Digital building auxiliary construction method of building decoration component and digital system

By integrating CAD, CNC equipment and AR technology, the entire process of building decoration components is digitized and automated, solving the problems of efficiency, precision and quality control in traditional construction methods, and improving the level of intelligence and informatization in construction.

CN118863802APending Publication Date: 2024-10-29SHANGHAI JINMAO BUILDING DECORATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411079281.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Traditional building decoration construction methods have problems such as low construction efficiency, poor accuracy, difficult quality control, and low informatization. The existing digital construction methods lack system integration, real-time monitoring and feedback capabilities, and have limited intelligence levels.

Method used

Using integrated computer-aided design (CAD), CNC equipment, holographic projection and augmented reality (AR) technology, the entire process from design to installation is digitized and automated through digital design, automated manufacturing, real-time monitoring and data feedback.

Benefits of technology

It improves construction efficiency and precision, strengthens quality control, realizes intelligent management and information sharing of the construction process, reduces rework rates, and improves the transparency and reliability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863802A_ABST
    Figure CN118863802A_ABST
Patent Text Reader

Abstract

The invention relates to a digital building auxiliary construction method of a building decoration component, which comprises the following steps of: performing digital design of the building decoration component through computer aided design software to generate a three-dimensional model and a construction drawing; transmitting the three-dimensional model and the construction drawing to a digital construction system; automatically manufacturing the building decoration component according to the three-dimensional model; a constructor is assisted in positioning and mounting the component; the progress and quality of a construction site are monitored in real time through a sensor and monitoring equipment, and data are fed back to the digital management platform; and according to real-time monitoring data, a construction report and a quality detection report are automatically generated to guide subsequent construction and maintenance work. The auxiliary construction method is high in integration level, high in real-time monitoring and feedback capacity and high in intelligent level, can improve the construction efficiency, precision and quality when being applied to digital building auxiliary construction of building decoration components, and achieves comprehensive digitization and intelligentization of building decoration construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering, and in particular to a digital construction auxiliary construction method and a digital system for building decorative components. Background Art

[0002] With the development of modern construction industry, architectural decoration has become a key link to improve the aesthetics and functionality of buildings. However, traditional architectural decoration construction methods have many shortcomings and cannot meet the current complex and changing design requirements and high-efficiency and high-quality construction requirements.

[0003] At present, traditional building decoration construction methods mainly rely on manual operation and on-site construction, which have the following defects:

[0004] 1. Low construction efficiency: Traditional construction methods rely on a lot of manual operations, and the process is cumbersome and time-consuming, which makes it difficult to meet the strict requirements of modern building decoration projects on the construction period. A lot of measurement, cutting and adjustment work is required on the construction site, resulting in low construction efficiency.

[0005] 2. Poor construction accuracy: Due to reliance on manual operation, construction accuracy is difficult to guarantee, especially when dealing with decorative components with complex shapes and high precision requirements, dimensional deviations and installation errors are prone to occur, affecting the decorative effect and structural safety.

[0006] 3. Difficult quality control: Traditional construction methods lack systematic quality control measures, and quality inspection mainly relies on manual experience, making it difficult to achieve quality monitoring and management throughout the entire process, which can easily lead to uneven construction quality and a high rework rate.

[0007] 4. Low level of informatization: Traditional construction methods have a low level of informatization. Construction data mainly relies on manual recording and management. Information transmission and sharing are inefficient, making it difficult to achieve comprehensive digital management of the construction process.

[0008] In order to solve the above problems, the construction industry has gradually introduced digital technology and intelligent equipment in recent years to promote the modernization of building decoration construction. The existing digital construction methods mainly include the following categories:

[0009] Computer-aided design (CAD): Use CAD software to design and draw architectural decoration components, generate detailed three-dimensional models and construction drawings, and improve design accuracy and efficiency.

[0010] Building Information Model (BIM): BIM technology establishes an information model of the entire life cycle of a building, enables data sharing and collaborative work in the design, construction, operation and maintenance stages, and improves project management efficiency and construction quality.

[0011] CNC equipment: Use CNC machine tools, laser cutting machines, 3D printers and other equipment to automate the manufacturing of building decoration components, improve manufacturing accuracy and efficiency, and reduce manual errors.

[0012] Augmented reality (AR) and holographic projection: AR and holographic projection technologies assist construction workers in accurate positioning and installation by projecting the positioning information of three-dimensional models on the construction site, thereby improving construction accuracy and efficiency.

