Ground T-shaped branch horizontal well hard roof mine pressure disaster control method

By drilling T-shaped branch horizontal wells on the roof-covered surface of the coal seam mining working surface, the problem of tight connection and high cost of underground mining is solved, the effective control of mine pressure disasters on the coal seam mining working surface covered with a hard roof is reduced, and the control costs and ensure a comprehensive range of mine pressure disaster control effects.

CN118815475AActive Publication Date: 2024-10-22XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410934809.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-22
Estimated Expiration
2044-07-12

AI Technical Summary

Technical Problem

The segmented hydraulic fracturing technology of directional long boreholes underground in coal mines cannot meet the tension and conflicts of mining. The segmented hydraulic fracturing technology of surface horizontal wells requires drilling one more well, which leads to high costs and it is difficult to effectively control the mining pressure of the hard roof on the coal seam mining working surface. disaster.

Method used

Using the T-shaped branch horizontal well method on the ground, a vertical well is drilled by covering the roof on the coal seam mining working surface, and a side drilling point is designed to open a branch horizontal hole, and hydraulic fracturing is performed in stages to form hydraulic fractures to control mine pressure. disaster, avoiding the drilling and high cost of multiple wells.

Benefits of technology

It has achieved effective control of mine pressure disasters covered by hard roofs on coal seam mining working surfaces, reduced management costs, avoided the difficulty of drilling single horizontal wells and insufficient management of blind zones, and ensured comprehensive management of mine pressure disasters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815475A_ABST
    Figure CN118815475A_ABST
Patent Text Reader

Abstract

The invention discloses a ground T-shaped branch horizontal well hard roof mine pressure disaster treatment method which comprises the following steps: firstly, drilling a two-opening hole body structure straight well lower sleeve, and respectively drilling a branch horizontal hole a and a branch horizontal hole b of the lower sleeve by virtue of a whipstock; and then segmented perforation hydraulic fracturing of the branch horizontal hole a and the branch horizontal hole b and perforation fracturing construction of a vertical well are sequentially carried out, and finally a complex hydraulic fracture grid is formed. The hydraulic fracture grid formed by the method can efficiently realize advanced treatment of the mine pressure disaster of the overlying roof hard key rock stratum on the coal seam stoping working face so as to prevent the occurrence of the strong mine pressure disaster of the overlying roof hard rock stratum in the coal seam working face stoping period, and guarantee orderly proceeding of coal mining continuous work and efficient production of a coal mine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine area mine pressure disaster management, and relates to a ground T-shaped branch horizontal well hard roof mine pressure disaster management method. Background Art

[0002] During the coal mining process, the hard roof rock layer overlying the coal seam mining face will cause mining pressure disasters. The mechanical characteristics of the hard roof rock layer are: high strength, large thickness, good integrity, and higher tensile strength than ordinary rock layers. During the advancement of the coal seam working face, the roof of this layer is often suspended but not collapsed. When the overhang reaches the limit span, the roof will collapse instantly on a large scale, causing severe pressure on the coal seam mining face, which seriously restricts the safe and efficient mining of coal mines underground and seriously threatens the safety of life and property. Therefore, before coal mining, it is necessary to control the mining pressure disaster of the hard roof rock layer overlying the coal seam mining face, so as to reduce the serious economic losses caused by mining pressure disasters.

[0003] The main means of managing coal mine pressure disasters is to use segmented hydraulic fracturing roof weakening technology, which can be divided into: directional long-hole segmented hydraulic fracturing technology for underground coal mines and segmented fracturing technology for ground horizontal wells according to the different underground and ground management sites. The directional long-hole segmented hydraulic fracturing technology for underground coal mines is used to manage roof pressure disasters. The trajectory of a directional long borehole drilled is long and can extend to the entire coal seam mining face. However, this technology requires the construction tunnel to be excavated in advance, so it is difficult to meet the problem of tension and conflict in coal mining. The use of ground horizontal well staged fracturing technology to control roof pressure disasters can achieve advanced pressure control in tunnels and coal seam working faces for mining or recovery, and effectively solve the problem of tension and conflict in coal mining succession. However, the coal seams in coal mining areas are shallow, mostly at a depth of several hundred meters, and the overlying hard rock strata on the roof are even shallower. Therefore, the horizontal section length of the ground horizontal wells drilled by ground horizontal well staged fracturing is hundreds of meters, which is difficult to extend to the entire coal seam working face of more than a thousand meters. Therefore, the mine pressure disaster control of the hard rock strata on the roof corresponding to the coal seam recovery working face requires the deployment of two horizontal wells. Since two horizontal wells need to be drilled, the cost of using this technology to control mine pressure disasters is relatively high. Summary of the invention

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a method for controlling hard roof mine pressure disasters in a ground T-shaped branch horizontal well, so as to solve the problem of conflicting mining connections in the above-mentioned underground directional long-hole segmented hydraulic fracturing technology for controlling mine pressure disasters in coal mines, and the problem of high costs caused by drilling an additional ground horizontal well when using the ground horizontal well segmented fracturing technology to control mine pressure disasters.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:

[0006] A method for managing hard roof mine pressure disasters in a ground T-shaped branch horizontal well, comprising the following steps:

[0007] Step 1: determine the main key rock layer overlying the coal seam mining working face, and accurately determine the vertical distance between the coal seam mining working face and the main key rock layer overlying it, and the distance between the two and the ground;

