when the prior art does not consider the effect of acceleration on driving power, the acquisition of the vehicle's driving power will be inaccurate.

[0040] In this embodiment, when the predicted vehicle speeds of the sub-sections of the driving section are different, the predicted acceleration corresponding to the driving section will be obtained, so as to further obtain the vehicle driving power based on the predicted acceleration, and fully consider the influence of the acceleration on the vehicle driving power, that is, fully consider the influence of the acceleration on the vehicle driving power, so that the obtained vehicle driving power is more accurate.

[0041] Figure 2 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 2 In some specific embodiments, if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the step of obtaining the predicted acceleration corresponding to the driving section, i.e., the above-mentioned step S13, includes:

[0042] S21: When it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, the predicted acceleration of the speed change section in the driving section is obtained; wherein the speed change section includes two adjacent sub-sections with different predicted vehicle speeds, and different speed change sections do not overlap with each other.

[0043] It should be understood that since a driving section has multiple sub-sections, although the predicted vehicle speeds corresponding to two adjacent sub-sections are different, it is possible that the predicted vehicle speeds corresponding to two adjacent sub-sections are the same. In this case, we regard the two adjacent sub-sections with different predicted vehicle speeds as a speed-changing section, and a driving section may be composed entirely of speed-changing sections, or may be composed of some speed-changing sections and some sub-sections.

[0044] S22: The predicted accelerations corresponding to all the speed change sections in the driving section are used as the predicted accelerations corresponding to the driving section.

[0045] After determining the speed change section in the driving section, the predicted acceleration of all the speed change sections in the driving section is further obtained as the predicted acceleration of the driving section. It should be understood that since the non-speed change section is regarded as having no acceleration or deceleration, the predicted acceleration corresponding to all the speed change sections can represent the predicted acceleration of the entire driving section.

[0046] Figure 3 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 3 In some specific embodiments, the step of obtaining the predicted acceleration of the speed change section in the driving section includes:

[0047] S31: Obtain predicted vehicle speeds and predicted travel times corresponding to two sub-sections in a speed change section in a travel section.

[0048] Combined with the above content, it can be seen that the predicted vehicle speeds corresponding to the two sub-sections in the speed change section are different, so it is necessary to obtain the predicted vehicle speeds corresponding to the two sub-sections respectively. Generally speaking, the predicted travel time in the two sub-sections in the speed change section is also different, so it is also necessary to obtain the predicted travel time corresponding to the two sub-sections.

[0049] S32: Obtain the speed difference between the predicted vehicle speeds corresponding to the two sub-sections in the speed change section, and obtain the time difference between the predicted travel times corresponding to the two sub-sections in the speed change section, and use the ratio of the speed difference to the time difference as the predicted acceleration of the speed change section.

[0050] In this embodiment, it is more reasonable and accurate to use the speed difference of the predicted vehicle speeds of the two sub-sections as the speed change of the speed change section, that is, to use the speed difference of the average vehicle speeds of the two sub-sections as the speed change of the speed change section. Further, it is more reasonable and accurate to use the time difference of the predicted travel time corresponding to the two sub-sections in the speed change section as the time taken by the speed change section to generate the speed difference.

[0051] At this time, by comparing the speed difference with the time difference, the acceleration of the speed change section, that is, the predicted acceleration of the speed change section, can be obtained.

[0052] Figure 4 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 4 In some specific embodiments, the step of obtaining the predicted acceleration of the speed change section in the driving section includes:

[0053] S41: Obtain the predicted midpoint speeds corresponding to the midpoints of two sub-segments in the driving section, and the driving time corresponding to the distance between the midpoints of the two sub-segments.

[0054] The midpoint of a sub-segment is the position of halfway of the sub-segment, and the specific position can be obtained according to navigation information. It can also be determined according to the driving time. For example, if the predicted driving time corresponding to the sub-segment is two minutes, then the position at one minute can be used as the midpoint position of the sub-segment.

[0055] The predicted midpoint speed at the midpoint of the sub-segment can also be obtained based on the navigation data, and the travel time between the midpoints of two sub-segments can also be obtained based on the navigation data.

[0056] S42: Obtain a midpoint speed difference between the predicted midpoint speeds of the two sub-sections, and use the ratio of the midpoint speed difference to the travel time as the predicted acceleration of the speed change section.

