A welding tool for high-voltage power transmission and transformation insulators
By using production line chain frame and linkage welding mechanism in high-voltage transmission and transformer insulator welding tooling, combined with robotic arm group and internal lock plate, linkage welding of insulators and metal accessories is achieved, solving the cumbersome limit assembly and low efficiency The problem of welding efficiency and quality has improved and meets the requirements of modern production.
Patent Information
- Application Number
- CN202411319872.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-23
AI Technical Summary
The existing high-voltage transmission and transformer insulator welding equipment is complicated in the limit assembly process, resulting in low in insulator welding efficiency, and there are differences between insulators and welding accessories, which require cumbersome structural adjustments and affect production efficiency.
A high-voltage transmission and transformer insulator welding tooling is designed, using production line chain frame and multiple sets of clips to achieve linkage welding of insulators and metal accessories through linkage welding mechanism and robotic arm group, and the internal locking disc is used for self-organization. Adapt to pressure clamping and rotation, and perform precise welding with welding gun heads to simplify the handling and welding steps of insulators.
It improves the insulator welding efficiency, reduces the damage of insulators during transit, realizes integrated production line processing, meets modern production needs, reduces costs and improves welding quality.
Smart Images

Figure CN118848399B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of insulator welding, in particular to a welding tool for high-voltage power transmission and transformation insulators. Background Art
[0002] In the transmission line, the welding of high-voltage power transmission and transformation insulators is a key process operation. Insulators play the role of supporting conductors and preventing current leakage, which is crucial to ensure the safe and stable operation of the power transmission and transformation system. Since high-voltage transmission lines carry a large amount of electricity, the welding quality of insulators is very important and directly related to the safe and stable operation of the line;
[0003] The use of high-voltage power transmission and transformation insulator welding tools can improve work efficiency, ensure welding quality, and ensure the stable operation of transmission lines. In the field of high-voltage power transmission, insulator welding is an indispensable tool that helps ensure the safe operation of the power system.
[0004] In conjunction with the above content, it should be explained that: the Chinese patent with announcement number CN118404276A discloses a high-voltage power transmission and transformation insulator welding tool and a welding method thereof, wherein the positioning assembly includes multiple groups of clamps distributed in a ring array, and the multiple groups of clamps are driven by a pushing assembly and perform synchronous radial movement, which is achieved by setting up multiple groups of spot welding machines and multiple groups of welding tooling for use. Although it can achieve synchronous circumferential welding of multiple insulators, the limiting assembly process of the positioning assembly for the insulator is extremely cumbersome, and the efficiency corresponding to the single assembly and welding of the insulator is almost the same.
[0005] A Chinese patent with announcement number CN118081252A discloses a welding tool for high-voltage power transmission and transformation insulators, including a mounting frame, a support plate, and an adjustment plate, etc., which can be used to weld insulators and workpieces. When the insulators are fixed before welding, the fixed part of the insulators is clamped and fixed by two placement plates. Affected by the body structure, only single insulators can be limited one by one. The replacement before and after the limit is extremely cumbersome, which is contrary to modern production efficiency. In addition, there are differences between insulators and welding accessories, resulting in each group of insulators and welding accessories. The structural adjustment requires subtle and cumbersome steps during the combined welding, resulting in extremely low insulator welding efficiency.
[0006] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0007] The purpose of the present invention is to provide a welding tool for high-voltage power transmission and transformation insulators to solve the problems raised in the background technology.
