Resource allocation method, device and equipment and readable storage medium
By obtaining service characteristics and attributes in the TDM-PON network and using deep neural network models to determine requirements and dynamically allocate resources, the problem of traditional TDM-PON networks being unable to meet low-latency requirements is solved, achieving efficient resource utilization and improving user experience. .
Patent Information
- Application Number
- CN202410069014.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-18
AI Technical Summary
Traditional TDM-PON networks cannot meet the low-latency requirements of scenarios such as smart homes and industrial Internet when processing computing services, and it is difficult to perceive business needs, resulting in a waste of resources and poor user experience.
By obtaining business characteristic attributes in the OLT, using intent analysis and deep neural network models to determine target computing power requirements and delay requirements, dynamically allocate computing power resources and bandwidth resources, make real-time adjustments based on sensory information, and optimize resource allocation strategies to meet specific needs. business needs.
It effectively reduces latency, improves resource utilization, meets the low latency requirements of massive heterogeneous computing services, and improves user experience and system performance.
Smart Images

Figure CN118803476A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to a resource allocation method, device, equipment and readable storage medium. Background Art
[0002] TDM (Time Division Multiplexing)-PON (Passive Optical Network) is a passive optical network technology based on time division multiplexing, usually used to provide broadband access services. When processing computing services, especially in the scenario of backhaul small base station processing, the following is the general process of traditional TDM-PON processing computing services:
[0003] Access layer: The user terminal (such as a small base station or terminal equipment) is connected to the access layer of the TDM-PON network. This can be achieved through optical fiber connection or other appropriate access technology.
[0004] ONU (Optical Network Unit): ONU is an optical network unit in a TDM-PON network, located at the user end. Each ONU usually serves one or more user terminal devices. ONU is responsible for encapsulating the user's data into appropriate optical signals and sending them to the OLT.
[0005] OLT (Optical Line Terminal): OLT is the central node of the TDM-PON network and is located on the operator side. OLT is responsible for coordinating communications between ONUs, processing data from ONUs, and forwarding data to appropriate destinations. When processing computing services, since traditional OLTs do not have computing resources, they may need to identify the data that needs to be processed and forward it to the corresponding processing unit.
[0006] Transmission and distribution: The OLT distributes the received data to different processing units. This may involve transmitting the data to a cloud server, edge computing node, or other device for processing. This can be achieved through a network connection or other appropriate communication means.
[0007] Processing unit selection and distribution: Based on the data classification results, OLT decides to which processing unit the data to be processed will be transmitted. This process may involve network topology considerations, load balancing and other factors to ensure the effective use of processing unit resources.
[0008] Data processing: After receiving the data, the processing unit performs specific computing tasks. This may include data parsing, algorithm execution, model inference, etc. During the processing, data caching, storage, and communication with other processing units may also be required.
[0009] The processing results are returned to the OLT: The processing unit encapsulates the calculation results into optical signals and transmits them back to the OLT. In this step, data compression and encryption may also be involved to ensure the security and validity of the data.
[0010] OLT data transmission back to ONU: OLT transmits the processing results back to the original ONU, using TDM technology to ensure that different user data transmitted on the same optical fiber can be correctly distinguished. This may also include some transmission protocol control to ensure the integrity and correctness of the data.
[0011] User terminal receives and processes the result: The ONU transmits the processing result to the user terminal device, such as a small base station. This may involve operations such as data decapsulation and decryption to ensure that the user can correctly receive and understand the processing result and then take appropriate actions.
[0012] In general, the TDM-PON network transmits user data through optical signals, while the data for processing computing services is forwarded to a dedicated processing unit in the network and then returned to the user end after processing. This method can effectively transfer processing power from the user terminal to the network center, improving the overall performance and efficiency of the network.
[0013] However, in current application scenarios such as smart homes and industrial Internet, a large amount of computing services are processed through TDM-PON network transmission, and the current processing method of TDM-PON network cannot meet the low latency requirements of computing services. Summary of the invention
[0014] The embodiments of the present application provide a resource allocation method, apparatus, device and readable storage medium to meet the low latency requirements of computing power services.
