Resource allocation method and device, communication equipment and readable storage medium
By allocating resource blocks according to the needs and priorities of user equipment in millimeter wave systems, multi-peak beam scheduling is achieved, which solves the problem of low user experience rate at low load caused by traditional single-peak beams and improves the load utilization of the system. and user experience.
Patent Information
- Application Number
- CN202311633226.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-01
- Publication Date
- 2024-10-18
AI Technical Summary
In millimeter-wave systems, traditional single-peak analog beams result in a larger scheduling rotation period for users at low loads and a lower user experience rate, because only one user under an analog beam can be scheduled in each time slot.
Through the resource allocation method executed on the network side, the target beam direction is determined according to the number of required resource blocks and the scheduling priority of the user equipment in each beam direction, and RB resources are allocated according to the priority and the number of required resource blocks of the user equipment to achieve Scheduling of multimodal beams.
The user's scheduling rotation period is shortened, the user experience rate is improved, and the load utilization of the system is improved by flexibly selecting single-peak or multi-peak beams to adapt to load conditions.
Smart Images

Figure CN118804304A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to a resource allocation method, apparatus, communication equipment and readable storage medium. Background Art
[0002] In millimeter wave systems, existing technical solutions are mainly based on discrete Fourier transform (DFT) codebooks to generate single-peak analog beams. This solution aims to maximize the antenna gain in the selected direction to improve user performance, such as improving the signal to interference plus noise ratio (SINR) and spectrum efficiency.
[0003] However, as the size of antennas in millimeter wave systems increases, the analog beam width becomes narrower and the number of users under each beam decreases. When using traditional single-peak beams, only one user under the analog beam can be scheduled per time slot. This results in a longer scheduling rotation cycle for users under low load and a lower user experience rate. Summary of the invention
[0004] The embodiments of the present application provide a resource allocation method, apparatus, communication equipment and readable storage medium to solve the problem that a traditional single-peak beam can only schedule one user under an analog beam in each time slot, resulting in a large scheduling rotation cycle for users under low load and a low user experience rate.
[0005] In a first aspect, an embodiment of the present application provides a resource allocation method, which is performed by a network side, and the method includes:
[0006] Determine the required number of RBs for each beam direction according to the required number of resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1;
[0007] Determining the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction;
[0008] Determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction;
[0009] Schedule the beam of the at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
[0010] Optionally, before determining the priority of each beam direction, the method further includes:
[0011] For a first user equipment in each beam direction, setting a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment;
[0012] For the second user equipment in each beam direction, the scheduling priority of the second user equipment is updated according to the channel state information CSI of the second user equipment and the size of the cache data queue of the second user equipment, wherein the second user equipment is a scheduled user equipment.
[0013] Optionally, updating the scheduling priority of the second user equipment according to the channel state information CSI of the second user equipment and the size of the buffered data queue of the second user equipment includes:
[0014] According to the first information corresponding to the CSI of the second user equipment and the size of the cache data queue of the second user equipment, searching the first preset mapping table to determine the estimated value of the data block size transmitted by the second user equipment on the full bandwidth, wherein the first information includes a modulation coding scheme MCS and a multiple-input multiple-output MIMO layer number, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cache data queue, and the estimated data block size transmitted on the full bandwidth;
[0015] Calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value;
[0016] Using the difference between the current time slot and the earliest generated time slot of the data packet in the cache data queue of the second user equipment as the second scheduling priority;
[0017] The sum of the first scheduling priority and the second scheduling priority is determined as the updated scheduling priority of the second user equipment.
[0018] Optionally, before determining the required number of RBs for each beam direction, the method further includes:
[0019] According to the first information corresponding to the CSI of each user equipment, the second preset mapping table is searched to determine the required number of RBs for each user equipment, the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, MIMO layers and the required number of RBs.
[0020] Optionally, determining the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction includes:
[0021] According to the scheduling priority of each user equipment in the first beam direction, a priority weight is allocated to each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions;
[0022] The priority weights allocated to the user equipments in the first beam direction are used to perform a weighted sum calculation on the scheduling priorities of the user equipments in the first beam direction to obtain the priority of the first beam direction.
[0023] Optionally, allocating a priority weight to each user equipment in the first beam direction according to the scheduling priority of each user equipment in the first beam direction includes:
[0024] According to the scheduling priority of each user equipment in the first beam direction from large to small, a priority weight is allocated to each user equipment in the first beam direction using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
[0025] Optionally, determining at least one target beam direction from the N beam directions according to the priority and the required number of RBs of each beam direction includes:
[0026] According to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, determine the first N beam directions in the sorting result as the target beam directions, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number;
[0027] Alternatively, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required numbers of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, and M is the maximum number of beam directions supported;
[0028] The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
[0029] Optionally, allocating RB resources to each user equipment in each target beam direction according to the scheduling priority and required number of RBs of each user equipment in each target beam direction includes:
[0030] According to the number of RBs required by each user equipment in the first target beam direction, RB resources of the number of RBs required by each user equipment in the first target beam direction are allocated to each user equipment in the first target beam direction in order from high to low scheduling priorities, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full-bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
[0031] In a second aspect, an embodiment of the present application further provides a resource allocation device, which is arranged on a network side, and the resource allocation device includes:
[0032] A first determination module, configured to determine the required number of RBs for each beam direction according to the required number of resource blocks RBs of each user equipment in each beam direction of N beam directions, wherein the N beam directions include beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1;
[0033] A second determination module, configured to determine the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction;
[0034] A third determination module is used to determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction;
[0035] A resource allocation module is used to schedule the beam of at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
[0036] Optionally, the resource allocation device further includes:
[0037] a setting module, configured to set, for a first user equipment in each beam direction, a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment;
[0038] An update module is used to update the scheduling priority of the second user equipment in each beam direction according to the channel state information CSI of the second user equipment and the size of the cache data queue of the second user equipment, where the second user equipment is a scheduled user equipment.
