Cabinet equipment production progress prediction method and system
By calculating the production capacity and risk index of the sub-processes of cabinet equipment production, a schedule prediction model is constructed, which solves the problem of inaccurate schedule predictions caused by the lack of risk consideration in the existing technology, and achieves more accurate and reliable production schedule predictions.
Patent Information
- Application Number
- CN202411082880.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When predicting the production progress of cabinet equipment, the existing technology lacks consideration of multiple risk factors, resulting in inaccurate prediction results.
By obtaining the historical and current production data of multiple sub-processes of cabinet equipment, the production capacity index and production risk index are calculated, a production progress prediction model is constructed, and predictions are made based on the risk production cycle and production capacity index.
It improves the accuracy and reliability of production schedule forecasts, enables a more comprehensive understanding and management of potential risks in the production process, and ensures the accuracy of production plans and overall production efficiency.
Smart Images

Figure CN118798652A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of production progress prediction, and in particular to a method and system for predicting the production progress of cabinet equipment. Background Art
[0002] Cabinets are an indispensable component of electrical equipment and are the carriers of electrical control equipment. In order to better grasp the construction period and production progress, the existing technology provides a variety of progress prediction methods. Among them, the most commonly used method is to use real-time production data and combine employees' experience to judge and predict the production progress. Since the progress of cabinet equipment production is affected by various risk factors, such as equipment, environment, personnel flow, etc., only using real-time production data and experience to predict the cabinet production progress lacks consideration of risk factors, resulting in certain limitations and ultimately making the progress prediction results inaccurate. Summary of the invention
[0003] The main purpose of the present invention is to provide a method for predicting the production progress of cabinet equipment, aiming to solve the technical problems in the prior art.
[0004] The present invention provides a method for predicting the production progress of cabinet equipment, comprising:
[0005] Obtain multiple sub-processes of cabinet equipment production, and obtain historical production data and current production data of each sub-process;
[0006] Acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data;
[0007] Calculate the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data;
[0008] Acquire risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration;
[0009] Calculate the production risk index of the corresponding process according to each of the risk failure data and process duration;
[0010] Obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and production capacity indexes;
[0011] A production progress prediction model is constructed according to the risk production cycle of multiple processes, and the current production data is input into the production progress prediction model to obtain the production progress prediction value.
[0012] Preferably, the step of calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data comprises:
[0013] Acquire total production volume and production duration according to the production efficiency data, wherein the production duration includes actual production duration and planned production duration;
[0014] The output per unit time is calculated according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is:
[0015]
[0016] Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data;
[0017] Acquire the unit qualification rate according to the production efficiency data, and acquire the unit manpower output according to the manpower data;
[0018] The production capacity index is calculated based on the unit manpower output, unit qualification rate and unit time output, wherein the calculation formula is:
[0019]
[0020] Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
[0021] Preferably, the step of obtaining the unit qualification rate according to the production efficiency data and obtaining the unit manpower output according to the manpower data comprises:
[0022] The qualified production volume is obtained according to the production efficiency data, and the unit qualified rate is calculated according to the qualified production volume and the total production volume, wherein the calculation formula is:
[0023]
[0024] Among them, D(H) represents the unit manpower output, S(C) represents the total production, and H(S) represents the qualified production;
[0025] The total manpower input value is obtained according to the manpower data, and the unit manpower output is calculated according to the total manpower input value and the total production volume, wherein the calculation formula is:
[0026]
[0027] Among them, D(R) represents unit manpower output, S(C) represents total production, and R(T) represents total manpower input value.