[0015] In a first aspect, an embodiment of the present application provides a resource allocation method, which is applied to an OLT, including:
[0016] Obtaining business characteristic attributes of the target business;
[0017] According to the service characteristic attributes, a target computing power requirement and a target latency requirement are obtained;
[0018] According to the target computing power requirement and the target latency requirement, an allocation strategy for computing power resources and bandwidth resources of the target business is determined.
[0019] Optionally, obtaining a target computing power requirement and a target latency requirement according to the service characteristic attribute includes:
[0020] Performing intent analysis on the service feature attributes to obtain the target computing power requirement;
[0021] The service characteristic attributes are mapped according to a mapping strategy to obtain the target delay requirement.
[0022] Optionally, mapping the service characteristic attribute according to a mapping strategy to obtain the target delay requirement includes:
[0023] Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or
[0024] The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
[0025] Optionally, determining an allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirement and the target latency requirement includes:
[0026] Obtain the current computing power resource usage information and the current bandwidth resource usage information;
[0027] Determine an allocation strategy for the computing power resources and bandwidth resources of the target business based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information, and the current bandwidth resource occupancy information.
[0028] Optionally, the method further includes:
[0029] Acquiring perception information of the target service;
[0030] The allocation strategy is adjusted according to the perception information.
[0031] Optionally, adjusting the allocation strategy according to the perception information includes:
[0032] Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service;
[0033] Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute;
[0034] Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
[0035] In a second aspect, an embodiment of the present application provides a resource allocation method, which is applied to an ONU, including:
[0036] Send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
[0037] Optionally, the method further includes:
[0038] The perception information of the target service is sent to the OLT to adjust the allocation strategy of computing power resources and bandwidth resources of the target service.
[0039] In a third aspect, an embodiment of the present application provides a resource allocation device, which is applied to an OLT, including:
[0040] A first acquisition module, used to acquire business characteristic attributes of a target business;
[0041] A second acquisition module is used to obtain a target computing power requirement and a target latency requirement according to the service characteristic attributes;
[0042] The first determination module is used to determine an allocation strategy for computing power resources and bandwidth resources of the target business according to the target computing power requirement and the target latency requirement.
[0043] Optionally, the second acquisition module includes:
[0044] A first parsing submodule is used to perform intent parsing on the service feature attributes to obtain the target computing power requirement;
[0045] The first mapping submodule is used to map the service characteristic attributes according to a mapping strategy to obtain the target delay requirement.
[0046] Optionally, the first mapping submodule is further used for:
[0047] Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or
[0048] The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
[0049] Optionally, the first determining module includes:
[0050] The first acquisition submodule is used to obtain the current computing power resource occupancy information and the current bandwidth resource occupancy information;
[0051] The first determination submodule is used to determine the allocation strategy of the computing power resources and bandwidth resources of the target business according to the target computing power requirement, the target latency requirement, the current computing power resource occupancy information and the current bandwidth resource occupancy information.
[0052] Optionally, the device may further include:
[0053] A third acquisition module, used to acquire the perception information of the target service;
[0054] The first adjustment module is used to adjust the allocation strategy according to the perception information.
[0055] Optionally, the first adjustment module is further used for:
[0056] Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service;
[0057] Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute;
[0058] Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
[0059] In a fourth aspect, an embodiment of the present application provides a resource allocation device, applied to an ONU, including:
[0060] The first sending module is used to send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
[0061] Optionally, the device may further include:
[0062] The first sending module is used to send the perception information of the target service to the OLT, so as to adjust the allocation strategy of the computing power resources and bandwidth resources of the target service.
[0063] In a fifth aspect, an embodiment of the present application provides a resource allocation device, applied to an OLT, comprising: a processor and a transceiver;
[0064] Among them, the processor is used to obtain the service characteristic attributes of the target service; obtain the target computing power requirement and the target delay requirement based on the service characteristic attributes; and determine the allocation strategy of the computing power resources and bandwidth resources of the target service based on the target computing power requirement and the target delay requirement.
[0065] Optionally, the processor is further configured to:
[0066] Performing intent analysis on the service feature attributes to obtain the target computing power requirement;
[0067] The service characteristic attributes are mapped according to a mapping strategy to obtain the target delay requirement.
[0068] Optionally, the processor is further configured to:
[0069] Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or
[0070] The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
[0071] Optionally, the processor is further configured to:
[0072] Obtain the current computing power resource usage information and the current bandwidth resource usage information;
[0073] Determine an allocation strategy for the computing power resources and bandwidth resources of the target business based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information, and the current bandwidth resource occupancy information.