[0057] At this time, the speed difference between the midpoint speeds of the two sub-sections can represent the speed change of the speed change section, and the driving time determined in the above steps is used as the time taken for the speed change to occur, which is relatively accurate. At this time, taking the ratio of the midpoint speed difference to the driving time as the predicted acceleration of the speed change section is more in line with the actual driving situation.

[0058] The above two embodiments respectively provide two ways of obtaining the predicted acceleration of the speed change section in the driving section, and the two ways can be selected and applied according to actual conditions.

[0059] Figure 5 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 5 In some specific embodiments, if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the step of obtaining the predicted acceleration of the speed change section in the driving section, i.e., the above-mentioned step S21, includes:

[0060] S51: If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the sub-segments in the driving section are sequentially combined in the driving order to form a speed change section.

[0061] When it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, it means that there is a speed change section in the driving section. In this case, it is necessary to first determine the speed change section and then obtain the predicted acceleration corresponding to the speed change section.

[0062] In this step, the sub-sections in the driving section are combined in sequence to form a speed change section according to the driving sequence. For example, there are ten sub-sections in the driving section, which are respectively: the first sub-section, the second sub-section...the tenth sub-section in the driving sequence. Then, at this time, first determine whether the predicted speeds of the first sub-section and the second sub-section are the same. If they are not the same, they are combined to form a speed change section. Then determine whether the predicted speeds of the third sub-section and the fourth sub-section are the same. If they are not the same, they are combined to form a speed change section. In this way, all the speed change sections in the driving section are determined in sequence.

[0063] It should be understood that if there are only two sub-sections in a driving section, the two sub-sections are combined to form a speed change section. If there are more than two sub-sections in a driving section, there are more than one speed change section in this driving section.

[0064] The speed change section determined by this step is more consistent with the speed change during the vehicle's driving process, that is, the speed change is generally completed in two adjacent sub-sections.

[0065] S52: Obtain the predicted acceleration of the speed change section in the driving section.

[0066] After the speed change section is determined, the predicted acceleration of all speed change sections in the driving section can be obtained.

[0067] Figure 6 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 6 This embodiment may be based on the above first embodiment. In some specific embodiments, the method further includes:

[0068] S61: If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the predicted average vehicle speed, predicted driving time and road slope of the driving section are obtained.

[0069] If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, it means that there is a speed change section in the driving section. In this case, the driving power is obtained based on the predicted acceleration corresponding to the driving section. In order to obtain the driving power, in addition to the predicted acceleration, the predicted average vehicle speed, predicted driving time and road slope of the driving section are also required.

[0070] Combined with the above content, since the driving section at this time may be composed entirely of speed-changing sections, it may also be composed of partial speed-changing sections and partial sub-sections. At this time, if the driving section is composed entirely of speed-changing sections, then the predicted average vehicle speed of the driving section obtained may be the predicted average vehicle speed of each speed-changing section, the predicted driving time obtained may be the predicted driving time of each speed-changing section, and the road slope obtained may also be the road slope of each speed-changing section. If the driving section is composed of partial speed-changing sections and partial sub-sections, then the average vehicle speed of the driving section obtained may be the average vehicle speed of each speed-changing section and sub-section, the predicted driving time obtained may also be the predicted driving time of each speed-changing section and sub-section, and the road slope obtained may also be the predicted driving time of each speed-changing section and sub-section.

[0071] S62: Obtain the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, the road slope and the predicted acceleration, and obtain the vehicle driving power corresponding to the driving section based on the vehicle driving power and the predicted driving time.

[0072] In combination with the above content, if the driving section is entirely composed of speed-changing sections, then the vehicle driving power corresponding to the driving section is obtained based on the predicted average vehicle speed, road slope and predicted acceleration. The driving power of each speed-changing section can be obtained based on the predicted average vehicle speed, road slope and predicted acceleration corresponding to the speed-changing section, and the driving power of all speed-changing sections is used as the vehicle driving power of the driving section. If the driving section is composed of some speed-changing sections and some sub-sections, then the vehicle driving power corresponding to the driving section is obtained based on the predicted average vehicle speed, road slope and predicted acceleration. The driving power of each speed-changing section can be obtained based on the predicted average vehicle speed, road slope and predicted acceleration corresponding to the speed-changing section, and the driving power of each sub-section can be obtained based on the predicted average vehicle speed, road slope and predicted acceleration corresponding to the sub-sections outside the speed-changing sections, and the driving power of all speed-changing sections and the driving power of the sub-sections outside the speed-changing sections are used as the driving power of the driving section.