[0028] Preferably, the step of calculating the production risk index of the corresponding process according to each of the risk failure data and the process duration includes:
[0029] Obtaining equipment failure rate, environmental impact rate and personnel turnover rate according to the risk failure data;
[0030] The total risk rate is calculated based on the equipment failure rate, environmental impact rate and personnel turnover rate, where the calculation formula is:
[0031] Z(F)=S(G)+H(Y)+R(L);
[0032] Among them, Z(F) represents the total risk rate, S(G) represents the equipment failure rate, H(Y) represents the environmental impact rate, and R(L) represents the staff turnover rate;
[0033] Obtaining the process handover duration according to the process duration;
[0034] Obtain process dependency duration according to the process handover duration;
[0035] The process risk duration is calculated according to the process dependency duration and the process handover duration, wherein the calculation formula is:
[0036] G(F)=G(J)+G(Y);
[0037] Among them, G(F) represents the process risk duration, G(J) represents the process handover duration, and G(Y) represents the process dependency duration;
[0038] The production risk index is calculated according to the process risk duration and the total risk rate, wherein the calculation formula is:
[0039] S(F)=G(F)*Z(F);
[0040] Among them, S(F) represents the production risk index, G(F) represents the process risk duration, and Z(F) represents the total risk rate.
[0041] Preferably, the step of obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and the production capacity index comprises:
[0042] Obtain the production risk index and production capacity index of each process;
[0043] The risk production cycle of the corresponding process is calculated based on each production risk index and production capacity index, where the calculation formula is:
[0044] LF(Q)=S(Z)*[1-S(F)];
[0045] Among them, LF(Q) represents the risk production cycle, S(F) represents the production risk index, and S(Z) represents the production capacity index.
[0046] Preferably, the step of constructing a production schedule prediction model according to the risk production cycles of multiple processes, and inputting current production data into the production schedule prediction model to obtain a production schedule prediction value comprises:
[0047] The risk production cycle of each process is obtained, and a preset production schedule prediction model is constructed based on multiple risk production cycles, where the preset production schedule prediction model is:
[0048]
[0049] Among them, Y(D) represents the predicted production progress value, β1 represents the model parameter, N represents the number of risk production cycles, n represents the sequence number of the risk production cycle, and LF(Q) represents the risk production cycle;
[0050] Each of the risky production cycles is sequentially input as a training set into a preset production schedule prediction model for training, and the remaining multiple risky production cycles are used as a validation set for validation, to obtain multiple prediction training results:
[0051] Adjusting the model parameters of the preset production schedule prediction model according to the plurality of prediction training results to obtain the production schedule prediction model;
[0052] According to the current production data, multiple current risk production cycles are obtained, and the current risk production cycles are input into the production schedule prediction model to obtain the production schedule prediction value, where the production schedule prediction model is:
[0053] Among them, J(D) represents the predicted value of production progress, β2 represents the model parameter, M represents the number of current risk production cycles, m represents the sequence number of the current risk production cycle, and DF(Q) represents the current risk production cycle.
[0054] The present application also provides a cabinet equipment production progress prediction system, including:
[0055] The first acquisition module is used to acquire multiple sub-processes of cabinet equipment production, and acquire historical production data and current production data of each sub-process;
[0056] A second acquisition module is used to acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data;
[0057] A first calculation module, used for calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data;
[0058] A third acquisition module is used to acquire risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration;
[0059] A second calculation module, used to calculate the production risk index of the corresponding process according to each of the risk failure data and the process duration;
[0060] A fourth acquisition module, used for acquiring a risk production cycle of a corresponding process according to each of the production risk indexes and production capacity indexes;
[0061] The prediction module is used to build a production progress prediction model according to the risk production cycle of multiple processes, and input the current production data into the production progress prediction model to obtain the production progress prediction value.
[0062] Preferably, the first calculation module comprises:
[0063] A first acquisition unit, configured to acquire a total production volume and a production duration according to the production efficiency data, wherein the production duration includes an actual production duration and a planned production duration;
[0064] The first calculation unit is used to calculate the output per unit time according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is:
[0065]
[0066] Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data;
[0067] A second acquisition unit is used to acquire a unit qualified rate according to the production efficiency data, and to acquire a unit manpower output according to the manpower data;
[0068] The second calculation unit is used to calculate the production capacity index according to the unit manpower output, the unit qualification rate and the unit time output, wherein the calculation formula is:
[0069]
[0070] Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
[0071] The present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned cabinet equipment production progress prediction method when executing the computer program.
