Economic analysis method and support system based on big data model
Through economic analysis methods and support systems based on big data models, the problem of resource waste and low success rate in enterprises' application for science and technology projects has been solved. The project application status of various jurisdictions in the city has been analyzed, and a more accurate optimal development area has been provided. Judgment to help understand economic diversity and enterprise development within the city.
Patent Information
- Application Number
- CN202410868280.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-22
AI Technical Summary
When companies apply for science and technology projects, it is difficult to fully understand various science and technology project policies and the content of projects that meet their own conditions, resulting in a waste of resources and projects with low success rates being ignored. The existing system cannot effectively analyze the project declaration status of each jurisdiction within the city, affecting the objective understanding of urban development.
Economic analysis methods and support systems based on big data models are used to screen and analyze enterprise declaration records, calculate project weight values and success rates, and generate comprehensive potential values for each district to determine the best development areas. The system includes a screening module, an item set generation module, a weight value calculation module, a sub-weight value allocation module, a success rate calculation module and a sequence generation module, and supports multi-dimensional analysis and trend curve generation.
By screening out large enterprises and focusing on the analysis of small, medium and micro enterprises, it reflects the economic diversity and development of different industries in the area, improves the accuracy of judgment of the best development areas, and provides an objective understanding of the development of each jurisdiction in the city.
Smart Images

Figure CN118822360A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of economic data analysis, and in particular to an economic analysis method and a supporting system based on a big data model. Background Art
[0002] The application for scientific and technological projects refers to a series of preferential policies made by government agencies for enterprises or other research institutions. Enterprises or related research institutions then prepare application documents based on government policies and then apply according to relevant application requirements and procedures.
[0003] Since there are many science and technology projects that can be applied for, the difficulty of applying for each science and technology project is different, and the qualifications and conditions required for applicants are also different. When enterprises apply for science and technology projects, first, they cannot have a relatively comprehensive understanding of various science and technology project policies; second, enterprises cannot have a good understanding and grasp of the project content and reward policies that meet their own conditions, which leads to enterprises wasting more manpower and material resources to carry out projects with lower pass rates, while ignoring science and technology projects with higher success rates.
[0004] Service platforms connecting government and enterprises have now appeared on the market. Some cities focus on management and service objects such as urban space, enterprises, institutions, the public, and public officials. Through the construction of special topics such as smart city digital foundation (smart construction foundation), precise urban governance system (smart city governance), intelligent and proactive industrial service model (smart promotion of industry), and inclusive and convenient people's livelihood service environment (smart people's livelihood), they deepen the "one-stop" reform of government services featuring one network, one place, one window, one time, one machine, one code, and one number.
[0005] Therefore, a policy service platform is provided to collect various support policies in the jurisdiction, provide a one-stop application model, enjoy the full process service of "checking policies, reporting projects, and obtaining funds", and provide policy names, issuing departments, fulfillment responsible departments, specific terms, beneficiaries, fulfillment forms (funds, physical objects, qualifications, etc.), fulfillment channels, fulfillment workload, application standards and procedures, application channels, fulfillment time limits, interpreters and contact information, contacts and contact information, etc. The system can clearly display data such as the total number of projects, application amounts, and the number of enterprises that have been allocated.
[0006] However, these systems are only unable to analyze the project application status of enterprises within the city in order to objectively understand the development status of each district within the city. Summary of the invention
[0007] In order to analyze the project application status of enterprises in the city and objectively understand the development status of each district in the city, this application provides an economic analysis method and support system based on a big data model.
