Multi-reservoir group dimensionality reduction combined peak shifting optimization scheduling method based on flood scheduling period division
Through the combination of flood dispatch period division and POA algorithm, the 'dimensionality disaster' problem in the reservoir group is solved, the calculation speed and optimization ability of multi-reservoir joint peak shifting optimization dispatch are improved, and a more effective flood control effect is achieved.
Patent Information
- Application Number
- CN202411276873.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-09-12
AI Technical Summary
The existing technology suffers from the 'curse of dimensionality' problem in the flood dispatching of reservoir groups, which results in a large amount of calculation and easy local convergence of optimization results, making it difficult to effectively solve the problem of multi-reservoir joint peak-shifting optimization dispatching.
A multi-reservoir group dimensionality reduction joint peak-staggering optimal dispatching method based on the division of flood dispatch periods is adopted. By analyzing the flood control tasks of each reservoir, the dispatch periods are divided, and the POA algorithm is used to generate an optimized dispatch plan that meets flood control safety and reduce the risk of dimensionality disasters. influence, while ensuring the solution accuracy during critical periods.
It significantly improves the calculation speed of the optimized dispatch plan, improves the optimization capability, effectively exerts the flood control benefits, and provides a new idea for multi-database joint peak shifting optimization dispatch.
Smart Images

Figure CN118798599A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of joint flood control optimization scheduling of reservoir groups, and relates to a dimensionality reduction joint peak-shifting optimization scheduling method for a multi-reservoir reservoir group based on flood scheduling period division. Background Art
[0002] Floods are one of the most frequent, harmful and loss-making natural disasters. Flood control is not only related to the safety of people's lives and property. Reservoirs are important engineering measures for flood control. Reservoir flood control dispatching is an important part of water conservancy dispatching. It aims to ensure the safety of reservoir dam projects, and scientifically and rationally control and use existing water conservancy projects to intercept and store floods and reduce peak water flow according to the upstream and downstream water conditions. It has important practical significance for downstream flood control and disaster reduction.
[0003] Tang Qianbai et al. [Tang Qianbai, Cao Xiyao, Three-stage reservoir optimization dispatching technology [J], Hunan Electric Power, 2017, 37(3): 47-51] proposed a three-stage optimization dispatching method before, during and after rain based on the dispatching objectives and strategies of reservoirs at different stages, realizing the organic connection between short-term and medium-term forecast dispatching and long-term optimization dispatching of reservoirs. Li Wanxu [Li Wanxu, Risk dispatching method of reservoir flood period [J], Dams and Safety, 2003(1): 18-21] divided the flood period into three stages according to the flood period dispatching process, mainly targeting the rising water stage and the receding water stage, and established a flood dispatching method mainly for obtaining benefits. Most of the research focuses on the medium- and long-term optimization dispatching considering the power generation benefits, and the research on the optimization dispatching scheme of medium-sized reservoirs during the flood period is relatively small.
[0004] The traditional solution method in optimization scheduling is dynamic programming and its improved algorithm. However, when the number of variables increases, the actual calculation of dynamic programming will encounter "dimensionality barrier", which makes the calculation too large. In addition, dynamic programming requires that the state variables meet the non-aftereffect property. When encountering flood routing, this algorithm cannot be used. The POA algorithm decomposes the multi-stage decision-making problem into a series of two-stage sub-problems for solution, which can alleviate the "dimensionality disaster" to a certain extent. However, for complex flood control systems with a large number of variables to solve, complex hydrological and hydraulic connections, and many constraints, the use of the POA algorithm alone has problems such as low computational efficiency and easy local convergence of optimization results. Jiang Zhiqiang et al. [Jiang Zhiqiang, Ji Changming, Sun Ping et al., Comparative Analysis of Three Parallel Modes of Multidimensional Dynamic Programming [J], China Rural Water Conservancy and Hydropower, 2015 (3): 168-173, 176] parallelized the multidimensional dynamic programming algorithm and constructed parallel algorithms between time periods, within time periods, and a mixture of the two, which alleviated the "dimensionality disaster" problem to a certain extent. Therefore, exploring reasonable and effective dimensionality reduction methods and applying relevant theoretical methods to actual production are of great significance and practical value for theoretical guidance of practice.
[0005] Qin Hui et al. [Qin Hui, Liu Yongqi, Zhang Zhendong et al., A multi-objective hierarchical flood control dispatching method for reservoirs [P], Hubei Province: CN201811573140.2, 2019-04-16] classified the water level in front of the dam and the inflow into the reservoir to form a hierarchical flood control dispatching rule, and then established an optimization model based on a multi-objective evolutionary algorithm. The classification rule adopted by this method does not take into account the differences in flood characteristics of different events. At the same time, the optimization algorithm used has a slow convergence speed and complex parameter adjustment. Xiao Jing et al. [Xiao Jing, Dong Zengchuan, A reservoir flood control dispatching method based on the POA algorithm [P], Jiangsu: CN201810465280.1, 2018-10-26] improved the POA algorithm through the segmented compensation method, but the judgment conditions of flood control operations are relatively complex and are only suitable for the generation of single reservoir optimization dispatching plans. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention considers the number of periods for flood optimization and provides a method for dimensionality reduction and joint peak-shifting optimization scheduling of multi-reservoir groups based on flood scheduling period division. It can reduce the impact of dimensionality disaster while ensuring the accuracy of solving key periods, thus providing a new idea for solving the problem of multi-reservoir joint peak-shifting optimization scheduling.