[0008] Step 2: Use a measuring point layout instrument to measure the geodetic coordinates of the four corner points of the coal seam mining face boundary, calculate the geodetic coordinates of the center point A of the coal seam mining face according to the measured geodetic coordinate data of the four corner points of the coal seam mining face boundary, use the measuring point layout instrument to accurately circle the position of the coordinate point B projected on the ground directly above the center point A, and determine the coordinate point B as the wellhead position of the vertical well to be drilled;

[0009] Step 3: Based on the vertical distance parameters of the coal seam recovery working face and the main key rock formation from the ground obtained in step 1, a vertical well is drilled at the coordinate point B determined in step 2. The vertical well is a two-opening structure; the first opening is drilled to 5 to 10 meters of stable bedrock, and the first opening casing is lowered and cemented with pure cement slurry; the second opening is drilled to a depth below the main key rock formation, and the second opening casing is lowered and cemented with pure cement slurry;

[0010] Step 4: In the vertical well drilled in step 3, a whipstock is lowered for side drilling of a branch horizontal hole, and then a Φ171.5 mm drill bit and drill tool assembly is lowered to side drill a branch horizontal hole a at the side drilling point a on the secondary casing. The landing point of the horizontal section of the branch horizontal hole a is located in the main key rock formation, and the drilling depth of the horizontal section of the branch horizontal hole a is to the end position of the right boundary of the main key rock formation. A pressure-bearing alkaline soluble bridge plug is lowered into the section 5 to 10 m below the side drilling point a of the branch horizontal hole a.

[0011] Step 5, implement the casing and cementing operation of the branch horizontal hole a drilled in step 4: insert casing and pipe string into the branch horizontal hole a, and the casing and pipe string inserted into the hole are, from top to bottom: Φ89mm drill pipe, hand release tool, 1 Φ139.7mm branch horizontal hole short casing, graded hoop, Φ139.7mm branch horizontal hole casing; lower the above pipe string into the branch horizontal hole a, 1 to 2m away from the bottom of the hole, for normal circulation of cement slurry for cementing, and lower the short casing of the branch horizontal hole to the side drilling point a of the branch horizontal hole a; lower the above pipe string to the designed hole After the deep position, pure cement slurry cementing operation is carried out; after the cementing and curing are completed, the inner ring hole of the drill pipe is opened on the ground and a steel ball is lowered. When the steel ball is lowered to the release tool, high-pressure clean water is injected into the drill pipe. At this time, the pressure at the release tool increases instantly, so that the release tool is separated from the short casing of the branch horizontal hole. The drill pipe is pulled out on the ground, and a Φ120mm PDC drill bit is lowered to drill into the internal structure of the milling graded collar to make the entire branch horizontal hole a unobstructed. Then, an alkaline soluble sealing bridge plug is lowered into the orifice of the branch horizontal hole at the side drilling point a of the branch horizontal hole a to temporarily block the branch horizontal hole a;

[0012] Step 6: First, a whipstock is lowered into the vertical well drilled in step 3 for side drilling of the branch horizontal hole, and then a Φ171.5 mm drill bit and drill tool assembly is lowered to side drill a branch horizontal hole b at the side drilling point b on the secondary casing. The side drilling point b is located above the side drilling point a. The landing point of the horizontal section of the branch horizontal hole b is located in the main key rock formation. The horizontal section of the branch horizontal hole b is drilled to a depth to the left boundary end position of the main key rock formation.

[0013] Step 7, performing casing and cementing operations on the branch horizontal hole b drilled in the above step 6, the implementation process of which is the same as step 5, and finally achieving temporary plugging of the branch horizontal hole b with a bridge plug;

[0014] Step 8, lower the Φ89mm bare drill pipe assembly to 1-3m above the side drilling point b, adjust the mud pump displacement to the maximum displacement on the ground, and inject a high-velocity alkaline circulating liquid into the bottom of the well to flush and clean the drill cuttings deposited on the alkaline soluble bridge plug and the bridge plug that play a sealing and temporary plugging role, and at the same time quickly dissolve the alkaline soluble bridge plug and the bridge plug at the vertical well, the branch horizontal hole a, and the branch horizontal hole b, so as to make the vertical well, the branch horizontal hole a, and the branch horizontal hole b unblocked;

[0015] Step 9, sequentially implement branch horizontal hole a segmented perforation hydraulic fracturing, branch horizontal hole b segmented perforation hydraulic fracturing, and vertical well perforation fracturing construction to form a large number of hydraulic fractures. The hydraulic fractures formed by the perforation fracturing of the two branch horizontal holes and the vertical well can effectively achieve the strong mining pressure disaster control of the hard main key rock strata overlying the roof of the coal seam recovery working face.

[0016] The present invention also includes the following technical features:

[0017] Specifically, in step 3, in the vertical well two-opening structure, the first opening is drilled with a Φ346.1mm roller drill bit, and a Φ273.1mm J55 steel grade first opening casing is inserted, and a low-grade 32.5 cement ash with a specific gravity of 1.7-2.0g / cm 3 Pure cement slurry cementing; the second opening is drilled with a Φ241.3mm PDC drill bit, and a Φ193.7mm N80 steel grade second opening casing is put in. The second opening casing put in at the side drilling point of the two pre-designed branch horizontal holes is a Φ193.7mm glass fiber reinforced plastic casing, which is made of high-grade 42.5 cement ash with a specific gravity of 1.8-2.10g / cm 3 Pure cement slurry cementing; after the second opening cementing is completed and the waiting time is 72 hours, a casing pressure test of 15-20Mpa must be carried out to test the cementing sealing condition of the second opening casing. The pressure bearing time is 30 minutes and the pressure drop must be less than or equal to 0.5Mpa.

