A smart supervision efficiency enhancement method and system based on AI+
Through the intelligent AI-based supervision method, the monitoring angle and idle period of the construction site monitoring device are dynamically adjusted, which solves the problem of insufficient supervision reliability caused by changes in construction safety risks, and improves the supervision and handling efficiency and reliability of construction safety risks.
Patent Information
- Application Number
- CN202411311507.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-20
AI Technical Summary
The monitoring devices at existing construction sites cannot be dynamically adjusted according to changes in construction safety risks, resulting in insufficient reliability and efficiency of supervision and processing.
Using the intelligent AI-based supervision and efficiency enhancement method, multiple sets of monitoring device adjustment plans are generated by determining the safety risk point distribution data at the construction site and the setting location of the monitoring device, and using the AI model to determine the optimal adjustment plan, optimize the monitoring angle and idle time period. monitoring status improves regulatory reliability and effectiveness.
Accurate evaluation and optimization of the idle state of the monitoring device is achieved, the efficiency and reliability of supervision and handling of construction safety risks is improved, and inefficient supervision problems caused by idle state are avoided.
Smart Images

Figure CN118822114B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of safety supervision technology, and in particular relates to an AI+-based intelligent supervision efficiency enhancement method and system. Background Art
[0002] In order to achieve construction safety supervision during the construction process, the invention patent application CN202410143900.5 "Smart construction site safety supervision method and system based on the Internet of Things" is specifically based on regional monitoring feedback information to reasonably and accurately classify the corresponding areas, significantly improving the construction efficiency and construction safety of the construction site. However, the existing technical solutions have the following technical problems:
[0003] At the on-site construction site, the construction safety risk of the safety supervision area corresponding to the monitoring device is not static, but will change with the change of construction status. For example, the suspension, update of construction projects and changes in construction progress will cause changes in construction safety risks. Therefore, if the monitoring device cannot be adjusted according to the changes in construction safety risks, the reliability of supervision processing cannot be improved.
[0004] In response to the above technical problems, the present invention provides an AI+-based intelligent supervision efficiency enhancement method and system. Summary of the invention
[0005] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:
[0006] According to one aspect of the present invention, an AI+-based intelligent supervision efficiency enhancement method is provided.
[0007] An AI+-based intelligent supervision efficiency enhancement method, specifically including:
[0008] S1 determines the distribution data of the safety risk points of the construction site, and when the reliability of the supervision of the safety risk points meets the requirements in combination with the setting positions of different monitoring devices, proceeds to the next step;
[0009] S2 determines the distribution data of the different monitoring devices in the idle time periods on different dates based on the analysis results of the monitoring images of the different monitoring devices, and when it is determined through the distribution data of the idle time periods on different dates that the idle monitoring conditions of the monitoring devices do not meet the requirements, proceeds to the next step;
[0010] S3 uses the monitoring angles of different monitoring devices as dependent variables to generate multiple groups of adjustment plans for the monitoring devices, and determines the alternative adjustment plans in the adjustment plans based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment plans;
[0011] S4 obtains the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and combines the distribution data of different monitoring devices in idle periods on different dates, uses a preset AI model to determine the optimal adjustment scheme among the alternative adjustment schemes, and uses the optimal adjustment scheme to adjust the monitoring angles of the monitoring devices.
[0012] A further technical solution is that the distribution data of the safety risk points of the construction site is determined according to the construction projects of the construction site, and specifically determined according to the construction areas corresponding to the construction projects having the safety risk points.
[0013] A further technical solution is that the setting position of the monitoring device includes the monitoring angle, setting height and setting location coordinates of the monitoring device.
[0014] A further technical solution is to determine whether the supervision reliability of the safety risk point meets the requirements, specifically including:
[0015] Based on the distribution data of the safety risk points, determining the distribution locations of different safety risk points;
[0016] Based on the distribution positions and the monitoring positions of different monitoring devices, the monitoring image areas of different security risk points in different monitoring devices are determined, and the effective monitoring devices of the security risk points are determined in combination with the preset image area thresholds corresponding to the different security risk points;
[0017] The supervision reliability of the security risk points is determined by using the proportion of the number of security risk points with effective monitoring devices, and a preset reliability threshold is used to determine whether the supervision reliability of the security risk points meets the requirements.