[0073] After obtaining the driving power of the speed-changing section in the driving section, or the driving power of the speed-changing section and the sub-section, the driving power of the section can be obtained based on the predicted driving time of the corresponding section, and the driving power of each section can be added to obtain the vehicle driving power corresponding to the driving section. For example, if the driving section is composed entirely of speed-changing sections, then after obtaining the driving power of each speed-changing section, the driving power corresponding to the speed-changing section can be obtained based on the predicted driving time corresponding to the speed-changing section, and the driving power corresponding to each speed-changing section can be added to obtain the vehicle driving power corresponding to the driving section.

[0074] In some application scenarios, the specific method of obtaining the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, road slope and predicted acceleration can be as follows:

[0075] First, a first product between a first preset parameter and a road gradient, a second product between a second preset parameter and a square of a predicted vehicle speed, and a third product between a third preset parameter and a predicted acceleration are determined.

[0076] Taking the calculation of the driving power corresponding to a speed change section as an example, the road slope, predicted average vehicle speed and predicted acceleration obtained at this time all correspond to the speed change section.

[0077] Among them, the first preset parameter, the second preset parameter and the third preset parameter are all pre-set parameters related to the vehicle's own parameters, and the first preset parameter, the second preset parameter and the third preset parameter are different from each other.

[0078] Then, based on the sum of the first product, the second product and the third product, the torque of the driving motor of the vehicle in the remaining distance is determined.

[0079] Here, assuming that the first product, the second product and the third product are A, B and C respectively, then the torque of the drive motor = A + B + C. In some application scenarios, a correction factor D may be added, and the torque of the drive motor = A + B + C + D.

[0080] Regarding the specific setting methods of the first preset parameter, the second preset parameter and the third preset parameter, in some specific embodiments:

[0081] The first preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and weight, the second preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius, air resistance coefficient and frontal area, and the third preset parameter is obtained based on the vehicle's reducer speed ratio, drive shaft efficiency, tire rolling radius and rotational mass.

[0082] Specifically, let the speed ratio of the reducer, the efficiency of the transmission shaft, and the rolling radius of the tire be ig and n respectively. t and r, the vehicle weight, air resistance coefficient, frontal area and rotational mass are G, Cd, A and δm respectively. At this time, the first preset parameter can be The second preset parameter can be The third preset parameter may be In combination with the above, the correction coefficient D can be determined by the vehicle's own parameters, such as transmission system resistance, reducer ratio, transmission shaft efficiency, tire rolling radius and other parameters, without specific limitation.

[0083] As for the rotation speed of the drive motor, there is a fixed relationship between the vehicle speed and the rotation speed of the drive motor, and the fixed relationship is determined by the nature of the vehicle itself. Therefore, after obtaining the predicted vehicle speed of the corresponding road section, the rotation speed of the drive motor can be obtained according to the fixed relationship.

[0084] After the speed and torque corresponding to the driving motor of the corresponding road section are obtained, the product of the speed and the torque can be used as the driving power of the driving motor corresponding to the road section.

[0085] Figure 7 is a flow chart of another embodiment of the method for obtaining vehicle driving power provided by the present application, combined with Figure 7 In some specific embodiments, after the step of obtaining the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, the road slope and the predicted acceleration, and obtaining the vehicle driving power corresponding to the driving section based on the vehicle driving power and the predicted driving time, that is, after the above step S13, the method includes:

[0086] S71: Obtain the current ambient temperature of the vehicle's environment.

[0087] The current ambient temperature may be obtained through weather information, sensor information, etc., without specific restrictions.

[0088] S72: determining a corresponding preset power correction amount based on the current ambient temperature, correcting the vehicle driving power based on the preset power correction amount, and determining a corrected vehicle driving power based on the corrected vehicle driving power and the predicted driving time.

[0089] It should be understood that, under the condition that other conditions remain unchanged, the ambient temperature of the environment in which the vehicle is located will affect the driving power of the vehicle. Generally speaking, at a certain temperature, the driving power of the vehicle is less affected by the ambient temperature. When the temperature is greater than or less than the certain temperature, as the temperature decreases or increases, the driving power of the vehicle is gradually affected by the ambient temperature.

