Pumped storage project field survey method, server and system

By planning and managing survey routes and optimizing the survey process, the problem of low efficiency in field surveys of pumped hydro energy storage projects has been solved, the work efficiency of survey personnel and the quality of survey results have been improved, and safety assurance has been enhanced.

CN118863201APending Publication Date: 2024-10-29POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410962004.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The efficiency of field surveys of pumped storage projects is low, resulting in long pre-preparation, in-process collection, and post-analysis work chains, multiple contents, heavy workloads, and low efficiency.

Method used

By obtaining the survey projects, survey points, starting points and transfer points uploaded by the operation terminal, plan the survey path and transmit the path to the handheld terminal, receive and organize survey information, generate survey reports, optimize the survey process, and reduce unnecessary path movements , centrally manage and organize survey information, and improve the work efficiency of survey personnel.

Benefits of technology

It greatly improves the work efficiency of survey personnel, ensures that survey work is completed within a reasonable time, improves the systematicness and coherence of survey work, and provides more comprehensive geographical and environmental information through aerial photography data and positioning modules, enhancing survey results. quality and safety assurance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863201A_ABST
    Figure CN118863201A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pumped storage engineering survey, and discloses a pumped storage engineering field survey method, server and system, and the method comprises the steps: obtaining a survey project, survey points, a starting point, an end point and a transfer point uploaded by an operation terminal, and enabling one survey project to correspond to one or more survey points; planning a survey path according to the survey project, the survey point, the survey starting point, the survey ending point and the survey transfer point; transmitting the survey path to a handheld terminal; survey information uploaded by the handheld terminal in the survey period is received; the survey information uploaded by the handheld terminal is organized, and a survey report is generated. The survey process can be optimized, unnecessary path movement is reduced, the survey information is managed and organized in a centralized mode, follow-up analysis and archiving are facilitated, and the working efficiency of survey personnel is greatly improved in the front, middle and later periods of survey of the user.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pumped storage engineering survey, and in particular to a method, server and system for field survey of a pumped storage engineering. Background Art

[0002] Pumped storage power stations are an important part of the power system. They can generate electricity to serve as power sources for the grid and use electricity to charge grid loads.

[0003] In the early planning and design of pumped storage projects, it is generally necessary to arrange relevant personnel to go to the site for field surveys to collect actual information about the project area, facilitate the analysis of the actual construction conditions of the project, and carry out related technical work. For projects located in the wild and mountainous areas, the project conditions are complex, there are many factors to be analyzed and judged, and many people are involved. The work chain of pre-investigation preparation, in-process collection, and post-investigation analysis is long, with many contents and heavy workload, resulting in low efficiency of engineering surveys. Summary of the invention

[0004] In view of this, the present invention provides a method, server and system for field survey of pumped storage projects to solve the technical problem of low efficiency of field survey of existing pumped storage projects.

[0005] In a first aspect, the present invention provides a method for field survey of a pumped-storage project, comprising: obtaining a survey project, survey points, a starting point, an end point and a transfer point uploaded by an operating terminal, wherein one survey project corresponds to one or more survey points; planning a survey route according to the survey project, survey points, the starting point, the end point and the transfer point of the survey; transmitting the survey route to a handheld terminal; receiving survey information uploaded by the handheld terminal during the survey; and organizing the survey information uploaded by the handheld terminal to generate a survey report.

[0006] In the present invention, by acquiring the survey project, survey point, starting point, end point and transfer point uploaded by the operation terminal, a survey path is planned according to the survey project, survey point, starting point, end point and transfer point of the survey, the survey path is transmitted to the handheld terminal, the survey information uploaded by the handheld terminal during the survey is received, the survey information uploaded by the handheld terminal is sorted, and a survey report is generated. By generating a survey path, recording survey information and automatically generating a survey report, the survey process is optimized, unnecessary path movement is reduced, and the survey information is centrally managed and sorted to facilitate subsequent analysis and archiving. This is carried out throughout the pre-, mid- and post-stages of the user's survey, greatly improving the work efficiency of the surveyors.

