Operation method and system of intellectual property achievement transformation system
By obtaining the target equipment resources and the conversion plan to be evaluated in the intellectual property results transformation system, determining the parallel operation task of the parallel operation group, filtering out the intermediate transformation plan and running the second operation task in turn, the problem of slow system operation speed is solved, and the Efficient utilization of resources and rapid screening effects.
Patent Information
- Application Number
- CN202411334710.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2044-09-24
AI Technical Summary
The intellectual property results conversion system has a slow speed during operation, and it is impossible to effectively utilize the resources of the target equipment, and it is difficult to quickly screen out conversion plans that meet the evaluation requirements.
By obtaining the available resources of the target device and multiple conversion plans to be evaluated, we determine the parallel operation group parallel operation tasks, filter out the intermediate conversion plans, and run the second operation tasks in turn to determine the target conversion plans, make full use of resources and quickly eliminate non-compliances. A plan for evaluating the target.
It has improved the operation speed of the intellectual property results transformation system, made full use of target equipment resources, and quickly screened out transformation plans that meet the evaluation requirements, improving the efficiency of the system.
Smart Images

Figure CN118864175B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and specifically to an operation method and system of an intellectual property achievement transformation system. Background Art
[0002] Aerodynamics is a branch of mechanics that focuses on studying the force characteristics of aircraft or other objects in relative motion with air or other gases, the flow laws of gases, and the accompanying physical and chemical changes. Intellectual property achievements in the field of aerodynamics are not only widely used in the design, optimization, and performance testing of aircraft, but also in the design of vehicles such as cars, trains, and ships, as well as in the fields of wind power generation, air purification, and house design.
[0003] The intellectual property achievement transformation system can conduct a comprehensive evaluation of multiple evaluation targets for each transformation plan to be evaluated based on the intellectual property achievements owned by the enterprise and multiple transformation plans to be evaluated, so as to determine the target transformation plan that meets the evaluation requirements among the multiple transformation plans to be evaluated, and help the target enterprise with intellectual property achievements to transform the intellectual property achievements. However, the intellectual property achievement transformation system has the problem of slow operation when it is running. Summary of the invention
[0004] In view of the shortcomings of the related technologies mentioned above, the present application provides an operation method and system of an intellectual property achievement transformation system to solve the above technical problems.
[0005] The present application provides an operation method of an intellectual property achievement transformation system, comprising:
[0006] Obtaining available operating resources of a target device, a plurality of transformation schemes to be evaluated for a transformation product, a first evaluation target group, and a second evaluation target group, and determining a plurality of first operating tasks based on each of the transformation schemes to be evaluated and the first evaluation target group, wherein the transformation product is obtained by transforming an intellectual property achievement on the basis of a basic product, the first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group;
[0007] Determine the resource demand corresponding to each of the first operating tasks based on the first evaluation target group;
[0008] According to the available operating resources of the target device and the resource requirements corresponding to each first operating task, a plurality of the first operating tasks are grouped to obtain at least one parallel operating group, wherein the parallel operating group includes at least one first operating task;
[0009] At least one of the parallel operation groups is sequentially determined as a target operation group, and all first operation tasks of the target operation group are run in parallel on the target device to obtain a first evaluation parameter group corresponding to each of the transformation schemes to be evaluated, wherein the first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameter in the first evaluation parameter group corresponds one-to-one to the first evaluation target in the first evaluation target group;
[0010] Based on the first evaluation parameter group, the transformation scheme to be evaluated is screened once to obtain at least one intermediate transformation scheme;
[0011] Based on each of the intermediate conversion schemes and the second evaluation target group, multiple second operating tasks are determined, and each of the second operating tasks is run in sequence on the target device to determine the second evaluation parameter group corresponding to each of the intermediate conversion schemes, and the intermediate conversion schemes are secondary screened according to the second evaluation parameter group to obtain a target conversion scheme, wherein the second evaluation parameter group includes multiple second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
[0012] In one embodiment of the present application, the transformation scheme to be evaluated is screened once based on the first evaluation parameter group to obtain at least one intermediate transformation scheme, including:
[0013] Determining each first evaluation parameter group as an array to be screened in sequence;
[0014] Comparing each first evaluation parameter in the to-be-screened array with a first preset interval corresponding to each first evaluation parameter;
[0015] If all the first evaluation parameters in the array to be screened belong to the corresponding first preset interval, the transformation scheme to be evaluated corresponding to the array to be screened is determined as an intermediate transformation scheme.
[0016] In one embodiment of the present application, the first evaluation target group includes a first evaluation target, and the transformation scheme to be evaluated is screened once based on the first evaluation parameter group to obtain at least one intermediate transformation scheme, including:
[0017] Sorting the first evaluation parameters corresponding to the transformation schemes to be evaluated to obtain a parameter sequence;
[0018] Determining a benchmark parameter from among a plurality of the first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target;
[0019] In the parameter sequence, a preset number of first evaluation parameters including the reference parameter are determined as the demand parameters;
[0020] The transformation scheme to be evaluated corresponding to the demand parameter is determined as an intermediate transformation scheme.
[0021] In an embodiment of the present application, the preset number includes a first preset number and a second preset number, and in the parameter sequence, a preset number of multiple first evaluation parameters including the benchmark parameter are determined as the demand parameters, including:
[0022] In the parameter sequence, determining an actual number of first evaluation parameters between a preset parameter threshold and a reference parameter;
[0023] If the actual number is greater than the first preset number, in the parameter sequence, a plurality of first evaluation parameters including a first preset number of reference parameters are determined as demand parameters;
[0024] If the actual number is less than the second preset number, then in the parameter sequence, a plurality of first evaluation parameters of the second preset number including the reference parameters are determined as the demand parameters.
[0025] In one embodiment of the present application, the intermediate conversion scheme is screened for a second time according to the second evaluation parameter group to obtain a target conversion scheme, including:
[0026] sequentially determining each of the second evaluation parameter groups as a second array;
[0027] Obtaining a target evaluation parameter based on a plurality of second evaluation parameters in the second array;
[0028] The intermediate conversion scheme corresponding to the maximum value of the target evaluation parameter is determined as the target conversion scheme.
[0029] In one embodiment of the present application, the first evaluation target is the sales volume of the converted product, and all the first operation tasks in the target operation group are run in parallel on the target device to obtain a first evaluation parameter group corresponding to each of the conversion schemes to be evaluated, including:
[0030] Obtain the remaining time of intellectual property rights corresponding to the technology life cycle and intellectual property achievements;
[0031] If the technology life cycle is less than or equal to the remaining time of the intellectual property, the technology life cycle is determined as the predicted duration; if the technology life cycle is greater than the remaining time of the intellectual property, the remaining time of the intellectual property is determined as the predicted duration;
[0032] Based on the predicted duration, all first running tasks in each of the parallel running groups are run in parallel on the target device to obtain first evaluation parameters of the conversion products corresponding to each of the conversion solutions to be evaluated within the predicted duration.