[0018] A further technical solution is that, when the supervision reliability of the safety risk point is less than the preset reliability threshold, it is determined that the supervision reliability of the safety risk point does not meet the requirement.
[0019] A further technical solution is that the preset image area threshold corresponding to the security risk point is determined according to the type of the security risk point.
[0020] A further technical solution is that the method for determining the optimal adjustment scheme among the alternative adjustment schemes is:
[0021] Determining an angle adjustment monitoring device in the monitoring devices based on the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes;
[0022] Based on the distribution data of the idle time periods of different monitoring devices on different dates, determine the duration ratios of the idle time periods of different monitoring devices on different dates, and determine the idle coefficients of different monitoring devices by taking the average values of the duration ratios of the idle time periods on different dates;
[0023] The monitoring adjustment angle and idle coefficient of different angle adjustment monitoring devices are used as input quantities, and the preset AI model is used to determine the scheme matching coefficient with different alternative schemes, and the optimal adjustment scheme among the alternative adjustment schemes is determined according to the scheme matching coefficient.
[0024] A further technical solution is that the optimal adjustment solution is an alternative adjustment solution with the largest solution matching coefficient.
[0025] In the second aspect, the present application provides an AI+-based intelligent supervision efficiency enhancement system, which is applied to the above-mentioned AI+-based intelligent supervision efficiency enhancement method, specifically including:
[0026] Reliability assessment module, limitation assessment module, adjustment plan generation module, monitoring angle adjustment module;
[0027] The reliability assessment module is responsible for determining the distribution data of the safety risk points at the construction site, and determining whether the supervision reliability of the safety risk points meets the requirements in combination with the setting locations of different monitoring devices;
[0028] The restriction situation evaluation module is responsible for determining the distribution data of the idle time periods of different monitoring devices on different dates based on the analysis results of the monitoring images of different monitoring devices, and determining whether the idle monitoring situation of the monitoring device meets the requirements through the distribution data of the idle time periods on different dates;
[0029] The adjustment scheme generation module is responsible for taking the monitoring angles of different monitoring devices as dependent variables, generating adjustment schemes for multiple groups of monitoring devices, and determining the alternative adjustment schemes in the adjustment schemes based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment schemes;
[0030] The monitoring angle adjustment module is responsible for obtaining the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and combining the distribution data of different monitoring devices in idle periods on different dates, using a preset AI model to determine the optimal adjustment scheme among the alternative adjustment schemes, and using the optimal adjustment scheme to adjust the monitoring angles of the monitoring devices.
[0031] The beneficial effects of the present invention are:
[0032] In the present invention, whether the idle monitoring situation of the monitoring device meets the requirements is determined by using the distribution data of the idle time periods on different dates, thereby achieving accurate evaluation of the monitoring idle state of the monitoring device from the perspective of the distribution data of the idle time periods of the monitoring device, avoiding the technical problem of low efficiency of the supervision and processing of security risks due to the idle state of the monitoring device, and improving the efficiency of the supervision and processing of security risks of the monitoring device while ensuring the reliability of the supervision of security risks.
[0033] In the present invention, the monitoring adjustment angles of different monitoring devices and the distribution data of idle time periods on different dates are used to determine the optimal adjustment scheme among the alternative adjustment schemes using a preset AI model, which not only realizes the screening of alternative adjustment schemes with a small number of monitoring adjustment angles, but also realizes the priority adjustment of the monitoring angles of monitoring devices with more serious idle states, thereby improving the efficiency of the supervision and processing of safety risks of monitoring devices with more serious idle states, and improving the efficiency and reliability of the supervision and processing of safety risks.
[0034] Other features and advantages will be described in the following description. The objects and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and drawings.
