Park distributed-centralized energy supply and consumption optimization control method, device, equipment and medium
By obtaining the power consumption data of the park's electrical equipment, establishing an economic and environmental benefit analysis model, and formulating an optimal control strategy, it solves the problem of load characteristics and spatiotemporal distribution characteristics not being considered in traditional methods, and achieves a more efficient and sustainable park. Energy management.
Patent Information
- Application Number
- CN202410821308.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-25
AI Technical Summary
Traditional park energy supply and consumption optimization control methods fail to fully consider the load characteristics and spatio-temporal distribution characteristics of energy-consuming equipment, resulting in inaccurate calculation of load demand response potential and lack of flexibility in participation in the power market and carbon trading market.
By obtaining the equipment power consumption data of the park's power equipment, extracting typical daily load distribution characteristics, establishing an economic and environmental benefit analysis model, and formulating an optimal distribution-centralized distribution based on the renewable energy consumption effect, operator income, and total park income. The supply and demand energy optimization control strategy model takes into account the space-time complementary characteristics of source and load.
It has achieved a more accurate and comprehensively optimized control scheme, improved the energy utilization efficiency of the park, reduced carbon emissions, and enhanced the flexibility of participation in the power market and carbon trading market.
Smart Images

Figure CN118838166A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of park energy control optimization, and specifically relates to a park distributed-centralized energy supply and utilization optimization control method, device, equipment and medium. Background Art
[0002] As the power system deepens the reform of the power sales side, it becomes possible for carbon-neutral parks, as independent entities, to participate in power market dispatch by integrating demand-side resources through load aggregators. Park energy management has become an important issue, aiming to improve energy efficiency, reduce carbon emissions, and promote sustainable development. Traditional park energy supply and consumption optimization control methods often fail to fully consider the load characteristics and spatiotemporal distribution characteristics of energy-consuming equipment in data processing, resulting in inaccurate calculations of load demand response potential. In terms of economic and environmental benefit analysis, they usually only focus on the cost of purchasing electricity and the cost of equipment operation and maintenance, without comprehensively considering the economic benefits of green electricity, which lacks comprehensiveness. In addition, the existing methods are relatively traditional in the formulation of energy supply and consumption optimization strategies, and do not fully consider the spatiotemporal complementarity of sources and loads, making the park's participation in the power market and carbon trading market lack flexibility. Summary of the invention
[0003] The purpose of the present invention is to provide a park distributed-centralized energy supply and utilization optimization control method, device, equipment and medium to solve the problem of lack of flexibility in the park's participation in the electricity market and carbon trading market in the prior art.
[0004] In order to achieve the above object, the present invention adopts the following technical solution:
[0005] In a first aspect, the present invention provides a method for optimizing and controlling distributed and centralized energy supply and use in a park, comprising:
[0006] Obtain equipment power consumption data of various typical power-consuming equipment in the park, extract features from the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park;
[0007] Based on the typical daily load distribution characteristics of the park and the load demand response potential of the park, an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment are established respectively;
[0008] Based on the economic benefit analysis model and environmental benefit analysis model of the park's power generation and consumption equipment, with the optimization of renewable energy consumption effect, operator revenue, and total park revenue as the optimization goals, a park distribution-centralized energy supply and consumption optimization control strategy model is established, and the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model are determined;
[0009] Based on the constraints, the park distributed-centralized energy supply and consumption optimization control strategy model is solved to obtain the energy supply and consumption optimization control strategy.
[0010] Furthermore, the economic benefit analysis model of the power generation and consumption equipment in the park is expressed as follows:
[0011]
[0012] In the formula, G buy is the daily electricity purchase cost; C ebuy is the electricity price for the period; Δt represents the length of the period; P buy (t) is the electric power required to be purchased from the power grid at time t; G fd is the daily power generation cost; P gf is the photovoltaic power generation power at a certain time of the day, k gf G is the power generation cost coefficient of photovoltaic power generation equipment. L is the operation and maintenance cost of the daily power equipment; P i,l (t) is the power consumption of the ith device at time t; k l G is the operation and maintenance cost coefficient of power equipment. ess is the daily operation and maintenance cost of energy storage equipment; P i,ess (t) is the charge / discharge power of the i-th device at time t; k ess G is the operation and maintenance cost coefficient of energy storage equipment. sell is the cost of selling electricity during the day; C se ll is the green electricity price during the period; P sell (t) is the electric power that needs to be sold to the grid at time t, taking into account peak and valley electricity prices.