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-voltage power transmission and transformation insulator welding tool, comprising a production line chain frame, a sleeve clamp 1 is arranged on the inner side wall of the production line chain frame, and a moving block and a winding disk are arranged on the outer wall of the sleeve clamp 1, an inner clamping plate is arranged on the inner wall of the sleeve clamp 1, and a movable guard plate is arranged on the inner wall of the inner clamping plate, a beam frame 1 and a beam frame 2 are symmetrically arranged on the outer side wall of the production line chain frame, a linkage welding mechanism is arranged on the outer wall of the beam frame 1, and a parts transfer mechanical arm group is arranged on the top of the beam frame 2;
[0009] The linkage welding mechanism includes an upper telescopic cylinder arm and a lower telescopic cylinder arm, the arm end surface of the upper telescopic cylinder arm is provided with a welding mounting frame, and the arm end surface of the lower telescopic cylinder arm is provided with a tray, the top of the tray is provided with an inner locking plate, and the top of the accessory transfer robot arm group is provided with a pneumatic clamp.
[0010] Furthermore, a conveying track is arranged on the inner wall of the production line chain frame, a pressure plate is arranged on the inner wall of the middle part of the beam frame 1 and the beam frame 2, and a propulsion cylinder embedded in the frame body of the beam frame 1 and the beam frame 2 is arranged on the outer wall of the pressure plate, and a guide groove is arranged in a recessed manner on the top surface of the beam frame 2.
[0011] Furthermore, a fixed block is provided in the middle of the outer wall of the first clamp, winding disks are symmetrically provided on both sides of the fixed block, a connecting chain connected to the moving block is provided in the middle of the outer wall of the fixed block, and a second clamp with the same structure is provided side by side on the end face of the first clamp.
[0012] Furthermore, an inner arc groove is recessed on the inner wall of the inner clamp, and the movable guard plate is slidably engaged in the inner arc groove. A guide frame passing through the first and second clamps is provided on the outer wall of the inner clamp, and a traction rope staggeredly connected to the first and second clamps is provided on the end face of the inner clamp.
[0013] Furthermore, a movable base connected to the guide groove is provided at the bottom of the accessory transporting robot arm group, a rotary cylinder is provided on the top of the movable base, a lifting cylinder column is provided on the top of the rotary cylinder, and an extension cylinder arm connected to the pneumatic clamp is provided on the outer wall of the lifting cylinder column.
[0014] Furthermore, a fine-tuning cylinder is provided on the inner wall of one end of the upper telescopic cylinder arm close to the first sleeve clamp, and the fine-tuning cylinder is clamped with the outer wall of the welding mounting frame, and the welding mounting frame is located above the first sleeve clamp.
[0015] Furthermore, a lifting cylinder that penetrates the pallet is provided at the bottom of one end of the lower telescopic cylinder arm close to the sleeve clamp, and the top of the lifting cylinder is connected to the bottom of the inner locking disk. A spring guide column is sleeved at the center of the top of the inner locking disk, and a storage rack is provided on the outside of one end of the lower telescopic cylinder arm close to the pallet.
[0016] Furthermore, a pressure plate is provided on the top of the spring guide column, and a plurality of groups of inner grab rods are sleeved in a circular array on the inner wall of the edge of the inner lock plate, and a pushing rod abutting against the inner grab rod is embedded in the inner wall of the edge of the inner lock plate, and a towing rope connected to the bottom of the spring guide column is provided on the rod body of the pushing rod.
[0017] The present invention also provides a working method of a high-voltage power transmission and transformation insulator welding tool, comprising the following steps:
[0018] S1: Preparation before welding. The production line chain racks are installed according to the on-site layout requirements. The spacing between the production line chain racks near the loading and unloading areas is reduced, and the spacing between the production line chain racks in the mid-transport area is kept constant. The spacing between the production line chain racks is from large to small, which causes the gap between the clamp 1 and the clamp 2 to be relaxed, so that the external loading equipment can mechanizedly transfer the insulator to between the clamp 1 and the clamp 2;
[0019] S2: Welding pairing, the accessory transfer robot arm group slides along the guide groove surface through the mobile base, and the rotary cylinder drives the lifting cylinder column and the extension cylinder arm to rotate until the pneumatic clamp is deflected close to the metal accessory. The lifting cylinder column drives the pneumatic clamp to slide down and insert the metal accessory into the hole on the top of the insulator;
[0020] S3: Adaptive welding, the lower telescopic cylinder arm drives the tray to move along the inside of the storage rack to the bottom of the insulator, the lifting cylinder drives the inner locking plate to slide up and contact the bottom of the insulator, the spring guide column drives the drag rope to drag the pushing rod during the downward movement, the top of the pushing rod slides along the top rod body of the inner grab rod to contact the insulator, the upper telescopic cylinder arm drives the welding mounting frame to move axially close to the top of the insulator, and an adjustable angle mechanical arm rod is set in the connection area between the welding gun head and the welding mounting frame to further adjust the welding angle.
