Battery testing method, system, device, equipment, medium and program product

By adjusting the power connection status between battery test stations, the problem of idle power waste at test stations is solved, the test cost is reduced, and the test accuracy and reliability are improved.

CN118818331APending Publication Date: 2024-10-22CONTEMPORARY AMPEREX TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310409684.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-17
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

In the existing battery testing technology, the actual power of the testing station is idle and wasted, resulting in high testing costs.

Method used

By obtaining the test power requirements of the target test station, and controlling the connection status between the target test station and the shared test station according to the demand, the test power of the target test station is adjusted to reasonably configure the test power of each test station. , reduce idle waste.

Benefits of technology

It effectively reduces test costs, improves the accuracy and reliability of battery testing, and optimizes the connection rationality and utilization of shared test stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118818331A_ABST
    Figure CN118818331A_ABST
Patent Text Reader

Abstract

The invention relates to a battery testing method, system, device and equipment, a medium and a program product, and the method comprises the steps: obtaining a testing power demand of a battery on a target testing station, and controlling a connection state between the target testing station and a shared testing station according to the testing power demand, so as to adjust the testing power of the target testing station, then testing the battery on the target test station; the target test station is any test station in the plurality of test stations. According to the method, the situation that the actual configuration power of the test station is idle and wasted is reduced, so that the test cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of testing technology, and in particular to a battery testing method, system, device, equipment, medium and program product. Background Art

[0002] With the continuous development and progress of science and technology, testing technology is playing an increasingly important role in industrial development.

[0003] Taking battery testing as an example, in the related art, the battery is tested through a dedicated testing station, and each testing station is configured to meet the maximum test power requirement of the battery testing process.

[0004] However, in the related art, the actual power of the test station is idle and wasted, resulting in high testing costs. Summary of the invention

[0005] Based on this, it is necessary to provide a battery testing method, system, device, equipment, medium and program product that can reduce the testing cost in response to the above technical problems.

[0006] In a first aspect, an embodiment of the present application provides a battery testing method, the method comprising:

[0007] Obtaining a test power requirement of a battery at a target test station; the target test station is any test station among multiple test stations;

[0008] According to the test power requirement, controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station;

[0009] Test the battery at the target test station.

[0010] In an embodiment of the present application, the test power requirement of the battery at the target test station is obtained, and according to the test power requirement, the connection state between the target test station and the shared test station is controlled to adjust the test power of the target test station, and then the battery at the target test station is tested; the target test station is any one of the multiple test stations. In this embodiment, for any target test station, according to the test power requirement of the target test station, the test power of the target test station is adjusted by controlling the connection state between the shared test station and the target test station, so that the test power of each test station is reasonably configured. During the test process, based on the test power requirement of the battery at the test station, it is flexibly adjusted so that the battery can be tested with the power required by the battery, reducing the idle waste of the actual configuration power of the test station due to excessive power, thereby reducing the test cost.

[0011] In one embodiment, controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station includes:

[0012] If the test power requirement is greater than the configured test power of the target test station, the target test station is controlled to be connected to the shared test station to increase the test power of the target test station.

[0013] In an embodiment of the present application, if the test power demand is greater than the configured test power of the target test station, the target test station is controlled to be connected to the shared test station to increase the test power of the target test station. In this embodiment, when the test power demand is greater than the configured power of the target test station, it means that the configured power of the current target test station cannot meet the test power demand of the battery on the target test station, then the shared test station is connected to the target test station, so that the common test power of the shared test station and the target test station acts on the battery, thereby meeting the test power demand of the battery on the target test station and improving the accuracy and reliability of the battery test.

[0014] In one embodiment, controlling the target test station to connect with the shared test station includes:

[0015] Get the usage status of the shared test station;

[0016] When the use status of the shared test station is an idle state, the target test station is controlled to be connected to the shared test station.

[0017] In the embodiment of the present application, the use status of the shared test station is obtained, and when the use status of the shared test station is idle, the target test station is controlled to connect with the shared test station. In this embodiment, the connection between the target test station and the shared test station is controlled only when the use status of the shared test station is idle, which reduces the connection conflict of the shared test station and improves the connection rationality and connection reliability of the shared test station.

[0018] In one embodiment, the method further comprises:

[0019] When the use status of the shared test station is an occupied status, generating a connection request between the target test station and the shared test station;

[0020] The connection request is stored in the cache queue until the use state of the shared test station is switched to the idle state to execute the connection request.

[0021] In the embodiment of the present application, when the use status of the shared test station is occupied, a connection request between the target test station and the shared test station is generated, and the connection request is stored in the cache queue until the use status of the shared test station is switched to the idle state to execute the connection request. The shared test station is in the occupied state, which means that the shared test station is currently in a state of connection with other test stations, that is, the shared test station is facing a use conflict at this time. Then, in the embodiment of the present application, the connection request between the target test station and the shared test station is stored in the cache queue, and the use conflict of the shared test station is adjusted by intelligent queuing, thereby improving the connection reliability of the shared test station; in addition, the connection request is stored in the cache queue. Once there are multiple connection requests to be executed, the connection request can be processed more orderly without congestion, thereby improving the system response efficiency and reducing the waste of time.

[0022] In one embodiment, controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station includes:

[0023] If the test power requirement is less than or equal to the configured test power of the target test station, and the target test station is connected to the shared test station, the target test station is controlled to be disconnected from the shared test station to reduce the test power of the target test station.

[0024] In an embodiment of the present application, if the test power demand is less than or equal to the configured test power of the target test station, and the target test station is in a connected state with the shared test station, the target test station is controlled to be disconnected from the shared test station to reduce the test power of the target test station. In this embodiment, for the case where the test power demand is less than or equal to the configured test power of the target test station, this situation indicates that only the target test station can meet the test power demand of the battery, but if the target test station is still in a connected state with the shared test station at this time, the additional test power provided by the shared test station is in an idle state. Therefore, when the target test station is in a connected state with the shared test station, the connection between the target test station and the shared test station is disconnected, which reduces the idle waste of power resources of the shared test station, thereby reducing costs; and disconnecting the target test station from the shared test station can also enable other test stations to connect to the shared test station when the test power needs to be increased, thereby improving the test power utilization rate of the shared test station.

[0025] In one embodiment, obtaining the test power requirement of a battery at a target test station includes:

[0026] Obtain the test process flow of the battery at the target test station;

[0027] According to the test step process, obtain the test parameters of the battery test step to be executed at the target test station;

[0028] According to the test parameters, the test power requirement of the battery at the target test station is determined.