[0013] Furthermore, the environmental benefit analysis model is expressed as follows:
[0014]
[0015] Where E1 is the carbon emission reduction of power generation; e j is the carbon emission of carbon source factor; a1 is the coefficient of greenhouse gas generated by power generation converted into CO2; P j The installed capacity of photovoltaic power generation in the park; t n is the effective daylight duration; E2 is agricultural carbon emissions; e i is the carbon emission of a single carbon source factor; x i is the usage of each carbon source factor, f i is the carbon emission coefficient of each carbon source factor, and a2 is the coefficient of converting agricultural carbon emission greenhouse gases into CO2.
[0016] Furthermore, the park distributed-centralized energy supply and utilization optimization control strategy model is expressed as:
[0017]
[0018] Where F represents the overall optimization goal; F1 represents renewable energy consumption; F2 represents the operator's revenue; F3 represents the total revenue of the park; λ1, λ2, λ3 are the weights of each goal; α is the binary determination coefficient; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called within a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i is the unit price of electricity purchased by the energy storage device; η is the charging and discharging efficiency; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, p out,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,i is the load charging time that can be responded to in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E1 and E2 are the carbon emission reduction of power generation in the park and the carbon emission of agriculture in the park respectively.
[0019] Furthermore, the constraints of the park distributed-centralized energy supply and consumption optimization control strategy model include:
[0020] Available capacity constraints of electric agricultural machinery, available capacity constraints of respondable loads, quantity constraints of respondable loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
[0021] In a second aspect, the present invention provides a park distributed-centralized energy supply and utilization optimization control device, comprising:
[0022] The data acquisition module is used to obtain the equipment power consumption data of various typical power-consuming equipment in the park, extract features of the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park;
[0023] The first model building module is used to establish an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment based on the park's typical daily load distribution characteristics and the park's load demand response potential;
[0024] The second model building module is used to establish a park distribution-centralized energy supply and consumption optimization control strategy model based on the park power generation and consumption equipment economic benefit analysis model and the environmental benefit analysis model, with the optimization of renewable energy consumption effect, operator revenue, and park total revenue as the optimization goals, and determine the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model;
[0025] The model solving module is used to solve the park distributed-centralized energy supply and consumption optimization control strategy model based on the constraints to obtain the energy supply and consumption optimization control strategy.
[0026] Furthermore, in the second model building module, the park distributed-centralized energy supply and utilization optimization control strategy model is expressed as:
[0027]
[0028] Where F represents the overall optimization goal; F1 represents renewable energy consumption; F2 represents the operator's revenue; F3 represents the total revenue of the park; λ1, λ2, λ3 are the weights of each goal; α is the binary determination coefficient; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called within a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i is the unit price of electricity purchased by the energy storage device; η is the charging and discharging efficiency; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, p out,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,iis the load charging time that can be responded to in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E1 and E2 are the carbon emission reduction of power generation in the park and the carbon emission of agriculture in the park respectively.
[0029] Furthermore, in the second model building module, the constraints of the park distributed-centralized energy supply and utilization optimization control strategy model include:
[0030] Available capacity constraints of electric agricultural machinery, available capacity constraints of respondable loads, quantity constraints of respondable loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
[0031] According to a third aspect of the present invention, there is provided an electronic device comprising a processor and a memory, wherein the processor is configured to execute a computer program stored in the memory to implement the above-mentioned park distributed-centralized energy supply and utilization optimization control method.
[0032] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the above-mentioned park distributed-centralized energy supply and utilization optimization control method is implemented.
[0033] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0034] The park distribution-centralized energy supply and consumption optimization control method provided by the present invention takes into account the load demand response potential of the park, and integrates the load characteristics of various electrical equipment and the spatiotemporal distribution characteristics of energy consumption; when constructing the optimization model, it comprehensively considers the changes in system costs and benefits before and after the collaborative optimization, as well as the economic and environmental benefits; in the park energy optimization control strategy, the spatiotemporal complementary characteristics of source and load are fully considered. Through the steps of establishing an economic and environmental benefit analysis model, formulating an optimization control strategy for the spatiotemporal complementary characteristics of source and load, and comprehensively considering carbon emissions and environmental benefits, the deficiencies of traditional methods are made up, providing a more comprehensive and accurate optimization control solution for carbon-neutral park energy management, and achieving more efficient and sustainable park energy utilization.