[0033] To achieve the above objectives and other related objectives, the present application provides an operation system of an intellectual property achievement transformation system, including:
[0034] A data acquisition module, used to acquire available operating resources of a target device, a plurality of transformation schemes to be evaluated for a transformation product, a first evaluation target group, and a second evaluation target group, and determine a plurality of first operating tasks based on each of the transformation schemes to be evaluated and the first evaluation target group, wherein the transformation product is obtained by transforming an intellectual property achievement on the basis of a basic product, the first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group;
[0035] A first determination module, configured to determine a resource requirement corresponding to each of the first operating tasks based on the first evaluation target group;
[0036] an execution module, configured to group the plurality of first running tasks according to available running resources of the target device and resource requirements corresponding to each first running task, to obtain at least one parallel running group, wherein the parallel running group includes at least one first running task;
[0037] A second determination module is used to sequentially determine at least one of the parallel operation groups as a target operation group, and to parallelly run all the first operation tasks in the target operation group on the target device to obtain a first evaluation parameter group corresponding to each of the conversion schemes to be evaluated, wherein the first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameter in the first evaluation parameter group corresponds one-to-one to the first evaluation target in the first evaluation target group;
[0038] A first screening module, used for screening the transformation scheme to be evaluated based on the first evaluation parameter group to obtain at least one intermediate transformation scheme;
[0039] The second screening module is used to determine multiple second operating tasks based on each of the intermediate conversion schemes and the second evaluation target group, and to run each of the second operating tasks in sequence on the target device to determine the second evaluation parameter group corresponding to each of the intermediate conversion schemes, and to perform secondary screening on the intermediate conversion schemes according to the second evaluation parameter group to obtain a target conversion scheme, wherein the second evaluation parameter group includes multiple second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
[0040] In one embodiment of the present application, the first screening module includes:
[0041] A first determining unit, used to sequentially determine each first evaluation parameter group as an array to be screened;
[0042] A first comparison unit, used for comparing each first evaluation parameter in the array to be screened and a first preset interval corresponding to each first evaluation parameter;
[0043] The second determining unit is configured to determine the to-be-evaluated conversion scheme corresponding to the to-be-screened array as an intermediate conversion scheme if all the first evaluation parameters in the to-be-screened array belong to the corresponding first preset interval.
[0044] In one embodiment of the present application, the first evaluation target group includes a first evaluation target, and the first screening module further includes:
[0045] A third determining unit is used to sort the first evaluation parameters corresponding to the transformation schemes to be evaluated to obtain a parameter sequence;
[0046] a fourth determining unit, configured to determine a reference parameter from among the plurality of first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target;
[0047] a fifth determining unit, configured to determine, in the parameter sequence, a preset number of first evaluation parameters including the reference parameter as the required parameter;
[0048] The sixth determining unit is used to determine the to-be-evaluated conversion scheme corresponding to the demand parameter as an intermediate conversion scheme.
[0049] In an embodiment of the present application, the preset number includes a first preset number and a second preset number, and the fifth determining unit is further configured to:
[0050] In the parameter sequence, determining an actual number of first evaluation parameters between a preset parameter threshold and a reference parameter;
[0051] If the actual number is greater than the first preset number, in the parameter sequence, a plurality of first evaluation parameters including a first preset number of reference parameters are determined as demand parameters;
[0052] If the actual number is less than the second preset number, then in the parameter sequence, a plurality of first evaluation parameters of the second preset number including the reference parameters are determined as the demand parameters.
[0053] As described above, the operation method and system of the intellectual property achievement transformation system provided by this application have the following beneficial effects:
[0054] The present application discloses an operation method of an intellectual property achievement transformation system, which screens each transformation scheme to be evaluated by running all first tasks in a target operation group in parallel on a target device, determines multiple second operation tasks based on the intermediate transformation schemes and the second evaluation target group obtained after the screening, and runs each second operation task in sequence on the target device to determine the target transformation scheme. Since the number of second evaluation targets is greater than the number of first evaluation targets, when running each first operation task in parallel, the transformation scheme to be evaluated can be screened faster based on the first evaluation target, and when running the second operation task, the transformation scheme to be evaluated after the initial screening can be evaluated more comprehensively. With such a setting, not only can the available operation resources of the target device be fully utilized, but also the transformation scheme to be evaluated that obviously does not meet the first evaluation target can be quickly eliminated, thereby improving the operation speed of the intellectual property achievement transformation system.
[0055] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and for those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0057] Figure 1 is a flow chart of an operation method of an intellectual property achievement transformation system shown in an exemplary embodiment of the present application;
[0058] Figure 2 It is a structural block diagram of the operating system of the intellectual property achievement transformation system shown in an exemplary embodiment of the present application. DETAILED DESCRIPTION
[0059] The following will describe the implementation methods of the present application with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. The present application can also be implemented or applied through other different specific implementation methods, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be understood that the preferred embodiments are only for illustrating the present application, not for limiting the scope of protection of the present application.
[0060] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present application, and thus the drawings only show components related to the present application rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed at will, and the component layout may also be more complicated.
[0061] In the following description, a large number of details are discussed to provide a more thorough explanation of the embodiments of the present application. However, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details. In other embodiments, well-known structures and devices are shown in the form of block diagrams rather than in detail to avoid making the embodiments of the present application difficult to understand.
[0062] Intellectual property achievement transformation refers to the process of transforming intellectual property achievements (such as patents, trademarks, copyrights, etc.) into actual products, services or commercial values through various channels. It involves transferring scientific research results, innovative technologies or ideas from the theoretical stage to the market application stage, thereby generating economic and social benefits.
[0063] See also Figure 1 , Figure 1 1 is a flowchart of an exemplary embodiment of the present application showing an operation method of the intellectual property achievement transformation system. Figure 1 It can be seen that the operation method of the intellectual property achievement transformation system may include:
[0064] Step S110, obtaining available operating resources of the target device, multiple transformation schemes to be evaluated of the transformation product, a first evaluation target group, and a second evaluation target group, and determining multiple first operating tasks based on each transformation scheme to be evaluated and the first evaluation target group.
[0065] Among them, the transformation product is obtained by transforming the intellectual property results on the basis of the basic product, the first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group. The intellectual property results can be patents, and the transformation plan to be evaluated can be determined based on the licensing method of the patent and the production method of the patent licensor. The transformation product can be determined based on the basic product and at least one intellectual property result. The first operation task can be determined with each transformation plan to be evaluated as the evaluation object and the first evaluation target group as the evaluation indicator.
[0066] In one embodiment of the present application, basic product information and at least one intellectual property achievement can be input into the intellectual property achievement transformation system. The basic product information can include a feature set, cost, and selling price of the basic product. The intellectual property achievement can be a patent, and multiple intellectual property achievement information can be input, that is, multiple patent texts can be input. The input intellectual property achievement can be applied to the basic product to improve the basic product.
[0067] In one embodiment of the present application, available operating resources of a target device, multiple transformation schemes to be evaluated for a transformation product, a first evaluation target group, and a second evaluation target group may be obtained. The target device may be a server, and the available operating resources of the target device may represent the hardware and system resources used to process operating tasks (including the first operating task and the second operating task). The first evaluation target and the second evaluation target may be used to evaluate the pros and cons of each transformation scheme to be evaluated in a certain dimension, and the first evaluation target and the second evaluation target may be determined by an operator and input into the target device.
[0068] For example, the first evaluation target group may include cost (i.e., one first evaluation target), and the second evaluation target group may include cost, profit, production difficulty of the transformed product, and quality of the transformed product (i.e., four second evaluation targets).
[0069] A transformation product can be obtained based on a basic product and at least one intellectual property achievement. For example, the basic product can be an aircraft, and an aircraft with an improved vector nozzle (that is, a transformation product) can be obtained based on the aircraft and an intellectual property achievement (the intellectual property achievement can be an improvement on a certain part of the aircraft, such as an improvement on the vector nozzle). The basic product can be the product of the target enterprise. When the intellectual property achievement is a patent, the target enterprise can be the current right holder of the patent. There can be multiple transformation plans to be evaluated for the transformation product:
[0070] The first type: the patent licensing method is an exclusive license, and the licensor produces it itself.