[0007] In order to solve the above technical problems, the technical solution of the present invention is:
[0008] A multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method based on flood scheduling period division, the multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method includes two stages: scheduling key period selection and optimization scheduling. The first stage divides multiple scheduling periods by analyzing the different flood control tasks of each reservoir in the basin at different time periods, and takes the peak-shifting period as the scheduling key period; the second stage generates an initial solution according to the regulation scheduling, and quickly generates a multi-reservoir joint peak-shifting optimization scheduling plan that meets flood control safety through the POA algorithm. Follow the following steps (1) to (10) to complete the output of the optimized scheduling plan:
[0009] Step (1) Based on the flood forecast information, the natural flow process of the downstream flood control section is obtained when all reservoirs are not regulating water.
[0010] Step (2) According to the warning flow and guaranteed flow, the scheduling period of each reservoir is divided into the flooding period and the peak period ( ), dam protection period and water withdrawal period. Wherein T is the total time consumption of flood dispatching. The method of the present invention sets the total time consumption of flood dispatching of each reservoir to be the same. Combined with the set optimization step length, the total time consumption of flood dispatching is divided into a certain number of time periods, and the time period sequence number is sorted from 0. The peak shift period is selected as the key dispatching period.
[0011] The specific scheduling period is divided as follows:
[0012] (1) The starting time of the flood season is the starting time of the flood dispatch, i.e. 0h.
[0013] (2) The end time of the flood season is the period before the start time of the off-peak season, that is, h.
[0014] (3) The start time of the off-peak period is h. The method of the present invention provides h is the start time of the natural flow of the downstream flood control section (the reservoir is not regulated, and the outflow is equal to the inflow) exceeding the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is .when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow.
[0015] (4) The end time of the off-peak period is h. The method of the present invention provides h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h. Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now .
[0016] (5) The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h. The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which endangers its own flood control safety. The discharge flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the discharge flow should be reduced.
[0017] (6) End time of the dam protection period. The method of the present invention classifies the time from the start of the dam protection period to the end of the flood dispatch as the water retreat period. ,Right now h.
[0018] (7) The start time of the water withdrawal period is the next period after the end of the dam protection period, that is, h.
[0019] (8) The end time of the water withdrawal period is the end time of the flood dispatch, that is, h.
[0020] Step (3) During the flood season, each reservoir adopts regular scheduling, or uses one-third of the safe discharge volume of the reservoir downstream as a fixed discharge volume;
[0021] Furthermore, in step (3), the rule-based scheduling specifically refers to the corresponding rule-based scheduling methods already existing in each reservoir.
[0022] Step (4) Optimize scheduling during the off-peak period (critical scheduling period).
[0023] 4.1) First, all reservoirs are regularly dispatched to respond to flood events.
[0024] The "rule-based scheduling" mentioned here refers to the corresponding rule-based scheduling methods already in place for each reservoir.
[0025] 4.2) According to the dispatching results of rule 4.1, the corresponding part of the dispatching key period is used as the initial discharge trajectory of the POA optimization algorithm for the dispatching key period of each reservoir in step (4).
[0026] The initial discharge trajectory line is determined by directly using the regular dispatching results of the key dispatching period of each reservoir involved in the dispatching.
[0027] 4.3) Schedule the total time period of the critical period The optimization step is divided into a certain number of time periods according to the set optimization step. From this step, the POA algorithm iterative optimization is performed.
[0028] The algorithm involves parameters that need to be set in advance, including: optimization time step, number of optimization iterations, convergence accuracy, etc.
[0029] Algorithm-related settings include: the number of flood scheduling periods, the minimum water level allowed for each reservoir, the maximum water level allowed for each reservoir, the final water level of each reservoir, etc.
[0030] It refers to the objective function value of the i-th period during the j-th iteration when the POA algorithm performs optimal scheduling for hotspot reservoirs.
[0031] Refers to the objective function corresponding to the complete scheduling process after the nth optimization, that is, the algorithm optimizes each time period The objective function of the scheduling process generated under the optimal condition is calculated. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.
[0032] 4.3.1) The corresponding part of the critical dispatching period in the initial discharge trajectory of each reservoir is divided into this period, and the period number is sorted starting from 0.
[0033] Fixed reservoirs , Discharge flow during the period. It indicates the starting time of the off-peak period of the a-th reservoir in the first iterative calculation.
[0034] 4.3.2) Discretize each reservoir according to the algorithm The discharge during a time period, that is, , The discharge between time periods is divided with 1 m 3 / s as the graduation value, and the discharge during each reservoir time period is adjusted.