[0008] The above-mentioned invention objective of the present application is achieved through the following technical solutions:
[0009] An economic analysis method based on a big data model, comprising:
[0010] According to the preset conditions, the set of enterprises to be analyzed in the city is screened in the application platform database. The application platform database stores the previous application records of various enterprises in the city in the form of time series. The application records include the application materials submitted by the enterprise, the application items and the approval status, as well as the district to which the enterprise belongs;
[0011] Generate a set of reported projects in each district of the city in a specified year in the reporting platform database, and the reported project set in the district is associated with the corresponding district;
[0012] The project weight value of each district is obtained based on the project set that has been applied for in each district and the number of projects that can be applied for in the city in a specified year;
[0013] Allocate sub-weight values for each declared project in the declared project set according to the award type and project level of each declared project in the district and the project weight value of the district associated with the declared project set in the district;
[0014] The success rate of each declared project in the declared project set in the specified year in the district is statistically generated in the declaration platform database to obtain the success rate set of the declared projects in the district, and the comprehensive potential value is calculated based on the success rate set of the declared projects in the district and the sub-weight values of each declared project in the declared project set in the district;
[0015] Generate a development sequence for each district in the city based on the comprehensive potential value of each district.
[0016] In a preferred example, the application can be further configured as follows: according to preset conditions, a set of enterprises to be analyzed in the city is obtained by screening in the declaration platform database, including:
[0017] The remaining enterprises after removing large enterprises in various industries from the declaration platform database are regarded as the set of enterprises to be analyzed in the city.
[0018] In a preferred example, the present application can be further configured as follows:
[0019] Generate the comprehensive potential value change trend curve of each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve of each district in the previous n years.
[0020] In a preferred example, this application can be further configured as follows: the award types include financial support, policy support, and honorary qualification; projects are divided into national projects, provincial projects, municipal projects, and district projects according to the project levels, and district projects refer to projects with district-level awards.
[0021] In a preferred example, the present application can be further configured as follows: according to the concentration of projects that have been applied for in each district and the number of projects that can be applied for in a specified year, the project weight value of each district is obtained, including:
[0022] Generate a collection of projects reported in the city based on the collection of projects reported in each district, where the number of elements in the collection of projects reported in the city is the number of projects that can be reported;
[0023] The ratio of the number of elements in the declared project set in each district to the number of projects that can be declared is used as the project weight value of each district.
[0024] The second object of the invention is achieved by the following technical solutions:
[0025] An economic analysis support system based on a big data model, comprising:
[0026] The screening module is used to screen the set of enterprises to be analyzed in the city from the application platform database according to preset conditions. The application platform database stores the previous application records of various enterprises in the city in the form of time series. The application records include the application materials submitted by the enterprise, the application items and the approval status, as well as the district to which the enterprise belongs;
[0027] A project set generation module is used to generate a set of reported projects in each district of the city in a specified year in the application platform database, and the reported project set in the district is associated with the corresponding district;
[0028] A project weight value calculation module is used to obtain the project weight value of each district according to the concentration of projects that have been applied for in each district and the number of projects that can be applied for in the city in a specified year;
[0029] A sub-weight value allocation module is used to allocate sub-weight values to each declared project in the declared project set according to the award type and project level of each declared project in the declared project set and the project weight value of the district associated with the declared project set in the district;
[0030] A comprehensive potential value calculation module is used to generate statistics in the application platform database on the success rate of each applied project in the specified year of the area in the applied project set to obtain the success rate set of the applied projects in the area, and calculate the comprehensive potential value based on the success rate set of the applied projects in the area and the sub-weight values of each applied project in the applied project set;
[0031] The sequence generation module is used to generate the development sequence of each district in the city based on the comprehensive potential value of each district.
[0032] In a preferred example, the present application can be further configured as follows: the screening module includes:
[0033] The screening submodule is used to remove the large enterprises in various industries from the declaration platform database and select the remaining enterprises as the set of enterprises to be analyzed in the city.
[0034] In a preferred example, the present application can be further configured as follows:
[0035] The trend curve generation module is used to generate the comprehensive potential value change trend curve of each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve of each district in the previous n years.