[0029] In an embodiment of the present application, a test step process of a battery at a target test station is obtained, and based on the test step process, test parameters of the test step to be executed by the battery at the target test station are obtained, and then the test power requirement of the battery at the target test station is determined based on the test parameters. In this embodiment, since the test step process of the battery can be directly obtained in advance, the parameter information required for each test step in the test step process can also be read, and therefore, the test power requirement of the battery at the target test station can be quickly determined based on the test parameters of the test step to be executed by the battery, thereby improving the speed of adjusting the test power of the target test station based on the test power requirement of the battery, and since the test power requirement is obtained based on the test step process of the battery, the test power requirement of the battery at the target test station obtained is more accurate.

[0030] In one embodiment, the method further comprises:

[0031] Obtain the test process flow of the battery at each test station;

[0032] According to the test process flow and historical test process data of the batteries at each test station, the conflict time and frequency of shared test stations are predicted;

[0033] The test start time of the battery at each test station is determined according to the conflict time and number of the shared test stations.

[0034] In the embodiment of the present application, the test step flow of the battery at each test station is obtained, and the conflict time and number of the shared test station are predicted based on the test step flow and historical test step data of the battery at each test station, and then the test start time of the battery at each test station is determined based on the conflict time and number of the shared test station. In this embodiment, since the predicted conflict time and number of the shared test station are generated based on the test step flow and historical test step data of the battery at each test station, it is equivalent to considering both the test step flow of the battery at each test station and the historical test step data of the battery at each test station when generating the conflict time and number of the shared test station, which improves the accuracy of the conflict time and number of the shared test station to a certain extent; in addition, according to the accurate conflict time and number, the test start time of the battery at each test station is adjusted, reducing the conflict of each test station connecting to the shared test station.

[0035] In one embodiment, the method further comprises:

[0036] According to the test power requirements of each battery in the historical period, the configured test powers of multiple test stations and the shared configured test power of the shared test station are determined; the sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirements.

[0037] In an embodiment of the present application, the configuration test power of multiple test stations and the shared configuration test power of the shared test station are determined according to the test power requirements of each battery within the historical time length; the sum of the shared configuration test power and the configuration test power of any test station is greater than or equal to the maximum value in the test power requirement. In this embodiment, the sum of the shared configuration test power and the configuration test power of any test station is greater than or equal to the maximum value in the test power requirement, so that when any test station needs to increase the test power, it can meet the test power requirements of the battery by connecting with the shared test station, making the configuration test power and the shared configuration test power more reasonable, and there will be no situation where the test station cannot meet the test power requirements of the battery; and, through the actual test power requirements, the test power of the configuration test station and the shared test power of the shared test station are reduced, thereby reducing power waste and reducing testing costs.

[0038] In a second aspect, the present application further provides a battery testing system, which includes a control device, a plurality of test stations and a shared test station, wherein the plurality of test stations and the shared test station are connected to the control device, and each test station tests at least one battery;

[0039] The control device is used to adjust the test power of the test station according to the test power requirement of the battery at any test station by controlling the connection state between the test station and the shared test station to test the battery at the test station.

[0040] In an embodiment of the present application, the battery testing system includes a control device, a plurality of test stations and a shared test station, wherein the plurality of test stations and the shared test station are all connected to the control device, and each test station corresponds to testing at least one battery; the control device is used to adjust the test power of the test station by controlling the connection state between the test station and the shared test station according to the test power demand of the battery at any test station, so as to test the battery at the test station. In this embodiment, a shared test station is configured, and for any test station, the test power of the test station is adjusted by controlling the connection state between the shared test station and the test station according to the test power demand of the test station, so that the test power of each test station is reasonably configured. During the test process, the test power demand of the battery at the test station is flexibly adjusted, so that the battery can be tested with the power required by the battery, and the actual configuration power of the test station is reduced due to excessive idle waste, thereby reducing the test cost.

[0041] In a third aspect, the present application further provides a battery testing device, the device comprising:

[0042] A demand acquisition module is used to acquire the test power demand of the battery at a target test station; the target test station is any test station among the multiple test stations;

[0043] A power adjustment module, used to control the connection state between the target test station and the shared test station to adjust the test power of the target test station according to the test power requirement;

[0044] The test module is used to test the battery on the target test station.

[0045] In a fourth aspect, an embodiment of the present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the method provided in any embodiment of the first aspect are implemented.

[0046] In a fifth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method provided in any embodiment of the first aspect above.

[0047] In a sixth aspect, an embodiment of the present application further provides a computer program product, comprising a computer program, which, when executed by a processor, implements the steps of the method provided in any embodiment of the first aspect above.

[0048] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Moreover, the same reference numerals are used throughout the drawings to represent the same components. In the drawings:

[0050] Figure 1 is a schematic structural diagram of a battery testing system in one embodiment;

[0051] Figure 2 A schematic diagram of a battery testing method according to an embodiment;

[0052] Figure 3 It is a structural schematic diagram of a battery testing system in another embodiment;

[0053] Figure 4 is a flow chart of a battery testing method in another embodiment;

[0054] Figure 5 is a flow chart of a battery testing method in another embodiment;

[0055] Figure 6 is a flow chart of a battery testing method in another embodiment;

[0056] Figure 7 is a flow chart of a battery testing method in another embodiment;

[0057] Figure 8a A schematic diagram of the structure of a traditional test station in one embodiment;

[0058] Figure 8b It is a structural schematic diagram of a battery testing system in another embodiment;

[0059] Fig. 9 is a flow chart of a battery testing method in another embodiment;

[0060] Fig.10 is a structural block diagram of a battery testing device in one embodiment;

[0061] Fig.11 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment.

[0062] Description of reference numerals:

[0063] 100 battery test system; 101 control equipment;

[0064] 102 testing station; 103 shared testing station. DETAILED DESCRIPTION

[0065] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0066] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of the present application; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present application; the term "including" in the specification and claims of the present application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined. The reference to "embodiment" in this article means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present application. The appearance of this phrase in various positions in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments. In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there can be three relationships, such as A and / or B, which can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0067] During the battery testing process, high power is required to execute some steps. For example, rate testing requires a high-power test station to test the battery. Therefore, in order to meet the high-power demand, the test power of each test station is configured to high power.

