Early warning work order generation method and device, equipment and medium
By acquiring and preprocessing historical operating data in the cloud center, training the health model and automatically generating early warning work orders, the problem of low efficiency and accuracy of traditional work order processing is solved, and more efficient and accurate fault prediction and processing are achieved.
Patent Information
- Application Number
- CN202411151122.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-29
AI Technical Summary
The efficiency and accuracy of work order processing in traditional cloud center management are low, and manual monitoring and analysis of data is time-consuming and error-prone, resulting in inaccurate or delayed diagnosis of system problems.
By obtaining the historical operating data of the cloud center platform, preprocessing and training the platform health model are performed to predict failure risks and automatically generate early warning work orders to reduce manual intervention and time consumption.
It improves the accuracy and efficiency of early warning work order generation, reduces the risk of system failure, and improves the operation and maintenance efficiency and response speed of the cloud center.
Smart Images

Figure CN118863809A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a method, device, equipment and medium for generating an early warning work order. Background Art
[0002] In today's rapidly developing information technology era, cloud centers are the main processing and storage sites for data and applications, and their stability and efficiency are crucial to enterprises and individual users. Traditionally, the operation and maintenance team of cloud centers relies on manual monitoring and processing of work orders to maintain the normal operation of the system. However, as the scale and complexity of cloud centers increase, this traditional approach faces many challenges.
[0003] Manually monitoring and analyzing large amounts of system data is time-consuming and error-prone. Cloud centers generate a huge amount of data, including various performance indicators, system logs, user feedback, etc. Manually analyzing this data to identify potential system problems is a cumbersome and inefficient process. In addition, the results of manual processing are often limited by personal experience and subjective judgment, which may lead to inaccurate or delayed diagnosis of system problems.
[0004] Therefore, how to solve the problems of efficiency and accuracy in work order processing in traditional cloud center management is a technical problem that needs to be solved urgently in this field. Summary of the invention
[0005] The purpose of the present invention is to provide a method, device, equipment and medium for generating an early warning work order, which can greatly reduce the subjectivity and time consumption of manual intervention and improve the accuracy and efficiency of generating early warning work orders.
[0006] In order to solve the above technical problems, the present invention provides a method for generating an early warning work order, the method comprising:
[0007] Obtain historical operation data and corresponding health status of different areas under the cloud center platform;
[0008] Preprocessing the historical operation data to obtain platform health indicator data;
[0009] Using the platform health indicator data and the health status of the cloud center platform to train the platform health model;
[0010] Input the health index data of each area under multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each of the cloud center platforms to be tested;
[0011] According to the failure risk probability existing in each area of the cloud center platform to be tested, an early warning work order is automatically generated.
[0012] In a first aspect, in the above-mentioned early warning work order generation method provided by the present invention, the historical operation data is preprocessed to obtain platform health index data, including:
[0013] Cleaning the historical operation data;
[0014] Fill missing values in the cleaned running data;
[0015] Numerizing, standardizing or normalizing the populated operation data so as to convert the populated operation data into a target format of the platform health model input data;
[0016] According to the operation data after format conversion, the platform health indicator data is obtained.
[0017] On the other hand, in the above-mentioned early warning work order generation method provided by the present invention, the platform health index data is obtained according to the operation data after the format conversion, including:
[0018] Calculate the converted operation data according to the set rules to obtain the equipment load, platform load and stability index;
[0019] Each indicator item in the equipment load, platform load and stability index is normalized separately, and the final score value is obtained by weighted accumulation.
[0020] On the other hand, in the above-mentioned early warning work order generation method provided by the present invention, in the process of obtaining the equipment load, it includes:
[0021] Count the percentage of data where the average processor and memory utilization exceeds the threshold value to obtain the computing device load rate;
[0022] Calculate the standard deviation of the average utilization of processors and memory to obtain the load balance of computing devices;
[0023] The process of obtaining the platform load includes:
[0024] Calculate the platform over-provisioning ratio based on the cloud center platform over-provisioning standard;
[0025] The processor allocation rate excess rate is obtained according to the ratio of the number of hosts whose processor allocation rate exceeds the limit to the number of hosts whose processor allocation rate exceeds the limit.