[0039] Optionally, the update module includes:
[0040] a search unit, configured to search a first preset mapping table according to first information corresponding to the CSI of the second user equipment and the size of a cached data queue of the second user equipment, and determine an estimated value of a data block size transmitted by the second user equipment over the full bandwidth, wherein the first information includes a modulation coding scheme MCS and a number of multiple-input multiple-output MIMO layers, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cached data queue, and the estimated data block size transmitted over the full bandwidth;
[0041] a first calculation unit, configured to calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and is negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value;
[0042] A second calculation unit, configured to use a difference between a current time slot and an earliest generated time slot of a data packet in a cached data queue of the second user equipment as a second scheduling priority;
[0043] The first determining unit is used to determine the sum of the first scheduling priority and the second scheduling priority as the updated scheduling priority of the second user equipment.
[0044] Optionally, the resource allocation device further includes:
[0045] The fourth determination module is used to search the second preset mapping table according to the first information corresponding to the CSI of each user equipment, and determine the required number of RBs for each user equipment, wherein the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, the number of MIMO layers and the required number of RBs.
[0046] Optionally, the second determining module includes:
[0047] an allocating unit, configured to allocate a priority weight to each user equipment in the first beam direction according to the scheduling priority of each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions;
[0048] A weighting unit is used to use the priority weights assigned to each user equipment in the first beam direction to perform weighted sum calculation on the scheduling priority of each user equipment in the first beam direction to obtain the priority of the first beam direction.
[0049] Optionally, the allocation unit is used to allocate priority weights to each user equipment in the first beam direction in order of the scheduling priority of each user equipment in the first beam direction from large to small, using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
[0050] Optionally, the third determination module is used to determine the first N beam directions in the sorting result as the target beam directions according to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number;
[0051] Alternatively, the third determination module is used to determine, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required numbers of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, where M is the maximum number of beam directions supported;
[0052] The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
[0053] Optionally, the resource allocation module is used to allocate RB resources of the required number of RBs of each user equipment in the first target beam direction in order from high to low according to the required number of RBs of each user equipment in the first target beam direction, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
[0054] In a third aspect, an embodiment of the present application further provides a communication device, comprising: a transceiver, a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps in the resource allocation method as described above when executing the computer program.
[0055] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps in the resource allocation method as described above are implemented.
[0056] In an embodiment of the present application, the number of required RBs for each beam direction is determined according to the number of required resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1; the priority of each beam direction is determined according to the scheduling priority of each user equipment in each beam direction; at least one target beam direction is determined from the N beam directions according to the priority and the required RB number of each beam direction; the beam of the at least one target beam direction is scheduled, and RB resources are allocated to each user equipment in each target beam direction according to the scheduling priority and the required RB number of each user equipment in each target beam direction. In this way, by determining the priority and the required RB number of each beam direction based on the scheduling priority and the required RB number of the user equipment, it is determined whether to schedule a single-peak or multi-peak beam, and the required RB resources are allocated to the users in each beam direction according to their scheduling priority, so that the corresponding beam can be scheduled based on the actual resource scheduling requirements of the user, thereby shortening the scheduling rotation cycle of the user and improving the user experience rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0058] Figure 1 is a flow chart of a resource allocation method provided in an embodiment of the present application;
[0059] Figure 2 It is an overall flow chart of the multi-peak beam rate optimization solution provided in the embodiment of the present application;
[0060] Figure 3 It is a multi-peak beam antenna pattern pointing in two directions provided in an embodiment of the present application;
[0061] Figure 4 is a structural diagram of a resource allocation device provided in an embodiment of the present application;
[0062] Figure 5 It is a structural diagram of the communication device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0063] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0064] It is worth noting that the technology described in the embodiments of the present application is not limited to the Long Term Evolution (LTE) / LTE-Advanced (LTE-A) system, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency Division Multiple Access (SC-FDMA) and other systems. The terms "system" and "network" in the embodiments of the present application are often used interchangeably, and the described technology can be used for the above-mentioned systems and radio technologies as well as other systems and radio technologies. The following description describes a new radio (NR) system for example purposes, and NR terms are used in most of the following descriptions, but these technologies can also be applied to applications other than NR system applications, such as the 6th Generation (6G) communication system.
[0065] The embodiment of the present application can be applied to a wireless communication system, including a terminal and a network side device. The terminal can also be called a user equipment (UE), which can be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer) or a notebook computer, a personal digital assistant (Personal Digital Assistant, PDA), a handheld computer, a netbook, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a mobile Internet device (Mobile Internet Device, MID), an augmented reality (augmented reality, AR) / virtual reality (virtual reality, VR) device, a robot, a wearable device (Wearable Device), a vehicle user equipment (VUE), a pedestrian terminal (Pedestrian User Equipment, PUE), a smart home (home equipment with wireless communication function, such as a refrigerator, a television, a washing machine or furniture, etc.), a game console, a personal computer (personal Terminal side devices include: computer, PC), ATM or self-service machine, perception service terminal, various sensors, smart cameras and other terminal side devices, wearable devices include: smart watches, smart bracelets, smart headphones, smart glasses, smart jewelry (smart bracelets, smart bracelets, smart rings, smart necklaces, smart anklets, smart anklets, etc.), smart wristbands, smart clothing, etc. It should be noted that the specific type of terminal is not limited in the embodiments of the present application. Network side devices may include access network devices or core network devices, wherein the access network device may also be called wireless access network equipment, wireless access network (Radio Access Network, RAN), wireless access network function or wireless access network unit.The access network equipment may include a base station, a wireless local area network (WLAN) access point or a WiFi node, etc. The base station may be called a node B, an evolved node B (eNB), an access point, a base transceiver station (Base Transceiver Station, BTS), a radio base station, a radio transceiver, a basic service set (Basic Service Set, BSS), an extended service set (Extended Service Set, ESS), a home B node, a home evolved B node, a transmitting receiving point (Transmitting Receiving Point, TRP), a perception signal sending device, a perception information receiving device or some other suitable term in the field. As long as the same technical effect is achieved, the base station is not limited to specific technical vocabulary. It should be noted that in the embodiment of the present application, only the base station in the NR system is used as an example for introduction, and the specific type of the base station is not limited.The core network equipment may include but is not limited to at least one of the following: core network node, core network function, mobility management entity (Mobility Management Entity, MME), access mobility management function (Access and Mobility Management Function, AMF), session management function (Session Management Function, SMF), user plane function (User Plane Function, UPF), policy control function (Policy Control Function, PCF), policy and charging rules function unit (Policy and Charging Rules Function, PCRF), edge application service discovery function (Edge Application Server Discovery Function, EASDF), unified data management (Unified Data Management, UDM), unified data storage (Unified Data Repository, UDR), home user server (Home Subscriber Server, HSS), centralized network configuration (CNC), network storage function (Network Repository Function, NRF), network exposure function (Network Exposure Function, NEF), local NEF (Local NEF, or L-NEF), binding support function (Binding Support Function, BSF), application function (Application Function, AF), etc.