[0013] Although these digital technologies have improved the defects of traditional construction methods to a certain extent, the current digital construction methods and systems still have the following shortcomings:

[0014] Low system integration: Existing digital construction technologies and equipment are mostly single-function and lack system integration, making it difficult to achieve seamless connection and collaborative work throughout the entire process of design, manufacturing, installation, and monitoring.

[0015] Insufficient real-time monitoring and feedback: Existing monitoring methods are mostly post-detection, lacking real-time monitoring and feedback mechanisms, and unable to promptly detect and correct deviations and problems in the construction process.

[0016] Limited level of intelligence: Existing digital construction systems are mostly auxiliary tools with limited intelligence levels. They lack autonomous decision-making and optimization capabilities, making it difficult to achieve automated and intelligent management of the construction process.

[0017] Therefore, there is an urgent need for a digital construction auxiliary construction method and system for building decoration components with high integration, strong real-time monitoring and feedback capabilities, and high intelligence level, so as to improve construction efficiency, accuracy and quality and realize the comprehensive digitalization and intelligence of building decoration construction. Summary of the invention

[0018] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a digital construction auxiliary construction method and system for building decoration components with high integration, strong real-time monitoring and feedback capabilities, and high intelligence level. Its purpose is to improve construction efficiency, the quality and precision of building decoration, so as to keep up with the current development trend of comprehensive digitalization and intelligence in the construction and decoration industry and meet the goals of digital decoration and intelligent decoration.

[0019] Based on the above invention objectives, the present invention first proposes a digital construction auxiliary construction method for building decoration components, comprising the following steps:

[0020] a) Use computer-aided design (CAD) software to digitally design building decoration components and generate three-dimensional models and construction drawings;

[0021] b) Transmit the designed 3D model and construction drawings to the digital construction system through the network;

[0022] c) Automated manufacturing of building decoration components based on three-dimensional models using CNC machine tools, laser cutting machines or 3D printers;

[0023] d) Use holographic projection, augmented reality (AR) and other technologies to assist construction workers in positioning and installing components;

[0024] e) Use sensors and monitoring equipment to monitor the progress and quality of the construction site in real time and feed the data back to the digital management platform;

[0025] f) Automatically generate construction reports and quality inspection reports based on real-time monitoring data to guide subsequent construction and maintenance work.

[0026] As a preferred technical solution of the present invention, the three-dimensional model in step a) includes the following data:

[0027] Component geometric dimension data;

[0028] Component material data;

[0029] Component connection node data;

[0030] Surface treatment and decorative effect data of components.

[0031] As a preferred technical solution of the present invention, the automated manufacturing in step c) includes:

[0032] Use CNC machine tools for precise cutting and processing;

[0033] Use laser cutting machines to cut complex shapes;

[0034] Use 3D printing technology to manufacture components with complex structures and shapes;

[0035] Automatically adjust equipment parameters according to the 3D model to ensure manufacturing accuracy.

[0036] As a preferred technical solution of the present invention, the holographic projection and augmented reality technology in step d) includes:

[0037] The positioning information of the three-dimensional model is projected on the construction site through holographic projection equipment to assist construction workers in accurate positioning;

[0038] The installation location and operation guide of the components, including installation steps and precautions, are displayed in real time through AR glasses;

[0039] Interact with the AR system through gesture recognition or voice control to get instant help and guidance.

[0040] As a preferred technical solution of the present invention, the monitoring system in step e) includes:

[0041] Progress monitoring module, which records construction progress in real time and generates progress reports;

[0042] The quality monitoring module detects the installation accuracy and quality of components in real time, including flatness, verticality, connection tightness, etc.

[0043] The data feedback module uploads monitoring data to the digital management platform in real time and provides visual data analysis tools.

[0044] On the basis of the construction implementation method, the present invention also proposes a digital system for building decoration components, including:

[0045] Computer-aided design (CAD) software module for digital design of components;

[0046] Data transmission module, used to transmit design data to the construction system through the network;

[0047] CNC machine tools, laser cutting machines and 3D printers for automated manufacturing of components;

[0048] Holographic projection equipment and AR glasses are used to assist in the positioning and installation of components;

[0049] Sensors and monitoring equipment to monitor construction progress and quality in real time;

[0050] Digital management platform for data management and monitoring.

