Device and method for compensating soil mass loss in disturbance area in steel pipe pile recovery process

By installing bag grouting pipes and ground grouting hoses inside the steel pipe piles, the problem of environmental deformation caused by strong disturbance and soil loss during the steel pipe pile recycling process is solved, and efficient soil loss compensation is achieved. and reinforcement, providing a low-impact construction method.

CN118814764AActive Publication Date: 2024-10-22SHANGHAI CONSTRUCTION GROUP CO LTD +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410941094.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-22
Estimated Expiration
2044-07-15

Smart Images

  • Figure CN118814764A_ABST
    Figure CN118814764A_ABST
Patent Text Reader

Abstract

The invention relates to a disturbance area soil body loss compensation device and method in the steel pipe pile recycling process, the device comprises a steel pipe pile, a sleeve set is annularly arranged on the inner wall of the pile and comprises a bag grouting pipe and a stratum grouting hose, a bottom sealing bag is arranged at the bottom of the steel pipe pile, the bag grouting pipe is communicated with the bottom sealing bag, and the stratum grouting hose is communicated with the bag grouting pipe. And the stratum grouting hose is fixedly connected with the bottom sealing bag. According to the device and the method, ultra-deep full-length arrangement of the stratum grouting hose in the pulling-out process of the steel pipe pile is achieved, in-situ compensation grouting reinforcement is adopted subsequently, and the problem of large surrounding environment deformation caused by strong disturbance and soil mass loss in the recycling process of the steel pipe pile is solved. By means of the device and method, stratum grouting reinforcement and soil mass loss compensation of the strong disturbance area around the steel pipe pile can be achieved, and therefore a reliable method is provided for efficient, low-disturbance and low-influence construction implementation in the steel pipe pile recycling process. The method is a method for conducting stratum compensation grouting through automatic pipe arrangement in the steel pipe pile pulling-out process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a device and method for compensating soil loss in a disturbed area during the recovery of a steel pipe pile. Background Art

[0002] In recent years, the steel pipe pile sinking technology of the resonance-free hydraulic vibration hammer has been widely used in soft soil areas. It is widely used in municipal bridge pile foundation projects due to its advantages of high construction efficiency, low noise and low environmental impact. With the continuous promotion of the low-carbon and green development concept of the construction industry, the green and efficient enclosure structure system such as PC method pile based on steel pipe piles has gradually been recognized by the industry by utilizing the recyclable characteristics of steel pipe piles.

[0003] However, due to the strong disturbance of the soil due to vibration and soil squeezing effect during the construction of resonance-free steel pipe piles, the surrounding soil, especially the soil inside the pipe, has lost some strength. Therefore, the disturbance is more severe during the extraction process, and obvious volume loss occurs. Such repeated strong disturbance process will inevitably cause the recovery of steel pipe piles to have a greater impact on the deformation of the surrounding environment. There are certain deformation effects on nearby pipelines, tunnels, existing buildings, etc., especially under the condition of soil loss, there are long-term adverse risks to the underground structure within the retaining structure.

[0004] At present, the more common practice is to drive in grouting pipes for grouting reinforcement after the steel pipe piles are pulled out. The driven grouting pipes are also steel flower pipes. After the grouting is completed, most of them are abandoned in the soil. It is still difficult to meet the needs of low-carbon construction. At the same time, this construction process is relatively cumbersome and relatively lagging, and it is difficult to achieve uniform effects by single-tube grouting.

[0005] Therefore, how to provide a soil loss compensation device in the disturbed area during the steel pipe pile recovery process and provide a reliable method for the efficient, low-disturbance and low-impact construction implementation of the steel pipe pile recovery process is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0006] The present invention provides a device and method for compensating soil loss in a disturbed area during the recovery of steel pipe piles. Aiming at the problem of large deformation of the surrounding environment caused by strong disturbance and soil loss during the recovery of steel pipe piles, a device and method for automatically laying pipes for stratum compensation grouting during the steel pipe pile removal process are proposed, so as to realize stratum grouting reinforcement and soil loss compensation in the strongly disturbed area around the steel pipe piles, thereby providing a reliable method for the high-efficiency, low-disturbance and low-impact construction implementation of the steel pipe pile recovery process.

[0007] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0008] A device for compensating soil loss in a disturbed area during steel pipe pile recovery, comprising:

[0009] A steel pipe pile, wherein a casing group is circumferentially arranged on the inner wall of the steel pipe pile, wherein the casing group comprises a bag grouting pipe and a formation grouting hose, a bottom sealing bag and a bag grouting ring pipe are arranged at the bottom of the steel pipe pile, wherein the bag grouting pipe is interconnected with the bottom sealing bag, and the formation grouting hose is fixedly connected with the bag grouting ring pipe.

