One-time locking and anchoring method, stratigraphic displacement monitoring method and stratigraphic structural plane stress change monitoring method
Through the one-time locking anchoring method, the one-way conductivity and expansion of the pressure bladder are used to provide instant tension, which solves the problem of anchor failure of tension members, achieves efficient formation displacement and stress monitoring, and enhances the ability to prevent and control geological disasters.
Patent Information
- Application Number
- CN202410983821.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-22
AI Technical Summary
In the rescue and monitoring of geological disasters and engineering diseases, the anchorage between the tensile member and the formation often fails due to the volume shrinkage and fullness of the grouting fluid and the stress deformation of the formation, leading to accidents and the need to wait for the liquid in the anchoring section to solidify. The best time for prevention and treatment.
A one-time locking anchoring method is used, by drilling and pre-opening tensile through holes and grouting through holes, using a grout tube to fix the pressure bag in the drill hole, and using one-way conductive grouting to expand the bag, providing Instant tension and locking the tensile member through the friction of the bladder, avoiding rust and waiting for solidification.
It can provide the required tensile force without waiting for the grouting fluid to solidify, prevent corrosion, improve anchoring efficiency and safety, monitor formation displacement and stress changes in a timely manner, and enhance geological disaster risk assessment and prevention capabilities.
Smart Images

Figure CN118835601A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of geological disaster and engineering disease rescue and monitoring technology, and in particular to a one-time locking anchoring method, a stratum layer displacement monitoring method, and a stratum structure surface stress change monitoring method. Background Art
[0002] Landslide is an important global geological disaster, which has brought great harm to human life, property and economic construction. For example, factories, mines and towns are buried, traffic is interrupted, rivers are blocked, and engineering projects are damaged. Especially in my country, which has a vast territory and a large mountainous area, landslide disasters occur frequently and the losses are extremely serious. The problem of slope stability has always been an important research content and goal of geotechnical engineering.
[0003] Tension components are widely used in geological disaster control, mine support, engineering construction, landslide damage feature prediction (damage change monitoring) and other activities. Since the stratum is a semi-infinite body in space relative to engineering activities, the connection between the tension component and the stratum can only be achieved through friction. The failure of the tension component is often caused by factors such as the volume shrinkage of the grouting liquid in the anchoring section of the component, the grouting fullness, and the stress deformation of the stratum, resulting in various accidents. The best prevention and control time is also missed due to the need to wait for the grouting liquid in the anchoring section between the component and the stratum to solidify. Summary of the invention
[0004] The present application provides a one-time locking anchoring method, a stratum displacement monitoring method and a stratum structure surface stress change monitoring method, which can provide the required tension required by the design without waiting for the slurry between the anchoring section of the tension member and the stratum to solidify, and can provide greater tension after the slurry solidifies to meet the tension requirement.
[0005] The one-time locking and anchoring method provided in this application adopts the following technical solution: A one-time locking anchoring method comprises the following steps: S1, drilling and hole cleaning; S2, pre-opening a tensile through hole and a grouting through hole on the pressure bag, passing the tensile member through the tensile through hole, passing the grouting pipe through the grouting through hole, and fixing the pressure bag at a predetermined position of the tensile member; S3, lowering the pressure bag along with the tensile member to the preset drilling position; S4, the slurry guide pipe has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag. Grout is injected into the pressure bag through the slurry guide pipe, so that the pressure bag expands to abut against the inner wall of the borehole, and the friction between the pressure bag and the inner wall of the borehole reaches a certain value; S5. Grouting is performed into the bottom of the borehole or into the boreholes between adjacent pressure bags through the grouting pipe.
[0006] By adopting the above technical solution, high-pressure grouting can be completed at one time, without waiting for the grouting liquid to solidify before secondary grouting. The pressure bag squeezes the stratum to provide a certain tension to the tensile member immediately, without waiting for the grouting liquid to solidify and can provide the required tension. At the same time, after the pressure bag expands during grouting, the tensile member is in the center of the borehole, so that the tensile member overcomes the effect of gravity and effectively avoids contact with the stratum around the hole wall, thereby preventing the tensile member from rusting and failing due to the effect of groundwater and stratum. The locking structure formed by the pressure bag can make the locking between the tensile member and the stratum have both good locking function and effective unlocking measures.
[0007] Optionally, step S4 further includes: S41. Pre-install a first one-way pressure valve and a second one-way pressure valve in the slurry guiding pipe, pre-open a slurry hole connecting the slurry guiding pipe and the pressure bag on the side wall of the slurry guiding pipe between the first one-way pressure valve and the second one-way pressure valve, the pressure conductance value of the second one-way pressure valve is greater than the pressure conductance value of the first one-way pressure valve, and the pressure conductance value of the second one-way pressure valve is less than a certain level of the maximum pressure to which the pressure bag is subjected.
[0008] By adopting the above technical solution, the grouting liquid can first flow into the pressure bag, expand the pressure bag, and make the pressure bag reach a certain friction with the inner wall of the hole before grouting in the borehole. At this time, the pressure bag acts as a plugging end, and when grouting in the borehole, the volume shrinkage rate of the grouting liquid and the grouting fullness can meet the requirements, thereby improving the anchoring efficiency.
[0009] The magnitude of the tensile force provided by the tensile member during the locking process is: In the first stage, the length of the pressure bag in contact with the formation is l, the diameter of the pressure bag is d, the pressure inside the bag is p, and the friction coefficient between the bag and the formation is μ, then the tension F1=πdlpμ; In the second stage, the length of the hole bottom and the pressure bag grouting section is L, the diameter of the slurry bonding section is D, and the bonding strength between the formation and the slurry is P, then the tension F2=πDLP; Through the pre-locking feature of the pressure bag, the tensile member overcomes the problem of direct shear contact with the stratum under the action of gravity, and a gap is formed between the tensile member and the stratum. The gap is filled and bonded with grouting liquid to isolate groundwater and air, solving the problem of rust caused by contact with groundwater in the tensile member.