[0051] As a preferred technical solution of the present invention, a digital management platform is also included, which includes:

[0052] Data management module, used to store and manage all data in the design, manufacturing and installation processes;

[0053] Monitoring and management module, used to monitor the progress and quality of the construction site in real time;

[0054] The alarm module sends out an alarm signal and provides solution suggestions when construction deviations or quality problems are detected;

[0055] The data analysis module uses big data analysis technology to analyze construction data and optimize construction processes and quality control.

[0056] As a preferred technical solution of the present invention, the sensor includes:

[0057] Laser distance measuring sensor, used to detect the installation accuracy of components;

[0058] Temperature sensors and humidity sensors to monitor the conditions of the construction environment;

[0059] Vibration sensors are used to monitor the operating status of equipment during construction;

[0060] Image sensors are used to capture images and videos of construction sites in real time for visual analysis and quality inspection.

[0061] As a preferred technical solution of the present invention, the holographic projection device and AR glasses determine the installation position of the component by the following formula:

[0062] P install =P model +△P

[0063] Among them, P install is the actual installation position of the component, P model is the designed position in the 3D model, and ΔP is the deviation value calibrated in real time, which is determined by sensor data and visual analysis.

[0064] As a preferred technical solution of the present invention, a construction progress prediction module is also included to predict the construction completion time by the following formula:

[0065]

[0066] Among them, T complete is the estimated construction completion time, T start is the construction start time, D total is the total construction workload in hours, R avg is the average construction rate, expressed in work completed per hour, calibrated and optimized using historical data and real-time monitoring data.

[0067] Based on the above technical solution, the patent of this invention has achieved the following beneficial effects through practical application:

[0068] 1. Improve construction efficiency and precision: This invention realizes the digitization and automation of the entire process of design, manufacturing and installation of building decoration components by integrating computer-aided design (CAD), CNC manufacturing, augmented reality (AR) and holographic projection technologies. Through the precise manufacturing of CNC machine tools, laser cutting machines and 3D printers, combined with AR technology to assist construction personnel in precise positioning and installation, the construction efficiency and precision are greatly improved, and the errors in manual operation are reduced.

[0069] 2. Strengthen quality control and real-time monitoring: The present invention uses sensors and monitoring equipment to monitor the progress and quality of the construction site in real time, ensuring the accurate execution of each construction step. The real-time monitoring system can promptly detect deviations and problems in the construction process, and feed back data to the digital management platform, automatically generating construction reports and quality inspection reports, effectively ensuring construction quality, reducing rework rates, and improving the reliability and safety of the overall project.

[0070] 3. Realize intelligent management and information sharing: The present invention establishes an integrated data management platform to centrally store and manage all data in the construction process, and realize efficient transmission and sharing of information. Through intelligent technology and big data analysis, the system can provide construction decision support and optimization suggestions to improve project management efficiency. In addition, the automatically generated construction report and quality inspection report are convenient for subsequent review and maintenance, further enhancing the transparency and traceability of the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 A method flow chart of a digital construction auxiliary construction method and a digital system for a building decoration component proposed by the present invention;

[0072] Figure 2 This is a system block diagram of a digital construction auxiliary construction method and a digital system for building decoration components proposed by the present invention. DETAILED DESCRIPTION

[0073] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0074] Example 1

[0075] This embodiment involves the exterior wall decoration construction process of a large commercial center, and its specific implementation includes the following process:

[0076] Step 1: Digital Design

[0077] In the exterior wall decoration construction of large commercial centers, CAD software is first used to digitally design the exterior wall decoration components to generate detailed 3D models and construction drawings. The design content includes the size, material, connection nodes and surface treatment effects of the exterior wall decoration panels.

[0078] Step 2: Data Transfer

[0079] After the design is completed, the 3D model and construction drawings are transmitted to the digital construction system at the construction site via the Internet. The data transmission adopts encryption protocol to ensure the security and integrity of the data.

[0080] Step 3: Digital Manufacturing

[0081] In the prefabrication workshop at the construction site, CNC machine tools and laser cutting machines are used to manufacture exterior wall decorative panels according to the 3D model. The manufacturing process automatically adjusts the equipment parameters to ensure the accuracy and quality of the components. For decorative panels with complex shapes, 3D printing technology is used for manufacturing.

[0082] Step 4: Digital Installation

[0083] At the construction site, holographic projection equipment is used to project the positioning information of the 3D model onto the actual building surface to assist construction workers in accurate positioning. Construction workers wear AR glasses to display the installation location and operation guide of the decorative panels in real time. The AR system provides gesture recognition and voice control functions, making it easy for construction workers to get instant help and guidance.