[0018] Specifically, in step 5, after the pipe string is lowered to the designed hole depth, pure cement slurry cementing operation is carried out, and high-grade 42.5 cement ash is used to prepare a specific gravity of 1.8-2.10 g / cm 3 Pure cement slurry positive circulation cementing, including:

[0019] First, inject a designed amount of pure cement slurry into the pipe string. The designed amount of pure cement is enough to fill the annular space from the graded collar to the bottom section of the branch horizontal hole a. Then, continuously inject clean water into the pipe string. The clean water is added with red visual traces. When the injected pure cement slurry is located in the annular space between the open hole of the branch horizontal hole a and the casing of the branch horizontal hole and flows back to the graded collar, a ball throwing operation is performed at the wellhead on the ground. When the steel ball moves to the graded collar, the instantaneous pressure increase triggers the effect of the graded collar. At this time, the pure cement slurry is located in the annular space between the open hole of the branch horizontal hole a and the casing of the branch horizontal hole and flows back to The grading collar is positioned. At the same time, the clean water pressed from the ground begins to flow from the holes on both sides of the grading collar to the annular space between the open hole of the branch horizontal hole a and the casing of the branch horizontal hole. The pressed clean water flows back to the ground from the grading collar holes. When a red visual trace is found on the ground, it indicates that the clean water has been returned to the ground. At this time, the annular space inside the drill pipe and the annular space between the drill pipe and the second opening casing of the vertical well are closed on the ground to achieve a pressure-holding state in the annular space between the pipe string and the branch horizontal hole a, so that the pure cement slurry injected into the grading collar and the bottom section of the branch horizontal hole a can be solidified for 72 hours under the pressure-holding state.

[0020] Specifically, when performing segmented perforation hydraulic fracturing in branch horizontal hole a and branch horizontal hole b in step 9, a whipstock is used to allow the fracturing tool string to re-enter branch horizontal hole a and branch horizontal hole b for segmented hydraulic fracturing construction;

[0021] The process of the fracturing tool string entering the branch horizontal hole a: first, the whipstock is lowered to the side drilling point a. When the whipstock is lowered to the side drilling point a, its slope end face is in any orientation. Then, the fracturing tool string is lowered to the bottom of the whipstock. The whipstock is slowly rotated on the ground. When the slowly rotating whipstock is rotated to the orientation of the side drilling point a, the fracturing tool string enters the branch horizontal hole a. After the fracturing tool string enters the branch horizontal hole a, the fracturing tool string is continued to be lowered to the bottom of the branch horizontal hole a. Then, backward staged perforating hydraulic fracturing is adopted to finally form a large number of hydraulic fractures.

[0022] Specifically, the lowering of the fracturing tool string into the branch horizontal hole b is the same as that of the branch horizontal hole a. After the fracturing tool string enters the branch horizontal hole b, it continues to be lowered to the bottom of the branch horizontal hole b, and then backward staged perforating hydraulic fracturing is adopted to eventually form a large number of hydraulic fractures; the hydraulic fractures can effectively play a role in pressure relief, thereby achieving the purpose of mine pressure disaster management.

[0023] Specifically, there is a blind spot for controlling mine pressure disasters in the main key rock formation in the horizontal projection of the landing points of the branch horizontal holes a and the branch horizontal holes b to the length of the vertical well section at the same depth, and the blind spot is controlled by implementing perforating and fracturing in the vertical well; the implementation of perforating and fracturing in the vertical well includes: lowering the fracturing tool string into the vertical well section of the main key rock formation and performing perforating and fracturing construction in the vertical well section. The hydraulic fractures formed can effectively control the blind spots that cannot be controlled by the segmented hydraulic fracturing of the two branch horizontal holes.

[0024] Compared with the prior art, the present invention has the following technical effects:

[0025] 1. The present invention only needs to drill a vertical well on the ground, and then conduct side drilling and branch hole drilling and staged hydraulic fracturing construction by designing side drilling points at specific positions in the vertical well to achieve the management of the mine pressure disaster that may be caused by the main key layer overlying the coal seam recovery working face.

[0026] 2. The present invention only requires drilling a vertical well on the upper surface of the coal seam recovery working face, thus avoiding repeated drilling of the vertical well section, and reducing the cost of mine pressure disaster management.

[0027] 3. The present invention relies on T-shaped branch horizontal wells to achieve the weakening treatment of the hard roof on both sides of the hole, avoiding the problem of using a single horizontal well for treatment, where the shallow depth of the rock formation causes the water-to-vertical ratio to be too high during horizontal well drilling, the horizontal section drilling is difficult, and the full coverage of the working surface cannot be achieved.

[0028] 4. The present invention adopts the method of drilling two branch holes in a vertical well successively, and after each branch hole is drilled and casing cementing is completed, an alkaline soluble bridge plug is used to temporarily block each successfully drilled branch hole to ensure the normal drilling cycle of the next branch hole. After all branch holes are successfully drilled, a high-speed alkaline solvent is used to unblock them, and finally segmented hydraulic fracturing construction is implemented for each branch hole and the blind spot of mine pressure disaster management in the vertical well section. After the segmented fracturing construction is completed, no fracturing and drainage construction work is required. Compared with the existing technology, this method can effectively ensure that each branch horizontal hole can achieve segmented hydraulic fracturing.