[0010] A method for monitoring stratum displacement comprises the following steps: S1, drilling and hole cleaning; S2, pre-opening a grouting through hole on the pressure bag and installing a displacement sensor, inserting a grouting pipe into the grouting through hole and fixing a plurality of pressure bags at predetermined positions on the grouting pipe, and connecting the displacement sensor to a data acquisition center; S3, lowering a plurality of pressure bags along with the grouting pipe to a preset position of the borehole so that different pressure bags are located in different formations; S4, the slurry guide pipe has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag. Grout is injected into the pressure bag through the slurry guide pipe, so that the pressure bag expands to abut against the inner wall of the borehole, and the friction between the pressure bag and the inner wall of the borehole reaches a certain value; S5. Collect, count and analyze the data of the displacement sensor at different times.
[0011] By adopting the above technical solution, a displacement sensor is installed at the displacement to be measured in the borehole using a pressure bag. The pressure bag is locked with the formation and moves with the movement of the formation. When the formation moves, the pressure bag moves and drives the displacement sensor to move, thereby solving the problem that the displacement sensor is difficult to couple with the formation.
[0012] Optionally, the step of installing a displacement sensor on the pressure bladder bag in step S2 specifically includes: S21, pre-opening a protection tube installation hole and a sensor installation hole in the pressure bag; S22, installing the displacement sensor in the sensor installation hole; S23, providing a communication equipment protection tube which contains a line between the displacement sensor and the data acquisition center, and passing the communication equipment protection tube through the protection tube installation hole.
[0013] By adopting the above technical solution, the displacement sensor can be quickly installed in the pressure bag and the normal operation of the displacement sensor is guaranteed.
[0014] A method for monitoring stress changes between stratum structure surfaces comprises the following steps: S1, drilling and hole cleaning; S2, providing a plurality of pressure bags with force sensors installed inside; S3, connecting the force sensors between adjacent pressure bladder bags in advance, applying a certain prestress to the connected force sensors, and obtaining the prestress values between the connected force sensors; S4, locking the pressure bladders at predetermined positions in the borehole so that different pressure bladders are located in different formations; S5. Measure the prestress change between the force sensors connected at different times, and determine the force change between the structural surfaces according to the prestress change.
[0015] By adopting the above technical solution, a force sensor is installed in a pressure bladder at the position to be measured in the borehole. The pressure bladder is locked with the formation and moves with the movement of the formation. When the formation moves, the pressure bladder moves and drives the force sensor to move. By monitoring the numerical change of the force sensor, the force change between the structural planes can be judged. The solution of the present application uses the pressure bladder as the locking mechanism of the force sensor, so that the force sensor is locked with the formation and can accurately change with the change of the formation, improving the accuracy of the monitoring result.
[0016] Optionally, the readings of the connected force sensors are equal, and the step S5 includes: S51. Obtain the values of the force sensor at the time t0, the time t1, and the time t2 respectively. The obtained values are: At the time t0, it is measured that x1 = x2 = fAB0; At the time t1, it is measured that x1 = x2 = fAB1; At the time t2, it is measured that x1 = x2 = fAB2; S52. Calculate the obtained values: If fAB1 - fAB0 = fAB2 - fAB1, it indicates that the adjacent structural planes are relatively stable; If fAB1 - fAB0 < fAB2 - fAB1, it indicates that the adjacent structural planes are expanding; If fAB1 - fAB0 > fAB2 - fAB1, it indicates that the adjacent structural planes are compressing.
[0017] By adopting the above technical solution, the stress change between the formation structural planes can be accurately monitored and judged. By monitoring the force change trend at more moments, the formation movement trend and rate on both sides of the structural plane can be monitored and calculated.
[0018] Optionally, the step S3 includes: S31. Connect adjacent force sensors with pre-tensioned steel wires and prestressed steel wires in advance; S32. Pull the pre-tensioned steel wire with a certain tension; S33. Obtain the tension value between the connected force sensors; After the step S4, it further includes: S34. Eliminate the tension on the pre-tensioned steel wire.
[0019] By adopting the above technical solution, the accuracy of the force sensor detection result is guaranteed.
[0020] Optionally, the certain tension in the step S52 refers to not exceeding 1 / 3 of the load of the prestressed steel wire.
[0021] By adopting the above technical solution, excessive force can be avoided to prevent the prestressed steel wire from breaking and failing during subsequent stratum changes.
[0022] Optionally, step S4 includes: S41, pre-opening a grouting through hole on the pressure bag, inserting a grouting pipe into the grouting through hole, and fixing a plurality of pressure bags at predetermined positions on the grouting pipe; S42, lowering a plurality of pressure bags along with the grouting pipe to preset positions of the borehole so that different pressure bags are located in different formations; S43. The slurry guide pipe has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bladder. Grout is injected into the pressure bladder through the slurry guide pipe, so that the pressure bladder expands until it abuts against the inner wall of the borehole, and the friction between the pressure bladder and the inner wall of the borehole reaches a certain value.
[0023] By adopting the above technical solution, a method for quickly and easily locking the bladder at a predetermined position in the drilled hole is provided.
[0024] Optionally, the step S43 includes: S431. Pre-install multiple groups of first one-way pressure valves and second one-way pressure valves in the slurry guiding pipe, pre-open a slurry hole connecting the slurry guiding pipe and the pressure bag on the side wall of the slurry guiding pipe between the first one-way pressure valve and the second one-way pressure valve, the pressure conductance value of the second one-way pressure valve is greater than the pressure conductance value of the first one-way pressure valve, the pressure conductance value of the second one-way pressure valve is less than a certain level of the maximum pressure to which the pressure bag is subjected, and the liquid outlet end of the second one-way pressure valve faces the pressure bag below.