[0026] The memory allocation rate excess rate is obtained based on the ratio of the number of host aggregates with memory allocation rate exceeding the limit to the number of all host aggregates.
[0027] The ratio of resource pools with corresponding utilization rates to the total number of resource pools is used to obtain the proportion of resource pools with high utilization rates.
[0028] The process of obtaining stability indicators includes:
[0029] According to the alarm quantity or work order situation in each area of the cloud center platform, the alarm density and work order density of each device are calculated.
[0030] On the other hand, in the above-mentioned early warning work order generation method provided by the present invention, each index item in the equipment load, platform load and stability index is normalized respectively, and weighted accumulation is performed to obtain the final score value, including:
[0031] The computing device load rate, the computing device load balance degree, the platform over-provisioning ratio, the processor allocation rate exceeding standard rate, the memory allocation rate exceeding standard rate, the resource pool high utilization rate ratio, the alarm density and the work order density are normalized by a standardized function;
[0032] The normalized processing results are weightedly added with the corresponding weights to obtain the final score value.
[0033] On the other hand, in the above-mentioned early warning work order generation method provided by the present invention, before using the platform health indicator to train the platform health model, it also includes:
[0034] A platform health model is constructed based on a logistic regression model, a decision tree or a neural network; the input of the platform health model is health indicator data, and the output is the failure risk probability.
[0035] On the other hand, in the above-mentioned early warning work order generation method provided by the present invention, according to the failure risk probability existing in each area under each of the cloud center platforms to be tested, an early warning work order is automatically generated, including:
[0036] Extract areas where the probability of failure risk exceeds the warning threshold;
[0037] Query the cloud center platform to be tested corresponding to the extracted area;
[0038] According to the queried information of the cloud center platform to be tested, a corresponding early warning work order is automatically generated.
[0039] In order to solve the above technical problems, the present invention further provides a warning work order generation device, the device comprising:
[0040] The data acquisition module is used to obtain the historical operation data and corresponding health status of different areas under the cloud center platform;
[0041] An indicator calculation module, used to pre-process the historical operation data to obtain platform health indicator data;
[0042] A model training module, used to train a platform health model using the platform health indicator data and the health status of the cloud center platform;
[0043] The model reasoning module is used to input the health index data of each area under the multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each of the cloud center platforms to be tested;
[0044] The work order generation module is used to automatically generate an early warning work order based on the failure risk probability existing in each area under the cloud center platform to be tested.
[0045] In order to solve the above technical problems, the present invention further provides a warning work order generation device, the device comprising:
[0046] Memory for storing computer programs;
[0047] A processor is used to implement the steps of the above-mentioned early warning work order generation method when executing the computer program.
[0048] In order to solve the above technical problem, the present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned early warning work order generation method are implemented.
[0049] It can be seen from the above technical scheme that the present invention provides a method for generating an early warning work order, which includes: obtaining historical operation data and corresponding health conditions of different areas under the cloud center platform; preprocessing the historical operation data to obtain platform health index data; using the platform health index data and the health status of the cloud center platform to train the platform health model; inputting the health index data of each area under multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each cloud center platform to be tested; and automatically generating an early warning work order based on the failure risk probability of each area under each cloud center platform to be tested.