[0021] The beneficial effects of the present invention are:
[0022] The present invention connects the insulator production process through the production line chain frame, realizes the wrapped transportation of the insulator, and cooperates with the targeted welding tooling installed on the production line chain frame to realize the integrated linkage welding processing of the insulator and metal accessories, effectively avoiding the tedious steps of repeated handling, loading, welding and unloading of the insulator, improving the processing efficiency, and reducing the damage of the insulator caused by external uncontrollable factors during the transfer, forming an integrated production line processing and welding process, which is in line with the modern production concept and the production requirements of low cost, high efficiency, high quality control and high-quality finished products.
[0023] The present invention uses multiple sets of clamps and inner clamping plates in coordination with each other, and changes in the spacing between the chain frames of the production line. The multiple sets of clamps are combined with external equipment during movement to achieve the operation process of continuous feeding, centering and limiting clamping, positioning accessory installation and upper and lower coordinated welding of insulators. During welding, the inner locking disk is used to perform adaptive pressure clamping and active rotation on the insulator, and then cooperates with the welding gun head to perform comprehensive, efficient and precise welding on it, thereby greatly improving the processing efficiency of the overall insulator on the welding tooling. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a three-dimensional diagram of the overall structure of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the chain frame of the production line of the present invention;
[0027] Figure 3 It is a schematic diagram of the connection structure between the production line chain frame and the sleeve clamp 1 of the present invention;
[0028] Figure 4 This is a schematic diagram of the connection structure of the first sleeve clamp and the second sleeve clamp of the present invention;
[0029] Figure 5 It is a structural schematic diagram of the inner splint of the present invention;
[0030] Figure 6 It is a schematic diagram of the connection structure between the beam frame 2 and the accessory transfer mechanical arm group of the present invention;
[0031] Figure 7 It is a schematic diagram of the connection structure between the beam frame 1 and the linkage welding mechanism of the present invention;
[0032] Figure 8 It is a structural schematic diagram of the lower telescopic cylinder arm of the present invention;
[0033] Fig. 9 It is a structural schematic diagram of the inner locking disk of the present invention.
[0034] Figure numerals: 1. Production line chain frame; 101. Beam frame 1; 102. Pressure plate; 103. Beam frame 2; 104. Guide groove; 105. Conveying track; 2. Clamp 1; 201. Clamp 2; 202. Moving block; 203. Connecting chain; 204. Fixed block; 205. Reel; 3. Parts transfer robot arm group; 301. Moving base; 302. Rotary cylinder; 303. Lifting cylinder column; 304. Extending cylinder arm; 305. Pneumatic clamp; 4. Linked welding mechanism; 401, upper telescopic cylinder arm; 402, fine-tuning cylinder; 403, welding mounting frame; 404, lower telescopic cylinder arm; 405, storage rack; 406, tray; 407, lifting cylinder; 408, inner locking plate; 409, pressure plate; 410, spring guide column; 411, towing rope; 412, inner grab bar; 413, pushing rod; 5, inner splint; 501, movable guard plate; 502, traction rope; 503, guide frame; 504, inner arc groove. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Example 1: Please refer to Figure 1 - Figure 5 As shown, this embodiment is a high-voltage power transmission and transformation insulator welding tool, including a production line chain frame 1, a sleeve clamp 2 is arranged on the inner wall of the production line chain frame 1, and a moving block 202 and a winding disk 205 are arranged on the outer wall of the sleeve clamp 2, an inner clamping plate 5 is arranged on the inner wall of the sleeve clamp 2, and a movable guard plate 501 is arranged on the inner wall of the inner clamping plate 5;
[0037] A beam frame 101 and a beam frame 2 103 are symmetrically arranged on the outer wall of the production line chain frame 1, a linkage welding mechanism 4 is arranged on the outer wall of the beam frame 101, and a parts transfer robot arm group 3 is arranged on the top of the beam frame 2 103. The insulators waiting for welding are clamped and placed between the production line chain frames 1 through external loading equipment, and the waiting clamps 1 2 and 201 are moved closer to clamp them. The metal parts waiting for welding are transported to the vicinity of the parts transfer robot arm group 3 in an orderly manner through external feeding equipment, so that the parts transfer robot arm group 3 can clamp them one by one according to the transportation and welding process of the insulators. The production line chain frame 1 is installed according to the on-site layout requirements, and the spacing between the production line chain frames 1 near the loading and unloading areas is reduced, and the spacing between the production line chain frames 1 in the mid-transport area is kept constant.