[0025] By adopting the above technical solution, the position of the pressure bag is locked in sequence from top to bottom, reducing the possibility of position change of the pressure bag and improving the accuracy of subsequent monitoring results.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. High-pressure grouting can be completed in one go, and secondary grouting can be carried out without waiting for the grouting liquid to solidify. The pressure bag squeezes the stratum to provide a certain amount of tension to the tensile member immediately, and the required tension can be provided without waiting for the grouting liquid to solidify. At the same time, after the pressure bag expands during grouting, the tensile member is located in the center of the borehole, allowing the tensile member to overcome the gravity and effectively avoid contact with the stratum around the hole wall, thereby preventing the tensile member from rusting and failing due to the action of groundwater and stratum.
[0027] 2. A displacement sensor is installed at the displacement to be measured in the borehole using a pressure bag. The pressure bag is locked with the formation and moves with the movement of the formation. When the formation moves, the pressure bag moves and drives the displacement sensor to move, thereby solving the problem that the displacement sensor is difficult to couple with the formation.
[0028] 3. The present application scheme utilizes a pressure bag as a locking mechanism for the force sensor, so that the force sensor is locked to the stratum and can change accurately with the changes in the stratum, thereby improving the accuracy of the monitoring results, thereby being able to monitor the stress changes between the structural surfaces of the stratum in real time, and providing an important basis for geological disaster risk assessment, so as to take effective measures in a timely manner to prevent and control the occurrence of geological disasters. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the disposable locking anchoring device of Example 1 of the present application.
[0030] Figure 2 This is a schematic diagram of calculating the tension of the pressure bag of the disposable locking anchoring device in Example 1 of the present application.
[0031] Figure 3 It is a schematic diagram of calculating the tensile force of the high-pressure slurry solid body by the one-time locking anchoring device in Example 1 of the present application.
[0032] Figure 4 It is a schematic diagram of the layer structure of the pressure bladder bag of the present application.
[0033] Figure 5 It is a schematic diagram of the stratum displacement monitoring device of Example 2 of the present application.
[0034] Figure 6 It is a schematic diagram of the equipment for monitoring stress changes between formation structure surfaces in Example 2 of the present application.
[0035] Figure 7 It is a schematic diagram of the connection relationship of the force sensors in Example 2 of the present application.
[0036] Description of reference numerals: 10. Tensile member; 11. Tension rod (rope); 12. Tension rod (rope) retaining spring; 20. Pressure bladder; 21. Bladder tension net; 22. Bladder anti-seepage membrane; 201. Tensile through hole; 202. Grouting through hole; 203. Protection tube installation hole; 204. Sensor installation hole; 30. Slurry guide pipe; 301. Slurry penetration hole; 31. First one-way pressure valve; 32. Second one-way pressure valve; 33. High-pressure pump; 40. Displacement sensor; 50. Data acquisition center; 51. Communication equipment protection tube; 60. Force sensor; 601. Waterproof shell; 602. Force sensor body; 603. Force sensor fixed end; 70. Pre-tensioned steel wire; 71. Prestressed steel wire. DETAILED DESCRIPTION
[0037] The following is combined with Figure 1-7 This application is described in further detail.
[0038] Example 1 Reference Figure 1 The embodiment of the present application discloses a one-time locking and anchoring method, comprising the following steps: S1. Drilling and hole cleaning.
[0039] Specifically, a hole is drilled at a location where the tensile member 10 needs to be installed, and after the drilling is completed, all mud and sediment in the hole are cleaned out.
[0040] S2. Pre-open a tensile through hole 201 and a grouting through hole 202 on the pressure bag 20, pass the tensile member 10 through the tensile through hole 201, pass the grouting through hole 202, and fix the pressure bag 20 at a predetermined position of the tensile member 10.
[0041] Optionally, one or more pressure bags 20 may be passed through the tensile member 10 and temporarily fixed at relative positions. The pressure bags 20 are connected by a slurry guide pipe 30 , and the first end of the slurry guide pipe 30 extends out of the ground and is connected to a high-pressure pump 33 .
[0042] S3, lowering the pressure bag 20 along with the tensile member 10 to the preset drilling position.
[0043] Specifically, since no grouting is performed in the pressure bag 20 , the pressure bag 20 is in a relaxed state and can be placed at a predetermined position in the drilled hole along with the tensile member 10 .
[0044] S4. The slurry guide tube 30 has unidirectional conductivity from the inlet to the slurry outlet. The unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag 20. Grout is injected into the pressure bag 20 through the slurry guide tube 30, so that the pressure bag 20 expands to abut against the inner wall of the borehole, and the friction between the pressure bag 20 and the inner wall of the borehole reaches a certain value.
[0045] Preferably, step S4 comprises: S41. A first one-way pressure valve 31 and a second one-way pressure valve 32 are pre-installed in the slurry guiding pipe 30. A slurry-permeable hole 301 connecting the slurry guiding pipe 30 and the pressure bag 20 is pre-opened on the side wall of the slurry guiding pipe 30 between the first one-way pressure valve 31 and the second one-way pressure valve 32. The pressure conductance value of the second one-way pressure valve 32 is greater than the pressure conductance value of the first one-way pressure valve 31. The pressure conductance value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure to which the pressure bag 20 is subjected, so as to prevent the pressure bag 20 from being damaged due to excessive pressure in the pressure bag 20, so as to make the slurry guiding pipe 30 have unidirectional conductivity from the inlet to the outlet.