[0090] There is a certain preset relationship between the ambient temperature and the preset power correction amount. After obtaining the current ambient temperature, the preset power correction amount corresponding to the current ambient temperature can be determined according to the preset relationship. Among them, the corrected driving power is equal to the sum of the driving power before correction plus the preset power correction amount. If the preset power correction amount is a positive value, the corrected driving power will increase. If the preset power correction amount is a negative value, the corrected driving power will decrease.

[0091] Through this embodiment, the vehicle driving power is corrected according to the ambient temperature, so that the obtained driving power of the vehicle in a specific road section is more realistic and more accurate.

[0092] A second aspect of the present application provides a vehicle driving power acquisition device 20, Figure 8 It is a structural block diagram of an embodiment of a vehicle driving power acquisition device 20 provided in the present application.

[0093] Combination Figure 8 The vehicle driving power acquisition device 20 includes an acquisition module 21 and a processing module 22. The acquisition module 21 is used to acquire the navigation data of the vehicle and acquire the navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; based on the navigation data, the predicted vehicle speed and predicted driving time corresponding to each sub-section in the driving section are acquired; wherein the driving section includes a plurality of connected sub-sections. When the processing module 22 detects that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, the predicted acceleration corresponding to the driving section is acquired, and the vehicle driving power corresponding to the driving section is acquired based on the predicted acceleration. For the specific execution method of the acquisition module 21 and the processing module 22 for the above steps, reference can be made to the content of the vehicle driving power acquisition method in the above embodiment, and no specific limitation is made here.

[0094] A third aspect of the present application provides an electronic device, comprising: a processor; and a memory for storing a computer program, which, when executed by the processor, implements the method for obtaining vehicle driving power in any of the above embodiments.

[0095] Fig. 9 It is a schematic diagram of the structural framework of an embodiment of the electronic device 500 provided in the present application.

[0096] In some specific embodiments, the electronic device 500 includes a central processing unit (CPU) 501 and a read-only memory (ROM) 502, wherein the CPU 501 is a processor and the ROM 502 is a memory. The CPU 501 can perform various appropriate actions and processes according to the program stored in the ROM 502 or the program loaded from the storage part 508 to the random access memory (RAM) 503, such as executing the method in the above embodiment. In the RAM 503, various programs and data required for system operation are also stored. The CPU 501, the ROM 502 and the RAM 503 are connected to each other via a bus 504. The input / output (I / O) interface 505 is also connected to the bus 504.

[0097] The following components are connected to the I / O interface 505: an input section 506 including a keyboard, a mouse, etc.; an output section 507 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 508 including a hard disk, etc.; and a communication section 509 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 509 performs communication processing via a network such as the Internet. A drive 510 is also connected to the I / O interface 505 as needed. A removable medium 511, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 510 as needed so that a computer program read therefrom is installed into the storage section 508 as needed.

[0098] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 509, and / or installed from a removable medium 511. When the computer program is executed by a central processing unit (CPU) 501, various functions defined in the system of the present application are executed.

[0099] A fourth aspect of the present application provides a computer-readable storage medium 40, Fig.10 It is a schematic diagram of the structural framework of an embodiment of the computer-readable storage medium 40 provided in the present application.

[0100] The computer readable storage medium 40 stores a computer program 41 , and when the computer program 41 is executed by a processor, the method for obtaining the vehicle driving power in any of the above embodiments is implemented.

[0101] It should be noted that the computer-readable medium 40 shown in the embodiment of the present application can be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium can be, for example, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media can include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it. In the present application, a computer-readable signal medium can include a data signal propagated in a baseband or as part of a carrier wave, wherein a computer-readable computer program is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The computer program contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0102] In summary, based on the vehicle driving power acquisition method, device, electronic device and computer-readable storage medium provided by the present application, the vehicle driving power acquisition method includes: acquiring the navigation data of the vehicle, and acquiring the navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; acquiring the predicted vehicle speed and predicted driving time corresponding to each sub-section in the driving section based on the navigation data; wherein the driving section includes a plurality of connected sub-sections; if it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, then the predicted acceleration corresponding to the driving section is acquired, and the vehicle driving power corresponding to the driving section is acquired based on the predicted acceleration. Therefore, when the predicted vehicle speeds of the sub-sections of the driving section are different, the predicted acceleration corresponding to the driving section will be acquired, so as to further acquire the vehicle driving power based on the predicted acceleration, so that the acquired vehicle driving power is more accurate.