[0072] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned cabinet equipment production progress prediction method are implemented.
[0073] The beneficial effects of the present invention are as follows: the present invention obtains multiple sub-processes of cabinet equipment production, and obtains historical production data and current production data of each sub-process, and calculates the production capacity index of the corresponding process according to each production efficiency data, energy consumption data and manpower data. Since the production capacity index quantifies the production capacity of each sub-process by comprehensively considering data such as production efficiency, energy consumption and manpower, it is possible to accurately evaluate the production capacity of each process. Through historical data analysis and the production capacity index, the production time and productivity of each sub-process can be predicted. By obtaining the risk characteristic data of each historical production data, the production risk index of the corresponding process is calculated according to each risk failure data and process duration. By comprehensively considering the risk characteristic data and calculating the production risk index , so that we can more comprehensively understand and manage the potential risks in the production process, improve the accuracy and reliability of production forecasts, obtain the risk production cycle of the corresponding process through each production risk index and production capacity index, build a production schedule prediction model based on the risk production cycles of multiple processes, and input the current production data into the production schedule prediction model to obtain the production schedule prediction value. In this way, by combining the production risk index and the production capacity index, we can conduct a comprehensive evaluation of the risk production cycle of each process. The production schedule prediction model is constructed based on the risk production cycles of multiple processes, and can more accurately predict the overall production progress. By combining the risk characteristics in the historical data and the current production data, the influencing factors of each process are analyzed, thereby generating reliable production schedule prediction values. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 The figure is a schematic diagram of a method flow according to an embodiment of the present invention.
[0075] Figure 2 FIG. 1 is a schematic diagram of a device structure according to an embodiment of the present invention.
[0076] Figure 3 A schematic diagram of the internal structure of a computer device according to an embodiment of the present application.
[0077] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0078] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0079] like Figure 1As shown, the present application provides a method for predicting the production progress of a cabinet device, comprising:
[0080] S 1. Obtain multiple sub-processes of cabinet equipment production, and obtain historical production data and current production data of each sub-process;
[0081] S2. Acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data;
[0082] S3, calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data;
[0083] S4. Obtain risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration;
[0084] S5. Calculate the production risk index of the corresponding process according to each of the risk failure data and process duration;
[0085] S6. Obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and production capacity indexes;
[0086] S7. Construct a production progress prediction model according to the risk production cycles of multiple processes, and input the current production data into the production progress prediction model to obtain a production progress prediction value.
[0087] As described in the above steps S1-S7, the cabinet is an indispensable component of electrical equipment and is the carrier of electrical control equipment. In order to better grasp the construction period and production progress, the prior art provides a variety of progress prediction methods, among which the most commonly used method is to use real-time production data and combine the experience of employees to judge and predict the production progress. Since the progress of cabinet equipment production is affected by various risk factors, such as equipment, environment, personnel flow, etc., only using real-time production data and experience to predict the cabinet production progress lacks consideration of risk factors, resulting in certain limitations, and ultimately making the progress prediction results inaccurate.The present invention obtains multiple sub-processes of cabinet equipment production, and obtains historical production data and current production data of each sub-process, obtains production feature data of each of the historical production data, wherein the production feature data includes production efficiency data, energy consumption data and manpower data, and then calculates the production capacity index of the corresponding process according to each production efficiency data, energy consumption data and manpower data. Since the production capacity index quantifies the production capacity of each sub-process by comprehensively considering data such as production efficiency, energy consumption and manpower, it can accurately evaluate the production capacity of each process. Through historical data analysis and production capacity index, the production time and productivity of each sub-process can be predicted, which is effective. It helps to formulate production plans and schedules more accurately, avoid delays and production interruptions, and thus improve overall production efficiency. Using production characteristic data and production capacity index to predict the production progress of cabinet equipment can improve the efficiency of production management and reduce