[0068] However, among the multiple steps of battery testing, where a step refers to any step in the test condition, usually only a few steps are high-power tests, and most steps are low-power tests, which causes the actual power of the test station to be idle and wasted most of the time, and the battery testing cost is high.

[0069] Based on the above considerations, in order to reduce the cost of battery testing, a battery testing method is proposed, in which a shared test station is configured for multiple test stations. For any target test station, according to the test power requirement of the battery at the target test station, the test power of the target test station is adjusted by controlling the connection status of the target test station and the shared test station. In this way, the test power of each test station is reasonably configured. During the test process, based on the test power requirement of the battery at the test station, it is flexibly adjusted, so that the battery can be tested with the power required by the battery, reducing the idle waste of the actual configured power of the test station due to excessive power, thereby reducing the battery testing cost.

[0070] The battery testing method provided in the embodiment of the present application is applied to a battery testing system. Based on this, before describing the battery testing method provided in the embodiment of the present application, the battery testing system to which the battery testing method provided in the embodiment of the present application is applied is first described.

[0071] like Figure 1 As shown, Figure 1 This is a schematic diagram of a battery testing system provided in an embodiment of the present application. The battery testing system 100 includes a control device 101, multiple test stations 102 and a shared test station 103. The multiple test stations 102 and the shared test station 103 are all connected to the control device 101. Each test station 102 corresponds to testing at least one battery, for example, it can include one battery, or it can be two, three or even more batteries.

[0072] The control device 101 may be a host computer or other device capable of sending operation instructions, and the host computer includes but is not limited to a smart terminal, a personal computer, a workbench, a processor, a wearable smart device, a laptop computer, and a server.

[0073] The control device 101 is used to adjust the test power of the test station 102 according to the test power requirement of the battery at any test station 102 by controlling the connection state between the test station 102 and the shared test station 103 to test the battery at the test station 102 .

[0074] During the battery production process, the battery can be tested by the battery testing system 100 to detect whether the battery is a defective battery or not.

[0075] Among them, the battery testing system 100 includes a controller 101, multiple test stations 102 and a shared test station 103. The controller 101 is used to control the connection between the test station 102 and the shared test station 103. The test station 102 is used to test the battery. One test station 102 is used to connect to at least one battery and test at least one battery. The shared test station 103 is used to adjust the test power of the test station 102. The shared test station 103 can only be connected to one test station 102 at the same time, and cannot be connected to multiple test stations 102 at the same time.

[0076] Taking the charge and discharge test as an example, a certain charging system can be used to perform the charge and discharge test on the battery, such as: charging test at a fixed current value or a fixed power value, and discharging test at a fixed current value or a fixed power value.

[0077] For any test station 102 among the multiple test stations, the control device 101 controls the connection status between the test station 102 and the shared test station 103 according to the test power requirement of the battery on the test station 102, so as to adjust the test power of the test station 102, and then tests the battery based on the adjusted test power in the test station 102; wherein the test power requirement may include the test power and / or test current required for the battery on the test station during testing.

[0078] The connection state between the test station 102 and the shared test station 103 may include the test station 102 and the shared test station 103 being in a connected state, the test station 102 and the shared test station 103 being in a disconnected state, etc. Optionally, the connection between the test station 102 and the shared test station 103 may be in parallel, and the parallel connection between the test station 102 and the shared test station 103 may increase the test power of the corresponding test station 102; for example, if the test power of the test station 102 is 300A and the test power of the shared test station 103 is 400A, then when the test station 102 and the shared test station 103 are in a connected state, the test power of the test station 102 is 700A.

[0079] It should be noted that the number of shared test stations 103 can be one or more, and can be configured according to actual power requirements, as long as the total configuration cost of the test stations and shared test stations is the lowest while meeting the test resources.

[0080] The number of test stations 102 can be set based on actual cost, site conditions and other factors. Figure 1 The battery testing system 100 is an example in which the number of the testing stations 102 is four and the number of the shared testing station 103 is one.

[0081] In the battery testing system provided by the embodiment of the present application, the battery testing system includes a control device, a plurality of test stations and a shared test station, the plurality of test stations and the shared test station are all connected to the control device, and at least one battery is tested at each test station; the control device is used to adjust the test power of the test station by controlling the connection state between the test station and the shared test station according to the test power demand of the battery at any test station, so as to test the battery at the test station. In the system, a shared test station is configured, and for any test station, the test power of the test station is adjusted by controlling the connection state between the shared test station and the test station according to the test power demand of the test station, so that the test power of each test station is reasonably configured. During the test process, the test power demand of the battery at the test station is flexibly adjusted, so that the battery can be tested with the power required by the battery, and the actual configuration power of the test station is reduced due to excessive idle waste, thereby reducing the test cost.

[0082] The battery testing method provided in the embodiment of the present application is described below with the control device as the execution subject.

[0083] In one embodiment, Figure 2 As shown, a battery testing method is provided, comprising the following steps:

[0084] S201, obtaining a test power requirement of a battery at a target test station; the target test station is any test station among a plurality of test stations.

[0085] Among them, the battery on the target test station refers to the battery that needs to be tested by the target test station. The test power requirement can be the electrical energy required for the battery when being tested at the target test station. The test power requirement may include the power, voltage and / or current required for the battery on the target test station during testing.

[0086] Taking any test station among multiple test stations as the target test station as an example, it should be noted that the multiple test stations refer to multiple test stations in the battery testing system, excluding shared test stations, that is, the target test station can be any test station among the multiple test stations in the battery testing system except the shared test station.

[0087] Before testing the battery on the target test station, it is necessary to obtain the test power requirement of the battery on the target test station, and test the battery according to the test power requirement.

[0088] The method of obtaining the test power requirement of the battery at the target test station may be to obtain the test items of the battery at the target test station and determine the test power requirement of the battery according to the test items; the battery includes multiple test items during the testing process, and the test power requirement corresponding to each test item may be the same or different.

[0089] The test power requirement of the battery at the target test station may also be obtained by obtaining the test power requirement of the battery from a storage database of the control device according to the identification of the battery at the target test station.

[0090] S202: According to the test power requirement, control the connection state between the target test station and the shared test station to adjust the test power of the target test station.

[0091] The sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirements.

[0092] A test station corresponds to a configured test power, and a shared test station corresponds to a shared configured test power. Therefore, the connection status between the target test station and the shared test station will affect the test power of the target test station; for example, when the target test station and the shared test station are in a connected state, the test power of the target test station will increase.