[0035] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the accompanying drawings;
[0037] Figure 1 It is a framework diagram of an AI+-based smart supervision efficiency enhancement method;
[0038] Figure 2 It is a flow chart of the method for determining the regulatory reliability of safety risk points that meets the requirements;
[0039] Figure 3 is a flow chart of a method for determining that an idle monitoring condition of a monitoring device does not meet a requirement;
[0040] Figure 4 The present invention is a flow chart of a method for determining an alternative adjustment solution among adjustment solutions. DETAILED DESCRIPTION
[0041] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.
[0042] At the on-site construction site, the construction safety risk in the safety supervision area is not static, but will change with the changes in the construction status. Therefore, it is necessary to adjust the monitoring device according to the changes in construction safety risks to improve the reliability of supervision and processing.
[0043] Supervision reliability: It is determined based on the distribution data of safety risk points at the construction site and the locations of different monitoring devices. Specifically, based on the monitoring image areas of different safety risk points in the monitoring devices, the safety risk points with monitoring image areas larger than the preset image areas are regarded as effective monitoring devices, and the proportion of safety risk points with effective monitoring devices is regarded as the supervision reliability. Specifically, when the proportion of safety risk points with effective monitoring devices is 0.7, the supervision reliability is 0.7.
[0044] Idle monitoring status of the monitoring device: The idle monitoring status of the monitoring device is determined based on the proportion of the monitoring time of the idle period of the monitoring device. For example, if the proportion of the monitoring time of the idle period on different dates is 0.6, then the idle monitoring coefficient of the monitoring device is 0.6. When the idle monitoring coefficient is greater than 0.5, it is determined that the idle monitoring status of the monitoring device does not meet the requirements.
[0045] Alternative adjustment plan: It is determined based on the overlap between different security risk points and the monitoring area of the monitoring device under different adjustment plans. When it is determined that all security risk points overlap with the monitoring area of the monitoring device, the adjustment plan is determined to be an alternative adjustment plan.
[0046] Determination of the optimal adjustment scheme among the alternative adjustment schemes: using the monitoring adjustment angles of different monitoring devices and the distribution data of idle time periods on different dates as input, using a preset AI model to determine the matching coefficients of different alternative adjustment schemes, taking the alternative adjustment scheme with the largest matching coefficient as the optimal adjustment scheme, and using the optimal adjustment scheme to adjust the monitoring angle of the monitoring device. Example
[0047] To solve the above problems, according to one aspect of the present invention, Figure 1As shown in the figure, a smart supervision efficiency enhancement method based on AI+ is provided, which specifically includes:
[0048] S1 determines the distribution data of the safety risk points of the construction site, and when the reliability of the supervision of the safety risk points meets the requirements in combination with the setting positions of different monitoring devices, proceeds to the next step;
[0049] S2 determines the distribution data of the different monitoring devices in the idle time periods on different dates based on the analysis results of the monitoring images of the different monitoring devices, and when it is determined through the distribution data of the idle time periods on different dates that the idle monitoring conditions of the monitoring devices do not meet the requirements, proceeds to the next step;
[0050] S3 uses the monitoring angles of different monitoring devices as dependent variables to generate multiple groups of adjustment plans for the monitoring devices, and determines the alternative adjustment plans in the adjustment plans based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment plans;
[0051] S4 obtains the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and combines the distribution data of different monitoring devices in idle periods on different dates, uses a preset AI model to determine the optimal adjustment scheme among the alternative adjustment schemes, and uses the optimal adjustment scheme to adjust the monitoring angles of the monitoring devices.
[0052] Furthermore, the distribution data of the safety risk points of the construction site is determined according to the construction projects of the construction site, and specifically determined according to the construction areas corresponding to the construction projects having the safety risk points.
[0053] Specifically, the setting position of the monitoring device includes the monitoring angle, setting height and setting location coordinates of the monitoring device.
[0054] Optional, such as Figure 2 As shown, it is determined that the regulatory reliability of the safety risk point meets the requirements, specifically including:
[0055] Based on the distribution data of the safety risk points, determining the distribution locations of different safety risk points;
[0056] Based on the distribution positions and the monitoring positions of different monitoring devices, the monitoring image areas of different security risk points in different monitoring devices are determined, and the effective monitoring devices of the security risk points are determined in combination with the preset image area thresholds corresponding to the different security risk points;
[0057] The supervision reliability of the security risk points is determined by using the proportion of the number of security risk points with effective monitoring devices, and a preset reliability threshold is used to determine whether the supervision reliability of the security risk points meets the requirements.