production risks. By obtaining the risk characteristic data of each historical production data, the risk characteristic data includes risk failure data and process duration, and then calculating the production risk index of the corresponding process based on each risk failure data and process duration, the production risk index can quantify the risk level of each process. In particular, through the consideration of risk failure data and process duration, it helps to identify and warn of key factors that may cause production delays or quality problems, such as equipment failures. The high frequency of equipment failures and long process cycles can be comprehensively considered and the production risk index can be calculated by comprehensively considering the risk feature data, so that the potential risks in the production process can be more comprehensively understood and managed, and the accuracy and reliability of production forecasts can be improved. The risk production cycle of the corresponding process can be obtained through each production risk index and production capacity index. A production schedule prediction model is constructed according to the risk production cycles of multiple processes, and the current production data is input into the production schedule prediction model to obtain the production schedule prediction value. In this way, the production risk index and the production capacity index are combined to comprehensively evaluate the risk production cycle of each process, which helps to fully understand the actual performance of the production risks and production capacity faced by each process, so as to better manage and control the uncertainty factors in the production process. The production schedule prediction model is constructed based on the risk production cycle of multiple processes, which can more accurately predict the overall production schedule. The model analyzes the influencing factors of each process by combining the risk features in the historical data and the current production data, so as to generate a reliable production schedule prediction value. The current production data is input into the production schedule prediction model, which can monitor the changes and trends of the production schedule in real time. By combining risk analysis and historical data analysis, since the historical data analysis provides detailed records and trends of the past production schedule, combined with the scenarios and possibilities of risk analysis, the future production schedule can be predicted more accurately.
[0088] In one embodiment, the step S2 of calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data includes:
[0089] S21. Acquire total production volume and production duration according to the production efficiency data, wherein the production duration includes actual production duration and planned production duration;
[0090] S22. Calculate the output per unit time according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is:
[0091]
[0092] Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data;
[0093] S23, obtaining a unit qualification rate according to the production efficiency data, and obtaining a unit manpower output according to the manpower data;
[0094] S24. Calculate the production capacity index according to the unit manpower output, unit qualification rate and unit time output, wherein the calculation formula is:
[0095]
[0096] Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
[0097] As described in the above steps S21-S24, the present invention obtains the total production volume and production time through production efficiency data, wherein the production time includes the actual production time and the planned production time, and then calculates the unit time output according to the energy consumption data, the actual production time, the planned production time and the total production volume. Since the unit time output is one of the important indicators for measuring production efficiency, the unit time output can be calculated to accurately evaluate the production efficiency level in each production cycle, so that the unit time output in the historical data can be combined with the current production plan and the actual production situation to improve the accuracy and reliability of the prediction, obtain the unit qualification rate according to the production efficiency data, obtain the unit manpower output according to the manpower data, and then calculate the production capacity index according to the unit manpower output, the unit qualification rate and the unit time output. The production capacity index comprehensively considers the three key factors of production efficiency, manpower input and product quality. By calculating the production capacity index, the overall production capacity of each process or production cycle can be more comprehensively evaluated, and the unit time output, unit manpower output and unit qualification rate are comprehensively considered, so that the production progress can be predicted more accurately.
[0098] In one embodiment, the step S23 of acquiring the unit qualification rate according to the production efficiency data and acquiring the unit manpower output according to the manpower data includes:
[0099] S23 1. Obtain qualified production volume according to the production efficiency data, and calculate the unit qualified rate according to the qualified production volume and the total production volume, wherein the calculation formula is:
[0100]
[0101] Among them, D(H) represents the unit manpower output, S(C) represents the total production, and H(S) represents the qualified production;
[0102] S232. Obtain a total manpower input value according to the manpower data, and calculate a unit manpower output according to the total manpower input value and the total production volume, wherein the calculation formula is:
[0103]
[0104] Among them, D(R) represents unit manpower output, S(C) represents total production, and R(T) represents total manpower input value.