[0074] Optionally, the processor is further configured to:
[0075] Acquiring perception information of the target service;
[0076] The allocation strategy is adjusted according to the perception information.
[0077] Optionally, the processor is further configured to:
[0078] Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service;
[0079] Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute;
[0080] Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
[0081] In a sixth aspect, an embodiment of the present application further provides a resource allocation device, applied to an ONU, comprising: a processor and a transceiver;
[0082] Among them, the processor is used to send data of the target service to the OLT, and is used for the OLT to obtain the service characteristic attributes of the target service, obtain the target computing power requirement and the target delay requirement according to the service characteristic attributes, and determine the allocation strategy of the computing power resources and bandwidth resources of the target service according to the target computing power requirement and the target delay requirement.
[0083] Optionally, the processor is further used to send perception information of the target service to the OLT, so as to adjust an allocation strategy of computing resources and bandwidth resources of the target service.
[0084] In a seventh aspect, an embodiment of the present application further provides a communication device, comprising: a memory, a processor, and a program stored in the memory and executable on the processor, wherein the processor implements the steps in the resource allocation method as described above when executing the program.
[0085] In an eighth aspect, an embodiment of the present application further provides a readable storage medium, on which a program is stored, and when the program is executed by a processor, the steps in the resource allocation method as described above are implemented.
[0086] In the embodiment of the present application, the target computing power requirement and the target latency requirement can be obtained according to the service characteristic attributes of the target service, and then the allocation strategy of the computing power resources and bandwidth resources of the target service can be determined. Since the service characteristic attributes of the target service are taken into consideration, the embodiment of the present application can perform personalized resource allocation according to the specific service to meet the low latency requirement of the computing power service. BRIEF DESCRIPTION OF THE DRAWINGS
[0087] Figure 1 This is one of the flow charts of the resource allocation method provided in the embodiment of the present application;
[0088] Figure 2 This is the second flowchart of the resource allocation method provided in the embodiment of the present application;
[0089] Figure 3 is a schematic diagram of resource allocation provided in an embodiment of the present application;
[0090] Figure 4It is one of the structural diagrams of the resource allocation device provided in the embodiment of the present application;
[0091] Figure 5 This is the second structural diagram of the resource allocation device provided in the embodiment of the present application;
[0092] Figure 6 This is the third structural diagram of the resource allocation device provided in the embodiment of the present application;
[0093] Figure 7 This is the fourth structural diagram of the resource allocation device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0094] In the embodiments of the present application, the term "and / or" describes the association relationship of the associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the associated objects before and after are in an "or" relationship.
[0095] In the embodiments of the present application, the term "plurality" refers to two or more than two, and other quantifiers are similar.
[0096] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0097] In application scenarios such as smart homes and industrial Internet, a large number of computing services are transmitted to small base stations through PON for processing, which has the problems of long transmission process and large communication delay. In the current PON network, dumb pipe resources are difficult to perceive business needs, which affects the user experience, especially for the low latency requirements of massive heterogeneous computing services.
[0098] DBA (Dynamic Bandwidth Allocation) in TDM-PON is a technology used to effectively manage upstream bandwidth. In existing TDM-PON networks, the traditional DBA method ignores the characteristic differences between different services and is difficult to meet the unique requirements of specific services for low latency, resulting in a waste of resources.
[0099] Therefore, the solution of the embodiment of the present application aims to optimize the transmission efficiency of computing power services by improving the DBA method, and can perform personalized bandwidth allocation according to the latency requirements of specific services. Such optimization measures can not only reduce the overall latency, but also effectively avoid resource waste, and better meet the low latency requirements of massive heterogeneous computing power services.
[0100] See also Figure 1 , Figure 1 Flowchart of the resource allocation method provided in the embodiment of the present application, which is applied to OLT, such as Figure 1 As shown, the following steps are included:
[0101] Step 101: Obtain service characteristic attributes of a target service.
[0102] The target service may be any service, such as video conferencing, live broadcasting, multimedia, etc. The service characteristic attributes may include occupied bandwidth, end-to-end delay, transmission delay, jitter, bit error rate, etc.
[0103] Step 102: Obtain target computing power requirements and target latency requirements based on the service characteristic attributes.