[0035] Step (5) Determine the objective function according to the characteristics of the flood inflow of a flood event, and calculate the objective function . Make the , The objective function value during the time period is the smallest, optimal, that is, the objective function value during the , time period is the smallest in the first optimization calculation of the algorithm. The refers to the objective function value during the i-th time period in the j-th iteration process of the algorithm.
[0036] Furthermore, in the step (5), the flood inflow characteristics refer to: in the composition of the flood source, the proportion of the inflow from the upstream reservoir to the inflow from the interval. Define the ratio P of the inflow from the upstream reservoir to the inflow from the interval:
[0037] When P > P1, the maximum flood control safety guarantee criterion is selected for the objective function;
[0038] When P < P2, the maximum peak shaving criterion is selected for the objective function, and P1 > P2.
[0039] When P2 < P < P1, the combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion is selected for the objective function.
[0040] The P1 is 7:3 and the P2 is 3:7.
[0041] In the step (5), the objective function is specifically:
[0042] 5.1) Take the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the objective function is that the flood control storage capacity occupied by each reservoir is the largest and the smallest: F = my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;
[0043] 5.2) Represent the flood control optimization objective function with the maximum peak shaving criterion: = my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 ;
[0044] 5.3) The combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion, and its objective function can be expressed as: F = α 1 my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 + α 2 my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] .
[0045] Step (6) Optimize one by one for each time period and advance to The optimal objective function value for this off-peak period is obtained. When , one round of algorithm iteration calculation is completed;
[0046] Step (7) During the dam protection period, the discharge volume is increased in stages according to the dispatching rules until the maximum discharge capacity is reached;
[0047] Step (8) The water discharge section first discharges at the maximum discharge capacity. When the forecast information indicates that there will be no rain in the later period, the discharge flow is reduced in stages to ensure the flood control safety of the downstream.
[0048] Step (9) corresponds the optimized complete scheduling process to the objective function The objective function under all reservoir regulation is Compare and judge the optimized objective function Whether the accuracy requirement is met or the objective function is no longer improved. If both of the above judgment conditions are not met, return to step (4) to start a new round of optimization, or reach the set number of optimization iterations, the iteration stops, and the optimal solution is obtained. Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.
[0049] Furthermore, in step (9), the accuracy requirement specifically refers to: the convergence accuracy is 0.0001.
[0050] The “objective function no longer improves” here means that the difference between two objective function values is less than 0.0001.
[0051] The “return to step (4) to start a new round of optimization” here means: updating the critical period of the scheduling in the complete scheduling process of each reservoir after this optimization to the initial discharge trajectory line, and the other parameter settings remain unchanged.
[0052] Step (10) outputs a flood control optimization scheduling plan based on the optimal solution obtained in step (9).
[0053] The beneficial effects of the present invention are:
[0054] The present invention can effectively overcome the "curse of dimensionality" and significantly improve the calculation speed of generating an optimized scheduling solution, enhance the optimization capability, and thus more effectively exert the benefits of flood control. The present invention can reduce the impact of the curse of dimensionality while ensuring the accuracy of the solution in the critical period, thereby providing a new idea for solving the problem of multi-repository joint peak-shifting optimization scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a flow chart of the combined peak-shifting optimization dispatching of a multi-reservoir group based on flood dispatching period division according to the present invention;
[0056] Figure 2 Schematic diagram of reservoir scheduling process. DETAILED DESCRIPTION
[0057] Based on typical flood data, this paper establishes a dimensionality reduction joint peak-shifting optimization scheduling model for series-parallel reservoirs. On the premise of ensuring the flood control safety of the basin, it seeks a multi-reservoir joint flood control optimization scheduling scheme with high solution efficiency and strong practicality. The specific process is detailed in Figure 1 .
[0058] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0059] The present invention consists of two parts: the division of the critical scheduling period and the solution of the optimal scheduling scheme. In the first stage, multiple scheduling periods are divided by analyzing the different flood control tasks of each reservoir in the basin at different time periods, and the peak shift period is used as the critical scheduling period; in the second stage, the initial solution is generated according to the regulation scheduling, and the multi-reservoir joint peak shift optimization scheduling scheme that meets flood control safety is quickly generated through the POA algorithm.
[0060] 1. Selection of critical scheduling period;
[0061] The reservoir flood control scheduling process has multiple scheduling periods due to the different flood control tasks in different time periods. It can be roughly divided into the following four periods: rising water period, peak shifting period, dam protection period, and water receding period.
[0062] (1) Flood stage: refers to the stage when floods begin to rise. At this time, the inflow into the reservoir is small and lower than the safe discharge flow, the outflow from the reservoir is equal to the inflow, and the reservoir water level is maintained at the flood limit water level. The purpose is to have sufficient flood control storage capacity to reduce the peak of the downstream flood control section before the flood peak arrives.
[0063] (2) Peak shifting period: refers to the time period when the reservoir is responsible for downstream flood control and the reservoir discharge flow plus the interval flow exceeds the guaranteed flow of the downstream flood control section. The reservoir reduces the discharge flow to reduce the impact of floods on the downstream areas.