[0029] 5. The present invention adopts a combination of a casing string in a branch hole, which includes a Φ89mm drill pipe + a hand-release tool + a Φ139.7mm short casing for a horizontal branch hole + a grading hoop + a Φ139.7mm horizontal branch hole casing. This can effectively seal only the casing strings inserted into each branch hole, and effectively seal and solidify the casing strings inserted into the branch holes under pressure. At the same time, the Φ89mm drill pipe string inserted into the vertical well section outside the branch hole can be effectively taken out and reused.

[0030] 6. After the drilling and fracturing of each branch horizontal hole in the present invention are completed, segmented hydraulic fracturing is finally carried out in the vertical well to treat the blind spots of the vertical well section with the same depth from the landing point to the landing point. Compared with the prior art that ignores the blind spot treatment, this method can achieve all-round and full-space range of blank zone mining disaster treatment.

[0031] 7. The present invention is located on the ground to control the mining pressure disasters that may be caused by the hard rock layer overlying the main key roof of the coal seam mining working face, and transfers the construction environment from the underground coal mine to the ground, effectively improving the construction environment of the workers. At the same time, it is located on the ground to realize the advanced control of mining pressure disasters before the tunnel is mined.

[0032] 8. The present invention arranges the horizontal section of the side-drilled wellbore in the middle of the working face, which is conducive to the balanced expansion of cracks to both sides of the wellbore, promotes the uniform weakening and treatment of the hard roof, and avoids stress concentration during coal mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 The distribution map of the main key rock strata where the overlying roof of the coal seam mining face is hard and may cause mining pressure disasters;

[0034] Figure 2 A schematic diagram for determining the geodetic position coordinates of the wellhead on the surface of a vertical well;

[0035] Figure 3 It is the relative spatial position diagram of the vertical well depth and the main key rock formations on the ground;

[0036] Figure 4 Schematic diagram of drilling and completion of the horizontal hole in the right branch of the main key rock formation a;

[0037] Figure 5 It is a structural schematic diagram of the casing string lowered into the branch horizontal hole;

[0038] Figure 6 Schematic diagram of drilling and completion of the horizontal hole in the left branch of the main key rock formation b;

[0039] Figure 7 This is the wellbore structure diagram of the entire well after the alkaline soluble bridge plug at the bottom of the vertical well and the orifice of the branch horizontal hole is dissolved;

[0040] Figure 8 This is a schematic diagram after the hydraulic fracturing is carried out in sequence throughout the well;

[0041] Fig. 9 A locally enlarged schematic diagram of the key rock formation after the hydraulic fracturing is completed in the whole well.

[0042] The meaning of each number in the figure is:

[0043] 1. Ground, 2. Main key rock formation, 3. Coal seam mining face, 4. Center point A, 5. Coordinate point B, 6. First opening casing, 7. Second opening casing, 8. Alkaline soluble bridge plug, 9. Side drilling point a, 10. Landing point, 11. Branch horizontal hole a, 12. Branch horizontal hole casing, 13. Grading hoop, 14. Bridge plug, 15. Side drilling point b, 16. Branch horizontal hole b, 17. Packer, 18. Blind area, 19. Branch horizontal hole short casing, 20. Drop tool, 21. Drill pipe, 22. Hydraulic fracture. DETAILED DESCRIPTION

[0044] The present invention proposes a method for managing hard roof mine pressure disasters in a ground T-shaped branch horizontal well. The method mainly selects the coordinates of a middle point on the ground corresponding to the hard roof rock layer overlying the coal seam recovery working face as the wellhead position, drills a vertical well at the wellhead coordinates, optimizes the side drilling point depths of the branch horizontal holes on both sides in the vertical well, and then drills branch horizontal holes on the left and right sides along the hard key rock layer of the roof respectively. The plane projection angle between the two branch horizontal holes drilled in the hard key rock layer of the roof is 180°, and the shape between the two branch horizontal holes and the vertical well is similar to that of the vertical well. Similar to a T-type, the vertical well and the two branch horizontal holes in the T-type well are designed to be casing cemented. However, the casing near the side drilling point is designed to be glass fiber reinforced plastic casing, which is easy for side drilling of the branch horizontal hole. Each branch horizontal hole is designed to adopt a graded hoop cementing process. After the drilling, casing and cementing of the branch horizontal holes are completed, the perforation and segmented fracturing construction of the two branch horizontal holes is carried out uniformly. Finally, hydraulic perforation and fracturing of the branch hole fracturing blind area are carried out in the well section of the vertical well where the key rock formation is located, ultimately achieving the purpose of efficiently achieving the purpose of controlling the mining pressure disaster in the hard key rock formation on the roof of the coal seam recovery working face.

[0045] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.

[0046] Example:

[0047] like Figures 1 to 9 As shown, this embodiment provides a method for controlling hard roof pressure disasters in a ground T-shaped branch horizontal well. The method is mainly used to realize the control of hard main key rock strata overlying the roof pressure disasters on the coal seam mining working face in advance, so as to prevent the strong mine pressure disasters of the hard rock strata overlying the roof from appearing during the coal seam working face mining. The implementation process of the method is as follows:

[0048] Step 1: Use the theoretical calculation formula of the key rock layer of the overlying roof of the coal seam mining working face 3 to determine that the overlying roof of the coal seam mining working face 3 is hard and the most important key rock layer that may cause mining pressure disasters is the main key rock layer 2, such as Figure 1 As shown, the vertical distance between the coal seam recovery working face 3 and the main key rock layer 2 overlying it, and the distance between the two and the ground are accurately determined, so as to provide a reference for the subsequent vertical well drilling trajectory design and the side drilling point design of the two branch horizontal holes;