[0104] Here, the service characteristic attributes are intentionally parsed to obtain the target computing power requirement, and the service characteristic attributes are mapped according to a mapping strategy to obtain the target latency requirement.
[0105] When performing intent analysis, for example, computing services (i.e., target services) from the fields of industrial Internet, smart home, and Internet of Vehicles are aggregated to OLT for processing through ONU. OLT maps these computing services to the management and control layer through the computing service board management and control interface, and then performs computing intent analysis. Among them, the method of computing intent analysis can be arbitrary and is not limited here. The analyzed computing intent may include information on bandwidth requirements, such as current business volume, queue status, delay, etc.
[0106] In the process of mapping the service characteristic attributes according to the mapping strategy to obtain the target delay requirement, the target delay requirement may be obtained at least in the following manner:
[0107] Method 1: Latency requirement mapping based on service classification:
[0108] Specifically, according to the first mapping relationship, the target delay requirement corresponding to the service characteristic attribute is obtained, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement.
[0109] The first mapping relationship is used to determine the delay requirement of the target service. The first mapping relationship may be a linear mapping relationship or a corresponding relationship (such as a corresponding relationship table) between service characteristic attributes and delay requirements.
[0110] For example, in one embodiment, the target delay requirement may be obtained as follows:
[0111] Ω p,q =τ×P(θ p,q )
[0112] Among them, Ω p,q represents the target delay requirement, τ represents the delay of the target service type, and θ p,q represents the delay coefficient matrix, p, q represents the mapping table of delay requirements corresponding to the service type of the target service, P(θ p,q ) indicates the weight increment according to priority.
[0113] Method 2: Quantitative analysis based on deep learning analysis model:
[0114] Specifically, the service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement. The deep neural network model is used to determine the delay requirement of the target service.
[0115] The service delay tolerance intention parsing model is embedded in the computing power smart board of OLT, and the model parses the service characteristic attributes through deep neural network. These service characteristic attributes include occupied bandwidth, end-to-end delay, transmission delay, jitter, bit error rate, etc., and are used as inputs of the model. After being processed by the deep neural network, the computing power demand and the service sensitivity to delay (i.e., the target delay demand) are parsed, that is, the tolerance to service response delay.
[0116] Specifically, the service delay tolerance intention parsing model learns the service's sensitivity to delay based on the input service feature attributes. In this way, it helps to gain a deeper understanding of each service's requirements and tolerance for service response delay, allowing the system to more intelligently adapt to different types of service needs.
[0117] For example, the service delay tolerance intention parsing model can be expressed as:
[0118]
[0119] Among them, β represents the target delay requirement, ρ = (ρ1ρ2ρ3) is the coefficient matrix, which is used to adjust the proportion of services with different delay sensitivity. Indicates resource occupancy status. Indicates the degree of disorder of resource status; k = 1, ... K, represents the subscript of computing power routing node, t is the column subscript of resource occupancy status, including bandwidth and computing power requirements, W (l) is the parameter matrix of the neural network, b is the bias, T represents the dimension of information, Represents the number of layers of the neural network.
[0120] In the embodiment of the present application, the above two methods can also be used in combination. For example, considering the sensitivity of dynamic bandwidth allocation to latency, the model can directly use simple classification such as that shown in method 1 at the beginning, and then update the classification parameters after the neural network converges. The combination of these two methods and feedback bandwidth allocation improves the accuracy of perception, can more comprehensively understand business needs, and provide stronger support for subsequent dynamic allocation.
[0121] Step 103: Determine an allocation strategy for computing power resources and bandwidth resources of the target service based on the target computing power requirement and the target latency requirement.
[0122] In this step, the current computing power resource occupancy information and the current bandwidth resource occupancy information are obtained, and the allocation strategy of the computing power resources and bandwidth resources of the target business is determined based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information and the current bandwidth resource occupancy information.
[0123] The allocation strategy may include the allocation of computing resources and bandwidth resources for the target service. Optionally, the OLT may also allocate computing resources and bandwidth resources according to the strategy. After obtaining the allocation strategy as described above, the OLT may perform data transmission according to the allocation strategy.