[0038] A conveying track 105 is arranged on the inner wall of the production line chain frame 1, a pressure plate 102 is arranged on the inner wall of the middle part of the beam frame 101 and the beam frame 2 103, and a propulsion cylinder embedded in the frame body of the beam frame 101 and the beam frame 2 103 is arranged on the outer wall of the pressure plate 102, and a guide groove 104 is arranged in a concave shape on the top surface of the beam frame 2 103;
[0039] When the external loading equipment clamps and transfers the insulator to the production line chain frame 1, when the clamp 1 2 and the clamp 2 201 move along the inside of the conveying track 105 through the moving block 202 to approach the clamped insulator, the distance between the production line chain frames 1 decreases from large to small, causing the gap between the clamp 1 2 and the clamp 2 201 to relax, so that the external loading equipment can mechanizedly transfer the insulator to between the clamp 1 2 and the clamp 2 201, and locate it in the middle of the movable guard plate 501, and move with the clamp 1 2 and the clamp 2 201 at a fixed distance. During the fixed distance movement of the clamp 1 2 and the clamp 2 201, the clamp between the production line chain frames 1 returns to a constant state from small to large.
[0040] A fixed block 204 is arranged in the middle of the outer wall of the sleeve clamp 2, and winding disks 205 are symmetrically arranged on both sides of the fixed block 204. A connecting chain 203 connected to the moving block 202 is arranged in the middle of the outer wall of the fixed block 204. A sleeve clamp 201 with the same structure is arranged side by side on the end surface of the sleeve clamp 2. The sleeve clamp 2 and the sleeve clamp 201 are separated from each other, so that the sleeve clamp 2 and the sleeve clamp 201 drag the inner clamp 5 through the traction line.
[0041] The two ends of the inner clamp 5 are dragged close to each other, and the guide frame 503 slides along the upper limit of the body of the clamp 1 2 and the clamp 2 201, so as to keep the inner clamp 5 limited in movement between the clamp 1 2 and the clamp 2 201. When the edge of the insulator contacts the inner wall of the movable guard plate 501, a groove is provided on the inner wall of the movable guard plate 501, which fits the shape of the outer edge of the insulator, thereby causing the insulator to be limited in position between multiple groups of movable guard plates 501 when being wrapped and squeezed by the movable guard plate 501.
[0042] A traction chain connected to the moving block 202 is provided inside the conveying track 105, and the traction chain drives the moving block 202 to move along the conveying track 105 until the clamped insulator is moved between the beam frame 101 and the beam frame 103, and the movement of the clamp 1 2 and the clamp 2 201 is suspended, and the thrust cylinder drives the pressure plate 102 to move toward the insulator along the beam frame 101 and the beam frame 103 until the pressure plate 102 abuts against the outer walls of both sides of the clamp 1 2 and the clamp 2 201 to limit the position, and the production line chain frame 1 drags and pulls the outer walls of the two ends of the clamp 1 2 and the clamp 2 201 to limit the position, so as to realize the coordinated limitation of the peripheral multi-directional force of the insulator waiting for welding.