[0050] The beneficial effect of the present invention lies in that the above-mentioned early warning work order generation method provided by the present invention first obtains the historical operation data and the corresponding health conditions of different areas under the cloud center platform, pre-processes them to obtain the platform health index data, and then uses the platform health index data and the corresponding health conditions to train the platform health model. The trained platform health model can realize the prediction of potential failures of the cloud center and generate early warning work orders accordingly. In this way, by introducing the platform health model and the automatic generation mechanism of early warning work orders, a large amount of cloud center platform data can be processed quickly and the processing time can be reduced. At the same time, the subjectivity and time consumption of manual intervention can be greatly reduced, and early warning work orders can be generated intelligently, thereby improving the accuracy and efficiency of early warning work order generation, reducing the risk of system failures, and improving the automation level of the entire system, thereby improving the operation and maintenance efficiency and response speed of the cloud center.
[0051] In addition, the present invention also provides a corresponding warning work order generation device, warning work order generation equipment and computer-readable storage medium for the warning work order generation method, which have the same or corresponding technical features as the above-mentioned warning work order generation method and have the same effect as above. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0053] Figure 1 A flowchart of a method for generating an early warning work order provided in an embodiment of the present invention;
[0054] Figure 2 A schematic diagram of the architecture of a method for generating an early warning work order provided in an embodiment of the present invention;
[0055] Figure 3 A schematic diagram of the structure of a warning work order generating device provided in an embodiment of the present invention;
[0056] Figure 4 A schematic diagram of the structure of a warning work order generating device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0057] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0058] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 A flowchart of a method for generating an early warning work order provided by an embodiment of the present invention is shown in FIG. Figure 1 As shown, the method includes:
[0059] S101. Obtain historical operation data and corresponding health status of different areas under the cloud center platform.
[0060] Figure 2 The schematic diagram of the architecture of the method for generating a warning work order provided by an embodiment of the present invention is shown in FIG. Figure 2 As shown, the present invention can be connected with the traditional work order system, start the scheduled task regularly with a daily cycle, and extract the historical operation data and corresponding health status of different areas under the cloud center platform from the data lake.
[0061] S102: Preprocess historical operation data to obtain platform health indicator data.
[0062] In implementation, the present invention can pre-process the historical operation data of different areas under the cloud center platform to obtain platform health indicator data related to the health of the cloud center.
[0063] S103. Use the platform health indicator data and the health status of the cloud center platform to train the platform health model.
[0064] In implementation, the platform health model of the present invention can be responsible for analyzing the operating data of the equipment in each area of the cloud center platform and predicting potential faults and problems. The input of the platform health model is the health characteristics of each cloud center area every day, and the output is the probability distribution of health problems in each area on that day. The model performance is optimized through cross-validation and parameter adjustment technology to ensure the accuracy and stability of the prediction.
[0065] S104, inputting the health index data of each area under multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each cloud center platform to be tested.
[0066] It should be noted that the traditional cloud center fault diagnosis method mainly relies on the manual experience and real-time monitoring of operation and maintenance personnel. This method is not only time-consuming and labor-intensive, but also prone to missing key performance indicators, resulting in inaccurate and delayed fault prediction. Faced with massive data and complex system structures, manual monitoring is difficult to be comprehensive and accurate. The present invention uses a platform health model to analyze and learn the historical operation data of the cloud center, thereby achieving accurate prediction of system failures.
[0067] The platform health model can process large amounts of data and identify complex patterns and relationships. Through in-depth analysis of historical data, the model can find key indicators that lead to system failures, such as processor utilization, memory usage, network latency, etc. Once these key indicators exceed a certain threshold, the model can predict that the system may fail, thereby generating early warning tickets in advance. This data-driven approach greatly improves the accuracy of fault prediction and reduces the frequency and scope of system failures.
[0068] During implementation, the present invention can monitor the operating data of each area of different cloud center platforms to be tested in real time to obtain the operating data of each area of different cloud center platforms to be tested, and can perform preprocessing as in step S102 to obtain the health indicator data of each area under multiple cloud center platforms to be tested, and then input it into the trained platform health model to predict the failure risk probability of each area under each cloud center platform to be tested.
[0069] S105. Automatically generate an early warning work order based on the failure risk probability in each area of each cloud center platform to be tested.