[0124] For example, the resource occupancy status of the current computing network, such as the current computing resource occupancy information and the current bandwidth resource occupancy information, can be obtained by querying the computing power and bandwidth resource pools. Afterwards, the allocation strategy of the computing power resources and bandwidth resources of the target business can be determined by combining the information obtained from the query with the target computing power requirement and the target latency requirement.
[0125] From the above description, it can be seen that in the embodiment of the present application, the target computing power requirement and the target latency requirement can be obtained according to the service characteristic attributes of the target service, and then the allocation strategy of the computing power resources and bandwidth resources of the target service can be determined. Since the service characteristic attributes of the target service are taken into consideration, the embodiment of the present application can perform personalized resource allocation according to the specific service to meet the low latency requirement of the computing power service.
[0126] Optionally, based on the above embodiment, the OLT may further obtain perception information of the target service, and adjust the allocation strategy according to the perception information.
[0127] After obtaining the allocation strategy as described above, the OLT can perform data transmission according to the allocation strategy. After the data transmission is completed, the perception node set on the ONU side can send the perception information it obtains to the OLT. Among them, the perception information may include user experience, network computing power indicator status, etc., for example, transmission delay, computing power occupancy status on a time scale, calculation delay, delay after service transmission is completed, etc.
[0128] For example, the sensing node is responsible for real-time sensing of the user's computing power service experience at the near end, and uploading the sensing results to the OLT. The OLT uses these sensing results to adjust the model parameters to achieve the purpose of adjusting the mapping strategy, thereby realizing the ability to adaptively adjust the allocation strategy. This intelligent adjustment strategy aims to dynamically adjust the allocation of computing power and bandwidth resources according to the user's actual experience, so as to provide more efficient and high-quality services.
[0129] In the process of adjusting the allocation strategy, the first mapping relationship or the model parameters of the deep neural network model can be adjusted according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model. Afterwards, the target latency requirement is updated according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attributes, and the allocation strategy can be adjusted according to the updated target latency requirement and the target computing power requirement.
[0130] From the above description, it can be seen that in the computing service process, a mechanism for real-time acquisition of perception information (such as business service quality) is introduced, and resources are dynamically allocated based on this. By real-time monitoring of the service quality of the business, the system can maximize the satisfaction of the computing service under the contradictory trade-off between latency and utilization. This real-time perception and dynamic adjustment strategy helps to find the optimal computing power allocation plan under different business needs and network conditions, and improve the performance of the overall system. At the same time, through intelligent perception and dynamic resource allocation strategies, it can adapt to different business scenarios and network conditions more flexibly, maximize the resource utilization of computing services, help avoid resource waste, and improve the efficiency of the overall system.
[0131] See also Figure 2 , Figure 2 Flowchart of the resource allocation method provided in the embodiment of the present application, which is applied to ONU, such as Figure 2 As shown, the following steps are included:
[0132] Step 201: Send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
[0133] For example, computing services (i.e., target services) from the fields of industrial Internet, smart home, and Internet of Vehicles are aggregated to OLT through ONU for processing.
[0134] From the above description, it can be seen that in the embodiment of the present application, the target computing power requirement and the target latency requirement can be obtained according to the service characteristic attributes of the target service, and then the allocation strategy of the computing power resources and bandwidth resources of the target service can be determined. Since the service characteristic attributes of the target service are taken into consideration, the embodiment of the present application can perform personalized resource allocation according to the specific service to meet the low latency requirement of the computing power service.
[0135] Optionally, the ONU may also send the perception information of the target service to the OLT to adjust the allocation strategy of computing power resources and bandwidth resources of the target service. The perception information may include transmission delay, computing power occupancy status on a time scale, calculation delay, delay after service transmission is completed, etc.
[0136] See also Figure 3 , is a schematic diagram of the resource allocation process of an embodiment of the present application.
[0137] exist Figure 3 In the OLT, computing services (i.e., target services) from the fields of industrial Internet, smart home, and Internet of Vehicles are aggregated to OLT for processing through ONU. OLT maps these computing services to the management and control layer through the computing service board management and control interface, and then obtains the service attribute characteristics and performs computing power intent analysis to obtain the target computing power requirements. Among them, the method of computing power intent analysis can be arbitrary and is not limited here. The analyzed computing power intent may include information on bandwidth requirements, such as current business volume, queue status, delay, etc.
[0138] At the same time, OLT maps these computing services to the management and control layer through the computing service board management and control interface, and then obtains the service attribute characteristics and maps the service attribute characteristics through the mapping strategy to obtain the target latency requirement.