[0007] Optionally, a survey route is planned according to the survey project, survey points, starting points, end points and transfer points, including: calculating the distance and time between any two of all survey points, starting points, end points and transfer points in combination with road network information; traversing all transfer points and survey points from the starting point to the end point, and passing through each transfer point and survey point only once, and generating all initial routes using an exhaustive approach; calculating the total survey time and the time of entering each survey point corresponding to each of the initial routes according to the distance and time between any two of the points; sorting all of the initial routes from small to large according to the total survey time; and checking one by one whether the time of entering each survey point in each of the initial routes meets the preset requirements according to the sorting results. If the preset requirements are met, the corresponding initial route is used as the survey route.

[0008] In this method, the most time-saving survey route is found through calculation and sorting, and the survey work is ensured to be completed within a reasonable time.

[0009] Optionally, before respectively calculating the total survey time corresponding to each of the initial routes and the time of entering each survey point based on the distance and time between any two points, it also includes: judging whether each of the initial routes meets the project continuity based on the survey project and its corresponding survey points, and removing the initial routes that do not meet the project continuity.

[0010] In this method, the initial route that does not meet the continuity of the project is removed, so that the survey work can be carried out according to the planned survey route to ensure the continuity of the project.

[0011] Optionally, judging whether each of the initial routes meets the engineering continuity is performed based on the survey projects and their corresponding survey points, including: judging whether each of the initial routes first passes through all of the survey points corresponding to the current survey project and then passes through the survey points corresponding to the next survey project; if it first passes through all of the survey points corresponding to the current survey project and then passes through the survey points corresponding to the next survey project, then the initial route meets the engineering continuity; if it passes through the survey points corresponding to the next survey project before passing through all of the survey points corresponding to the current survey project, then the initial route does not meet the engineering continuity.

[0012] In this approach, it is ensured that the survey path complies with engineering logic, thereby improving the systematicness and consistency of the survey work.

[0013] In a second aspect, the present invention provides a server, which is used to execute the field survey method for pumped storage projects as described in the first aspect of the present invention.

[0014] In a third aspect, the present invention provides a field survey system for a pumped-storage project, comprising: an operation terminal, a handheld terminal and a server as described in the second aspect of the present invention, wherein the operation terminal comprises an information entry module, and the handheld terminal comprises an information collection module; the information entry module is used to enter the survey project, survey points, starting points, end points and transfer points and upload the entered information to the server; the information collection module is used to collect survey information during the survey and upload the survey information to the server.

[0015] Optionally, the pumped-storage project field survey system further includes an aerial photography unit, and the handheld terminal further includes an aerial photography device control module; the aerial photography unit is used to collect aerial photography data; and the aerial photography device control module is used to control the aerial photography unit to collect aerial photography data.

[0016] The collection of aerial data provides more comprehensive geographical and environmental information for the survey.

[0017] Optionally, the handheld terminal also includes a positioning module, a communication module and an alarm module; the positioning module is used to collect positioning information; the communication module is used to communicate with other handheld terminals; the alarm module is used to generate an alarm signal, and send the alarm signal and positioning information to other handheld terminals through the communication module.

[0018] This method can provide members of the survey team with a convenient way to ask for help, greatly improving the safety and security of field surveys.

[0019] Optionally, the server includes a storage module, a path planning module and a three-dimensional view generation module; the storage module is used to store the received data; the path planning module is used to plan the survey path according to the survey project, survey points, survey starting point, end point and transfer point, and publish the survey path to each of the handheld terminals; the three-dimensional view generation module is used to draw a survey three-dimensional view and a path map according to the survey situation, and summarize and display the survey three-dimensional view and the path map.

[0020] This method can significantly improve the quality of survey results.

[0021] Optionally, the operation terminal also includes a team configuration module and a professional data input module; the team configuration module is used to input surveyor information and handheld terminal information, establish an association between the surveyor and the handheld terminal, and match work content for the surveyor based on the surveyor information; the professional data input module is used to input professional data.

[0022] This method optimizes the configuration and management of survey personnel, improves work efficiency, and the input of professional data provides necessary data support for the survey work. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 It is a schematic diagram of a flow chart of a method for field investigation of a pumped storage project according to an embodiment of the present invention;

[0025] Figure 2 It is a schematic structural diagram of a pumped storage project field survey system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0027] In order to improve the efficiency of field investigation of pumped storage projects, an embodiment of the present invention provides a method for field investigation of pumped storage projects.