[0058] It should also be noted that when the supervision reliability of the safety risk point is less than the preset reliability threshold, it is determined that the supervision reliability of the safety risk point does not meet the requirement.
[0059] Furthermore, the preset image area threshold corresponding to the security risk point is determined according to the type of the security risk point.
[0060] It should also be noted that when the supervision reliability of the safety risk point does not meet the requirements, the alternative adjustment plan in the adjustment plan is directly determined.
[0061] Optionally, determining whether the supervision reliability of the safety risk point meets the requirements specifically includes:
[0062] Determining the distribution locations of different security risk points based on the distribution data of the security risk points;
[0063] Based on the distribution positions and the monitoring positions of different monitoring devices, the monitoring image areas of different security risk points in different monitoring devices are determined, and the monitoring reliability coefficients of different security risk points are determined based on the monitoring image areas in different monitoring devices;
[0064] The monitoring reliability coefficients of different safety risk points are used to determine the supervision reliability of the safety risk points, and a preset reliability threshold is used to determine whether the supervision reliability of the safety risk points meets the requirements.
[0065] Furthermore, the supervision reliability of the safety risk point is the average value of the monitoring reliability coefficients of different safety risk points;
[0066] Optionally, the idle period is determined based on an analysis result of a monitoring image of the monitoring device, and specifically based on whether the monitoring image of the monitoring device changes.
[0067] Optionally, the idle time distribution data includes distribution time intervals of the idle time on different dates and durations of different idle time periods.
[0068] Specifically, Figure 3 As shown, determining that the idle monitoring situation of the monitoring device does not meet the requirements specifically includes:
[0069] Determine the duration ratio of the idle time periods of different monitoring devices on different dates through the distribution data of the idle time periods of different monitoring devices on different dates, and determine the number of idle days of different monitoring devices using the duration ratio;
[0070] The idle devices in the monitoring device are determined by utilizing the proportion of the number of idle dates, and whether the idle monitoring situation of the monitoring device meets the requirements is determined according to the proportion of the number of idle devices.
[0071] Furthermore, when the proportion of the number of idle devices is greater than a preset proportion, it is determined that the idle monitoring situation of the monitoring device does not meet the requirements.
[0072] It should also be noted that when the idle monitoring situation of the monitoring device meets the requirements, there is no need to adjust the monitoring angle of the monitoring device temporarily.
[0073] Further, determining that the idle monitoring condition of the monitoring device does not meet the requirements specifically includes steps S21-S23, specifically:
[0074] S21 determines the duration ratio of the idle time periods of different monitoring devices on different dates according to the distribution data of the idle time periods of different monitoring devices on different dates;
[0075] S22 determines the idle coefficients of different monitoring devices by using the proportion of the idle time periods on different dates, and determines the idle rates of the monitoring devices according to the idle coefficients of the different monitoring devices;
[0076] S23 determines whether the idle monitoring situation of the monitoring device meets the requirement according to the idle rate of the monitoring device.
[0077] Optionally, the above step S21 includes step S211 and step S212, which are specifically:
[0078] S211 determines the duration ratio of the idle time periods of different monitoring devices on different dates through the distribution data of the idle time periods of different monitoring devices on different dates. When it is determined by the duration ratio that none of the different monitoring devices have idle dates, it is determined that the idle monitoring situation meets the requirements. When there are idle devices with idle dates, the process proceeds to step S212.
[0079] S212 determines the idle dates of different monitoring devices. When the number of idle dates accounts for the number of monitoring devices that do not meet the requirements is greater than the preset number of devices, it is determined that the idle monitoring situation of the monitoring device does not meet the requirements. When the number of idle dates accounts for the number of monitoring devices that do not meet the requirements is not greater than the preset number of devices, proceed to step S22.