[0010] Furthermore, the formation grouting hoses are arranged at even intervals.

[0011] Furthermore, the number of the formation grouting hoses is greater than the number of the bag grouting pipes.

[0012] The present invention provides a method for compensating soil loss in a disturbed area during steel pipe pile recovery, the method comprising the following steps:

[0013] Step S1, providing a device for compensating soil loss in the disturbed area during the steel pipe pile recovery process for standby;

[0014] Step S2, using a resonance-free hydraulic vibration hammer to carry out steel pipe pile sinking construction;

[0015] Step S3: before the steel pipe pile is removed, the grouting equipment is connected to the bag grouting pipe;

[0016] Step S4, start the grouting equipment to expand the bottom bag at the bottom of the steel pipe pile to form an anchor with the stratum;

[0017] Step S5, remove the grouting pipe, and install a resonance-free hydraulic vibration hammer on the top of the steel pipe pile;

[0018] Step S6, start the resonance-free hydraulic vibration hammer to remove the steel pipe pile, and under the anchoring action of the bottom sealing bag, the formation grouting hose connected to the bottom sealing bag gradually slides from the casing into the in-situ formation of the steel pipe pile; and

[0019] Step S7: The steel pipe piles are completely removed, the grouting equipment is connected to the formation grouting hose, and the compensatory grouting is started to complete the soil reinforcement and soil loss compensation of the disturbed area.

[0020] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0021] The present invention provides a device for compensating soil loss in a disturbed area during steel pipe pile recovery, comprising a steel pipe pile, a casing group circumferentially arranged on the inner wall of the steel pipe pile, the casing group comprising a bag grouting pipe and a formation grouting hose, a bottom-sealing bag arranged at the bottom of the steel pipe pile, the bag grouting pipe and the bottom-sealing bag being interconnected, and the formation grouting hose being fixedly connected to the bottom-sealing bag. The device and method for compensating soil loss in a disturbed area during steel pipe pile recovery proposed by the present invention solve the problem of large deformation of the surrounding environment caused by strong disturbance and soil loss during steel pipe pile recovery. Through the device and method provided by the present invention, grouting reinforcement of the formation and compensation for soil loss in the strongly disturbed area around the steel pipe pile can be achieved, thereby providing a reliable method for the efficient, low-disturbance, and low-impact construction implementation of the steel pipe pile recovery process. The method of the present invention is a method for automatically laying pipes for formation compensation grouting during the steel pipe pile removal process. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic structural diagram of a device for compensating soil loss in a disturbed area during the recovery of a steel pipe pile according to an embodiment of the present invention;

[0023] Figure 2 for Figure 1 AA section view;

[0024] Figure 3 for Figure 1 BB cross-sectional view;

[0025] Figures 4 to 9 The present invention is a construction flow chart of steps S2 to S7 in a method for compensating for soil loss in a disturbed area during steel pipe pile recovery in one embodiment of the present invention.

[0026] In the figure:

[0027] 1- steel pipe pile, 2- bag grouting pipe, 3- formation grouting hose, 4- bottom sealing bag, 5- resonance-free hydraulic vibration hammer, 6- formation, 7- lifting equipment, 8- grouting equipment, 9- bag grouting ring pipe. DETAILED DESCRIPTION

[0028] The following is a further detailed description of a device and method for compensating for soil loss in the disturbed area during the recovery of steel pipe piles provided by the present invention in conjunction with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will become clearer. It should be noted that the accompanying drawings are all in a very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.

[0029] Principle: The present invention is mainly aimed at the problem that during the recovery process of steel pipe piles, the formation is greatly affected by deformation of the surrounding environment due to strong disturbance and soil loss. A series of casings are evenly arranged in an annular direction in the steel pipe pile, and bag grouting pipes are arranged in some casings, and formation grouting hoses are arranged in the remaining casings. A bottom bag is arranged at the bottom of the steel pipe pile, and the bag grouting pipes are interconnected with the bag, and the grouting hose is fixedly connected to the bottom bag. Before the steel pipe pile is removed, the bottom bag is first grouting and expanded through the bag grouting pipe to form an anchoring end, and then the steel pipe pile is opened for removal. At this time, the formation grouting hose inside the steel pipe pile will gradually slide along the casing, and finally all the steel pipe piles are removed. The formation grouting hose is also arranged at the original location of the steel pipe piles. The formation is compensated by grouting through the grouting hose, thereby achieving compensation and reinforcement of the disturbed area of ​​the steel pipe pile and the soil loss.

[0030] Embodiment 1

[0031] Combine the following Figures 1 to 9 , and detailed description of the structural composition of the soil loss compensation device in the disturbed area during the steel pipe pile recovery process.