[0035] The present invention establishes a mathematical model of the economic cost-benefit of the park and a mathematical model of the environmental cost-benefit, taking into account the changes in system costs and benefits before and after collaborative optimization, including the cost of purchasing electricity, the operation and maintenance cost of power generation equipment, the operation and maintenance cost of power consumption equipment, the operation and maintenance cost of energy storage equipment, and the economic benefits brought by the production of green electricity.
[0036] The present invention has formulated a distributed-centralized energy supply and consumption optimization control strategy for carbon-neutral parks to participate in the electricity market and carbon trading market. Taking into account the spatiotemporal complementarity of the park's source and load, the coordinated optimization of the park's electricity supply and demand is achieved by optimizing the objectives and constraints. The park's distributed-centralized energy supply and consumption optimization control device, electronic device, and computer-readable storage medium provided by the present invention also solve the problems raised in the background technology section. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0038] Figure 1 This is a flow chart of a method for optimizing control of distributed and centralized energy supply and utilization in a park according to an embodiment of the present invention;
[0039] Figure 2 This is a curve diagram of the photovoltaic output power of the park changing with time in an embodiment of the present invention;
[0040] Figure 3 This is a load operation scheme diagram in a carbon neutral park in an embodiment of the present invention;
[0041] Figure 4 This is a structural block diagram of a distributed-centralized energy supply and utilization optimization control device for a park according to an embodiment of the present invention;
[0042] Figure 5 The present invention is a structural block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0043] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0044] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.
[0045] Example 1
[0046] like Figure 1 As shown, an embodiment of the present invention provides a park distributed-centralized energy supply and utilization optimization control method, including:
[0047] S1. Obtain equipment power consumption data of various typical power-consuming equipment in the park, extract features of the equipment power consumption data, obtain typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park.
[0048] Specifically, the power consumption data of various typical power-consuming equipment in the park are collected, the data are preprocessed, and the typical daily load distribution characteristics of the park are identified and extracted.
[0049] Specifically, based on the power data sensors installed on typical power-consuming equipment in the park, power consumption data is collected in real time or at a scheduled time. After collecting the power consumption data of the equipment, data cleaning and preprocessing are performed to ensure the quality and accuracy of the data.
[0050] For example, identify and process abnormal values that may be generated by sensors, such as sudden peaks or sudden drops; interpolate missing data or adopt appropriate filling strategies to reduce data incompleteness. Perform noise filtering and use filtering technology to eliminate noise caused by sensor errors or environmental interference to ensure data smoothness. In addition, to ensure the accuracy of subsequent analysis, the collected equipment power consumption data is synchronized to unify the timestamp format to facilitate comparison and collaborative analysis between different devices. Convert power data into standard energy consumption units, such as kilowatt-hours (kWh), to ensure data consistency and comparability.
[0051] More specifically, when identifying and extracting the typical daily load distribution characteristics of the park, this solution can use statistics and machine learning techniques to extract and analyze load characteristics.
[0052] For example, calculate the daily average load, peak load, valley load and other indicators to obtain the typical daily load distribution characteristics of the park; then use cluster analysis, time series analysis and other methods to identify and extract load patterns in different time periods to form a classification of the load characteristics of the park equipment.
[0053] Specifically, the load demand response potential of the park is determined based on the typical daily load distribution characteristics of the park, including: based on the typical daily load distribution characteristics of the park, analyzing the adjustability and flexibility of electrical equipment to evaluate the load demand response potential of the park and establish the time-shiftable load capacity and interruptible load capacity of the park.
[0054] For example, based on the typical daily load distribution of the park and the load characteristics of the park equipment, the load curve is split by equipment based on data clustering technology, so that each device generates corresponding load characteristic data, considering factors such as the start and stop flexibility and power adjustment capability of the equipment, and determining the potential of the equipment in load adjustment. Combined with the typical daily load distribution characteristics and the adjustability analysis of the equipment, the load demand response potential of the entire park is calculated. Taking into account the potential of each device, the load response potential of the park in different time periods is calculated through mathematical models or rule engines.
[0055] S2. Based on the typical daily load distribution characteristics of the park and the load demand response potential of the park, an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment are established respectively.
[0056] Specifically, the cost and benefit of the system will change before and after the overall coordinated optimization of the park. The system's electricity purchase cost, power generation equipment operation and maintenance cost, power equipment operation and maintenance cost, energy storage equipment operation and maintenance cost, and the economic benefits generated by the production of green electricity are comprehensively considered to establish a specific park economic cost-benefit mathematical model.