[0046] Specifically, the certain level of the maximum pressure to which the pressure bladder 20 is subjected refers to 0.5-0.8 times of the maximum pressure to which the pressure bladder 20 is subjected.
[0047] Specifically, a high-pressure pump 33 is used to inject grout into the pressure bag 20 through the grouting pipe 30 , and the injected high-pressure grout expands the pressure bag 20 . Under the pressure condition provided by the pressure bag 20 , the pressure bag 20 compacts the hole wall formation.
[0048] S5, injecting grout into the bottom of the borehole or injecting grout into the borehole between adjacent pressure bags 20 through the grout guide pipe 30.
[0049] In this embodiment, grouting is performed to the bottom of the borehole through the grouting pipe 30. At this time, after the high-pressure grouting expands the pressure bag 20 and the friction between the pressure bag 20 and the inner wall of the borehole reaches a certain value, the second one-way pressure valve 32 is turned on, and the grouting liquid flows to the bottom of the grouting pipe 30 and flows into the borehole from the bottom of the grouting pipe 30. Due to the blocking effect of the pressure bag 20, the grouting liquid can penetrate into the stratum drilled out under a certain pressure. In this way, the high-pressure grouting work can be completed at one time, and secondary grouting can be performed without waiting for the grouting liquid to solidify. The pressure bag 20 squeezes the stratum to provide a certain pulling force to the tensile member 10 immediately, and the required pulling force can be provided without waiting for the grouting liquid to solidify.
[0050] Specifically, the tension value provided by the pressure bladder 20 and the tensile member 10 is calculated as follows: Reference Figure 2 , the initial tension F1 provided by the pressure bladder 20: the pressure inside the pressure bladder 20 is p, the length of the pressure bladder 20 is ι, the maximum diameter of the pressure bladder 20 is d, and the friction coefficient between the formation and the pressure bladder 20 is μ, then F1=πdLpμ.
[0051] Reference Figure 3 , the tensile force F2 provided by the tensile member 10 after the high-pressure slurry at the tail end solidifies: the bonding strength between the solidified body of the high-pressure slurry and the formation is P, the length is L, and the diameter is D, then F2=πDLP.
[0052] In another embodiment, grout is injected into the borehole between adjacent pressure bags 20 through the grouting pipe 30. Specifically, the pressure bags 20 on the tensile member 10 form two blocked ends, and after the pressure bags 20 at both ends are grout-locked, the grout flows into the borehole between the two pressure bags 20 to achieve grouting anchoring.
[0053] In addition, a large-diameter high-pressure bag can be used to perform a large radial compression on the hole wall of the soft soil layer, thereby providing a larger anchor head of the tensile member 10 in the soft soil layer, providing greater tension and reliable stability.
[0054] In the present application, the pressure bag 20 is expanded by grouting, and the tensile member 10 is located at the center of the borehole, so that the tensile member 10 overcomes the effect of gravity and effectively avoids its contact with the strata around the hole wall, thereby preventing the tensile member 10 from rusting and failing due to the action of groundwater and strata.
[0055] Reference Figure 1 , the embodiment of the present application also discloses a disposable locking anchoring device. The anchoring device includes a pressure bag 20 and a tensile member 10. The pressure bag 20 is provided with a tensile through hole 201 and a grouting through hole 202, the tensile member 10 passes through the tensile through hole 201, and a grouting pipe 30 is connected in the grouting through hole 202, a first one-way pressure valve 31 and a second one-way pressure valve 32 are pre-installed in the grouting pipe 30, a grouting hole 301 connecting the grouting pipe 30 and the pressure bag 20 is pre-opened on the side wall of the grouting pipe 30 between the first one-way pressure valve 31 and the second one-way pressure valve 32, the pressure conductance value of the second one-way pressure valve 32 is greater than the pressure conductance value of the first one-way pressure valve 31, and the pressure conductance value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure to which the pressure bag 20 is subjected.
[0056] Optionally, the tensile member 10 may include a tension rod (rope) 11 and a tension rod (rope) spring 12, wherein the tension rod (rope) spring 12 is fixed to the outer wall of the tension rod (rope) 11 and is located outside the pressure bag 20. After the slurry in the borehole solidifies, the tension rod (rope) spring 12 can provide additional tensile stress.
[0057] Reference Figure 4 Preferably, the pressure bladder 20 in the present application includes a bladder tension net 21 and a bladder anti-seepage membrane 22 that are bonded to each other, the bladder anti-seepage membrane 22 is arranged on the inner wall of the pressure bladder 20, and the bladder tension net 21 is arranged on the outer wall of the pressure bladder 20. This structure can improve the anti-seepage performance and high pressure resistance of the pressure bladder 20.
[0058] The disposable locking anchoring device of the embodiment of the present application can complete the high-pressure grouting work at one time, and the secondary grouting can be carried out without waiting for the grouting liquid to solidify. Also, because the pressure bag 20 squeezes the formation, it instantly provides a certain tension to the tensile member 10, and there is no need to wait for the grouting liquid to solidify and can provide the required tension.
[0059] Example 2 Reference Figure 5 The present application discloses a method for monitoring stratum displacement, comprising the following steps: S1. Drilling and hole cleaning.
[0060] Specifically, a hole is drilled at a location where the formation change needs to be monitored, and after the drilling is completed, all mud and sediment in the hole are cleaned out.
[0061] S2, pre-opening a grouting hole 202 on the pressure bag 20 and installing a displacement sensor 40, inserting a grouting tube 30 into the grouting hole 202 and fixing a plurality of pressure bags 20 at predetermined positions on the grouting tube 30, and connecting the displacement sensor 40 to a data acquisition center 50.