[0028] According to an embodiment of the present invention, an embodiment of a field survey method for a pumped storage project is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0029] In this embodiment, a method for field investigation of a pumped storage project is provided, which is applied to a server. Figure 1 is a flow chart of a method for field investigation of a pumped storage project according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0030] Step S101, obtaining the survey project, survey points, starting point, end point and transfer point uploaded by the operation terminal, wherein one survey project corresponds to one or more survey points.

[0031] Specifically, before field survey, users input survey projects and survey points through the operation terminal. Survey projects refer to pumped storage power stations, and survey points refer to the points that need to be surveyed in each power station. Survey points include the location of the upper and lower reservoir dam sites, the location of the water inlet / outlet, the location of the reservoir area, the flood sensitive points upstream of the reservoir, and the flood control sensitive points downstream of the reservoir, and input the work content at each survey point. Transit points are places for meals and rest during the journey.

[0032] There can be one or more survey projects and survey points. There are two ways to enter them: one is to connect with other systems through interfaces, and the other is to enter manually. When entering, the survey project and survey point are associated.

[0033] For each survey point, you need to mark the points that need to be actually reached by personnel and the points that need to be photographed by aerial photography. For the points that need to be visited by personnel, select which professional or professionals are needed to go there. In addition, you also need to set the locations of the survey's starting point, end point, and transfer point.

[0034] Step S102, planning a survey route according to the survey project, survey points, survey starting point, end point and transfer point.

[0035] Specifically, the server plans the optimal survey route based on information such as the survey project, survey points, survey starting point, end point and transfer point.

[0036] Step S103, transmitting the survey route to the handheld terminal.

[0037] Specifically, the server sends the survey path to each handheld terminal, and the surveyor checks the survey path through the handheld terminal and surveys each point in turn according to the survey path. If the survey points in the survey path need to be photographed by aerial photography, the survey path can also be sent to the aerial photography unit synchronously.

[0038] Step S104, receiving the survey information uploaded by the handheld terminal during the survey.

[0039] Specifically, during the survey of each survey point, the user uses the handheld terminal to record the on-site survey information according to the needs of the on-site survey. The survey information includes images, videos, audio recordings, text, and the survey personnel who recorded the information and their codes, etc. The handheld terminal automatically uploads the survey information to the server.

[0040] For example, aerial images and videos can be collected through the aerial photography unit. The aerial photography unit uses a drone, which controls the drone to fly around the survey point to take aerial photos, and the data is uploaded to the server. The user can use a handheld terminal to adjust the fly-around point and the aerial photography angle. The drone flight route planning method is: according to the preset flight points and the principle of shortest total flight time, the flight route is planned. The drone must take aerial photos of the topography of the reservoir, the topography and geology near the inlet / outlet, and the submerged objects in the upper and lower reservoir areas.

[0041] The survey information recorded by the handheld terminals of all users conducting field surveys will be automatically synchronized to the server. Each time a survey point is reached and the aforementioned survey content is completed, it is marked as completed, and the server has a record of all survey information.

[0042] Step S105, sorting out the survey information uploaded by the handheld terminal and generating a survey report.

[0043] Specifically, after the field survey is completed, the server automatically organizes all the survey data, including: survey routes (planned routes and actual routes) and survey points and corresponding records (including photos, text, recordings, etc.), and finally generates a survey report based on the preset survey report template and the data during the survey.

[0044] In an embodiment of the present invention, by obtaining the survey project, survey point, starting point, end point and transfer point uploaded by the operation terminal, the survey path is planned according to the survey project, survey point, starting point, end point and transfer point of the survey, the survey path is transmitted to the handheld terminal, the survey information uploaded by the handheld terminal during the survey is received, the survey information uploaded by the handheld terminal is sorted, and a survey report is generated. By generating a survey path, recording the survey information and automatically generating a survey report, the survey process is optimized, unnecessary path movements are reduced, and the survey information is centrally managed and sorted to facilitate subsequent analysis and archiving, and it runs through the user's pre-, mid- and post-survey period, greatly improving the work efficiency of the survey personnel.