[0093] In one embodiment, the target connection state between the target test station and the shared test station may be determined according to the test power requirement, and the connection between the target test station and the shared test station may be controlled according to the target connection state to adjust the test power of the target test station.

[0094] Optionally, the target connection state between the target test station and the shared test station can be determined based on a pre-trained state model; specifically, the test power requirement of the battery is input into the state model, the test power requirement is analyzed through the state model, and the target connection state between the target test station and the shared test station is output; wherein the target connection state includes connection and disconnection, etc.

[0095] When the target connection state is connected, the control device performs a connection operation to control the target test station to be connected to the shared test station.

[0096] When the target connection state is disconnected, the control device performs a disconnection operation to control the target test station to be disconnected from the shared test station.

[0097] In another embodiment, the connection status of the target test power and the shared test station can also be determined based on the relationship between the test power demand and the preset power threshold; for example, if the test power demand is greater than the power threshold and the connection status is connected, the target test station is controlled to be connected to the shared test station, and the test power of the target test station is adjusted according to the state after the connection; if the test power demand is less than or equal to the power threshold and the connection status is disconnected, the target test station is controlled to be disconnected from the shared test station, and the test power of the target test station is adjusted according to the state after the disconnection.

[0098] The configuration test power of each test station and the shared configuration test power of the shared test station may be determined by: determining the configuration test power of multiple test stations and the shared configuration test power of the shared test station according to the test power requirements of each battery within a historical period.

[0099] Among them, the historical duration refers to a period of time in the past, which can be one day, one month, one year, three years, and so on.

[0100] According to the test power requirements of each battery within the historical period, determine the configured test powers of multiple test stations and the shared configured test powers of shared test stations; the configured test powers of multiple test stations can be the same or different, but the sum of the shared configured test power and the configured test power of any test station must be greater than or equal to the maximum value of the test power requirements.

[0101] The test power requirements of each battery in the historical duration include the test power requirements of all batteries tested by each test station in the historical duration. In one embodiment, the configured test power of multiple test stations and the shared configured test power of shared test stations can be determined according to a preset configuration model; specifically, the test power requirements of each battery in the historical duration are input into the configuration model, and the test power requirements of each battery in the historical duration are analyzed by the configuration model, and the configured test power of multiple test stations and the shared configured test power of shared test stations are output.

[0102] For example, the test power requirements of each battery in the historical period include 300A, 200A, 500A, 600A, 300A, 200A, 300A, and 200A. If the configured test powers of multiple test stations are all 300A, the shared configured test power of the shared test station can be 300A.

[0103] In an embodiment of the present application, the sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirement. In this way, when any test station needs to increase the test power, it can meet the test power requirement of the battery by connecting with the shared test station, making the configured test power and the shared configured test power more reasonable, and there will be no situation where the test station cannot meet the test power requirement of the battery; and, through the actual test power requirement, the test power of the test station and the shared test power of the shared test station are configured, which reduces power waste and thus reduces the testing cost.

[0104] S203, testing the battery at the target testing station.

[0105] Based on the above-adjusted test power of the target test station, the battery on the target test station is tested; the method for testing the battery on the target test station can be, after adjusting the test power of the target test station according to the test power requirement of the battery, placing the battery on the target test station for testing.

[0106] In one embodiment, when the target test station is in a connected state with the shared test station, the battery on the target test station is tested; wherein, when the target test station is in a connected state with the shared test station, the configured test power of the target test station and the shared configured test power of the shared test station are jointly applied to the battery to test the battery.

[0107] In another embodiment, when the target test station is in a disconnected state from the shared test station, the battery on the target test station is tested; wherein, when the target test station is in a disconnected state from the shared test station, the battery is tested by applying the configured test power of the target test station to the battery.

[0108] In the battery testing method provided in the embodiment of the present application, the test power requirement of the battery on the target test station is obtained, and according to the test power requirement, the connection state between the target test station and the shared test station is controlled to adjust the test power of the target test station, and then the battery on the target test station is tested; the target test station is any one of the multiple test stations. In this method, for any target test station, according to the test power requirement of the target test station, the test power of the target test station is adjusted by controlling the connection state between the shared test station and the target test station, so that the test power of each test station is reasonably configured. During the test process, based on the test power requirement of the battery on the test station, it is flexibly adjusted so that the battery can be tested with the power required by the battery, reducing the idle waste of the actual configuration power of the test station due to excessive power, thereby reducing the test cost.

[0109] In one embodiment, controlling the connection status between the target test station and the shared test station to adjust the test power of the target test station includes: if the test power requirement is greater than the configured test power of the target test station, controlling the target test station to connect with the shared test station to increase the test power of the target test station.

[0110] The configuration of the test power may include the power, voltage and / or current configured on the test station.

[0111] If the test power requirement of the battery at the target test station is greater than the configured test power of the target test station, it means that the configured test power at the target test station does not meet the test conditions of the battery at the target test station, and the test power of the target test station needs to be increased. Therefore, the target test station needs to be connected to the shared test station to increase the test power of the target test station.

[0112] The method of controlling the target test station to connect with the shared test station may be that the control device generates a connection instruction and sends the connection instruction to the shared test station, wherein the connection instruction is used to control the shared test station to connect with the target test station; wherein the connection instruction may include an identifier of the target test station.

[0113] Optionally, the connection or disconnection between the target test station and the shared test station can be achieved through a contactor or a switch device on the target test station. Taking the switch device as an example, Figure 3 As shown, Figure 3 It is a structural diagram of a battery testing system, including 4 test stations, 1 shared test station, and switch devices k1, k2, k3 and k4 between each test station and the shared test station. The shared test station can be connected and disconnected with each test station through the switch devices.

[0114] In the battery testing method provided in the embodiment of the present application, if the test power demand is greater than the configured test power of the target test station, the target test station is controlled to be connected to the shared test station to increase the test power of the target test station. In this method, when the test power demand is greater than the configured power of the target test station, it means that the configured power of the current target test station cannot meet the test power demand of the battery on the target test station, then the shared test station is connected to the target test station, so that the common test power of the shared test station and the target test station acts on the battery, thereby meeting the test power demand of the battery on the target test station and improving the accuracy and reliability of the battery test.