[0084] Step 5: Real-time monitoring and feedback

[0085] During the construction process, the installation accuracy of the decorative panels is monitored in real time through laser distance sensors and image sensors. Sensor data and on-site images are uploaded to the digital management platform via wireless networks. The platform automatically generates construction progress reports and quality inspection reports, and issues alarm signals when deviations or problems are found. The construction accuracy calculation formula is as follows:

[0086]

[0087] Among them, E precision is the installation accuracy, (x0, y0, z0) is the design position coordinate, and (x1, y1, z1) is the actual installation position coordinate.

[0088] Step 6: Construction report generation

[0089] After the construction is completed, the system automatically generates a detailed construction report, including the installation location, time, quality inspection results and construction personnel information of each decorative panel. The report is stored on the digital management platform for subsequent review and maintenance.

[0090] Example 2

[0091] This embodiment involves the interior decoration construction of a residential area, and the construction process includes:

[0092] Step 1: Digital Design

[0093] In the interior decoration construction of residential areas, CAD software is used to digitally design interior decoration components and generate three-dimensional models and construction drawings. The design content includes the size, material, connection nodes and surface treatment effects of wall decoration panels, ceiling decoration panels and floor decoration panels.

[0094] Step 2: Data Transfer

[0095] After the design is completed, the 3D model and construction drawings are transmitted to the digital construction system at the construction site via the Internet. The data transmission adopts encryption protocol to ensure the security and integrity of the data.

[0096] Step 3: Digital Manufacturing

[0097] In the prefabrication workshop at the construction site, CNC machine tools and laser cutting machines are used to manufacture decorative panels according to the 3D model. The manufacturing process automatically adjusts the equipment parameters to ensure the accuracy and quality of the components. For decorative panels with complex shapes, 3D printing technology is used for manufacturing.

[0098] Step 4: Digital Installation

[0099] At the construction site, holographic projection equipment is used to project the positioning information of the 3D model onto the actual indoor walls and ceilings to assist construction workers in accurate positioning. Construction workers wear AR glasses to display the installation location and operation guide of the decorative panels in real time. The AR system provides gesture recognition and voice control functions, making it easy for construction workers to get instant help and guidance.

[0100] Step 5: Real-time monitoring and feedback

[0101] During the construction process, the installation accuracy of the decorative panels is monitored in real time through laser distance sensors and image sensors. Sensor data and on-site images are uploaded to the digital management platform via wireless networks. The platform automatically generates construction progress reports and quality inspection reports, and issues alarm signals when deviations or problems are found. The construction quality calculation formula is as follows:

[0102] Among them, Q quality is the overall construction quality score, N is the number of inspection points, Q i It is the quality score of the i-th detection point.

[0103] Step 6: Construction report generation

[0104] After the construction is completed, the system automatically generates a detailed construction report, including the installation location, time, quality inspection results and construction personnel information of each decorative panel. The report is stored on the digital management platform for subsequent review and maintenance.

[0105] Example 3

[0106] This embodiment is a decoration construction process of the stairwell of an office building:

[0107] Step 1: Digital Design

[0108] In the decoration construction of the stairwell of the office building, CAD software is used to digitally design the stairwell decoration components and generate 3D models and construction drawings. The design content includes the size, material, connection nodes and surface treatment effects of the stair handrails, guardrails and wall decoration panels.

[0109] Step 2: Data Transfer

[0110] After the design is completed, the 3D model and construction drawings are transmitted to the digital construction system at the construction site via the Internet. The data transmission adopts encryption protocol to ensure the security and integrity of the data.

[0111] Step 3: Digital Manufacturing

[0112] In the prefabricated workshop at the construction site, CNC machine tools and laser cutting machines are used to manufacture staircase decorative components according to the 3D model. The manufacturing process automatically adjusts the equipment parameters to ensure the accuracy and quality of the components. For decorative components with complex shapes, 3D printing technology is used for manufacturing.

[0113] Step 4: Digital Installation

[0114] At the construction site, holographic projection equipment is used to project the positioning information of the 3D model onto the actual stairwell to assist construction workers in accurate positioning. Construction workers wear AR glasses to display the installation location and operation guide of decorative components in real time. The AR system provides gesture recognition and voice control functions, making it easy for construction workers to get instant help and guidance.