[0080] Optionally, the above step S22 includes steps S221-S223, specifically:
[0081] S221 determines the idle usage coefficients of different monitoring devices on different dates by using the proportion of the duration of the idle time periods on different dates and the number of the idle time periods on different dates. When the number of dates that do not meet the requirements of the idle usage coefficients is greater than the preset number of dates and the number of monitoring devices is greater than the preset number of devices, it is determined that the idle monitoring situation of the monitoring device does not meet the requirements. When the number of dates that do not meet the requirements of the idle usage coefficients is greater than the preset number of dates and the number of monitoring devices is not greater than the preset number of devices, the process proceeds to step S222;
[0082] S222 determines the idle coefficients of different monitoring devices based on the idle coefficients of different dates. When the number of monitoring devices whose idle coefficients do not meet the requirements is greater than the preset number of devices, it is determined that the idle monitoring conditions of the monitoring devices do not meet the requirements. When the number of monitoring devices whose idle coefficients do not meet the requirements is not greater than the preset number of devices, the process proceeds to step S223.
[0083] S223 determines the idle rate of the monitoring device according to the idle coefficients of different monitoring devices, and proceeds to step S23.
[0084] Furthermore, an adjustment plan for multiple groups of monitoring devices is generated, specifically including:
[0085] Determining an alternative adjustment angle of the monitoring device based on a current monitoring angle of the monitoring device and an adjustment range of the monitoring angle;
[0086] Based on the different optional adjustment angles of the monitoring device, an adjustment plan for the monitoring device is determined.
[0087] Specifically, Figure 4 As shown, the method for determining the alternative adjustment scheme in the adjustment scheme is:
[0088] Determining monitoring areas of different monitoring devices based on the monitoring angles corresponding to the monitoring devices under the adjustment scheme;
[0089] The monitoring devices corresponding to different security risk points are determined by the overlap between the monitoring areas of different monitoring devices and different security risk points, and the monitoring reliability coefficients of different security risk points are determined by the number of monitoring devices corresponding to different security risk points;
[0090] Based on the monitoring reliability coefficients of different safety risk points, the monitoring reliable risk points among the safety risk points in the adjustment scheme are determined, and the alternative adjustment schemes in the adjustment scheme are determined according to the number of the monitoring reliable risk points.
[0091] Furthermore, the scheme monitoring reliability coefficient of the adjustment scheme is determined according to the average value of the monitoring reliability coefficients of different safety risk points.
[0092] It should also be noted that the alternative adjustment scheme is an adjustment scheme whose scheme monitoring reliability coefficient is greater than a preset reliability coefficient threshold.
[0093] Optionally, the determination of the alternative adjustment scheme in the adjustment scheme specifically includes steps S31-S33, specifically:
[0094] S31 determines monitoring areas of different monitoring devices based on the monitoring angles corresponding to the monitoring devices under the adjustment scheme;
[0095] S32 determines the monitoring devices corresponding to different security risk points by the overlap between the monitoring areas of different monitoring devices and different security risk points, and determines the monitoring reliability coefficients of different security risk points by using the number of monitoring devices corresponding to different security risk points and the monitoring image areas in different monitoring devices;
[0096] S33 determines the scheme monitoring reliability coefficient of the adjustment scheme based on the monitoring reliability coefficients of different safety risk points, and determines the alternative adjustment scheme in the adjustment scheme through the scheme monitoring reliability coefficient.
[0097] A further technical solution is that the above step S32 includes steps S321 to S323, which specifically include:
[0098] S321 determines the monitoring devices corresponding to different security risk points by the overlap between the monitoring areas of different monitoring devices and different security risk points, and uses them as matching monitoring devices. When the number of security risk points without matching monitoring devices does not meet the requirements, it is determined that the adjustment scheme does not belong to the alternative adjustment scheme. When the number of security risk points with matching monitoring devices meets the requirements, it enters step S322;
[0099] S322 is based on the number of matching monitoring devices at different security risk points. When there is no security risk point where the number of matching monitoring devices is less than the preset device number threshold, it is determined that the adjustment scheme belongs to the alternative adjustment scheme. When there is a security risk point where the number of matching monitoring devices is less than the preset device number threshold, the process proceeds to step S323;
[0100] S323 When the number of matching monitoring devices is less than the number of security risk points of the preset device number threshold and the number does not meet the requirements, it is determined that the adjustment plan does not belong to the alternative adjustment plan; when the number of matching monitoring devices is less than the number of security risk points of the preset device number threshold and the number of monitoring devices corresponding to different security risk points and the monitoring image areas in different monitoring devices are used to determine the monitoring reliability coefficients of different security risk points, and directly proceed to step S33.