[0049] Step 2, using the measuring point layout instrument to measure the geodetic coordinates of the four corner points of the boundary of the coal seam mining working face 3 to determine the boundary range distribution of the coal seam mining working face 3 area, and then calculate the geodetic coordinates of the center point A4 of the coal seam mining working face 3 based on the measured geodetic coordinate data of the four corner points of the boundary of the coal seam mining working face 3, and finally use the measuring point layout instrument on the ground 1 to accurately circle the position of the coordinate point B5 projected on the ground directly above the center point A4 of the coal seam mining working face 3, and determine the coordinate point B5 as the wellhead position of the vertical well to be drilled, such as Figure 2 As shown;

[0050] Step 3, based on the vertical distance parameters of the coal seam recovery working face 3 and the top hard key rock layer 2 from the ground obtained in step 1, a vertical well is drilled at the ground coordinate point B5 given in step 2, such as Figure 3 As shown in the figure, the vertical well is designed as a two-hole structure. The first hole is drilled with a Φ346.1mm roller bit. The hole is drilled to a stable bedrock of 5 to 10 meters. A Φ273.1mm J55 steel grade single-hole casing 6 is inserted. Low-grade 32.5 cement ash is used to prepare a specific gravity of 1.7 to 2.0 g / cm 3Pure cement slurry cementing, the second opening is drilled with Φ241.3mm PDC drill bit, the drilling depth is below the main key rock layer 2, and the Φ193.7mm N80 steel grade second opening casing 7 is lowered. The second opening casing 7 lowered at the side drilling point of the pre-designed two branch horizontal holes adopts Φ193.7mm glass fiber reinforced plastic casing, which is convenient for the subsequent casing window side drilling of the two branch horizontal holes. High-grade 42.5 cement ash is used with a specific gravity of 1.8-2.10g / cm 3 For pure cement slurry cementing, a casing pressure test of 15-20Mpa must be carried out after the second opening cementing is completed and the setting time is 72 hours to detect the cementing and sealing condition of the second opening casing 7. The pressure bearing time is 30 minutes, and the pressure drop must be less than or equal to 0.5Mpa to be reasonable, otherwise remedial cementing operation is required; a pressure-bearing alkaline soluble bridge plug 8 is inserted 5-10m below the side drilling point a9 of the designed branch horizontal hole a11 to ensure the normal circulation drilling of the subsequent two branch horizontal holes.

[0051] Step 4, based on the vertical well drilled in step 3, firstly lower a whipstock for side drilling of the branch horizontal hole, then lower a Φ171.5 mm drill bit and drilling tool assembly, and drill the branch horizontal hole a11 through the fiberglass casing side drilling at the side drilling point a9. The landing point 10 of the horizontal section of the branch horizontal hole a11 is in the main key rock formation 2. The drilling depth of the horizontal section of the branch horizontal hole a11 is to the end position of the right boundary of the main key rock formation 2. Figure 4 shown.

[0052] Step 5, implement casing and cementing operations for the branch horizontal hole a11 drilled in step 4. The branch horizontal hole a11 is designed to be lowered into a Φ139.7mm N80 steel grade branch horizontal hole casing 12. The casing and other auxiliary tools lowered into the hole are composed of a pipe string from top to bottom: Φ89mm drill pipe 21+hand-drop tool 20+1 Φ139.7mm branch horizontal hole short casing 19+grading hoop 13+Φ139.7mm branch horizontal hole casing 12, such as Figure 5 The above pipe string is lowered into the branch horizontal hole a11, 1 to 2 meters away from the bottom of the hole, for normal circulation of cement slurry. The Φ139.7mm branch horizontal hole short casing 19 is lowered to the side drilling point a9 of the branch horizontal hole a11. After the above pipe string is lowered to the designed hole depth, the cementing operation of pure cement slurry is started. High-grade 42.5 cement ash with a specific gravity of 1.8 to 2.10 g / cm 3Pure cement slurry, design pure cement slurry positive circulation cementing, advance and accurately calculate the amount of cement slurry required for cementing, first inject the designed amount of pure cement slurry into the pipe string, the designed amount of pure cement is enough to just fill the annular space from the grading collar 13 to the bottom section of the branch horizontal hole a11, then continuously inject clean water into the pipe string, the clean water is added with red visual traces, when the injected pure cement slurry is located in the annular space between the open hole of the branch horizontal hole a11 and the branch horizontal hole casing 12 and flows back to the grading collar 13, a ball throwing operation is performed at the ground wellhead, and the instantaneous pressure increase when the steel ball moves to the grading collar 13 triggers the effect of the grading collar 13, at this time, the pure cement slurry is located between the open hole of the branch horizontal hole a11 and the branch horizontal hole The annular space between the casings 12 flows back to the position of the grading collar 13. At the same time, the clean water pressed from the ground 1 begins to flow from the holes on both sides of the grading collar 13 to the annular space between the open eye of the branch horizontal hole a11 and the casing 12 of the branch horizontal hole. The pressed clean water flows back from the holes of the grading collar 13 to the ground 1. When a red visual trace is found on the ground 1, it indicates that the clean water has been returned to the ground 1. At this time, the annular space inside the drill pipe 21 and the annular space between the drill pipe 21 and the second opening casing 7 of the vertical well are closed on the ground 1 to achieve the pressure holding state of the annular space between the above-mentioned pipe string and the branch horizontal hole a11, so that the pure cement slurry injected into the grading collar 13 and the bottom section of the branch horizontal hole a11 is allowed to solidify for 72 hours under the pressure holding state. After the solidification is completed, the ground 1 opens the inner ring hole of the drill pipe 21 and lowers a larger steel ball. When the larger steel ball is lowered to the release tool 20, high-pressure clean water is injected into the drill pipe. At this time, the pressure at the release tool 20 increases instantly, so that the release tool 20 is separated from the Φ139.7mm branch horizontal hole short casing 19, and the drill pipe 21 is pulled out on the ground 1, and a Φ120mm PDC drill bit is lowered to drill into the internal structure of the milling grading hoop 13, so that the entire branch horizontal hole a11 is unobstructed, and then the alkaline soluble sealing bridge plug 14 is lowered into the branch horizontal hole mouth at the side drilling point a9 of the branch horizontal hole a11 to temporarily block the branch horizontal hole a11. Figure 4 shown.