[0032] A device for compensating soil loss in a disturbed area during steel pipe pile recovery, comprising:

[0033] A steel pipe pile 1 is provided with a casing group in an annular direction on the inner wall of the steel pipe pile 1, the casing group includes a bag grouting pipe 2 and a formation grouting hose 3, a bottom sealing bag 4 and a bag grouting ring pipe 9 are provided at the bottom of the steel pipe pile 1, the bag grouting pipe 2 and the bottom sealing bag 4 are interconnected, and the formation grouting hose 3 is fixedly connected to the bag grouting ring pipe 9.

[0034] In this embodiment, more preferably, the formation grouting hoses 3 are evenly spaced.

[0035] In this embodiment, more preferably, the number of the formation grouting hoses 3 is greater than the number of the bag grouting pipes 2 .

[0036] Please continue to refer to Figures 1 to 9 The present invention provides a method for compensating soil loss in a disturbed area during steel pipe pile recovery, the method comprising the following steps:

[0037] Step S1, providing a device for compensating soil loss in the disturbed area during the steel pipe pile recovery process for standby;

[0038] Step S2, using the lifting equipment 7 to lift the resonance-free hydraulic vibration hammer 5 to the top of the steel pipe pile 1, and perform the steel pipe pile 1 sinking construction;

[0039] Step S3, before the steel pipe pile 1 is removed, the grouting equipment 8 is connected to the bag grouting pipe 2;

[0040] Step S4, start the grouting equipment 8, so that the bottom sealing bag 4 at the bottom of the steel pipe pile 1 expands and forms an anchor with the stratum 6;

[0041] Step S5, remove the grouting pipe, and install a resonance-free hydraulic vibration hammer 5 on the top of the steel pipe pile 1;

[0042] Step S6, start the resonance-free hydraulic vibration hammer 5, remove the steel pipe pile 1, and under the anchoring action of the bottom sealing bag 4, the formation grouting hose 3 connected to the bottom sealing bag 4 gradually slides from the casing into the in-situ formation of the steel pipe pile 1; and

[0043] Step S7, the steel pipe pile 1 is completely pulled out, the grouting equipment 8 is connected to the formation grouting hose 3, and the compensatory grouting is started to complete the soil reinforcement and soil loss compensation of the disturbed area.

[0044] The above examples are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. The above embodiments only express several embodiments of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A device for compensating soil loss in a disturbed area during the recovery of a steel pipe pile, characterized in that: include: A steel pipe pile, wherein a casing group is circumferentially arranged on the inner wall of the steel pipe pile, wherein the casing group comprises a bag grouting pipe and a formation grouting hose, a bottom sealing bag and a bag grouting ring pipe are arranged at the bottom of the steel pipe pile, wherein the bag grouting pipe is interconnected with the bottom sealing bag, and the formation grouting hose is fixedly connected with the bag grouting ring pipe.

2. The device for compensating soil loss in the disturbed area during the recovery of steel pipe piles according to claim 1, characterized in that: The formation grouting hoses are arranged at even intervals.

3. The device for compensating soil loss in the disturbed area during the recovery of steel pipe piles according to claim 1, characterized in that: The number of the formation grouting hoses is greater than the number of the bag grouting pipes.

4. The method for compensating soil loss in the disturbed area during the recovery of steel pipe piles according to any one of claims 1 to 3, characterized in that: The steps include: Step S1, providing a device for compensating soil loss in the disturbed area during the steel pipe pile recovery process for standby; Step S2, using a resonance-free hydraulic vibration hammer to carry out steel pipe pile sinking construction; Step S3: before the steel pipe pile is removed, the grouting equipment is connected to the bag grouting pipe; Step S4, start the grouting equipment to expand the bottom bag at the bottom of the steel pipe pile to form an anchor with the stratum; Step S5, remove the grouting pipe, and install a resonance-free hydraulic vibration hammer on the top of the steel pipe pile; Step S6, start the resonance-free hydraulic vibration hammer to remove the steel pipe pile, and under the anchoring action of the bottom sealing bag, the formation grouting hose connected to the bottom sealing bag gradually slides from the casing into the original formation of the steel pipe pile; as well as Step S7: The steel pipe piles are completely removed, the grouting equipment is connected to the formation grouting hose, and the compensatory grouting is started to complete the soil reinforcement and soil loss compensation of the disturbed area.

Citation Information

Patent Citations

  • Tube-sinking cast-in-situ pile and construction technology thereof

    CN107059849A

  • Treatment structure of shield tunnel operation period over-limit convergence deformation and construction method thereof

    CN113137257A

  • Low-disturbance deformation recovery method for old building

    CN115853039A

  • Slip casting device behind tubular pile

    CN207277326U

  • Force transmission device for use in vehicle construction

    DE19524903A1