[0066] The following is a description of the technical knowledge related to the embodiments of the present application:
[0067] A codebook is a set of predefined codeword vectors, where each codeword vector corresponds to a set of coefficients of an analog phase shifter, which can generate a beam in a specific direction. The DFT codebook is generated in the form of discrete Fourier transform and is used for multiple input multiple output (MIMO) digital precoding processing. Because the beam it generates has good directional gain, it is widely used in millimeter-wave large-scale antenna systems.
[0068] Antenna weights are calculated by adjusting the amplitude and phase of signals transmitted by different antenna units. Even if their propagation paths are different, as long as the phases are the same when they reach the receiving end, the result of signal superposition and enhancement can be achieved, which is equivalent to the antenna array aligning the signal with the receiving end.
[0069] In millimeter wave systems, as the number of antenna arrays in each channel increases, the beam becomes narrower while the antenna gain increases, resulting in too few users in each beam. Existing DFT-based analog beamforming or optimization algorithms often use the SINR or throughput of the user's receiving end as the optimization target to increase the upper limit of the entire system's carrying capacity. When the service load of the entire system is low, the number of users scheduled in each transmission time interval (Transport Time Interval, TTI) requires fewer physical resources, which will result in a longer scheduling rotation period for users under low load and a lower user experience rate.
[0070] The embodiment of the present application calculates the scheduling information of each beam direction, estimates the number of RBs required for each beam direction, and determines whether to use a single-peak or multi-peak beam. That is, the embodiment of the present application can select the scheduling beam direction and the number of beams based on the load situation, thereby shortening the scheduling rotation cycle under low load conditions and enabling users to obtain a higher experience rate.
[0071] The resource allocation method provided in the embodiment of the present application is described in detail below through specific embodiments and their application scenarios in conjunction with the accompanying drawings.
[0072] See also Figure 1 , Figure 1 is a flow chart of a resource allocation method provided in an embodiment of the present application, which is executed by the network side, such as Figure 1 As shown, the following steps are included:
[0073] Step 101. Determine the required number of resource blocks (RBs) for each user equipment in each beam direction among N beam directions according to the required number of RBs for each user equipment in each beam direction, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1.
[0074] The above-mentioned N beam directions can be determined based on the beam direction selected by each user device when accessing the network. For example, if 10 user devices have selected beams in 3 different directions in total, there are 3 beam directions in total, and the scheduling information of these 3 beam directions can be analyzed subsequently.
[0075] For the convenience of introduction, the user equipment in the embodiment of the present application may be referred to as user for explanation, that is, it can be understood that the following users all refer to user equipment connected to the network. The beam in the embodiment of the present application may refer to an analog beam.
[0076] For example, in actual applications, the base station may determine several simulated beam directions according to the strongest beam selected by the user when accessing, and may determine the user equipment set active_set={user_1, user_2, ..., user_i} in each simulated beam direction. This step corresponds to Figure 2 Step 21 is shown.
[0077] In the embodiment of the present application, the number of RBs required by each accessed user can be obtained. Specifically, the number of RBs required by each user can be estimated based on the quality information of the channel where each user is located, or the reported size of the data to be transmitted, that is, the size of the cached data queue. Then, based on the user set in each beam direction and the number of RBs required by each user, the number of RBs required in each beam direction can be counted or calculated. It can be understood that the number of RBs required in a certain beam direction is the sum of the number of RBs required by each user in the beam direction.
[0078] Step 102: Determine the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction.
[0079] In the embodiment of the present application, different scheduling priorities may be assigned or set for each accessed user. Specifically, they may be determined or regularly updated according to the access time, the quality of the channel, the size of the data to be transmitted, etc. Then, the priority of each beam direction may be comprehensively calculated or determined according to the scheduling priority of each user in the user set in each beam direction. For example, for a certain beam direction, the scheduling priority of each user in the beam direction may be weighted summed or averaged to obtain the priority of the beam direction. Of course, the priority of each beam direction may also be calculated according to other methods, which are not listed here one by one.
[0080] Optionally, before step 102, the method further includes:
[0081] For a first user equipment in each beam direction, setting a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment;
[0082] For the second user equipment in each beam direction, the scheduling priority of the second user equipment is updated according to the channel state information (CSI) of the second user equipment and the size of the cache data queue of the second user equipment, wherein the second user equipment is a scheduled user equipment.
[0083] In some embodiments, an initial scheduling priority may be set for each user who newly accesses the network, that is, each user will obtain an initialized scheduling priority when it first accesses the network. For example, the priority of the newly accessed user may be initialized to a preset value P user_i , where it can be assumed that the user is relatively stationary relative to the base station (ie, the network side).
[0084] For users who have been connected and scheduled (i.e., users who have been allocated RB resources), the scheduling priority of the user can be recalculated and the original scheduling priority can be updated based on the channel state information CSI of the user, such as channel quality and the size of the user's cached data queue, that is, the size of the data queue to be transmitted. Specifically, the size of the data block transmitted on the full bandwidth can be estimated based on the channel state information CSI of the user, and then combined with the size of its cached data queue, the scheduling priority of the user can be calculated using a pre-designed scheduling priority calculation formula, wherein the size of the user's scheduling priority can be positively correlated with the size of its cached data queue, and negatively correlated with the estimated size of the data block transmitted on the full bandwidth.
[0085] Through this implementation, it is possible to set a reasonable scheduling priority for each user based on the channel state information and pending resource conditions of each accessed user, which serves as a reference for subsequent scheduling of resources for each user.