[0053] Step 6, based on the vertical well drilled in step 3, first lower a whipstock for side drilling of the branch horizontal hole, then lower a Φ171.5 mm drill bit and drill tool assembly, and perform side drilling of the fiberglass casing at the side drilling point b15 to drill the branch horizontal hole b16. The side drilling point b15 is located above the side drilling point a9, and the landing point of the horizontal section of the branch horizontal hole b16 is in the main key rock layer 2. The drilling depth of the horizontal section of the branch horizontal hole b16 is to the left boundary end position of the strike of the main key rock layer 2.

[0054] Step 7, implement casing and cementing operations for the branch horizontal hole b16 drilled in step 6 above, the implementation process is the same as step 5, and the final result is as follows: Figure 6 shown.

[0055] Step 8, then lower the Φ89mm bare drill pipe assembly to 1-3m above the side drilling point b15, adjust the mud pump displacement to the maximum displacement on the ground 1, inject high-velocity alkaline circulating liquid into the bottom of the well to flush and clean the drill cuttings deposited at the alkaline soluble bridge plugs 8 and 14 that have a sealing and temporary plugging effect, and quickly dissolve the alkaline soluble bridge plugs 8 and 14 at the vertical well, branch horizontal hole a11, and branch horizontal hole b16, so that the vertical well, branch horizontal hole a11, and branch horizontal hole b16 are unblocked, as shown in FIG. Figure 7 As shown, it is convenient for the subsequent construction of the fracturing tool string to be smoothly lowered.

[0056] Step 9, sequentially implement the branch horizontal hole a11 segmented perforation hydraulic fracturing, the branch horizontal hole b16 segmented perforation hydraulic fracturing, and the vertical well perforation hydraulic fracturing construction, and use the whipstock to make the fracturing tool string re-enter the branch horizontal hole a11 and the branch horizontal hole b16 for segmented hydraulic fracturing construction. The process of making the fracturing tool string enter the branch horizontal hole is as follows: taking the branch horizontal hole a11 as an example, first lower the whipstock to the side drilling point a9, when the whipstock is lowered to the side drilling point a9, its slope end face is in any orientation, then lower the fracturing tool string to the bottom of the whipstock, and then slowly rotate the whipstock on the ground 1, when the slowly rotating whipstock rotates to the side drilling point a9 orientation, the fracturing tool string enters the branch horizontal hole a11, after the fracturing tool string enters the branch horizontal hole a11, continue to lower the fracturing tool string to the bottom of the branch horizontal hole a11, and then adopt the backward segmented perforation hydraulic fracturing, and finally form a large number of hydraulic fractures 22. The lowering of the fracturing tool string in the branch horizontal hole b16 is the same as that in the branch horizontal hole a11. After the fracturing tool string enters the branch horizontal hole b16, it continues to be lowered to the bottom of the branch horizontal hole b16, and then the backward staged perforation hydraulic fracturing is adopted, and finally a large number of hydraulic fractures 22 are formed. The hydraulic fractures 22 formed by the above-mentioned fracturing construction can effectively relieve pressure, thereby achieving the purpose of mine pressure disaster management. The purpose of implementing perforation fracturing in a vertical well is to treat the blind area 18 of mine pressure disaster treatment in the vertical well of the same depth from the landing point 10 of the branch horizontal hole to the same depth in the horizontal projection. The fracturing tool string is lowered into the vertical well without the need for a diverter. The fracturing tool string can be lowered into the vertical well section of the main key rock formation 2 by relying only on its own weight. Perforation hydraulic fracturing construction is carried out on the left and right sides of the main key rock formation 2 in the vertical well section of the main key rock formation 2. The hydraulic fractures 22 formed by the fracturing construction in the vertical well section can effectively treat the blind area 18 where the mine pressure cannot be treated by the segmented hydraulic fracturing of the above-mentioned two horizontal branch holes. The hydraulic fractures formed by the perforation hydraulic fracturing based on the above-mentioned two branch horizontal holes and the vertical well can effectively achieve the strong mine pressure disaster treatment of the hard main key rock formation overlying the roof of the coal seam recovery working face, such as Figure 8 and Fig. 9 shown.