[0057] The economic benefit analysis model of the park's power generation and consumption equipment is expressed as follows:
[0058]
[0059] In the formula, G buy is the electricity purchase cost on that day; C ebuy is the electricity price for this period; Δt represents the length of the period, which is 0.5 hours in this paper; P buy (t) is the electric power that needs to be purchased from the power grid at time t, taking into account the peak and valley electricity prices. fd is the power generation cost on that day; P gf is the photovoltaic power generation power at a certain time of the day, k gf G is the power generation cost coefficient of photovoltaic power generation equipment. L is the operation and maintenance cost of the daily power equipment; P i,l (t) is the power consumption of the ith device at time t; k l G is the operation and maintenance cost coefficient of power equipment. ess is the daily operation and maintenance cost of energy storage equipment; P i,ess (t) is the charge / discharge power of the i-th device at time t; k ess G is the operation and maintenance cost coefficient of energy storage equipment. sell is the cost of electricity sold on that day; C se ll is the green electricity price during the period; Δt represents the length of the period, which is 0.5 hours in this paper; P sell (t) is the electric power that needs to be sold to the grid at time t, taking into account peak and valley electricity prices.
[0060] Specifically, the carbon emissions of a carbon neutral park are comprehensively considered, mainly including the carbon emission reduction caused by renewable energy replacing traditional energy power generation and the greenhouse gas emission reduction caused by its agricultural production activities, to establish a mathematical model of the park's environmental protection cost-benefit.
[0061] Among them, the environmental benefit analysis model is expressed as follows:
[0062]
[0063] Where E1 is the carbon emission reduction of power generation, calculated in tons (CO2); j is the carbon emission of carbon source factor, calculated in t(CO2); a1 is the coefficient of greenhouse gas conversion into CO2 generated by power generation; P j is the installed capacity of photovoltaic power generation in the park, in kW; t n is the effective daylight duration, unit is h; E2 is agricultural carbon emissions, unit is t; CO2 is used to effectively represent the greenhouse effect; e i is the carbon emission of a single carbon source factor, in tons of CO2; x i is the usage of each carbon source factor, f i is the carbon emission coefficient of each carbon source factor, and a2 is the coefficient of converting agricultural carbon emission greenhouse gases into CO2.
[0064] It should be noted that this plan uses the IPCC carbon emission estimation method combined with the field measurement method to measure and calculate the carbon emissions in the carbon neutral park. The IPCC method is the first carbon emission estimation method. First, the carbon emission source list of the study area, that is, the types of carbon source factors, is sorted out; secondly, based on various carbon source factors, the corresponding carbon emission coefficients are found; finally, the carbon emissions of each carbon source factor are calculated by multiplying the various carbon source factors and their corresponding carbon emission coefficients, that is: Carbon emissions = carbon source factor × carbon emission coefficient. The sum of the carbon emissions of all carbon source factors is the carbon emissions within a specific time scale of the study area. The carbon emissions of the carbon neutral park mainly take into account the carbon emission reductions generated by the replacement of traditional energy for power generation with renewable energy and the greenhouse gas emission reductions caused by its agricultural production activities.
[0065] S3. Based on the economic benefit analysis model of the park's power generation and consumption equipment and the environmental benefit analysis model, with the optimization of renewable energy consumption effect, operator revenue, and total park revenue as the optimization goals, a park distribution-centralized energy supply and consumption optimization control strategy model is established, and the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model are determined.
[0066] In this plan, there are two main ways to absorb distributed photovoltaic power: one is to adjust the load usage period to match the source and load; the other is to transfer energy through energy storage equipment to achieve the purpose of peak load reduction and valley load filling. This plan divides the load of each functional area of the park according to the load characteristics based on whether it can be interrupted and time-shifted, and conducts centralized optimization.
[0067] This plan comprehensively considers the demand response volume difference and renewable energy consumption effect, operator revenue, and total park revenue as optimization targets, and establishes the optimization target of the park distributed-centralized energy supply and consumption optimization control strategy model; comprehensively considers the operating characteristics of the park's energy supply and consumption equipment and energy storage equipment, and establishes the constraint conditions of the park's distributed-centralized energy supply and consumption optimization control strategy model.