[0115] The above embodiment is to explain how to control the target test station to connect with the shared test station if the test power demand is greater than the configured test power of the target test station. The following is a detailed description of how to control the target test station to connect with the shared test station through an embodiment. In one embodiment, Figure 4 As shown, controlling the target test station to connect with the shared test station includes the following steps:

[0116] S401, obtaining the usage status of the shared test station.

[0117] The usage status of the shared test station may include an idle state and an occupied state; the idle state indicates that the shared test station is not connected to any test station, and the occupied state indicates that the shared test station is connected to one test station.

[0118] In one embodiment, a method for obtaining the usage status of a shared test station may be to detect the usage status of the shared test station based on a sensor installed near the shared test station; specifically, a control device sends a detection instruction to the sensor, the detection instruction is used to control the sensor to detect the usage status of the shared test station, and the control device receives the detection result sent by the sensor, and the detection result includes the usage status of the shared test station.

[0119] In another embodiment, the method for obtaining the usage status of the shared test station may also be that the usage status of the shared test station is stored in the control device, and the usage status of the shared test station can be directly obtained from the control device; when the shared test station is connected to any test station, the usage status of the shared test station will be adjusted to an occupied state in the control device; when the shared test station is disconnected from the test station, the usage status of the shared test station will be adjusted to an idle state in the control device.

[0120] S402, when the use status of the shared test station is an idle state, controlling the target test station to connect with the shared test station.

[0121] When the use status of the shared test station is an idle state, which means that the shared test station is not connected to any test station, the target test station can be controlled to be connected to the shared test station.

[0122] It should be noted that the connection method between the target test station and the shared test station in the embodiment of the present application is the same as the method of controlling the connection between the target test station and the shared test station in the above embodiment, and the embodiment of the present application will not be repeated here.

[0123] Optionally, the target test station is controlled to be connected to the shared test station to adjust the test power of the target test station, and then the battery on the target test station is tested. After the test is completed, the target test station is controlled to be disconnected from the shared test station, and the use status of the shared test station is switched to an idle state.

[0124] The method for controlling the target test station to be disconnected from the shared test station may be that the control device generates a disconnection instruction and sends the disconnection instruction to the shared test station, wherein the disconnection instruction is used to control the shared test station to be disconnected from the target test station; wherein the disconnection instruction may include an identifier of the target test station.

[0125] In the battery testing method provided in the embodiment of the present application, the use status of the shared test station is obtained, and when the use status of the shared test station is an idle state, the target test station is controlled to connect with the shared test station. In this method, the connection between the target test station and the shared test station is controlled only when the use status of the shared test station is an idle state, which reduces the connection conflict of the shared test station and improves the connection rationality and connection reliability of the shared test station.

[0126] The above embodiment is a case where the use state of the shared test station is idle and the target test station is controlled to be connected to the shared test station. The following is an explanation of the connection between the shared test station and the target test station when the use state of the shared test station is occupied. Figure 5 As shown, this embodiment includes the following steps:

[0127] S501, when the use status of the shared test station is occupied, generating a connection request between the target test station and the shared test station.

[0128] When the use status of the shared test station is the occupied status, it means that the shared test station is in a connected status with other test stations, wherein the other test stations are any other test stations except the target test station.

[0129] Therefore, when the use status of the shared test station is the occupied status, the shared test station is in the connected status with other test stations, and a connection request between the target test station and the shared test station is generated.

[0130] The connection request between the target test station and the shared test station may include an identifier of the target test station and an identifier of the shared test station; the connection request is used to create a connection between the target test station and the shared test station.

[0131] S502, storing the connection request in a cache queue until the use state of the shared test station is switched to an idle state to execute the connection request.

[0132] The cache queue may include multiple connection requests, ie, connection requests between multiple test stations and a shared test station.

[0133] When the usage status of the shared test station is occupied, a connection request between the target test station and the shared test station is generated and stored in a cache queue. Then, the connection request between the target test station and the shared test station in the cache queue is executed to connect the target test station to the shared test station.

[0134] Optionally, the cache queue may include multiple connection requests, which correspond one-to-one to the time stored in the cache queue. Therefore, after the use state of the shared test station is switched to the idle state, the corresponding connection requests are executed according to the time sequence.

[0135] For example, if the cache queue includes connection request A and connection request B, and connection request A is stored in the cache queue earlier than connection request B, after the usage status of the shared test station is switched to the idle status, connection request A is executed first, and the shared test station is switched to the occupied status. After the test corresponding to connection request A is completed, the usage status of the shared test station is switched to the idle status, and connection request B is executed.

[0136] It is also possible to execute multiple connection requests in the cache queue in order of priority. The connection request also includes a test item. The priority of the corresponding connection request can be determined based on the test item. The connection request with a higher priority is executed first, and the connection request with a lower priority is executed later. If at least two connection requests have the same priority, the corresponding connection requests are executed in the order of the time when the two connection requests are stored in the cache queue.

[0137] For example, if the cache queue includes connection request A and connection request B, and the priority of connection request B is higher than that of connection request A, then after the usage status of the shared test station is switched to the idle status, connection request B is executed first, and the shared test station is switched to the occupied status. After the test corresponding to connection request B is completed, the usage status of the shared test station is switched to the idle status, and connection request A is executed.

[0138] After the test station is connected to the shared test station, the use status of the shared test station is switched to an occupied status. After the test station is disconnected from the shared test station, the use status of the shared test station is adjusted to an idle status.

[0139] In the battery testing method provided in the embodiment of the present application, when the use state of the shared test station is occupied, a connection request between the target test station and the shared test station is generated, and the connection request is stored in the cache queue until the use state of the shared test station is switched to the idle state to execute the connection request. In this method, the shared test station is in an occupied state, indicating that the shared test station is currently in a state of connection with other test stations, that is, the shared test station is facing a use conflict at this time, then in the embodiment of the present application, the connection request between the target test station and the shared test station is stored in the cache queue, and the use conflict of the shared test station is adjusted by intelligent queuing, thereby improving the connection reliability of the shared test station; in addition, the connection request is stored in the cache queue. Once there are multiple connection requests to be executed, the connection request can be processed more orderly without congestion, thereby improving the system response efficiency and reducing the waste of time.

[0140] The above embodiments all illustrate how to adjust the test power of the target test station when the test power requirement of the battery is greater than the configured test power of the target test station. The following illustrates how to adjust the test power of the target test station when the test power is less than or equal to the configured test power of the target test station through an embodiment. In one embodiment, the connection status between the target test station and the shared test station is controlled to adjust the test power of the target test station, including: if the test power requirement is less than or equal to the configured test power of the target test station, and the target test station and the shared test station are in a connected state, then the target test station is controlled to disconnect from the shared test station to reduce the test power of the target test station.