[0071] The second type: the patent licensing method is an exclusive license, and the licensor does not produce it itself.
[0072] The third type: The patent licensing method is an exclusive license.
[0073] The fourth type: the patent licensing method is a general license, and the licensor produces it itself.
[0074] Fifth type: The patent licensing method is a general license, and the licensor does not produce it itself.
[0075] The sixth type: The patent licensing method is no licensing, and the licensor produces it by itself.
[0076] The seventh type: the patent licensing method is no licensing, and the licensor does not produce it itself.
[0077] The eighth type: The patent licensing method is open licensing, and the licensor produces it itself.
[0078] Ninth type: The patent licensing method is open licensing, and the licensor does not produce itself.
[0079] It should be noted that if multiple intellectual property achievements are applied to the basic product, a transformation product that applies multiple intellectual property achievements can be obtained. For this transformation product, the number of corresponding transformation schemes to be evaluated is greater than the number of transformation schemes to be evaluated for the transformation product that only applies one intellectual property achievement in the above embodiment. For example, if multiple parts on an aircraft are transformed with intellectual property achievements, the licensing method and production method of any intellectual property achievement need to be considered.
[0080] In one embodiment of the present application, for an intellectual property achievement, different licensing methods may correspond to different estimated licensing fees. The estimated licensing fees may be determined using a patent value assessment model. The estimated licensing fees may also be set to a preset value based on expert experience. The embodiment of the present application does not limit this.
[0081] In a possible implementation, if the intellectual property achievement is a patent, a keyword extraction model can be used to identify the content of the patent claims to obtain the patent feature set. The feature set of the patent and the feature set of the basic product are combined to determine the feature set of the transformed product. The cost of the transformed product can be determined based on the feature set of the transformed product. A neural network model can be pre-trained based on the feature sets and corresponding costs of different products, and the trained neural network model can be used to predict the cost of the transformed product based on the feature set of the transformed product.
[0082] Step S120: determining the resource demand corresponding to each first running task based on the first evaluation target group.
[0083] In one embodiment of the present application, the resource requirements corresponding to each first operation task can be determined based on the first evaluation target group. Since the first evaluation target group includes at least one first evaluation target, when the number of first evaluation targets in the first evaluation target group is different, the resource requirements corresponding to each first operation task are different. Different first resource requirements can be preset for the number of intellectual property achievements applied in the transformation product, and different second resource requirements can be preset for different first evaluation targets. The resource requirements of the first operation task are determined based on the number of intellectual property achievements applied in the transformation product and the first evaluation targets in the first evaluation target group. The sum of the first resource requirement and the second resource requirement can be determined as the resource requirement corresponding to each first operation task.
[0084] Exemplarily, there are three intellectual property achievements that can be transformed into intellectual property achievements based on the basic product m, namely n1, n2, and n3. The transformation products can include m+n1, m+n2, m+n3, m+n1+n2, m+n1+n3, m+n2+n3, and m+n1+n2+n3, that is, there can be 7 transformation products. The licensing method of each intellectual property achievement is different, and the production method of the licensor is different. Therefore, when the number of intellectual property achievements and the production method of the licensor are different, a transformation plan to be evaluated can be determined. The transformation products obtained based on the transformation of the basic product and one intellectual property achievement can correspond to 9 transformation plans to be evaluated.
[0085] It should be noted that, in the process of executing step S120, if historical data exists, the historical resource requirements of the historical transformation plans to be evaluated can be obtained from the historical data, and the historical resource requirements can be determined as the resource requirements of the target transformation plan to be evaluated. The target transformation plan to be evaluated has the same number of first evaluation targets as the historical transformation plan to be evaluated, and the number and type of intellectual property achievements applied in the transformation products are the same (for example, both are aircraft).
[0086] Step S130: grouping the plurality of first running tasks according to the available running resources of the target device and the resource requirements corresponding to the first running tasks to obtain at least one parallel running group.
[0087] The parallel operation group includes at least one first operation task.
[0088] In one embodiment of the present application, multiple first running tasks can be grouped according to the available running resources of the target device and the resource requirements corresponding to each first running task to obtain at least one parallel running group. The sum of the resource requirements corresponding to all first running tasks in the parallel running group is less than or equal to the available running resources, so as to ensure that all first running tasks in a parallel running group can be run in parallel on the target device at the same time.
[0089] It should be noted that the available operating resources of the target device may be used as the target resource amount, and the sum of the resource requirements corresponding to all first operating tasks in each parallel operating group should be as close to the target resource amount as possible.
[0090] Step S140, sequentially determining at least one parallel operation group as a target operation group, and executing all first operation tasks in the target operation group in parallel on a target device to obtain a first evaluation parameter group corresponding to each conversion scheme to be evaluated.
[0091] The first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameters in the first evaluation parameter group correspond one-to-one to the first evaluation targets in the first evaluation target group.
[0092] In one embodiment of the present application, at least one parallel operation group can be determined as a target operation group in turn, and all first operation tasks in the target operation group can be run in parallel on the target device to obtain the first evaluation parameter group corresponding to each conversion scheme to be evaluated. In this way, each target operation group can be run on the target device with full resources of the target device, and each first operation task in the target operation group can be run at the same time, which can avoid the problem of resource waste caused by running the first task alone. When running the first operation task, the first evaluation parameter corresponding to each first evaluation target in the first evaluation target group can be calculated based on the conversion scheme to be evaluated.
[0093] In a possible implementation, when the first evaluation target is sales volume, in step S140, the process of running all first operation tasks in the target operation group in parallel on the target device to obtain the first evaluation parameter group corresponding to each conversion plan to be evaluated may include steps S1411 to S1413.
[0094] Step S1411, obtaining the remaining time of the intellectual property rights corresponding to the technology life cycle and the intellectual property rights achievements.
[0095] In one embodiment of the present application, the technology life cycle can reflect the iteration and update time of the technology. Since the technology is iterated, the transformed product may lose its competitiveness. Therefore, the technology life cycle needs to be considered when transforming knowledge achievements. Since intellectual property rights have a certain protection period, the remaining time of intellectual property rights also needs to be considered when transforming intellectual property achievements. Based on the basic products and intellectual property achievements, the intellectual property achievements can be transformed to obtain transformed products.
[0096] It should be noted that the technology life cycle can be a value determined based on expert experience. The historical life cycle of historical transformation products in historical data can also be counted in advance, and the average of all historical life cycles can be determined as the technology life cycle, or any value can be selected from all historical life cycles to be determined as the technology life cycle. In an embodiment of the present application, if the intellectual property achievement is a patent, the remaining time of the intellectual property can be the remaining time that the patent owner enjoys the exclusive right to his invention.
[0097] Step S1412: if the technology life cycle is less than or equal to the remaining time of the intellectual property, the technology life cycle is determined as the predicted duration; if the technology life cycle is greater than the remaining time of the intellectual property, the remaining time of the intellectual property is determined as the predicted duration.
[0098] In one embodiment of the present application, if the technology life cycle is less than or equal to the remaining time of the intellectual property, the technology life cycle can be determined as the predicted duration. If the technology life cycle is less than or equal to the remaining time of the intellectual property, it can be considered that the technology iteration is fast, and before the remaining time of the intellectual property expires, the technology may have been iterated to produce new technology. At this time, the prediction time of the conversion product sales can focus on the technology life cycle.