[0139] Afterwards, the OLT queries the computing power and bandwidth resource pools to obtain the resource occupancy status of the current computing power network, such as the current computing power resource occupancy information and the current bandwidth resource occupancy information, and determines the allocation strategy of the computing power resources and bandwidth resources of the target service based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information and the current bandwidth resource occupancy information.
[0140] After obtaining the allocation strategy as described above, the OLT can perform data transmission according to the allocation strategy. After the data transmission is completed, the perception node set on the ONU side can send the perception information it obtains to the OLT. Among them, the perception information may include transmission delay, computing power occupancy status on a time scale, calculation delay, delay after service transmission is completed, etc.
[0141] For example, this sensing node is responsible for real-time sensing of the user's computing power service experience at the near end, and uploading the sensing results to the OLT. The OLT uses these sensing results to adjust parameters, thereby realizing the ability to adaptively adjust the allocation strategy. This intelligent adjustment strategy aims to dynamically adjust the allocation of computing power and bandwidth resources according to the user's actual experience, so as to provide more efficient and high-quality services.
[0142] In the process of adjusting the allocation strategy, the mapping strategy can be adjusted according to the perception information, such as the model parameters of the first mapping relationship or the deep neural network model, to obtain the adjusted first mapping relationship or the adjusted deep neural network model. Afterwards, the target latency requirement is updated according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attributes, and the allocation strategy can be adjusted according to the updated target latency requirement and the target computing power requirement.
[0143] From the above description, we can see that by integrating computing service boards, resource pools, perception nodes and other components, we have built an intelligent resource management system to achieve accurate scheduling and optimization of computing services. This not only helps to improve user experience, but also can flexibly adapt to the needs of different business scenarios in a dynamic network environment, providing more intelligent and efficient solutions for computing services in the fields of industrial Internet and intelligent applications.
[0144] In summary, the embodiments of the present application have the following advantages:
[0145] 1. Reduced latency: Giving OLT the ability to dynamically allocate computing power effectively reduces the latency of base station backhaul. By implementing dynamic resource allocation on the OLT side, the data transmission process is optimized and the timeliness of computing power services is improved.
[0146] 2. Improved perception accuracy: Two intelligent perception methods for business needs are proposed, including latency demand mapping based on business classification and quantitative analysis based on deep learning analysis models. This comprehensive perception method combines qualitative and quantitative analysis, improves the perception accuracy of business needs, and makes the system more intelligent and accurate.
[0147] 3. Real-time dynamic allocation: A mechanism for real-time perception of business service quality is introduced, and dynamic allocation is performed based on the perception results, so that computing power allocation can be adjusted in real time during the business service process, maximizing the satisfaction of computing power services, effectively balancing the contradiction between latency and utilization, and improving overall system performance.
[0148] 4. Maximize resource utilization: Through intelligent perception and dynamic allocation strategies, it can more flexibly adapt to different business scenarios and network conditions, and maximize the resource utilization of computing services. This helps to avoid resource waste and improve the efficiency of the overall system.
[0149] 5. More comprehensive solution: The embodiments of this application not only focus on innovation at the hardware level, but also conduct in-depth research on intelligent perception and dynamic allocation to form a more comprehensive solution. This helps to build a more intelligent and efficient PON computing network, which is suitable for a variety of application scenarios, such as industrial Internet and smart home.
[0150] See also Figure 4 , Figure 4 is a structural diagram of a resource allocation device provided in an embodiment of the present application, which is applied to OLT. Figure 4 As shown, the resource allocation device includes:
[0151] The first acquisition module 401 is used to acquire the service characteristic attributes of the target service; the second acquisition module 402 is used to obtain the target computing power requirement and the target delay requirement according to the service characteristic attributes; the first determination module 403 is used to determine the allocation strategy of the computing power resources and bandwidth resources of the target service according to the target computing power requirement and the target delay requirement.
[0152] Optionally, the second obtaining module 402 includes:
[0153] A first parsing submodule is used to perform intent parsing on the service feature attributes to obtain the target computing power requirement;
[0154] The first mapping submodule is used to map the service characteristic attributes according to a mapping strategy to obtain the target delay requirement.