[0086] Further, updating the scheduling priority of the second user equipment according to the channel state information CSI of the second user equipment and the size of the buffered data queue of the second user equipment includes:
[0087] searching a first preset mapping table according to first information corresponding to the CSI of the second user equipment and the size of a cached data queue of the second user equipment to determine an estimated value of a data block size transmitted by the second user equipment over the full bandwidth, wherein the first information includes a modulation and coding scheme (MCS) and a multiple-input multiple-output MIMO layer number, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cached data queue, and the estimated data block size transmitted over the full bandwidth;
[0088] Calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value;
[0089] Using the difference between the current time slot and the earliest generated time slot of the data packet in the cache data queue of the second user equipment as the second scheduling priority;
[0090] The sum of the first part of scheduling priorities and the second part of scheduling priorities is determined as the updated scheduling priority of the second user equipment.
[0091] In some specific embodiments, for a scheduled user, an estimated value of the data block size transmitted by the user on the full bandwidth can be obtained by looking up a table based on the MCS and MIMO layer number (layer, also called MIMO level) corresponding to its CSI, and the size K of the cache data queue (also called the size of the waiting data queue, or the cache queue size indicated in the buffer state report (BSR)). Specifically, the network side is pre-configured with a mapping table that represents the mapping relationship between MCS, MIMO layer number, cache data queue size and the estimated data block size transmitted on the full bandwidth, so the MCS and MIMO layer number and cache data queue size corresponding to the user's CSI, and the estimated value R of the data block size transmitted on the full bandwidth can be found from the mapping table.
[0092] Then, according to the number of full bandwidth RBs N on the network side, RB , the size of the user's cache data queue K, the average number of scheduled RBs for the user N RB_avg and the estimated value R obtained by looking up the table, as well as the current time slot T m and the earliest generation time slot T of the data packet in the user's cache data queue b , the scheduling priority of the user is calculated according to a specific formula, where the average number of scheduled RBs N of the user RB_avg It can be determined based on the scheduled data of the user, such as the average number of RBs scheduled each time in history.
[0093] Specifically, the number of full bandwidth RBs N on the network side may be RB , the size of the user's cache data queue K, the average number of scheduled RBs for the user N RB_avg and the estimated value R obtained by looking up the table, calculate the first scheduling priority, and the first scheduling priority in the calculation formula can be combined with N RB , K is positively correlated, and is RB_avg, R is negatively correlated; and the current time slot T m The earliest generation time slot T of the data packet in the user's cache data queue b as the second scheduling priority; and finally, calculating the sum of the first scheduling priority and the second scheduling priority as the updated scheduling priority of the user.
[0094] Exemplarily, the base station updates the priority of the scheduled user according to the downlink channel state information (CSI) and the size of the user's downlink data buffer / BSR to be transmitted, using the following direct proportional formula based on low load optimization:
[0095]
[0096] Among them, N RB Indicates the number of RBs in the current transmitter's full bandwidth; K indicates the size of the user's waiting-to-transmit data queue; N RB_avg Indicates the average number of RBs used by the user in each scheduling; R indicates the size of the data block predicted to be transmitted by the user on the full bandwidth, which is obtained by searching the preset mapping table according to the MCS and MIMO level corresponding to the user's current channel quality CSI and the downlink BSR; T m Indicates the current time slot; T b Indicates the earliest time slot for generating a data packet in the buffer / data queue to be transmitted. This step corresponds to Figure 2 Step 22 is shown.
[0097] Through this implementation, the scheduling priority of each user can be calculated accurately and quickly, and the rationality of the scheduling priority of each user can be guaranteed, ensuring that each user is allocated equal network resources based on its own channel and cache status.
[0098] Optionally, before step 101, the method further includes:
[0099] According to the first information corresponding to the CSI of each user equipment, the second preset mapping table is searched to determine the required number of RBs for each user equipment, wherein the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, the number of MIMO layers and the required number of RBs.
[0100] In some embodiments, the required number of RBs for each user can be obtained by looking up the table according to the MCS and MIMO layers corresponding to the CSI of each user. Specifically, the network side is pre-configured with a mapping table representing the mapping relationship between MCS, MIMO layers and required number of RBs, so the MCS and MIMO layers corresponding to the user's CSI and the corresponding required number of RBs can be found from the mapping table.
[0101] It should be noted that when searching for the required number of RBs of each accessed user, the required number of RBs of each user may also be searched in order from high to low according to the obtained scheduling priorities of each user.
[0102] For example, the base station calculates the number of RBs required for each user in descending order according to the scheduling priority of each user calculated by the base station. The specific method is as follows: the number of RBs required for each user N is obtained by searching the preset mapping table according to the MCS and layer corresponding to the current channel information CSI of the user. RB,user_i To prevent the packet from being left behind and causing a large packet delay, the number of RBs can be rounded up. This step corresponds to Figure 2 Step 23 is shown.
[0103] Determine the number of RBs N required for each user RB,user_i After that, the number of RBs required for each simulated beam direction is the sum of the number of RBs required for each user in the beam direction, and the calculation formula is as follows:
[0104]
[0105] It should be noted that the second preset mapping table and the first preset mapping table can be the same preset mapping table, but the dimensions of the table lookup are different when querying the estimated value of the data block size predicted to be transmitted by the user on the full bandwidth and the required number of RBs. In other words, the preset mapping table stores the mapping relationship between the MCS, the number of MIMO layers, the size of the cached data queue and the estimated data block size transmitted on the full bandwidth, and stores the mapping relationship between the MCS, the number of MIMO layers and the required number of RBs.
[0106] Through this implementation, the required number of RBs of each user can be obtained accurately and quickly.
[0107] Optionally, step 102 includes:
[0108] According to the scheduling priority of each user equipment in the first beam direction, a priority weight is allocated to each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions;
[0109] The priority weights allocated to the user equipments in the first beam direction are used to perform a weighted sum calculation on the scheduling priorities of the user equipments in the first beam direction to obtain the priority of the first beam direction.
[0110] In some embodiments, for any beam direction, a priority weight can be assigned to each user in the beam direction according to the scheduling priority of each user in the beam direction. For example, the higher the scheduling priority of the user, the greater the assigned priority weight, and the lower the scheduling priority of the user, the smaller the assigned priority weight; then, based on the priority weight of each user, a weighted calculation is performed on the scheduling priority of each user in the beam direction, and the calculation result is used as the priority of the beam direction.