[0099] In one embodiment of the present application, if the technology life cycle is greater than the remaining time of the intellectual property, the remaining time of the intellectual property can be determined as the prediction time. If the technology life cycle is greater than the remaining time of the intellectual property, the technology iteration is slow, and new technologies may not appear within the remaining time of the intellectual property. At this time, the prediction time for the sales volume of the conversion product can be based on the remaining time of the intellectual property.
[0100] For example, if the conversion product applies multiple intellectual property results, a sub-product can be determined based on the basic product and each intellectual property result (that is, multiple sub-products can be determined), each sub-product corresponds to a sub-prediction duration (the sub-prediction duration can be determined based on step S1412), and the minimum value of all sub-prediction durations is determined as the prediction duration.
[0101] Step S1413, based on the predicted duration, all first running tasks in each parallel running group are run in parallel on the target device to obtain first evaluation parameters of the conversion products corresponding to each conversion solution to be evaluated within the predicted duration.
[0102] That is, the sales volume of the conversion products corresponding to each conversion plan to be evaluated within the predicted period can be obtained.
[0103] In an exemplary embodiment, the first evaluation target may be conversion benefit, and the process of determining the first evaluation parameter (the value of the conversion benefit) corresponding to the first evaluation target may include steps S201 to S207.
[0104] Step S201, predicting the first sales volume of the target enterprise's conversion product in each conversion plan to be evaluated within the prediction period.
[0105] The first sales volume is the sales volume of the conversion product within the forecast period. When the first evaluation target is the sales volume of the conversion product, the goal of the first running task is to determine the first sales volume (that is, the first evaluation parameter) of the conversion product corresponding to each conversion plan to be evaluated within the forecast period.
[0106] In one embodiment of the present application, the first sales volume of the conversion product of the target enterprise in each conversion scheme to be evaluated within the predicted time period can be predicted. Since the conversion schemes to be evaluated are different, the first sales volume of the conversion product of the target enterprise in different conversion schemes to be evaluated within the predicted time period is also different.
[0107] In a possible implementation, the intellectual property achievement is a patent. When making the first sales forecast, the market share of the basic product of all similar manufacturing enterprises including the target enterprise can be determined first (the similar manufacturing enterprises can be enterprises of the same type as the basic product of the target enterprise and can use the transformation product). Predict the total sales volume of all similar manufacturing enterprises that can produce the transformation product in each transformation plan to be evaluated. Based on the market share and total sales volume, determine the first sales volume of the transformation product of the target enterprise in each transformation plan to be evaluated within the forecast period. The product of the market share of the target enterprise in all the products that are authorized to produce the transformation and the total sales volume can be determined as the first sales volume.
[0108] For example, A is the target enterprise (also the patent owner), B is the licensee, and all similar manufacturing enterprises are A, B, and C. The market share of the basic product is 2:3:5, and the predicted total sales volume is 100,000. Then the first sales volume of the target enterprise can be 10×2 / (2+3)=40,000.
[0109] Exemplarily, to predict the total sales volume of all transformed products of all similar manufacturing enterprises within a preset time period, a feature set of the transformed products can be obtained; the sales volume of the marketed products having all or part of the features in the feature set of the transformed products can be obtained; a feature subset can be selected from the feature set, and multiple similar products having the features in the feature subset and being similar to the transformed products in the feature subset can be screened out from the marketed products; and the weighted average of the sales volume of multiple similar products within the prediction time period can be used as the first sales volume of the transformed product within the prediction time period.
[0110] In one embodiment of the present application, when the technology life cycle is greater than the remaining time of the intellectual property rights and the predicted duration is the remaining time of the intellectual property rights, the process of predicting the first sales volume of the target enterprise's transformation products in each transformation plan to be evaluated within the predicted duration may include predicting the initial sales volume of each transformation plan to be evaluated within the remaining time of the intellectual property rights. The difference between the technology life cycle and the remaining time of the intellectual property rights is determined as the difference time, and the difference sales volume within the difference time is predicted according to the transformation plan to be evaluated that is openly licensed and produced by itself. The sum of the initial sales volume and the difference sales volume is determined as the first sales volume corresponding to each transformation plan to be evaluated.
[0111] In one embodiment of the present application, if the intellectual property achievement is a patent, and the technology life cycle is greater than the remaining time of the intellectual property, it means that after the expiration of the time when the patent owner enjoys the exclusive right to his invention, the technology has not yet been iterated, and no other new products that are different from the transformed products have appeared. At this time, the initial sales volume of each transformation plan to be evaluated within the remaining time of the intellectual property can be predicted. After that, the difference time between the technology life cycle and the remaining time of the intellectual property can be determined. During the difference time, all similar manufacturing companies can produce and manufacture transformed products. At this time, the difference sales volume within the difference time can be predicted according to the transformation plan to be evaluated that is openly licensed and produced by itself. Finally, the sum of the initial sales volume and the difference sales volume can be determined as the first sales volume corresponding to each transformation plan to be evaluated. Among them, the determination of the estimated licensing fee only considers the remaining time of the intellectual property.
[0112] Step S202, obtaining the second sales volume of the basic product during the forecast period.
[0113] In one embodiment of the present application, the second sales volume of the basic product during the forecast period may be obtained.
[0114] In an exemplary embodiment, the process of obtaining the second sales volume of the basic product within the prediction period may include obtaining historical sales data of the basic product; obtaining a sales volume trend function of the basic product based on the historical sales data; and predicting the second sales volume of the basic product within a preset period based on the sales volume trend function.
[0115] In another exemplary embodiment, the process of obtaining the second sales volume of the basic product within the prediction period may include obtaining historical sales data and a sales prediction model of the basic product; and inputting the historical sales data into the sales prediction model to predict the second sales volume of the basic product within a preset period.
[0116] Step S203, determining the sales increment corresponding to each conversion solution to be evaluated according to the first sales volume and the second sales volume.
[0117] In one embodiment of the present application, the sales increment corresponding to each conversion scheme to be evaluated can be determined based on the first sales and the second sales. Since each conversion scheme to be evaluated corresponds to a first sales, the difference between the first sales and the second sales can be determined as the sales increment corresponding to each conversion scheme to be evaluated.
[0118] In an exemplary embodiment, the process of determining the sales increment corresponding to each transformation scheme to be evaluated according to the first sales volume and the second sales volume may include obtaining the theoretical output of the transformation product produced by the target enterprise, the theoretical output being the output when the marginal revenue of the transformation product is equal to the marginal cost; comparing the theoretical output with the first sales volume; if the theoretical output is greater than the first sales volume, determining the first sales volume as the actual output; if the theoretical output is less than or equal to the first sales volume, determining the theoretical output as the actual output; and determining the sales increment according to the actual output and the second sales volume. The difference between the actual output and the second sales volume may be determined as the sales increment.
[0119] Among them, marginal cost refers to the additional cost of producing an additional unit of transformed product. Marginal revenue refers to the additional revenue from selling an additional unit of transformed product. When marginal revenue equals marginal cost, it means that the cost of producing an additional unit of transformed product is equal to the revenue from selling an additional unit of transformed product, which can represent the target enterprise's most profitable output when producing transformed products.
[0120] Step S204: determining a cost increment based on the basic cost and the conversion cost, and determining a price increment based on the basic selling price and the conversion selling price.
[0121] In one embodiment of the present application, the cost increment may be determined based on the base cost and the conversion cost, and the price increment may be determined based on the base selling price and the conversion selling price. Exemplarily, the difference between the conversion cost and the base cost may be determined as the cost increment, and the difference between the conversion selling price and the base selling price may be determined as the price increment. The conversion cost is the cost of the conversion product. The conversion selling price is the selling price of the conversion product. The base cost is the cost of the base product, and the base selling price is the selling price of the base product.