[0070] It should be noted that the early warning in the traditional method mainly relies on the judgment of the staff. This method is not only inefficient, but also easily affected by subjective factors, resulting in important problems not being handled in a timely manner. In the present invention, once the platform health model predicts that a certain cloud center platform has a higher health risk, a corresponding early warning work order can be automatically generated to ensure rapid response and problem solving. The problem level of the early warning work order can be adjusted according to the prediction results. This dynamic adjustment mechanism can ensure that important work orders are responded to and processed in a timely manner, thereby improving the efficiency and accuracy of the overall work order processing. For example, when the system predicts that the network delay of a cloud center may cause service interruption, an early warning work order will be generated immediately to ensure that the operation and maintenance team can take quick action to avoid system failures.
[0071] In addition, the creation and processing of early warning work orders in traditional methods often require a large amount of human resources for monitoring and decision-making. The automated system of the present invention can handle a large amount of data analysis and early warning work order generation process, and can operate efficiently without or with only a small amount of human intervention. Through automated processing, the system can complete data analysis, fault prediction and work order generation in a short time, greatly improving work efficiency. Operation and maintenance personnel only need to pay attention to the early warning work orders generated by the system, reducing the time and energy of daily monitoring and data analysis, so that they can focus more on solving practical problems. This not only reduces labor costs, but also improves the work efficiency and work quality of the operation and maintenance team.
[0072] In the above-mentioned early warning work order generation method provided by the embodiment of the present invention, the historical operation data and the corresponding health conditions of different areas under the cloud center platform are first obtained, and the platform health index data is obtained after preprocessing, and then the platform health index data and the corresponding health conditions are used to train the platform health model. The trained platform health model can realize the prediction of potential failures of the cloud center and generate early warning work orders accordingly. In this way, by introducing the platform health model and the automatic generation mechanism of early warning work orders, a large amount of cloud center platform data can be processed quickly and the processing time can be reduced. At the same time, the subjectivity and time consumption of manual intervention can be greatly reduced, and early warning work orders can be generated intelligently, thereby improving the accuracy and efficiency of early warning work order generation, reducing the risk of system failures, and improving the automation level of the entire system, thereby improving the operation and maintenance efficiency and response speed of the cloud center.
[0073] Furthermore, in a specific implementation, in the above-mentioned early warning work order generation method provided in an embodiment of the present invention, step S102 pre-processes the historical operation data to obtain platform health index data, which may specifically include: cleaning the historical operation data; filling the missing values in the cleaned operation data; digitizing, standardizing or normalizing the filled operation data to convert the filled operation data into the target format of the platform health model input data; and obtaining the platform health index data based on the operation data after the format conversion.
[0074] During implementation, the historical operation data is cleaned, including removing invalid and incomplete data records; then the missing values of the cleaned operation data are processed, and then the operation data is converted into a format suitable for platform health model processing, including but not limited to digitization, standardization or normalization.
[0075] Furthermore, in the specific implementation, the above steps obtain platform health index data based on the format-converted operating data, which may specifically include: calculating the format-converted operating data according to the set rules to obtain device load, platform load and stability indicators; normalizing each indicator item in the device load, platform load and stability indicators, and weightedly accumulating them to obtain the final score value.
[0076] It should be noted that the platform health index data that affects the health of the platform mainly include two parts: system load conditions (physical machine conditions, overall platform conditions) and alarm conditions. The system load condition is mainly reflected through performance indicators. Performance indicators are a direct display of the internal operation of the system, which are roughly divided into two categories: device load and platform load. Alarms are a reflection of internal equipment problems and failures in the system. The present invention can calculate platform health index data including device load, platform load, stability index and final score value according to the set rules. Preferably, the obtained platform health index data can be further processed, and when the daily data of a certain area is missing, the area is removed from the candidate area list.