[0062] Specifically, a plurality of pressure bags 20 are passed through the slurry guide tube 30 and temporarily fixed at relative positions. The pressure bags 20 are connected by the slurry guide tube 30 , and the head end of the slurry guide tube 30 extends out of the ground and is connected to the high-pressure pump 33 .
[0063] The step S2 of installing the displacement sensor 40 on the pressure bag 20 specifically includes: S21 , pre-opening a protection tube mounting hole 203 and a sensor mounting hole 204 in the pressure bag 20 .
[0064] S22 , installing the displacement sensor 40 in the sensor installation hole 204 .
[0065] S23 , providing a communication equipment protection tube 51 that contains a line between the displacement sensor 40 and the data acquisition center 50 , and passing the communication equipment protection tube 51 through the protection tube installation hole 203 .
[0066] Preferably, step S2 also includes S24, pre-installing a first one-way pressure valve 31 and a second one-way pressure valve 32 in the slurry guiding pipe 30, pre-opening a slurry-permeable hole 301 connecting the slurry guiding pipe 30 and the pressure bag 20 on the side wall of the slurry guiding pipe 30 between the first one-way pressure valve 31 and the second one-way pressure valve 32, the pressure conductivity value of the second one-way pressure valve 32 is greater than the pressure conductivity value of the first one-way pressure valve 31, the pressure conductivity value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure to which the pressure bag 20 is subjected, and the liquid outlet end of the second one-way pressure valve 32 faces the pressure bag 20 below, so that the slurry guiding pipe 30 has unidirectional conductivity from the inlet to the outlet.
[0067] S3, lowering a plurality of pressure bags 20 along with the grouting pipe 30 to preset positions of the borehole so that different pressure bags 20 are located in different formations.
[0068] Specifically, since grouting is not performed in the pressure bladder 20 , the pressure bladder 20 is in a relaxed state and can be placed at a predetermined position in the borehole along with the grouting tube 30 .
[0069] In this embodiment, the formations are divided into formation A, formation B and formation C, and the pressure bladder 20 is locked in formation A, formation B and formation C respectively.
[0070] S4. Inject grout into the pressure bag 20 through the grout guide pipe 30 to expand the pressure bag 20 until it abuts against the inner wall of the borehole, and make the friction between the pressure bag 20 and the inner wall of the borehole reach a certain value.
[0071] Specifically, a high-pressure pump 33 is used to inject grout into the pressure bag 20 through the grouting pipe 30. The injected high-pressure slurry expands the pressure bag 20. Under the pressure conditions provided by the pressure bag 20, the pressure bag 20 compacts the hole wall formation. Multiple pressure bags 20 can be expanded from top to bottom in sequence and locked in position.
[0072] S5. Collect, count and analyze the data of the displacement sensors 40 at different positions at different times.
[0073] Specifically, the data A of the displacement sensor A 40 and the displacement sensor B 40 at time T0 is recorded, and the distance LA between the displacement sensor A 40 and the displacement sensor B 40 at time T0 is calculated based on the data A; the data B of the displacement sensor A 40 and the displacement sensor B 40 at time T1 is recorded, and the distance LB between the displacement sensor A 40 and the displacement sensor B 40 at time T1 is calculated based on the data B; and the displacement change of the stratum is determined based on the distances LA and LB.
[0074] The present application can solve the problem that the displacement sensor 40 is difficult to couple with the formation.
[0075] The present application also discloses a stratum displacement monitoring device. Figure 5 The monitoring equipment includes a pressure bag 20, a displacement sensor 40, a communication equipment protection tube 51 and a data acquisition center 50. A grouting hole 202 is provided on the pressure bag 20, a grouting pipe 30 is connected to the grouting hole 202, a first one-way pressure valve 31 and a second one-way pressure valve 32 are pre-installed in the grouting pipe 30, a grouting hole 301 connecting the grouting pipe 30 and the pressure bag 20 is pre-opened on the side wall of the grouting pipe 30 located between the first one-way pressure valve 31 and the second one-way pressure valve 32, the pressure conductance value of the second one-way pressure valve 32 is greater than the pressure conductance value of the first one-way pressure valve 31, the pressure conductance value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure to which the pressure bag 20 is subjected, and the liquid outlet of the second one-way pressure valve 32 faces the pressure bag 20 below.
[0076] At the same time, a protective tube mounting hole 203 and a sensor mounting hole 204 that are interconnected are pre-opened in the pressure bag 20, the communication equipment protective tube 51 passes through the protective tube mounting hole 203, the displacement sensor 40 is installed in the sensor mounting hole 204, and a line is connected between the displacement sensor 40 and the data acquisition center 50, and the line is arranged in the communication equipment protective tube 51.
[0077] Reference Figure 4Preferably, the pressure bladder 20 in the present application includes a bladder tension net 21 and a bladder anti-seepage membrane 22 that are bonded to each other, the bladder anti-seepage membrane 22 is arranged on the inner wall of the pressure bladder 20, and the bladder tension net 21 is arranged on the outer wall of the pressure bladder 20. This structure can improve the anti-seepage performance and high pressure resistance of the pressure bladder 20.
[0078] The implementation principle of a stratum displacement monitoring device in an embodiment of the present application is as follows: a displacement sensor 40 is installed at the displacement to be measured in the borehole using a pressure bag 20, the pressure bag 20 is locked with the stratum and moves with the movement of the stratum. When the stratum moves, the pressure bag 20 moves and drives the displacement sensor 40 to move, thereby solving the problem that the displacement sensor 40 is difficult to couple with the stratum.
[0079] Example 3 Reference Figure 6 The present application discloses a method for monitoring stress changes between stratum structure surfaces, comprising the following steps: S1. Drilling and hole cleaning.