[0101] Optionally, the above step S33 further includes steps S331 and S332, which specifically include:
[0102] Step S331 determines that the monitoring reliability coefficients of different security risk points are greater than the preset coefficient threshold based on the monitoring reliability coefficients of different security risk points, then determines that the adjustment scheme belongs to the alternative adjustment scheme, and when there is a security risk point whose monitoring reliability coefficient is not greater than the preset coefficient threshold, proceeds to step S332;
[0103] A scheme monitoring reliability coefficient of the adjustment scheme is used, and an alternative adjustment scheme among the adjustment schemes is determined through the scheme monitoring reliability coefficient.
[0104] Step S332, when the number of security risk points whose monitoring reliability coefficient is not greater than the preset coefficient threshold does not meet the requirements, it is determined that the adjustment scheme belongs to an alternative adjustment scheme, and when the number of security risk points whose monitoring reliability coefficient is not greater than the preset coefficient threshold meets the requirements, the process proceeds to step S333;
[0105] Step S333 determines the scheme monitoring reliability coefficient of the adjustment scheme based on the monitoring reliability coefficients of different safety risk points, and determines the alternative adjustment scheme in the adjustment scheme through the scheme monitoring reliability coefficient.
[0106] Specifically, the method for determining the optimal adjustment scheme among the alternative adjustment schemes is:
[0107] Determining an angle adjustment monitoring device in the monitoring devices based on the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes;
[0108] Based on the distribution data of the idle time periods of different monitoring devices on different dates, determine the duration ratios of the idle time periods of different monitoring devices on different dates, and determine the idle coefficients of different monitoring devices by taking the average values of the duration ratios of the idle time periods on different dates;
[0109] The monitoring adjustment angle and idle coefficient of different angle adjustment monitoring devices are used as input quantities, and the preset AI model is used to determine the scheme matching coefficient with different alternative schemes, and the optimal adjustment scheme among the alternative adjustment schemes is determined according to the scheme matching coefficient.
[0110] A further technical solution is that the optimal adjustment solution is an alternative adjustment solution with the largest solution matching coefficient. Example
[0111] In the second aspect, the present application provides an AI+-based intelligent supervision efficiency enhancement system, which is applied to the above-mentioned AI+-based intelligent supervision efficiency enhancement method, specifically including:
[0112] Reliability assessment module, limitation assessment module, adjustment plan generation module, monitoring angle adjustment module;
[0113] The reliability assessment module is responsible for determining the distribution data of the safety risk points at the construction site, and determining whether the supervision reliability of the safety risk points meets the requirements in combination with the setting locations of different monitoring devices;
[0114] The restriction situation evaluation module is responsible for determining the distribution data of the idle time periods of different monitoring devices on different dates based on the analysis results of the monitoring images of different monitoring devices, and determining whether the idle monitoring situation of the monitoring device meets the requirements through the distribution data of the idle time periods on different dates;
[0115] The adjustment scheme generation module is responsible for taking the monitoring angles of different monitoring devices as dependent variables, generating adjustment schemes for multiple groups of monitoring devices, and determining the alternative adjustment schemes in the adjustment schemes based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment schemes;
[0116] The monitoring angle adjustment module is responsible for obtaining the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and combining the distribution data of different monitoring devices in idle periods on different dates, using a preset AI model to determine the optimal adjustment scheme among the alternative adjustment schemes, and using the optimal adjustment scheme to adjust the monitoring angles of the monitoring devices.