[0115] Step 5: Real-time monitoring and feedback

[0116] During the construction process, the installation accuracy of decorative components is monitored in real time through laser distance sensors and image sensors. Sensor data and on-site images are uploaded to the digital management platform via wireless networks. The platform automatically generates construction progress reports and quality inspection reports, and issues alarm signals when deviations or problems are found. The construction progress calculation formula is as follows:

[0117]

[0118] Among them, P progress is the construction progress percentage, W c ompleted is the amount of work completed, W tota l is the total workload.

[0119] Step 6: Construction report generation

[0120] After the construction is completed, the system automatically generates a detailed construction report, including the installation location, time, quality inspection results and construction personnel information of each decorative component. The report is stored on the digital management platform for subsequent reference and maintenance.

[0121] Example 4

[0122] This embodiment is the decoration construction of the exhibition hall of a museum, and its specific implementation process is as follows:

[0123] Step 1: Digital Design

[0124] In the decoration construction of the museum's exhibition hall, CAD software is used to digitally design the decoration components of the exhibition hall to generate three-dimensional models and construction drawings. The design content includes the size, material, connection nodes and surface treatment effects of the exhibition wall, display cabinet and ceiling decoration.

[0125] Step 2: Data Transfer

[0126] After the design is completed, the 3D model and construction drawings are transmitted to the digital construction system at the construction site via the Internet. The data transmission adopts encryption protocol to ensure the security and integrity of the data.

[0127] Step 3: Digital Manufacturing

[0128] In the prefabricated workshop at the construction site, CNC machine tools and laser cutting machines are used to manufacture the decoration components of the exhibition hall according to the 3D model. The manufacturing process automatically adjusts the equipment parameters to ensure the accuracy and quality of the components. For decoration components with complex shapes, 3D printing technology is used for manufacturing.

[0129] Step 4: Digital Installation

[0130] At the construction site, holographic projection equipment is used to project the positioning information of the 3D model onto the actual exhibition hall to assist construction workers in accurate positioning. Construction workers wear AR glasses to display the installation location and operation guide of decorative components in real time. The AR system provides gesture recognition and voice control functions, making it easy for construction workers to get instant help and guidance.

[0131] Step 5: Real-time monitoring and feedback

[0132] During the construction process, the installation accuracy of decorative components is monitored in real time through laser distance sensors and image sensors. Sensor data and on-site images are uploaded to the digital management platform via wireless networks. The platform automatically generates construction progress reports and quality inspection reports, and issues alarm signals when deviations or problems are found. The quality deviation calculation formula is as follows:

[0133]

[0134] Among them, Ddeviation is the quality deviation, Q design Q is the design quality standard. actual,i is the actual quality detection value of the ith value, N is

[0135] Number of detection points.

[0136] Step 6: Construction report generation

[0137] After the construction is completed, the system automatically generates a detailed construction report, including the installation location, time, quality inspection results and construction personnel information of each decorative component. The report is stored on the digital management platform for subsequent reference and maintenance.

[0138] Example 5: Interior decoration construction of airport terminal

[0139] Step 1: Digital Design

[0140] In the interior decoration construction of the airport terminal, CAD software is used to digitally design the interior decoration components of the terminal to generate 3D models and construction drawings. The design content includes the size, material, connection nodes and surface treatment effects of the waiting area seats, wall decoration panels, ceiling decorations and floor decorations.

[0141] Step 2: Data Transfer

[0142] After the design is completed, the 3D model and construction drawings are transmitted to the digital construction system at the construction site via the Internet. The data transmission adopts encryption protocol to ensure the security and integrity of the data.

[0143] Step 3: Digital Manufacturing

[0144] In the prefabricated workshop at the construction site, CNC machine tools and laser cutting machines are used to manufacture the terminal building's decorative components based on the 3D model. The manufacturing process automatically adjusts the equipment parameters to ensure the accuracy and quality of the components. For decorative components with complex shapes, 3D printing technology is used for manufacturing.

[0145] Step 4: Digital Installation

[0146] At the construction site, holographic projection equipment is used to project the positioning information of the 3D model into the actual terminal building to assist construction workers in accurate positioning. Construction workers wear AR glasses to display the installation location and operation instructions of decorative components in real time. The AR system provides gesture recognition and voice control functions, making it easy for construction workers to get instant help and guidance.

[0147] Step 5: Real-time monitoring and feedback

[0148] During the construction process, the installation accuracy of decorative components is monitored in real time through laser distance sensors and image sensors. Sensor data and on-site images are uploaded to the digital management platform via wireless networks. The platform automatically generates construction progress reports and quality inspection reports, and issues alarm signals when deviations or problems are found. The construction efficiency calculation formula is as follows:

[0149]

[0150] Among them, E efficiency is the construction efficiency, W completed is the amount of work completed, T used The actual time used.