[0068] Specifically, the park distributed-centralized energy supply and consumption optimization control strategy model is expressed as:
[0069]
[0070] Where, F represents the overall optimization target; F1 represents the difference in demand response and renewable energy consumption effect; F2 represents the operator's income; F3 represents the total income of the park; λ1, λ2, λ3 are the weights of each target, focusing on the difference in demand response, renewable energy consumption effect and park income, so λ1 and λ3 are 0.4, λ2 is 0.2; α is a binary determination coefficient, which takes 1 or 0. When the value is 1, it means that this mode considers this objective function, and when it is 0, it does not consider it; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; F2 is the operator's profit, the larger its value, the higher the operator's profit; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called in a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i is the unit price of electricity purchased by the energy storage device; η is the charging and discharging efficiency; F3 is the expression of the park's profit, the larger its value, the higher the park's profit; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, pout,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,i is the load charging time that can be responded to in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E1 and E2 are the carbon emission reduction of power generation in the park and the carbon emission of agriculture in the park respectively.
[0071] Specifically, the constraints of the park distributed-centralized energy supply and consumption optimization control strategy model include: available capacity constraints of electric agricultural machinery, available capacity constraints of responsive loads, quantity constraints of responsive loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
[0072] Specifically, after the responsive load ends charging, during normal agricultural production operations, the battery charging depth must meet the upper and lower limits of the available capacity and must not exceed its own maximum capacity. The responsive load charging must not exceed its own battery capacity, that is, the maximum power S max =1, and the available power of the battery cannot be too low to ensure the battery life, so its minimum power must meet its minimum power S min , taking the common value of 0.2, the available capacity constraint expression of electric agricultural machinery is:
[0073] S min ≤S i,j ≤S max
[0074] In the formula, S i,j is the available battery capacity of the i-th responsive load in time period j.
[0075] During charging, for each connected responsive load, within a certain charging time, the user's charging expectations should be met after charging is completed, and the battery charging depth should be within the upper and lower limits expected by the user. The available capacity constraint expression of the responsive load is:
[0076]
[0077] In the formula, S i,min,exp,soc is the lower limit of the expected value of the depth of charge after charging is completed; S i,soc is the initial battery depth of the ith responsive load; B i is the responsive load capacity of the i-th unit; P e is the charge and discharge power, x i,j is a binary charging state variable, x i,j = 0, indicating that the i-th responsive load is not charged in the j-th period, x i,j=1, indicating that the i-th unit can respond to the load and charge in the j-period, x i,j =-1, indicating that the i-th unit can respond to the load and discharge in the j-period.
[0078] The number of responsive loads in any period cannot be greater than the total number of responsive loads. The constraint expression of the responsive load number is:
[0079] a j ≤N
[0080] In the formula, a j is the total number of responsive loads connected to the grid in period j; N is the total number of responsive loads.
[0081] The storage capacity of the energy storage unit is subject to the upper and lower limits of capacity. In order to prevent excessive battery loss, the remaining battery capacity should not be too low. The energy storage charge and discharge constraints are:
[0082]
[0083] In the formula, S ess,min is the minimum remaining capacity constraint, which is generally taken as 0.2; S i,ess,soc is the initial charge depth of the ith battery; B i,ess is the capacity value of the ith battery.
[0084] The number of idle agricultural machinery charged in any period cannot be greater than the total number of idle agricultural machinery. The energy storage quantity constraint expression is:
[0085] a ess,j ≤N ess
[0086] In the formula, a ess,j N is the number of idle electric agricultural machinery used as energy storage units in the charging and discharging state during period j; ess The total number of idle electric agricultural machinery used as energy storage units.
[0087] The load demand in the optimized park must meet the actual production demand of the park. The total energy consumption constraint of the park is as follows:
[0088]
[0089] In the formula, is the original power load of the i-th responsive load in period t before optimization.
[0090] S4. Solve the park distributed-centralized energy supply and consumption optimization control strategy model based on the constraints to obtain the energy supply and consumption optimization control strategy.
[0091] Specifically, when solving the distributed-centralized energy supply and consumption optimization control strategy model of the park, a mixed integer nonlinear programming method can be used to solve it.
[0092] Verification Example
[0093] This solution selects the application scenario of the carbon neutral park and carries out specific case analysis. The distributed photovoltaic installed capacity of the carbon neutral park is set to 150kW, the short-circuit current is 196A, the open-circuit voltage is 986V, the maximum power point current is 185A, the maximum power point voltage is 790V, and the photovoltaic output power change curve over time on that day is as shown in the attached figure. Figure 1 As shown, the output power is maximum from 12:00 to 13:00.
