Method for assembling flexible pin shaft for gear box

Through the combined use of the tooling pressure plate and the coil induction heating device, the problem of insufficient assembly accuracy of the flexible pin of the gearbox is solved, a high-precision assembly effect is achieved, and the deformation of the planet carrier connecting hole is avoided.

CN118809091APending Publication Date: 2024-10-22TAIYUAN HEAVY IND
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410840786.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing technology cannot meet the assembly accuracy requirements of the flexible pin of the gearbox, and the planet carrier stopper and the main shaft connection hole are prone to deformation after assembly, resulting in substandard connection accuracy.

Method used

The tooling pressure plate and screws are used for position limiting, and the coil induction heating device is used to locally heat the flexible pin hole. The rough machining and finishing steps are combined to ensure assembly accuracy by adjusting the assembly gap and precise adjustment.

Benefits of technology

The assembly accuracy is improved, and the position deviation of the planet carrier stopper and the main shaft connection hole behind the flexible pin is avoided, ensuring a high-precision assembly effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118809091A_ABST
    Figure CN118809091A_ABST
Patent Text Reader

Abstract

The invention discloses a method for assembling a flexible pin shaft for a gear box. The method comprises the following steps: roughly machining a planet carrier spigot and a main shaft connecting hole; the tool pressing plates are respectively fastened on the end surfaces of the flexible pin shaft holes of the planet carrier through screws; a coil induction heating device is wound in the flexible pin shaft hole, one end of the coil induction heating device abuts against the tool pressing plate, and the inner wall of the flexible pin shaft hole is heated; the coil induction heating device is taken out, meanwhile, the assembled flexible pin shaft is inserted into the flexible pin shaft hole, and one end of the flexible pin shaft abuts against the tool pressing plate; measuring whether the distance between the tail end of the pin shaft sleeve and the planet carrier meets a required value or not, and if the measured size is larger than the required value, loosening the screw to adjust the tool pressing plate to reduce the distance between the tail end of the pin shaft sleeve and the planet carrier until the distance meets the required value; and finish machining is conducted on the planet carrier spigot and the main shaft connecting hole. The mounting precision of the flexible pin shaft is effectively improved, and the influence on the precision of the planet carrier after the flexible pin shaft is mounted is effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of flexible pin assembly, and in particular relates to a flexible pin assembly method for a gear box. Background Art

[0002] The planetary carrier is one of the main components of the planetary gear transmission. When assembling the flexible pin of the gear box and the planetary carrier, the flexible pin is often frozen as a whole, the planetary carrier is heated, or the flexible pin is frozen as a whole and heated at the same time. However, these assembly methods do not meet the assembly requirements with high assembly accuracy. At the same time, after the flexible pin is assembled, the planetary carrier stop and the main shaft connecting hole will expand, resulting in the planetary carrier connection accuracy exceeding the tolerance and failing to meet the technical requirements.

[0003] Therefore, there is a need in the art for a method for assembling a flexible pin shaft for a gear box, which can eliminate or at least alleviate all or part of the defects in the above-mentioned prior art. Summary of the invention

[0004] In order to at least partially solve the technical problems existing in the above-mentioned prior art, the present invention provides a method for assembling a flexible pin shaft for a gear box.

[0005] The method for assembling a flexible pin shaft for a gear box of the present invention utilizes an assembly tool, wherein the assembly tool comprises a tool pressing plate, screws and a coil induction heating device, wherein: the tool pressing plate is mounted on the end surface of the flexible pin shaft hole through the screws to limit the flexible pin shaft, and the coil induction heating device is wound around the flexible pin shaft hole to heat the flexible pin shaft hole;

[0006] The method comprises the following steps:

[0007] Step S1, rough machining of the planet carrier: rough machining of the planet carrier stopper and the spindle connecting hole;

[0008] Step S2, installing the tooling pressure plate: fastening the tooling pressure plate to the end surface of the flexible pin shaft hole of the planet carrier by screws;

[0009] Step S3, assembling the flexible pin: sleeve the pin sleeve onto the pin and process it to the required size;

[0010] Step S4, heating the flexible pin shaft hole: winding the coil induction heating device in the flexible pin shaft hole, making one end of the coil induction heating device abut against the tooling pressing plate, and heating the inner wall of the flexible pin shaft hole;

[0011] Step S5, installing the flexible pin: taking out the coil induction heating device, and inserting the assembled flexible pin into the flexible pin hole, so that one end of the flexible pin abuts against the tooling pressing plate;

[0012] Step S6, precise adjustment: measure the distance between the end of the pin sleeve and the planet carrier to see if it meets the required value. If the measured size is larger than the required value, loosen the screw to adjust the tooling pressure plate to reduce the distance between the end of the pin sleeve and the planet carrier until it meets the required value.