[0122] Step S205, determining the premium income corresponding to each conversion scheme to be evaluated based on the cost increment, the price increment, the sales increment, and the second sales volume.
[0123] In one embodiment of the present application, the premium income corresponding to each transformation scheme to be evaluated can be determined based on the cost increment, price increment, sales increment, and second sales volume. The premium income can represent the increased value of the transformation product relative to the basic product. The transformation product may have a higher market value than the basic product, so that the transformation selling price of the transformation product exceeds the value of the basic product, thereby generating additional income.
[0124] For example, the conversion cost is x1, the conversion price is x2, and the first sales volume is Q1. The basic cost is y1, the basic price is y2, and the second sales volume is Q2. Cost increment o=x1-y1; price increment p=x2-y2; sales increment q=Q1-Q2, premium income E=(po)×(q+Q2).
[0125] For example, the conversion cost is x1, the conversion price is x2, the first sales volume is Q1, the theoretical output is T, and the actual output is Z=min(Q1, T). The basic cost is y1, the basic selling price is y2, and the second sales volume is Q2. Cost increment o=x1-y1; price increment p=x2-y2; sales increment q=Z-Q2, premium income E=(po)×(q+Q2).
[0126] Step S206, determining the sales increment profit corresponding to each conversion scheme to be evaluated according to the basic cost, the basic selling price, and the sales increment corresponding to each conversion scheme to be evaluated.
[0127] In one embodiment of the present application, the sales increment profit corresponding to each conversion scheme to be evaluated can be determined based on the basic cost, the basic selling price, and the sales increment corresponding to each conversion scheme to be evaluated.
[0128] Exemplarily, the difference between the basic selling price and the basic cost may be first determined as the basic unit profit, and the product of the basic unit profit and the sales increment corresponding to each conversion scheme to be evaluated may be determined as the sales increment profit corresponding to each conversion scheme to be evaluated.
[0129] Step S207, based on the premium income, the incremental sales profit, and the estimated licensing fee, the conversion income corresponding to each conversion scheme to be evaluated is determined.
[0130] In one embodiment of the present application, the conversion income corresponding to each conversion scheme to be evaluated can be determined based on the premium income, the sales incremental profit, and the estimated license fee. The conversion income of each conversion scheme to be evaluated can be the sum of the sales incremental profit, the premium income, and the estimated license fee of each conversion scheme to be evaluated.
[0131] Step S150: screening the transformation schemes to be evaluated based on the first evaluation parameter group to obtain at least one intermediate transformation scheme.
[0132] In one embodiment of the present application, the transformation schemes to be evaluated can be screened once based on the first evaluation parameter group to obtain at least one intermediate transformation scheme. Some transformation schemes to be evaluated can be screened out from all the transformation schemes to be evaluated, and the screened transformation schemes to be evaluated can be determined as intermediate transformation schemes. In this way, the transformation schemes to be evaluated are screened once, and some transformation schemes to be evaluated whose evaluation targets do not meet expectations can be eliminated, and fewer intermediate transformation schemes can be screened twice in subsequent steps.
[0133] It should be noted that the first evaluation target group may be an evaluation indicator that is more important for the transformation scheme to be evaluated. If the first evaluation parameter group of the transformation scheme to be evaluated does not meet the preset requirements, the second evaluation parameter group of the transformation scheme to be evaluated will not be determined as the target transformation scheme even if it meets the preset requirements. Therefore, the first evaluation target group can be used to screen the transformation scheme to be evaluated.
[0134] In a possible implementation, the process of screening the transformation schemes to be evaluated based on the first evaluation parameter group to obtain at least one intermediate transformation scheme in step S150 may include steps S1511 to S1513.
[0135] Step S1511, sequentially determine each first evaluation parameter group as an array to be screened.
[0136] In one embodiment of the present application, each first evaluation parameter group may be determined as an array to be screened in sequence.
[0137] Step S1512 , comparing each first evaluation parameter in the array to be screened and a first preset interval corresponding to each first evaluation parameter.
[0138] In one embodiment of the present application, each first evaluation parameter in the array to be screened and the first preset interval corresponding to each first evaluation parameter can be compared. Each first evaluation parameter corresponds to a first preset interval. The corresponding first preset interval can be determined based on any first evaluation target, and the first evaluation parameter can be compared with the first preset interval based on the corresponding relationship between the first evaluation target and the first evaluation parameter.
[0139] Step S1513: if all the first evaluation parameters in the array to be screened belong to the corresponding first preset interval, the transformation scheme to be evaluated corresponding to the array to be screened is determined as an intermediate transformation scheme.
[0140] In one embodiment of the present application, if all the first evaluation parameters in the array to be screened belong to the corresponding first preset interval, it can be determined that the transformation scheme to be evaluated corresponding to the array to be screened can meet the screening requirements. At this time, the transformation scheme to be evaluated corresponding to the array to be screened can be determined as an intermediate transformation scheme.
[0141] Exemplarily, if the array to be screened includes two first evaluation parameters, the first preset interval corresponding to one of the first evaluation parameters may be [j1, j2], and the first preset interval corresponding to the other first evaluation parameter may be [k1, k2]. Then, when one first evaluation parameter belongs to [j1, j2], and the other first evaluation parameter belongs to [k1, k2], the transformation scheme to be evaluated corresponding to the array to be screened may be determined as an intermediate transformation scheme.
[0142] In another possible implementation, the first evaluation target group includes a first evaluation target, the first evaluation parameter group includes a first evaluation parameter, and each transformation scheme to be evaluated corresponds to a first evaluation parameter (that is, the transformation scheme to be evaluated corresponds to the first evaluation parameter one by one). The process of screening the transformation scheme to be evaluated based on the first evaluation parameter group in step S150 to obtain at least one intermediate transformation scheme may include steps S1521 to S1524.
[0143] Step S1521, sorting the first evaluation parameters corresponding to each transformation scheme to be evaluated to obtain a parameter sequence.
[0144] In one embodiment of the present application, the first evaluation parameters corresponding to the transformation schemes to be evaluated may be sorted to obtain a parameter sequence, which may be sorted in ascending order or in descending order.
[0145] Step S1522: determining a reference parameter from among a plurality of first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target.
[0146] In one embodiment of the present application, the reference parameter can be determined from a plurality of first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target. The operator can pre-set a corresponding preset evaluation strategy for each first evaluation target.
[0147] For example, when the first evaluation target is cost, the preset evaluation strategy may be to find the first evaluation parameter with the smallest value in the parameter sequence, and determine the first evaluation parameter as the benchmark parameter. For example, when the first evaluation target is profit, the target evaluation strategy may be to find the first evaluation parameter with the largest value in the parameter sequence, and determine the first evaluation parameter as the benchmark parameter.
[0148] Step S1523: In the parameter sequence, a preset number of first evaluation parameters including the reference parameter are determined as the required parameters.
[0149] In one embodiment of the present application, a preset number of first evaluation parameters including a reference parameter may be determined as demand parameters in a parameter sequence.
[0150] In a possible scenario, the preset number includes a first preset number and a second preset number, and in a parameter sequence, the process of determining a preset number of multiple first evaluation parameters including a benchmark parameter as the required parameters may include, in the parameter sequence, determining the actual number of first evaluation parameters between the preset parameter threshold and the benchmark parameter; if the actual number is greater than the first preset number, then in the parameter sequence, determining a first preset number of multiple first evaluation parameters including the benchmark parameter as the required parameters; if the actual number is less than the second preset number, then in the parameter sequence, determining a second preset number of multiple first evaluation parameters including the benchmark parameter as the required parameters.