Claims

1. A method for managing hard roof mine pressure disasters in a ground T-shaped branch horizontal well, characterized in that: The following steps are involved: Step 1, determining the main key rock layer (2) overlying the coal seam mining working face (3), accurately determining the vertical distance between the coal seam mining working face (3) and the main key rock layer (2) overlying the coal seam mining working face (3), and the distance between the two and the ground (1); Step 2, using a measuring point layout instrument to measure the geodetic coordinates of the four corner points of the boundary of the coal seam mining working face (3), calculating the geodetic coordinates of the center point A (4) of the coal seam mining working face (3) based on the measured geodetic coordinate data of the four corner points of the boundary of the coal seam mining working face (3), using the measuring point layout instrument to accurately circle the position of the coordinate point B (5) projected onto the ground (1) directly above the center point A (4), and determine the coordinate point B (5) as the wellhead position of the vertical well to be drilled; Step 3, based on the vertical distance parameters of the coal seam recovery working face (3) and the main key rock layer (2) from the ground (1) obtained in step 1, a vertical well is drilled at the coordinate point B (5) determined in step 2, and the vertical well is a two-opening body structure; the first opening is drilled to 5 to 10 meters of stable bedrock, and the first opening casing (6) is lowered, and pure cement slurry is used for cementing; the second opening is drilled to a depth below the main key rock layer (2), and the second opening casing (7) is lowered, and pure cement slurry is used for cementing; Step 4, inserting a whipstock into the vertical well drilled in step 3 for side drilling of a branch horizontal hole, and then inserting a Φ171.5 mm drill bit and drilling tool assembly, side drilling a branch horizontal hole a (11) at the side drilling point a (9) on the secondary casing (7), the landing point (10) of the horizontal section of the branch horizontal hole a (11) is located in the main key rock formation (2), and the drilling depth of the horizontal section of the branch horizontal hole a (11) is to the end position of the right boundary of the main key rock formation (2); a pressure-bearing alkaline soluble bridge plug (8) is inserted into the section 5 to 10 m below the side drilling point a (9) of the branch horizontal hole a (11); Step 5, performing casing lowering and cementing operations for the branch horizontal hole a (11) drilled in step 4: lowering casing and pipe strings into the branch horizontal hole a (11), wherein the casing and pipe strings lowered into the hole are, from top to bottom, Φ89 mm drill pipe (21), a hand release tool (20), a Φ139.7 mm branch horizontal hole short casing (19), a grading collar (13), and a Φ139.7 mm branch horizontal hole casing (12); lowering the above-mentioned pipe strings into the branch horizontal hole a (11) to a distance of 1 to 2 m from the bottom end of the hole for normal circulation of cement slurry for cementing, and lowering the branch horizontal hole short casing (19) to a depth of a side drilling point a (9) of the branch horizontal hole a (11); after the above-mentioned pipe strings are lowered to the designed hole depth position, Pure cement slurry cementing operation is performed; after the cementing is completed, the inner ring hole of the drill pipe (21) is opened on the ground (1) and a steel ball is lowered into the drill pipe. When the steel ball is lowered to the release tool (20), high-pressure clean water is injected into the drill pipe. At this time, the pressure at the release tool (20) increases instantly, so that the release tool (20) is separated from the short casing (19) of the branch horizontal hole. The drill pipe (21) is pulled out on the ground (1), and a Φ120 mm PDC drill bit is lowered to drill into the internal structure of the milling graded collar (13) to make the entire branch horizontal hole a (11) unblocked. Then, an alkaline soluble sealing bridge plug (14) is lowered into the branch horizontal hole mouth at the side drilling point a (9) of the branch horizontal hole a (11) to achieve temporary blocking of the branch horizontal hole a (11); Step 6, based on the vertical well drilled in step 3, firstly lower a whipstock for side drilling of a branch horizontal hole, then lower a Φ171.5 mm drill bit and drill tool assembly, and side drill a branch horizontal hole b (16) at the side drilling point b (15) on the secondary casing (7), wherein the side drilling point b (15) is located above the side drilling point a (9), and the landing point of the horizontal section of the branch horizontal hole b (16) is located in the main key rock formation (2), and the drilling depth of the horizontal section of the branch horizontal hole b (16) reaches the left boundary end position of the main key rock formation (2); Step 7, performing casing and cementing operations on the branch horizontal hole b (16) drilled in the above step 6, the implementation process of which is the same as step 5, and finally achieving temporary plugging of the branch horizontal hole b (16) by the bridge plug (14); Step 8, lowering the Φ89 mm bare drill pipe drill bit assembly to 1 to 3 m above the side drilling point b (15), adjusting the displacement of the mud pump to the maximum displacement on the ground (1), injecting a high-velocity alkaline circulating liquid into the bottom of the well to flush and clean the drill cuttings deposited on the alkaline soluble bridge plug (8) and the bridge plug (14) that have a sealing and temporary plugging effect, and at the same time quickly dissolving the alkaline soluble bridge plug (8) and the bridge plug (14) at the vertical well, the branch horizontal hole a (11), and the branch horizontal hole b (16), thereby making the vertical well, the branch horizontal hole a (11), and the branch horizontal hole b (16) unobstructed; Step 9, sequentially implement the branch horizontal hole a (11) segmented perforation hydraulic fracturing, the branch horizontal hole b (16) segmented perforation hydraulic fracturing, and the vertical well perforation fracturing construction to form a large number of hydraulic fractures (22). The hydraulic fractures (22) formed by the perforation fracturing of the two branch horizontal holes and the vertical well can effectively achieve the strong mine pressure disaster control of the hard main key rock layer (2) overlying the roof of the coal seam recovery working face.