[0111] In this way, by increasing the weight of users with higher scheduling priority, the resource allocation of high scheduling priority users and low scheduling priority users can be effectively balanced to ensure that resources are scheduled preferentially for users with higher priority, which is beneficial to ensuring the service experience quality of users with high scheduling priority.
[0112] Further, allocating a priority weight to each user equipment in the first beam direction according to the scheduling priority of each user equipment in the first beam direction includes:
[0113] According to the scheduling priority of each user equipment in the first beam direction from large to small, a priority weight is allocated to each user equipment in the first beam direction using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
[0114] In some specific embodiments, the priority of the beam may be calculated by summing up the users in the beam direction in descending order of scheduling priority in a geometric progression.
[0115] Exemplarily, the priority of a beam is the weighted sum of the scheduling priorities of all users in the beam direction. user_i Sort in descending order, and then sort according to the user priority P after descending order user_i Substitute the following formula from high to low to calculate the beam priority:
[0116]
[0117] This step corresponds to Figure 2 Step 24 is shown.
[0118] This implementation can effectively prevent the number of users accessing a beam from having too great an impact on the priority of the beam.
[0119] Step 103: Determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction.
[0120] In this step, the current load demand and priority of each beam direction can be evaluated based on the priority and required RB number of each beam direction, and then the target beam directions and number to be called first can be determined accordingly. This is equivalent to deciding whether to call a single-peak beam or a multi-peak beam, and which direction of the beam to call based on the load situation, so as to ensure that the user scheduling rotation cycle is shortened as much as possible and the user experience rate is improved while meeting the user's required resources.
[0121] Exemplarily, the target beam direction can be preferentially selected in order of priority of each beam direction from high to low, and it is ensured that the sum of the required RB numbers of the selected target beam directions does not exceed the total number of RBs on the network side over the full bandwidth, or does not exceed a certain percentage of the total number of RBs, such as not exceeding 70%, 60% or 50% of the total number of RBs.
[0122] Optionally, step 103 includes:
[0123] According to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, determine the first N beam directions in the sorting result as the target beam directions, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number;
[0124] Alternatively, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required numbers of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, and M is the maximum number of beam directions supported;
[0125] The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
[0126] In some embodiments, the beam direction may be selected as the target beam direction to be scheduled in descending order of the priority of each beam direction calculated, and whether the total number of required RBs of the selected beam direction reaches the number of full bandwidth RBs N on the network side may be considered. RB The preset percentage PT may be considered, or whether the maximum number of beam directions supported by the multi-peak beam is reached. The preset percentage PT may be flexibly set based on actual applications or requirements, such as usually 50%, 60%, etc.
[0127] In specific implementation, the beam direction with the highest priority can be selected first, and then it is determined whether the required RB number of the beam direction is greater than or equal to N. RB×PT, if yes, then only schedule the beam of this single beam direction; otherwise, continue to select the next high-priority beam direction, and then determine whether the total number of required RBs of the two selected beam directions is greater than or equal to N RB ×PT, if yes, schedule the beam of the dual-peak beam direction, otherwise continue to select the next high-priority beam direction, and so on, until the total number of required RBs in each selected beam direction is greater than or equal to N RB ×PT, or, until the maximum number of supported multi-peak beams is reached.
[0128] For example, if the RB requirement of the highest priority beam direction is greater than or equal to N RB ×PT, the single beam direction with the highest priority is scheduled; otherwise, the beam directions with the second highest priority are added in sequence until the sum of the number of RBs required for all beam directions reaches ∑N RB,beam ≥N RB ×PT, or the maximum number of directions supported by the multi-peak beam is N maxBeam .
[0129] When it is determined to use a multi-peak beam, the multi-peak beam simulation weights can be synthesized by means of mean normalization. The synthesis formula of the simulation weights is as follows:
[0130]
[0131] Among them, W multibeam is the generated multi-peak beam weight matrix, where W i is the simulated weight matrix of the i-th single-peak beam to be synthesized by the multi-peak beam; n is the number of multi-peak beams to be scheduled. This step corresponds to Figure 2 Step 25 is shown.
[0132] Exemplarily, the multi-peak beam antenna pattern pointing in two directions is as follows: Figure 3 shown.
[0133] Through this implementation, the single-peak or multi-peak beam with the greatest demand can be flexibly scheduled according to the beam priority and the required RB number, which can not only effectively improve the cell load, but also greatly reduce the user's scheduling rotation cycle and improve the user's network experience rate.
[0134] Step 104: Schedule the beam of the at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
[0135] After determining that the at least one target beam direction is the beam direction to be scheduled, the beam in the at least one target beam direction can be scheduled. Specifically, whether to enable a single-peak beam or a multi-peak beam can be decided based on whether the number of the at least one target beam direction is 1 or greater than 1. When only one target beam direction needs to be scheduled, the beam in that direction can be directly scheduled. When two or more target beam directions need to be scheduled, the beams in these multiple target beam directions can be fused according to the weight of each target beam direction to generate a multi-peak beam simulation weight, and then the corresponding multi-peak simulation beam can be enabled.
[0136] Then, RB resources of the required number of RBs can be allocated to each user in the target beam direction according to the scheduling priority order of each user in the target beam direction. For example, RB resources are first allocated to the user with the highest priority in the target beam direction, and then RB resources are allocated to the user with the second highest priority in the target beam direction, and so on, until RB resources are allocated to each user, or until the full bandwidth RB resources on the network side are allocated.
[0137] It should be noted that when there are two or more target beam directions, the order of RB resource allocation to users in each target beam direction can also be determined according to the priority of each determined target beam direction, such as first allocating RB resources to users in a target beam direction with a high priority, and then allocating RB resources to users in a target beam direction with a low priority.
[0138] Optionally, step 104 includes:
[0139] According to the number of RBs required by each user equipment in the first target beam direction, RB resources of the number of RBs required by each user equipment in the first target beam direction are allocated to each user equipment in the first target beam direction in order from high to low scheduling priorities, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full-bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
[0140] That is, for the first target beam direction, RB resources of the number of RBs required by each user in this direction can be allocated in turn according to the required RB number and scheduling priority of each user in this direction, in order of scheduling priority from high to low, until RB resources have been allocated to each user in this direction, or until the network side has allocated all RB resources in the full bandwidth.