[0151] It should be noted that the second preset number is smaller than the first preset number. The preset evaluation strategy corresponding to the first evaluation target may include a preset parameter threshold. That is, different first evaluation targets may correspond to different preset parameter thresholds.
[0152] Step S1524: determine the transformation plan to be evaluated corresponding to the demand parameter as the intermediate transformation plan.
[0153] In one embodiment of the present application, the transformation scheme to be evaluated corresponding to the demand parameter may be determined as an intermediate transformation scheme.
[0154] Step S160, determine multiple second operating tasks based on each intermediate conversion scheme and the second evaluation target group, run each second operating task in sequence on the target device to determine the second evaluation parameter group corresponding to each intermediate conversion scheme, and perform secondary screening on the intermediate conversion scheme according to the second evaluation parameter group to obtain the target conversion scheme.
[0155] The second evaluation parameter group includes a plurality of second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
[0156] In one embodiment of the present application, after a screening, compared with all the transformation schemes to be evaluated, the number of intermediate transformation schemes at this time is small, and the transformation schemes to be evaluated that do not meet the preset requirements can be eliminated through a screening. The parallel operation target operation group can process multiple first operation tasks in parallel, which can reduce the operation time. In addition, when the second operation task is run after a screening of the transformation scheme to be evaluated, the number of second operation tasks to be run can be reduced, and the target transformation scheme can be determined in the more streamlined intermediate transformation scheme. The second operation task corresponds to multiple second evaluation targets, and the evaluation of the transformation scheme to be evaluated is more comprehensive. At this time, more operation resources are required to run the second operation task, so it is necessary to run each second operation task in sequence.
[0157] It should be noted that the intellectual property achievement transformation system can be deployed on the target device, and the intellectual property achievement transformation system can determine the first operating task and the second operating task.
[0158] In a possible implementation, the process of performing secondary screening on the intermediate conversion schemes according to the second evaluation parameter group to obtain the target conversion scheme in step S160 may include step S161 and step S162.
[0159] Step S161, sequentially determining each second evaluation parameter group as a second array.
[0160] In one embodiment of the present application, each second evaluation parameter group may be sequentially determined as a second array.
[0161] Step S162, obtaining a target evaluation parameter based on a plurality of second evaluation parameters in the second array.
[0162] In one embodiment of the present application, the target evaluation parameter can be obtained based on the multiple second evaluation parameters in the second array. For example, the second evaluation parameter can include the second evaluation parameter corresponding to the cost, the second evaluation parameter corresponding to the profit, and the production difficulty. The ratio of the profit to the cost can be first determined as the return on investment, and the sum of the return on investment and the production difficulty can be determined as the target evaluation parameter.
[0163] It should be noted that if all parameter evaluation strategies for commenting on the second evaluation parameters are that the larger the value, the better, then the sum of all second evaluation parameters in the second array can be determined as the target evaluation parameter. If there is a parameter evaluation strategy for any second evaluation parameter that the smaller the value, the better, then it is necessary to set a corresponding preset conversion scheme for the second evaluation parameter to convert the second evaluation parameter into a conversion parameter with a larger value, the better, and determine the sum of all conversion parameters in the second array and other second evaluation parameters except the conversion parameter as the target evaluation parameter.
[0164] Step S163: determine the intermediate conversion solution corresponding to the maximum value of the target evaluation parameter as the target conversion solution.
[0165] In one embodiment of the present application, each intermediate transformation scheme corresponds to a target evaluation parameter, and the intermediate transformation scheme corresponding to the maximum value of all target evaluation parameters can be determined as the target transformation scheme. The target enterprise can transform and apply the intellectual property results according to the target transformation scheme.
[0166] In one embodiment of the present application, after executing step S160 to obtain the target conversion solution, steps S310 to S330 may also be executed.
[0167] Step S310, obtaining the maximum production capacity of the target enterprise.
[0168] In one embodiment of the present application, the maximum production capacity of the target enterprise can be obtained. The maximum production capacity can represent the production limit of the enterprise using the current existing equipment under the best production state, that is, the maximum output. The maximum production capacity can be a preset value, and the operator can preset the maximum production capacity of the target enterprise according to the production capacity of the target enterprise.
[0169] Step S320, comparing the maximum production capacity and the actual output.
[0170] In one embodiment of the present application, the maximum production capacity and the actual output can be compared. Comparing the maximum production capacity and the actual output can determine whether it is necessary to expand the production of the target enterprise.
[0171] It should be noted that the theoretical output of the conversion product produced by the target enterprise can be obtained first; the theoretical output and the first sales volume can be compared; if the theoretical output is greater than the first sales volume, the first sales volume can be determined as the actual output; if the theoretical output is less than or equal to the first sales volume, the theoretical output can be determined as the actual output.
[0172] Step S330: If the maximum production capacity is less than the actual output, expansion is performed based on the target expansion strategy.
[0173] In one embodiment of the present application, if the maximum capacity is less than the actual output, then the target expansion strategy is used to expand the production. If the maximum capacity is greater than or equal to the actual output, it indicates that the quantity of the target enterprise's production of the conversion product can meet the demand, and there is no need to expand the target enterprise.
[0174] In one embodiment of the present application, the target expansion strategy may include determining the difference between the actual output and the maximum output as the output increment; determining the incremental revenue and the expansion cost according to the output increment; if the incremental revenue is greater than the expansion cost, then expansion is performed; if the incremental revenue is less than or equal to the expansion cost, then no expansion is performed. The sign of the output increment is positive.
[0175] It should be noted that the operator can pre-set the cost of adding a production line and the increase in output of a production line. Based on the output increment, the number of production lines that need to be added can be calculated, and the cost of expansion can be obtained. The difference between the conversion price and the conversion cost can be first determined as the conversion unit profit, and the product of the conversion unit profit and the output increment can be determined as the incremental income.
[0176] In summary, the scheme of the embodiment of the present application performs a screening of each transformation scheme to be evaluated by running all the first tasks in the target operation group in parallel on the target device, and after the screening, multiple second operation tasks are determined according to the intermediate transformation scheme obtained by the screening and the second evaluation target group, and each second operation task is sequentially run on the target device to determine the target transformation scheme. Since the number of second evaluation targets is greater than the number of first evaluation targets, when running each first operation task in parallel, the transformation scheme to be evaluated can be screened faster based on the first evaluation target, and when running the second operation task, the transformation scheme to be evaluated after the initial screening can be evaluated more comprehensively. With such a setting, not only can the available operation resources of the target device be fully utilized, but also the transformation scheme to be evaluated that obviously does not meet the first evaluation target can be quickly eliminated, thereby improving the operation speed of the intellectual property achievement transformation system.
[0177] Figure 2 FIG. 1 is a structural block diagram of an operation system of an intellectual property achievement transformation system shown in an exemplary embodiment of the present application. Figure 2 As shown, the operating system 200 of the exemplary intellectual property achievement transformation system includes:
[0178] The data acquisition module 210 is used to obtain the available operating resources of the target device, multiple transformation schemes to be evaluated for the transformation product, a first evaluation target group, and a second evaluation target group. Based on each transformation scheme to be evaluated and the first evaluation target group, a plurality of first operating tasks are determined. The transformation product is obtained by transforming the intellectual property results based on the basic product. The first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group.