[0077] In the specific implementation, the process of obtaining the device load can specifically include: counting the proportion of data whose average processor and memory utilization exceeds the threshold value to obtain the computing device load rate; counting the standard deviation of the average processor and memory utilization to obtain the computing device load balance.
[0078] In the implementation, the percentage of data with average CPU and memory utilization exceeding the threshold is counted, and the computing device load rate f(x) can be obtained using the following formula:
[0079] ;
[0080] In the above formula, the CPU threshold and memory threshold can be set to 90%, indicating that there are too many time points with high utilization in the physical machine. The higher the value, the more unhealthy it is.
[0081] The standard deviation of the average CPU and memory utilization is used to obtain the load balance of computing devices, which is mainly reflected in the load balance of all machines. If the utilization of most machines is similar, but the utilization of a few machines is very high (not reaching the load threshold), the standard deviation of the data will also be large. Since the utilization value range is [0,1], the standard deviation of this indicator ranges from [0,0.5]. When calculating, it needs to be multiplied by the correlation coefficient. The higher the value, the less healthy it is.
[0082] In the specific implementation, in the process of obtaining the platform load, it can specifically include: calculating the platform over-provisioning ratio according to the cloud center platform over-provisioning standard; obtaining the processor allocation rate excess rate according to the ratio of the number of host aggregates with processor allocation rate exceeding the limit to the number of all host aggregates; obtaining the memory allocation rate excess rate according to the ratio of the number of host aggregates with memory allocation rate exceeding the limit to the number of all host aggregates; obtaining the proportion of resource pools with high utilization according to the ratio of the number of resource pools with corresponding utilization to the total number of all resource pools.
[0083] In practice, the platform load situation indicates the overall status of the platform, which is reflected in the following two aspects: one is the over-allocation ratio, see Table 1 below; the other is the overall resource utilization.
[0084] Table 1 Calculation of relevant indicators based on cloud platform over-provisioning standards
[0085]
[0086] The overall resource utilization rate is used to present the total capacity of the cloud center. The less data, the healthier it is. CPU allocation rate exceeding the standard rate / memory allocation rate exceeding the standard rate = number of host aggregates with abnormal allocation rate / number of host aggregates. Abnormality definition: (number of hosts - 1) / number of hosts>CPU allocation rate. Host aggregate high utilization ratio = number of host aggregates with utilization exceeding the threshold value / number of all host aggregates. Abnormality is calculated based on whether it exceeds the 80% percentile.
[0087] Percentage of storage pools with high utilization:
[0088] ;
[0089] If the calculated result of the storage pool high utilization ratio is greater than 1, it is corrected to 1.
[0090] In the specific implementation, in the process of obtaining the stability index, it can specifically include: according to the alarm quantity or work order situation of each area under the cloud center platform, calculating the alarm density and work order density of each device.
[0091] In implementation, the stability index mainly reflects the alarm or work order situation of the cloud center. When there are many alarms or work orders for each device in each area of the cloud center, it indicates that there are relatively many problems and attention needs to be paid. Alarm density = alarm quantity / (equipment quantity*number of days). The number of alarms per device on the platform per day during the statistical time period is standardized to a value of [0,1] using the tanh function. The conversion of alarms to work orders indicates that this type of alarm requires special attention, especially S-type work orders will affect the system's SLA, so consider independent analysis. The present invention uses the calculation method shown in Table 2 below to derive the work order density value. Standardized to a value of [0,1] using the tanh function.
[0092] Table 2 Calculation method of work order density
[0093]
[0094] Furthermore, in the specific implementation, the above steps normalize each indicator item in the device load, platform load and stability index respectively, and weightedly accumulate to obtain the final score value, which may specifically include: first, normalize the computing device load rate, computing device load balance, platform over-allocation ratio, processor allocation rate excess rate, memory allocation rate excess rate, resource pool high utilization rate, alarm density and work order density through a standardized function; then perform weighted accumulation on the normalized processing result and the corresponding weight to obtain the final score value.