[0141] For example, the users under the selected target beam may be scheduled in descending order of priority according to the number of RBs N required by each user. RB,user_i, continuously allocate RB resources according to RB number from small to large until all users are allocated or all bandwidth RB resources are allocated. This step corresponds to Figure 2 Step 26 is shown.
[0142] In this way, it can be ensured that users with higher priorities are given priority in obtaining RB resources, providing differentiated resource services to each user, and giving priority to ensuring the experience rate of high-priority users.
[0143] The following is an example of the implementation of the present application described above with reference to a specific embodiment:
[0144] Assume that 3 transmitters, 20 receivers, 3 File Transfer Protocol (FTP) services, 20 Mbps traffic, and a maximum of two directions of multi-peak beams. maxBeam =2.
[0145] 1) Calculate the user priority first. Take user 5 as an example. The number of RBs in the cell full bandwidth is N. RB =132, the size of the data queue to be transmitted by user 5 K = 100 kbits, the historical average number of scheduled RBs N RB_avg =11.726, estimated full bandwidth transport block size (TBS), R = 327.888 kbits, current time slot T m =573, the earliest data packet generation time slot T in the waiting queue b =560, so the scheduling priority of user 5 is as follows:
[0146]
[0147] 2) Calculate the number of RBs required by the user. The buffer size of user 5 is 100 kbits, the MCS reported by CSI is 28, and layer is 1. The corresponding number of RBs is 40 as obtained by looking up the table.
[0148] The scheduling priorities and required RB numbers of other users are calculated as shown in Table 1:
[0149] Table 1. Estimation results of user scheduling priority and required RB number
[0150] TTI Number User ID Cell ID Number of RBs required by users User Priority 573 2 (0,0) 31 18.415 573 5 (0,0) 40 16.433 573 6 (0,0) 4 18.979 573 8 (0,0) 28 22.488 573 11 (0,0) 41 22.555 573 12 (0,0) 4 4.171
[0151] 3) Based on the strongest beam selected by the user's initial access cell, taking beam 28 as an example, the user set in the direction of beam 28 is {user 2, user 8, user 12}. The number of RBs required for beam 28 is:
[0152] N RB,beam28 =28+31+4=63
[0153] The calculation results of the number of RBs required for other beam directions are shown in Table 2:
[0154] Table 2. Estimation results of the number of RBs in the beam direction
[0155] TTI Number Cell ID Beam ID Beam Priority Number of RBs required for a beam 573 (0,0) 28 16.369 63 573 (0,0) 37 12.9465 10.788 573 (0,0) 41 10.239 36 573 (0,0) 40 10.2075 15.178 573 (0,0) 42 10.0455 21.72 573 (0,0) 38 10.0035 51.092
[0156] 4) Calculate the priority of beam 28 as:
[0157]
[0158] 5) The number of RBs 63 required by beam 28 with the highest beam priority is less than 50% of the number of RBs in the full bandwidth, that is, PT = 50%, N RB ×PT=132×50%=66, so the second highest priority beam direction 37 is added to the scheduling direction. Since the upper limit of the direction of the multi-peak beam is set to N maxBeam =2, so time slot 573 uses a dual-peak beam scheduling beam 28 with the highest priority and beam 37 with the second highest priority.
[0159] 6) Simulation results
[0160] The simulation results are shown in Table 3 below. After using the multi-peak beam technology, due to the reduction of antenna gain, the user's SINR is reduced and the cell load is increased. However, due to the shortening of the scheduling rotation cycle, the user's average scheduling delay is significantly improved, so that the user experience rate is increased by about 35%.
[0161] Table 3 Performance comparison between multi-peak beam and DFT single-peak beam
[0162] Performance Indicators Single peak beam Multi-peak beam SSB-RSRP(dBm) -94.51 -94.51 PDSCH SINR(dB) 31.18 29.20 Average scheduling delay (ms) 37.25 8.80 Cell load (%) 20.55 30.89 Average number of scheduled users 0.52 0.67 Average user rate (Mbps) 20.83 27.68
[0163] The embodiment of the present application calculates the scheduling information of each beam, estimates the number of RBs required for each beam, determines whether the RB threshold is exceeded, and then determines whether to use a single-peak or multi-peak beam, as well as the number of beams of the multi-peak beam, and uses the antenna weight normalization method to generate the corresponding simulated beam. The embodiment of the present application can make full use of the user's waiting data queue information, select the number of scheduling directions based on the load situation to synthesize the simulated beam, thereby obtaining a higher user experience rate for users under low load conditions.
[0164] The resource allocation method of the embodiment of the present application determines the required RB number of each beam direction according to the required resource block RB number of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1; determines the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction; determines at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction; schedules the beam of the at least one target beam direction, and allocates RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction. In this way, by determining the priority and required RB number of each beam direction based on the scheduling priority and required RB number of the user equipment, it is determined whether to schedule a single-peak or multi-peak beam, and the required RB resources are allocated to the users in each beam direction according to their scheduling priority, so that the corresponding beam can be scheduled based on the actual resource scheduling requirements of the user, thereby shortening the scheduling rotation cycle of the user and improving the user experience rate.
[0165] The embodiment of the present application also provides a resource allocation device, which is arranged on the network side. Figure 4 , Figure 4 1 is a structural diagram of a resource allocation device provided in an embodiment of the present application. Since the principle of solving the problem by the resource allocation device is similar to that of the resource allocation method in the embodiment of the present application, the implementation of the resource allocation device can refer to the implementation of the method, and the repeated parts will not be repeated.
[0166] like Figure 4 As shown, the resource allocation device 400 includes:
[0167] A first determination module 401 is used to determine the required number of RBs for each beam direction according to the required number of resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1;
[0168] A second determination module 402, configured to determine the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction;
[0169] A third determination module 403 is used to determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction;
[0170] The resource allocation module 404 is used to schedule the beam of the at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
[0171] Optionally, the resource allocation device 400 further includes:
[0172] a setting module, configured to set, for a first user equipment in each beam direction, a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment;
[0173] An update module is used to update the scheduling priority of the second user equipment in each beam direction according to the channel state information CSI of the second user equipment and the size of the cache data queue of the second user equipment, wherein the second user equipment is a scheduled user equipment.