[0036] In summary, this application includes the following beneficial technical effects:
[0037] The large enterprises in the city from the application platform database will be screened out first, and small, medium and micro-sized enterprises will be used as the concentrated elements of the enterprises to be analyzed in the city. In this way, in the subsequent analysis, we can be closer to the development of small, medium and micro-sized enterprises and reflect the development potential of the district. According to the number of different projects that have been applied for in each district, the economic diversity of the district, that is, the development of enterprises in different industries, will be reflected, and the year-on-year impact of large enterprises will be removed, so that the judgment of the best development zone can be more accurate, so as to objectively understand the development of each district in the city. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of the architecture of the economic analysis and decision-making platform of the big data model in one embodiment of the present application;
[0039] Figure 2 It is a flowchart of an economic analysis method based on a big data model in one embodiment of the present application;
[0040] Figure 3 It is a flow chart of an economic analysis method based on a big data model in another embodiment of the present application. DETAILED DESCRIPTION
[0041] The following is a description of exemplary embodiments of the present application in conjunction with the accompanying drawings, including various details of the embodiments of the present application to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. Similarly, for the sake of clarity and conciseness, the description of well-known functions and structures is omitted in the following description.
[0042] It should be noted that the terms "first", "second", etc. in the present invention are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure.
[0043] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0044] like Figure 1 As shown in the figure, the economic analysis method based on the big data model and the economic analysis decision-making platform based on the big data model adopt a hierarchical structure design. The overall architecture is divided into the infrastructure layer, data resource layer, application layer and display layer: the basic layer provides the computing, storage, network and security infrastructure required by the economic analysis and decision-making system, realizing the intensive use of the infrastructure. The data resource layer provides the required data resources for the system, and the system docking area data aggregation and sharing application platform completes the unified collection, unified processing, unified precipitation and storage, and unified sharing of data through data aggregation and sharing applications, laying the foundation for the integration of data analysis. By building a resource directory system, it is possible to achieve effective organization and management of economic and enterprise data, while providing functions such as multi-dimensional visualization, dynamic update, special query and statistical analysis. The application layer mainly provides economic operation analysis and business applications, realizing all-round zero-distance interactive docking services from offline to online for governments, enterprises and users. The display layer is the system's internal and external interface, including PC display, large-screen display, and mobile phone display. The system supports multi-dimensional trend analysis of enterprises in the region, and displays it in the form of visual charts and analytical text through time series models, providing technical support for various applications of enterprise economic data analysis.
[0045] Combination Figure 2 , economic analysis methods based on big data models include:
[0046] S1. According to the preset conditions, the set of enterprises to be analyzed in the city is screened in the declaration platform database.
[0047] Specifically, the declaration platform database stores the previous declaration records of enterprises in the city in a time series format. The declaration records include the declaration materials submitted by the enterprise, the declaration projects and the approval status, as well as the district to which the enterprise belongs.
[0048] The types of awards include financial support, policy support, and honorary qualifications. Projects are divided into national, provincial, municipal, and district projects according to their levels. District projects refer to projects that have district-level awards, and the distinction standard is the level of funding for the award. For example, intellectual property demonstration enterprises have national and provincial levels, and some cities have municipal levels, which are projects of different levels belonging to the same lineage. For example, high-tech enterprises, some regions can obtain both national and municipal subsidies, as well as district-level financial awards, etc., which are also projects of different levels belonging to the same lineage.
[0049] The set of enterprises to be analyzed in the city is obtained by screening in the declaration platform database according to the preset conditions, which means that the remaining enterprises after removing the large enterprises in various industries in the declaration platform database are the set of enterprises to be analyzed in the city. The definition of large enterprises in various industries can be set with reference to the "Statistical Standards for Classification of Large, Medium, Small and Micro Enterprises (2011)", that is, the large enterprises in the city in the declaration platform database are first screened out, and small, medium and micro enterprises are used as the elements of the set of enterprises to be analyzed in the city, so that in the subsequent analysis, it is closer to the development of small, medium and micro enterprises and reflects the development potential of the region.