[0045] In one embodiment, step S102, planning a survey route according to the survey project, survey points, starting point, end point and transfer point, includes:

[0046] Step S1021, calculate the distance and time between every two points in all survey points, starting points, end points and transfer points in combination with the road network information.

[0047] Specifically, the road network information is obtained, and the distance and time between each two points are calculated for the starting point, the end point, the transfer point and all the survey points. For the points that are not connected to the road network, the walking arrival time is calculated.

[0048] Step S1022, starting from the starting point and ending at the end point, traversing all transfer points and survey points, and each transfer point and survey point is passed only once, and all initial routes are generated using an exhaustive approach.

[0049] The initial route includes all paths that can complete the survey work, and the entire initial route is obtained by traversing all transfer points and survey points.

[0050] Step S1023, calculating the total survey time corresponding to each initial route and the time to enter each survey point according to the distance and time between each point.

[0051] Based on the survey start time of the starting point, such as 9:00 in the morning, the total survey time of all initial routes is calculated.

[0052] Specifically, the total survey time = the sum of the time between any two points on the initial route + the survey time at the point. The survey time can be estimated manually.

[0053] Calculate the time of entering and leaving each survey point in turn. The entry time is the time of arriving at the survey point, and the exit time is the time of leaving the survey point. The exit time = entry time + survey time at the point.

[0054] Calculate the time of entering and leaving each survey project. The time of entering the survey project is the time of first arriving at the survey point corresponding to the survey project. The time of leaving is the time of passing through all the survey points of the survey project and leaving the last corresponding survey point of the survey project.

[0055] Step S1024, sorting all initial routes from small to large according to the total survey time.

[0056] Step S1025, checking one by one whether the time of entering each survey point in each initial route meets the preset requirements according to the sorting results, and if the preset requirements are met, the corresponding initial route is used as the survey path.

[0057] According to the sorting results, check the arrival time of the survey points corresponding to each survey project in each initial route one by one. If the arrival time does not meet the preset requirements, the initial route will not be selected, otherwise it will be selected. Because there are many uncertainties in the survey work itinerary, specific time requirements often appear. For example, survey points in remote places with difficult roads should be placed in the front. Before starting to plan the route, you need to first select whether each survey project has a time requirement. If so, you need to set the requirement, such as 14:00. Finally, output the survey path and the corresponding itinerary information.

[0058] Through the above method, the survey route can be planned systematically and efficiently, which directly improves the efficiency of the survey trip, while also improving the safety of the survey and the quality of the survey results.

[0059] Furthermore, before calculating the total survey time corresponding to each initial route and the time of entering each survey point respectively according to the distance and time between two points in step S1023, the method further includes:

[0060] Step a1, judging whether each initial route meets the engineering continuity according to the survey project and its corresponding survey points, and removing the initial routes that do not meet the engineering continuity.

[0061] Specifically, determine whether each initial route first passes through all the survey points corresponding to the current survey project and then passes through the survey points corresponding to the next survey project; if it passes through all the survey points corresponding to the current survey project and then passes through the survey points corresponding to the next survey project, the initial route meets the project continuity; if it passes through the survey points corresponding to the next survey project without passing through all the survey points corresponding to the current survey project, the initial route does not meet the project continuity.

[0062] For example, a certain survey project, namely a power station, requires surveying three survey points. If these three survey points are reached consecutively in the survey route, the project continuity is satisfied.

[0063] By removing initial routes that do not meet engineering continuity, we ensure that the survey path is consistent with engineering logic and improve the systematicness and consistency of the survey work.

[0064] Furthermore, during the survey, users may adjust the survey points and survey time requirements as needed. After making adjustments using a handheld terminal device, the server re-plans the survey path: using the adjusted location as a new starting point, and the subsequent new points and information to be surveyed as boundary conditions, a new route is re-planned, and the planned new route is automatically connected to the completed survey path.

[0065] Survey members can communicate with each other through handheld terminals, including voice, video, text and other modes, and can share location information with each other. When encountering danger or emergency, users can use the one-key alarm function, and the system will send the user's location and alarm signal to the handheld terminals of all users in the survey team to help the alarming user seek help.