[0117] Optionally, determining whether the supervision reliability of the safety risk point meets the requirements includes steps S11-S14, specifically:
[0118] S11 determines the distribution positions of different security risk points based on the distribution data of the security risk points;
[0119] S12 determines the monitoring image areas of different security risk points in different monitoring devices based on the distribution positions and the monitoring positions of different monitoring devices, and determines the effective monitoring devices of different security risk points in combination with the preset image area thresholds corresponding to the different security risk points;
[0120] S13 determines the monitoring reliability coefficients of different security risk points according to the number of effective monitoring devices at different security risk points and the deviations between the monitoring image areas in different monitoring devices and the preset image area thresholds;
[0121] Optionally, the above step S13 includes the following steps:
[0122] S131 determines the security risk points whose deviations in different monitoring devices do not meet the requirements based on the deviations between the monitoring image areas of different security risk points in different monitoring devices and the preset image area thresholds. When there are security risk points whose deviations in different monitoring devices do not meet the requirements, it is directly determined that the supervision reliability of the security risk points does not meet the requirements. When there are no security risk points whose deviations in different monitoring devices do not meet the requirements, the process proceeds to step S132.
[0123] S132 determines the monitoring reliability coefficients of different safety risk points according to the number of effective monitoring devices at different safety risk points and the deviations between the monitoring image areas in the different monitoring devices and the preset image area threshold. When the proportion of the number of safety risk points that do not meet the requirements due to the monitoring reliability coefficients does not meet the requirements, it is directly determined that the supervision reliability of the safety risk points does not meet the requirements. When the proportion of the number of safety risk points that do not meet the requirements due to the monitoring reliability coefficients meets the requirements, step S14 is entered.
[0124] S14 uses the monitoring reliability coefficients of different safety risk points to determine the supervision reliability of the safety risk points, and uses a preset reliability threshold to determine whether the supervision reliability of the safety risk points meets the requirements.
[0125] Optionally, the above step S12 includes steps S121-S122, which are specifically:
[0126] S121 determines the overlap between different security risk points and the monitoring areas of different monitoring devices based on the distribution positions and the monitoring positions of different monitoring devices. When there are security risk points that are not in the monitoring area, it is directly determined that the supervision reliability of the security risk points does not meet the requirements. When there are no security risk points that are not in the monitoring area, enter step S122;
[0127] S122 determines the monitoring image areas of different security risk points in different monitoring devices, and determines the effective monitoring devices of different security risk points in combination with the preset image area thresholds corresponding to different security risk points. When the number of security risk points without effective monitoring devices does not meet the requirements, it is directly determined that the supervision reliability of the security risk points does not meet the requirements. When the number of security risk points without effective monitoring devices meets the requirements, it directly proceeds to step S13.
[0128] Optionally, determining that the idle monitoring condition of the monitoring device does not meet the requirement specifically includes:
[0129] Determine the duration ratio of the idle time periods of different monitoring devices on different dates through the distribution data of the idle time periods of different monitoring devices on different dates;
[0130] Determine the idle coefficients of different monitoring devices by using the average value of the duration ratio of the idle time periods on different dates;
[0131] The idle devices in the monitoring device are determined according to the idle coefficient, and whether the idle monitoring situation of the monitoring device meets the requirements is determined according to the proportion of the number of the idle devices.
[0132] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0133] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0134] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.