[0064] (3) Dam protection period: refers to the period after the peak shifting period when the reservoir water level reaches the maximum allowable water level. It is necessary to increase the reservoir discharge flow to lower the reservoir water level to avoid the reservoir exceeding the maximum carrying capacity and endangering the reservoir's own safety. If the flood standard is judged to be lower than the downstream flood control standard at the end of the peak shifting period, there will be no dam protection period and the water withdrawal period will be entered directly.
[0065] (4) Water drawdown period: refers to the period after the dam protection period when the reservoir is safe and the discharge flow is reduced to prepare for the next flood. The reservoir water level gradually drops to the final water level. The final water level can be reduced to the upper limit of the dynamic control range of the flood limit water level based on rainfall forecast information. If there is heavy rainfall in the future, it can be reduced to the lower limit of the dynamic control range of the flood limit water level or the flood limit water level.
[0066] When reservoirs carry out flood control optimization scheduling, they ensure the flood control safety of the basin by reducing the peak flow of the downstream flood control section. The scheduling period when the reservoir can play a peak-cutting role in the peak flow of the downstream flood control section is the peak-shifting period, which is determined as the key scheduling period.
[0067] The specific scheduling period is divided as follows:
[0068] (1) The starting time of the flood season is the starting time of the flood dispatch, i.e. 0h.
[0069] (2) The end time of the flood season is the period before the start time of the off-peak season, that is, h.
[0070] (3) The start time of the off-peak period is h. The method of the present invention provides h is the start time of the natural flow of the downstream flood control section (the reservoir is not regulated, and the outflow is equal to the inflow) exceeding the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is .when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow.
[0071] (4) The end time of the off-peak period is h. The method of the present invention provides h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h. Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now .
[0072] (5) The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h. The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which endangers its own flood control safety. The discharge flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the discharge flow should be reduced.
[0073] (6) End time of the dam protection period. The method of the present invention classifies the time from the start of the dam protection period to the end of the flood dispatch as the water retreat period. ,Right now h.
[0074] (7) The start time of the water withdrawal period is the next period after the end of the dam protection period, that is, h.
[0075] (8) The end time of the water withdrawal period is the end time of the flood dispatch, that is, h.
[0076] The flooding period is scheduled regularly or with fixed outflow, the peak-shifting period is determined as the key period for optimized scheduling, and the dam protection period is graded to increase the discharge according to the scheduling rules until the maximum discharge capacity is reached. 2. During the water withdrawal period, the maximum discharge capacity is first discharged, and the discharge flow is graded and reduced in combination with forecast information, so as to meet the subsequent storage and discharge requirements under the premise of ensuring the safety of downstream flood control. In this way, the model can reduce decision variables and achieve dimensionality reduction while ensuring the flood control effect.
[0077] 2. Solve the optimization scheduling plan;
[0078] As the number of reservoirs increases and the calculation period lengthens, the scale of the problem will rise sharply, and the dynamic programming method will face a serious "curse of dimensionality" problem. The method of the present invention uses a stepwise optimization algorithm as a solution strategy based on the characteristics of the problem. Starting from an initial feasible solution, the method iteratively optimizes the size of the discharge flow in each period during the entire scheduling process until it converges to the global optimal solution. The solution process includes the following two main parts:
[0079] (1) Determine the initial feasible solution. The rule dispatch result is used as the initial feasible solution in which the discharge of each reservoir is relatively stable and meets the reservoir discharge constraint conditions.
[0080] (2) Based on the initial feasible solution obtained in the first step, the discharge flow in each time period is readjusted according to the rule of optimizing the time periods in sequence to make the overall objective function optimal until all time periods reach the optimal state.
[0081] Different floods have different sources. For upstream reservoirs with smaller inflows than interval water, the smaller the peak flow of the downstream flood control section, the better, provided that the maximum water level of the reservoir does not exceed the maximum allowable water level. This method uses the maximum peak reduction criterion to represent the flood control optimization target, as shown in the following formula:
[0082] = my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 ;
[0083] Where: F is the objective function value; T is the total time period; N is the total number of reservoirs; i is the reservoir number; t is the time period number; is the interval inflow of reservoir i in period t, m 3 / s; is the discharge flow of reservoir i at period t, evolving through Muskingum to the downstream flood control section, m 3 / s; , is the flow calculation coefficient; is the discharge flow of reservoir i in period t, m 3 / s.
[0084] When the water inflow to the upstream reservoir is larger than that to the interval, the flood control storage capacity of each reservoir should be used as little as possible, under the premise of meeting the safety of the downstream flood control section, in order to prepare for the subsequent possible major floods. This method uses the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the maximum and minimum flood control storage capacity occupied by each reservoir is taken as the objective function:
[0085] F = my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;
[0086] Where: is the water storage capacity of reservoir i in period t, m 3 .