[0151] Step 6: Construction report generation

[0152] After the construction is completed, the system automatically generates a detailed construction report, including the installation location, time, quality inspection results and construction personnel information of each decorative component. The report is stored on the digital management platform for subsequent reference and maintenance.

[0153] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0154] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A digital construction auxiliary construction method for building decoration components, characterized in that: The following steps are involved: a) Digitally design building decoration components through computer-aided design software to generate three-dimensional models and construction drawings; b) Transmit the designed 3D model and construction drawings to the digital construction system through the network; c) Automated manufacturing of building decoration components based on three-dimensional models using CNC machine tools, laser cutting machines or 3D printers; d) Use holographic projection and augmented reality technology to assist construction workers in positioning and installing components; e) Use sensors and monitoring equipment to monitor the progress and quality of the construction site in real time and feed the data back to the digital management platform; f) Automatically generate construction reports and quality inspection reports based on real-time monitoring data to guide subsequent construction and maintenance work.

2. The digital construction auxiliary construction method of building decoration components according to claim 1 is characterized in that: The three-dimensional model in step a) includes the following data: Component geometric dimension data; Component material data; Component connection node data; Surface treatment and decorative effect data of components.

3. The digital construction auxiliary construction method of building decoration components according to claim 1 is characterized in that: The automated manufacturing in step c) includes: Use CNC machine tools for precise cutting and processing; Use laser cutting machines to cut complex shapes; Use 3D printing technology to manufacture components with complex structures and shapes; Automatically adjust equipment parameters according to the 3D model to ensure manufacturing accuracy.

4. The digital construction auxiliary construction method of building decoration components according to claim 1 is characterized in that: The holographic projection and augmented reality technology in step d) includes: The positioning information of the three-dimensional model is projected on the construction site through holographic projection equipment to assist construction workers in accurate positioning; The installation location and operation guide of the components, including installation steps and precautions, are displayed in real time through AR glasses; Interact with the AR system through gesture recognition or voice control to get instant help and guidance.

5. The digital construction auxiliary construction method of building decoration components according to claim 1 is characterized in that: The monitoring system in step e) comprises: Progress monitoring module, which records construction progress in real time and generates progress reports; Quality monitoring module, real-time detection of component installation accuracy and quality, including flatness, verticality and connection tightness; The data feedback module uploads monitoring data to the digital management platform in real time and provides visual data analysis tools.

6. A digital system for building decoration components, characterized in that: include: Computer-aided design software module for digital design of components; Data transmission module, used to transmit design data to the construction system through the network; CNC machine tools, laser cutting machines and 3D printers for automated manufacturing of components; Holographic projection equipment and AR glasses are used to assist in the positioning and installation of components; Sensors and monitoring equipment to monitor construction progress and quality in real time; Digital management platform for data management and monitoring.

7. The digital system for building decoration components according to claim 6, characterized in that: The digital management platform includes: Data management module, used to store and manage all data in the design, manufacturing and installation processes; Monitoring and management module, used to monitor the progress and quality of the construction site in real time; The alarm module sends out an alarm signal and provides solution suggestions when construction deviations or quality problems are detected; The data analysis module uses big data analysis technology to analyze construction data and optimize construction processes and quality control.

8. The digital system for building decoration components according to claim 6, characterized in that: The sensor comprises: Laser distance measuring sensor, used to detect the installation accuracy of components; Temperature sensors and humidity sensors to monitor the conditions of the construction environment; Vibration sensors are used to monitor the operating status of equipment during construction; Image sensors are used to capture images and videos of construction sites in real time for visual analysis and quality inspection.

9. The digital system for building decoration components according to claim 6, characterized in that: The holographic projection device and AR glasses determine the installation position of the components by the following formula: P install =P model +△P Among them, P install is the actual installation position of the component, P model is the designed position in the 3D model, △P is the deviation value of real-time calibration, which is determined by sensor data and visual analysis.

10. The digital system for building decoration components according to claim 6, characterized in that: It also includes a construction progress prediction module, which predicts the construction completion time through the following formula: Among them, T complete is the estimated construction completion time, T start is the construction start time, D total is the total construction workload in hours, R avg is the average construction rate, expressed in work completed per hour, calibrated and optimized using historical data and real-time monitoring data.