[0066] Before and after the survey, the information recorded during the survey can be displayed through a display unit such as an LCD screen, and the team can be organized to carry out report planning.

[0067] The present invention also provides a server, which is used in the field survey method for pumped storage projects in the above embodiment.

[0068] The embodiment of the present invention also provides a pumped storage project field survey system, such as Figure 2As shown, the system includes: an operation terminal, a handheld terminal and the server in the above embodiment, the operation terminal includes an information entry module, and the handheld terminal includes an information collection module; the information entry module is used to enter the survey project, survey points, starting points, end points and transfer points and upload the entered information to the server; the information collection module is used to collect survey information during the survey and upload the survey information to the server.

[0069] Specifically, the field survey system for pumped storage projects also includes an aerial photography unit and a display unit. The aerial photography unit is used to collect aerial photography data, such as images or videos, and the aerial photography unit is one or more drone devices. The display unit is an audio / video display device such as a large screen, and the information during the survey is displayed in real time through the display unit.

[0070] The server is deployed in the cloud and includes a storage module, a path planning module, and a 3D view generation module.

[0071] The operation terminal and handheld terminal upload various data to the server, which stores the data through the storage module. The path planning module automatically plans the survey path according to the input starting point, end point and survey point information, sends it to the storage module for storage, and publishes it to each handheld terminal and aerial photography unit. The three-dimensional view generation module automatically draws the survey three-dimensional view and path map according to the survey situation, and the survey results are well summarized and displayed, which can significantly improve the quality of the survey results.

[0072] The operation terminal can be a microcomputer device, which also includes a team configuration module, a professional data input module and a display module. The team configuration module is used to input surveyor information and handheld terminal information, establish an association between surveyors and handheld terminals, and match work content for surveyors based on surveyor information; the professional data input module is used to input professional data.

[0073] Specifically, the team configuration module is used to input surveyor information, profession, and code, input handheld terminals, codes, and aerial photography units, and establish a one-to-one association between surveyors and handheld terminals, and an association between aerial photography units and all surveyors. The work content at each point is matched according to the profession of the surveyor. For example, geology professionals survey the topographic and geological conditions at the dam site and reservoir area, and planning professionals survey the objects affected by flooding and water and sand conditions. Through the operation terminal, the technical staff uses the professional data input module to input professional data, such as water energy parameters, regional geological maps, and environmental restrictive factor vector data.

[0074] The handheld terminal is a dedicated mobile device, and there are multiple handheld terminals. The handheld terminal includes a positioning module, an information collection module, a communication module, an aerial photography equipment control module, an alarm module and a display module.

[0075] The aerial photography equipment control module is used to control the aerial photography unit to collect aerial photography data.

[0076] The collection of aerial data provides more comprehensive geographic and environmental information for the survey, and the survey information can be intuitively displayed through the display unit.

[0077] The positioning module is used to collect positioning information;

[0078] The communication module is used to communicate with other handheld terminals;

[0079] The alarm module is used to generate an alarm signal and send the alarm signal and positioning information to other handheld terminals through the communication module.

[0080] Survey members can communicate with each other through the communication module, including voice, video, text and other modes, and can share location information with each other. When encountering danger or emergency, users can use the alarm module to make an alarm with one click. The system will send the user's location and alarm signal to the handheld terminals of all users in the survey team to help the alarming user seek help.

[0081] The embodiment of the present invention can provide a convenient way for members of the survey team to ask for help by setting up an alarm module, thereby greatly improving the safety and security of field surveys.

[0082] In one example, the information collection module includes a voice collection submodule, a video collection submodule, an image collection submodule and a text collection submodule, and the voice collection submodule, the video collection submodule, the image collection submodule and the text collection submodule are respectively used to collect corresponding information.

[0083] The pumped storage project field survey system of the embodiment of the present invention has the following advantages:

[0084] First, the field survey system for pumped storage projects can be used before, during and after the user's survey, greatly improving the work efficiency of surveyors, and can help surveyors conveniently record and save a lot of information during the survey to avoid forgetting;

[0085] Second, the alarm module can provide members of the survey team with a convenient way to ask for help, greatly improving the safety and security of field surveys;

[0086] Third, it can significantly improve the quality of survey results. The 3D view generation module automatically draws the survey 3D view and path map based on the survey situation, and summarizes and displays the survey results well.