[0094] like Figure 2 As shown in the figure, by adjusting the use period of the time-shiftable load, the daytime load curve and the distributed photovoltaic output curve tend to be consistent. From the figure, it can be seen that the load in the living and office area is the largest, and the load in the facility agriculture area and the forest breeding area is relatively small. At night, the energy stored during the day is released through the energy storage battery. Moreover, the load value at most times is less than the photovoltaic output power, which greatly reduces the cost of purchasing electricity from the power grid and realizes the local consumption of distributed energy.
[0095] This solution adjusts the use period of time-shiftable loads to make the daytime load curve consistent with the distributed photovoltaic output curve, and releases the energy stored during the day through energy storage batteries at night, thereby reducing the cost of purchasing electricity from the power grid and realizing the local consumption of distributed energy in the park.
[0096] The cost of consuming grid power at various times during the day is shown in Appendix 1. Taking the latest adjustment information of peak and valley electricity prices in Beijing as an example, the operating cost of the park (grid electricity purchase cost) during this day is 25.5125 yuan. The energy storage battery stores 240kW·h of energy during the day, and the battery releases 221.75kW·h of electricity at night during the day. According to the latest time-of-use electricity price regulations in Beijing, the carbon neutral park converts 1444.291kW·h of electricity from photovoltaics during the day. The operating cost during the day was reduced by 1162.846 yuan. The total daily load of the carbon neutral park is 1453.8kW·h, the total photovoltaic energy supply of the carbon neutral park is 1426.041kW·h, the total photovoltaic conversion of the carbon neutral park is 1444.291kW·h, and the theoretical maximum daily photovoltaic capacity of the carbon neutral park is 1477.219kW·h.
[0097] Table 1 The cost of electricity purchased by the ecological park at various times during the day
[0098]
[0099] The daily photovoltaic power supply rate of the carbon neutral park is expressed by μ:
[0100] When the park load uses more distributed energy generation, the entire park will purchase less electricity from the power grid, and the operating cost of the entire park will be lower. The photovoltaic power supply rate is taken as the evaluation index of the optimization result. The higher the photovoltaic power supply rate, the better the solution.
[0101]
[0102] Where μ is the photovoltaic power supply rate in the carbon neutral park during the day; W ppt Daily photovoltaic energy supply for carbon neutral parks, kW·h; W fh is the total daily load of the carbon neutral park, kW·h.
[0103] The daily photovoltaic consumption rate of the carbon neutral park is expressed by σ:
[0104]
[0105] Where, σ is the daily photovoltaic consumption rate of the carbon neutral park; W pcs The photovoltaic power conversion energy in the carbon neutral park in a day, kW·h; W pmax is the theoretical maximum photovoltaic capacity of the carbon neutral park in a day, kW·h; σ reflects the photovoltaic absorption rate of the carbon neutral park in a day. The closer the ratio is to 1, the higher the photovoltaic absorption rate of the system. After calculation, the carbon reduction in each area in a day is shown in Table 2. The photovoltaic power supply rate in the carbon neutral park in a day is 0.98091; the photovoltaic absorption rate in the carbon neutral park in a day is 0.96535, and the system optimization effect is good.
[0106] Table 2 Daily carbon reduction in each energy supply area
[0107]
[0108] Example 2
[0109] like Figure 4 As shown, based on the same inventive concept as the above embodiment, the present invention also provides a park distributed-centralized energy supply and utilization optimization control device, comprising:
[0110] The data acquisition module is used to obtain the equipment power consumption data of various typical power-consuming equipment in the park, extract features of the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park;
[0111] The first model building module is used to establish an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment based on the park's typical daily load distribution characteristics and the park's load demand response potential;
[0112] The second model building module is used to establish a park distribution-centralized energy supply and consumption optimization control strategy model based on the park power generation and consumption equipment economic benefit analysis model and the environmental benefit analysis model, with the optimization of renewable energy consumption effect, operator revenue, and park total revenue as the optimization goals, and determine the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model;
[0113] The model solving module is used to solve the park distributed-centralized energy supply and consumption optimization control strategy model based on the constraint conditions to obtain the energy supply and consumption optimization control strategy.
[0114] In the second model building module, the park distributed-centralized energy supply and utilization optimization control strategy model is expressed as:
[0115]
[0116] Where F represents the overall optimization goal; F1 represents renewable energy consumption; F2 represents the operator's revenue; F3 represents the total revenue of the park; λ1, λ2, λ3 are the weights of each goal; α is the binary determination coefficient; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called within a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i is the unit price of electricity purchased by the energy storage device; η is the charging and discharging efficiency; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, p out,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,i is the load charging time that can be responded to in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E1 and E2 are the carbon emission reduction of power generation in the park and the carbon emission of agriculture in the park respectively.