[0095] In implementation, the final data of each indicator item is calculated, all normalized to values between 0 and 1, and weighted accumulation is performed to obtain the final score value, which is based on a 100-point system.
[0096] Table 3 Calculation method and weights
[0097]
[0098] Through the standardization function, the indicator is normalized to a value between [0,1]. Since the original data interval is [0,+∞), the positive number can be normalized to between 0 and 1.
[0099] Furthermore, in a specific implementation, in the above-mentioned early warning work order generation method provided in an embodiment of the present invention, before executing step S103 to train the platform health model using the platform health index, it may also include: constructing a platform health model based on a logistic regression model, a decision tree or a neural network; the input of the platform health model is the health index data, and the output is the failure risk probability.
[0100] In implementation, the platform health model can be based on logistic regression, decision tree or neural network structure, with the corresponding health indicators of each area under the cloud center as parameters, and output the model of the probability of health problems in the corresponding area. Through the historical cloud center health indicator data and whether the cloud center has health problems, the cloud center health indicator data is input into the health model to calculate the probability of health problems in each area on the day, and the area with a probability exceeding the warning threshold is selected and the corresponding cloud center is queried. At the same time, the daily prediction results and the prediction results based on the platform health model are recorded.
[0101] Furthermore, in the specific implementation, in the above-mentioned warning work order generation method provided in the embodiment of the present invention, step S105 automatically generates a warning work order according to the failure risk probability existing in each area under each cloud center platform to be tested, and may specifically include: extracting areas where the failure risk probability exceeds the warning threshold; querying the cloud center platform to be tested corresponding to the extracted area; and automatically generating a corresponding warning work order based on the information of the queried cloud center platform to be tested.
[0102] In implementation, based on the model prediction results, if there is a cloud center that exceeds the warning threshold, the cloud center information is extracted and the corresponding work order content is generated. The work order business is classified as a platform health warning and assigned to different problem levels according to the specific problem probability, and a new work order request is initiated to the work order system.
[0103] The above-mentioned automated early warning ticket generation mechanism reduces the subjectivity and uncertainty of manual decision-making. The system can objectively and accurately generate early warning tickets based on data and model results, and assign reasonable problem levels. This method not only improves the accuracy and efficiency of ticket processing, but also effectively reduces the frequency of system failures, ensuring rapid response and resolution when problems occur, thereby improving user satisfaction and service quality. The operation and maintenance team can quickly take corresponding measures based on the problem level and specific content of the early warning ticket to avoid the expansion and continuation of system failures and ensure the stable operation of the platform. This real-time monitoring and dynamic response mechanism can significantly improve the operational efficiency of the cloud center and reduce downtime and economic losses caused by failures.
[0104] It should be noted that the present invention can integrate the platform health model and the early warning work order generation system into the cloud center management platform. Regularly use the newly collected data to evaluate the model, including indicators such as accuracy, recall rate and F1 score. According to the evaluation results, the model is optimized, including adjusting features, optimizing algorithm parameters, etc.
[0105] In the above embodiments, the method for generating a warning work order is described in detail, and the present invention also provides embodiments corresponding to a warning work order generating device and a warning work order generating device. It should be noted that the present invention describes the embodiments of the device part from two perspectives, one is based on the functional module perspective, and the other is based on the hardware perspective.
[0106] Figure 3 This is a schematic diagram of the structure of the warning work order generation device provided by the embodiment of the present invention. This embodiment is based on the perspective of functional modules, such as Figure 3 As shown, the device comprises:
[0107] The data acquisition module 10 is used to obtain the historical operation data and corresponding health status of different areas under the cloud center platform;
[0108] The indicator calculation module 11 is used to pre-process the historical operation data to obtain the platform health indicator data;
[0109] The model training module 12 is used to train the platform health model using the platform health indicator data and the health status of the cloud center platform;
[0110] The model reasoning module 13 is used to input the health index data of each area under the multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each cloud center platform to be tested;
[0111] The work order generation module 14 is used to automatically generate an early warning work order according to the failure risk probability existing in each area of each cloud center platform to be tested.