[0105] As described in the above steps S231-S232, the present invention obtains qualified production volume through production efficiency data, and calculates the unit qualified rate based on the qualified production volume and the total production volume. By calculating the unit qualified rate, the product quality level of each production cycle or process can be understood in real time. By analyzing the unit qualified rates of different processes or cycles in historical data, the quality control in future production processes can be more accurately estimated. The total manpower input value is obtained through manpower data, and the unit manpower output is calculated based on the total manpower input value and the total production volume. By calculating the unit manpower output, the actual utilization of human resources in each production cycle or process can be evaluated. The model can more accurately estimate future manpower demand and production progress based on the unit manpower output in the historical data, combined with the current production plan and actual production situation, thereby improving the accuracy of the prediction.
[0106] In one embodiment, the step S5 of calculating the production risk index of the corresponding process according to each risk failure data and process duration includes:
[0107] S51, obtaining equipment failure rate, environmental impact rate and personnel turnover rate according to the risk failure data;
[0108] S52. Calculate the total risk rate according to the equipment failure rate, environmental impact rate and personnel turnover rate, wherein the calculation formula is:
[0109] Z(F)=S(G)+H(Y)+R(L);
[0110] Among them, Z(F) represents the total risk rate, S(G) represents the equipment failure rate, H(Y) represents the environmental impact rate, and R(L) represents the staff turnover rate;
[0111] S53, obtaining the process handover duration according to the process duration;
[0112] S54, obtaining the process dependency duration according to the process handover duration;
[0113] S55. Calculate the process risk duration according to the process dependency duration and the process handover duration, wherein the calculation formula is:
[0114] G(F)=G(J)+G(Y);
[0115] Among them, G(F) represents the process risk duration, G(J) represents the process handover duration, and G(Y) represents the process dependency duration;
[0116] S56. Calculate the production risk index according to the process risk duration and the total risk rate, wherein the calculation formula is:
[0117] S(F)=G(F)*Z(F);
[0118] Among them, S(F) represents the production risk index, G(F) represents the process risk duration, and Z(F) represents the total risk rate.
[0119] As described in the above steps S51-S56, the present invention obtains equipment failure rate, environmental impact rate and personnel turnover rate through risk failure data, and then calculates the total risk rate based on the equipment failure rate, environmental impact rate and personnel turnover rate. The total risk rate comprehensively considers multiple risk factors such as equipment failure, environmental impact and personnel turnover. By calculating the total risk rate, it is possible to comprehensively evaluate various potential risks that the production schedule may face, so as to more effectively formulate risk management strategies and response measures, and to improve the accuracy of production schedule prediction. The process handover duration is obtained through the process duration, the process dependency duration is obtained based on the process handover duration, and the process risk duration is calculated based on the process dependency duration and the process handover duration. By considering the dependency relationship and handover duration between processes, it can be In order to more accurately estimate the completion time of each process and thus optimize the production schedule, combined with the prediction of process risk duration, it can improve project management efficiency, accurately predict process completion time and possible delays, and help better arrange resources and monitor progress. The production risk index is calculated based on the process risk duration and the total risk rate. The production risk index comprehensively considers the process risk duration and the total risk rate, and can provide a more comprehensive production risk assessment, which helps to fully understand the potential risks in each process and the overall production process, so as to more effectively formulate risk management strategies and countermeasures. The production risk index can be used as one of the inputs of the prediction model, which can more accurately assess the risk level that the production schedule may face, and can improve the accuracy and reliability of the prediction.
[0120] In one embodiment, the step S6 of obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and the production capacity index comprises:
[0121] S61. Obtain the production risk index and production capacity index of each process;
[0122] S62. Calculate the risk production cycle of the corresponding process according to each production risk index and production capacity index, where the calculation formula is:
[0123] LF(Q)=S(Z)*[1-S(F)];
[0124] Among them, LF(Q) represents the risk production cycle, S(F) represents the production risk index, and S(Z) represents the production capacity index.