[0117] In the second model construction module, the constraints of the park distributed-centralized energy supply and consumption optimization control strategy model include: available capacity constraints of electric agricultural machinery, available capacity constraints of responsive loads, quantity constraints of responsive loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
[0118] Example 3
[0119] like Figure 5 As shown, the present invention also provides an electronic device 100 for implementing a park distributed-centralized energy supply and utilization optimization control method;
[0120] The electronic device 100 includes a memory 101 , at least one processor 102 , a computer program 103 stored in the memory 101 and executable on the at least one processor 102 , and at least one communication bus 104 .
[0121] The memory 101 can be used to store a computer program 103. The processor 102 implements the steps of a distributed-centralized energy supply and utilization optimization control method for a park in Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101.
[0122] The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.
[0123] At least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.
[0124] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a park distributed-centralized energy supply and utilization optimization control method, and the processor 102 can execute the plurality of instructions to implement:
[0125] Obtain equipment power consumption data of various typical power-consuming equipment in the park, extract features from the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park;
[0126] Based on the typical daily load distribution characteristics of the park and the load demand response potential of the park, an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment are established respectively;
[0127] Based on the economic benefit analysis model and environmental benefit analysis model of the park's power generation and consumption equipment, with the optimization of renewable energy consumption effect, operator revenue, and total park revenue as the optimization goals, a park distribution-centralized energy supply and consumption optimization control strategy model is established, and the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model are determined;
[0128] Based on the constraints, the park distributed-centralized energy supply and consumption optimization control strategy model is solved to obtain the energy supply and consumption optimization control strategy.
[0129] Example 4
[0130] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).
[0131] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0132] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0133] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0134] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0135] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0136] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for optimizing and controlling distributed and centralized energy supply and use in a park. It is characterized in that include: Obtain equipment power consumption data of various typical power-consuming equipment in the park, extract features from the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park; Based on the typical daily load distribution characteristics of the park and the load demand response potential of the park, an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment are established respectively; Based on the economic benefit analysis model and environmental benefit analysis model of the park's power generation and consumption equipment, with the optimization of renewable energy consumption effect, operator revenue, and total park revenue as the optimization goals, a park distribution-centralized energy supply and consumption optimization control strategy model is established, and the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model are determined; Based on the constraints, the park distributed-centralized energy supply and consumption optimization control strategy model is solved to obtain the energy supply and consumption optimization control strategy.
2. The park distributed-centralized energy supply and utilization optimization control method according to claim 1, It is characterized in that The economic benefit analysis model of the park's power generation and consumption equipment is expressed as follows: In the formula, G buy is the daily electricity purchase cost; C ebuy is the electricity price for the period; Δt represents the length of the period; P buy (t) is the electric power required to be purchased from the power grid at time t; G fd is the daily power generation cost; P gf is the photovoltaic power generation power at a certain time of the day, k gf is the power generation cost coefficient of photovoltaic power generation equipment; G L is the operation and maintenance cost of the daily power equipment; P i,l (t) is the power consumption of the ith device at time t; k l G is the operation and maintenance cost coefficient of power equipment; ess is the daily operation and maintenance cost of energy storage equipment; P i,ess (t) is the charge / discharge power of the i-th device at time t; k ess G is the operation and maintenance cost coefficient of energy storage equipment; sell is the cost of selling electricity during the day; C sell is the green electricity price during the period; P sell (t) is the electric power that needs to be sold to the grid at time t, taking into account peak and valley electricity prices.
3. The park distributed-centralized energy supply and utilization optimization control method according to claim 2, It is characterized in that The environmental benefit analysis model is expressed as follows: In the formula, E 1 Carbon emissions reduction for power generation; e j is the carbon emission of carbon source factor; a 1 Greenhouse gases generated by power generation are converted into CO 2 The coefficient of P j The installed capacity of photovoltaic power generation in the park; t n E is the effective light duration in a day; 2 is agricultural carbon emissions; i is the carbon emission of a single carbon source factor; x i is the usage of each carbon source factor, f i is the carbon emission coefficient of each carbon source factor, a 2 Converting agricultural greenhouse gases into CO 2 The coefficient of .