[0013] Step S7, planet carrier finishing: finishing the planet carrier stop and the spindle connecting hole.

[0014] Furthermore, in the above-mentioned flexible pin assembly method for a gear box, in step S4, the heating temperature T of the coil induction heating device and the heating time t of the flexible pin hole are determined according to the interference fit size between the flexible pin and the planet carrier.

[0015] Furthermore, in the above-mentioned flexible pin assembly method for a gear box, in step S5, a coil induction heating device can be wound in all the flexible pin holes at the same time, and the start time can be set in sequence according to the flexible pin installation time.

[0016] Furthermore, in the above-mentioned flexible pin assembly method for a gear box, in step S6, after the distance between the end of the pin sleeve and the planetary carrier meets the required value, the screws are tightened, and the runout of the tooling pressure plate is detected by a table to be ≤0.02mm.

[0017] The flexible pin assembly method for a gear box of the present invention has the following advantages and beneficial effects:

[0018] The present invention adopts local induction heating to assemble the flexible pin and the planetary carrier, and adjusts the assembly gap through the tooling pressure plate and screws, which effectively improves the assembly accuracy. The planetary carrier stop and the main shaft connecting hole are first rough-processed, and then fine-processed after the flexible pin is assembled, thereby effectively ensuring that the position of the planetary carrier stop and the main shaft connecting hole does not deviate after the flexible pin is assembled. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings in the following descriptions are only used to further understand the embodiments of the present invention and constitute a part of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0020] Figure 1 It is a cross-sectional view of the assembly of the flexible pin shaft for the gear box of the present invention;

[0021] Figure 2 It is a schematic diagram of assembling the flexible pin shaft for the gear box of the present invention.

[0022] Description of reference numerals:

[0023] 1: Tooling plate;

[0024] 2: Screws;

[0025] 3: Coil induction heating device;

[0026] 10: Planet carrier;

[0027] 20: flexible pin, 201: pin, 202: pin sleeve. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the specific embodiments of the present invention and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0029] like Figure 1 to Figure 2 As shown, the flexible pin assembly method for a gear box of the present invention utilizes an assembly tool, the assembly tool comprises a tool pressing plate 1, a screw 2 and a coil induction heating device 3, wherein: the tool pressing plate 1 is mounted on the end surface of the flexible pin hole through the screw 2, and is used to limit the flexible pin, and the coil induction heating device 3 is wound around the flexible pin hole, and is used to heat the flexible pin hole;

[0030] The method comprises the following steps:

[0031] Rough machining of the planet carrier stop and spindle connection hole;

[0032] Use screws to fasten the tooling pressure plate to d1, d2, d3, d4, d5, d6, and d7 of the planetary frame respectively. Figure 2 The seven flexible pin shaft holes are placed on the end faces as shown, and the planet carrier is placed on the platform to ensure it is level;

[0033] Sleeve the pin sleeve onto the pin shaft and process it to the requirements;

[0034] Wind the coil induction heating device around the flexible pin holes d1, d2, d3, d4, d5, d6, and d7 on the horizontally placed planet carrier, so that one end of the coil induction heating device abuts against the tooling pressure plate to heat the inner wall of the flexible pin hole;

[0035] Take out the coil induction heating device in the d1 flexible pin hole, and insert the assembled flexible pin into the d1 flexible pin hole, so that one end of the flexible pin abuts against the tooling pressure plate;

[0036] Measure the distance C between the end of the pin sleeve and the planet carrier to see if it meets the required value. If the measured size is larger than the required value, loosen the screw to adjust the tooling pressure plate to reduce the distance between the end of the pin sleeve and the planet carrier until it meets the required value, thereby ensuring the assembly accuracy of each flexible pin shaft;

[0037] Subsequently, according to the above method, the coil induction heating devices in the flexible pin holes of d2, d3, d4, d5, d6, and d7 are taken out in turn, and the assembled flexible pins are inserted into the corresponding flexible pin holes, and precise adjustments are performed in turn. By forming a corresponding installation in the installation order of d1, d2, d3, d4, d5, d6, and d7, the deformation of the planetary carrier during installation is effectively reduced.