[0043] An inner arc groove 504 is recessed on the inner wall of the inner clamp plate 5, and the movable guard plate 501 is slidably engaged in the inner arc groove 504. A guide frame 503 that passes through the sleeve clamp 1 2 and the sleeve clamp 201 is provided on the outer wall of the inner clamp plate 5, and a traction rope 502 that is staggeredly connected to the sleeve clamp 1 2 and the sleeve clamp 201 is provided on the end face of the inner clamp plate 5.
[0044] Example 2: Please refer to Figure 6 - Fig. 9 As shown, this embodiment is a high-voltage power transmission and transformation insulator welding tool, including a linkage welding mechanism 4 including an upper telescopic cylinder arm 401 and a lower telescopic cylinder arm 404, the arm end face of the upper telescopic cylinder arm 401 is provided with a welding mounting frame 403, and the arm end face of the lower telescopic cylinder arm 404 is provided with a tray 406, and the top of the tray 406 is provided with an inner locking plate 408, and the top of the accessory transfer robot arm group 3 is provided with a pneumatic clamp 305. Before welding, the appropriate welding gun head is replaced according to the insulator model and welding steps, and the welding gun head is docked and installed with the welding mounting frame 403, and the appropriate inner locking plate 408 is replaced at the same time.
[0045] The bottom of the accessory transfer robot arm group 3 is provided with a mobile base 301 connected to the guide groove 104, the top of the mobile base 301 is provided with a rotary cylinder 302, the top of the rotary cylinder 302 is provided with a lifting cylinder column 303, and the outer wall of the lifting cylinder column 303 is provided with an extended cylinder arm 304 connected to a pneumatic clamp 305. The accessory transfer robot arm group 3 slides along the surface of the guide groove 104 through the mobile base 301;
[0046] A micromotor and a driving wheel are provided inside the mobile base 301. The micromotor contacts the inner wall of the guide groove 104 through the driving wheel, thereby driving the accessory transporting robot arm group 3 to slide along the surface of the beam frame 103. The rotary cylinder 302 drives the lifting cylinder column 303 and the extension cylinder arm 304 to rotate until the pneumatic clamp 305 is deflected close to the metal accessory. The lifting cylinder column 303 drives the extension cylinder arm 304 to move axially up and down, and the extension cylinder arm 304 drives the pneumatic clamp 305 to extend axially until the metal accessory is clamped and transported to the top of the insulator. The lifting cylinder column 303 then drives the pneumatic clamp 305 to slide down until the metal accessory is inserted into the hole at the top of the insulator.
[0047] A fine-tuning cylinder 402 is provided on the inner wall of one end of the upper telescopic cylinder arm 401 close to the sleeve clamp 2, and the fine-tuning cylinder 402 is clamped with the outer wall of the welding mounting frame 403. The welding mounting frame 403 is located above the sleeve clamp 2. The upper telescopic cylinder arm 401 drives the welding mounting frame 403 to move axially close to the top of the insulator, and the fine-tuning cylinder 402 drives the welding mounting frame 403 to slide axially up and down to adjust the connection area between the welding gun head and the metal fitting and the insulator hole. The connection area between the welding gun head and the welding mounting frame 403 is provided with an adjustable angle mechanical arm rod for further adjusting the welding angle;
[0048] At the same time, the rotating motor drives the inner locking plate 408 and the insulator to rotate according to welding requirements, and the insulator drives the movable guard plate 501 to deflect along the limit position in the inner arc groove 504, prompting the insulator to further deflect according to the welding requirements. After welding is completed, the rotating motor drives the insulator to deflect and reset.