[0174] Optionally, the update module includes:
[0175] a search unit, configured to search a first preset mapping table according to first information corresponding to the CSI of the second user equipment and the size of a cached data queue of the second user equipment, and determine an estimated value of a data block size transmitted by the second user equipment over the full bandwidth, wherein the first information includes a modulation coding scheme MCS and a number of multiple-input multiple-output MIMO layers, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cached data queue, and the estimated data block size transmitted over the full bandwidth;
[0176] a first calculation unit, configured to calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and is negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value;
[0177] A second calculation unit, configured to use a difference between a current time slot and an earliest generated time slot of a data packet in a cached data queue of the second user equipment as a second scheduling priority;
[0178] The first determining unit is used to determine the sum of the first scheduling priority and the second scheduling priority as the updated scheduling priority of the second user equipment.
[0179] Optionally, the resource allocation device 400 further includes:
[0180] The fourth determination module is used to search the second preset mapping table according to the first information corresponding to the CSI of each user equipment, and determine the required number of RBs for each user equipment, wherein the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, the number of MIMO layers and the required number of RBs.
[0181] Optionally, the second determining module 402 includes:
[0182] an allocating unit, configured to allocate a priority weight to each user equipment in the first beam direction according to the scheduling priority of each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions;
[0183] A weighting unit is used to use the priority weights assigned to each user equipment in the first beam direction to perform weighted sum calculation on the scheduling priority of each user equipment in the first beam direction to obtain the priority of the first beam direction.
[0184] Optionally, the allocation unit is used to allocate priority weights to each user equipment in the first beam direction in order of the scheduling priority of each user equipment in the first beam direction from large to small, using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
[0185] Optionally, the third determination module 403 is used to determine the first N beam directions in the sorting result as the target beam directions according to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number;
[0186] Alternatively, the third determination module 403 is used to determine, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required number of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, where M is the maximum number of beam directions supported;
[0187] The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
[0188] Optionally, the resource allocation module 404 is used to allocate RB resources of the required number of RBs to each user equipment in the first target beam direction in order from high to low according to the required number of RBs of each user equipment in the first target beam direction, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full-bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
[0189] The resource allocation device 400 provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, which will not be repeated in this embodiment.
[0190] The resource allocation device of the embodiment of the present application determines the required number of RBs for each beam direction according to the required number of resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1; determines the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction; determines at least one target beam direction from the N beam directions according to the priority and required number of RBs of each beam direction; schedules the beam of the at least one target beam direction, and allocates RB resources to each user equipment in each target beam direction according to the scheduling priority and required number of RBs of each user equipment in each target beam direction. In this way, by determining the priority and required number of RBs of each beam direction based on the scheduling priority and required number of RBs of the user, it is determined whether to schedule a single-peak or multi-peak beam, and the required RB resources are allocated to the users in each beam direction according to their scheduling priority, so that the corresponding beam can be scheduled based on the actual resource scheduling requirements of the user, thereby shortening the scheduling rotation cycle of the user and improving the user experience rate.
[0191] The embodiment of the present application also provides a communication device. Since the principle of solving the problem by the communication device is similar to the resource allocation method in the embodiment of the present application, the implementation of the communication device can refer to the implementation of the method, and the repeated parts will not be repeated. Figure 5 As shown, the communication device of the embodiment of the present application includes:
[0192] The processor 500 is used to read the program in the memory 520 and execute the following process:
[0193] Determine the required number of RBs for each beam direction according to the required number of resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1;
[0194] Determining the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction;
[0195] Determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction;
[0196] Schedule the beam of the at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
[0197] The transceiver 510 is configured to receive and send data under the control of the processor 500 .
[0198] Among them, Figure 5 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits of one or more processors represented by processor 500 and memory represented by memory 520. The bus architecture may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 510 may be a plurality of components, namely, a transmitter and a transceiver, providing a unit for communicating with various other devices on a transmission medium. The processor 500 is responsible for managing the bus architecture and general processing, and the memory 520 may store data used by the processor 500 when performing operations.
[0199] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0200] For a first user equipment in each beam direction, setting a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment;
[0201] For the second user equipment in each beam direction, the scheduling priority of the second user equipment is updated according to the channel state information CSI of the second user equipment and the size of the cache data queue of the second user equipment, wherein the second user equipment is a scheduled user equipment.
[0202] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0203] According to the first information corresponding to the CSI of the second user equipment and the size of the cache data queue of the second user equipment, searching the first preset mapping table to determine the estimated value of the data block size transmitted by the second user equipment on the full bandwidth, wherein the first information includes a modulation coding scheme MCS and a multiple-input multiple-output MIMO layer number, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cache data queue, and the estimated data block size transmitted on the full bandwidth;
[0204] Calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value;
[0205] Using the difference between the current time slot and the earliest generated time slot of the data packet in the cache data queue of the second user equipment as the second scheduling priority;
[0206] The sum of the first scheduling priority and the second scheduling priority is determined as the updated scheduling priority of the second user equipment.
[0207] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0208] According to the first information corresponding to the CSI of each user equipment, the second preset mapping table is searched to determine the required number of RBs for each user equipment, wherein the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, the number of MIMO layers and the required number of RBs.
[0209] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0210] According to the scheduling priority of each user equipment in the first beam direction, a priority weight is allocated to each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions;
[0211] The priority weights allocated to the user equipments in the first beam direction are used to perform a weighted sum calculation on the scheduling priorities of the user equipments in the first beam direction to obtain the priority of the first beam direction.
[0212] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0213] According to the scheduling priority of each user equipment in the first beam direction from large to small, a priority weight is allocated to each user equipment in the first beam direction using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
[0214] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0215] According to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, determine the first N beam directions in the sorting result as the target beam directions, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number;
[0216] Alternatively, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required numbers of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, and M is the maximum number of beam directions supported;
[0217] The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
[0218] Optionally, the processor 500 is further configured to read a program in the memory 520 and execute the following steps:
[0219] According to the number of RBs required by each user equipment in the first target beam direction, RB resources of the number of RBs required by each user equipment in the first target beam direction are allocated to each user equipment in the first target beam direction in order from high to low scheduling priorities, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full-bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
[0220] The communication device provided in the embodiment of the present application can execute the above method embodiment, and its implementation principle and technical effect are similar, so this embodiment will not be repeated here.