[0103] The above content is only a preferred exemplary embodiment of the present application and is not intended to limit the implementation scheme of the present application. A person skilled in the art can easily make corresponding changes or modifications based on the main concept and spirit of the present application. Therefore, the scope of protection of the present application shall be based on the scope of protection required by the claims.

Claims

1. A method for obtaining vehicle driving power, characterized in that: include: Acquire navigation data of the vehicle, and acquire a navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; Acquire the predicted vehicle speed and predicted travel time corresponding to each sub-segment in the travel segment based on the navigation data; wherein the travel segment includes a plurality of connected sub-segments; If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, the predicted acceleration corresponding to the driving section is obtained, and the vehicle driving power corresponding to the driving section is obtained based on the predicted acceleration.

2. The method for obtaining vehicle driving power according to claim 1, characterized in that: When it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the step of obtaining the predicted acceleration corresponding to the driving section comprises: When it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the predicted acceleration of the speed change section in the driving section is obtained; wherein the speed change section includes two adjacent sub-segments with different predicted vehicle speeds, and different speed change sections do not overlap with each other; The predicted accelerations corresponding to all the speed change sections in the driving section are used as the predicted accelerations corresponding to the driving section.

3. The method for obtaining vehicle driving power according to claim 2, characterized in that: The step of obtaining the predicted acceleration of the speed change section in the driving section comprises: Obtaining predicted vehicle speeds and predicted travel times corresponding to two subsections in a speed change section in the travel section; Obtain a speed difference between the predicted vehicle speeds corresponding to the two sub-sections in the speed change section, and obtain a time difference between the predicted travel times corresponding to the two sub-sections in the speed change section, and use the ratio of the speed difference to the time difference as the predicted acceleration of the speed change section.

4. The method for obtaining vehicle driving power according to claim 2, characterized in that: The step of obtaining the predicted acceleration of the speed change section in the driving section comprises: Obtaining the predicted midpoint speeds corresponding to the midpoints of the two sub-segments in the driving section, and the driving time corresponding to the distance between the midpoints of the two sub-segments; A midpoint speed difference between the predicted midpoint speeds of the two sub-sections is obtained, and a ratio of the midpoint speed difference to the travel time is used as the predicted acceleration of the speed change section.

5. The method for obtaining vehicle driving power according to claim 2, characterized in that: When it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-sections in the driving section are different, the step of obtaining the predicted acceleration of the speed change section in the driving section comprises: If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the sub-segments in the driving section are sequentially combined in the driving order to form a speed change section; The predicted acceleration of the speed change section in the driving section is obtained.

6. The method for obtaining vehicle driving power according to claim 1, characterized in that: The method further comprises: If it is detected that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, the predicted average vehicle speed, predicted driving time and road slope of the driving section are obtained; The vehicle driving power corresponding to the driving section is obtained based on the predicted average vehicle speed, the road slope and the predicted acceleration, and the vehicle driving power corresponding to the driving section is obtained based on the vehicle driving power and the predicted driving time.

7. The method for obtaining vehicle driving power according to claim 6, characterized in that: After the steps of acquiring the vehicle driving power corresponding to the driving section based on the predicted average vehicle speed, the road slope and the predicted acceleration, and acquiring the vehicle driving power corresponding to the driving section based on the vehicle driving power and the predicted driving time, the method includes: Obtaining the current ambient temperature of the environment in which the vehicle is located; A corresponding preset power correction amount is determined based on the current ambient temperature, the vehicle driving power is corrected based on the preset power correction amount, and a corrected vehicle driving power amount is determined based on the corrected vehicle driving power and the predicted driving time.

8. A device for obtaining vehicle driving power, characterized in that: include: an acquisition module, configured to acquire navigation data of the vehicle, and acquire a navigation route based on the navigation data; wherein the navigation route includes a plurality of connected driving sections; and acquire a predicted vehicle speed and a predicted driving time corresponding to each sub-section in the driving section based on the navigation data; wherein the driving section includes a plurality of connected sub-sections; The processing module detects that the predicted vehicle speeds corresponding to at least two adjacent sub-segments in the driving section are different, then obtains the predicted acceleration corresponding to the driving section, and obtains the vehicle driving power corresponding to the driving section based on the predicted acceleration.

9. An electronic device, characterized in that: include: processor; A memory for storing a computer program, wherein the computer program, when executed by the processor, implements the method for obtaining the vehicle driving power according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the method for obtaining vehicle driving power according to any one of claims 1 to 7 is implemented.