[0141] If the test power demand of the battery is less than or equal to the configured test power of the target test station, it means that the configured test power of the target test station can meet the test conditions of the battery, and there is no need to additionally control the connection between the target test station and the shared test station. Therefore, if the target test station and the shared test station are in a connected state, the test power of the target test station is the sum of the configured test power of the target test station and the shared configured test power of the shared test station. It is necessary to control the target test station to disconnect from the shared test station to reduce the test power of the target test station and reduce the idle time of the power resources of the test station.

[0142] If the test power demand is less than or equal to the configured test power of the target test station, and the target test station is disconnected from the shared test station, the test power of the target test station is the configured test power of the target test station, and therefore the test power of the target test station remains unchanged.

[0143] In the battery testing method provided by the embodiment of the present application, if the test power demand is less than or equal to the configured test power of the target test station, and the target test station is in a connected state with the shared test station, the target test station is controlled to be disconnected from the shared test station to reduce the test power of the target test station. In this method, for the case where the test power demand is less than or equal to the configured test power of the target test station, this situation indicates that only the target test station can meet the test power demand of the battery, but if the target test station is still in a connected state with the shared test station at this time, the test power additionally provided by the shared test station is in an idle state. Therefore, when the target test station is in a connected state with the shared test station, the connection between the target test station and the shared test station is disconnected, which reduces the idle waste of power resources of the shared test station, thereby reducing costs; and disconnecting the target test station from the shared test station can also enable other test stations to connect to the shared test station when the test power needs to be increased, thereby improving the test power utilization rate of the shared test station.

[0144] In one embodiment, if Figure 6 As shown, obtaining the test power requirement of the battery at the target test station includes the following steps:

[0145] S601, obtaining a test process flow of a battery at a target test station.

[0146] The battery test process refers to the steps in the battery test conditions. One step is called a process step. Each step may include test power, test current, test voltage, test time, and test temperature.

[0147] The battery test process can be stored in the test system of the control device, and the battery test process can be obtained according to the identification of the battery at the target test station; the test process of each specification or model of battery can be different.

[0148] Optionally, taking the hybrid power pulse test of the battery as an example, the test step process of the hybrid power pulse test of the battery can be shown in Table 1; it should be noted that the parameters in Table 1: T1, T2, T3, T4, T5, T6, N1, N2, N3, M1, M2, M3, M4, M5, M6, I1, I2, I3, C1 and C2 represent specific values, and the specific values ​​can be set according to actual conditions.

[0149] Table 1

[0150]

[0151]

[0152] S602, according to the test step flow, obtaining the test parameters of the test step to be executed by the battery at the target test station.

[0153] According to the test step flow, the test parameters of all test steps executed by the battery at the target test station can be determined. Therefore, the test parameters of the test step to be executed by the battery at the target test station are obtained from the test parameters of all test steps.

[0154] It is also possible to determine the test parameters of the test steps to be executed by the battery at the target test station by analyzing the test step process; specifically, the test steps to be executed by the battery are obtained from the test step process, and the test parameters are determined according to the execution parameters corresponding to the test steps to be executed; optionally, the execution parameters corresponding to the test steps to be executed can be input into a preset analysis model, and the execution parameters corresponding to the test steps to be executed can be analyzed by the analysis model to output the test parameters of the test steps to be executed by the battery; it is also possible to determine the execution parameters corresponding to the test steps to be executed as the test parameters.

[0155] S603, determining the test power requirement of the battery at the target test station according to the test parameters.

[0156] The test parameters may include the test power requirement, and therefore the test power requirement of the battery at the target test station may be directly obtained from the test parameters.

[0157] The test parameters may also be analyzed according to a preset analysis algorithm to determine the test power requirement of the battery at the target test station.

[0158] In the battery testing method provided in the embodiment of the present application, the test step process of the battery at the target test station is obtained, and according to the test step process, the test parameters of the test step to be executed by the battery at the target test station are obtained, and then according to the test parameters, the test power requirement of the battery at the target test station is determined. In this method, since the test step process of the battery can be directly obtained in advance, the parameter information required for each test step in the test step process can also be read. Therefore, the test power requirement of the battery at the target test station can be quickly determined according to the test parameters of the test step to be executed by the battery, thereby improving the speed of adjusting the test power of the target test station according to the test power requirement of the battery in the future, and since the test power requirement is obtained based on the test step process of the battery, the test power requirement of the battery at the target test station obtained is more accurate.

[0159] During the testing process at each test station, the shared test station may be crowded. Therefore, the battery test of each test station can be planned in advance to reduce the possibility of crowding of the shared channel, thereby improving the test efficiency. This is described in detail below through an embodiment. In one embodiment, Figure 7 As shown, this embodiment includes the following steps:

[0160] S701, obtaining the test process flow of the battery at each test station.

[0161] Before each test station tests the battery, a test step flow of the battery at each test station is obtained, wherein the test step flow of the battery at each test station can be directly obtained from a test system of a control device.

[0162] S702, predicting the conflict time and number of shared test stations according to the test step flow and historical test step data of the batteries at each test station.

[0163] The historical test step data may be historical data of tests on historical batteries at each test station in the battery test system, and may include: the test step flow of each historical battery, the test time of all test steps of each historical battery, the queue time and the number of queues, etc.

[0164] Each step in the test process may include test power, test current, test time, and test temperature, etc. Therefore, the test process of the batteries at each test station can be regarded as a theoretical test process under ideal conditions, and the historical test process data is the historical test process under actual conditions. Therefore, according to the test process of the batteries at each test station and the historical test process data, the conflict time and number of conflicts of the shared test station can be determined; any test station waiting to connect to a shared test station once can be regarded as a conflict.

[0165] In one embodiment, a method for predicting the conflict time and number of shared test stations may be to predict the conflict time and number of shared test stations based on a pre-trained prediction model. Specifically, the test step process and historical test step data of the batteries at each test station are input into the prediction model, and the test step process and historical test step data are analyzed through the prediction model to obtain the predicted conflict time and number of shared test stations.

[0166] Optionally, when predicting the conflict time and number of shared test stations, the conflict time and number of shared test stations can be predicted based on the configured test power of each test station and the shared configured test power of the shared test station, and according to the test step process and historical test step data of the batteries at each test station.