[0087] In the case of large inflows from upstream reservoirs and intervals, under the premise of ensuring the safety of the downstream flood control section and the maximum water level of the reservoir not exceeding the maximum allowable water level, it is necessary to minimize both the peak flow of the downstream flood control section and the utilization of the flood control capacity of each reservoir. The flood control optimization criterion of this method is a combined weighted criterion of the maximum peak reduction criterion and the maximum flood control safety guarantee criterion, and its objective function can be expressed as:
[0088] F = α 1 my ∑ t = 1 T ∑ i = 1 N [ Q seconds _ i , t + Q down _ i , t ] 2 + α 2 my ∑ i = 1 N [max( V i , 1 , V i , 2 , ⋯ , V i , t , ⋯ , V i , T )] ;
[0089] Where: is the weight coefficient of the maximum peak shaving criterion objective function; is the weight coefficient of the objective function of the maximum flood control safety guarantee criterion.
[0090] The constraint expressions that need to be satisfied to solve the flood control optimization scheduling problem of reservoir groups are as follows:
[0091] (1) Water balance constraints:
[0092] ;
[0093] Where: is the water storage capacity of reservoir i at the tth and t+1th periods, m 3 ; is the inflow to reservoir i in period t, m 3 / s; is the outflow of reservoir i in period t, m 3 / s; To calculate the long period, 3600s is taken.
[0094] (2) Water level constraint:
[0095] ;
[0096] Where: represents the water level of reservoir i in time period t, m; are the upper and lower limits of the water level allowed during operation of reservoir i, m.
[0097] (3) Final water level constraint:
[0098] ;
[0099] Where: is the water level of reservoir i in period T, m; is the final water level of reservoir i, m.
[0100] (4) Discharge capacity constraints:
[0101] ;
[0102] Where: is the discharge capacity of reservoir i at period t, m 3 / s.
[0103] (5) Reservoir discharge safety constraints:
[0104] ;
[0105] Where: is the safe discharge flow of reservoir i, m 3 / s.
[0106] (6) Discharge flow rate fluctuation constraints:
[0107] ;
[0108] In the formula, is the maximum outflow amplitude of reservoir i, m 3 / s.
[0109] (7) Downstream flood control safety constraints:
[0110] ;
[0111] Where: is the maximum flow allowed in the downstream flood control section, m 3 / s.
[0112] (8) Flood peak constraints for discharge into the reservoir:
[0113] ;
[0114] Where: is the flood peak in reservoir i, m 3 / s.
[0115] Based on the above ideas, a complete optimization scheduling process is implemented according to the following steps (1)-(10):
[0116] (1) Based on the flood forecast information, the natural flow process of the downstream flood control section is obtained when all reservoirs are not regulating water;
[0117] (2) According to the warning flow and guaranteed flow, the reservoir operation period is divided into the flooding period and the peak period ( ), dam protection period and water withdrawal period. Among them, T is the total time of flood dispatch. Combined with the set optimization step, the total time of flood dispatch is divided into a certain number of time periods, and the time period sequence starts from 0. The peak period is selected as the key period for dispatch. The details are shown in Table 1:
[0118] Table 1 Results of the operation period division for each reservoir
[0119]
[0120] The optimization step size is set to 1h.
[0121] (3) During the flood season, each reservoir adopts regular dispatching, or uses one-third of the safe discharge volume downstream of the reservoir as a fixed discharge volume. In this embodiment, each reservoir is dispatched regularly.
[0122] (4) Optimize scheduling during off-peak periods.
[0123] 4.1) First, all reservoirs are regularly dispatched to respond to flood events.
[0124] The "rule-based scheduling" mentioned here refers to the corresponding rule-based scheduling methods already in place for each reservoir.
[0125] 4.2) According to the dispatching results of rule 4.1, the corresponding part of the dispatching key period will be used as the initial discharge trajectory of the POA optimization algorithm for the dispatching key period of each reservoir in step (4).
[0126] The initial discharge trajectory line is determined by directly using the regular dispatching results of the key dispatching period of each reservoir involved in the dispatching.
[0127] 4.3) Schedule the total time period of the critical period The optimization step is divided into a certain number of time periods according to the set optimization step. From this step, the POA algorithm is iterated to find the optimal solution. In this embodiment, the relevant settings are as follows:
[0128] The algorithm parameters that need to be set in advance include: optimization time step of 1h, number of optimization iterations of 50 times, convergence accuracy of 0.0001, etc.
[0129] The algorithm-related settings include: the total time for flood dispatching of each reservoir is 137 hours, the minimum allowable water level of each reservoir is the corresponding flood limit water level of each reservoir, the maximum allowable water level of each reservoir is the corresponding flood control high water level of each reservoir, and the final water level of each reservoir is the corresponding flood limit water level of each reservoir.
[0130] When the POA algorithm optimizes the operation of hotspot reservoirs, the objective function value of the i-th period in the j-th iteration process is .
[0131] The complete scheduling process after the nth optimization corresponds to the objective function, that is, the algorithm optimizes each time period The objective function of the scheduling process calculated by the optimal situation is .
[0132] 4.3.1) The corresponding part of the critical dispatching period in the initial discharge trajectory of each reservoir is divided into this period, and the period number is sorted starting from 0.
[0133] Fixed reservoirs , Discharge flow during the period. It indicates the starting time of the off-peak period of the a-th reservoir in the first iterative calculation.