[0179] The first determination module 220 is used to determine the resource demand corresponding to each first running task based on the first evaluation target group.
[0180] The execution module 230 is used to group multiple first running tasks according to the available running resources of the target device and the resource requirements corresponding to each first running task to obtain at least one parallel running group, and the parallel running group includes at least one first running task.
[0181] The second determination module 240 is used to sequentially determine at least one parallel operation group as a target operation group, and to run all first operation tasks in the target operation group in parallel on the target device to obtain a first evaluation parameter group corresponding to each conversion scheme to be evaluated, wherein the first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameter in the first evaluation parameter group corresponds one-to-one to the first evaluation target in the first evaluation target group.
[0182] The first screening module 250 is used to screen the transformation schemes to be evaluated based on the first evaluation parameter group to obtain at least one intermediate transformation scheme.
[0183] The second screening module 260 is used to determine multiple second operating tasks based on each intermediate conversion scheme and the second evaluation target group, and to run each second operating task in sequence on the target device to determine the second evaluation parameter group corresponding to each intermediate conversion scheme, and to perform secondary screening on the intermediate conversion scheme according to the second evaluation parameter group to obtain a target conversion scheme. The second evaluation parameter group includes multiple second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
[0184] In one embodiment of the present application, the first screening module includes:
[0185] A first determining unit, used to sequentially determine each first evaluation parameter group as an array to be screened;
[0186] A first comparison unit, used for comparing each first evaluation parameter in the array to be screened and a first preset interval corresponding to each first evaluation parameter;
[0187] The second determining unit is configured to determine the to-be-evaluated conversion scheme corresponding to the to-be-screened array as an intermediate conversion scheme if all the first evaluation parameters in the to-be-screened array belong to the corresponding first preset interval.
[0188] In one embodiment of the present application, the first evaluation target group includes a first evaluation target, and the first screening module further includes:
[0189] A third determining unit is used to sort the first evaluation parameters corresponding to each transformation scheme to be evaluated to obtain a parameter sequence;
[0190] a fourth determining unit, configured to determine a reference parameter from among a plurality of first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target;
[0191] a fifth determining unit, configured to determine, in the parameter sequence, a preset number of first evaluation parameters including the reference parameter as the required parameter;
[0192] The sixth determining unit is used to determine the transformation scheme to be evaluated corresponding to the demand parameter as an intermediate transformation scheme.
[0193] In one embodiment of the present application, the preset number includes a first preset number and a second preset number, and the fifth determining unit is further configured to:
[0194] In the parameter sequence, determining an actual number of first evaluation parameters between a preset parameter threshold and a reference parameter;
[0195] If the actual number is greater than the first preset number, in the parameter sequence, a plurality of first evaluation parameters including a first preset number of the reference parameters are determined as the demand parameters;
[0196] If the actual number is less than the second preset number, a plurality of first evaluation parameters of the second preset number including the reference parameter are determined as the demand parameters in the parameter sequence.
[0197] In one embodiment of the present application, the second screening module is further used for:
[0198] sequentially determining each second evaluation parameter group as a second array;
[0199] Based on the plurality of second evaluation parameters in the second array, obtaining a target evaluation parameter;
[0200] The intermediate transformation scheme corresponding to the maximum value of the target evaluation parameter is determined as the target transformation scheme.
[0201] In one embodiment of the present application, the first evaluation target is the sales volume of the converted product, and the second determination module may also be used to:
[0202] Obtain the remaining time of intellectual property rights corresponding to the technology life cycle and intellectual property achievements;
[0203] If the technology life cycle is less than or equal to the remaining time of the intellectual property, the technology life cycle is determined as the predicted duration; if the technology life cycle is greater than the remaining time of the intellectual property, the remaining time of the intellectual property is determined as the predicted duration;
[0204] Based on the predicted duration, all first running tasks in each parallel running group are run in parallel on the target device to obtain first evaluation parameters of the conversion products corresponding to each conversion scheme to be evaluated within the predicted duration.
[0205] It should be noted that the operating system of the intellectual property achievement transformation system provided in the above embodiment and the operating method of the intellectual property achievement transformation system provided in the above embodiment belong to the same concept, wherein the specific manner in which each module and unit performs the operation has been described in detail in the method embodiment and will not be repeated here. In practical applications, the operating system of the intellectual property achievement transformation system provided in the above embodiment can allocate the above functions to different functional modules as needed, that is, divide the internal structure of the system into different functional modules to complete all or part of the functions described above, and this is not limited here.
[0206] An embodiment of the present application also provides an electronic device, comprising: one or more processors; a storage device for storing one or more programs, and when the one or more programs are executed by one or more processors, the electronic device implements the operating method of the intellectual property achievement transformation system provided in the above-mentioned embodiments.
[0207] Another aspect of the present application further provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor of a computer, the computer executes the operation method of the intellectual property achievement transformation system provided in the above embodiments. The computer-readable storage medium may be included in the electronic device described in the above embodiments, or may exist independently without being assembled into the electronic device.
[0208] Another aspect of the present application also provides a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. The processor of the computer device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the operation method of the intellectual property achievement transformation system provided in each of the above embodiments.
[0209] In the embodiments of the present application, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. "Including" and "comprising" mentioned throughout the specification and claims are open-ended terms and should be interpreted as "including but not limited to".
[0210] The above embodiments are merely illustrative of the principles and effects of the present application, and are not intended to limit the present application. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present application. Therefore, all equivalent modifications or changes made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed in the present application shall still be covered by the claims of the present application.
Claims
1. An operation method of an intellectual property achievement transformation system, characterized in that: include: Obtaining available operating resources of a target device, a plurality of transformation schemes to be evaluated for a transformation product, a first evaluation target group, and a second evaluation target group, and determining a plurality of first operating tasks based on each of the transformation schemes to be evaluated and the first evaluation target group, wherein the transformation product is obtained by transforming an intellectual property achievement on the basis of a basic product, the first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group; The target device is a server, and the available operating resources of the target device represent the hardware and system resources used to process the operating tasks; Determine the resource demand corresponding to each of the first operating tasks based on the first evaluation target group; When the number of first evaluation targets in the first evaluation target group is different, the resource requirements corresponding to each first running task are different; According to the available operating resources of the target device and the resource requirements corresponding to each first operating task, a plurality of the first operating tasks are grouped to obtain at least one parallel operating group, wherein the parallel operating group includes at least one first operating task; the sum of the resource requirements corresponding to all the first operating tasks in the parallel operating group is less than or equal to the available operating resources, so as to ensure that all the first operating tasks in one parallel operating group are simultaneously and parallelly operated on the target device; At least one of the parallel operation groups is sequentially determined as a target operation group, and all first operation tasks of the target operation group are run in parallel on the target device to obtain a first evaluation parameter group corresponding to each of the transformation schemes to be evaluated, wherein the first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameter in the first evaluation parameter group corresponds one-to-one to the first evaluation target in the first evaluation target group; Based on the first evaluation parameter group, the transformation scheme to be evaluated is screened once to obtain at least one intermediate transformation scheme; Based on each of the intermediate conversion schemes and the second evaluation target group, multiple second operating tasks are determined, and each of the second operating tasks is run in sequence on the target device to determine the second evaluation parameter group corresponding to each of the intermediate conversion schemes, and the intermediate conversion schemes are secondary screened according to the second evaluation parameter group to obtain a target conversion scheme, wherein the second evaluation parameter group includes multiple second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
2. The operating method of the intellectual property achievement transformation system according to claim 1 is characterized in that: The transformation scheme to be evaluated is screened based on the first evaluation parameter group to obtain at least one intermediate transformation scheme, including: Determining each first evaluation parameter group as an array to be screened in sequence; Comparing each first evaluation parameter in the to-be-screened array with a first preset interval corresponding to each first evaluation parameter; If all the first evaluation parameters in the array to be screened belong to the corresponding first preset interval, the transformation scheme to be evaluated corresponding to the array to be screened is determined as an intermediate transformation scheme.