[0080] Specifically, a hole is drilled at a location where the formation change needs to be monitored, and after the drilling is completed, all mud and sediment in the hole are cleaned out.
[0081] S2. Provide a plurality of pressure bladders 20 with force sensors 60 mounted therein.
[0082] Specifically, a protective tube mounting hole 203 and a sensor mounting hole 204 are pre-opened in the pressure bag 20; the force sensor 60 is installed in the sensor mounting hole 204; a communication equipment protective tube 51 is provided which accommodates a transmission line of the force sensor 60 inside, and the communication equipment protective tube 51 is passed through the protective tube mounting hole 203.
[0083] S3 . Pre-connect the force sensors 60 between adjacent pressure bladders 20 , apply a certain prestress to the connected force sensors 60 , and obtain the prestress values between the connected force sensors 60 .
[0084] For details, refer to 6 and Figure 7 , step S3 comprises: S31 . Pre-connect adjacent force sensors 60 using pre-tensioned steel wires 70 and pre-stressed steel wires 71 , so that the readings of the connected force sensors 60 are equal.
[0085] S32, pulling the pre-tensioning steel wire 70 with a certain pulling force.
[0086] S33, obtaining the tension value between the connected force sensors 60.
[0087] Specifically, when the force sensor 60 is installed, the force sensor 60 is installed in the pressure bag 20. After the pressure bag 20 reaches the predetermined position, low-pressure slurry is injected into the pressure bag 20, and then the pre-tensioned steel wire 70 is pulled so that each force sensor 60 can read a certain value of tension, and the tension level of the pre-tensioned steel wire 70 is maintained. High-pressure slurry is injected into the pressure bag 20 to lock the position of the force sensor 60. After completion, tension is further applied to the pre-tensioned steel wire 70, so that the tension of each force sensor 60 is further increased by a certain value, which cannot exceed 1 / 3 of the load of the prestressed steel wire 71.
[0088] S4. Lock the pressure bladder 20 at a predetermined position in the borehole so that different pressure bladders 20 are located in different formations.
[0089] Specifically, step S4 includes: S41, pre-opening a grouting hole 202 on the pressure bag 20, inserting a grouting tube 30 into the grouting hole 202 and fixing a plurality of pressure bags 20 at predetermined positions of the grouting tube 30.
[0090] S42, lowering a plurality of pressure bags 20 along with the grouting pipe 30 to preset positions of the borehole so that different pressure bags 20 are located in different formations.
[0091] Specifically, since grouting is not performed in the pressure bladder 20 , the pressure bladder 20 is in a relaxed state and can be placed at a predetermined position in the borehole along with the grouting tube 30 .
[0092] S43, the slurry guide tube 30 has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag 20. Grout is injected into the pressure bag 20 through the slurry guide tube 30, so that the pressure bag 20 expands to abut against the inner wall of the borehole, and the friction between the pressure bag 20 and the inner wall of the borehole reaches a certain value.
[0093] The step S43 further includes: S431, pre-install multiple groups of first one-way pressure valves 31 and second one-way pressure valves 32 in the slurry guiding pipe 30, pre-open a slurry hole 301 connecting the slurry guiding pipe 30 and the pressure bag 20 on the side wall of the slurry guiding pipe 30 between the first one-way pressure valve 31 and the second one-way pressure valve 32, the pressure conductance value of the second one-way pressure valve 32 is greater than the pressure conductance value of the first one-way pressure valve 31, the pressure conductance value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure to which the pressure bag 20 is subjected, and the liquid outlet end of the second one-way pressure valve 32 faces the pressure bag 20 below.
[0094] Specifically, a high-pressure pump 33 is used to grout into the pressure bladder 20 through a slurry guide pipe 30. The injected high-pressure slurry expands the pressure bladder 20, and under the pressure condition provided by the pressure bladder 20, the pressure bladder 20 compacts the hole wall formation. Multiple pressure bladders 20 can expand successively from top to bottom and lock their positions. After fixing the pressure bladder 20, the installation steel wire bracket is removed to eliminate the tension on the pre-tension steel wire 70, so that each pressure bladder 20 can move freely with the formation.
[0095] S5. Measure the change in prestress between the connected force sensors 60 at different times, and determine the change in force between the structural surfaces according to the change in prestress.
[0096] In this embodiment, the formation is divided into formation A, formation B, and formation C, and the pressure bladders 20 are respectively locked in formation A, formation B, and formation C. There are upper and lower readings in the same force sensor 60. The upper reading is equal to the lower reading at the front end connected to it, and the lower reading is equal to the upper reading at the rear end connected to it.
[0097] It is set that A, B, and C are 3 connected force sensors 60, and the prestress steel wire 71 straddles the two structural surfaces AB and BC. The readings of the force sensor 60 are: A lower = x1, B upper = X2, B lower = y1, C upper = y2. When installed properly, x1 = x2 and y1 = y2.
[0098] The step S5 includes: S51. Obtain the values of the force sensor 60 at time t0, time t1, and time t2 respectively. The obtained values are: At time t0, it is measured that x1 = x2 = fAB0; y1 = y2 = fBC0; At time t1, it is measured that x1 = x2 = fAB1; y1 = y2 = fBC1; At time t2, it is measured that x1 = x2 = fAB2; y1 = y2 = fBC2.
[0099] S52. Calculate the obtained values: If fAB1 - fAB0 = fAB2 - fAB1, it indicates that the AB structural surface is relatively stable.
[0100] If fAB1 - fAB0 < fAB2 - fAB1, it indicates that the AB structural surface expands.
[0101] If fAB1 - fAB0 > fAB2 - fAB1, it indicates that the AB structural surface compresses.