[0049] A lifting cylinder 407 that penetrates the tray 406 is provided at the bottom of one end of the lower telescopic cylinder arm 404 close to the sleeve clamp 2, and the top of the lifting cylinder 407 is connected to the bottom of the inner locking disk 408, and a spring guide column 410 is sleeved on the center of the top of the inner locking disk 408. A storage rack 405 is provided on the outside of one end of the lower telescopic cylinder arm 404 close to the tray 406. The lower telescopic cylinder arm 404 is started first, and the lower telescopic cylinder arm 404 drives the tray 406 to move along the inside of the storage rack 405 to under the insulator. The lifting cylinder 407 drives the inner locking disk 408 to separate from the tray 406 until the inner tray 406 slides up and contacts the bottom of the insulator. The pressure plate 409 contacts the bottom of the insulator and is affected by the continuous thrust of the lifting cylinder. The pressure plate pushes the spring guide column 410 to slide down.
[0050] A pressure plate 409 is provided on the top of the spring guide column 410, and a plurality of groups of inner grab bars 412 are sleeved in a circular array on the inner wall of the edge of the inner lock plate 408, and a pushing rod 413 is sleeved in the inner wall of the edge of the inner lock plate 408 to abut against the inner grab bar 412, and a towing rope 411 connected to the bottom of the spring guide column 410 is provided on the rod body of the pushing rod 413, and the pressure plate is embedded in the surface of the inner lock plate 408, and the spring guide column 410 drives one end of the towing rope 411 during the downward movement, and a plurality of groups of guide wheels contacting the towing rope 411 are provided inside the inner lock plate 408;
[0051] The other end of the towing rope 411 is towed by the pushing rod 413, the bottom of the pushing rod 413 is hinged to the inner wall of the edge of the inner locking disk 408, and the bottom of the inner grab rod 412 is hinged to the inner wall of the edge of the inner locking disk 408. The top of the pushing rod 413 is pulled and deflected along the hinge point. The top of the pushing rod 413 slides along the top rod body of the inner grab rod 412, thereby pushing the inner grab rod 412 to deflect along the hinge point. An anti-slip rubber sleeve is provided on the outer wall of the rod body of the inner grab rod 412, which contacts the outer wall of the bottom of the insulator under force to clamp it. The top of the lifting cylinder is rotatably sleeved with the bottom of the inner locking disk 408, and a rotating motor connected to the inner locking disk 408 is embedded in the top of the lifting cylinder 407.
[0052] Combining the first embodiment and the second embodiment, it is possible to realize the wrapped transportation of the insulators and metal accessories in combination with the targeted welding tooling installed on the production line chain frame 1, thereby realizing the integrated linkage welding processing of the insulators and metal accessories, effectively avoiding the tedious steps of repeated handling, loading, welding and unloading of the insulators, improving the processing efficiency, and reducing the damage to the insulators caused by external uncontrollable factors during the transfer period, thus forming an integrated production line processing and welding process, which is in line with the modern production concept and the production requirements of low cost, high efficiency, high quality control and high-quality finished products;
[0053] It can also form multiple sets of clamps that can be combined with external equipment during movement to achieve continuous feeding, centering and limiting clamping, positioning accessory installation and upper and lower coordinated welding of insulators. During welding, the inner locking disk 408 is used to perform adaptive pressure clamping and active rotation on the insulator, and then cooperate with the welding gun head to perform comprehensive, efficient and precise welding on it, greatly improving the overall processing efficiency of the insulator on the welding tooling.