[0038] After all the flexible pins are installed, the planet carrier stop and the main shaft connecting hole are finely processed to avoid deviation of the position of the planet carrier stop and the main shaft connecting hole after the flexible pin is assembled.

[0039] Furthermore, in the flexible pin assembly method for a gear box of the present invention, the heating temperature T of the coil induction heating device and the heating time t of the flexible pin hole are determined according to the interference fit size between the flexible pin and the planetary carrier.

[0040] Furthermore, in the flexible pin assembly method for a gear box of the present invention, a coil induction heating device can be wound in all the flexible pin holes at the same time, and the start time can be set in sequence according to the flexible pin installation time.

[0041] Furthermore, in the flexible pin assembly method for a gear box of the present invention, the screws are tightened after the distance between the end of the pin sleeve and the planetary carrier meets the required value, and the runout of the tooling pressure plate is detected by a table to be ≤0.02mm.

[0042] To sum up, compared with the prior art, the flexible pin assembly method for a gear box of the present invention has the following advantages and beneficial effects: the present invention adopts local induction heating to assemble the flexible pin and the planetary carrier, and adjusts the assembly gap through the tooling pressure plate and screws, thereby effectively improving the assembly accuracy, and firstly rough-processing the planetary carrier stop and the main shaft connecting hole, and then fine-processing is performed after assembling the flexible pin, thereby effectively ensuring that the position of the planetary carrier stop and the main shaft connecting hole does not deviate after assembling the flexible pin.

[0043] It should be noted that, in this article, unless otherwise clearly specified and limited, the term "connection" or its synonyms should be understood in a broad sense. For example, "connection" can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. Moreover, expressions such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. At the same time, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such a process, method, article or device. In addition, "front", "back", "left", "right", "upper" and "lower" in this article are all referenced to the placement state shown in the accompanying drawings.

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for assembling a flexible pin for a gear box, characterized in that: The method uses an assembly tool, which includes a tool pressing plate, screws and a coil induction heating device, wherein: the tool pressing plate is installed on the end surface of the flexible pin shaft hole through the screws to limit the flexible pin shaft, and the coil induction heating device is wound around the flexible pin shaft hole to heat the flexible pin shaft hole; The method comprises the following steps: Step S1, rough machining of the planet carrier: rough machining of the planet carrier stopper and the spindle connecting hole; Step S2, installing the tooling pressure plate: fastening the tooling pressure plate to the end surface of the flexible pin shaft hole of the planet carrier by screws; Step S3, assembling the flexible pin: sleeve the pin sleeve onto the pin and process it to the required size; Step S4, heating the flexible pin shaft hole: winding the coil induction heating device in the flexible pin shaft hole, making one end of the coil induction heating device abut against the tooling pressing plate, and heating the inner wall of the flexible pin shaft hole; Step S5, installing the flexible pin: taking out the coil induction heating device, and inserting the assembled flexible pin into the flexible pin hole, so that one end of the flexible pin abuts against the tooling pressing plate; Step S6, precise adjustment: measure the distance between the end of the pin sleeve and the planet carrier to see if it meets the required value. If the measured size is larger than the required value, loosen the screw to adjust the tooling pressure plate to reduce the distance between the end of the pin sleeve and the planet carrier until it meets the required value. Step S7, planet carrier finishing: finishing the planet carrier stop and the spindle connecting hole.

2. The method for assembling a flexible pin for a gear box according to claim 1, characterized in that: In step S4, the heating temperature T of the coil induction heating device and the heating time t of the flexible pin hole are determined according to the interference fit size between the flexible pin and the planet carrier.

3. The method for assembling a flexible pin for a gear box according to claim 1, characterized in that: In step S5, the coil induction heating device may be wound in all the flexible pin holes at the same time, and the start time may be set in sequence according to the flexible pin installation time.

4. The method for assembling a flexible pin for a gear box according to claim 1, characterized in that: In step S6, after the distance between the end of the pin sleeve and the planet carrier meets the required value, the screws are tightened, and the runout of the tooling pressure plate is checked by a gauge to be ≤0.02 mm.

Citation Information

Patent Citations

  • Assembling method for gear box end cover and elastic pin shaft

    CN103273258A

  • Device and device for assembling bearing pin shaft in wind power gear box

    CN105673821A

  • Machining method of planetary gear box body

    CN111515631A

  • Processing device for assembling balancing shaft hole and balancing shaft of balancing shaft bracket

    CN202527898U

  • Quick returns that degree of depth is adjustable pressure equipment simultaneously anchor clamps

    CN206436165U