[0134] 4.3.2) Discretize each reservoir according to the algorithm The period of leakage flow is about to , The leakage flow between time periods is 1 m 3 / s is the division value for division, and each reservoir is adjusted Discharge flow during the period.
[0135] In a specific example, taking Jindou Reservoir as an example, the discharge flow in the 0th period of the peak period is 82m 3 / s, the discharge flow in the second period is 90 m 3 / s, the discrete leakage flow in the first period is 82, 83, , 90 m 3 / s.
[0136] (5) Determine the objective function based on the flood water characteristics and calculate the objective function . Make the , The objective function value of the period is the smallest. The best, that is, the first optimization calculation of the algorithm , The objective function value of the time period is the minimum. Refers to the objective function value of the i-th period during the j-th iteration of the algorithm.
[0137] The flood water characteristics refer to the proportion of upstream reservoir water and interval water in the source composition of the flood. Upstream reservoir water: interval water>7:3, the objective function selects the maximum flood control safety guarantee criterion; upstream reservoir water: interval water<3:7, the objective function selects the maximum peak reduction criterion; the ratio of upstream reservoir water: interval water P, 3:7<P<7:3, the objective function selects the combined weight criterion of the maximum peak reduction criterion and the maximum flood control safety guarantee criterion.
[0138] The typical flood corresponding to the embodiment is: the water flow in the upstream reservoir is small and the water flow in the interval is large. Therefore, the flood control optimization criterion is the maximum peak reduction criterion. Under the premise that the maximum water level of the reservoir does not exceed the maximum allowable water level, the smaller the peak flow of the downstream flood control section, the better. Its objective function is to minimize the combined flow of the downstream flood control section: F = my ∑ t = 1 T ∑ i = 1 N [ Q down _ i , t + Q sec_i,t ] 2 .
[0139] (6) Search for the best solution in each time period and advance to The time period (the end of the off-peak period) is adjusted according to the principle of optimizing the time periods in sequence to optimize the overall objective function, until all time periods reach the optimal value, that is, the new optimal objective function value for this off-peak period is obtained. When , one round of algorithm iteration calculation is completed;
[0140] (7) During the dam protection period, the discharge volume is increased in stages according to the dispatching rules until the maximum discharge capacity is reached;
[0141] (8) The water discharge section will first discharge at the maximum discharge capacity. When the forecast information indicates that there will be no rain in the future, the discharge flow will be reduced in stages to ensure the safety of downstream flood control;
[0142] (9) The optimized complete scheduling process corresponds to the objective function The objective function under all reservoir regulation is Compare and judge the optimized objective function Whether the accuracy requirement is met or the objective function is no longer improved. If both of the above judgment conditions are not met, return to step (4) to start a new round of optimization, or reach the set number of optimization iterations, the iteration stops, and the optimal solution is obtained. Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation.
[0143] The “objective function no longer improves” here means that the difference between two objective function values is less than 0.0001.
[0144] The accuracy requirement is: the convergence accuracy is 0.0001.
[0145] The “number of optimization iterations” mentioned above means that the number of optimization iterations set by the POA algorithm is 50 times.
[0146] The “return to step (4) to start a new round of optimization” here means: updating the critical period of the scheduling in the complete scheduling process of each reservoir after this optimization to the initial discharge trajectory line, and the other parameter settings remain unchanged.
[0147] (10) Output optimized flood control scheduling plan.
[0148] This example uses seven large and medium-sized reservoirs in the Dawen River Basin from Beiwang to Dawenkou as the research object, and adopts the method of the present invention to carry out joint flood control optimization peak shifting scheduling. When the flood control effect of each reservoir is relatively obvious and the flood lasts for a long time, in the face of complex and changeable flood situations, optimization scheduling can be carried out according to the flood forecast results. The number of time periods for flood optimization can be reduced to establish a joint flood control optimization scheduling model for reservoir groups based on the scheduling key period. While effectively overcoming the "dimensionality disaster", the calculation speed of generating the optimized scheduling plan is significantly improved, and the optimization ability is enhanced, so as to more effectively play the flood control benefits.
[0149] The optimization scheduling of the whole process of the reservoir is compared with the optimization scheduling scheme of the method of the present invention. Among them, the Tiancun Reservoir has no gate control and only performs regular scheduling, and does not participate in the optimization of this method. By comparison, it can be seen that: when the whole process of the reservoir is optimized and scheduled, there are as many as 822 decision variables, the optimization calculation time is about 15 minutes, and there is a problem of low utilization rate of some flood control storage capacity; the method of the present invention can reduce the decision variables to 120, and the optimization calculation time is shortened to about 2 minutes. At the same time, according to different scheduling rules in different scheduling periods, the discharge flow is smaller when the flood peak in the reservoir comes, and the optimization effect is better. It effectively avoids the downstream flood control hidden dangers caused by the sudden increase of the discharge flow during the dam protection period and the water withdrawal period, and the optimization effect is obvious. Therefore, the method of the present invention is used to carry out the joint peak-shifting optimization scheduling of the series-parallel reservoir group, which can significantly improve the calculation speed of the optimization scheduling scheme and improve the optimization ability.