[0050] S2. Generate a set of reported projects in each district of the city in a specified year in the reporting platform database, and the set of reported projects in the district is associated with the corresponding district.
[0051] For example, a city has District 1, District 2, District 3, District 4 and District 5, and the designated year is 2022. Taking District 1 as an example, the projects declared by each enterprise in District 1 in 2022 are counted as the declared project set in District 1. In this way, the projects that were not declared by all enterprises in District 1 in 2022 are removed.
[0052] S3. Obtain the project weight value of each district based on the project set that has been applied for in each district and the number of projects that can be applied for in the city in a specified year.
[0053] Combination Figure 3 , S3 specifically includes:
[0054] S31. Gather the declared projects in each district and generate a collection of declared projects in the city.
[0055] Among them, the number of elements in the collection of projects that have been applied for in the city is the number of projects that can be applied for.
[0056] S32. The ratio of the number of elements in the declared project set in each district to the number of declared projects is used as the project weight value of each district.
[0057] The number of different projects that have been applied for in each district reflects the economic diversity of the district, that is, the development of enterprises in different industries.
[0058] It is understandable that projects in the same vein, if they can successfully apply for high-level projects, can generally apply for low-level projects successfully, and enterprises will generally apply for both when the quantity is high; in addition, the district's enterprises are in many types of industries, and the number of different projects will increase accordingly. Therefore, the project weight value calculated in this way can reflect the above two situations at the same time.
[0059] S4. Allocate sub-weight values for each declared project in the declared project set according to the award type and project level of each declared project in the district and the project weight value of the district associated with the declared project set in the district.
[0060] Specifically, different reward types and different project levels will have different motivations for enterprises to apply. The project has a reward weight ratio A with respect to the reward type, and a level weight ratio B with respect to the project level. The project weight value of the district associated with the declared project set in the district is M, the number of elements in the declared project set in the district is n, and the sub-weight value m of the project is (M / n)*(A+B). Different reward types have corresponding sub-weight ratios a. For example, the financial support type corresponds to a sub-weight ratio a1, the policy support type corresponds to a sub-weight ratio a2, and the honor and qualification type corresponds to a sub-weight ratio a3, a1>a2>a3. In one embodiment, a1 is 1, a2 is 0.8, and a3 is 0.6.
[0061] The number of reward types corresponding to a project is d, and the sum of the sub-weight ratios of the reward types corresponding to the project is SUMa, then the project reward weight ratio A is SUMa / (d+1). For example, if a project corresponds to two reward types, namely, financial support and policy support, then the project reward weight ratio A is (a1+a2) / 3.
[0062] Different levels correspond to different sub-level weight ratios b. National-level projects correspond to sub-level weight ratios b1, provincial-level projects correspond to sub-level weight ratios b2, municipal-level projects correspond to sub-level weight ratios b3, and district-level projects correspond to sub-level weight ratios b4, b1>b2>b3>b4. The level weight ratio corresponding to a project is the sub-level weight ratio of the corresponding project level. Continuing with the above example, if the project is a national-level project, the sub-weight value m of the project is (M / n)*((a1+a2) / 3+b1).
[0063] S5. Generate statistics in the application platform database on the success rate of each project in the area in the specified year to obtain the success rate set of the projects in the area. Calculate the comprehensive potential value based on the success rate set of the projects in the area and the sub-weight values of each project in the area.
[0064] Specifically, the corresponding success rate of each project can be counted in different districts. Continuing with the above example, if the national-level project with the aforementioned sub-weight value m of (M / n)*((a1+a2) / 3+b1) is an element in the set of declared projects in District 1, and the declaration success rate in District 1 in 2022 is e, then m*e is the sub-potential value corresponding to the project. The corresponding sub-potential values of the elements in the set of declared projects in the district are calculated in this way, and the sum of them is the comprehensive potential value of the district.
[0065] S6. Generate the development sequence of each district in the city based on the comprehensive potential value of each district.