[0102] Similarly, If fBC - fBC0 = fBC2 - fBC1, it indicates that the BC structural surface is relatively stable.
[0103] If fBC1 - fBC0 < fBC2 - fBC1, it indicates that there is relative expansion between the BC structural planes.
[0104] If fBC1 - fBC0 > fBC2 - fBC1, it indicates that there is relative compression between the BC structural planes.
[0105] The solution of this application uses the pressure bladder 20 as the locking mechanism of the force sensor 60, so that the force sensor 60 is locked with the formation and can accurately change with the change of the formation, improving the accuracy of the monitoring results. Thus, the stress change between the formation structural planes can be monitored in real time, providing an important basis for geological disaster risk assessment, so as to take effective measures in time to prevent and control the occurrence of geological disasters.
[0106] This application embodiment also discloses a monitoring device for the stress change between formation structural planes. Refer to Figure 6 and Figure 7 , the monitoring device includes a pressure bladder 20, a force sensor 60, a communication device protection tube 51, and a data acquisition center 50. A grouting through-hole 202 is provided on the pressure bladder 20, and a slurry guide tube 30 is connected in the grouting through-hole 202. A plurality of groups of first one-way pressure valves 31 and second one-way pressure valves 32 are pre-installed in the slurry guide tube 30. A slurry permeation hole 301 communicating the slurry guide tube 30 with the pressure bladder 20 is pre-opened on the side wall of the slurry guide tube 30 between the first one-way pressure valve 31 and the second one-way pressure valve 32. The pressure conduction value of the second one-way pressure valve 32 is greater than that of the first one-way pressure valve 31, and the pressure conduction value of the second one-way pressure valve 32 is less than a certain level of the maximum pressure received by the pressure bladder 20. The liquid outlet end of the second one-way pressure valve 32 faces the downward pressure bladder 20.
[0107] Refer to Figure 4 , preferably, the pressure bladder 20 in this application includes a bladder tensile net 21 and a bladder anti-seepage membrane 22 that are adhesively bonded to each other. The bladder anti-seepage membrane 22 is arranged on the inner wall of the pressure bladder 20, and the bladder tensile net 21 is arranged on the outer wall of the pressure bladder 20. This structure can improve the anti-seepage performance and high-pressure resistance of the pressure bladder 20.
[0108] At the same time, a protection tube installation hole 203 and a sensor installation hole 204 that communicate with each other are pre-opened in the pressure bladder 20. The communication device protection tube 51 passes through the protection tube installation hole 203, and the force sensor 60 is installed in the sensor installation hole 204. A circuit is connected between the force sensor 60 and the data acquisition center 50, and the circuit is arranged in the communication device protection tube 51.
[0109] Refer to Figure 7, wherein the force sensor 60 includes a waterproof shell 601, a force sensor body 602 and a force sensor fixed end 603, the force sensor body 602 is installed in the waterproof shell 601, the force sensor body 602 is connected to the waterproof shell 601 through the force sensor fixed end 603, a pre-tensioned steel wire 70 is connected between the upper and lower waterproof shells 601, and a prestressed steel wire 71 is connected to the force sensor body 602 between the upper and lower strata, and the readings of the force sensor body 602 connected to the upper and lower strata are the same.
[0110] The implementation principle of the stress change monitoring device between stratum structural planes in the embodiment of the present application is as follows: a pressure bag 20 is used to install a force sensor 60 at the position to be tested in the borehole. The pressure bag 20 is locked with the stratum and moves with the movement of the stratum. When the stratum moves, the pressure bag 20 moves and moves with the force sensor 60. By monitoring the value change of the force sensor 60, the force change between the structural planes can be judged. The present application scheme uses the pressure bag 20 as a locking mechanism for the force sensor 60, so that the force sensor 60 is locked with the stratum and can change accurately with the change of the stratum, thereby improving the accuracy of the monitoring results.
[0111] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A one-time locking and anchoring method, characterized in that: The following steps are involved: S1, drilling and hole cleaning; S2, pre-opening a tensile through hole (201) and a grouting through hole (202) on the pressure bag (20), passing the tensile member (10) through the tensile through hole (201), passing the grouting pipe (30) through the grouting through hole (202), and fixing the pressure bag (20) at a predetermined position on the tensile member (10); S3, lowering the pressure bag (20) along with the tensile member (10) to a preset drilling position; S4, the slurry guide pipe (30) has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag (20), and grout is injected into the pressure bag (20) through the slurry guide pipe (30), so that the pressure bag (20) expands to abut against the inner wall of the borehole, and the friction between the pressure bag (20) and the inner wall of the borehole reaches a certain value; S5. Grouting is injected into the bottom of the borehole or into the borehole between adjacent pressure bags (20) through the grouting pipe (30).
2. The one-time locking and anchoring method according to claim 1, characterized in that: The step S4 further comprises: S41, pre-installing a first one-way pressure valve (31) and a second one-way pressure valve (32) in the slurry guiding pipe (30), pre-opening a slurry penetration hole (301) in the side wall of the slurry guiding pipe (30) located between the first one-way pressure valve (31) and the second one-way pressure valve (32) for connecting the slurry guiding pipe (30) and the pressure bag (20), the pressure conductance value of the second one-way pressure valve (32) being greater than the pressure conductance value of the first one-way pressure valve (31), and the pressure conductance value of the second one-way pressure valve (32) being less than a certain level of the maximum pressure to which the pressure bag (20) is subjected.