[0112] In the above-mentioned early warning work order generation device provided in the embodiment of the present invention, the historical operation data and the corresponding health conditions of different areas under the cloud center platform can be obtained through the interaction of the above-mentioned five modules, and the platform health index data can be obtained after pre-processing. The platform health index data and the corresponding health conditions are used to train the platform health model. The trained platform health model can realize the prediction of potential failures of the cloud center and generate early warning work orders accordingly. In this way, by introducing the platform health model and the automatic generation mechanism of early warning work orders, a large amount of cloud center platform data can be processed quickly to reduce processing time. At the same time, the subjectivity and time consumption of manual intervention are also greatly reduced, and early warning work orders are generated intelligently, thereby improving the accuracy and efficiency of early warning work order generation, reducing the risk of system failures, and improving the automation level of the entire system, thereby improving the operation and maintenance efficiency and response speed of the cloud center.
[0113] Since the embodiments of the device part correspond to the embodiments of the method part, the embodiments of the device part refer to the description of the embodiments of the method part, which will not be described here. And it has the same beneficial effects as the above-mentioned warning work order generation method.
[0114] Figure 4 This is a schematic diagram of the structure of the warning work order generation device provided by the embodiment of the present invention. This embodiment is based on the hardware perspective, such as Figure 4 As shown, the warning work order generation device includes:
[0115] A memory 20, used for storing computer programs;
[0116] The processor 21 is used to implement the steps of the early warning work order generation method mentioned in the above embodiment when executing the computer program.
[0117] Among them, the processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 21 can be implemented in at least one hardware form of a digital signal processor (DSP), a field-programmable gate array (FPGA), and a programmable logic array (PLA). The processor 21 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a CPU; the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 21 may be integrated with a graphics processing unit (GPU), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 21 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0118] The memory 20 may include one or more computer-readable storage media, which may be non-transitory. The memory 20 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 21, it can implement the relevant steps of the early warning work order generation method disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. The data 203 may include, but is not limited to, the data involved in the above-mentioned early warning work order generation method, etc.
[0119] In some embodiments, the early warning work order generating device may further include a display screen 22, an input and output interface 23, a communication interface 24, a power supply 25 and a communication bus 26. Those skilled in the art will appreciate that Figure 4 The structure shown in does not constitute a limitation on the warning work order generation device, and may include more or fewer components than shown in the figure. The warning work order generation device provided by the embodiment of the present invention includes a memory and a processor. When the processor executes the program stored in the memory, it can implement the warning work order generation method mentioned above, and the effect is the same as above.
[0120] Finally, the present invention also provides an embodiment corresponding to a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps recorded in the above method embodiment are implemented.
[0121] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium and executes all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code. The computer-readable storage medium provided by the present invention can realize the above-mentioned warning work order generation method, and the effect is the same as above.
[0122] Finally, the present invention also provides an embodiment corresponding to a computer program product. The computer program product includes a computer program / instruction, and when the computer program / instruction is executed by a processor, the steps recorded in the above-mentioned early warning work order generation method embodiment are implemented. The computer program product provided by the present invention can implement the above-mentioned early warning work order generation method, and the effect is the same as above.
[0123] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
[0124] The above is a detailed introduction to the warning work order generation method, device, equipment and medium provided by the present invention. The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can refer to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can refer to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the present invention.
Claims
1. A method for generating an early warning work order, characterized in that: The method comprises: Obtain historical operation data and corresponding health status of different areas under the cloud center platform; Preprocessing the historical operation data to obtain platform health indicator data; Using the platform health indicator data and the health status of the cloud center platform to train the platform health model; Input the health index data of each area under multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each of the cloud center platforms to be tested; According to the failure risk probability existing in each area of the cloud center platform to be tested, an early warning work order is automatically generated.