[0221] In addition, the computer-readable storage medium of the embodiment of the present application is used to store a computer program, and the computer program can be executed by a processor to implement the various steps in the above method embodiment.
[0222] In the several embodiments provided in the present application, it should be understood that the disclosed methods and devices can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0223] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may be physically included separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0224] The above-mentioned integrated unit implemented in the form of a software functional unit can be stored in a computer-readable storage medium. The above-mentioned software functional unit is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform some steps of the sending and receiving methods described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.
[0225] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles described in the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A resource allocation method, executed by a network side, characterized in that: The method comprises: Determine the required number of RBs for each beam direction according to the required number of resource blocks RB of each user equipment in each beam direction of N beam directions, wherein the N beam directions include the beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1; Determining the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction; Determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction; Schedule the beam of the at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
2. The method according to claim 1, characterized in that Before determining the priority of each beam direction, the method further includes: For a first user equipment in each beam direction, setting a scheduling priority of the first user equipment to a preset priority, wherein the first user equipment is a newly connected user equipment; For the second user equipment in each beam direction, the scheduling priority of the second user equipment is updated according to the channel state information CSI of the second user equipment and the size of the cache data queue of the second user equipment, wherein the second user equipment is a scheduled user equipment.
3. The method according to claim 2, characterized in that The updating the scheduling priority of the second user equipment according to the channel state information CSI of the second user equipment and the size of the buffered data queue of the second user equipment includes: According to the first information corresponding to the CSI of the second user equipment and the size of the cache data queue of the second user equipment, searching the first preset mapping table to determine the estimated value of the data block size transmitted by the second user equipment on the full bandwidth, wherein the first information includes a modulation coding scheme MCS and a multiple-input multiple-output MIMO layer number, and the first preset mapping table stores a mapping relationship between the MCS, the number of MIMO layers, the size of the cache data queue, and the estimated data block size transmitted on the full bandwidth; Calculate a first scheduling priority according to the number of full bandwidth RBs, the size of the cache data queue of the second user equipment, the average number of scheduled RBs of the second user equipment, and the estimated value, wherein the first scheduling priority is positively correlated with the number of full bandwidth RBs and the size of the cache data queue of the second user equipment, and negatively correlated with the average number of scheduled RBs of the second user equipment and the estimated value; Using the difference between the current time slot and the earliest generated time slot of the data packet in the cache data queue of the second user equipment as the second scheduling priority; The sum of the first scheduling priority and the second scheduling priority is determined as the updated scheduling priority of the second user equipment.
4. The method according to claim 1, characterized in that: Before determining the required number of RBs for each beam direction, the method further includes: According to the first information corresponding to the CSI of each user equipment, the second preset mapping table is searched to determine the required number of RBs for each user equipment, wherein the first information includes MCS and the number of MIMO layers, and the second preset mapping table stores the mapping relationship between MCS, the number of MIMO layers and the required number of RBs.
5. The method according to claim 1, characterized in that The determining the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction includes: According to the scheduling priority of each user equipment in the first beam direction, a priority weight is allocated to each user equipment in the first beam direction, wherein a user equipment with a higher scheduling priority is allocated a higher priority weight, and the first beam direction is any beam direction of the N beam directions; The priority weights allocated to the user equipments in the first beam direction are used to perform a weighted sum calculation on the scheduling priorities of the user equipments in the first beam direction to obtain the priority of the first beam direction.
6. The method according to claim 5, characterized in that The allocating a priority weight to each user equipment in the first beam direction according to the scheduling priority of each user equipment in the first beam direction includes: According to the scheduling priority of each user equipment in the first beam direction from large to small, a priority weight is allocated to each user equipment in the first beam direction using a geometric series with a first term of 1 / 2 and a common ratio of 1 / 2.
7. The method according to claim 1, characterized in that The determining at least one target beam direction from the N beam directions according to the priority and the required number of RBs of each beam direction comprises: According to the priority and the required RB number of each beam direction, and in a descending order of the priority of each beam direction, determine the first N beam directions in the sorting result as the target beam directions, wherein the sum of the required RB numbers of the first N beam directions is greater than or equal to the first RB number, and the sum of the required RB numbers of the first N-1 beam directions in the sorting result is less than the first RB number; Alternatively, according to the priority and the required number of RBs of each beam direction, and in descending order of the priority of each beam direction, when it is determined that the sum of the required numbers of RBs of the first M beam directions is not greater than or equal to the first number of RBs, the first M beam directions are determined as target beam directions, and M is the maximum number of beam directions supported; The first number of RBs is a preset percentage of the number of RBs of the full bandwidth.
8. The method according to claim 1, characterized in that The allocating RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction includes: According to the number of RBs required by each user equipment in the first target beam direction, RB resources of the number of RBs required by each user equipment in the first target beam direction are allocated to each user equipment in the first target beam direction in order from high to low scheduling priorities, until the allocation of RB resources to each user equipment in the first target beam direction is completed or the full-bandwidth RB resources have been allocated, wherein the first target beam direction is any of the target beam directions.
9. A resource allocation device, arranged on a network side, characterized in that: The resource allocation device comprises: A first determination module, configured to determine the required number of RBs for each beam direction according to the required number of resource blocks RBs of each user equipment in each beam direction of N beam directions, wherein the N beam directions include beam directions selected by each user equipment accessing the network side when accessing, and N is an integer greater than 1; A second determination module, configured to determine the priority of each beam direction according to the scheduling priority of each user equipment in each beam direction; A third determination module is used to determine at least one target beam direction from the N beam directions according to the priority and required RB number of each beam direction; A resource allocation module is used to schedule the beam of at least one target beam direction, and allocate RB resources to each user equipment in each target beam direction according to the scheduling priority and required RB number of each user equipment in each target beam direction.
10. A communication device, comprising: A transceiver, a memory, a processor and a computer program stored in the memory and executable on the processor; wherein the processor is used to read the program in the memory to implement the steps in the resource allocation method as described in any one of claims 1 to 8.
11. A computer-readable storage medium for storing a computer program, characterized in that: When the computer program is executed by a processor, the steps in the resource allocation method according to any one of claims 1 to 8 are implemented.