3. The operating method of the intellectual property achievement transformation system according to claim 1 is characterized in that: The first evaluation target group includes a first evaluation target, and the transformation scheme to be evaluated is screened based on the first evaluation parameter group to obtain at least one intermediate transformation scheme, including: Sorting the first evaluation parameters corresponding to the transformation schemes to be evaluated to obtain a parameter sequence; Determining a benchmark parameter from among a plurality of the first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target; In the parameter sequence, a preset number of first evaluation parameters including the reference parameter are determined as the demand parameters; The transformation scheme to be evaluated corresponding to the demand parameter is determined as an intermediate transformation scheme.
4. The operating method of the intellectual property achievement transformation system according to claim 3 is characterized in that: The preset number includes a first preset number and a second preset number. In the parameter sequence, a preset number of first evaluation parameters including a reference parameter are determined as demand parameters, including: In the parameter sequence, determining an actual number of first evaluation parameters between a preset parameter threshold and a reference parameter; If the actual number is greater than the first preset number, in the parameter sequence, a plurality of first evaluation parameters including a first preset number of reference parameters are determined as demand parameters; If the actual number is less than the second preset number, then in the parameter sequence, a plurality of first evaluation parameters of the second preset number including the reference parameters are determined as the demand parameters.
5. The operating method of the intellectual property achievement transformation system according to claim 1 is characterized in that: The intermediate transformation scheme is screened again according to the second evaluation parameter group to obtain a target transformation scheme, including: sequentially determining each of the second evaluation parameter groups as a second array; Obtaining a target evaluation parameter based on a plurality of second evaluation parameters in the second array; The intermediate conversion scheme corresponding to the maximum value of the target evaluation parameter is determined as the target conversion scheme.
6. The operating method of the intellectual property achievement transformation system according to claim 3 is characterized in that: The first evaluation target is the sales volume of the converted product. All first operation tasks in the target operation group are run in parallel on the target device to obtain a first evaluation parameter group corresponding to each conversion scheme to be evaluated, including: Obtain the remaining time of intellectual property rights corresponding to the technology life cycle and intellectual property achievements; If the technology life cycle is less than or equal to the remaining time of the intellectual property, the technology life cycle is determined as the predicted duration; if the technology life cycle is greater than the remaining time of the intellectual property, the remaining time of the intellectual property is determined as the predicted duration; Based on the predicted duration, all first running tasks in each of the parallel running groups are run in parallel on the target device to obtain first evaluation parameters of the conversion products corresponding to each of the conversion solutions to be evaluated within the predicted duration.
7. An operating system for an intellectual property achievement transformation system, characterized in that: include: A data acquisition module, used to acquire available operating resources of a target device, a plurality of transformation schemes to be evaluated for a transformation product, a first evaluation target group, and a second evaluation target group, and determine a plurality of first operating tasks based on each of the transformation schemes to be evaluated and the first evaluation target group, wherein the transformation product is obtained by transforming an intellectual property achievement on the basis of a basic product, the first evaluation target group includes at least one first evaluation target, and the number of second evaluation targets included in the second evaluation target group is greater than the number of first evaluation targets included in the first evaluation target group; The target device is a server, and the available operating resources of the target device represent the hardware and system resources used to process the operating tasks; A first determination module, configured to determine a resource requirement corresponding to each of the first operating tasks based on the first evaluation target group; When the number of first evaluation targets in the first evaluation target group is different, the resource requirements corresponding to each first running task are different; An execution module, configured to group a plurality of the first running tasks according to the available running resources of the target device and the resource requirements corresponding to each first running task, to obtain at least one parallel running group, wherein the parallel running group includes at least one first running task; the sum of the resource requirements corresponding to all the first running tasks in the parallel running group is less than or equal to the available running resources, so as to ensure that all the first running tasks in one parallel running group are simultaneously and parallelly run on the target device; A second determination module is used to sequentially determine at least one of the parallel operation groups as a target operation group, and to parallelly run all the first operation tasks in the target operation group on the target device to obtain a first evaluation parameter group corresponding to each of the conversion schemes to be evaluated, wherein the first evaluation parameter group includes at least one first evaluation parameter, and the first evaluation parameter in the first evaluation parameter group corresponds one-to-one to the first evaluation target in the first evaluation target group; A first screening module, used for screening the transformation scheme to be evaluated based on the first evaluation parameter group to obtain at least one intermediate transformation scheme; The second screening module is used to determine multiple second operating tasks based on each of the intermediate conversion schemes and the second evaluation target group, and to run each of the second operating tasks in sequence on the target device to determine the second evaluation parameter group corresponding to each of the intermediate conversion schemes, and to perform secondary screening on the intermediate conversion schemes according to the second evaluation parameter group to obtain a target conversion scheme, wherein the second evaluation parameter group includes multiple second evaluation parameters, and the second evaluation parameters in the second evaluation parameter group correspond one-to-one to the second evaluation targets in the second evaluation target group.
8. The operating system of the intellectual property achievement transformation system according to claim 7 is characterized in that: The first screening module includes: A first determining unit, used to sequentially determine each first evaluation parameter group as an array to be screened; A first comparison unit, used for comparing each first evaluation parameter in the array to be screened and a first preset interval corresponding to each first evaluation parameter; The second determining unit is configured to determine the to-be-evaluated conversion scheme corresponding to the to-be-screened array as an intermediate conversion scheme if all the first evaluation parameters in the to-be-screened array belong to the corresponding first preset interval.
9. The operating system of the intellectual property achievement transformation system according to claim 7 is characterized in that: The first evaluation target group includes a first evaluation target, and the first screening module further includes: A third determining unit is used to sort the first evaluation parameters corresponding to the transformation schemes to be evaluated to obtain a parameter sequence; a fourth determining unit, configured to determine a reference parameter from among the plurality of first evaluation parameters based on a preset evaluation strategy corresponding to the first evaluation target; a fifth determining unit, configured to determine, in the parameter sequence, a preset number of first evaluation parameters including the reference parameter as the required parameter; The sixth determining unit is used to determine the to-be-evaluated conversion scheme corresponding to the demand parameter as an intermediate conversion scheme.
10. The operating system of the intellectual property achievement transformation system according to claim 9 is characterized in that: The preset number includes a first preset number and a second preset number, and the fifth determining unit is further used for: In the parameter sequence, determining an actual number of first evaluation parameters between a preset parameter threshold and a reference parameter; If the actual number is greater than the first preset number, in the parameter sequence, a plurality of first evaluation parameters including a first preset number of reference parameters are determined as demand parameters; If the actual number is less than the second preset number, then in the parameter sequence, a plurality of first evaluation parameters of the second preset number including the reference parameters are determined as the demand parameters.
Citation Information
Patent Citations
Patent value degree evaluation method and a computer readable storage medium
CN108694462A
System and method for evaluating performance of achievement transformation
CN118278821A
Patent value evaluation device and patent value evaluation method
JP2018067274A
System and method for quantitatively evaluating the result of research / development technology
KR1020120105914A
System and method for quantitatively predicting and evaluating the result of research / development technology
KR1020120105916A