[0155] Optionally, the first mapping submodule is further used for:
[0156] Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or
[0157] The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
[0158] Optionally, the first determining module 403 includes:
[0159] The first acquisition submodule is used to obtain the current computing power resource occupancy information and the current bandwidth resource occupancy information;
[0160] The first determination submodule is used to determine the allocation strategy of the computing power resources and bandwidth resources of the target business according to the target computing power requirement, the target latency requirement, the current computing power resource occupancy information and the current bandwidth resource occupancy information.
[0161] Optionally, the device may further include:
[0162] A third acquisition module, used to acquire the perception information of the target service;
[0163] The first adjustment module is used to adjust the allocation strategy according to the perception information.
[0164] Optionally, the first adjustment module is further used for:
[0165] Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service;
[0166] Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute;
[0167] Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
[0168] The device provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, so this embodiment will not be repeated here.
[0169] See also Figure 5 , Figure 5 is a structural diagram of a resource allocation device provided in an embodiment of the present application, which is applied to an ONU. Figure 5 As shown, the resource allocation device includes:
[0170] The first sending module 501 is used to send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
[0171] Optionally, the device may further include:
[0172] The first sending module is used to send the perception information of the target service to the OLT, so as to adjust the allocation strategy of the computing power resources and bandwidth resources of the target service.
[0173] The device provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, so this embodiment will not be repeated here.
[0174] It should be noted that the division of units in the embodiments of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional unit in each embodiment of the present application may be integrated into a processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0175] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a processor-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) or a processor (processor) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.
[0176] See also Figure 6 , Figure 6 is a structural diagram of a resource allocation device provided in an embodiment of the present application, which is applied to OLT. Figure 6 As shown, the resource allocation device includes: a processor 601 and a transceiver 602;
[0177] Among them, the processor 601 is used to obtain the service characteristic attributes of the target service; obtain the target computing power requirement and the target delay requirement based on the service characteristic attributes; and determine the allocation strategy of the computing power resources and bandwidth resources of the target service based on the target computing power requirement and the target delay requirement.
[0178] Optionally, the processor 601 is further configured to:
[0179] Performing intent analysis on the service feature attributes to obtain the target computing power requirement;
[0180] The service characteristic attributes are mapped according to a mapping strategy to obtain the target delay requirement.
[0181] Optionally, the processor 601 is further configured to:
[0182] Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or
[0183] The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
[0184] Optionally, the processor 601 is further configured to:
[0185] Obtain the current computing power resource usage information and the current bandwidth resource usage information;
[0186] Determine an allocation strategy for the computing power resources and bandwidth resources of the target business based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information, and the current bandwidth resource occupancy information.
[0187] Optionally, the processor 601 is further configured to:
[0188] Acquiring perception information of the target service;
[0189] The allocation strategy is adjusted according to the perception information.
[0190] Optionally, the processor 601 is further configured to:
[0191] Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service;
[0192] Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute;
[0193] Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
[0194] The device provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, so this embodiment will not be repeated here.
[0195] See also Figure 7 , Figure 7 is a structural diagram of a resource allocation device provided in an embodiment of the present application, which is applied to an ONU. Figure 7 As shown, the resource allocation device includes: a processor 701 and a transceiver 702;
[0196] Among them, the processor 701 is used to send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
[0197] Optionally, the processor 701 is further used to send perception information of the target service to the OLT, so as to adjust an allocation strategy of computing resources and bandwidth resources of the target service.
[0198] The device provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, so this embodiment will not be repeated here.
[0199] An embodiment of the present application provides a communication device, including: a memory, a processor, and a program stored in the memory and executable on the processor; the processor is used to read the program in the memory to implement the steps in the resource allocation method described above.
[0200] The embodiment of the present application also provides a readable storage medium, on which a program is stored, and when the program is executed by the processor, each process of the above-mentioned resource allocation method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it is not repeated here. Among them, the readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disk, hard disk, magnetic tape, magneto-optical disk (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NAND FLASH), solid state drive (SSD)), etc.
[0201] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0202] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD), and includes a number of instructions for a terminal (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in each embodiment of the present application.
[0203] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.
Claims
1. A resource allocation method, It is characterized in that Applied to optical line terminal OLT, including: Obtaining business characteristic attributes of the target business; According to the service characteristic attributes, a target computing power requirement and a target latency requirement are obtained; According to the target computing power requirement and the target latency requirement, an allocation strategy for computing power resources and bandwidth resources of the target business is determined.