2. The method for generating an early warning work order according to claim 1, characterized in that: The historical operation data is preprocessed to obtain platform health indicator data, including: Cleaning the historical operation data; Fill missing values in the cleaned running data; Numerizing, standardizing or normalizing the populated operation data so as to convert the populated operation data into a target format of the platform health model input data; According to the operation data after format conversion, the platform health indicator data is obtained.
3. The method for generating an early warning work order according to claim 2, characterized in that: According to the converted operation data, the platform health indicator data is obtained, including: Calculate the converted operation data according to the set rules to obtain the equipment load, platform load and stability index; Each indicator item in the equipment load, platform load and stability index is normalized separately, and the final score value is obtained by weighted accumulation.
4. The method for generating an early warning work order according to claim 3, characterized in that: The process of obtaining the device load includes: Count the percentage of data where the average processor and memory utilization exceeds the threshold value to obtain the computing device load rate; Calculate the standard deviation of the average utilization of processors and memory to obtain the load balance of computing devices; The process of obtaining the platform load includes: Calculate the platform over-provisioning ratio based on the cloud center platform over-provisioning standard; The processor allocation rate excess rate is obtained according to the ratio of the number of hosts whose processor allocation rate exceeds the limit to the number of hosts whose processor allocation rate exceeds the limit. The memory allocation rate excess rate is obtained based on the ratio of the number of host aggregates with memory allocation rate exceeding the limit to the number of all host aggregates. The ratio of resource pools with corresponding utilization rates to the total number of resource pools is used to obtain the proportion of resource pools with high utilization rates. The process of obtaining stability indicators includes: According to the alarm quantity or work order situation in each area of the cloud center platform, the alarm density and work order density of each device are calculated.
5. The method for generating an early warning work order according to claim 4, characterized in that: Each index item in the equipment load, platform load and stability index is normalized and weighted and accumulated to obtain the final score value, including: The computing device load rate, the computing device load balance degree, the platform over-provisioning ratio, the processor allocation rate exceeding standard rate, the memory allocation rate exceeding standard rate, the resource pool high utilization rate ratio, the alarm density and the work order density are normalized by a standardized function; The normalized processing results are weightedly added with the corresponding weights to obtain the final score value.
6. The method for generating an early warning work order according to claim 1, characterized in that: Before using the platform health indicator to train the platform health model, the method further includes: A platform health model is constructed based on a logistic regression model, a decision tree or a neural network; the input of the platform health model is health indicator data, and the output is the failure risk probability.
7. The method for generating an early warning work order according to claim 1, characterized in that: According to the failure risk probability of each area under each of the cloud center platforms to be tested, an early warning work order is automatically generated, including: Extract areas where the probability of failure risk exceeds the warning threshold; Query the cloud center platform to be tested corresponding to the extracted area; According to the queried information of the cloud center platform to be tested, a corresponding early warning work order is automatically generated.
8. A warning work order generation device, characterized in that: The device comprises: The data acquisition module is used to obtain the historical operation data and corresponding health status of different areas under the cloud center platform; An indicator calculation module, used to pre-process the historical operation data to obtain platform health indicator data; A model training module, used to train a platform health model using the platform health indicator data and the health status of the cloud center platform; The model reasoning module is used to input the health index data of each area under the multiple cloud center platforms to be tested into the trained platform health model to predict the failure risk probability of each area under each of the cloud center platforms to be tested; The work order generation module is used to automatically generate an early warning work order based on the failure risk probability existing in each area under the cloud center platform to be tested.
9. A warning work order generation device, characterized in that: The device comprises: Memory for storing computer programs; A processor is used to implement the steps of the early warning work order generation method as described in any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the early warning work order generation method according to any one of claims 1 to 7 are implemented.