2. The method for treating hard roof mine pressure disasters in a ground T-shaped branch horizontal well according to claim 1, characterized in that: In step 3, in the vertical well two-opening structure, the first opening is drilled with a Φ346.1mm roller drill bit, and a Φ273.1mm J55 steel grade first opening casing (6) is inserted, and a low-grade 32.5 cement ash with a specific gravity of 1.7-2.0g / cm 3 Pure cement slurry cementing; the second opening is drilled with a Φ241.3mm PDC drill bit, and a Φ193.7mm N80 steel grade second opening casing (7) is lowered. The second opening casing (7) lowered at the side drilling point of the two pre-designed branch horizontal holes is a Φ193.7mm glass fiber reinforced plastic casing, and a high-grade 42.5 cement ash is used to prepare a specific gravity of 1.8-2.10g / cm 3 Pure cement slurry cementing; after the second opening cementing is completed and the setting is continued for 72 hours, a casing pressure test of 15-20Mpa must be carried out to test the cementing and sealing condition of the second opening casing (7). The pressure bearing time is 30 minutes and the pressure drop must be less than or equal to 0.5Mpa.

3. The method for treating hard roof mine pressure disasters in a ground T-shaped branch horizontal well according to claim 1, characterized in that: In step 5, after the pipe string is lowered to the designed hole depth, pure cement slurry cementing operation is carried out, using high-grade 42.5 cement ash with a specific gravity of 1.8-2.10 g / cm 3 Pure cement slurry positive circulation cementing, including: First, a designed amount of pure cement slurry is injected into the pipe string, and the designed amount of pure cement is sufficient to just fill the annular space from the grading collar (13) to the bottom section of the branch horizontal hole a (11); then, clean water is continuously injected into the pipe string, and a red visual trace is added to the clean water. When the injected pure cement slurry is located in the annular space between the open hole of the branch horizontal hole a (11) and the branch horizontal hole casing (12), and flows back to the grading collar (13), a ball throwing operation is performed at the surface wellhead. When the steel ball moves to the grading collar (13), the instantaneous pressure increase triggers the effect of the grading collar (13). At this time, the pure cement slurry is located in the annular space between the open hole of the branch horizontal hole a (11) and the branch horizontal hole casing (12), and flows back to the grading collar (13) and At the same time, the clean water pressed from the ground (1) begins to flow from the holes on both sides of the grading collar (13) to the annular space between the open hole of the branch horizontal hole a (11) and the casing (12) of the branch horizontal hole. The pressed clean water flows back from the holes of the grading collar (13) to the ground (1). When a red visual trace is found on the ground (1), it indicates that the clean water has returned to the ground (1). At this time, the annular space inside the drill pipe (21) and the annular space between the drill pipe (21) and the second casing (7) of the vertical well are sealed on the ground (1), so that the annular space between the pipe string and the branch horizontal hole a (11) is pressed, so that the pure cement slurry injected into the grading collar (13) and the bottom section of the branch horizontal hole a (11) is allowed to solidify for 72 hours under the pressed state.

4. The method for treating hard roof mine pressure disasters in a ground T-shaped branch horizontal well according to claim 1, characterized in that: When the step 9 implements the segmented perforation hydraulic fracturing of the branch horizontal hole a (11) and the branch horizontal hole b (16), the whipstock is used to allow the fracturing tool string to re-enter the branch horizontal hole a (11) and the branch horizontal hole b (16) to perform segmented hydraulic fracturing construction; The process of the fracturing tool string entering the branch horizontal hole a (11): first, the whipstock is lowered to the side drilling point a (9). When the whipstock is lowered to the side drilling point a (9), its slope end face is in any orientation. Then, the fracturing tool string is lowered to the bottom of the whipstock. The whipstock is slowly rotated on the ground (1). When the slowly rotating whipstock is rotated to the orientation of the side drilling point a (9), the fracturing tool string enters the branch horizontal hole a (11). After the fracturing tool string enters the branch horizontal hole a (11), the fracturing tool string is continued to be lowered to the bottom of the branch horizontal hole a (11). Then, backward staged perforating hydraulic fracturing is adopted to finally form a large number of hydraulic fractures (22).

5. The method for treating hard roof mine pressure disasters in a ground T-shaped branch horizontal well according to claim 4, characterized in that: The lowering of the fracturing tool string into the branch horizontal hole b (16) is the same as that of the branch horizontal hole a (11). After the fracturing tool string enters the branch horizontal hole b (16), the fracturing tool string is further lowered to the bottom of the branch horizontal hole b (16), and then backward staged perforation hydraulic fracturing is adopted to finally form a large number of hydraulic fractures (22); the hydraulic fractures (22) can effectively relieve pressure, thereby achieving the purpose of mine pressure disaster control.

6. The method for treating hard roof mine pressure disasters in a ground T-shaped branch horizontal well according to claim 1, characterized in that: There is a blind area (18) for controlling the mine pressure disaster of the main key rock layer (2) in the horizontal projection of the landing point (10) of the branch horizontal hole a (11) and the branch horizontal hole b (16) to the vertical well section of the same depth. The blind area (18) is controlled by implementing perforation fracturing in the vertical well; the perforation fracturing in the vertical well includes: lowering a fracturing tool string into the vertical well section of the main key rock layer (2) to perform perforation fracturing in the vertical well section to form hydraulic fractures (22) that can effectively control the blind area (18) that cannot be controlled by segmented hydraulic fracturing of the two branch horizontal holes.

Citation Information

Patent Citations

  • Method for transforming coal bed gas horizontal well system

    CN112855087A

  • Downward-inclined horizontal well gas extraction method and downward-inclined horizontal well

    CN116084890A

  • Synchronous treatment method for coal seam gas and hard roof rock burst

    CN116163702A

  • Hard roof primary caving deep hole blasting parameter intelligent optimization method

    CN116556950A

  • Method for advanced prevention and treatment of coal mine rock burst in staged fracturing area of ground horizontal well

    CN117027802A