2. The method according to claim 1, It is characterized in that According to the service characteristic attributes, the target computing power requirement and the target latency requirement are obtained, including: Performing intent analysis on the service feature attributes to obtain the target computing power requirement; The service characteristic attributes are mapped according to a mapping strategy to obtain the target delay requirement.
3. The method according to claim 2, It is characterized in that Mapping the service characteristic attributes according to the mapping strategy to obtain the target delay requirement includes: Obtaining a target delay requirement corresponding to the service characteristic attribute according to a first mapping relationship, wherein the first mapping relationship is a correspondence relationship between the service characteristic attribute and the delay requirement; or The service characteristic attribute is used as an input of a deep neural network model and the deep neural network model is run to obtain the target delay requirement.
4. The method according to claim 1, It is characterized in that Determining an allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirement and the target latency requirement, including: Obtain the current computing power resource usage information and the current bandwidth resource usage information; Determine an allocation strategy for the computing power resources and bandwidth resources of the target business based on the target computing power requirement, the target latency requirement, the current computing power resource occupancy information, and the current bandwidth resource occupancy information.
5. The method according to any one of claims 1 to 4, It is characterized in that The method further comprises: Acquiring perception information of the target service; The allocation strategy is adjusted according to the perception information.
6. The method according to claim 5, It is characterized in that The adjusting the allocation strategy according to the perception information includes: Adjusting a first mapping relationship or a model parameter of a deep neural network model according to the perception information to obtain an adjusted first mapping relationship or an adjusted deep neural network model, wherein the first mapping relationship or the deep neural network model is used to determine a latency requirement of the target service; Updating the target delay requirement according to the adjusted first mapping relationship or the adjusted deep neural network model and the service feature attribute; Adjust the allocation strategy according to the updated target latency requirement and the target computing power requirement.
7. A resource allocation method, It is characterized in that Applicable to optical network unit (ONU), including: Send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
8. The method according to claim 7, It is characterized in that The method further comprises: The perception information of the target service is sent to the OLT to adjust the allocation strategy of computing power resources and bandwidth resources of the target service.
9. A resource allocation device, It is characterized in that Applied to OLT, including: A first acquisition module, used to acquire business characteristic attributes of a target business; A second acquisition module is used to obtain a target computing power requirement and a target latency requirement according to the service characteristic attributes; The first determination module is used to determine an allocation strategy for computing power resources and bandwidth resources of the target business according to the target computing power requirement and the target latency requirement.
10. A resource allocation device, It is characterized in that Applied to ONU, including: The first sending module is used to send data of the target service to the OLT, so that the OLT can obtain service characteristic attributes of the target service, obtain target computing power requirements and target delay requirements according to the service characteristic attributes, and determine the allocation strategy of computing power resources and bandwidth resources of the target service according to the target computing power requirements and the target delay requirements.
11. A resource allocation device, It is characterized in that Applied to OLT, including: processor and transceiver; Among them, the processor is used to obtain the service characteristic attributes of the target service; obtain the target computing power requirement and the target delay requirement based on the service characteristic attributes; and determine the allocation strategy of the computing power resources and bandwidth resources of the target service based on the target computing power requirement and the target delay requirement.
12. A resource allocation device, It is characterized in that Applied to ONU, including: processor and transceiver; Among them, the processor is used to send data of the target service to the OLT, and is used for the OLT to obtain the service characteristic attributes of the target service, obtain the target computing power requirement and the target delay requirement according to the service characteristic attributes, and determine the allocation strategy of the computing power resources and bandwidth resources of the target service according to the target computing power requirement and the target delay requirement.
13. A communication device, include: A memory, a processor, and a program stored in the memory and executable on the processor; wherein the processor is used to read the program in the memory to implement the steps in the resource allocation method as described in any one of claims 1 to 8.
14. A readable storage medium for storing a program, It is characterized in that When the program is executed by a processor, the steps in the resource allocation method according to any one of claims 1 to 8 are implemented.
Citation Information
Cited By
Flow request access method and device, computer equipment, readable storage medium and program product
CN120128553A
Traffic request access methods, devices, computer equipment, readable storage media, and program products
CN120128553B