[0167] S703, determining the test start time of the battery at each test station according to the conflict time and number of the shared test stations.

[0168] Based on the conflict time and number of shared test stations, the test start time of the battery at each test station is determined; the test start time of the battery at each test station can eliminate the conflict of the shared test station and reduce congestion.

[0169] The test start time of the battery at each test station can be determined according to a preset planning algorithm. Specifically, the conflict time and number of shared test stations are used as inputs of the planning algorithm, and then the planning algorithm is run to obtain the test start time of the battery at each test station. Based on the test start time of the battery at each test station, each battery is tested according to the test process flow of the corresponding battery.

[0170] Optionally, based on the test step flow and historical test step data of the battery at each test station, in addition to predicting the conflict time and number of shared test stations, the conflicting test stations and conflicting test steps can also be predicted. Based on the conflict time and number of shared test stations, the conflicting test stations and conflicting test steps, the test start time of the battery at each test station is determined.

[0171] For example, if the battery testing system includes three test stations: test station A1, test station A2 and test station A3, according to the prediction, the conflict time of the shared test station is determined to be time B, and the number of conflicts is 1, that is, test station A1 and test station B1 conflict at time B, and the conflicting test step is step C, and it is known that the time used for testing step C is T. Therefore, the test start time of the battery at test station B1 and the test start time of test station A1 can be set equal to T. There is no conflict at test station A3, so the batteries at test station A1 and test station A3 can be set to the same test start time, and the test start time of the battery at test station A2 can be extended backward by T.

[0172] In the battery testing method provided in the embodiment of the present application, the test step flow of the battery at each test station is obtained, and the conflict time and number of the shared test station are predicted based on the test step flow and historical test step data of the battery at each test station, and then the test start time of the battery at each test station is determined based on the conflict time and number of the shared test station. In this method, since the predicted conflict time and number of the shared test station are generated based on the test step flow and historical test step data of the battery at each test station, it is equivalent to considering both the test step flow of the battery at each test station and the historical test step data of the battery at each test station when generating the conflict time and number of the shared test station, which improves the accuracy of the conflict time and number of the shared test station to a certain extent; in addition, according to the accurate conflict time and number, the test start time of the battery at each test station is adjusted, reducing the conflict of each test station connecting to the shared test station.

[0173] Alternatively, taking the mixed pulse test of the battery as an example, only the rate charging (4.35CN) requires high-power charging, so the test station needs to be fully equipped with high power. Figure 8a As shown, Figure 8a This is a test system structure diagram corresponding to full high power. Taking 4 test stations as an example, all 4 test stations are configured with high power, where the high power can be 600A.

[0174] However, based on the battery testing system in the embodiment of the present application, shared test stations are used to reduce the configuration of the originally fully equipped 4 high-power test stations to 5 low-power channels, including one low-power shared test station and the remaining 4 low-power test stations. When the 4 test stations need high power, they can be switched through contactors / switches and connected in parallel with the test stations to achieve high-power testing. Figure 8b As shown, Figure 8b The schematic diagram of the structure of a battery test system includes 4 test stations and 1 shared test station, wherein the test power of the 4 test stations and the 1 shared test station is configured as low power, and the low power can be 300A.

[0175] It should be noted that Figure 8b The number of 4 test stations is only an example. In actual applications, the number of test stations in the battery testing system includes but is not limited to 4; Figure 8b The number of shared test stations in the figure is only one for example. In actual applications, the number of shared test stations in the battery testing system includes but is not limited to one.

[0176] Alternatively, if Figure 8b As shown, four test stations in the battery testing system share one shared test station, and there is a situation where the test stations compete for resources. The battery testing system is controlled by a control device, so when a shared test station is occupied, a queue can be executed on the control device to execute a software strategy. After the current test station is used, it will be arranged for use by other test stations. The software strategy can be to queue in the order of use, with the current use being 1, the second request use being 2, the third request use being 3, and so on, and execute 1, 2, 3, 4 in sequence, or by polling or the like.

[0177] The control device quickly queries whether several test stations have a need for use. If so, they are used in parallel with the shared test station. After use, it continues to query whether there is a need for use of other test stations. If so, they are used. If not, polling continues in sequence.

[0178] In one embodiment, the present application also provides a battery testing method, such as Fig. 9 As shown, this embodiment includes the following steps:

[0179] S901, determining the configuration test power and shared configuration test power of multiple test stations according to the test power requirements of each battery within a historical period;

[0180] The sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirements.

[0181] S902, obtaining a plurality of test stations and a shared test station according to the configured test powers of the plurality of test stations and the shared configured test powers of the shared test stations.

[0182] S903, for any target test station, detecting the relationship between the test power requirement of the battery at the target test station and the configured test power of the target test station;

[0183] Among them, the test power requirement of the battery at the target test station can be determined according to the test step flow of the battery at the target test station.

[0184] S904: If the test power requirement of the battery at the target test station is greater than the configured test power of the target test station, obtain the usage status of the shared test station.

[0185] S905 , when the use status of the shared test station is an idle state, controlling the target test station to connect with the shared test station.

[0186] S906, when the use status of the shared test station is occupied, generating a connection request for the target test station, adding the connection request to a cache queue, and executing each connection request in sequence according to the order of the connection requests in the cache queue.

[0187] S907, when the test power requirement of the battery at the target test station is less than the configured test power of the target test station, if the target test station is in a connected state with the shared test station, the connection between the target test station and the shared channel is disconnected, otherwise, the test power at the target test station is maintained at the configured test power.

[0188] S908, after adjusting the connection state between the target test station and the shared test station, test the battery on the target test station.

[0189] It should be noted that the conflict time and number of times each test station is connected to a shared test station can be predicted in advance based on the test step flow and historical test step data of the batteries at each test station; the test start time of the battery at each test station is determined based on the conflict time and number, and the conflict in connecting the shared test station between the test stations is adjusted by adjusting the test start time of the batteries at each test station.

[0190] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0191] Based on the same inventive concept, the embodiment of the present application also provides a battery testing device for implementing the battery testing method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more battery testing device embodiments provided below can refer to the limitations of the battery testing method above, and will not be repeated here.