4. The park distributed-centralized energy supply and utilization optimization control method according to claim 3, It is characterized in that The park distributed-centralized energy supply and utilization optimization control strategy model is expressed as: In the formula, F represents the overall optimization goal; F 1 Represents renewable energy consumption; F 2 represents the operator's profit; F 3 represents the total revenue of the park; 1 ,λ 2 ,λ 3 is the weight of each target; α is the binary determination coefficient; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called within a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i The unit price of electricity purchased for the energy storage device; η is the charge and discharge efficiency; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, p out,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,i is the available load charging time in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E 1 and E 2 They are respectively the carbon emission reduction from power generation in the park and the carbon emission from agriculture in the park.
5. The park distributed-centralized energy supply and utilization optimization control method according to claim 4, It is characterized in that The constraints of the park distributed-centralized energy supply and consumption optimization control strategy model include: Available capacity constraints of electric agricultural machinery, available capacity constraints of respondable loads, quantity constraints of respondable loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
6. A distributed-centralized energy supply and utilization optimization control device for a park, It is characterized in that include: The data acquisition module is used to obtain the equipment power consumption data of various typical power-consuming equipment in the park, extract features of the equipment power consumption data, obtain the typical daily load distribution characteristics of the park, and determine the load demand response potential of the park based on the typical daily load distribution characteristics of the park; The first model building module is used to establish an economic benefit analysis model and an environmental benefit analysis model for the park's power generation and consumption equipment based on the park's typical daily load distribution characteristics and the park's load demand response potential; The second model building module is used to establish a park distribution-centralized energy supply and consumption optimization control strategy model based on the park power generation and consumption equipment economic benefit analysis model and the environmental benefit analysis model, with the optimization of renewable energy consumption effect, operator revenue, and park total revenue as the optimization goals, and determine the constraints of the park distribution-centralized energy supply and consumption optimization control strategy model; The model solving module is used to solve the park distributed-centralized energy supply and consumption optimization control strategy model based on the constraints to obtain the energy supply and consumption optimization control strategy.
7. The park distributed-centralized energy supply and utilization optimization control device according to claim 6, It is characterized in that In the second model building module, the park distributed-centralized energy supply and utilization optimization control strategy model is expressed as: In the formula, F represents the overall optimization goal; F 1 Represents renewable energy consumption; F 2 represents the operator's profit; F 3 represents the total revenue of the park; 1 ,λ 2 ,λ 3 is the weight of each target; α is the binary determination coefficient; P out,all,i is the total output in period i, and the power output P of the power grid in period i G,i 、Total photovoltaic output power of the farm P pv,i 、Total output power of wind power in the farm P wt,i Composition; P load,all,i is the total load in period i, which is determined by the basic load P in period i. base,i and the park's responsive load P eam,i Composition; P eam,out,i is the discharge power of the responsive load to the grid during period i; T eam,out,i is the load discharge time that can be responded to in period i; p eam,out,i W is the unit price of responsive load compensation; ess is the total amount of energy storage charging called within a day, p ess,rent is the unit price of energy storage leasing; p ess,sell,i The unit price of electricity sold by the energy storage device; ess,buy,i The unit price of electricity purchased for the energy storage device; η is the charge and discharge efficiency; P out,i is the discharge power of the responsive load in period i, T out,i is the discharge time of the responsive load in period i, p out,i P is the compensation unit price for the responsive load during the i-th period; char,i is the charging power of the responsive load in period i, T char,i is the available load charging time in period i; p char,i E is the charging cost unit price of the responsive load in period i; all is the daily operating economic cost of the park, is the carbon emission penalty coefficient; E 1 and E 2 They are respectively the carbon emission reduction from power generation in the park and the carbon emission from agriculture in the park.
8. The park distributed-centralized energy supply and utilization optimization control device according to claim 6, It is characterized in that In the second model building module, the constraints of the park distributed-centralized energy supply and consumption optimization control strategy model include: Available capacity constraints of electric agricultural machinery, available capacity constraints of respondable loads, quantity constraints of respondable loads, energy storage charging and discharging constraints, energy storage quantity constraints and total energy consumption constraints of the park.
9. An electronic device, It is characterized in that It comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the park distributed-centralized energy supply and utilization optimization control method as described in any one of claims 1 to 5.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by the processor, it implements the park distributed-centralized energy supply and utilization optimization control method as described in any one of claims 1 to 5.
Citation Information
Cited By
Intelligent park electric power carbon emission prediction method and system based on artificial intelligence
CN120069487A
In-park equipment control method and device based on multi-dimensional demand response, electronic equipment and storage medium
CN121300187A