[0066] Specifically, by arranging from large to small, we obtain the development sequence of each district in the city.
[0067] In one embodiment, the economic analysis method based on the big data model further includes:
[0068] Generate a comprehensive potential value change trend curve for each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve for each district in the previous n years.
[0069] The aforementioned method of screening the set of enterprises to be analyzed in the city from the declaration platform database according to preset conditions can remove the year-on-year impact of large enterprises, thereby making the judgment of the best development zone more accurate.
[0070] The present application also provides an economic analysis support system based on a big data model, including:
[0071] The screening module is used to screen the set of enterprises to be analyzed in the city from the application platform database according to preset conditions. The application platform database stores the previous application records of various enterprises in the city in the form of time series. The application records include the application materials submitted by the enterprise, the application items and the approval status, as well as the district to which the enterprise belongs;
[0072] The project set generation module is used to generate the reported project sets in each district of the city in a specified year in the reporting platform database. The reported project sets in the districts are associated with the corresponding districts.
[0073] The project weight value calculation module is used to obtain the project weight value of each district based on the concentration of projects that have been applied for in each district and the number of projects that can be applied for in the city in a specified year.
[0074] The sub-weight value allocation module is used to allocate sub-weight values to each declared project in the declared project set in the district according to the reward type and project level of each declarable project in the declarable project set in the district and the project weight value of the district associated with the declared project set in the district.
[0075] The comprehensive potential value calculation module is used to generate statistics in the application platform database on the success rate of each declared project in the specified year in the district to obtain the success rate set of the declared projects in the district, and to calculate the comprehensive potential value based on the success rate set of the declared projects in the district and the sub-weight values of each declared project in the declared project set in the district.
[0076] The sequence generation module is used to generate the development sequence of each district in the city based on the comprehensive potential value of each district.
[0077] In one embodiment, the screening module of the economic analysis support system based on the big data model includes:
[0078] The screening submodule is used to remove the large enterprises in various industries from the declaration platform database and select the remaining enterprises as the set of enterprises to be analyzed in the city.
[0079] The economic analysis support system based on big data models also includes:
[0080] The trend curve generation module is used to generate the comprehensive potential value change trend curve of each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve of each district in the previous n years.
[0081] In summary, this economic analysis support system based on the big data model can first screen out the large enterprises in the city from the application platform database, and use small, medium and micro-sized enterprises as the concentrated elements of the enterprises to be analyzed in the city, so that in the subsequent analysis, it can be closer to the development of small, medium and micro-sized enterprises, and reflect the development potential of the district. According to the number of different projects that have been applied for in each district, it can reflect the economic diversity of the district, that is, the development of enterprises in different industries, and remove the year-on-year impact of large enterprises, so as to make the judgment of the best development zone more accurate, so as to objectively understand the development of each district in the city.
[0082] The specific definition of the economic analysis support system based on the big data model can be found in the above definition of the economic analysis method based on the big data model, which will not be repeated here. Each step of the above economic analysis method based on the big data model can be implemented in whole or in part by software, hardware and their combination.
[0083] Various implementations of the systems and techniques described herein can be realized in digital electronic circuit systems, integrated circuit systems, dedicated ASICs (application specific integrated circuits), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0084] These computer programs (also referred to as programs, software, software applications, or code) include machine instructions for programmable processors and can be implemented using high-level procedural and / or object-oriented programming languages and / or assembly / machine languages. As used herein, the terms "machine-readable medium" and "computer-readable medium" refer to any computer program product, device, and / or means (e.g., disk, optical disk, memory, programmable logic device (PLD)) for providing machine instructions and / or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term "machine-readable signal" refers to any signal for providing machine instructions and / or data to a programmable processor.
[0085] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0086] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communications network). Examples of communications networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0087] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in the present application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution disclosed in the present application can be achieved, and this document is not limited here.