[0192] In one embodiment, Fig.10 As shown, a battery testing device 1000 is provided, including: a demand acquisition module 1001, a power adjustment module 1002 and a testing module 1003, wherein:

[0193] The demand acquisition module 1001 is used to acquire the test power demand of the battery at the target test station; the target test station is any test station among the multiple test stations;

[0194] The power adjustment module 1002 is used to control the connection state between the target test station and the shared test station to adjust the test power of the target test station according to the test power requirement;

[0195] The testing module 1003 is used to test the battery at the target testing station.

[0196] In one embodiment, the power adjustment module 1002 includes:

[0197] The first power adjustment unit is used for controlling the target test station to connect with the shared test station to increase the test power of the target test station if the test power demand is greater than the configured test power of the target test station.

[0198] In one embodiment, the first power adjustment unit is configured to include:

[0199] A status acquisition subunit is used to obtain the usage status of the shared test station;

[0200] The control subunit is used to control the target test station to connect with the shared test station when the use status of the shared test station is an idle state.

[0201] In one embodiment, the apparatus 1000 further includes:

[0202] A request generation module, used for generating a connection request between the target test station and the shared test station when the use status of the shared test station is occupied;

[0203] The execution module is used to store the connection request in the cache queue until the use state of the shared test station is switched to the idle state to execute the connection request.

[0204] In one embodiment, the power adjustment module 1002 includes:

[0205] The second power adjustment unit is used to control the target test station to disconnect from the shared test station to reduce the test power of the target test station if the test power demand is less than or equal to the configured test power of the target test station and the target test station is in a connected state.

[0206] In one embodiment, the demand acquisition module 1001 includes:

[0207] A process acquisition unit, used to acquire the test process flow of the battery at the target test station;

[0208] A parameter acquisition unit, used to acquire the test parameters of the test step to be executed by the battery at the target test station according to the test step process;

[0209] The demand determination unit is used to determine the test power demand of the battery at the target test station according to the test parameters.

[0210] In one embodiment, the apparatus 1000 further includes:

[0211] A process acquisition module is used to obtain the test process steps of the battery at each test station;

[0212] A conflict prediction module is used to predict the conflict time and frequency of shared test stations based on the test step process and historical test step data of the batteries at each test station;

[0213] The determination module is used to determine the test start time of the battery at each test station according to the conflict time and number of the shared test stations.

[0214] In one embodiment, the apparatus 1000 further includes:

[0215] The power determination module is used to determine the configured test power of multiple test stations and the shared configured test power of shared test stations based on the test power requirements of each battery within a historical period; the sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirements.

[0216] Each module in the above-mentioned battery testing device can be implemented in whole or in part by software, hardware or a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0217] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig.11 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store battery test data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a battery testing method is implemented.

[0218] Those skilled in the art will understand that Fig.11 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0219] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.

[0220] The implementation principles and technical effects of each step implemented by the processor in the embodiment of the present application are similar to the principles of the above-mentioned battery testing method, and will not be repeated here.

[0221] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0222] The implementation principles and technical effects of the steps implemented when the computer program in the embodiment of the present application is executed by the processor are similar to the principles of the above-mentioned battery testing method, and will not be repeated here.

[0223] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0224] The implementation principles and technical effects of the steps implemented when the computer program in the embodiment of the present application is executed by the processor are similar to the principles of the above-mentioned battery testing method, and will not be repeated here.

[0225] It should be noted that the data involved in this application (including but not limited to data used for analysis, stored data, displayed data, etc.) are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant laws, regulations and standards of relevant countries and regions.

[0226] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0227] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0228] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A battery testing method, It is characterized in that The method comprises: Obtaining a test power requirement of a battery at a target test station; the target test station is any one of a plurality of test stations; According to the test power requirement, controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station; The battery at the target testing station is tested.

2. The method according to claim 1, It is characterized in that The controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station includes: If the test power requirement is greater than the configured test power of the target test station, the target test station is controlled to be connected to the shared test station to increase the test power of the target test station.

3. The method according to claim 2, It is characterized in that The controlling the target test station to connect with the shared test station includes: Obtaining the usage status of the shared test station; When the use state of the shared test station is an idle state, the target test station is controlled to be connected to the shared test station.

4. The method according to claim 3, It is characterized in that The method further comprises: When the use status of the shared test station is an occupied status, generating a connection request between the target test station and the shared test station; The connection request is stored in a cache queue until the use state of the shared test station is switched to an idle state to execute the connection request.

5. The method according to any one of claims 1 to 4, It is characterized in that The controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station includes: If the test power requirement is less than or equal to the configured test power of the target test station, and the target test station is connected to the shared test station, the target test station is controlled to be disconnected from the shared test station to reduce the test power of the target test station.

6. The method according to any one of claims 1 to 5, It is characterized in that The step of obtaining the test power requirement of the battery at the target test station includes: Obtaining a test process flow of a battery at the target test station; According to the test step process, obtaining the test parameters of the test step to be performed on the battery at the target test station; The test power requirement of the battery at the target test station is determined according to the test parameters.

7. The method according to claim 6, It is characterized in that The method further comprises: Obtaining the test process flow of the battery at each of the test stations; Predicting the conflict time and frequency of the shared test station according to the test step process and historical test step data of the battery at each test station; The test start time of the battery at each of the test stations is determined according to the conflict time and the number of times of the shared test stations.

8. The method according to any one of claims 1 to 5, It is characterized in that The method further comprises: According to the test power requirements of each battery within the historical period, the configured test powers of the multiple test stations and the shared configured test power of the shared test station are determined; the sum of the shared configured test power and the configured test power of any test station is greater than or equal to the maximum value of the test power requirements.

9. A battery testing system, It is characterized in that The battery testing system comprises a control device, a plurality of test stations and a shared test station, wherein the plurality of test stations and the shared test station are connected to the control device, and each test station tests at least one battery; The control device is used to adjust the test power of any test station by controlling the connection state between the test station and the shared test station according to the test power requirement of the battery at any test station, so as to test the battery at the test station.

10. A battery testing device, It is characterized in that The device comprises: A demand acquisition module, used to acquire the test power demand of the battery at a target test station; the target test station is any test station among the multiple test stations; A power adjustment module, used for controlling the connection state between the target test station and the shared test station to adjust the test power of the target test station according to the test power requirement; The testing module is used to test the battery on the target testing station.

11. A computer device, It is characterized in that The method comprises a memory and a processor, wherein the memory stores a computer program, and wherein the processor implements the steps of the method according to any one of claims 1 to 8 when executing the computer program.

12. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.

13. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are implemented.