Claims
1. A smart supervision efficiency enhancement method based on AI+, It is characterized in that Specifically include: Determine the distribution data of the safety risk points of the construction site, and when the reliability of the supervision of the safety risk points meets the requirements in combination with the setting positions of different monitoring devices, proceed to the next step; Determine the distribution data of the different monitoring devices in the idle time periods on different dates based on the analysis results of the monitoring images of the different monitoring devices, and when it is determined through the distribution data of the idle time periods on different dates that the idle monitoring conditions of the monitoring devices do not meet the requirements, proceed to the next step; Taking the monitoring angles of different monitoring devices as dependent variables, generating multiple groups of adjustment plans for the monitoring devices, and determining the alternative adjustment plans in the adjustment plans based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment plans; Acquire the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and determine the optimal adjustment scheme in the alternative adjustment schemes by using a preset AI model in combination with the distribution data of different monitoring devices in idle periods on different dates, and adjust the monitoring angles of the monitoring devices by using the optimal adjustment scheme; Determine that the regulatory reliability of the safety risk points meets the requirements, including: Determining the distribution locations of different security risk points based on the distribution data of the security risk points; Based on the distribution positions and the monitoring positions of different monitoring devices, the monitoring image areas of different security risk points in different monitoring devices are determined, and the effective monitoring devices of the security risk points are determined in combination with the preset image area thresholds corresponding to the different security risk points; Determine the supervision reliability of the safety risk points by using the proportion of the number of safety risk points with effective monitoring devices, and determine whether the supervision reliability of the safety risk points meets the requirements by using a preset reliability threshold; Determining that the idle monitoring condition of the monitoring device does not meet the requirements specifically includes: Determine the duration ratio of the idle time periods of different monitoring devices on different dates through the distribution data of the idle time periods of different monitoring devices on different dates, and determine the number of idle days of different monitoring devices using the duration ratio; Determine the idle devices in the monitoring device by using the proportion of the number of idle dates, and determine whether the idle monitoring situation of the monitoring device meets the requirements according to the proportion of the number of idle devices; The method for determining the optimal adjustment scheme among the alternative adjustment schemes is: Determining an angle adjustment monitoring device in the monitoring devices based on the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes; Based on the distribution data of the idle time periods of different monitoring devices on different dates, determine the duration ratios of the idle time periods of different monitoring devices on different dates, and determine the idle coefficients of different monitoring devices by taking the average values of the duration ratios of the idle time periods on different dates; The monitoring adjustment angle and idle coefficient of different angle adjustment monitoring devices are used as input quantities, and the preset AI model is used to determine the scheme matching coefficient with different alternative schemes, and the optimal adjustment scheme among the alternative adjustment schemes is determined according to the scheme matching coefficient.
2. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that The distribution data of the safety risk points of the construction site is determined according to the construction projects of the construction site, and specifically determined according to the construction areas corresponding to the construction projects where the safety risk points exist.
3. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that The setting position of the monitoring device includes the monitoring angle, setting height and setting location coordinates of the monitoring device.
4. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that When the supervision reliability of the safety risk point is less than the preset reliability threshold, it is determined that the supervision reliability of the safety risk point does not meet the requirement.
5. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that The preset image area threshold corresponding to the security risk point is determined according to the type of the security risk point.
6. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that The idle period is determined based on an analysis result of the monitoring image of the monitoring device, and specifically based on whether the monitoring image of the monitoring device changes.
7. The AI+-based intelligent supervision efficiency enhancement method according to claim 1, It is characterized in that The idle time distribution data includes the distribution time intervals of the idle time on different dates and the durations of different idle time periods.
8. An AI+-based intelligent supervision efficiency enhancement system, applied to an AI+-based intelligent supervision efficiency enhancement method according to any one of claims 1 to 7, It is characterized in that Specifically include: Reliability assessment module, limitation assessment module, adjustment plan generation module, monitoring angle adjustment module; The reliability assessment module is responsible for determining the distribution data of the safety risk points at the construction site, and determining whether the supervision reliability of the safety risk points meets the requirements in combination with the setting locations of different monitoring devices; The restriction situation evaluation module is responsible for determining the distribution data of the idle time periods of different monitoring devices on different dates based on the analysis results of the monitoring images of different monitoring devices, and determining whether the idle monitoring situation of the monitoring device meets the requirements through the distribution data of the idle time periods on different dates; The adjustment scheme generation module is responsible for taking the monitoring angles of different monitoring devices as dependent variables, generating adjustment schemes for multiple groups of monitoring devices, and determining the alternative adjustment schemes in the adjustment schemes based on the overlap between different security risk points and the monitoring areas of the monitoring devices under different adjustment schemes; The monitoring angle adjustment module is responsible for obtaining the monitoring adjustment angles of different monitoring devices in the alternative adjustment schemes, and combining the distribution data of different monitoring devices in idle periods on different dates, using a preset AI model to determine the optimal adjustment scheme among the alternative adjustment schemes, and using the optimal adjustment scheme to adjust the monitoring angles of the monitoring devices.