3. A method for monitoring stratum displacement, characterized in that: The following steps are involved: S1, drilling and hole cleaning; S2, pre-opening a grouting through hole (202) on the pressure bag (20) and installing a displacement sensor (40), inserting a grouting pipe (30) into the grouting through hole (202), fixing a plurality of pressure bags (20) at predetermined positions on the grouting pipe (30), and connecting the displacement sensor (40) to a data acquisition center (50); S3, lowering a plurality of pressure bags (20) along with the grouting pipe (30) to preset positions of the borehole so that different pressure bags (20) are located in different formations; S4, the slurry guide pipe (30) has unidirectional conductivity from the inlet to the slurry outlet, and the unidirectional conductivity can be adjusted according to the slurry pressure in the pressure bag (20), and grout is injected into the pressure bag (20) through the slurry guide pipe (30), so that the pressure bag (20) expands to abut against the inner wall of the borehole, and the friction between the pressure bag (20) and the inner wall of the borehole reaches a certain value; S5. Collecting, counting and analyzing the data of the displacement sensor (40) at different times.
4. The method for monitoring stratum displacement according to claim 3, characterized in that: The step S2 of installing the displacement sensor (40) on the pressure bladder bag (20) specifically includes: S21, pre-opening a protection tube mounting hole (203) and a sensor mounting hole (204) in the pressure bag (20); S22, installing the displacement sensor (40) in the sensor installation hole (204); S23. Provide a communication equipment protection tube (51) that houses the line between the displacement sensor (40) and the data acquisition center (50) inside, and pass the communication equipment protection tube (51) through the protection tube mounting hole (203).
5. A method for monitoring stress changes between stratum structure surfaces, characterized in that: The method includes the following steps: S1. Drill holes and clean the holes; S2. Provide a plurality of pressure bladder bags (20) with force sensors (60) installed inside; S3. Connect the force sensors (60) between adjacent pressure bladder bags (20) in advance, apply a certain prestress to the connected force sensors (60), and obtain the prestress value between the connected force sensors (60); S4. Lock the pressure bladder bags (20) at a predetermined position in the drill hole so that different pressure bladder bags (20) are in different strata; S5. Measure the change in prestress between the connected force sensors (60) at different times, and determine the change in force between the structural planes according to the change in prestress.
6. The method for monitoring stress changes between stratum structure planes according to claim 4, characterized in that: The readings of the connected force sensors (60) are equal. The step S5 includes: S51. Obtain the values of the force sensors (60) at time t0, time t1, and time t2 respectively. The obtained values are: At time t0, it is measured that x1 = x2 = fAB0; At time t1, it is measured that x1 = x2 = fAB1; At time t2, it is measured that x1 = x2 = fAB2; S52. Calculate the obtained values: If fAB1 - fAB0 = fAB2 - fAB1, it indicates that the adjacent structural planes are relatively stable; If fAB1 - fAB0 < fAB2 - fAB1, it indicates that the adjacent structural planes are expanding; If fAB1 - fAB0 > fAB2 - fAB1, it indicates that the adjacent structural planes are being compressed.
7. The method for monitoring stress changes between stratum structure planes according to claim 5, characterized in that: The step S3 includes: S31. Connect the adjacent force sensors (60) with a pre-tension steel wire (70) and a prestressed steel wire (71) in advance; S32. Pull the pre-tension steel wire (70) with a certain tension; S33. Obtain the tension value between the connected force sensors (60); After step S4, it further includes: S34. Eliminate the tension on the pre-tension steel wire (70).
8. The method for monitoring stress changes between stratum structure planes according to claim 7, characterized in that: The certain tension in the step S52 refers to not exceeding 1 / 3 of the load of the prestressed steel wire (71).
9. The method for monitoring stress changes between stratum structure planes according to claim 5, characterized in that: The step S4 includes: S41. Pre-drill a grouting through hole (202) on the pressure bladder bag (20), insert a grouting guide pipe (30) into the grouting through hole (202), and fix a plurality of pressure bladder bags (20) at a predetermined position on the grouting guide pipe (30); S42. Lower a plurality of pressure bladder bags (20) along with the grouting guide pipe (30) to a preset position in the drill hole so that different pressure bladder bags (20) are in different strata; S43. The grouting guide pipe (30) has a one-way conductivity from the inlet to the outlet slurry port, and the one-way conductivity can be adjusted according to the slurry pressure in the pressure bladder bag (20). Grout into the pressure bladder bag (20) through the grouting guide pipe (30) to make the pressure bladder bag (20) expand to abut against the inner wall of the drill hole, and make the friction force between the pressure bladder bag (20) and the inner wall of the drill hole reach a certain value.
10. The method for monitoring stress changes between stratum structure planes according to claim 9, characterized in that: The step S43 includes: S431, pre-install multiple groups of first one-way pressure valves (31) and second one-way pressure valves (32) in the slurry guide pipe (30), pre-open a slurry hole (301) in the side wall of the slurry guide pipe (30) located between the first one-way pressure valve (31) and the second one-way pressure valve (32) to connect the slurry guide pipe (30) and the pressure bag (20), the pressure conductance value of the second one-way pressure valve (32) is greater than the pressure conductance value of the first one-way pressure valve (31), the pressure conductance value of the second one-way pressure valve (32) is less than a certain level of the maximum pressure to which the pressure bag (20) is subjected, and the liquid outlet end of the second one-way pressure valve (32) faces the pressure bag (20) below.
Citation Information
Patent Citations
Mounting device for bead-string-type settlement plates of soil body layered settlement monitoring device
CN103266590A
Side slop optical fiber Bragg optical grating multi-point displacement sensor and using method thereof
CN104006744A
Three-axis model tester for testing pressure reduction, percolation, layering and consolidation deformation of soil layer
CN104181042A
Device and method for testing pile-soil interface soil pressure and pore water pressure
CN105200971A
Stress-loading three-dimensional test device and method for analyzing stability of shield tunneling faces
CN107664604A