[0054] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
[0055] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0056] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A welding tool for high-voltage power transmission and transformation insulators, comprising a production line chain frame (1), characterized in that: A sleeve clamp (2) is arranged on the inner wall of the production line chain frame (1), and a moving block (202) and a winding disk (205) are arranged on the outer wall of the sleeve clamp (2), an inner clamp (5) is arranged on the inner wall of the sleeve clamp (2), and a movable guard plate (501) is arranged on the inner wall of the inner clamp (5), a beam frame (101) and a beam frame (103) are symmetrically arranged on the outer wall of the production line chain frame (1), a linkage welding mechanism (4) is arranged on the outer wall of the beam frame (101), and a parts transfer mechanical arm group (3) is arranged on the top of the beam frame (103); The linkage welding mechanism (4) comprises an upper telescopic cylinder arm (401) and a lower telescopic cylinder arm (404), the arm end surface of the upper telescopic cylinder arm (401) is provided with a welding mounting frame (403), and the arm end surface of the lower telescopic cylinder arm (404) is provided with a tray (406), the top of the tray (406) is provided with an inner locking plate (408), and the top of the accessory transfer mechanical arm group (3) is provided with a pneumatic clamp (305); A conveying track (105) is arranged on the inner wall of the production line chain frame (1), and a pressure plate (102) is arranged on the inner wall of the middle part of the beam frame 1 (101) and the beam frame 2 (103); A fixed block (204) is arranged in the middle of the outer wall of the sleeve clamp (2), and winding disks (205) are symmetrically arranged on both sides of the fixed block (204). A connecting chain (203) connected to the moving block (202) is arranged in the middle of the outer wall of the fixed block (204), and a sleeve clamp (201) with the same structure is arranged side by side on the end face of the sleeve clamp (2), and a traction rope (502) staggeredly connected to the sleeve clamp (2) and the sleeve clamp (201) is arranged on the end face of the inner clamp plate (5).
2. A high-voltage power transmission and transformation insulator welding tool according to claim 1, characterized in that: The outer wall of the pressure plate (102) is provided with a propulsion cylinder embedded in the frame of the first beam (101) and the second beam (103), and the top surface of the second beam (103) is concavely provided with a guide groove (104).
3. A high-voltage power transmission and transformation insulator welding tool according to claim 1, characterized in that: An inner arc groove (504) is recessed on the inner wall of the inner clamping plate (5), and the movable guard plate (501) is slidably engaged in the inner arc groove (504). A guide frame (503) that penetrates the first clamp (2) and the second clamp (201) is provided on the outer wall of the inner clamping plate (5).
4. A high-voltage power transmission and transformation insulator welding tool according to claim 2, characterized in that: The bottom of the accessory transfer robot arm group (3) is provided with a movable base (301) connected to the guide groove (104), the top of the movable base (301) is provided with a rotary cylinder (302), the top of the rotary cylinder (302) is provided with a lifting cylinder column (303), and the outer wall of the lifting cylinder column (303) is provided with an extension cylinder arm (304) connected to a pneumatic clamp (305).
5. The high-voltage power transmission and transformation insulator welding tool according to claim 1 is characterized in that: A fine-tuning cylinder (402) is provided on the inner wall of one end of the upper telescopic cylinder arm (401) close to the sleeve clamp (2), and the fine-tuning cylinder (402) is clamped with the outer wall of the welding mounting frame (403), and the welding mounting frame (403) is located above the sleeve clamp (2).
6. A high-voltage power transmission and transformation insulator welding tool according to claim 5, characterized in that: A lifting cylinder (407) penetrating the tray (406) is arranged at the bottom of one end of the lower telescopic cylinder arm (404) close to the sleeve clamp (2), and the top of the lifting cylinder (407) is connected to the bottom of the inner locking plate (408), and a spring guide column (410) is sleeved at the center of the top of the inner locking plate (408), and a storage rack (405) is arranged on the outside of one end of the lower telescopic cylinder arm (404) close to the tray (406).
7. A high-voltage power transmission and transformation insulator welding tool according to claim 6, characterized in that: A pressure plate (409) is arranged on the top of the spring guide column (410), a plurality of groups of inner grab bars (412) are sleeved in a circular array on the inner wall of the edge of the inner lock plate (408), and a pushing rod (413) abutting against the inner grab bar (412) is sleeved in the inner wall of the edge of the inner lock plate (408), and a towing rope (411) connected to the bottom of the spring guide column (410) is arranged on the rod body of the pushing rod (413).