[0125] As described in the above steps S61-S62, the present invention obtains the production risk index and production capacity index of each process, and calculates the risk production cycle of the corresponding process according to each production risk index and production capacity index. The production risk index and production capacity index provide a quantitative assessment of the risk and capacity of each process. By calculating the risk production cycle, the potential risk of completing each process can be more accurately assessed, and the actual production cycle of the process can be predicted based on the production capacity index. The calculation of the risk production cycle is helpful in formulating a refined production plan. For processes with higher risks, more buffer time can be reserved or other measures can be taken to deal with potential production delays, thereby ensuring the stability and reliability of the overall production schedule. By calculating the risk production cycle and combining it with the production capacity index, the enterprise can more comprehensively manage and optimize the cabinet equipment production schedule prediction process. This method not only helps to reduce production risks, but also improves production efficiency.
[0126] In one embodiment, the step S7 of building a production schedule prediction model according to the risk production cycles of multiple processes and inputting current production data into the production schedule prediction model to obtain a production schedule prediction value includes:
[0127] S71. Obtain the risk production cycle of each process, and construct a preset production schedule prediction model based on multiple risk production cycles, wherein the preset production schedule prediction model is:
[0128]
[0129] Among them, Y(D) represents the predicted production progress value, β1 represents the model parameter, N represents the number of risk production cycles, n represents the sequence number of the risk production cycle, and LF(Q) represents the risk production cycle;
[0130] S72, sequentially inputting each of the risk production cycles as a training set into a preset production schedule prediction model for training, and using the remaining multiple risk production cycles as a verification set for verification, to obtain multiple prediction training results;
[0131] S73, adjusting the model parameters of the preset production schedule prediction model according to the plurality of prediction training results to obtain the production schedule prediction model;
[0132] S74. Acquire multiple current risk production cycles according to current production data, and input the current risk production cycles into a production schedule prediction model to obtain a production schedule prediction value, wherein the production schedule prediction model is:
[0133] Among them, J(D) represents the predicted value of production progress, β2 represents the model parameter, M represents the number of current risk production cycles, m represents the sequence number of the current risk production cycle, and DF(Q) represents the current risk production cycle.
[0134] As described in the above steps S71-S74, in the present invention, a preset production progress prediction model is constructed according to multiple risk production cycles, each risk production cycle is input into the preset production progress prediction model as a training set in turn for training, and the remaining multiple risk production cycles are used as verification sets for verification to obtain multiple prediction training results, and the model parameters of the preset production progress prediction model are adjusted according to the multiple prediction training results to obtain the production progress prediction model, and multiple current risk production cycles are obtained through current production data, and the current risk production cycle is input into the production progress prediction model to obtain the production progress prediction value, so that each risk production cycle can be used as a training set for multiple training through cross-validation, thereby reducing the performance fluctuation caused by randomness, and the model parameters of the preset production progress prediction model are adjusted through the obtained multiple prediction training results until a stable and optimized production progress prediction model is reached, and multiple current risk production cycles are used as input to improve the precision and accuracy of the production progress prediction model, and the model can comprehensively consider the changes in production cycles under different risk scenarios, thereby generating more reliable production progress prediction values.
[0135] like Figure 2 As shown, the present application also provides a cabinet equipment production progress prediction system, including:
[0136] The first acquisition module is used to acquire multiple sub-processes of cabinet equipment production, and acquire historical production data and current production data of each sub-process;
[0137] A second acquisition module is used to acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data;
[0138] A first calculation module, used for calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data;
[0139] A third acquisition module is used to acquire risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration;
[0140] A second calculation module, used to calculate the production risk index of the corresponding process according to each of the risk failure data and the process duration;
[0141] A fourth acquisition module, used for acquiring a risk production cycle of a corresponding process according to each of the production risk indexes and production capacity indexes;
[0142] The prediction module is used to build a production progress prediction model according to the risk production cycle of multiple processes, and input the current production data into the production progress prediction model to obtain the production progress prediction value.