[0150] Table 2
[0151]
[0152] Table 3
[0153]
[0154] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for optimizing the multi-reservoir group water flow by reducing the dimension and optimizing the peak-shifting operation based on the flood operation period division. It is characterized in that The multi-reservoir group dimensionality reduction combined peak-shifting optimization scheduling method includes two major stages: scheduling key period selection and optimization scheduling. In the first stage, by analyzing the different flood control tasks of each reservoir in the basin at different time periods, multiple scheduling periods are divided, and the peak-shifting period is used as the scheduling key period; In the second stage, the initial solution is generated according to the regulation scheduling, and the multi-reservoir joint peak-shifting optimization scheduling scheme that meets flood control safety is quickly generated through the POA algorithm; the multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method adopts steps 1 to 10 to complete the output of the optimization scheduling scheme: Step 1: Based on the flood forecast information, the natural flow process of the downstream flood control section is obtained without regulating water in all reservoirs; Step 2: According to the warning flow and guaranteed flow, the dispatching period of each reservoir is divided, including: flooding period, peak-shifting period, dam protection period, and water withdrawal period; T is the total time of flood dispatching. This method sets the total time of flood dispatching of each reservoir to be the same; combined with the set optimization step length, the total time of flood dispatching is divided into a certain number of time periods, and the time period sequence number is sorted from 0; the peak-shifting period is selected as the key dispatching period; Step 3: During the flood season, each reservoir adopts regular dispatching, or uses one-third of the safe discharge volume of the reservoir downstream as a fixed discharge volume; Step 4: Optimize scheduling during off-peak periods; Step 4.1: First, all reservoirs conduct regular dispatching of flood events; Step 4.2: According to the rule dispatching result in step 4.1, the corresponding part of the dispatching key period is used as the initial discharge trajectory line of the POA optimization algorithm for the dispatching key period of each reservoir in step 4; Step 4.3: Schedule the total time period of the critical period According to the set optimization step length, it is divided into a certain number of time periods, and the POA algorithm iterative optimization is started; definition: Refers to the objective function value of the i-th period in the j-th iteration process when the POA algorithm performs optimal scheduling for hotspot reservoirs; Refers to the objective function corresponding to the complete scheduling process after the nth optimization, that is, the algorithm optimizes each time period The objective function of the scheduling process generated under the optimal condition is calculated; Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation; Step 5: Determine the objective function based on the flood water characteristics and calculate the objective function ; Make the , The objective function value of the period is the smallest. The best, that is, the first optimization calculation of the algorithm , The objective function value of the time period is the smallest; Refers to the objective function value of the i-th period during the j-th iteration of the algorithm; Step 6: Optimize each time period accordingly until The period, that is, the off-peak period ends, and the new optimal objective function value of this off-peak period is obtained; when the period is adjusted in step 4 When , one round of algorithm iteration calculation is completed; Step 7: During the dam protection period, the discharge volume is increased in stages according to the dispatching rules until the maximum discharge capacity is reached; Step 8: The water discharge section will first discharge at the maximum discharge capacity. When the forecast information indicates that there will be no rain in the later period, the discharge flow will be reduced in stages to ensure the safety of downstream flood control; Step 9: Correspond the optimized complete scheduling process to the objective function The objective function under all reservoir regulation is For comparison: If the optimized objective function If the accuracy requirement is met or the objective function is no longer improved, the optimization is completed and the optimal solution is obtained; if the optimized objective function If the accuracy requirement is not met or the objective function is not improved, return to step 4 to start a new round of optimization. At this time, if the set number of optimization iterations is reached, the iteration stops and the optimal solution is obtained; Refers to the objective function corresponding to the complete scheduling process after the nth optimization. Specifically refers to the objective function under the regular operation of all reservoirs without optimized operation; Step 10: Output the flood control optimization scheduling plan based on the optimal solution obtained in step 9.
2. According to claim 1, a multi-reservoir group dimensionality reduction joint peak shifting optimization scheduling method based on flood scheduling period division, It is characterized in that In step 2, the reservoir dispatch period is divided as follows: The starting time of the flood period is the starting time of the flood dispatch, that is, 0h; The end time of the flood season is the period before the start time of the off-peak season, that is, h; The peak period starts at h; regulations h is the starting time when the natural flow of the downstream flood control section exceeds the warning flow h, minus the time required for the reservoir outflow to evolve to the downstream flood control section h, that is ;when At h, the inflow flow is greater than the downstream safety flow. h needs to be advanced to the time when the inflow flow is less than or equal to the end time of the downstream safety flow; The peak period ends at h; regulations h is the end time of the natural flow in the downstream flood control section exceeding the guaranteed flow h, minus the reservoir outflow evolution time h; Due to the error and the fact that the peak time of the downstream flood control section may be delayed after the reservoir peak is staggered, flood control risks may be brought about. For safety reasons, a peak delay should be added. ,Right now ; The starting time of the dam protection period is the next period after the end of the peak-shifting period, that is, h; The flood peak of the downstream flood control section has passed and the flow is lower than the guaranteed flow, but the reservoir is still operating at a high water level, which threatens its own flood control safety. The downstream flow should be increased to quickly lower the reservoir water level, but the duration should not be too long. After the reservoir water level is lowered, the downstream flow should be reduced; End time of the dam protection period; 1 / 5 of the time from the start of the dam protection period to the end of the flood dispatch is classified as the water retreat period ,Right now h; The starting time of the water withdrawal period is the next period after the end of the dam protection period, that is, h; The end time of the water retreat period is the end time of the flood dispatch, that is, h.