[0087] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0088] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0089] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for field investigation of a pumped storage project, characterized in that: include: Obtain the survey project, survey points, starting point, end point and transfer point uploaded by the operation terminal, where one survey project corresponds to one or more survey points; Plan the survey route according to the survey project, survey points, survey starting point, end point and transfer point; transmitting the survey route to a handheld terminal; receiving survey information uploaded by the handheld terminal during the survey; The survey information uploaded by the handheld terminal is sorted out to generate a survey report.

2. The method for field investigation of a pumped storage project according to claim 1, characterized in that: Plan the survey route according to the survey project, survey points, starting point, end point and transfer point, including: Combined with the road network information, calculate the distance and time between each of the survey points, starting points, end points and transfer points; From the starting point to the end point, all transfer points and survey points are traversed, and each transfer point and survey point is passed only once, and all initial routes are generated using an exhaustive approach; Calculate the total survey time and the time to enter each survey point corresponding to each of the initial routes according to the distance and time between the two points; Sort all the initial routes from small to large according to the total survey time; According to the sorting results, it is checked one by one whether the time of entering each survey point in each initial route meets the preset requirements. If the preset requirements are met, the corresponding initial route is used as the survey path.

3. The method for field investigation of a pumped storage project according to claim 2, characterized in that: Before respectively calculating the total survey time corresponding to each of the initial routes and the time of entering each survey point according to the distance and time between two points, the method further includes: Whether each of the initial routes meets the engineering continuity requirement is determined based on the survey project and its corresponding survey points, and the initial routes that do not meet the engineering continuity requirement are removed.

4. The method for field investigation of a pumped storage project according to claim 3, characterized in that: Judging whether each of the initial routes meets the engineering continuity requirement according to the survey project and its corresponding survey point includes: Determine whether each of the initial routes first passes through all the survey points corresponding to the current survey project and then passes through the survey point corresponding to the next survey project; If the initial route first passes through all the survey points corresponding to the current survey project and then passes through the survey points corresponding to the next survey project, the initial route satisfies the project continuity. If the initial route passes through the survey points corresponding to the next survey project before passing through all the survey points corresponding to the current survey project, the initial route does not satisfy the project continuity.

5. A server, characterized in that: The server is used to execute the field survey method for pumped storage projects as described in any one of claims 1 to 4.

6. A field survey system for a pumped storage project, characterized in that: include: An operation terminal, a handheld terminal and a server as claimed in claim 5, wherein the operation terminal comprises an information entry module and the handheld terminal comprises an information collection module; The information input module is used to input the survey project, survey points, starting point, end point and transfer point and upload the input information to the server; The information collection module is used to collect survey information during the survey and upload the survey information to the server.

7. The pumped storage project field survey system according to claim 6, characterized in that: The pumped storage project field survey system also includes an aerial photography unit, and the handheld terminal also includes an aerial photography equipment control module; The aerial photography unit is used to collect aerial photography data; The aerial photography equipment control module is used to control the aerial photography unit to collect aerial photography data.

8. The field survey system for pumped storage projects according to claim 6, characterized in that: The handheld terminal also includes a positioning module, a communication module and an alarm module; The positioning module is used to collect positioning information; The communication module is used to communicate with other handheld terminals; The alarm module is used to generate an alarm signal, and send the alarm signal and positioning information to other handheld terminals through the communication module.

9. The pumped storage project field survey system according to claim 6, characterized in that: The server comprises a storage module, a path planning module and a three-dimensional view generation module; The storage module is used to store the received data; The path planning module is used to plan the survey path according to the survey project, survey points, survey starting point, end point and transfer point, and publish the survey path to each of the handheld terminals; The three-dimensional view generation module is used to draw a survey three-dimensional view and a path map according to the survey situation, and summarize and display the survey three-dimensional view and the path map.

10. The pumped storage project field survey system according to claim 6, characterized in that: The operation terminal also includes a team configuration module and a professional data input module; The team configuration module is used to input surveyor information and handheld terminal information, establish association between surveyors and handheld terminals, and match work content for surveyors according to surveyor information; The professional data input module is used to input professional data.