[0143] In one embodiment, the first computing module includes:
[0144] A first acquisition unit, configured to acquire a total production volume and a production duration according to the production efficiency data, wherein the production duration includes an actual production duration and a planned production duration;
[0145] The first calculation unit is used to calculate the output per unit time according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is:
[0146]
[0147] Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data;
[0148] A second acquisition unit is used to acquire a unit qualified rate according to the production efficiency data, and to acquire a unit manpower output according to the manpower data;
[0149] The second calculation unit is used to calculate the production capacity index according to the unit manpower output, the unit qualification rate and the unit time output, wherein the calculation formula is:
[0150]
[0151] Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
[0152] like Figure 3 As shown, the present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above-mentioned cabinet equipment production progress prediction method when executing the computer program.
[0153] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned cabinet equipment production progress prediction method are implemented.
[0154] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing related hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media provided in this application and used in the embodiments may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (SSRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0155] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, device, article or method including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, device, article or method. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the presence of other identical elements in the process, device, article or method including the element.
[0156] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for predicting the production progress of cabinet equipment, characterized in that: include: Obtain multiple sub-processes of cabinet equipment production, and obtain historical production data and current production data of each sub-process; Acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data; Calculate the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data; Acquire risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration; Calculate the production risk index of the corresponding process according to each of the risk failure data and process duration; Obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and production capacity indexes; A production progress prediction model is constructed according to the risk production cycle of multiple processes, and the current production data is input into the production progress prediction model to obtain the production progress prediction value.
2. The cabinet equipment production progress prediction method according to claim 1, characterized in that: The step of calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data comprises: Acquire total production volume and production time according to the production efficiency data, wherein the production time includes actual production time and planned production time; The output per unit time is calculated according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is: Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data; Acquire the unit qualification rate according to the production efficiency data, and acquire the unit manpower output according to the manpower data; The production capacity index is calculated based on the unit manpower output, unit qualification rate and unit time output, wherein the calculation formula is: Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
3. The cabinet equipment production progress prediction method according to claim 2, characterized in that: The step of obtaining the unit qualification rate according to the production efficiency data and obtaining the unit manpower output according to the manpower data comprises: The qualified production volume is obtained according to the production efficiency data, and the unit qualified rate is calculated according to the qualified production volume and the total production volume, wherein the calculation formula is: Among them, D(H) represents the unit manpower output, S(C) represents the total production, and H(S) represents the qualified production; The total manpower input value is obtained according to the manpower data, and the unit manpower output is calculated according to the total manpower input value and the total production volume, wherein the calculation formula is: Among them, D(R) represents unit manpower output, S(C) represents total production, and R(T) represents total manpower input value.
4. The cabinet equipment production progress prediction method according to claim 1, characterized in that: The step of calculating the production risk index of the corresponding process according to each of the risk failure data and the process duration includes: Obtaining equipment failure rate, environmental impact rate and personnel turnover rate according to the risk failure data; The total risk rate is calculated based on the equipment failure rate, environmental impact rate and personnel turnover rate, where the calculation formula is: Z(F)=S(G)+H(Y)+R(L); Among them, Z(F) represents the total risk rate, S(G) represents the equipment failure rate, H(Y) represents the environmental impact rate, and R(L) represents the staff turnover rate; Obtaining the process handover duration according to the process duration; Obtain process dependency duration according to the process handover duration; The process risk duration is calculated according to the process dependency duration and the process handover duration, wherein the calculation formula is: G(F)=G(J)+G(Y); Among them, G(F) represents the process risk duration, G(J) represents the process handover duration, and G(Y) represents the process dependency duration; The production risk index is calculated according to the process risk duration and the total risk rate, wherein the calculation formula is: S(F)=G(F)*Z(F); Among them, S(F) represents the production risk index, G(F) represents the process risk duration, and Z(F) represents the total risk rate.