[0088] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. An economic analysis method based on a big data model, characterized in that: include: According to the preset conditions, the set of enterprises to be analyzed in the city is screened in the application platform database. The application platform database stores the previous application records of various enterprises in the city in the form of time series. The application records include the application materials submitted by the enterprise, the application items and the approval status, as well as the district to which the enterprise belongs; Generate a set of reported projects in each district of the city in a specified year in the reporting platform database, and the reported project set in the district is associated with the corresponding district; The project weight value of each district is obtained based on the project set that has been applied for in each district and the number of projects that can be applied for in the city in a specified year; Allocate sub-weight values for each declared project in the declared project set according to the award type and project level of each declared project in the district and the project weight value of the district associated with the declared project set in the district; The success rate of each declared project in the specified year in the declared project set in the district is statistically generated in the declaration platform database to obtain the success rate set of declared projects in the district. The comprehensive potential value is calculated based on the success rate set of declared projects in the district and the sub-weight value of each declared project in the declared project set; Generate a development sequence for each district in the city based on the comprehensive potential value of each district.
2. The economic analysis method based on the big data model according to claim 1, characterized in that: According to the preset conditions, the set of enterprises to be analyzed in the city is screened in the declaration platform database, including: The remaining enterprises after removing large enterprises in various industries from the declaration platform database are regarded as the set of enterprises to be analyzed in the city.
3. The economic analysis method based on the big data model according to claim 1, characterized in that: Also includes: Generate the comprehensive potential value change trend curve of each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve of each district in the previous n years.
4. The economic analysis method based on the big data model according to claim 1, characterized in that: The award types include financial support, policy support, and honorary qualification; projects are divided into national projects, provincial projects, municipal projects, and district projects according to the project levels. District projects refer to projects with district-level awards.
5. The economic analysis method based on big data model according to claim 1, characterized in that: The project weight values of each district are obtained based on the concentration of projects that have been applied for in each district and the number of projects that can be applied for in the city in a specified year, including: Generate a collection of projects reported in the city based on the collection of projects reported in each district, where the number of elements in the collection of projects reported in the city is the number of projects that can be reported; The ratio of the number of elements in the declared project set in each district to the number of projects that can be declared is used as the project weight value of each district.
6. An economic analysis support system based on a big data model, using the economic analysis support system based on a big data model as described in any one of claims 1 to 5, characterized in that: The screening module is used to screen the set of enterprises to be analyzed in the city from the application platform database according to preset conditions. The application platform database stores the previous application records of various enterprises in the city in the form of time series. The application records include the application materials submitted by the enterprise, the application items and the approval status, as well as the district to which the enterprise belongs; A project set generation module is used to generate a set of reported projects in each district of the city in a specified year in the application platform database, and the reported project set in the district is associated with the corresponding district; A project weight value calculation module is used to obtain the project weight value of each district according to the concentration of projects that have been applied for in each district and the number of projects that can be applied for in the city in a specified year; A sub-weight value allocation module is used to allocate sub-weight values to each declared project in the declared project set in the district according to the award type and project level of each declared project in the declared project set in the district and the project weight value of the district associated with the declared project set in the district; A comprehensive potential value calculation module is used to generate statistics in the application platform database on the success rate of each applied project in the specified year of the area in the applied project set to obtain the success rate set of the applied projects in the area, and calculate the comprehensive potential value based on the success rate set of the applied projects in the area and the sub-weight values of each applied project in the applied project set; The sequence generation module is used to generate the development sequence of each district in the city based on the comprehensive potential value of each district.
7. The economic analysis support system based on big data model according to claim 6, characterized in that: The screening modules include: The screening submodule is used to remove the large enterprises in various industries from the declaration platform database and select the remaining enterprises as the set of enterprises to be analyzed in the city.
8. The economic analysis support system based on big data model according to claim 6, characterized in that: Also includes: The trend curve generation module is used to generate the comprehensive potential value change trend curve of each district in the previous n years, and determine the best development area based on the comprehensive potential value change trend curve of each district in the previous n years.