3. According to claim 1, a multi-reservoir group dimensionality reduction joint peak-shifting optimization scheduling method based on flood scheduling period division, It is characterized in that In step 4.2, the initial discharge trajectory is determined by directly using the regular dispatching results of the key dispatching period of each reservoir involved in the dispatching.
4. According to claim 1, a multi-reservoir group dimensionality reduction joint peak shifting optimization scheduling method based on flood scheduling period division, It is characterized in that In step 4.3: The parameters preset for iterative optimization of the POA algorithm include: optimization time step, optimization iteration number, and convergence accuracy; POA algorithm related settings include: number of flood dispatching periods, minimum water level allowed for each reservoir, maximum water level allowed for each reservoir, and final water level of each reservoir; Step 4.3.1: Divide the corresponding parts of the initial discharge trajectory lines of each reservoir during the critical period of scheduling according to this time period, and the time period numbers are sorted starting from 0; Fixed reservoirs , Discharge flow rate during period; It represents the starting time of the peak-shifting period of the ath reservoir in the first iterative calculation; Step 4.3.2: Discretize each reservoir according to the algorithm The period of leakage flow is about to , The leakage flow between time periods is 1 m 3 / s is the division value for division, and each reservoir is adjusted Discharge flow during the period.
5. A multi-reservoir group dimensionality reduction joint peak staggering optimization scheduling method based on flood scheduling period division according to claim 1, characterized in that, in the said step 5, the characteristics of the flood inflow of a flood event refer to: in the composition of the flood source, the proportion of the inflow from the upstream reservoir and the inflow from the intermediate area; define the ratio P of the inflow from the upstream reservoir to the inflow from the intermediate area: When P > P1, the objective function selects the maximum flood control safety guarantee criterion; where P1 is 7 / 3 and P2 is 3 / 7; When P < P2, the objective function selects the maximum peak shaving criterion, and P1 > P2; When P2 < P < P1, the objective function selects the combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion.
6. A multi-reservoir group dimensionality reduction joint peak staggering optimization scheduling method based on flood scheduling period division according to claim 1, characterized in that, in the said step 5, the objective function is specifically: Step 5.1: Take the maximum flood control safety guarantee criterion as the flood control optimization criterion, that is, the maximum and minimum flood control storage capacity occupied by each reservoir is taken as the objective function: ; Where: F is the objective function value; T is the total time of flood dispatch; N is the total number of reservoirs; i is the reservoir number; t is the time period number; is the water storage capacity of reservoir i in period t, m 3 ; Step 5.2: Express the flood control optimization objective function using the maximum peak reduction criterion: ; Where: is the interval inflow of reservoir i in period t, m 3 / s; is the discharge flow of reservoir i at period t, evolving through Muskingum to the downstream flood control section, m 3 / s; Step 5.3: The combined weight criterion of the maximum peak shaving criterion and the maximum flood control safety guarantee criterion, the objective function of which can be expressed as: ; Where: is the weight coefficient of the maximum peak shaving criterion objective function; is the weight coefficient of the objective function of the maximum flood control safety guarantee criterion.
7. A multi-reservoir group dimensionality reduction joint peak staggering optimization scheduling method based on flood scheduling period division according to claim 1, characterized in that, in the said step 9: the so-called "accuracy requirement" means: the convergence accuracy is 0.0001; the so-called "the objective function no longer improves" means: the difference between the two objective function values is less than 0.0001; the so-called "return to step 4 to start a new round of optimization search" means: update the time period of the critical period of scheduling in the complete scheduling process after the optimization of each reservoir this time to the initial discharge trajectory line, and keep the other parameter settings unchanged.
Citation Information
Patent Citations
Optimization Method for Joint Flood Control and Power Generation of Cascade Reservoirs
CN102296562A
Method and system for optimal scheduling on joint flood control for cascade reservoir groups
CN102817335A
Reservoir group multi-target flood control scheduling risk analysis method considering time-space correlation multi-dimensional uncertainty
CN113469528A
Forecast operation method for lowering reservoir flood limited water level considering forecast uncertainty
US20220003893A1
Cascade reservoir risk assessment method and system based on mutual feedback relationship analysis
WO2021196552A1
Cited By
Runoff reduction calculation method considering reservoir regulation and storage influence
CN120179985A
Reservoir flood control peak clipping scheduling method, system and equipment based on time sequence dynamic target water level and analysis POA optimization and medium
CN122175304A
Reservoir flood control peak shaving scheduling method, system and device based on timing dynamic target water level and analytic POA optimization and medium
CN122175304B
Drainage basin water engineering group joint scheduling method based on structure dimensionality reduction
CN122222310A