5. The cabinet equipment production progress prediction method according to claim 1, characterized in that: The step of obtaining the risk production cycle of the corresponding process according to each of the production risk indexes and the production capacity index comprises: Obtain the production risk index and production capacity index of each process; The risk production cycle of the corresponding process is calculated based on each production risk index and production capacity index, where the calculation formula is: LF(Q)=S(Z)*[1-S(F)]; Among them, LF(Q) represents the risk production cycle, S(F) represents the production risk index, and S(Z) represents the production capacity index.
6. The cabinet equipment production progress prediction method according to claim 1, characterized in that: The step of constructing a production schedule prediction model according to the risk production cycles of multiple processes and inputting current production data into the production schedule prediction model to obtain a production schedule prediction value includes: The risk production cycle of each process is obtained, and a preset production schedule prediction model is constructed based on multiple risk production cycles, where the preset production schedule prediction model is: Among them, Y(D) represents the predicted production progress value, β1 represents the model parameter, N represents the number of risk production cycles, n represents the sequence number of the risk production cycle, and LF(Q) represents the risk production cycle; Each of the risky production cycles is sequentially input as a training set into a preset production schedule prediction model for training, and the remaining multiple risky production cycles are used as a validation set for validation, to obtain multiple prediction training results: Adjusting the model parameters of the preset production schedule prediction model according to the plurality of prediction training results to obtain the production schedule prediction model; According to the current production data, multiple current risk production cycles are obtained, and the current risk production cycles are input into the production schedule prediction model to obtain the production schedule prediction value, where the production schedule prediction model is: Among them, J(D) represents the predicted value of production progress, β2 represents the model parameter, M represents the number of current risk production cycles, m represents the sequence number of the current risk production cycle, and DF(Q) represents the current risk production cycle.
7. A cabinet equipment production progress prediction system, characterized in that: include: The first acquisition module is used to acquire multiple sub-processes of cabinet equipment production, and acquire historical production data and current production data of each sub-process; A second acquisition module is used to acquire production characteristic data of each of the historical production data, wherein the production characteristic data includes production efficiency data, energy consumption data and manpower data; A first calculation module, used for calculating the production capacity index of the corresponding process according to each of the production efficiency data, energy consumption data and manpower data; A third acquisition module is used to acquire risk characteristic data of each of the historical production data, wherein the risk characteristic data includes risk failure data and process duration; A second calculation module, used to calculate the production risk index of the corresponding process according to each of the risk failure data and the process duration; A fourth acquisition module, used for acquiring the risk production cycle of the corresponding process according to each of the production risk indexes and the production capacity index; The prediction module is used to build a production progress prediction model according to the risk production cycle of multiple processes, and input the current production data into the production progress prediction model to obtain the production progress prediction value.
8. The cabinet equipment production progress prediction system according to claim 7, characterized in that: The first computing module comprises: A first acquisition unit, configured to acquire a total production volume and a production duration according to the production efficiency data, wherein the production duration includes an actual production duration and a planned production duration; The first calculation unit is used to calculate the output per unit time according to the energy consumption data, the actual production time, the planned production time and the total production volume, wherein the calculation formula is: Among them, D(S) represents the output per unit time, S(C) represents the total production, S(J) represents the actual production time, G(J) represents the planned production time, and N(H) represents the energy consumption data; A second acquisition unit is used to acquire a unit qualified rate according to the production efficiency data, and to acquire a unit manpower output according to the manpower data; The second calculation unit is used to calculate the production capacity index according to the unit manpower output, the unit qualification rate and the unit time output, wherein the calculation formula is: Among them, S(Z) represents the production capacity index, D(S) represents the output per unit time, D(R) represents the output per unit manpower, and D(H) represents the unit qualification rate.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Method and device for determining scheduling plan
CN108681838A
Project risk prediction method and system based on project research and development process
CN112465011A
Production progress automatic updating method, system and equipment and storage medium
CN114298589A
Petroleum drilling progress prediction model establishment method, progress prediction method and device
CN117910330A
Industrial Internet of Things information processing system for optimizing production line
CN118378779A